Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
Monday 1 to Sunday 7 March 2021 Line Select the line for more info Day(s) affected Reference: STN or TAA
Mobile devices must be connected via VPN
Bussing View timetable
WD WE
No planned trackwork
Central – Circular Quay
No planned trackwork
No planned trackwork
No planned trackwork
No planned trackwork
Weekend STN 0384
Weekend STN 0384
Weekend STN 0384
No planned trackwork
No planned trackwork
Weekend STN 0384
No planned trackwork
Monday – Friday STN 0187
Monday – Thursday STN 0294
Wednesday Saturday
STN 0305 + TAA 0266 STN 0384 + TAA 0307
Weekend STN 0384
No planned trackwork
Trackwork Bussing Map Special Events extract Key: Next week’s trackwork Feedback form Click to view the bus timetable
Scope of work: Configuration 12 Bus timetable is not available
Please use this guide to advise Sydney Metro, Sydney Trains and NSW TrainLink Intercity customers of trackwork affecting their journey. Please make this guide available to all staff at your location.
Easy access alternate transport Staff should contact ROC Customer & Information on 7 7039 if alternate transport is required for customers requiring easy access transport when travelling through areas affected by trackwork.
210301 Trackwork Reference Guide JK Current as of Wednesday, February 24, 2021 Produced by the CIU Trackwork Information Team [email protected]
Trackwork Altered transport arrangements Sydney Metro, Sydney Trains and NSW TrainLink Intercity services Monday 1 to Sunday 7 March
02:00 Saturday 6 to 02:00 Monday 8 March Reference: STN 0384 Work: Configuration 12 • Some trains run to a changed timetable and stopping pattern.• Daily from 08:00 to 20:30, extra trains run between Ashfield and Kingsgrove via the City and
Airport. Home
02:00 Saturday 6 to 02:00 Monday 8 March Reference: STN 0384 Work: Configuration 12 • Buses replace all trains between Sydenham and Central.• Trains run between Liverpool or Lidcombe and Sydenham only, some to a changed timetable.Bus routes1T3 Sydenham, then all stations to Central and return2T3 Sydenham, then Central and return
Suggested Station Announcements Good morning/afternoon/evening customers,
Due to trackwork this weekend, buses replace all trains between Sydenham and Central. As there is limited capacity for physical distancing on trackwork buses, please wear a face mask on public transport and only travel if essential. Plan ahead by checking transportNSW dot info or transport apps.
Home
02:00 Saturday 6 to 02:00 Monday 8 March Reference: STN 0384 Work: Configuration 12 • Buses replace trains between Sydenham and Central.• Trains run to a changed timetable between:
- Cronulla and Sydenham- Waterfall and Hurstville- Central and Bondi Junction
• Customers travelling to the City from Illawarra Line stations should change at Wolli Creek for aT8 Airport & South Line train to City Circle stations.
• Change at Central for trains to Martin Place, Kings Cross, Edgecliff or Bondi Junction.Bus routes1T3 Sydenham, then all stations to Central and return2T3 Sydenham, then Central and return
Suggested Station Announcements Good morning/afternoon/evening customers,
Due to trackwork this weekend, buses replace all trains between Sydenham and Central. As there is limited capacity for physical distancing on trackwork buses, please wear a face mask on public transport and only travel if essential. Plan ahead by checking transportNSW dot info or transport apps.
Home
210301 Trackwork Reference Guide JK Current as of Wednesday, February 24, 2021 Produced by the CIU Trackwork Information Team [email protected]
02:00 Saturday 6 to 02:00 Monday 8 March Reference: STN 0384 Work: Configuration 12 • Some trains run to a changed timetable and stopping pattern.• Daily from 08:00 to 20:30, extra trains run between Kingsgrove and the City Circle, continuing to
Redfern, Newtown then Ashfield.
Home
Monday 1 to Friday 5 March Reference: STN 0187 Work: Katoomba – Lithgow • Buses replace trains between Lithgow and Mount Victoria.• Trains run to a changed timetable between Mount Victoria and Central.• Bathurst trains continue to run to the normal timetable.• Daily from 09:20 until 17:00, buses replace trains between Lithgow and Katoomba.• Trains run between Katoomba and Central, some to a changed timetable.Bus routes7BM Katoomba, then all stations to Lithgow and return 31BM Lithgow, then express to Mount Victoria and return 32BM Lithgow, then all stations to Mount Victoria and return 33BM Katoomba, then all stations to Mount Victoria and return 34BM Katoomba, then express to Lithgow and return
Suggested Station Announcements – Good morning/afternoon/evening customers,
Due to trackwork until Friday 5 March, buses replace trains between Lithgow and Mount Victoria or Katoomba. As there is limited capacity for physical distancing on trackwork buses, please wear a face mask on public transport and only travel if essential. Plan ahead by checking transportNSW dot info or transport apps.
Home
Monday 1 to Thursday 4 March Reference: STN 0294 Work: Wyong – Gosford • Nightly from 21:10 until 03:55, buses replace trains from Gosford to Wyong.• Trains run to the normal timetable from Central to Gosford but run up to 30 minutes later than
normal from Wyong to Newcastle Interchange.• The last direct train leaves Central at 19:15 and arrives Newcastle Interchange at 22:01. (N183)• Nightly from 21:50 until 02:00, buses replace trains from Wyong to Gosford.• Trains run to the normal timetable from Newcastle Interchange to Wyong, but run up to 25 minutes
later than normal from Gosford to Central.• The last direct train leaves Newcastle Interchange at 19:45 and arrives Central at 22:39. (N182)
290F is the first UP train to be bussed from Wyong at 21:52204J is the first DOWN train to be bussed from Gosford at 21:13
Bus routes11CN Wyong, then Tuggerah, Gosford and return12CN Wyong, then all stations to Gosford and return
Home
210301 Trackwork Reference Guide JK Current as of Wednesday, February 24, 2021 Produced by the CIU Trackwork Information Team [email protected]
Wednesday 3 March Reference: STN 0305 + TAA 0266 Work: Maitland – Draytons Junction • Buses replace the following trains between Maitland and Muswellbrook:
- 08:14 Newcastle Interchange to Muswellbrook. V625- 10:09 Muswellbrook to Newcastle Interchange. V638
• Trains run to the normal timetable between Newcastle Interchange and Maitland.Bus routes10HU Muswellbrook, then Singleton, Maitland and return15HU Muswellbrook, then all stations to Maitland and return
Home Saturday 6 March From 20:55 until 03:40 Reference: STN 0384 + TAA 0307 Work: Configuration 12 • Buses replace trains between Telarah and Newcastle Interchange.Bus routes1HU Newcastle Interchange, then all stations to Telarah and return7HU Warabrook Mini Bus Shuttle
Home
02:00 Saturday 6 to 02:00 Monday 8 March Reference: STN 0384 Work: Configuration 12 • Trains run to a changed timetable between South Coast Line stations and Waterfall only.• Buses replace trains between Waterfall and Central.• Direct buses also run between Wollongong, North Wollongong, Thirroul and Central.• Trackwork also affects trains on the T4 Eastern Suburbs & Illawarra Line.Bus routes50SC Wollongong, North Wollongong then Central and return65SC Thirroul, express to Waterfall, then express to Central
Suggested Station Announcements Good morning/afternoon/evening customers,
Due to trackwork this weekend, buses replace trains between Waterfall and Central. As there is limited capacity for physical distancing on trackwork buses, please wear a face mask on public transport and only travel if essential. Plan ahead by checking transportNSW dot info or transport apps.
Home
Sydney Trackwork Bussing Map Monday 1 - Sunday 7 March 2021
Richmond
East Richmond
Clarendon
Windsor
Mulgrave
Vineyard
Riverstone
Schofields
ToBlw
Mountaln�LlnE
Quakers Hill
Marayong
0 Buses replace trains:
Weekend trackwork
Saturday 6 - Sunday 7 March T3 Bankstown Line: T4 Eastern Suburbs & lllawarra Line: Sydenham - Central
lilffl,l11H,hl
Merrylands
Guildford
Yennora
Fairfield
Canley Vale
Cabramatta
Warwick Farm
Liverpool
Casula
Glenfield
Macquarie Fields
lngleburn
Minto
Leumeah
Campbelltown
Macarthur
Regents Park
ToSouthernHighl,mdsllne
To Centtal Coa�I &
rlewca�tl Um
Normanhurst
Thornleigh
Pennant Hills
Beecroft
Cheltenham
Epping �:
Eastwood
Denistone
WestRyde
Meadowbank
Berowra
Mount Kuring-gai
Mount Colah
Asquith
Hornsby
Waitara
Wahroonga
Warrawee
Turramurra
Pymble
Gordon
Hurlstone Park
Canterbury
Campsie
Belmore
Killara
Lindfield
Roseville
Chatswood Artarmon
St Leonards
Wollstonecraft
Waverton
Milsons Point
North Sydney
Circular Quay
Martin Place
Museum
Green Square
Mascot
Domestic Airport :,(' S:a::b'IACCfflf�&ppl.�
International Airport:,(' Wolli Creek s:,tion1oea-ss,�app1.�
Turrella
Bardwell Park
Bexley North
Kingsgrove
Banksia
Rockdale
Kogarah
Carlton
Allawah Beverly Hills
Narwee
Hurstville
Penshurst
Mortdale
Oatley
Como
Jannali
: Sutherland
Loftus
Engadine
Heathcote
Waterfall To Sou1h Coa�t lin1
Check timetables and trip planners for train services and connections
Visit transportnsw.info
Please note: This map indicates where buses replace metro and train services.
Trackwork may also affect trains on other lines.
Buses may also replace trains on the Intercity rail network.
Check into your replacement service using the QR code on board.
210301 Trackwork Reference Guide JK Current as of Wednesday, February 24, 2021 Produced by the CIU Trackwork Information Team [email protected]
Special Events extract Updated Special Event details can be accessed on the Sydney Trains intranet
210301 Trackwork Reference Guide JK Current as of Wednesday, February 24, 2021 Produced by the CIU Trackwork Information Team [email protected]
210301 Trackwork Reference Guide JK Current as of Wednesday, February 24, 2021 Produced by the CIU Trackwork Information Team [email protected]
Scope of work: Configuration 12
This weekend a combination of capital works programs, major periodic and routine maintenance will take place. Some of the work scheduled is as follows:
- Capital, Major Periodic & Routine Maintenance- TAP Station Upgrade Redfern- Sydney Metro SSJ stage works- MTMS North stage works- Retaining wall works at Erskineville- Track Reconditioning works at Sydenham- Bridge Painting Flying Jct, Redfern- Bridge Refurbishment at Coulson St, St Peters- Plain Track and Turnout Resurfacing- Rail and Turnout Grinding- Corridor Presentation- OHW, Signal and Track Maintenance
210301 Trackwork Reference Guide JK Current as of Wednesday, February 24, 2021 Produced by the CIU Trackwork Information Team [email protected]
Next week’s trackworkSydney Metro, Sydney Trains and NSW TrainLink Intercity services Monday 8 to Sunday 14 March
Monday 8 to Thursday 11 March Nightly from 21:50 until 02:00 • If you are travelling to the City please change at Epping, not Chatswood, for a direct train via the
T9 Northern Line.
02:00 Saturday 13 to 02:00 Monday 15 March • If you are travelling to the City please change at Chatswood, not Epping, for a direct train via the
T1 North Shore Line.Home
Monday 8 to Thursday 11 March Nightly from 21:50 until 02:00 • Buses replace trains between Hornsby and Central. Some trains continue to run from Central to
North Sydney and Hornsby until 22:20.
02:00 Saturday 13 to 02:00 Monday 15 March • Buses replace trains between Berowra and Hornsby.
Home
02:00 Saturday 13 to 02:00 Monday 15 March • Trains run to a changed timetable and stopping pattern, making extra stops at Burwood, Croydon
and Ashfield.Home
02:00 Saturday 13 to 02:00 Monday 15 March • Trains run between Leppington and the City via Granville to a changed timetable and stopping
pattern, every 30 minutes.Home
Tuesday 9 to Thursday 11 March Nightly from 21:00 until 01:30 • Some trains run to a changed timetable and stopping pattern between Richmond and Granville, and
between Granville and Leppington only. Some trains start or end at Olympic Park.
Home
02:00 Saturday 13 to 02:00 Monday 15 March • Buses replace trains between Hornsby, Epping and Strathfield.
Home
02:00 Saturday 13 to 02:00 Monday 15 March • Trains may run to a changed timetable due to trackwork between Strathfield and Central.
Home
210301 Trackwork Reference Guide JK Current as of Wednesday, February 24, 2021 Produced by the CIU Trackwork Information Team [email protected]
01:20 Saturday 13 to 02:00 Monday 15 March • Buses replace trains between Newcastle Interchange and Central.
Home
02:00 Saturday 13 to 02:00 Monday 15 March • Buses replace trains between Scone, Dungog and Newcastle Interchange.
Home
Feedback form Please use this internal feedback form to advise of any issues in regards to trackwork information advertised internally to staff or externally to our Sydney Metro, Sydney Trains and NSW TrainLink Intercity customers.
Feedback is sought in regards to trackwork signage, Special Train Notices (STN), website information, customer train or bus timetables or alternative transport arrangements.
The purpose of this trackwork debrief is to improve the service we provide to our customers during future track possessions. All staff are encouraged to complete this form when required.
Station/location: ________________________ Date: ________________________
Your name: ______________________________ Phone number: _______________
Feedback Please provide as much information as possible: - what went well, what didn't, how this affected our customers or how you feel we could improve- include STN, bus route number, bus company, trackwork poster/signage details or URL details
Please add additional pages if required.
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
Please scan and email the completed feedback form to [email protected]