Upload
vuongbao
View
215
Download
2
Embed Size (px)
Citation preview
MOMENTUM raquoREPORT
2012 - 2014
WHAT IS A MOMENTUM REPORT This report provides a snapshot and summary of some of the projects initiatives and goals the City of Waterloo is embarking upon over the next three years illustrating some of the ldquomomentumrdquo the corporation has built up that will carry us forward
As you read through the Momentum Report you will note that each department through its past achievements and future goals strives to reflect the cityrsquos mission statement in every task priding ourselves ldquohellipin providing needed and valued services that help build the best quality of life possible for all of our citizensrdquo
As we move forward there will be some challenges that we face both as a corporation and a community but we also know that we have great momentum behind us to carry us successfully through the next three years
For more details on each department and division please visit the cityrsquos website at wwwwaterlooca
On behalf of the Corporation of the City of Waterloo we are proud to present our 2012-2014 Momentum Report As a city we know there are challenges ahead but as you can see in this report there is plenty of momentum to carry us successfully into the future ndash Tim Anderson CAO
THE 2011-2014 CITy Of WATERlOO STRATEgIC PlAN The guiding docuMenT behind The ciTyrsquos ldquoMoMenTuMrdquo The 2011-2014 city of Waterloo strategic Plan is the document that will guide the city over the next three years and beyond It acts as a road map that will continue to carry us forward as we strive to make Waterloo an even better place to live work and play
The strategic Plan document contains thousands of voices ideas and comments collected from the community through face-to-face workshops online surveys committee meetings and comment cards
The feedback collected helped define the six strategic pillars of the Strategic Plan which provides the future direction and areas of focus to help move our city forward
Within the Momentum Report each of the six strategic pillars are reflected in the direction of each initiative acting as a compass to move the project ahead
The strategic Plan is based on these six strategic pillars
bull Sustainability and our living environment
bull Public engagement
bull Healthy and safe community
bull Vibrant neighbourhoods
bull Getting around
bull Economic vitality
These pillars along with the strategic objectives that have been identified with each pillar will guide the direction of our City for the next three years and ensure that our momentum continues
For more details and updates on the 2011-2014 city of Waterloo strategic Plan please visit wwwmyfuturewaterlooca
CAOrsquoS OffICE The office of the CAO is responsible for the strategic leadership of the corporation while working to strengthen its relationship with the community The CAOrsquos office provides leadership and strategic advice to Council and works to create a framework through which the organization can thrive and meet Councilrsquos strategic goals and vision
ouR Mission Waterloo is a better place to work live and play than ever A green vision strong educational ties and booming workforce make us all proud to call Waterloo home The Corporation of the City of Waterloo is a dedicated team of volunteers staff and elected officials who apply leadership enthusiasm skill and integrity in providing needed and valued services that help build the best quality of life possible for all of our citizens
ouR goAL To foster a continuous improvement philosophy within our organization and support Council in building a better community A progressive organization built on principles which anticipate and satisfy the requirements of our customers and citizens achieved through a team of committed highly skilled and valued people
ouR chALLenges Shifting the culture of the City to a lsquosustainablersquo model in the implementation of all of our various departmentsaddressing our infrastructure deficit in areas that we know are designated as growth areasadapting our policies and processes to address the rapid pace of redevelopmentemerging technologies and changing social issuesproviding increased levels of servicewhile recognizing a desire to maintain taxes at reasonable levelsdeveloping and nurturing partnershipsimplementing rapid transit and intensifying development
CAOrsquoS OffICE
coRPoRATe coMMunicATions ouR goAL To provide information to our residents and employees in order to inform them about their municipal government its services and the value that they receive for their tax dollars inspire them to help the City realize its vision and ensure that they are aware of all the ways that they can become active and engaged in their city
ouR AchieveMenTs bull Introduction of a social media strategy has provided a fast efficient and additional way to communicate with residents and businesses
bull Implementation of a media-monitoring program has allowed Council and senior management to stay informed on issues and to react more proactively
bull Development of a formal work plan has allowed Communications to prioritize align resources and find many efficienices
bull Establishing dedicated Communications Specialist to each department has allowed the team to proactively respond to issues and learn the challenges within each area
bull Moving team together in one location has improved communication among all members and streamlined teamrsquos ability to respond quickly on issues and tactics
bull Teamrsquos new location provides proximity to IMTS CAOrsquos office and Mayorrsquos office - which has enhanced relationship building with these key work groups while enabling faster communication and reaction to issues
ouR Future goALs incLude A better informed and engaged community by bull Enhanced strategic issues management
bull Proactive strategic communication planningleadership for key projects
bull More citizen engagement opportunities
bull Improved and enhanced website and social media channels
bull Distribution of community reports
bull Delivery of effective town hall meetings
A better informed and engaged employee base by bull Development of an internal communications strategy
bull Development of an intranet strategy
bull Implementation of measurement for communications strategies
bull Delivery of effective internal communications
bull Launch of corporate identity standards for the corporation
bull Report on projects to inform and engage employees
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT(CCRS) CCRS provides programs and services that contribute to a sense of community and improved quality of life for Waterloo residents and visitors through access to arts culture and heritage programs and services access to cemetery recreational facility space and programs that promote active and healthy lifestyles
ouR Mission To improve the quality of life for residents and visitors by providing enriching cultural recreational and leisure opportunities in conjunction with community partners and volunteers
ouR goAL To improve the quality of life for residents and visitors by ensuring a comprehensive array of quality programs services and facilities is available at a reasonable cost
ouR chALLenges Sustainability over course of the budget binding agreements compliance to changing legislation succession planning and training and evolving customer expectations
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT
sTRATegic PLAnning PRoMoTion And PeRFoRMAnce division ouR goAL To support the departmentrsquos strategic objectives and priorities by ensuring all policy business planning promotion and support services are provided in advance of department divisional and community needs
ouR AchieveMenTs bull Consolidated policy research and project management into one division for overall cohesive and supportive work program for department success
bull Consolidated work for corporate reporting into one division provides oversight and review opportunity that has departmentrsquos interests at heart
bull CCRS Service Delivery Policy provides clear direction for overall delivery of department services sets priorities and provides overall guidelines
bull Implemented online Program and Activity Guide that uses flip-page technology to reduce print quantities and cost
bull Initiated development of a policy manual for the City of Waterloo Museum Once completed it will support the operation of the museum and enhance our ability to seek external funding
ouR Future goALs incLude bull Space allocation policy and implementation
bull Initiate a comprehensive training program for CCRS supervisors
bull Development of a Neighbourhood Engagement Strategy
bull Develop a long-term Cultural Plan
bull Phased design and development of libraryYMCA sports fields
bull Biometric (finger print) scanning implementation at some facilities
bull Implement the Action Skate Park facility strategy
bull WebSocial Media Strategy for CCRS
bull Implement an Older Adult Services Strategy
bull Hire intern position for sales and sponsorship
bull Increase the number of revenue streams
bull Build and increase methods of interacting with clients
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT
coMMuniTy amp cuLTuRAL seRvices division ouR goAL To ensure that the citizens of the City of Waterloo have the opportunity to access a wide variety of recreation leisure activities programs and services
ouR AchieveMenTs bull New Intake business practices designed in the Fee Assistance Leisure Access Program
bull Aligning City of Waterloo grants under one department
bull Continued review of grants for efficiencies
bull Reorganization of adult programs and staffing resources
bull Development of work plan efficiencies with other provincially funded programs
bull Initiated development of ldquoCCRS Event Permitrdquo process to allow congruency and compliance between outdoor festivalseventsprograms and the Noise Bylaw
ouR Future goALs incLude bull Initiate development of a Collections Policy Older Adult Strategic Plan
Public Art Master Plan and cultural strategy
bull Development of a partnership with Parkwood Manor for senior programs
bull Develop and expand the role of the private sector for expansion of the public art collection
bull Develop a policy on guiding principles to meet provincial museum standards
bull Board development across all division committees and affiliated groups
bull Implement Affiliation Service Agreement
bull Participate in theVolunteer Engagement Strategy
bull Development of cost recovery charges for replacement of capital items
bull Identify and facilitate training opportunities for affiliated organizations
bull Completion of public art projects
bull Participate in and implement theVolunteer Engagement Strategy
bull Development of a staffing strategy for all areas of CCS
bull Leadership training for all staff
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT
RecReATion And FAciLiTy seRvices ouR goAL Recreation and Facility Services will deliver programs and services that align with the Corporate Strategic Plan and the Community Culture and Recreation Services Master Plan and Guiding Principles
Key goals include bull Effective and efficient programs services and operations bull Fiscal responsibility bull Increased communication and engagement of staff bull Customer service excellence
ouR AchieveMenTs bull Customer Service Strategy ndash delivering a consistent model across facilities
bull Operations Strategy ndash cross training to maximize the efficient use of staffing resources
bull Digital signage installationutilization at RIM Park
bull Building maintenance staff re-integration into day-to-day operations of facilities
ouR Future goALs incLude bull Ongoing divisional assistance in the implementation of recommen-
dations associated the community culture and Recreation services Master Plan
bull Cemetery Services - Bechtel Park Master Plan ndash continued implementation of council-approved recommendations
bull Review of operations and aquatics models
bull Ongoing joint service opportunities with the City of Kitchener cemetery division
bull Implementation of Health and Safety and Risk Assessment Audit recommendations
bull Ongoing implementation of ODA requirements for facilities and customer service
bull Continued support of green initiatives within facilities
bull Development and implementation of facility equipment replacement strategies
CORPORATE SERVICES DEPARTMENT The Corporate Services department is responsible for the co-ordination and delivery of services by the ClerksCorporate Secretary division Economic Development division Asset Management division Information Management and Technology Services division and Legal Services
ouR Mission To oversee a dedicated team of professional and technical staff that is committed to providing quality customer service to staff as a support function and to the taxpayer and Council who expect timely service
ouR goAL To provide quality services valued by staff and the community in the areas of facility maintenance information technology Council support economic and community information and legal services
ouR chALLenges Budget resources lack of staffing resources and expertise cross-departmental co-ordination on priorities and projects
CORPORATE SERVICES DEPARTMENT
CLERKSCORPORATE SECRETARY division ouR goAL ClerksCorporate Secretary will continue to improve upon its solid foundation of customer service excellence for Council the general public and staff This will include the continuation of quick and accurate responses to general questions personalized assistance applying analysis to research and inquiries and brainstorming ideas for improvement of general services
ouR AchieveMenTs committee orientation
bull Resulted in better awareness of the Committee Policy and related policies and by-laws which will reduce staff time responding to questions and issues
bull Provided networking opportunity for Committees
New FOI requestTracking Form bull Will save 2-3 days of work when creating the Annual Report bull Colour-coded requests to ensure the deadlines are met
Records Management bull Working group met to review requirements for annual records management transfer to Service Centre
bull Resulted in a more efficient and successful Records Management
corporate Policy Manual bull Will result in more efficient access to corporate policies with standardized information
ouR Future goALs incLude bull Review of dog licensing program
bull Review of business licensinghome businesses
bull Implementation of new records management systems and processes
bull Review of election process and voting methods
bull Review of agenda and report templates
bull Procedural Bylaw review
bull Review legal invoice approval and process
bull Implement required AODA legislative requirements
CORPORATE SERVICES DEPARTMENT
inFoRMATion MAnAgeMenT amp TECHNOLOGY SERVICES (IMTS) ouR goAL To play an active leadership role in delivering comprehensive information and technology-based solutions and services to support the Cityrsquos vision and goals
ouR AchieveMenTs bull Core Switching and network enhancements to increase efficiency
bull Implemented A to Z Service Directory of municipal and regional services on our website as an aid to external customers
bull PC refresh to increase efficiency
econoMic deveLoPMenT division ouR goAL Our goal is to implement the strategic imperatives of the City of Waterloo Strategic Plan Economic Development Strategy and the City-Owned Employment Lands Strategy
ouR AchieveMenTs bull Business Directory ndash now available online searchable and updatable by business ndash co-ordinated regionally
bull Business Calling Program ndash co-ordinated regionally
bull Creative Talent Steering Committee ndash pooled resources regionally
bull Urban Design Video
ouR Future goALs incLude inFoRMATion MAnAgeMenT amp TechnoLogy seRvices bull Possible relocation of server room to third-floor space
bull Implementation of Maximo II and III
bull Completion of corporate website strategy requirements and build
bull Completion of Disaster Recovery Continuity Plan
bull Continue expansion of the underground fibre optic backbone infrastructure
econoMic deveLoPMenT division bull Continued implementation of Economic Development Strategy
bull Implementation of City-Owned Employment Land Strategy
bull Sector collisions between tourism and high-tech industries
bull Continued provision of visitor services
bull Collaborate with other organizations on Talent Strategy and Research
CORPORATE SERVICES DEPARTMENT
AsseT MAnAgeMenT division ouR goAL The objective of Asset Management is sustainability ndash environmental financial and social ndash in the face of a changing world It embraces the concepts of life- cycle assessment the valuation and protection of assets and optimized long-term investment decisions
ouR AchieveMenTs bull LEED Silver designation for YMCALibrary facility
bull Installation of new HVAC system in City Hall reduces energy costs
bull Installation of lsquoEco Chillrsquo refrigeration system at Waterloo Memorial Recreation Complex
bull Replacement of boiler systems at Waterloo Memorial Recreation Complex ndash increased efficiency with a reduction in the carbon footprint
bull Completion of various RInC projects
ouR Future goALs incLude bull Completion of implementation of Maximo Phases II
bull Commence implementation of Maximo Phase III
bull Corporate space planning initiatives
bull Implementation of environmental strategies and initiatives
bull Comprehensive plan for life-cycle managment of corporate assets
bull Update asset conditions and facility condition index maintaining VFA
bull Better utilize corporate intranet ndash develop AM online library and services (including digitizing current hard copy data and drawings)
bull Continued project managment of city projects
bull Completion of various land-related activities and transactions
YMCASTORK FAMILY LIBRARY
DEVELOPMENT SERVICES DEPARTMENT Development Services is responsible for helping ensure that the City is planned developed and constructed in a manner that meets the existing and future goals of our community as well as satisfying legislative requirements associated with our services
ouR Mission As a department we strive to plan build and realize a safe and attractive sustainable community through the combined work of our four divisions
ouR goAL In Development Services our goal is to ensure that our community evolves appropriately for our citizens through professional land use advise to Council
ouR chALLenges Increase resources to provide expected level of services given an ever increasing level of development activity increase training opportunities to reflect changing work managing unanticipated projects
DEVELOPMENT SERVICES DEPARTMENT
buiLding sTAndARds division ouR goAL Our goal is to inform and assist our customers to ensure safe and orderly development and to provide efficient delivery of building approvals inspections and management systems
ouR AchieveMenTs bull Minor permits review completed from e-drawings
bull Completion of site plan approval process
bull Projects completed Balsillie School Perimeter Institute and several residential high-rises
DEVELOPMENT SERVICES DEPARTMENT
PoLicy deveLoPMenT division ouR goAL To work with Council and the community to foster a healthy and vibrant place for people to live work do business and play
ouR AchieveMenT bull Significant efforts focused on site plan process review
ouR Future goALs incLude buiLding sTAndARds division Advance the use of technology bull For online permit applications inspection booking bull Paperless permit application
bull Paperless plan examination for small to medium-size projects bull Improve records management from paper based to electronic bull Review of service level and applicable building permit fees bull Establish standard operating procedures to manage our service
level and establish best practice guidelines bull Build strong partnerships with the industry engage them in our process
creating an education program and participating in industry functions
PoLicy deveLoPMenT division bull Develop Official Plan monitoring protocol bull Consider brownfield incentives bull Initiate major transit station area planning bull Complete Northdale Land Use and Community Improvement
Plan study bull Complete North Waterloo District Plan
bull Complete Clean Water Act Implementation with PWS
bull Complete Clair Hills remnant hydro parcels landscaping bull Construct Westvale Park
DEVELOPMENT SERVICES DEPARTMENT
deveLoPMenT APPRovALs division ouR goAL To work in partnership with citizens and the development industry to help ensure that our city evolves in the direction that meets existing and future community needs and desires
ouR AchieveMenTs bull Continuous Improvement Zoning bylaw updates are accessible from the web Integrated Development Approvals Process
bull Complete application and preconsultation requirements (Zone change site plan demo control and C of A)
bull Systemization of performance measurement for Committee of Adjustment Site Plan Review Committee Sign Variance Committee
ouR Future goALs incLude bull Implementation of the new Official Plan
bull New zoning bylaw to align with the new Official Plan
Development ProjectsProposals bull Balsillie School of International Affairs complete Phase I
initiate Phase ii
bull BarrelYards implementation
bull RIM East Campus additional phases
bull NCR Master Plan
bull Core Re-urbanization Projects
bull West Side Employment Lands
bull Implementation of West Side Plans of Subdivision
bull OMB Hearings
bull 144 Park St Phase II
committees and customer service bull Continue to provide high quality and timely customer service related to zoning development and committee inquiries
bull New Sign Bylaw implementation
bull AMANDA link to site plan
DEVELOPMENT SERVICES DEPARTMENT
engineeRing And consTRucTion division ouR goAL The Engineering and Construction divisionrsquos goal is to work co-operatively with the development industry consultants and the public to promote the construction of new high-quality infrastructure (roads watermains sewers stormwater management)
ouR AchieveMenTs bull Implementing a major Continuous Improvement (CI) project for Site Plan Control
ouR Future goALs incLude bull Implementation of new major subdivision developments (West Side Lands Carriage CrossingWoolwich Estates)
bull Complete policy review for enhanced service delivery and improved efficiencies and incorporate into regular updates of the development Manual
bull Implement enhanced electronic tracking of development approvals leveraging existing technologies within the department using the AMAndA system
bull Initiate review of records management needs and implement necessary changes in conjunction with corporate initiatives
bull Participate in the identification of service capacity issues to identify infrastructure needs for the capital budget
bull Continue to adapt skill sets and core competencies to the ldquonewrdquo development reality in Waterloo which is focused on urban intensification and infill projects
bull Provide engineering review and inspection services for new major site plans in the uptown and other locations
FINANCE DEPARTMENT The Finance department supports the organization by assisting Council and the Corporate Management Team in the development of financial policies and strategic goals The department also advises and assists city departments in the timely and effective provision of accounting budgeting purchasing and revenue services
ouR Mission The Finance department is committed to excellence in providing sound financial management and consultative services Support and enhance operational effectiveness and efficiency
ouR goAL To provide reliable sound short- medium- and long-term financial strategies to ensure the long-term sustainable financial viability of the corporation
ouR chALLenges Declining assessment growth and multiple demands on scarce financial resources
FINANCE DEPARTMENT
AccounTing division ouR goAL To provide efficient reporting while safeguarding the assets of the corporation and providing financial information to Council CMT other departments and the community
ouR AchieveMenTs bull Initialization of new procedures and requirements for the reporting of TCA requirement
bull Upgrade of Peoplesoft Payroll Management System
bull Increased payment through electronic channels
ouR Future goALs incLude Further enhancement of Reporting bull Annual Report (2013) bull Ongoing development of Financial Reporting System (2012) bull Finance upgrade (2014) bull Portal type delivery of financial information
Increased Utilization of PeopleSoft Payroll Management System bull Security (2012-2014) bull Manager view of leave banks (2012-2014) bull Staff Association time entry (2012-2014) bull Work flow (2013) bull Electronic fund transfer payments for vendors (2012-2013) bull Epay (2012)
implementation of Recommendations from continuous improvement bull Payroll time cards bull Account Payable entry
FINANCE DEPARTMENT
budgeTs amp FinAnciAL PLAnningdivision ouR goAL To fulfill fiduciary and statutory requirements and provide reliable financial strategies to ensure the financial viability of the corporation while maintaining effective stewardship of financial resources
ouR AchieveMenTs bull Refined the 3-year budget process
bull Reserve and Reserve Fund Policy review
bull Rolled out budget software to web-based version
FINANCE DEPARTMENT
Revenue division ouR goAL Develop and implement an effective system of recording and collecting amounts due to the City using a corporate approach across multiple subsystems
ouR AchieveMenT bull Department is handling approximately 3000 incoming calls per month water amp sewer billing accounted for a 3-fold increase in the number of incoming calls
ouR Future goALs incLude bull Development Charge Bylaw update
bull Financial Control Bylaw
bull Implement PSAB (Public Sector Accounting Board) requirements for budgeting
bull Develop long term financial plan
bull Continue to develop dynamic financial planning policies to adapt to an environment of constantly shifting priorities
bull Review Investment Strategy and review potential for institutional pricing
bull Collecting amounts due to the City using a corporate approach across multiple subsystems
bull Continue to stress customer service excellence including multiple sites payment stations and promoting electronic payment options
bull Ongoing implementation of POS at selected City sites
bull Develop the Cityrsquos internal controls for cash handling
bull Recommend policy on the use of special services levies
bull Developing a Payment Card Industry Data Security Standard (PCIDSS) compliance plan
bull Reduce and rationalize the number of water billing sections
FINANCE DEPARTMENT
PuRchAsing division ouR goAL The goal of the Purchasing division is to follow the Cityrsquos Purchasing Bylaw and provincial and federal government law to acquire the best total cost for the products and services required by the City of Waterloo as well as providing a fair open and transparent purchasing process for the supply base
ouR AchieveMenTs bull Additional expansion of using procurement cards has reduced staff time spent on issuing purchase orders
bull Issuing of cheques through Accounts Payable has been reduced through the implementation of the procurement card program
bull Using e-commerce platforms reduces the time required to input data for the purchasing receipt and payment of invoices
bull Involvement with the provincial contracts (vendor of records) has reduced the cost of the services supplied (courier and cellular devices)
bull Involvement in co-operative and provincial contracts has increased purchasing efficiencies
ouR Future goALs incLude bull Computerization and bar coding of stockroom items
bull Implement the recommendations listed in the Purchasing Review Report
bull Work with the Environmental Strategy Implementation Steering committee to further enhance green procurement and a sustainable Waterloo
bull Review implement most cost effective municipal and provincial contracts for items such as telecommunications and courier services
bull Investigate the possibility of a third-party agency to host our bid opportunities
bull Establish a more centralized purchasing function at the city of Waterloo
bull Review and implement new cash discounts for the supply base to the city of Waterloo
HUMAN RESOURCES DEPARTMENT VOLUNTEER SERVICES The provision of Human Resources and Volunteer Services includes recruitment and selection labour and employee relations compensation and benefits sick and disability management training collective bargaining health and safety and organizational design
ouR Mission Engaged competent employees and volunteers are successful in accomplishing strategic and business plans within a vibrant corporate culture at the City of Waterloo
ouR goAL Human Resources and Volunteer Services departmentrsquos programs and services comply with regulatory and legislative requirements and align with the Cityrsquos values to enable staff to accomplish strategic and business plans
ouR chALLenges Build sufficient HR specialist expertise within a generalist model to support service excellence free-up HR capacity through operational efficiencies to enable project work and program design in key areas and training initiatives trends indicating decline of volunteerism requires innovative approaches
HUMAN RESOURCES DEPARTMENT voLunTeeR seRvices
ouR AchieveMenTs bull Completion of a market review of insurance carriers to ensure the cost competitiveness of our employee group benefit plan rates
bull Continued implementation of violence in the workplace programs with respectful workplace training and risk assessment surveys
bull Conducted an employee engagement survey to measure employee engagement in important aspects of work activities relationships and working conditions
bull Research and preparation of negotiations plans for Staff Association CUPE and WPFFA collective agreements
bull Use of technology to create efficiencies using online automated recruitment screening for high volume recruits and enhanced use of PeopleSoft functionality for management information reporting
bull Implementation of volunteer software system to enhance volunteer recruitment and placements
ouR Future goALs incLude Utilize information system data to measure efficiencies and effectiveness of hR and volunteer process improvement and practices
bull Develop a performance appraisal tool to measure competencies and accountabilities
bull Develop a corporate staff recognition program with individual and group components
bull Provide coaching project management and volunteer training and leadership development programming
bull Continue to enhance workplace health and safety with Respectful Workplace initiatives and implementation of Corporate Health and safety Audit recommendations
bull Bargain new agreements for labour groups and Staff Association
bull Implement job evaluation maintenance program
bull Develop corporate and department plans to address issues in the employee engagement survey to enhance employee engagement
bull Continue to implement the Volunteer Engagement Strategy
PROTECTIVE SERVICES DEPARTMENT Protective Services is responsible for the delivery of services by Fire Rescue Bylaw EnforcementProperty Standards and Community Relations
ouR Mission A team of dedicated and professional staff committed to enhancing the safety and quality of life of our community through education inspection enforcement community relations and emergency response
ouR goAL To provide quality service valued by staff and the community in delivery of education inspection enforcement community relations and emergency response
ouR chALLenges Developmentbuilding construction intensification city-wide Light Rail Transit (LRT) green building construction increased population of the city including long-term and temporary residents ongoing need for improved technology to augment existing resources increased student enrollment communication to students living off-campus
PROTECTIVE SERVICES DEPARTMENT
WATeRLoo FiRe Rescue division ouR goAL Waterloo Fire Rescue will continue to grow in response to community needs and expectations to provide the highest standard of service
ouR AchieveMenTs bull Completion of Station 4
bull Activity Tracking Program
bull Enhanced response times on the Cityrsquos east side
bull Measures used to optimize service delivery
ouR Future goALs incLude bull Deliver a fiscally responsible and sustainable service delivery model
bull Reviseupdate simplified risk assessment (3-year cycle)
bull Reviseupdate Fire Master Plan (5-year cycle)
bull Leverage technology to enhance overall effectiveness and efficiency
bull Collaborate with local business and the community to promote fire safety
bull Collaborate with post-secondary institutions to mitigate fire safety priorities
bull Reviseupdate Emergency Management Plan
bull Reviseupdate fire inspection service delivery model
bull Enhance tactical pre-planning
bull Enhance training programs
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
WHAT IS A MOMENTUM REPORT This report provides a snapshot and summary of some of the projects initiatives and goals the City of Waterloo is embarking upon over the next three years illustrating some of the ldquomomentumrdquo the corporation has built up that will carry us forward
As you read through the Momentum Report you will note that each department through its past achievements and future goals strives to reflect the cityrsquos mission statement in every task priding ourselves ldquohellipin providing needed and valued services that help build the best quality of life possible for all of our citizensrdquo
As we move forward there will be some challenges that we face both as a corporation and a community but we also know that we have great momentum behind us to carry us successfully through the next three years
For more details on each department and division please visit the cityrsquos website at wwwwaterlooca
On behalf of the Corporation of the City of Waterloo we are proud to present our 2012-2014 Momentum Report As a city we know there are challenges ahead but as you can see in this report there is plenty of momentum to carry us successfully into the future ndash Tim Anderson CAO
THE 2011-2014 CITy Of WATERlOO STRATEgIC PlAN The guiding docuMenT behind The ciTyrsquos ldquoMoMenTuMrdquo The 2011-2014 city of Waterloo strategic Plan is the document that will guide the city over the next three years and beyond It acts as a road map that will continue to carry us forward as we strive to make Waterloo an even better place to live work and play
The strategic Plan document contains thousands of voices ideas and comments collected from the community through face-to-face workshops online surveys committee meetings and comment cards
The feedback collected helped define the six strategic pillars of the Strategic Plan which provides the future direction and areas of focus to help move our city forward
Within the Momentum Report each of the six strategic pillars are reflected in the direction of each initiative acting as a compass to move the project ahead
The strategic Plan is based on these six strategic pillars
bull Sustainability and our living environment
bull Public engagement
bull Healthy and safe community
bull Vibrant neighbourhoods
bull Getting around
bull Economic vitality
These pillars along with the strategic objectives that have been identified with each pillar will guide the direction of our City for the next three years and ensure that our momentum continues
For more details and updates on the 2011-2014 city of Waterloo strategic Plan please visit wwwmyfuturewaterlooca
CAOrsquoS OffICE The office of the CAO is responsible for the strategic leadership of the corporation while working to strengthen its relationship with the community The CAOrsquos office provides leadership and strategic advice to Council and works to create a framework through which the organization can thrive and meet Councilrsquos strategic goals and vision
ouR Mission Waterloo is a better place to work live and play than ever A green vision strong educational ties and booming workforce make us all proud to call Waterloo home The Corporation of the City of Waterloo is a dedicated team of volunteers staff and elected officials who apply leadership enthusiasm skill and integrity in providing needed and valued services that help build the best quality of life possible for all of our citizens
ouR goAL To foster a continuous improvement philosophy within our organization and support Council in building a better community A progressive organization built on principles which anticipate and satisfy the requirements of our customers and citizens achieved through a team of committed highly skilled and valued people
ouR chALLenges Shifting the culture of the City to a lsquosustainablersquo model in the implementation of all of our various departmentsaddressing our infrastructure deficit in areas that we know are designated as growth areasadapting our policies and processes to address the rapid pace of redevelopmentemerging technologies and changing social issuesproviding increased levels of servicewhile recognizing a desire to maintain taxes at reasonable levelsdeveloping and nurturing partnershipsimplementing rapid transit and intensifying development
CAOrsquoS OffICE
coRPoRATe coMMunicATions ouR goAL To provide information to our residents and employees in order to inform them about their municipal government its services and the value that they receive for their tax dollars inspire them to help the City realize its vision and ensure that they are aware of all the ways that they can become active and engaged in their city
ouR AchieveMenTs bull Introduction of a social media strategy has provided a fast efficient and additional way to communicate with residents and businesses
bull Implementation of a media-monitoring program has allowed Council and senior management to stay informed on issues and to react more proactively
bull Development of a formal work plan has allowed Communications to prioritize align resources and find many efficienices
bull Establishing dedicated Communications Specialist to each department has allowed the team to proactively respond to issues and learn the challenges within each area
bull Moving team together in one location has improved communication among all members and streamlined teamrsquos ability to respond quickly on issues and tactics
bull Teamrsquos new location provides proximity to IMTS CAOrsquos office and Mayorrsquos office - which has enhanced relationship building with these key work groups while enabling faster communication and reaction to issues
ouR Future goALs incLude A better informed and engaged community by bull Enhanced strategic issues management
bull Proactive strategic communication planningleadership for key projects
bull More citizen engagement opportunities
bull Improved and enhanced website and social media channels
bull Distribution of community reports
bull Delivery of effective town hall meetings
A better informed and engaged employee base by bull Development of an internal communications strategy
bull Development of an intranet strategy
bull Implementation of measurement for communications strategies
bull Delivery of effective internal communications
bull Launch of corporate identity standards for the corporation
bull Report on projects to inform and engage employees
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT(CCRS) CCRS provides programs and services that contribute to a sense of community and improved quality of life for Waterloo residents and visitors through access to arts culture and heritage programs and services access to cemetery recreational facility space and programs that promote active and healthy lifestyles
ouR Mission To improve the quality of life for residents and visitors by providing enriching cultural recreational and leisure opportunities in conjunction with community partners and volunteers
ouR goAL To improve the quality of life for residents and visitors by ensuring a comprehensive array of quality programs services and facilities is available at a reasonable cost
ouR chALLenges Sustainability over course of the budget binding agreements compliance to changing legislation succession planning and training and evolving customer expectations
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT
sTRATegic PLAnning PRoMoTion And PeRFoRMAnce division ouR goAL To support the departmentrsquos strategic objectives and priorities by ensuring all policy business planning promotion and support services are provided in advance of department divisional and community needs
ouR AchieveMenTs bull Consolidated policy research and project management into one division for overall cohesive and supportive work program for department success
bull Consolidated work for corporate reporting into one division provides oversight and review opportunity that has departmentrsquos interests at heart
bull CCRS Service Delivery Policy provides clear direction for overall delivery of department services sets priorities and provides overall guidelines
bull Implemented online Program and Activity Guide that uses flip-page technology to reduce print quantities and cost
bull Initiated development of a policy manual for the City of Waterloo Museum Once completed it will support the operation of the museum and enhance our ability to seek external funding
ouR Future goALs incLude bull Space allocation policy and implementation
bull Initiate a comprehensive training program for CCRS supervisors
bull Development of a Neighbourhood Engagement Strategy
bull Develop a long-term Cultural Plan
bull Phased design and development of libraryYMCA sports fields
bull Biometric (finger print) scanning implementation at some facilities
bull Implement the Action Skate Park facility strategy
bull WebSocial Media Strategy for CCRS
bull Implement an Older Adult Services Strategy
bull Hire intern position for sales and sponsorship
bull Increase the number of revenue streams
bull Build and increase methods of interacting with clients
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT
coMMuniTy amp cuLTuRAL seRvices division ouR goAL To ensure that the citizens of the City of Waterloo have the opportunity to access a wide variety of recreation leisure activities programs and services
ouR AchieveMenTs bull New Intake business practices designed in the Fee Assistance Leisure Access Program
bull Aligning City of Waterloo grants under one department
bull Continued review of grants for efficiencies
bull Reorganization of adult programs and staffing resources
bull Development of work plan efficiencies with other provincially funded programs
bull Initiated development of ldquoCCRS Event Permitrdquo process to allow congruency and compliance between outdoor festivalseventsprograms and the Noise Bylaw
ouR Future goALs incLude bull Initiate development of a Collections Policy Older Adult Strategic Plan
Public Art Master Plan and cultural strategy
bull Development of a partnership with Parkwood Manor for senior programs
bull Develop and expand the role of the private sector for expansion of the public art collection
bull Develop a policy on guiding principles to meet provincial museum standards
bull Board development across all division committees and affiliated groups
bull Implement Affiliation Service Agreement
bull Participate in theVolunteer Engagement Strategy
bull Development of cost recovery charges for replacement of capital items
bull Identify and facilitate training opportunities for affiliated organizations
bull Completion of public art projects
bull Participate in and implement theVolunteer Engagement Strategy
bull Development of a staffing strategy for all areas of CCS
bull Leadership training for all staff
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT
RecReATion And FAciLiTy seRvices ouR goAL Recreation and Facility Services will deliver programs and services that align with the Corporate Strategic Plan and the Community Culture and Recreation Services Master Plan and Guiding Principles
Key goals include bull Effective and efficient programs services and operations bull Fiscal responsibility bull Increased communication and engagement of staff bull Customer service excellence
ouR AchieveMenTs bull Customer Service Strategy ndash delivering a consistent model across facilities
bull Operations Strategy ndash cross training to maximize the efficient use of staffing resources
bull Digital signage installationutilization at RIM Park
bull Building maintenance staff re-integration into day-to-day operations of facilities
ouR Future goALs incLude bull Ongoing divisional assistance in the implementation of recommen-
dations associated the community culture and Recreation services Master Plan
bull Cemetery Services - Bechtel Park Master Plan ndash continued implementation of council-approved recommendations
bull Review of operations and aquatics models
bull Ongoing joint service opportunities with the City of Kitchener cemetery division
bull Implementation of Health and Safety and Risk Assessment Audit recommendations
bull Ongoing implementation of ODA requirements for facilities and customer service
bull Continued support of green initiatives within facilities
bull Development and implementation of facility equipment replacement strategies
CORPORATE SERVICES DEPARTMENT The Corporate Services department is responsible for the co-ordination and delivery of services by the ClerksCorporate Secretary division Economic Development division Asset Management division Information Management and Technology Services division and Legal Services
ouR Mission To oversee a dedicated team of professional and technical staff that is committed to providing quality customer service to staff as a support function and to the taxpayer and Council who expect timely service
ouR goAL To provide quality services valued by staff and the community in the areas of facility maintenance information technology Council support economic and community information and legal services
ouR chALLenges Budget resources lack of staffing resources and expertise cross-departmental co-ordination on priorities and projects
CORPORATE SERVICES DEPARTMENT
CLERKSCORPORATE SECRETARY division ouR goAL ClerksCorporate Secretary will continue to improve upon its solid foundation of customer service excellence for Council the general public and staff This will include the continuation of quick and accurate responses to general questions personalized assistance applying analysis to research and inquiries and brainstorming ideas for improvement of general services
ouR AchieveMenTs committee orientation
bull Resulted in better awareness of the Committee Policy and related policies and by-laws which will reduce staff time responding to questions and issues
bull Provided networking opportunity for Committees
New FOI requestTracking Form bull Will save 2-3 days of work when creating the Annual Report bull Colour-coded requests to ensure the deadlines are met
Records Management bull Working group met to review requirements for annual records management transfer to Service Centre
bull Resulted in a more efficient and successful Records Management
corporate Policy Manual bull Will result in more efficient access to corporate policies with standardized information
ouR Future goALs incLude bull Review of dog licensing program
bull Review of business licensinghome businesses
bull Implementation of new records management systems and processes
bull Review of election process and voting methods
bull Review of agenda and report templates
bull Procedural Bylaw review
bull Review legal invoice approval and process
bull Implement required AODA legislative requirements
CORPORATE SERVICES DEPARTMENT
inFoRMATion MAnAgeMenT amp TECHNOLOGY SERVICES (IMTS) ouR goAL To play an active leadership role in delivering comprehensive information and technology-based solutions and services to support the Cityrsquos vision and goals
ouR AchieveMenTs bull Core Switching and network enhancements to increase efficiency
bull Implemented A to Z Service Directory of municipal and regional services on our website as an aid to external customers
bull PC refresh to increase efficiency
econoMic deveLoPMenT division ouR goAL Our goal is to implement the strategic imperatives of the City of Waterloo Strategic Plan Economic Development Strategy and the City-Owned Employment Lands Strategy
ouR AchieveMenTs bull Business Directory ndash now available online searchable and updatable by business ndash co-ordinated regionally
bull Business Calling Program ndash co-ordinated regionally
bull Creative Talent Steering Committee ndash pooled resources regionally
bull Urban Design Video
ouR Future goALs incLude inFoRMATion MAnAgeMenT amp TechnoLogy seRvices bull Possible relocation of server room to third-floor space
bull Implementation of Maximo II and III
bull Completion of corporate website strategy requirements and build
bull Completion of Disaster Recovery Continuity Plan
bull Continue expansion of the underground fibre optic backbone infrastructure
econoMic deveLoPMenT division bull Continued implementation of Economic Development Strategy
bull Implementation of City-Owned Employment Land Strategy
bull Sector collisions between tourism and high-tech industries
bull Continued provision of visitor services
bull Collaborate with other organizations on Talent Strategy and Research
CORPORATE SERVICES DEPARTMENT
AsseT MAnAgeMenT division ouR goAL The objective of Asset Management is sustainability ndash environmental financial and social ndash in the face of a changing world It embraces the concepts of life- cycle assessment the valuation and protection of assets and optimized long-term investment decisions
ouR AchieveMenTs bull LEED Silver designation for YMCALibrary facility
bull Installation of new HVAC system in City Hall reduces energy costs
bull Installation of lsquoEco Chillrsquo refrigeration system at Waterloo Memorial Recreation Complex
bull Replacement of boiler systems at Waterloo Memorial Recreation Complex ndash increased efficiency with a reduction in the carbon footprint
bull Completion of various RInC projects
ouR Future goALs incLude bull Completion of implementation of Maximo Phases II
bull Commence implementation of Maximo Phase III
bull Corporate space planning initiatives
bull Implementation of environmental strategies and initiatives
bull Comprehensive plan for life-cycle managment of corporate assets
bull Update asset conditions and facility condition index maintaining VFA
bull Better utilize corporate intranet ndash develop AM online library and services (including digitizing current hard copy data and drawings)
bull Continued project managment of city projects
bull Completion of various land-related activities and transactions
YMCASTORK FAMILY LIBRARY
DEVELOPMENT SERVICES DEPARTMENT Development Services is responsible for helping ensure that the City is planned developed and constructed in a manner that meets the existing and future goals of our community as well as satisfying legislative requirements associated with our services
ouR Mission As a department we strive to plan build and realize a safe and attractive sustainable community through the combined work of our four divisions
ouR goAL In Development Services our goal is to ensure that our community evolves appropriately for our citizens through professional land use advise to Council
ouR chALLenges Increase resources to provide expected level of services given an ever increasing level of development activity increase training opportunities to reflect changing work managing unanticipated projects
DEVELOPMENT SERVICES DEPARTMENT
buiLding sTAndARds division ouR goAL Our goal is to inform and assist our customers to ensure safe and orderly development and to provide efficient delivery of building approvals inspections and management systems
ouR AchieveMenTs bull Minor permits review completed from e-drawings
bull Completion of site plan approval process
bull Projects completed Balsillie School Perimeter Institute and several residential high-rises
DEVELOPMENT SERVICES DEPARTMENT
PoLicy deveLoPMenT division ouR goAL To work with Council and the community to foster a healthy and vibrant place for people to live work do business and play
ouR AchieveMenT bull Significant efforts focused on site plan process review
ouR Future goALs incLude buiLding sTAndARds division Advance the use of technology bull For online permit applications inspection booking bull Paperless permit application
bull Paperless plan examination for small to medium-size projects bull Improve records management from paper based to electronic bull Review of service level and applicable building permit fees bull Establish standard operating procedures to manage our service
level and establish best practice guidelines bull Build strong partnerships with the industry engage them in our process
creating an education program and participating in industry functions
PoLicy deveLoPMenT division bull Develop Official Plan monitoring protocol bull Consider brownfield incentives bull Initiate major transit station area planning bull Complete Northdale Land Use and Community Improvement
Plan study bull Complete North Waterloo District Plan
bull Complete Clean Water Act Implementation with PWS
bull Complete Clair Hills remnant hydro parcels landscaping bull Construct Westvale Park
DEVELOPMENT SERVICES DEPARTMENT
deveLoPMenT APPRovALs division ouR goAL To work in partnership with citizens and the development industry to help ensure that our city evolves in the direction that meets existing and future community needs and desires
ouR AchieveMenTs bull Continuous Improvement Zoning bylaw updates are accessible from the web Integrated Development Approvals Process
bull Complete application and preconsultation requirements (Zone change site plan demo control and C of A)
bull Systemization of performance measurement for Committee of Adjustment Site Plan Review Committee Sign Variance Committee
ouR Future goALs incLude bull Implementation of the new Official Plan
bull New zoning bylaw to align with the new Official Plan
Development ProjectsProposals bull Balsillie School of International Affairs complete Phase I
initiate Phase ii
bull BarrelYards implementation
bull RIM East Campus additional phases
bull NCR Master Plan
bull Core Re-urbanization Projects
bull West Side Employment Lands
bull Implementation of West Side Plans of Subdivision
bull OMB Hearings
bull 144 Park St Phase II
committees and customer service bull Continue to provide high quality and timely customer service related to zoning development and committee inquiries
bull New Sign Bylaw implementation
bull AMANDA link to site plan
DEVELOPMENT SERVICES DEPARTMENT
engineeRing And consTRucTion division ouR goAL The Engineering and Construction divisionrsquos goal is to work co-operatively with the development industry consultants and the public to promote the construction of new high-quality infrastructure (roads watermains sewers stormwater management)
ouR AchieveMenTs bull Implementing a major Continuous Improvement (CI) project for Site Plan Control
ouR Future goALs incLude bull Implementation of new major subdivision developments (West Side Lands Carriage CrossingWoolwich Estates)
bull Complete policy review for enhanced service delivery and improved efficiencies and incorporate into regular updates of the development Manual
bull Implement enhanced electronic tracking of development approvals leveraging existing technologies within the department using the AMAndA system
bull Initiate review of records management needs and implement necessary changes in conjunction with corporate initiatives
bull Participate in the identification of service capacity issues to identify infrastructure needs for the capital budget
bull Continue to adapt skill sets and core competencies to the ldquonewrdquo development reality in Waterloo which is focused on urban intensification and infill projects
bull Provide engineering review and inspection services for new major site plans in the uptown and other locations
FINANCE DEPARTMENT The Finance department supports the organization by assisting Council and the Corporate Management Team in the development of financial policies and strategic goals The department also advises and assists city departments in the timely and effective provision of accounting budgeting purchasing and revenue services
ouR Mission The Finance department is committed to excellence in providing sound financial management and consultative services Support and enhance operational effectiveness and efficiency
ouR goAL To provide reliable sound short- medium- and long-term financial strategies to ensure the long-term sustainable financial viability of the corporation
ouR chALLenges Declining assessment growth and multiple demands on scarce financial resources
FINANCE DEPARTMENT
AccounTing division ouR goAL To provide efficient reporting while safeguarding the assets of the corporation and providing financial information to Council CMT other departments and the community
ouR AchieveMenTs bull Initialization of new procedures and requirements for the reporting of TCA requirement
bull Upgrade of Peoplesoft Payroll Management System
bull Increased payment through electronic channels
ouR Future goALs incLude Further enhancement of Reporting bull Annual Report (2013) bull Ongoing development of Financial Reporting System (2012) bull Finance upgrade (2014) bull Portal type delivery of financial information
Increased Utilization of PeopleSoft Payroll Management System bull Security (2012-2014) bull Manager view of leave banks (2012-2014) bull Staff Association time entry (2012-2014) bull Work flow (2013) bull Electronic fund transfer payments for vendors (2012-2013) bull Epay (2012)
implementation of Recommendations from continuous improvement bull Payroll time cards bull Account Payable entry
FINANCE DEPARTMENT
budgeTs amp FinAnciAL PLAnningdivision ouR goAL To fulfill fiduciary and statutory requirements and provide reliable financial strategies to ensure the financial viability of the corporation while maintaining effective stewardship of financial resources
ouR AchieveMenTs bull Refined the 3-year budget process
bull Reserve and Reserve Fund Policy review
bull Rolled out budget software to web-based version
FINANCE DEPARTMENT
Revenue division ouR goAL Develop and implement an effective system of recording and collecting amounts due to the City using a corporate approach across multiple subsystems
ouR AchieveMenT bull Department is handling approximately 3000 incoming calls per month water amp sewer billing accounted for a 3-fold increase in the number of incoming calls
ouR Future goALs incLude bull Development Charge Bylaw update
bull Financial Control Bylaw
bull Implement PSAB (Public Sector Accounting Board) requirements for budgeting
bull Develop long term financial plan
bull Continue to develop dynamic financial planning policies to adapt to an environment of constantly shifting priorities
bull Review Investment Strategy and review potential for institutional pricing
bull Collecting amounts due to the City using a corporate approach across multiple subsystems
bull Continue to stress customer service excellence including multiple sites payment stations and promoting electronic payment options
bull Ongoing implementation of POS at selected City sites
bull Develop the Cityrsquos internal controls for cash handling
bull Recommend policy on the use of special services levies
bull Developing a Payment Card Industry Data Security Standard (PCIDSS) compliance plan
bull Reduce and rationalize the number of water billing sections
FINANCE DEPARTMENT
PuRchAsing division ouR goAL The goal of the Purchasing division is to follow the Cityrsquos Purchasing Bylaw and provincial and federal government law to acquire the best total cost for the products and services required by the City of Waterloo as well as providing a fair open and transparent purchasing process for the supply base
ouR AchieveMenTs bull Additional expansion of using procurement cards has reduced staff time spent on issuing purchase orders
bull Issuing of cheques through Accounts Payable has been reduced through the implementation of the procurement card program
bull Using e-commerce platforms reduces the time required to input data for the purchasing receipt and payment of invoices
bull Involvement with the provincial contracts (vendor of records) has reduced the cost of the services supplied (courier and cellular devices)
bull Involvement in co-operative and provincial contracts has increased purchasing efficiencies
ouR Future goALs incLude bull Computerization and bar coding of stockroom items
bull Implement the recommendations listed in the Purchasing Review Report
bull Work with the Environmental Strategy Implementation Steering committee to further enhance green procurement and a sustainable Waterloo
bull Review implement most cost effective municipal and provincial contracts for items such as telecommunications and courier services
bull Investigate the possibility of a third-party agency to host our bid opportunities
bull Establish a more centralized purchasing function at the city of Waterloo
bull Review and implement new cash discounts for the supply base to the city of Waterloo
HUMAN RESOURCES DEPARTMENT VOLUNTEER SERVICES The provision of Human Resources and Volunteer Services includes recruitment and selection labour and employee relations compensation and benefits sick and disability management training collective bargaining health and safety and organizational design
ouR Mission Engaged competent employees and volunteers are successful in accomplishing strategic and business plans within a vibrant corporate culture at the City of Waterloo
ouR goAL Human Resources and Volunteer Services departmentrsquos programs and services comply with regulatory and legislative requirements and align with the Cityrsquos values to enable staff to accomplish strategic and business plans
ouR chALLenges Build sufficient HR specialist expertise within a generalist model to support service excellence free-up HR capacity through operational efficiencies to enable project work and program design in key areas and training initiatives trends indicating decline of volunteerism requires innovative approaches
HUMAN RESOURCES DEPARTMENT voLunTeeR seRvices
ouR AchieveMenTs bull Completion of a market review of insurance carriers to ensure the cost competitiveness of our employee group benefit plan rates
bull Continued implementation of violence in the workplace programs with respectful workplace training and risk assessment surveys
bull Conducted an employee engagement survey to measure employee engagement in important aspects of work activities relationships and working conditions
bull Research and preparation of negotiations plans for Staff Association CUPE and WPFFA collective agreements
bull Use of technology to create efficiencies using online automated recruitment screening for high volume recruits and enhanced use of PeopleSoft functionality for management information reporting
bull Implementation of volunteer software system to enhance volunteer recruitment and placements
ouR Future goALs incLude Utilize information system data to measure efficiencies and effectiveness of hR and volunteer process improvement and practices
bull Develop a performance appraisal tool to measure competencies and accountabilities
bull Develop a corporate staff recognition program with individual and group components
bull Provide coaching project management and volunteer training and leadership development programming
bull Continue to enhance workplace health and safety with Respectful Workplace initiatives and implementation of Corporate Health and safety Audit recommendations
bull Bargain new agreements for labour groups and Staff Association
bull Implement job evaluation maintenance program
bull Develop corporate and department plans to address issues in the employee engagement survey to enhance employee engagement
bull Continue to implement the Volunteer Engagement Strategy
PROTECTIVE SERVICES DEPARTMENT Protective Services is responsible for the delivery of services by Fire Rescue Bylaw EnforcementProperty Standards and Community Relations
ouR Mission A team of dedicated and professional staff committed to enhancing the safety and quality of life of our community through education inspection enforcement community relations and emergency response
ouR goAL To provide quality service valued by staff and the community in delivery of education inspection enforcement community relations and emergency response
ouR chALLenges Developmentbuilding construction intensification city-wide Light Rail Transit (LRT) green building construction increased population of the city including long-term and temporary residents ongoing need for improved technology to augment existing resources increased student enrollment communication to students living off-campus
PROTECTIVE SERVICES DEPARTMENT
WATeRLoo FiRe Rescue division ouR goAL Waterloo Fire Rescue will continue to grow in response to community needs and expectations to provide the highest standard of service
ouR AchieveMenTs bull Completion of Station 4
bull Activity Tracking Program
bull Enhanced response times on the Cityrsquos east side
bull Measures used to optimize service delivery
ouR Future goALs incLude bull Deliver a fiscally responsible and sustainable service delivery model
bull Reviseupdate simplified risk assessment (3-year cycle)
bull Reviseupdate Fire Master Plan (5-year cycle)
bull Leverage technology to enhance overall effectiveness and efficiency
bull Collaborate with local business and the community to promote fire safety
bull Collaborate with post-secondary institutions to mitigate fire safety priorities
bull Reviseupdate Emergency Management Plan
bull Reviseupdate fire inspection service delivery model
bull Enhance tactical pre-planning
bull Enhance training programs
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
On behalf of the Corporation of the City of Waterloo we are proud to present our 2012-2014 Momentum Report As a city we know there are challenges ahead but as you can see in this report there is plenty of momentum to carry us successfully into the future ndash Tim Anderson CAO
THE 2011-2014 CITy Of WATERlOO STRATEgIC PlAN The guiding docuMenT behind The ciTyrsquos ldquoMoMenTuMrdquo The 2011-2014 city of Waterloo strategic Plan is the document that will guide the city over the next three years and beyond It acts as a road map that will continue to carry us forward as we strive to make Waterloo an even better place to live work and play
The strategic Plan document contains thousands of voices ideas and comments collected from the community through face-to-face workshops online surveys committee meetings and comment cards
The feedback collected helped define the six strategic pillars of the Strategic Plan which provides the future direction and areas of focus to help move our city forward
Within the Momentum Report each of the six strategic pillars are reflected in the direction of each initiative acting as a compass to move the project ahead
The strategic Plan is based on these six strategic pillars
bull Sustainability and our living environment
bull Public engagement
bull Healthy and safe community
bull Vibrant neighbourhoods
bull Getting around
bull Economic vitality
These pillars along with the strategic objectives that have been identified with each pillar will guide the direction of our City for the next three years and ensure that our momentum continues
For more details and updates on the 2011-2014 city of Waterloo strategic Plan please visit wwwmyfuturewaterlooca
CAOrsquoS OffICE The office of the CAO is responsible for the strategic leadership of the corporation while working to strengthen its relationship with the community The CAOrsquos office provides leadership and strategic advice to Council and works to create a framework through which the organization can thrive and meet Councilrsquos strategic goals and vision
ouR Mission Waterloo is a better place to work live and play than ever A green vision strong educational ties and booming workforce make us all proud to call Waterloo home The Corporation of the City of Waterloo is a dedicated team of volunteers staff and elected officials who apply leadership enthusiasm skill and integrity in providing needed and valued services that help build the best quality of life possible for all of our citizens
ouR goAL To foster a continuous improvement philosophy within our organization and support Council in building a better community A progressive organization built on principles which anticipate and satisfy the requirements of our customers and citizens achieved through a team of committed highly skilled and valued people
ouR chALLenges Shifting the culture of the City to a lsquosustainablersquo model in the implementation of all of our various departmentsaddressing our infrastructure deficit in areas that we know are designated as growth areasadapting our policies and processes to address the rapid pace of redevelopmentemerging technologies and changing social issuesproviding increased levels of servicewhile recognizing a desire to maintain taxes at reasonable levelsdeveloping and nurturing partnershipsimplementing rapid transit and intensifying development
CAOrsquoS OffICE
coRPoRATe coMMunicATions ouR goAL To provide information to our residents and employees in order to inform them about their municipal government its services and the value that they receive for their tax dollars inspire them to help the City realize its vision and ensure that they are aware of all the ways that they can become active and engaged in their city
ouR AchieveMenTs bull Introduction of a social media strategy has provided a fast efficient and additional way to communicate with residents and businesses
bull Implementation of a media-monitoring program has allowed Council and senior management to stay informed on issues and to react more proactively
bull Development of a formal work plan has allowed Communications to prioritize align resources and find many efficienices
bull Establishing dedicated Communications Specialist to each department has allowed the team to proactively respond to issues and learn the challenges within each area
bull Moving team together in one location has improved communication among all members and streamlined teamrsquos ability to respond quickly on issues and tactics
bull Teamrsquos new location provides proximity to IMTS CAOrsquos office and Mayorrsquos office - which has enhanced relationship building with these key work groups while enabling faster communication and reaction to issues
ouR Future goALs incLude A better informed and engaged community by bull Enhanced strategic issues management
bull Proactive strategic communication planningleadership for key projects
bull More citizen engagement opportunities
bull Improved and enhanced website and social media channels
bull Distribution of community reports
bull Delivery of effective town hall meetings
A better informed and engaged employee base by bull Development of an internal communications strategy
bull Development of an intranet strategy
bull Implementation of measurement for communications strategies
bull Delivery of effective internal communications
bull Launch of corporate identity standards for the corporation
bull Report on projects to inform and engage employees
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT(CCRS) CCRS provides programs and services that contribute to a sense of community and improved quality of life for Waterloo residents and visitors through access to arts culture and heritage programs and services access to cemetery recreational facility space and programs that promote active and healthy lifestyles
ouR Mission To improve the quality of life for residents and visitors by providing enriching cultural recreational and leisure opportunities in conjunction with community partners and volunteers
ouR goAL To improve the quality of life for residents and visitors by ensuring a comprehensive array of quality programs services and facilities is available at a reasonable cost
ouR chALLenges Sustainability over course of the budget binding agreements compliance to changing legislation succession planning and training and evolving customer expectations
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT
sTRATegic PLAnning PRoMoTion And PeRFoRMAnce division ouR goAL To support the departmentrsquos strategic objectives and priorities by ensuring all policy business planning promotion and support services are provided in advance of department divisional and community needs
ouR AchieveMenTs bull Consolidated policy research and project management into one division for overall cohesive and supportive work program for department success
bull Consolidated work for corporate reporting into one division provides oversight and review opportunity that has departmentrsquos interests at heart
bull CCRS Service Delivery Policy provides clear direction for overall delivery of department services sets priorities and provides overall guidelines
bull Implemented online Program and Activity Guide that uses flip-page technology to reduce print quantities and cost
bull Initiated development of a policy manual for the City of Waterloo Museum Once completed it will support the operation of the museum and enhance our ability to seek external funding
ouR Future goALs incLude bull Space allocation policy and implementation
bull Initiate a comprehensive training program for CCRS supervisors
bull Development of a Neighbourhood Engagement Strategy
bull Develop a long-term Cultural Plan
bull Phased design and development of libraryYMCA sports fields
bull Biometric (finger print) scanning implementation at some facilities
bull Implement the Action Skate Park facility strategy
bull WebSocial Media Strategy for CCRS
bull Implement an Older Adult Services Strategy
bull Hire intern position for sales and sponsorship
bull Increase the number of revenue streams
bull Build and increase methods of interacting with clients
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT
coMMuniTy amp cuLTuRAL seRvices division ouR goAL To ensure that the citizens of the City of Waterloo have the opportunity to access a wide variety of recreation leisure activities programs and services
ouR AchieveMenTs bull New Intake business practices designed in the Fee Assistance Leisure Access Program
bull Aligning City of Waterloo grants under one department
bull Continued review of grants for efficiencies
bull Reorganization of adult programs and staffing resources
bull Development of work plan efficiencies with other provincially funded programs
bull Initiated development of ldquoCCRS Event Permitrdquo process to allow congruency and compliance between outdoor festivalseventsprograms and the Noise Bylaw
ouR Future goALs incLude bull Initiate development of a Collections Policy Older Adult Strategic Plan
Public Art Master Plan and cultural strategy
bull Development of a partnership with Parkwood Manor for senior programs
bull Develop and expand the role of the private sector for expansion of the public art collection
bull Develop a policy on guiding principles to meet provincial museum standards
bull Board development across all division committees and affiliated groups
bull Implement Affiliation Service Agreement
bull Participate in theVolunteer Engagement Strategy
bull Development of cost recovery charges for replacement of capital items
bull Identify and facilitate training opportunities for affiliated organizations
bull Completion of public art projects
bull Participate in and implement theVolunteer Engagement Strategy
bull Development of a staffing strategy for all areas of CCS
bull Leadership training for all staff
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT
RecReATion And FAciLiTy seRvices ouR goAL Recreation and Facility Services will deliver programs and services that align with the Corporate Strategic Plan and the Community Culture and Recreation Services Master Plan and Guiding Principles
Key goals include bull Effective and efficient programs services and operations bull Fiscal responsibility bull Increased communication and engagement of staff bull Customer service excellence
ouR AchieveMenTs bull Customer Service Strategy ndash delivering a consistent model across facilities
bull Operations Strategy ndash cross training to maximize the efficient use of staffing resources
bull Digital signage installationutilization at RIM Park
bull Building maintenance staff re-integration into day-to-day operations of facilities
ouR Future goALs incLude bull Ongoing divisional assistance in the implementation of recommen-
dations associated the community culture and Recreation services Master Plan
bull Cemetery Services - Bechtel Park Master Plan ndash continued implementation of council-approved recommendations
bull Review of operations and aquatics models
bull Ongoing joint service opportunities with the City of Kitchener cemetery division
bull Implementation of Health and Safety and Risk Assessment Audit recommendations
bull Ongoing implementation of ODA requirements for facilities and customer service
bull Continued support of green initiatives within facilities
bull Development and implementation of facility equipment replacement strategies
CORPORATE SERVICES DEPARTMENT The Corporate Services department is responsible for the co-ordination and delivery of services by the ClerksCorporate Secretary division Economic Development division Asset Management division Information Management and Technology Services division and Legal Services
ouR Mission To oversee a dedicated team of professional and technical staff that is committed to providing quality customer service to staff as a support function and to the taxpayer and Council who expect timely service
ouR goAL To provide quality services valued by staff and the community in the areas of facility maintenance information technology Council support economic and community information and legal services
ouR chALLenges Budget resources lack of staffing resources and expertise cross-departmental co-ordination on priorities and projects
CORPORATE SERVICES DEPARTMENT
CLERKSCORPORATE SECRETARY division ouR goAL ClerksCorporate Secretary will continue to improve upon its solid foundation of customer service excellence for Council the general public and staff This will include the continuation of quick and accurate responses to general questions personalized assistance applying analysis to research and inquiries and brainstorming ideas for improvement of general services
ouR AchieveMenTs committee orientation
bull Resulted in better awareness of the Committee Policy and related policies and by-laws which will reduce staff time responding to questions and issues
bull Provided networking opportunity for Committees
New FOI requestTracking Form bull Will save 2-3 days of work when creating the Annual Report bull Colour-coded requests to ensure the deadlines are met
Records Management bull Working group met to review requirements for annual records management transfer to Service Centre
bull Resulted in a more efficient and successful Records Management
corporate Policy Manual bull Will result in more efficient access to corporate policies with standardized information
ouR Future goALs incLude bull Review of dog licensing program
bull Review of business licensinghome businesses
bull Implementation of new records management systems and processes
bull Review of election process and voting methods
bull Review of agenda and report templates
bull Procedural Bylaw review
bull Review legal invoice approval and process
bull Implement required AODA legislative requirements
CORPORATE SERVICES DEPARTMENT
inFoRMATion MAnAgeMenT amp TECHNOLOGY SERVICES (IMTS) ouR goAL To play an active leadership role in delivering comprehensive information and technology-based solutions and services to support the Cityrsquos vision and goals
ouR AchieveMenTs bull Core Switching and network enhancements to increase efficiency
bull Implemented A to Z Service Directory of municipal and regional services on our website as an aid to external customers
bull PC refresh to increase efficiency
econoMic deveLoPMenT division ouR goAL Our goal is to implement the strategic imperatives of the City of Waterloo Strategic Plan Economic Development Strategy and the City-Owned Employment Lands Strategy
ouR AchieveMenTs bull Business Directory ndash now available online searchable and updatable by business ndash co-ordinated regionally
bull Business Calling Program ndash co-ordinated regionally
bull Creative Talent Steering Committee ndash pooled resources regionally
bull Urban Design Video
ouR Future goALs incLude inFoRMATion MAnAgeMenT amp TechnoLogy seRvices bull Possible relocation of server room to third-floor space
bull Implementation of Maximo II and III
bull Completion of corporate website strategy requirements and build
bull Completion of Disaster Recovery Continuity Plan
bull Continue expansion of the underground fibre optic backbone infrastructure
econoMic deveLoPMenT division bull Continued implementation of Economic Development Strategy
bull Implementation of City-Owned Employment Land Strategy
bull Sector collisions between tourism and high-tech industries
bull Continued provision of visitor services
bull Collaborate with other organizations on Talent Strategy and Research
CORPORATE SERVICES DEPARTMENT
AsseT MAnAgeMenT division ouR goAL The objective of Asset Management is sustainability ndash environmental financial and social ndash in the face of a changing world It embraces the concepts of life- cycle assessment the valuation and protection of assets and optimized long-term investment decisions
ouR AchieveMenTs bull LEED Silver designation for YMCALibrary facility
bull Installation of new HVAC system in City Hall reduces energy costs
bull Installation of lsquoEco Chillrsquo refrigeration system at Waterloo Memorial Recreation Complex
bull Replacement of boiler systems at Waterloo Memorial Recreation Complex ndash increased efficiency with a reduction in the carbon footprint
bull Completion of various RInC projects
ouR Future goALs incLude bull Completion of implementation of Maximo Phases II
bull Commence implementation of Maximo Phase III
bull Corporate space planning initiatives
bull Implementation of environmental strategies and initiatives
bull Comprehensive plan for life-cycle managment of corporate assets
bull Update asset conditions and facility condition index maintaining VFA
bull Better utilize corporate intranet ndash develop AM online library and services (including digitizing current hard copy data and drawings)
bull Continued project managment of city projects
bull Completion of various land-related activities and transactions
YMCASTORK FAMILY LIBRARY
DEVELOPMENT SERVICES DEPARTMENT Development Services is responsible for helping ensure that the City is planned developed and constructed in a manner that meets the existing and future goals of our community as well as satisfying legislative requirements associated with our services
ouR Mission As a department we strive to plan build and realize a safe and attractive sustainable community through the combined work of our four divisions
ouR goAL In Development Services our goal is to ensure that our community evolves appropriately for our citizens through professional land use advise to Council
ouR chALLenges Increase resources to provide expected level of services given an ever increasing level of development activity increase training opportunities to reflect changing work managing unanticipated projects
DEVELOPMENT SERVICES DEPARTMENT
buiLding sTAndARds division ouR goAL Our goal is to inform and assist our customers to ensure safe and orderly development and to provide efficient delivery of building approvals inspections and management systems
ouR AchieveMenTs bull Minor permits review completed from e-drawings
bull Completion of site plan approval process
bull Projects completed Balsillie School Perimeter Institute and several residential high-rises
DEVELOPMENT SERVICES DEPARTMENT
PoLicy deveLoPMenT division ouR goAL To work with Council and the community to foster a healthy and vibrant place for people to live work do business and play
ouR AchieveMenT bull Significant efforts focused on site plan process review
ouR Future goALs incLude buiLding sTAndARds division Advance the use of technology bull For online permit applications inspection booking bull Paperless permit application
bull Paperless plan examination for small to medium-size projects bull Improve records management from paper based to electronic bull Review of service level and applicable building permit fees bull Establish standard operating procedures to manage our service
level and establish best practice guidelines bull Build strong partnerships with the industry engage them in our process
creating an education program and participating in industry functions
PoLicy deveLoPMenT division bull Develop Official Plan monitoring protocol bull Consider brownfield incentives bull Initiate major transit station area planning bull Complete Northdale Land Use and Community Improvement
Plan study bull Complete North Waterloo District Plan
bull Complete Clean Water Act Implementation with PWS
bull Complete Clair Hills remnant hydro parcels landscaping bull Construct Westvale Park
DEVELOPMENT SERVICES DEPARTMENT
deveLoPMenT APPRovALs division ouR goAL To work in partnership with citizens and the development industry to help ensure that our city evolves in the direction that meets existing and future community needs and desires
ouR AchieveMenTs bull Continuous Improvement Zoning bylaw updates are accessible from the web Integrated Development Approvals Process
bull Complete application and preconsultation requirements (Zone change site plan demo control and C of A)
bull Systemization of performance measurement for Committee of Adjustment Site Plan Review Committee Sign Variance Committee
ouR Future goALs incLude bull Implementation of the new Official Plan
bull New zoning bylaw to align with the new Official Plan
Development ProjectsProposals bull Balsillie School of International Affairs complete Phase I
initiate Phase ii
bull BarrelYards implementation
bull RIM East Campus additional phases
bull NCR Master Plan
bull Core Re-urbanization Projects
bull West Side Employment Lands
bull Implementation of West Side Plans of Subdivision
bull OMB Hearings
bull 144 Park St Phase II
committees and customer service bull Continue to provide high quality and timely customer service related to zoning development and committee inquiries
bull New Sign Bylaw implementation
bull AMANDA link to site plan
DEVELOPMENT SERVICES DEPARTMENT
engineeRing And consTRucTion division ouR goAL The Engineering and Construction divisionrsquos goal is to work co-operatively with the development industry consultants and the public to promote the construction of new high-quality infrastructure (roads watermains sewers stormwater management)
ouR AchieveMenTs bull Implementing a major Continuous Improvement (CI) project for Site Plan Control
ouR Future goALs incLude bull Implementation of new major subdivision developments (West Side Lands Carriage CrossingWoolwich Estates)
bull Complete policy review for enhanced service delivery and improved efficiencies and incorporate into regular updates of the development Manual
bull Implement enhanced electronic tracking of development approvals leveraging existing technologies within the department using the AMAndA system
bull Initiate review of records management needs and implement necessary changes in conjunction with corporate initiatives
bull Participate in the identification of service capacity issues to identify infrastructure needs for the capital budget
bull Continue to adapt skill sets and core competencies to the ldquonewrdquo development reality in Waterloo which is focused on urban intensification and infill projects
bull Provide engineering review and inspection services for new major site plans in the uptown and other locations
FINANCE DEPARTMENT The Finance department supports the organization by assisting Council and the Corporate Management Team in the development of financial policies and strategic goals The department also advises and assists city departments in the timely and effective provision of accounting budgeting purchasing and revenue services
ouR Mission The Finance department is committed to excellence in providing sound financial management and consultative services Support and enhance operational effectiveness and efficiency
ouR goAL To provide reliable sound short- medium- and long-term financial strategies to ensure the long-term sustainable financial viability of the corporation
ouR chALLenges Declining assessment growth and multiple demands on scarce financial resources
FINANCE DEPARTMENT
AccounTing division ouR goAL To provide efficient reporting while safeguarding the assets of the corporation and providing financial information to Council CMT other departments and the community
ouR AchieveMenTs bull Initialization of new procedures and requirements for the reporting of TCA requirement
bull Upgrade of Peoplesoft Payroll Management System
bull Increased payment through electronic channels
ouR Future goALs incLude Further enhancement of Reporting bull Annual Report (2013) bull Ongoing development of Financial Reporting System (2012) bull Finance upgrade (2014) bull Portal type delivery of financial information
Increased Utilization of PeopleSoft Payroll Management System bull Security (2012-2014) bull Manager view of leave banks (2012-2014) bull Staff Association time entry (2012-2014) bull Work flow (2013) bull Electronic fund transfer payments for vendors (2012-2013) bull Epay (2012)
implementation of Recommendations from continuous improvement bull Payroll time cards bull Account Payable entry
FINANCE DEPARTMENT
budgeTs amp FinAnciAL PLAnningdivision ouR goAL To fulfill fiduciary and statutory requirements and provide reliable financial strategies to ensure the financial viability of the corporation while maintaining effective stewardship of financial resources
ouR AchieveMenTs bull Refined the 3-year budget process
bull Reserve and Reserve Fund Policy review
bull Rolled out budget software to web-based version
FINANCE DEPARTMENT
Revenue division ouR goAL Develop and implement an effective system of recording and collecting amounts due to the City using a corporate approach across multiple subsystems
ouR AchieveMenT bull Department is handling approximately 3000 incoming calls per month water amp sewer billing accounted for a 3-fold increase in the number of incoming calls
ouR Future goALs incLude bull Development Charge Bylaw update
bull Financial Control Bylaw
bull Implement PSAB (Public Sector Accounting Board) requirements for budgeting
bull Develop long term financial plan
bull Continue to develop dynamic financial planning policies to adapt to an environment of constantly shifting priorities
bull Review Investment Strategy and review potential for institutional pricing
bull Collecting amounts due to the City using a corporate approach across multiple subsystems
bull Continue to stress customer service excellence including multiple sites payment stations and promoting electronic payment options
bull Ongoing implementation of POS at selected City sites
bull Develop the Cityrsquos internal controls for cash handling
bull Recommend policy on the use of special services levies
bull Developing a Payment Card Industry Data Security Standard (PCIDSS) compliance plan
bull Reduce and rationalize the number of water billing sections
FINANCE DEPARTMENT
PuRchAsing division ouR goAL The goal of the Purchasing division is to follow the Cityrsquos Purchasing Bylaw and provincial and federal government law to acquire the best total cost for the products and services required by the City of Waterloo as well as providing a fair open and transparent purchasing process for the supply base
ouR AchieveMenTs bull Additional expansion of using procurement cards has reduced staff time spent on issuing purchase orders
bull Issuing of cheques through Accounts Payable has been reduced through the implementation of the procurement card program
bull Using e-commerce platforms reduces the time required to input data for the purchasing receipt and payment of invoices
bull Involvement with the provincial contracts (vendor of records) has reduced the cost of the services supplied (courier and cellular devices)
bull Involvement in co-operative and provincial contracts has increased purchasing efficiencies
ouR Future goALs incLude bull Computerization and bar coding of stockroom items
bull Implement the recommendations listed in the Purchasing Review Report
bull Work with the Environmental Strategy Implementation Steering committee to further enhance green procurement and a sustainable Waterloo
bull Review implement most cost effective municipal and provincial contracts for items such as telecommunications and courier services
bull Investigate the possibility of a third-party agency to host our bid opportunities
bull Establish a more centralized purchasing function at the city of Waterloo
bull Review and implement new cash discounts for the supply base to the city of Waterloo
HUMAN RESOURCES DEPARTMENT VOLUNTEER SERVICES The provision of Human Resources and Volunteer Services includes recruitment and selection labour and employee relations compensation and benefits sick and disability management training collective bargaining health and safety and organizational design
ouR Mission Engaged competent employees and volunteers are successful in accomplishing strategic and business plans within a vibrant corporate culture at the City of Waterloo
ouR goAL Human Resources and Volunteer Services departmentrsquos programs and services comply with regulatory and legislative requirements and align with the Cityrsquos values to enable staff to accomplish strategic and business plans
ouR chALLenges Build sufficient HR specialist expertise within a generalist model to support service excellence free-up HR capacity through operational efficiencies to enable project work and program design in key areas and training initiatives trends indicating decline of volunteerism requires innovative approaches
HUMAN RESOURCES DEPARTMENT voLunTeeR seRvices
ouR AchieveMenTs bull Completion of a market review of insurance carriers to ensure the cost competitiveness of our employee group benefit plan rates
bull Continued implementation of violence in the workplace programs with respectful workplace training and risk assessment surveys
bull Conducted an employee engagement survey to measure employee engagement in important aspects of work activities relationships and working conditions
bull Research and preparation of negotiations plans for Staff Association CUPE and WPFFA collective agreements
bull Use of technology to create efficiencies using online automated recruitment screening for high volume recruits and enhanced use of PeopleSoft functionality for management information reporting
bull Implementation of volunteer software system to enhance volunteer recruitment and placements
ouR Future goALs incLude Utilize information system data to measure efficiencies and effectiveness of hR and volunteer process improvement and practices
bull Develop a performance appraisal tool to measure competencies and accountabilities
bull Develop a corporate staff recognition program with individual and group components
bull Provide coaching project management and volunteer training and leadership development programming
bull Continue to enhance workplace health and safety with Respectful Workplace initiatives and implementation of Corporate Health and safety Audit recommendations
bull Bargain new agreements for labour groups and Staff Association
bull Implement job evaluation maintenance program
bull Develop corporate and department plans to address issues in the employee engagement survey to enhance employee engagement
bull Continue to implement the Volunteer Engagement Strategy
PROTECTIVE SERVICES DEPARTMENT Protective Services is responsible for the delivery of services by Fire Rescue Bylaw EnforcementProperty Standards and Community Relations
ouR Mission A team of dedicated and professional staff committed to enhancing the safety and quality of life of our community through education inspection enforcement community relations and emergency response
ouR goAL To provide quality service valued by staff and the community in delivery of education inspection enforcement community relations and emergency response
ouR chALLenges Developmentbuilding construction intensification city-wide Light Rail Transit (LRT) green building construction increased population of the city including long-term and temporary residents ongoing need for improved technology to augment existing resources increased student enrollment communication to students living off-campus
PROTECTIVE SERVICES DEPARTMENT
WATeRLoo FiRe Rescue division ouR goAL Waterloo Fire Rescue will continue to grow in response to community needs and expectations to provide the highest standard of service
ouR AchieveMenTs bull Completion of Station 4
bull Activity Tracking Program
bull Enhanced response times on the Cityrsquos east side
bull Measures used to optimize service delivery
ouR Future goALs incLude bull Deliver a fiscally responsible and sustainable service delivery model
bull Reviseupdate simplified risk assessment (3-year cycle)
bull Reviseupdate Fire Master Plan (5-year cycle)
bull Leverage technology to enhance overall effectiveness and efficiency
bull Collaborate with local business and the community to promote fire safety
bull Collaborate with post-secondary institutions to mitigate fire safety priorities
bull Reviseupdate Emergency Management Plan
bull Reviseupdate fire inspection service delivery model
bull Enhance tactical pre-planning
bull Enhance training programs
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
THE 2011-2014 CITy Of WATERlOO STRATEgIC PlAN The guiding docuMenT behind The ciTyrsquos ldquoMoMenTuMrdquo The 2011-2014 city of Waterloo strategic Plan is the document that will guide the city over the next three years and beyond It acts as a road map that will continue to carry us forward as we strive to make Waterloo an even better place to live work and play
The strategic Plan document contains thousands of voices ideas and comments collected from the community through face-to-face workshops online surveys committee meetings and comment cards
The feedback collected helped define the six strategic pillars of the Strategic Plan which provides the future direction and areas of focus to help move our city forward
Within the Momentum Report each of the six strategic pillars are reflected in the direction of each initiative acting as a compass to move the project ahead
The strategic Plan is based on these six strategic pillars
bull Sustainability and our living environment
bull Public engagement
bull Healthy and safe community
bull Vibrant neighbourhoods
bull Getting around
bull Economic vitality
These pillars along with the strategic objectives that have been identified with each pillar will guide the direction of our City for the next three years and ensure that our momentum continues
For more details and updates on the 2011-2014 city of Waterloo strategic Plan please visit wwwmyfuturewaterlooca
CAOrsquoS OffICE The office of the CAO is responsible for the strategic leadership of the corporation while working to strengthen its relationship with the community The CAOrsquos office provides leadership and strategic advice to Council and works to create a framework through which the organization can thrive and meet Councilrsquos strategic goals and vision
ouR Mission Waterloo is a better place to work live and play than ever A green vision strong educational ties and booming workforce make us all proud to call Waterloo home The Corporation of the City of Waterloo is a dedicated team of volunteers staff and elected officials who apply leadership enthusiasm skill and integrity in providing needed and valued services that help build the best quality of life possible for all of our citizens
ouR goAL To foster a continuous improvement philosophy within our organization and support Council in building a better community A progressive organization built on principles which anticipate and satisfy the requirements of our customers and citizens achieved through a team of committed highly skilled and valued people
ouR chALLenges Shifting the culture of the City to a lsquosustainablersquo model in the implementation of all of our various departmentsaddressing our infrastructure deficit in areas that we know are designated as growth areasadapting our policies and processes to address the rapid pace of redevelopmentemerging technologies and changing social issuesproviding increased levels of servicewhile recognizing a desire to maintain taxes at reasonable levelsdeveloping and nurturing partnershipsimplementing rapid transit and intensifying development
CAOrsquoS OffICE
coRPoRATe coMMunicATions ouR goAL To provide information to our residents and employees in order to inform them about their municipal government its services and the value that they receive for their tax dollars inspire them to help the City realize its vision and ensure that they are aware of all the ways that they can become active and engaged in their city
ouR AchieveMenTs bull Introduction of a social media strategy has provided a fast efficient and additional way to communicate with residents and businesses
bull Implementation of a media-monitoring program has allowed Council and senior management to stay informed on issues and to react more proactively
bull Development of a formal work plan has allowed Communications to prioritize align resources and find many efficienices
bull Establishing dedicated Communications Specialist to each department has allowed the team to proactively respond to issues and learn the challenges within each area
bull Moving team together in one location has improved communication among all members and streamlined teamrsquos ability to respond quickly on issues and tactics
bull Teamrsquos new location provides proximity to IMTS CAOrsquos office and Mayorrsquos office - which has enhanced relationship building with these key work groups while enabling faster communication and reaction to issues
ouR Future goALs incLude A better informed and engaged community by bull Enhanced strategic issues management
bull Proactive strategic communication planningleadership for key projects
bull More citizen engagement opportunities
bull Improved and enhanced website and social media channels
bull Distribution of community reports
bull Delivery of effective town hall meetings
A better informed and engaged employee base by bull Development of an internal communications strategy
bull Development of an intranet strategy
bull Implementation of measurement for communications strategies
bull Delivery of effective internal communications
bull Launch of corporate identity standards for the corporation
bull Report on projects to inform and engage employees
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT(CCRS) CCRS provides programs and services that contribute to a sense of community and improved quality of life for Waterloo residents and visitors through access to arts culture and heritage programs and services access to cemetery recreational facility space and programs that promote active and healthy lifestyles
ouR Mission To improve the quality of life for residents and visitors by providing enriching cultural recreational and leisure opportunities in conjunction with community partners and volunteers
ouR goAL To improve the quality of life for residents and visitors by ensuring a comprehensive array of quality programs services and facilities is available at a reasonable cost
ouR chALLenges Sustainability over course of the budget binding agreements compliance to changing legislation succession planning and training and evolving customer expectations
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT
sTRATegic PLAnning PRoMoTion And PeRFoRMAnce division ouR goAL To support the departmentrsquos strategic objectives and priorities by ensuring all policy business planning promotion and support services are provided in advance of department divisional and community needs
ouR AchieveMenTs bull Consolidated policy research and project management into one division for overall cohesive and supportive work program for department success
bull Consolidated work for corporate reporting into one division provides oversight and review opportunity that has departmentrsquos interests at heart
bull CCRS Service Delivery Policy provides clear direction for overall delivery of department services sets priorities and provides overall guidelines
bull Implemented online Program and Activity Guide that uses flip-page technology to reduce print quantities and cost
bull Initiated development of a policy manual for the City of Waterloo Museum Once completed it will support the operation of the museum and enhance our ability to seek external funding
ouR Future goALs incLude bull Space allocation policy and implementation
bull Initiate a comprehensive training program for CCRS supervisors
bull Development of a Neighbourhood Engagement Strategy
bull Develop a long-term Cultural Plan
bull Phased design and development of libraryYMCA sports fields
bull Biometric (finger print) scanning implementation at some facilities
bull Implement the Action Skate Park facility strategy
bull WebSocial Media Strategy for CCRS
bull Implement an Older Adult Services Strategy
bull Hire intern position for sales and sponsorship
bull Increase the number of revenue streams
bull Build and increase methods of interacting with clients
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT
coMMuniTy amp cuLTuRAL seRvices division ouR goAL To ensure that the citizens of the City of Waterloo have the opportunity to access a wide variety of recreation leisure activities programs and services
ouR AchieveMenTs bull New Intake business practices designed in the Fee Assistance Leisure Access Program
bull Aligning City of Waterloo grants under one department
bull Continued review of grants for efficiencies
bull Reorganization of adult programs and staffing resources
bull Development of work plan efficiencies with other provincially funded programs
bull Initiated development of ldquoCCRS Event Permitrdquo process to allow congruency and compliance between outdoor festivalseventsprograms and the Noise Bylaw
ouR Future goALs incLude bull Initiate development of a Collections Policy Older Adult Strategic Plan
Public Art Master Plan and cultural strategy
bull Development of a partnership with Parkwood Manor for senior programs
bull Develop and expand the role of the private sector for expansion of the public art collection
bull Develop a policy on guiding principles to meet provincial museum standards
bull Board development across all division committees and affiliated groups
bull Implement Affiliation Service Agreement
bull Participate in theVolunteer Engagement Strategy
bull Development of cost recovery charges for replacement of capital items
bull Identify and facilitate training opportunities for affiliated organizations
bull Completion of public art projects
bull Participate in and implement theVolunteer Engagement Strategy
bull Development of a staffing strategy for all areas of CCS
bull Leadership training for all staff
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT
RecReATion And FAciLiTy seRvices ouR goAL Recreation and Facility Services will deliver programs and services that align with the Corporate Strategic Plan and the Community Culture and Recreation Services Master Plan and Guiding Principles
Key goals include bull Effective and efficient programs services and operations bull Fiscal responsibility bull Increased communication and engagement of staff bull Customer service excellence
ouR AchieveMenTs bull Customer Service Strategy ndash delivering a consistent model across facilities
bull Operations Strategy ndash cross training to maximize the efficient use of staffing resources
bull Digital signage installationutilization at RIM Park
bull Building maintenance staff re-integration into day-to-day operations of facilities
ouR Future goALs incLude bull Ongoing divisional assistance in the implementation of recommen-
dations associated the community culture and Recreation services Master Plan
bull Cemetery Services - Bechtel Park Master Plan ndash continued implementation of council-approved recommendations
bull Review of operations and aquatics models
bull Ongoing joint service opportunities with the City of Kitchener cemetery division
bull Implementation of Health and Safety and Risk Assessment Audit recommendations
bull Ongoing implementation of ODA requirements for facilities and customer service
bull Continued support of green initiatives within facilities
bull Development and implementation of facility equipment replacement strategies
CORPORATE SERVICES DEPARTMENT The Corporate Services department is responsible for the co-ordination and delivery of services by the ClerksCorporate Secretary division Economic Development division Asset Management division Information Management and Technology Services division and Legal Services
ouR Mission To oversee a dedicated team of professional and technical staff that is committed to providing quality customer service to staff as a support function and to the taxpayer and Council who expect timely service
ouR goAL To provide quality services valued by staff and the community in the areas of facility maintenance information technology Council support economic and community information and legal services
ouR chALLenges Budget resources lack of staffing resources and expertise cross-departmental co-ordination on priorities and projects
CORPORATE SERVICES DEPARTMENT
CLERKSCORPORATE SECRETARY division ouR goAL ClerksCorporate Secretary will continue to improve upon its solid foundation of customer service excellence for Council the general public and staff This will include the continuation of quick and accurate responses to general questions personalized assistance applying analysis to research and inquiries and brainstorming ideas for improvement of general services
ouR AchieveMenTs committee orientation
bull Resulted in better awareness of the Committee Policy and related policies and by-laws which will reduce staff time responding to questions and issues
bull Provided networking opportunity for Committees
New FOI requestTracking Form bull Will save 2-3 days of work when creating the Annual Report bull Colour-coded requests to ensure the deadlines are met
Records Management bull Working group met to review requirements for annual records management transfer to Service Centre
bull Resulted in a more efficient and successful Records Management
corporate Policy Manual bull Will result in more efficient access to corporate policies with standardized information
ouR Future goALs incLude bull Review of dog licensing program
bull Review of business licensinghome businesses
bull Implementation of new records management systems and processes
bull Review of election process and voting methods
bull Review of agenda and report templates
bull Procedural Bylaw review
bull Review legal invoice approval and process
bull Implement required AODA legislative requirements
CORPORATE SERVICES DEPARTMENT
inFoRMATion MAnAgeMenT amp TECHNOLOGY SERVICES (IMTS) ouR goAL To play an active leadership role in delivering comprehensive information and technology-based solutions and services to support the Cityrsquos vision and goals
ouR AchieveMenTs bull Core Switching and network enhancements to increase efficiency
bull Implemented A to Z Service Directory of municipal and regional services on our website as an aid to external customers
bull PC refresh to increase efficiency
econoMic deveLoPMenT division ouR goAL Our goal is to implement the strategic imperatives of the City of Waterloo Strategic Plan Economic Development Strategy and the City-Owned Employment Lands Strategy
ouR AchieveMenTs bull Business Directory ndash now available online searchable and updatable by business ndash co-ordinated regionally
bull Business Calling Program ndash co-ordinated regionally
bull Creative Talent Steering Committee ndash pooled resources regionally
bull Urban Design Video
ouR Future goALs incLude inFoRMATion MAnAgeMenT amp TechnoLogy seRvices bull Possible relocation of server room to third-floor space
bull Implementation of Maximo II and III
bull Completion of corporate website strategy requirements and build
bull Completion of Disaster Recovery Continuity Plan
bull Continue expansion of the underground fibre optic backbone infrastructure
econoMic deveLoPMenT division bull Continued implementation of Economic Development Strategy
bull Implementation of City-Owned Employment Land Strategy
bull Sector collisions between tourism and high-tech industries
bull Continued provision of visitor services
bull Collaborate with other organizations on Talent Strategy and Research
CORPORATE SERVICES DEPARTMENT
AsseT MAnAgeMenT division ouR goAL The objective of Asset Management is sustainability ndash environmental financial and social ndash in the face of a changing world It embraces the concepts of life- cycle assessment the valuation and protection of assets and optimized long-term investment decisions
ouR AchieveMenTs bull LEED Silver designation for YMCALibrary facility
bull Installation of new HVAC system in City Hall reduces energy costs
bull Installation of lsquoEco Chillrsquo refrigeration system at Waterloo Memorial Recreation Complex
bull Replacement of boiler systems at Waterloo Memorial Recreation Complex ndash increased efficiency with a reduction in the carbon footprint
bull Completion of various RInC projects
ouR Future goALs incLude bull Completion of implementation of Maximo Phases II
bull Commence implementation of Maximo Phase III
bull Corporate space planning initiatives
bull Implementation of environmental strategies and initiatives
bull Comprehensive plan for life-cycle managment of corporate assets
bull Update asset conditions and facility condition index maintaining VFA
bull Better utilize corporate intranet ndash develop AM online library and services (including digitizing current hard copy data and drawings)
bull Continued project managment of city projects
bull Completion of various land-related activities and transactions
YMCASTORK FAMILY LIBRARY
DEVELOPMENT SERVICES DEPARTMENT Development Services is responsible for helping ensure that the City is planned developed and constructed in a manner that meets the existing and future goals of our community as well as satisfying legislative requirements associated with our services
ouR Mission As a department we strive to plan build and realize a safe and attractive sustainable community through the combined work of our four divisions
ouR goAL In Development Services our goal is to ensure that our community evolves appropriately for our citizens through professional land use advise to Council
ouR chALLenges Increase resources to provide expected level of services given an ever increasing level of development activity increase training opportunities to reflect changing work managing unanticipated projects
DEVELOPMENT SERVICES DEPARTMENT
buiLding sTAndARds division ouR goAL Our goal is to inform and assist our customers to ensure safe and orderly development and to provide efficient delivery of building approvals inspections and management systems
ouR AchieveMenTs bull Minor permits review completed from e-drawings
bull Completion of site plan approval process
bull Projects completed Balsillie School Perimeter Institute and several residential high-rises
DEVELOPMENT SERVICES DEPARTMENT
PoLicy deveLoPMenT division ouR goAL To work with Council and the community to foster a healthy and vibrant place for people to live work do business and play
ouR AchieveMenT bull Significant efforts focused on site plan process review
ouR Future goALs incLude buiLding sTAndARds division Advance the use of technology bull For online permit applications inspection booking bull Paperless permit application
bull Paperless plan examination for small to medium-size projects bull Improve records management from paper based to electronic bull Review of service level and applicable building permit fees bull Establish standard operating procedures to manage our service
level and establish best practice guidelines bull Build strong partnerships with the industry engage them in our process
creating an education program and participating in industry functions
PoLicy deveLoPMenT division bull Develop Official Plan monitoring protocol bull Consider brownfield incentives bull Initiate major transit station area planning bull Complete Northdale Land Use and Community Improvement
Plan study bull Complete North Waterloo District Plan
bull Complete Clean Water Act Implementation with PWS
bull Complete Clair Hills remnant hydro parcels landscaping bull Construct Westvale Park
DEVELOPMENT SERVICES DEPARTMENT
deveLoPMenT APPRovALs division ouR goAL To work in partnership with citizens and the development industry to help ensure that our city evolves in the direction that meets existing and future community needs and desires
ouR AchieveMenTs bull Continuous Improvement Zoning bylaw updates are accessible from the web Integrated Development Approvals Process
bull Complete application and preconsultation requirements (Zone change site plan demo control and C of A)
bull Systemization of performance measurement for Committee of Adjustment Site Plan Review Committee Sign Variance Committee
ouR Future goALs incLude bull Implementation of the new Official Plan
bull New zoning bylaw to align with the new Official Plan
Development ProjectsProposals bull Balsillie School of International Affairs complete Phase I
initiate Phase ii
bull BarrelYards implementation
bull RIM East Campus additional phases
bull NCR Master Plan
bull Core Re-urbanization Projects
bull West Side Employment Lands
bull Implementation of West Side Plans of Subdivision
bull OMB Hearings
bull 144 Park St Phase II
committees and customer service bull Continue to provide high quality and timely customer service related to zoning development and committee inquiries
bull New Sign Bylaw implementation
bull AMANDA link to site plan
DEVELOPMENT SERVICES DEPARTMENT
engineeRing And consTRucTion division ouR goAL The Engineering and Construction divisionrsquos goal is to work co-operatively with the development industry consultants and the public to promote the construction of new high-quality infrastructure (roads watermains sewers stormwater management)
ouR AchieveMenTs bull Implementing a major Continuous Improvement (CI) project for Site Plan Control
ouR Future goALs incLude bull Implementation of new major subdivision developments (West Side Lands Carriage CrossingWoolwich Estates)
bull Complete policy review for enhanced service delivery and improved efficiencies and incorporate into regular updates of the development Manual
bull Implement enhanced electronic tracking of development approvals leveraging existing technologies within the department using the AMAndA system
bull Initiate review of records management needs and implement necessary changes in conjunction with corporate initiatives
bull Participate in the identification of service capacity issues to identify infrastructure needs for the capital budget
bull Continue to adapt skill sets and core competencies to the ldquonewrdquo development reality in Waterloo which is focused on urban intensification and infill projects
bull Provide engineering review and inspection services for new major site plans in the uptown and other locations
FINANCE DEPARTMENT The Finance department supports the organization by assisting Council and the Corporate Management Team in the development of financial policies and strategic goals The department also advises and assists city departments in the timely and effective provision of accounting budgeting purchasing and revenue services
ouR Mission The Finance department is committed to excellence in providing sound financial management and consultative services Support and enhance operational effectiveness and efficiency
ouR goAL To provide reliable sound short- medium- and long-term financial strategies to ensure the long-term sustainable financial viability of the corporation
ouR chALLenges Declining assessment growth and multiple demands on scarce financial resources
FINANCE DEPARTMENT
AccounTing division ouR goAL To provide efficient reporting while safeguarding the assets of the corporation and providing financial information to Council CMT other departments and the community
ouR AchieveMenTs bull Initialization of new procedures and requirements for the reporting of TCA requirement
bull Upgrade of Peoplesoft Payroll Management System
bull Increased payment through electronic channels
ouR Future goALs incLude Further enhancement of Reporting bull Annual Report (2013) bull Ongoing development of Financial Reporting System (2012) bull Finance upgrade (2014) bull Portal type delivery of financial information
Increased Utilization of PeopleSoft Payroll Management System bull Security (2012-2014) bull Manager view of leave banks (2012-2014) bull Staff Association time entry (2012-2014) bull Work flow (2013) bull Electronic fund transfer payments for vendors (2012-2013) bull Epay (2012)
implementation of Recommendations from continuous improvement bull Payroll time cards bull Account Payable entry
FINANCE DEPARTMENT
budgeTs amp FinAnciAL PLAnningdivision ouR goAL To fulfill fiduciary and statutory requirements and provide reliable financial strategies to ensure the financial viability of the corporation while maintaining effective stewardship of financial resources
ouR AchieveMenTs bull Refined the 3-year budget process
bull Reserve and Reserve Fund Policy review
bull Rolled out budget software to web-based version
FINANCE DEPARTMENT
Revenue division ouR goAL Develop and implement an effective system of recording and collecting amounts due to the City using a corporate approach across multiple subsystems
ouR AchieveMenT bull Department is handling approximately 3000 incoming calls per month water amp sewer billing accounted for a 3-fold increase in the number of incoming calls
ouR Future goALs incLude bull Development Charge Bylaw update
bull Financial Control Bylaw
bull Implement PSAB (Public Sector Accounting Board) requirements for budgeting
bull Develop long term financial plan
bull Continue to develop dynamic financial planning policies to adapt to an environment of constantly shifting priorities
bull Review Investment Strategy and review potential for institutional pricing
bull Collecting amounts due to the City using a corporate approach across multiple subsystems
bull Continue to stress customer service excellence including multiple sites payment stations and promoting electronic payment options
bull Ongoing implementation of POS at selected City sites
bull Develop the Cityrsquos internal controls for cash handling
bull Recommend policy on the use of special services levies
bull Developing a Payment Card Industry Data Security Standard (PCIDSS) compliance plan
bull Reduce and rationalize the number of water billing sections
FINANCE DEPARTMENT
PuRchAsing division ouR goAL The goal of the Purchasing division is to follow the Cityrsquos Purchasing Bylaw and provincial and federal government law to acquire the best total cost for the products and services required by the City of Waterloo as well as providing a fair open and transparent purchasing process for the supply base
ouR AchieveMenTs bull Additional expansion of using procurement cards has reduced staff time spent on issuing purchase orders
bull Issuing of cheques through Accounts Payable has been reduced through the implementation of the procurement card program
bull Using e-commerce platforms reduces the time required to input data for the purchasing receipt and payment of invoices
bull Involvement with the provincial contracts (vendor of records) has reduced the cost of the services supplied (courier and cellular devices)
bull Involvement in co-operative and provincial contracts has increased purchasing efficiencies
ouR Future goALs incLude bull Computerization and bar coding of stockroom items
bull Implement the recommendations listed in the Purchasing Review Report
bull Work with the Environmental Strategy Implementation Steering committee to further enhance green procurement and a sustainable Waterloo
bull Review implement most cost effective municipal and provincial contracts for items such as telecommunications and courier services
bull Investigate the possibility of a third-party agency to host our bid opportunities
bull Establish a more centralized purchasing function at the city of Waterloo
bull Review and implement new cash discounts for the supply base to the city of Waterloo
HUMAN RESOURCES DEPARTMENT VOLUNTEER SERVICES The provision of Human Resources and Volunteer Services includes recruitment and selection labour and employee relations compensation and benefits sick and disability management training collective bargaining health and safety and organizational design
ouR Mission Engaged competent employees and volunteers are successful in accomplishing strategic and business plans within a vibrant corporate culture at the City of Waterloo
ouR goAL Human Resources and Volunteer Services departmentrsquos programs and services comply with regulatory and legislative requirements and align with the Cityrsquos values to enable staff to accomplish strategic and business plans
ouR chALLenges Build sufficient HR specialist expertise within a generalist model to support service excellence free-up HR capacity through operational efficiencies to enable project work and program design in key areas and training initiatives trends indicating decline of volunteerism requires innovative approaches
HUMAN RESOURCES DEPARTMENT voLunTeeR seRvices
ouR AchieveMenTs bull Completion of a market review of insurance carriers to ensure the cost competitiveness of our employee group benefit plan rates
bull Continued implementation of violence in the workplace programs with respectful workplace training and risk assessment surveys
bull Conducted an employee engagement survey to measure employee engagement in important aspects of work activities relationships and working conditions
bull Research and preparation of negotiations plans for Staff Association CUPE and WPFFA collective agreements
bull Use of technology to create efficiencies using online automated recruitment screening for high volume recruits and enhanced use of PeopleSoft functionality for management information reporting
bull Implementation of volunteer software system to enhance volunteer recruitment and placements
ouR Future goALs incLude Utilize information system data to measure efficiencies and effectiveness of hR and volunteer process improvement and practices
bull Develop a performance appraisal tool to measure competencies and accountabilities
bull Develop a corporate staff recognition program with individual and group components
bull Provide coaching project management and volunteer training and leadership development programming
bull Continue to enhance workplace health and safety with Respectful Workplace initiatives and implementation of Corporate Health and safety Audit recommendations
bull Bargain new agreements for labour groups and Staff Association
bull Implement job evaluation maintenance program
bull Develop corporate and department plans to address issues in the employee engagement survey to enhance employee engagement
bull Continue to implement the Volunteer Engagement Strategy
PROTECTIVE SERVICES DEPARTMENT Protective Services is responsible for the delivery of services by Fire Rescue Bylaw EnforcementProperty Standards and Community Relations
ouR Mission A team of dedicated and professional staff committed to enhancing the safety and quality of life of our community through education inspection enforcement community relations and emergency response
ouR goAL To provide quality service valued by staff and the community in delivery of education inspection enforcement community relations and emergency response
ouR chALLenges Developmentbuilding construction intensification city-wide Light Rail Transit (LRT) green building construction increased population of the city including long-term and temporary residents ongoing need for improved technology to augment existing resources increased student enrollment communication to students living off-campus
PROTECTIVE SERVICES DEPARTMENT
WATeRLoo FiRe Rescue division ouR goAL Waterloo Fire Rescue will continue to grow in response to community needs and expectations to provide the highest standard of service
ouR AchieveMenTs bull Completion of Station 4
bull Activity Tracking Program
bull Enhanced response times on the Cityrsquos east side
bull Measures used to optimize service delivery
ouR Future goALs incLude bull Deliver a fiscally responsible and sustainable service delivery model
bull Reviseupdate simplified risk assessment (3-year cycle)
bull Reviseupdate Fire Master Plan (5-year cycle)
bull Leverage technology to enhance overall effectiveness and efficiency
bull Collaborate with local business and the community to promote fire safety
bull Collaborate with post-secondary institutions to mitigate fire safety priorities
bull Reviseupdate Emergency Management Plan
bull Reviseupdate fire inspection service delivery model
bull Enhance tactical pre-planning
bull Enhance training programs
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
Within the Momentum Report each of the six strategic pillars are reflected in the direction of each initiative acting as a compass to move the project ahead
The strategic Plan is based on these six strategic pillars
bull Sustainability and our living environment
bull Public engagement
bull Healthy and safe community
bull Vibrant neighbourhoods
bull Getting around
bull Economic vitality
These pillars along with the strategic objectives that have been identified with each pillar will guide the direction of our City for the next three years and ensure that our momentum continues
For more details and updates on the 2011-2014 city of Waterloo strategic Plan please visit wwwmyfuturewaterlooca
CAOrsquoS OffICE The office of the CAO is responsible for the strategic leadership of the corporation while working to strengthen its relationship with the community The CAOrsquos office provides leadership and strategic advice to Council and works to create a framework through which the organization can thrive and meet Councilrsquos strategic goals and vision
ouR Mission Waterloo is a better place to work live and play than ever A green vision strong educational ties and booming workforce make us all proud to call Waterloo home The Corporation of the City of Waterloo is a dedicated team of volunteers staff and elected officials who apply leadership enthusiasm skill and integrity in providing needed and valued services that help build the best quality of life possible for all of our citizens
ouR goAL To foster a continuous improvement philosophy within our organization and support Council in building a better community A progressive organization built on principles which anticipate and satisfy the requirements of our customers and citizens achieved through a team of committed highly skilled and valued people
ouR chALLenges Shifting the culture of the City to a lsquosustainablersquo model in the implementation of all of our various departmentsaddressing our infrastructure deficit in areas that we know are designated as growth areasadapting our policies and processes to address the rapid pace of redevelopmentemerging technologies and changing social issuesproviding increased levels of servicewhile recognizing a desire to maintain taxes at reasonable levelsdeveloping and nurturing partnershipsimplementing rapid transit and intensifying development
CAOrsquoS OffICE
coRPoRATe coMMunicATions ouR goAL To provide information to our residents and employees in order to inform them about their municipal government its services and the value that they receive for their tax dollars inspire them to help the City realize its vision and ensure that they are aware of all the ways that they can become active and engaged in their city
ouR AchieveMenTs bull Introduction of a social media strategy has provided a fast efficient and additional way to communicate with residents and businesses
bull Implementation of a media-monitoring program has allowed Council and senior management to stay informed on issues and to react more proactively
bull Development of a formal work plan has allowed Communications to prioritize align resources and find many efficienices
bull Establishing dedicated Communications Specialist to each department has allowed the team to proactively respond to issues and learn the challenges within each area
bull Moving team together in one location has improved communication among all members and streamlined teamrsquos ability to respond quickly on issues and tactics
bull Teamrsquos new location provides proximity to IMTS CAOrsquos office and Mayorrsquos office - which has enhanced relationship building with these key work groups while enabling faster communication and reaction to issues
ouR Future goALs incLude A better informed and engaged community by bull Enhanced strategic issues management
bull Proactive strategic communication planningleadership for key projects
bull More citizen engagement opportunities
bull Improved and enhanced website and social media channels
bull Distribution of community reports
bull Delivery of effective town hall meetings
A better informed and engaged employee base by bull Development of an internal communications strategy
bull Development of an intranet strategy
bull Implementation of measurement for communications strategies
bull Delivery of effective internal communications
bull Launch of corporate identity standards for the corporation
bull Report on projects to inform and engage employees
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT(CCRS) CCRS provides programs and services that contribute to a sense of community and improved quality of life for Waterloo residents and visitors through access to arts culture and heritage programs and services access to cemetery recreational facility space and programs that promote active and healthy lifestyles
ouR Mission To improve the quality of life for residents and visitors by providing enriching cultural recreational and leisure opportunities in conjunction with community partners and volunteers
ouR goAL To improve the quality of life for residents and visitors by ensuring a comprehensive array of quality programs services and facilities is available at a reasonable cost
ouR chALLenges Sustainability over course of the budget binding agreements compliance to changing legislation succession planning and training and evolving customer expectations
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT
sTRATegic PLAnning PRoMoTion And PeRFoRMAnce division ouR goAL To support the departmentrsquos strategic objectives and priorities by ensuring all policy business planning promotion and support services are provided in advance of department divisional and community needs
ouR AchieveMenTs bull Consolidated policy research and project management into one division for overall cohesive and supportive work program for department success
bull Consolidated work for corporate reporting into one division provides oversight and review opportunity that has departmentrsquos interests at heart
bull CCRS Service Delivery Policy provides clear direction for overall delivery of department services sets priorities and provides overall guidelines
bull Implemented online Program and Activity Guide that uses flip-page technology to reduce print quantities and cost
bull Initiated development of a policy manual for the City of Waterloo Museum Once completed it will support the operation of the museum and enhance our ability to seek external funding
ouR Future goALs incLude bull Space allocation policy and implementation
bull Initiate a comprehensive training program for CCRS supervisors
bull Development of a Neighbourhood Engagement Strategy
bull Develop a long-term Cultural Plan
bull Phased design and development of libraryYMCA sports fields
bull Biometric (finger print) scanning implementation at some facilities
bull Implement the Action Skate Park facility strategy
bull WebSocial Media Strategy for CCRS
bull Implement an Older Adult Services Strategy
bull Hire intern position for sales and sponsorship
bull Increase the number of revenue streams
bull Build and increase methods of interacting with clients
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT
coMMuniTy amp cuLTuRAL seRvices division ouR goAL To ensure that the citizens of the City of Waterloo have the opportunity to access a wide variety of recreation leisure activities programs and services
ouR AchieveMenTs bull New Intake business practices designed in the Fee Assistance Leisure Access Program
bull Aligning City of Waterloo grants under one department
bull Continued review of grants for efficiencies
bull Reorganization of adult programs and staffing resources
bull Development of work plan efficiencies with other provincially funded programs
bull Initiated development of ldquoCCRS Event Permitrdquo process to allow congruency and compliance between outdoor festivalseventsprograms and the Noise Bylaw
ouR Future goALs incLude bull Initiate development of a Collections Policy Older Adult Strategic Plan
Public Art Master Plan and cultural strategy
bull Development of a partnership with Parkwood Manor for senior programs
bull Develop and expand the role of the private sector for expansion of the public art collection
bull Develop a policy on guiding principles to meet provincial museum standards
bull Board development across all division committees and affiliated groups
bull Implement Affiliation Service Agreement
bull Participate in theVolunteer Engagement Strategy
bull Development of cost recovery charges for replacement of capital items
bull Identify and facilitate training opportunities for affiliated organizations
bull Completion of public art projects
bull Participate in and implement theVolunteer Engagement Strategy
bull Development of a staffing strategy for all areas of CCS
bull Leadership training for all staff
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT
RecReATion And FAciLiTy seRvices ouR goAL Recreation and Facility Services will deliver programs and services that align with the Corporate Strategic Plan and the Community Culture and Recreation Services Master Plan and Guiding Principles
Key goals include bull Effective and efficient programs services and operations bull Fiscal responsibility bull Increased communication and engagement of staff bull Customer service excellence
ouR AchieveMenTs bull Customer Service Strategy ndash delivering a consistent model across facilities
bull Operations Strategy ndash cross training to maximize the efficient use of staffing resources
bull Digital signage installationutilization at RIM Park
bull Building maintenance staff re-integration into day-to-day operations of facilities
ouR Future goALs incLude bull Ongoing divisional assistance in the implementation of recommen-
dations associated the community culture and Recreation services Master Plan
bull Cemetery Services - Bechtel Park Master Plan ndash continued implementation of council-approved recommendations
bull Review of operations and aquatics models
bull Ongoing joint service opportunities with the City of Kitchener cemetery division
bull Implementation of Health and Safety and Risk Assessment Audit recommendations
bull Ongoing implementation of ODA requirements for facilities and customer service
bull Continued support of green initiatives within facilities
bull Development and implementation of facility equipment replacement strategies
CORPORATE SERVICES DEPARTMENT The Corporate Services department is responsible for the co-ordination and delivery of services by the ClerksCorporate Secretary division Economic Development division Asset Management division Information Management and Technology Services division and Legal Services
ouR Mission To oversee a dedicated team of professional and technical staff that is committed to providing quality customer service to staff as a support function and to the taxpayer and Council who expect timely service
ouR goAL To provide quality services valued by staff and the community in the areas of facility maintenance information technology Council support economic and community information and legal services
ouR chALLenges Budget resources lack of staffing resources and expertise cross-departmental co-ordination on priorities and projects
CORPORATE SERVICES DEPARTMENT
CLERKSCORPORATE SECRETARY division ouR goAL ClerksCorporate Secretary will continue to improve upon its solid foundation of customer service excellence for Council the general public and staff This will include the continuation of quick and accurate responses to general questions personalized assistance applying analysis to research and inquiries and brainstorming ideas for improvement of general services
ouR AchieveMenTs committee orientation
bull Resulted in better awareness of the Committee Policy and related policies and by-laws which will reduce staff time responding to questions and issues
bull Provided networking opportunity for Committees
New FOI requestTracking Form bull Will save 2-3 days of work when creating the Annual Report bull Colour-coded requests to ensure the deadlines are met
Records Management bull Working group met to review requirements for annual records management transfer to Service Centre
bull Resulted in a more efficient and successful Records Management
corporate Policy Manual bull Will result in more efficient access to corporate policies with standardized information
ouR Future goALs incLude bull Review of dog licensing program
bull Review of business licensinghome businesses
bull Implementation of new records management systems and processes
bull Review of election process and voting methods
bull Review of agenda and report templates
bull Procedural Bylaw review
bull Review legal invoice approval and process
bull Implement required AODA legislative requirements
CORPORATE SERVICES DEPARTMENT
inFoRMATion MAnAgeMenT amp TECHNOLOGY SERVICES (IMTS) ouR goAL To play an active leadership role in delivering comprehensive information and technology-based solutions and services to support the Cityrsquos vision and goals
ouR AchieveMenTs bull Core Switching and network enhancements to increase efficiency
bull Implemented A to Z Service Directory of municipal and regional services on our website as an aid to external customers
bull PC refresh to increase efficiency
econoMic deveLoPMenT division ouR goAL Our goal is to implement the strategic imperatives of the City of Waterloo Strategic Plan Economic Development Strategy and the City-Owned Employment Lands Strategy
ouR AchieveMenTs bull Business Directory ndash now available online searchable and updatable by business ndash co-ordinated regionally
bull Business Calling Program ndash co-ordinated regionally
bull Creative Talent Steering Committee ndash pooled resources regionally
bull Urban Design Video
ouR Future goALs incLude inFoRMATion MAnAgeMenT amp TechnoLogy seRvices bull Possible relocation of server room to third-floor space
bull Implementation of Maximo II and III
bull Completion of corporate website strategy requirements and build
bull Completion of Disaster Recovery Continuity Plan
bull Continue expansion of the underground fibre optic backbone infrastructure
econoMic deveLoPMenT division bull Continued implementation of Economic Development Strategy
bull Implementation of City-Owned Employment Land Strategy
bull Sector collisions between tourism and high-tech industries
bull Continued provision of visitor services
bull Collaborate with other organizations on Talent Strategy and Research
CORPORATE SERVICES DEPARTMENT
AsseT MAnAgeMenT division ouR goAL The objective of Asset Management is sustainability ndash environmental financial and social ndash in the face of a changing world It embraces the concepts of life- cycle assessment the valuation and protection of assets and optimized long-term investment decisions
ouR AchieveMenTs bull LEED Silver designation for YMCALibrary facility
bull Installation of new HVAC system in City Hall reduces energy costs
bull Installation of lsquoEco Chillrsquo refrigeration system at Waterloo Memorial Recreation Complex
bull Replacement of boiler systems at Waterloo Memorial Recreation Complex ndash increased efficiency with a reduction in the carbon footprint
bull Completion of various RInC projects
ouR Future goALs incLude bull Completion of implementation of Maximo Phases II
bull Commence implementation of Maximo Phase III
bull Corporate space planning initiatives
bull Implementation of environmental strategies and initiatives
bull Comprehensive plan for life-cycle managment of corporate assets
bull Update asset conditions and facility condition index maintaining VFA
bull Better utilize corporate intranet ndash develop AM online library and services (including digitizing current hard copy data and drawings)
bull Continued project managment of city projects
bull Completion of various land-related activities and transactions
YMCASTORK FAMILY LIBRARY
DEVELOPMENT SERVICES DEPARTMENT Development Services is responsible for helping ensure that the City is planned developed and constructed in a manner that meets the existing and future goals of our community as well as satisfying legislative requirements associated with our services
ouR Mission As a department we strive to plan build and realize a safe and attractive sustainable community through the combined work of our four divisions
ouR goAL In Development Services our goal is to ensure that our community evolves appropriately for our citizens through professional land use advise to Council
ouR chALLenges Increase resources to provide expected level of services given an ever increasing level of development activity increase training opportunities to reflect changing work managing unanticipated projects
DEVELOPMENT SERVICES DEPARTMENT
buiLding sTAndARds division ouR goAL Our goal is to inform and assist our customers to ensure safe and orderly development and to provide efficient delivery of building approvals inspections and management systems
ouR AchieveMenTs bull Minor permits review completed from e-drawings
bull Completion of site plan approval process
bull Projects completed Balsillie School Perimeter Institute and several residential high-rises
DEVELOPMENT SERVICES DEPARTMENT
PoLicy deveLoPMenT division ouR goAL To work with Council and the community to foster a healthy and vibrant place for people to live work do business and play
ouR AchieveMenT bull Significant efforts focused on site plan process review
ouR Future goALs incLude buiLding sTAndARds division Advance the use of technology bull For online permit applications inspection booking bull Paperless permit application
bull Paperless plan examination for small to medium-size projects bull Improve records management from paper based to electronic bull Review of service level and applicable building permit fees bull Establish standard operating procedures to manage our service
level and establish best practice guidelines bull Build strong partnerships with the industry engage them in our process
creating an education program and participating in industry functions
PoLicy deveLoPMenT division bull Develop Official Plan monitoring protocol bull Consider brownfield incentives bull Initiate major transit station area planning bull Complete Northdale Land Use and Community Improvement
Plan study bull Complete North Waterloo District Plan
bull Complete Clean Water Act Implementation with PWS
bull Complete Clair Hills remnant hydro parcels landscaping bull Construct Westvale Park
DEVELOPMENT SERVICES DEPARTMENT
deveLoPMenT APPRovALs division ouR goAL To work in partnership with citizens and the development industry to help ensure that our city evolves in the direction that meets existing and future community needs and desires
ouR AchieveMenTs bull Continuous Improvement Zoning bylaw updates are accessible from the web Integrated Development Approvals Process
bull Complete application and preconsultation requirements (Zone change site plan demo control and C of A)
bull Systemization of performance measurement for Committee of Adjustment Site Plan Review Committee Sign Variance Committee
ouR Future goALs incLude bull Implementation of the new Official Plan
bull New zoning bylaw to align with the new Official Plan
Development ProjectsProposals bull Balsillie School of International Affairs complete Phase I
initiate Phase ii
bull BarrelYards implementation
bull RIM East Campus additional phases
bull NCR Master Plan
bull Core Re-urbanization Projects
bull West Side Employment Lands
bull Implementation of West Side Plans of Subdivision
bull OMB Hearings
bull 144 Park St Phase II
committees and customer service bull Continue to provide high quality and timely customer service related to zoning development and committee inquiries
bull New Sign Bylaw implementation
bull AMANDA link to site plan
DEVELOPMENT SERVICES DEPARTMENT
engineeRing And consTRucTion division ouR goAL The Engineering and Construction divisionrsquos goal is to work co-operatively with the development industry consultants and the public to promote the construction of new high-quality infrastructure (roads watermains sewers stormwater management)
ouR AchieveMenTs bull Implementing a major Continuous Improvement (CI) project for Site Plan Control
ouR Future goALs incLude bull Implementation of new major subdivision developments (West Side Lands Carriage CrossingWoolwich Estates)
bull Complete policy review for enhanced service delivery and improved efficiencies and incorporate into regular updates of the development Manual
bull Implement enhanced electronic tracking of development approvals leveraging existing technologies within the department using the AMAndA system
bull Initiate review of records management needs and implement necessary changes in conjunction with corporate initiatives
bull Participate in the identification of service capacity issues to identify infrastructure needs for the capital budget
bull Continue to adapt skill sets and core competencies to the ldquonewrdquo development reality in Waterloo which is focused on urban intensification and infill projects
bull Provide engineering review and inspection services for new major site plans in the uptown and other locations
FINANCE DEPARTMENT The Finance department supports the organization by assisting Council and the Corporate Management Team in the development of financial policies and strategic goals The department also advises and assists city departments in the timely and effective provision of accounting budgeting purchasing and revenue services
ouR Mission The Finance department is committed to excellence in providing sound financial management and consultative services Support and enhance operational effectiveness and efficiency
ouR goAL To provide reliable sound short- medium- and long-term financial strategies to ensure the long-term sustainable financial viability of the corporation
ouR chALLenges Declining assessment growth and multiple demands on scarce financial resources
FINANCE DEPARTMENT
AccounTing division ouR goAL To provide efficient reporting while safeguarding the assets of the corporation and providing financial information to Council CMT other departments and the community
ouR AchieveMenTs bull Initialization of new procedures and requirements for the reporting of TCA requirement
bull Upgrade of Peoplesoft Payroll Management System
bull Increased payment through electronic channels
ouR Future goALs incLude Further enhancement of Reporting bull Annual Report (2013) bull Ongoing development of Financial Reporting System (2012) bull Finance upgrade (2014) bull Portal type delivery of financial information
Increased Utilization of PeopleSoft Payroll Management System bull Security (2012-2014) bull Manager view of leave banks (2012-2014) bull Staff Association time entry (2012-2014) bull Work flow (2013) bull Electronic fund transfer payments for vendors (2012-2013) bull Epay (2012)
implementation of Recommendations from continuous improvement bull Payroll time cards bull Account Payable entry
FINANCE DEPARTMENT
budgeTs amp FinAnciAL PLAnningdivision ouR goAL To fulfill fiduciary and statutory requirements and provide reliable financial strategies to ensure the financial viability of the corporation while maintaining effective stewardship of financial resources
ouR AchieveMenTs bull Refined the 3-year budget process
bull Reserve and Reserve Fund Policy review
bull Rolled out budget software to web-based version
FINANCE DEPARTMENT
Revenue division ouR goAL Develop and implement an effective system of recording and collecting amounts due to the City using a corporate approach across multiple subsystems
ouR AchieveMenT bull Department is handling approximately 3000 incoming calls per month water amp sewer billing accounted for a 3-fold increase in the number of incoming calls
ouR Future goALs incLude bull Development Charge Bylaw update
bull Financial Control Bylaw
bull Implement PSAB (Public Sector Accounting Board) requirements for budgeting
bull Develop long term financial plan
bull Continue to develop dynamic financial planning policies to adapt to an environment of constantly shifting priorities
bull Review Investment Strategy and review potential for institutional pricing
bull Collecting amounts due to the City using a corporate approach across multiple subsystems
bull Continue to stress customer service excellence including multiple sites payment stations and promoting electronic payment options
bull Ongoing implementation of POS at selected City sites
bull Develop the Cityrsquos internal controls for cash handling
bull Recommend policy on the use of special services levies
bull Developing a Payment Card Industry Data Security Standard (PCIDSS) compliance plan
bull Reduce and rationalize the number of water billing sections
FINANCE DEPARTMENT
PuRchAsing division ouR goAL The goal of the Purchasing division is to follow the Cityrsquos Purchasing Bylaw and provincial and federal government law to acquire the best total cost for the products and services required by the City of Waterloo as well as providing a fair open and transparent purchasing process for the supply base
ouR AchieveMenTs bull Additional expansion of using procurement cards has reduced staff time spent on issuing purchase orders
bull Issuing of cheques through Accounts Payable has been reduced through the implementation of the procurement card program
bull Using e-commerce platforms reduces the time required to input data for the purchasing receipt and payment of invoices
bull Involvement with the provincial contracts (vendor of records) has reduced the cost of the services supplied (courier and cellular devices)
bull Involvement in co-operative and provincial contracts has increased purchasing efficiencies
ouR Future goALs incLude bull Computerization and bar coding of stockroom items
bull Implement the recommendations listed in the Purchasing Review Report
bull Work with the Environmental Strategy Implementation Steering committee to further enhance green procurement and a sustainable Waterloo
bull Review implement most cost effective municipal and provincial contracts for items such as telecommunications and courier services
bull Investigate the possibility of a third-party agency to host our bid opportunities
bull Establish a more centralized purchasing function at the city of Waterloo
bull Review and implement new cash discounts for the supply base to the city of Waterloo
HUMAN RESOURCES DEPARTMENT VOLUNTEER SERVICES The provision of Human Resources and Volunteer Services includes recruitment and selection labour and employee relations compensation and benefits sick and disability management training collective bargaining health and safety and organizational design
ouR Mission Engaged competent employees and volunteers are successful in accomplishing strategic and business plans within a vibrant corporate culture at the City of Waterloo
ouR goAL Human Resources and Volunteer Services departmentrsquos programs and services comply with regulatory and legislative requirements and align with the Cityrsquos values to enable staff to accomplish strategic and business plans
ouR chALLenges Build sufficient HR specialist expertise within a generalist model to support service excellence free-up HR capacity through operational efficiencies to enable project work and program design in key areas and training initiatives trends indicating decline of volunteerism requires innovative approaches
HUMAN RESOURCES DEPARTMENT voLunTeeR seRvices
ouR AchieveMenTs bull Completion of a market review of insurance carriers to ensure the cost competitiveness of our employee group benefit plan rates
bull Continued implementation of violence in the workplace programs with respectful workplace training and risk assessment surveys
bull Conducted an employee engagement survey to measure employee engagement in important aspects of work activities relationships and working conditions
bull Research and preparation of negotiations plans for Staff Association CUPE and WPFFA collective agreements
bull Use of technology to create efficiencies using online automated recruitment screening for high volume recruits and enhanced use of PeopleSoft functionality for management information reporting
bull Implementation of volunteer software system to enhance volunteer recruitment and placements
ouR Future goALs incLude Utilize information system data to measure efficiencies and effectiveness of hR and volunteer process improvement and practices
bull Develop a performance appraisal tool to measure competencies and accountabilities
bull Develop a corporate staff recognition program with individual and group components
bull Provide coaching project management and volunteer training and leadership development programming
bull Continue to enhance workplace health and safety with Respectful Workplace initiatives and implementation of Corporate Health and safety Audit recommendations
bull Bargain new agreements for labour groups and Staff Association
bull Implement job evaluation maintenance program
bull Develop corporate and department plans to address issues in the employee engagement survey to enhance employee engagement
bull Continue to implement the Volunteer Engagement Strategy
PROTECTIVE SERVICES DEPARTMENT Protective Services is responsible for the delivery of services by Fire Rescue Bylaw EnforcementProperty Standards and Community Relations
ouR Mission A team of dedicated and professional staff committed to enhancing the safety and quality of life of our community through education inspection enforcement community relations and emergency response
ouR goAL To provide quality service valued by staff and the community in delivery of education inspection enforcement community relations and emergency response
ouR chALLenges Developmentbuilding construction intensification city-wide Light Rail Transit (LRT) green building construction increased population of the city including long-term and temporary residents ongoing need for improved technology to augment existing resources increased student enrollment communication to students living off-campus
PROTECTIVE SERVICES DEPARTMENT
WATeRLoo FiRe Rescue division ouR goAL Waterloo Fire Rescue will continue to grow in response to community needs and expectations to provide the highest standard of service
ouR AchieveMenTs bull Completion of Station 4
bull Activity Tracking Program
bull Enhanced response times on the Cityrsquos east side
bull Measures used to optimize service delivery
ouR Future goALs incLude bull Deliver a fiscally responsible and sustainable service delivery model
bull Reviseupdate simplified risk assessment (3-year cycle)
bull Reviseupdate Fire Master Plan (5-year cycle)
bull Leverage technology to enhance overall effectiveness and efficiency
bull Collaborate with local business and the community to promote fire safety
bull Collaborate with post-secondary institutions to mitigate fire safety priorities
bull Reviseupdate Emergency Management Plan
bull Reviseupdate fire inspection service delivery model
bull Enhance tactical pre-planning
bull Enhance training programs
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
CAOrsquoS OffICE The office of the CAO is responsible for the strategic leadership of the corporation while working to strengthen its relationship with the community The CAOrsquos office provides leadership and strategic advice to Council and works to create a framework through which the organization can thrive and meet Councilrsquos strategic goals and vision
ouR Mission Waterloo is a better place to work live and play than ever A green vision strong educational ties and booming workforce make us all proud to call Waterloo home The Corporation of the City of Waterloo is a dedicated team of volunteers staff and elected officials who apply leadership enthusiasm skill and integrity in providing needed and valued services that help build the best quality of life possible for all of our citizens
ouR goAL To foster a continuous improvement philosophy within our organization and support Council in building a better community A progressive organization built on principles which anticipate and satisfy the requirements of our customers and citizens achieved through a team of committed highly skilled and valued people
ouR chALLenges Shifting the culture of the City to a lsquosustainablersquo model in the implementation of all of our various departmentsaddressing our infrastructure deficit in areas that we know are designated as growth areasadapting our policies and processes to address the rapid pace of redevelopmentemerging technologies and changing social issuesproviding increased levels of servicewhile recognizing a desire to maintain taxes at reasonable levelsdeveloping and nurturing partnershipsimplementing rapid transit and intensifying development
CAOrsquoS OffICE
coRPoRATe coMMunicATions ouR goAL To provide information to our residents and employees in order to inform them about their municipal government its services and the value that they receive for their tax dollars inspire them to help the City realize its vision and ensure that they are aware of all the ways that they can become active and engaged in their city
ouR AchieveMenTs bull Introduction of a social media strategy has provided a fast efficient and additional way to communicate with residents and businesses
bull Implementation of a media-monitoring program has allowed Council and senior management to stay informed on issues and to react more proactively
bull Development of a formal work plan has allowed Communications to prioritize align resources and find many efficienices
bull Establishing dedicated Communications Specialist to each department has allowed the team to proactively respond to issues and learn the challenges within each area
bull Moving team together in one location has improved communication among all members and streamlined teamrsquos ability to respond quickly on issues and tactics
bull Teamrsquos new location provides proximity to IMTS CAOrsquos office and Mayorrsquos office - which has enhanced relationship building with these key work groups while enabling faster communication and reaction to issues
ouR Future goALs incLude A better informed and engaged community by bull Enhanced strategic issues management
bull Proactive strategic communication planningleadership for key projects
bull More citizen engagement opportunities
bull Improved and enhanced website and social media channels
bull Distribution of community reports
bull Delivery of effective town hall meetings
A better informed and engaged employee base by bull Development of an internal communications strategy
bull Development of an intranet strategy
bull Implementation of measurement for communications strategies
bull Delivery of effective internal communications
bull Launch of corporate identity standards for the corporation
bull Report on projects to inform and engage employees
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT(CCRS) CCRS provides programs and services that contribute to a sense of community and improved quality of life for Waterloo residents and visitors through access to arts culture and heritage programs and services access to cemetery recreational facility space and programs that promote active and healthy lifestyles
ouR Mission To improve the quality of life for residents and visitors by providing enriching cultural recreational and leisure opportunities in conjunction with community partners and volunteers
ouR goAL To improve the quality of life for residents and visitors by ensuring a comprehensive array of quality programs services and facilities is available at a reasonable cost
ouR chALLenges Sustainability over course of the budget binding agreements compliance to changing legislation succession planning and training and evolving customer expectations
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT
sTRATegic PLAnning PRoMoTion And PeRFoRMAnce division ouR goAL To support the departmentrsquos strategic objectives and priorities by ensuring all policy business planning promotion and support services are provided in advance of department divisional and community needs
ouR AchieveMenTs bull Consolidated policy research and project management into one division for overall cohesive and supportive work program for department success
bull Consolidated work for corporate reporting into one division provides oversight and review opportunity that has departmentrsquos interests at heart
bull CCRS Service Delivery Policy provides clear direction for overall delivery of department services sets priorities and provides overall guidelines
bull Implemented online Program and Activity Guide that uses flip-page technology to reduce print quantities and cost
bull Initiated development of a policy manual for the City of Waterloo Museum Once completed it will support the operation of the museum and enhance our ability to seek external funding
ouR Future goALs incLude bull Space allocation policy and implementation
bull Initiate a comprehensive training program for CCRS supervisors
bull Development of a Neighbourhood Engagement Strategy
bull Develop a long-term Cultural Plan
bull Phased design and development of libraryYMCA sports fields
bull Biometric (finger print) scanning implementation at some facilities
bull Implement the Action Skate Park facility strategy
bull WebSocial Media Strategy for CCRS
bull Implement an Older Adult Services Strategy
bull Hire intern position for sales and sponsorship
bull Increase the number of revenue streams
bull Build and increase methods of interacting with clients
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT
coMMuniTy amp cuLTuRAL seRvices division ouR goAL To ensure that the citizens of the City of Waterloo have the opportunity to access a wide variety of recreation leisure activities programs and services
ouR AchieveMenTs bull New Intake business practices designed in the Fee Assistance Leisure Access Program
bull Aligning City of Waterloo grants under one department
bull Continued review of grants for efficiencies
bull Reorganization of adult programs and staffing resources
bull Development of work plan efficiencies with other provincially funded programs
bull Initiated development of ldquoCCRS Event Permitrdquo process to allow congruency and compliance between outdoor festivalseventsprograms and the Noise Bylaw
ouR Future goALs incLude bull Initiate development of a Collections Policy Older Adult Strategic Plan
Public Art Master Plan and cultural strategy
bull Development of a partnership with Parkwood Manor for senior programs
bull Develop and expand the role of the private sector for expansion of the public art collection
bull Develop a policy on guiding principles to meet provincial museum standards
bull Board development across all division committees and affiliated groups
bull Implement Affiliation Service Agreement
bull Participate in theVolunteer Engagement Strategy
bull Development of cost recovery charges for replacement of capital items
bull Identify and facilitate training opportunities for affiliated organizations
bull Completion of public art projects
bull Participate in and implement theVolunteer Engagement Strategy
bull Development of a staffing strategy for all areas of CCS
bull Leadership training for all staff
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT
RecReATion And FAciLiTy seRvices ouR goAL Recreation and Facility Services will deliver programs and services that align with the Corporate Strategic Plan and the Community Culture and Recreation Services Master Plan and Guiding Principles
Key goals include bull Effective and efficient programs services and operations bull Fiscal responsibility bull Increased communication and engagement of staff bull Customer service excellence
ouR AchieveMenTs bull Customer Service Strategy ndash delivering a consistent model across facilities
bull Operations Strategy ndash cross training to maximize the efficient use of staffing resources
bull Digital signage installationutilization at RIM Park
bull Building maintenance staff re-integration into day-to-day operations of facilities
ouR Future goALs incLude bull Ongoing divisional assistance in the implementation of recommen-
dations associated the community culture and Recreation services Master Plan
bull Cemetery Services - Bechtel Park Master Plan ndash continued implementation of council-approved recommendations
bull Review of operations and aquatics models
bull Ongoing joint service opportunities with the City of Kitchener cemetery division
bull Implementation of Health and Safety and Risk Assessment Audit recommendations
bull Ongoing implementation of ODA requirements for facilities and customer service
bull Continued support of green initiatives within facilities
bull Development and implementation of facility equipment replacement strategies
CORPORATE SERVICES DEPARTMENT The Corporate Services department is responsible for the co-ordination and delivery of services by the ClerksCorporate Secretary division Economic Development division Asset Management division Information Management and Technology Services division and Legal Services
ouR Mission To oversee a dedicated team of professional and technical staff that is committed to providing quality customer service to staff as a support function and to the taxpayer and Council who expect timely service
ouR goAL To provide quality services valued by staff and the community in the areas of facility maintenance information technology Council support economic and community information and legal services
ouR chALLenges Budget resources lack of staffing resources and expertise cross-departmental co-ordination on priorities and projects
CORPORATE SERVICES DEPARTMENT
CLERKSCORPORATE SECRETARY division ouR goAL ClerksCorporate Secretary will continue to improve upon its solid foundation of customer service excellence for Council the general public and staff This will include the continuation of quick and accurate responses to general questions personalized assistance applying analysis to research and inquiries and brainstorming ideas for improvement of general services
ouR AchieveMenTs committee orientation
bull Resulted in better awareness of the Committee Policy and related policies and by-laws which will reduce staff time responding to questions and issues
bull Provided networking opportunity for Committees
New FOI requestTracking Form bull Will save 2-3 days of work when creating the Annual Report bull Colour-coded requests to ensure the deadlines are met
Records Management bull Working group met to review requirements for annual records management transfer to Service Centre
bull Resulted in a more efficient and successful Records Management
corporate Policy Manual bull Will result in more efficient access to corporate policies with standardized information
ouR Future goALs incLude bull Review of dog licensing program
bull Review of business licensinghome businesses
bull Implementation of new records management systems and processes
bull Review of election process and voting methods
bull Review of agenda and report templates
bull Procedural Bylaw review
bull Review legal invoice approval and process
bull Implement required AODA legislative requirements
CORPORATE SERVICES DEPARTMENT
inFoRMATion MAnAgeMenT amp TECHNOLOGY SERVICES (IMTS) ouR goAL To play an active leadership role in delivering comprehensive information and technology-based solutions and services to support the Cityrsquos vision and goals
ouR AchieveMenTs bull Core Switching and network enhancements to increase efficiency
bull Implemented A to Z Service Directory of municipal and regional services on our website as an aid to external customers
bull PC refresh to increase efficiency
econoMic deveLoPMenT division ouR goAL Our goal is to implement the strategic imperatives of the City of Waterloo Strategic Plan Economic Development Strategy and the City-Owned Employment Lands Strategy
ouR AchieveMenTs bull Business Directory ndash now available online searchable and updatable by business ndash co-ordinated regionally
bull Business Calling Program ndash co-ordinated regionally
bull Creative Talent Steering Committee ndash pooled resources regionally
bull Urban Design Video
ouR Future goALs incLude inFoRMATion MAnAgeMenT amp TechnoLogy seRvices bull Possible relocation of server room to third-floor space
bull Implementation of Maximo II and III
bull Completion of corporate website strategy requirements and build
bull Completion of Disaster Recovery Continuity Plan
bull Continue expansion of the underground fibre optic backbone infrastructure
econoMic deveLoPMenT division bull Continued implementation of Economic Development Strategy
bull Implementation of City-Owned Employment Land Strategy
bull Sector collisions between tourism and high-tech industries
bull Continued provision of visitor services
bull Collaborate with other organizations on Talent Strategy and Research
CORPORATE SERVICES DEPARTMENT
AsseT MAnAgeMenT division ouR goAL The objective of Asset Management is sustainability ndash environmental financial and social ndash in the face of a changing world It embraces the concepts of life- cycle assessment the valuation and protection of assets and optimized long-term investment decisions
ouR AchieveMenTs bull LEED Silver designation for YMCALibrary facility
bull Installation of new HVAC system in City Hall reduces energy costs
bull Installation of lsquoEco Chillrsquo refrigeration system at Waterloo Memorial Recreation Complex
bull Replacement of boiler systems at Waterloo Memorial Recreation Complex ndash increased efficiency with a reduction in the carbon footprint
bull Completion of various RInC projects
ouR Future goALs incLude bull Completion of implementation of Maximo Phases II
bull Commence implementation of Maximo Phase III
bull Corporate space planning initiatives
bull Implementation of environmental strategies and initiatives
bull Comprehensive plan for life-cycle managment of corporate assets
bull Update asset conditions and facility condition index maintaining VFA
bull Better utilize corporate intranet ndash develop AM online library and services (including digitizing current hard copy data and drawings)
bull Continued project managment of city projects
bull Completion of various land-related activities and transactions
YMCASTORK FAMILY LIBRARY
DEVELOPMENT SERVICES DEPARTMENT Development Services is responsible for helping ensure that the City is planned developed and constructed in a manner that meets the existing and future goals of our community as well as satisfying legislative requirements associated with our services
ouR Mission As a department we strive to plan build and realize a safe and attractive sustainable community through the combined work of our four divisions
ouR goAL In Development Services our goal is to ensure that our community evolves appropriately for our citizens through professional land use advise to Council
ouR chALLenges Increase resources to provide expected level of services given an ever increasing level of development activity increase training opportunities to reflect changing work managing unanticipated projects
DEVELOPMENT SERVICES DEPARTMENT
buiLding sTAndARds division ouR goAL Our goal is to inform and assist our customers to ensure safe and orderly development and to provide efficient delivery of building approvals inspections and management systems
ouR AchieveMenTs bull Minor permits review completed from e-drawings
bull Completion of site plan approval process
bull Projects completed Balsillie School Perimeter Institute and several residential high-rises
DEVELOPMENT SERVICES DEPARTMENT
PoLicy deveLoPMenT division ouR goAL To work with Council and the community to foster a healthy and vibrant place for people to live work do business and play
ouR AchieveMenT bull Significant efforts focused on site plan process review
ouR Future goALs incLude buiLding sTAndARds division Advance the use of technology bull For online permit applications inspection booking bull Paperless permit application
bull Paperless plan examination for small to medium-size projects bull Improve records management from paper based to electronic bull Review of service level and applicable building permit fees bull Establish standard operating procedures to manage our service
level and establish best practice guidelines bull Build strong partnerships with the industry engage them in our process
creating an education program and participating in industry functions
PoLicy deveLoPMenT division bull Develop Official Plan monitoring protocol bull Consider brownfield incentives bull Initiate major transit station area planning bull Complete Northdale Land Use and Community Improvement
Plan study bull Complete North Waterloo District Plan
bull Complete Clean Water Act Implementation with PWS
bull Complete Clair Hills remnant hydro parcels landscaping bull Construct Westvale Park
DEVELOPMENT SERVICES DEPARTMENT
deveLoPMenT APPRovALs division ouR goAL To work in partnership with citizens and the development industry to help ensure that our city evolves in the direction that meets existing and future community needs and desires
ouR AchieveMenTs bull Continuous Improvement Zoning bylaw updates are accessible from the web Integrated Development Approvals Process
bull Complete application and preconsultation requirements (Zone change site plan demo control and C of A)
bull Systemization of performance measurement for Committee of Adjustment Site Plan Review Committee Sign Variance Committee
ouR Future goALs incLude bull Implementation of the new Official Plan
bull New zoning bylaw to align with the new Official Plan
Development ProjectsProposals bull Balsillie School of International Affairs complete Phase I
initiate Phase ii
bull BarrelYards implementation
bull RIM East Campus additional phases
bull NCR Master Plan
bull Core Re-urbanization Projects
bull West Side Employment Lands
bull Implementation of West Side Plans of Subdivision
bull OMB Hearings
bull 144 Park St Phase II
committees and customer service bull Continue to provide high quality and timely customer service related to zoning development and committee inquiries
bull New Sign Bylaw implementation
bull AMANDA link to site plan
DEVELOPMENT SERVICES DEPARTMENT
engineeRing And consTRucTion division ouR goAL The Engineering and Construction divisionrsquos goal is to work co-operatively with the development industry consultants and the public to promote the construction of new high-quality infrastructure (roads watermains sewers stormwater management)
ouR AchieveMenTs bull Implementing a major Continuous Improvement (CI) project for Site Plan Control
ouR Future goALs incLude bull Implementation of new major subdivision developments (West Side Lands Carriage CrossingWoolwich Estates)
bull Complete policy review for enhanced service delivery and improved efficiencies and incorporate into regular updates of the development Manual
bull Implement enhanced electronic tracking of development approvals leveraging existing technologies within the department using the AMAndA system
bull Initiate review of records management needs and implement necessary changes in conjunction with corporate initiatives
bull Participate in the identification of service capacity issues to identify infrastructure needs for the capital budget
bull Continue to adapt skill sets and core competencies to the ldquonewrdquo development reality in Waterloo which is focused on urban intensification and infill projects
bull Provide engineering review and inspection services for new major site plans in the uptown and other locations
FINANCE DEPARTMENT The Finance department supports the organization by assisting Council and the Corporate Management Team in the development of financial policies and strategic goals The department also advises and assists city departments in the timely and effective provision of accounting budgeting purchasing and revenue services
ouR Mission The Finance department is committed to excellence in providing sound financial management and consultative services Support and enhance operational effectiveness and efficiency
ouR goAL To provide reliable sound short- medium- and long-term financial strategies to ensure the long-term sustainable financial viability of the corporation
ouR chALLenges Declining assessment growth and multiple demands on scarce financial resources
FINANCE DEPARTMENT
AccounTing division ouR goAL To provide efficient reporting while safeguarding the assets of the corporation and providing financial information to Council CMT other departments and the community
ouR AchieveMenTs bull Initialization of new procedures and requirements for the reporting of TCA requirement
bull Upgrade of Peoplesoft Payroll Management System
bull Increased payment through electronic channels
ouR Future goALs incLude Further enhancement of Reporting bull Annual Report (2013) bull Ongoing development of Financial Reporting System (2012) bull Finance upgrade (2014) bull Portal type delivery of financial information
Increased Utilization of PeopleSoft Payroll Management System bull Security (2012-2014) bull Manager view of leave banks (2012-2014) bull Staff Association time entry (2012-2014) bull Work flow (2013) bull Electronic fund transfer payments for vendors (2012-2013) bull Epay (2012)
implementation of Recommendations from continuous improvement bull Payroll time cards bull Account Payable entry
FINANCE DEPARTMENT
budgeTs amp FinAnciAL PLAnningdivision ouR goAL To fulfill fiduciary and statutory requirements and provide reliable financial strategies to ensure the financial viability of the corporation while maintaining effective stewardship of financial resources
ouR AchieveMenTs bull Refined the 3-year budget process
bull Reserve and Reserve Fund Policy review
bull Rolled out budget software to web-based version
FINANCE DEPARTMENT
Revenue division ouR goAL Develop and implement an effective system of recording and collecting amounts due to the City using a corporate approach across multiple subsystems
ouR AchieveMenT bull Department is handling approximately 3000 incoming calls per month water amp sewer billing accounted for a 3-fold increase in the number of incoming calls
ouR Future goALs incLude bull Development Charge Bylaw update
bull Financial Control Bylaw
bull Implement PSAB (Public Sector Accounting Board) requirements for budgeting
bull Develop long term financial plan
bull Continue to develop dynamic financial planning policies to adapt to an environment of constantly shifting priorities
bull Review Investment Strategy and review potential for institutional pricing
bull Collecting amounts due to the City using a corporate approach across multiple subsystems
bull Continue to stress customer service excellence including multiple sites payment stations and promoting electronic payment options
bull Ongoing implementation of POS at selected City sites
bull Develop the Cityrsquos internal controls for cash handling
bull Recommend policy on the use of special services levies
bull Developing a Payment Card Industry Data Security Standard (PCIDSS) compliance plan
bull Reduce and rationalize the number of water billing sections
FINANCE DEPARTMENT
PuRchAsing division ouR goAL The goal of the Purchasing division is to follow the Cityrsquos Purchasing Bylaw and provincial and federal government law to acquire the best total cost for the products and services required by the City of Waterloo as well as providing a fair open and transparent purchasing process for the supply base
ouR AchieveMenTs bull Additional expansion of using procurement cards has reduced staff time spent on issuing purchase orders
bull Issuing of cheques through Accounts Payable has been reduced through the implementation of the procurement card program
bull Using e-commerce platforms reduces the time required to input data for the purchasing receipt and payment of invoices
bull Involvement with the provincial contracts (vendor of records) has reduced the cost of the services supplied (courier and cellular devices)
bull Involvement in co-operative and provincial contracts has increased purchasing efficiencies
ouR Future goALs incLude bull Computerization and bar coding of stockroom items
bull Implement the recommendations listed in the Purchasing Review Report
bull Work with the Environmental Strategy Implementation Steering committee to further enhance green procurement and a sustainable Waterloo
bull Review implement most cost effective municipal and provincial contracts for items such as telecommunications and courier services
bull Investigate the possibility of a third-party agency to host our bid opportunities
bull Establish a more centralized purchasing function at the city of Waterloo
bull Review and implement new cash discounts for the supply base to the city of Waterloo
HUMAN RESOURCES DEPARTMENT VOLUNTEER SERVICES The provision of Human Resources and Volunteer Services includes recruitment and selection labour and employee relations compensation and benefits sick and disability management training collective bargaining health and safety and organizational design
ouR Mission Engaged competent employees and volunteers are successful in accomplishing strategic and business plans within a vibrant corporate culture at the City of Waterloo
ouR goAL Human Resources and Volunteer Services departmentrsquos programs and services comply with regulatory and legislative requirements and align with the Cityrsquos values to enable staff to accomplish strategic and business plans
ouR chALLenges Build sufficient HR specialist expertise within a generalist model to support service excellence free-up HR capacity through operational efficiencies to enable project work and program design in key areas and training initiatives trends indicating decline of volunteerism requires innovative approaches
HUMAN RESOURCES DEPARTMENT voLunTeeR seRvices
ouR AchieveMenTs bull Completion of a market review of insurance carriers to ensure the cost competitiveness of our employee group benefit plan rates
bull Continued implementation of violence in the workplace programs with respectful workplace training and risk assessment surveys
bull Conducted an employee engagement survey to measure employee engagement in important aspects of work activities relationships and working conditions
bull Research and preparation of negotiations plans for Staff Association CUPE and WPFFA collective agreements
bull Use of technology to create efficiencies using online automated recruitment screening for high volume recruits and enhanced use of PeopleSoft functionality for management information reporting
bull Implementation of volunteer software system to enhance volunteer recruitment and placements
ouR Future goALs incLude Utilize information system data to measure efficiencies and effectiveness of hR and volunteer process improvement and practices
bull Develop a performance appraisal tool to measure competencies and accountabilities
bull Develop a corporate staff recognition program with individual and group components
bull Provide coaching project management and volunteer training and leadership development programming
bull Continue to enhance workplace health and safety with Respectful Workplace initiatives and implementation of Corporate Health and safety Audit recommendations
bull Bargain new agreements for labour groups and Staff Association
bull Implement job evaluation maintenance program
bull Develop corporate and department plans to address issues in the employee engagement survey to enhance employee engagement
bull Continue to implement the Volunteer Engagement Strategy
PROTECTIVE SERVICES DEPARTMENT Protective Services is responsible for the delivery of services by Fire Rescue Bylaw EnforcementProperty Standards and Community Relations
ouR Mission A team of dedicated and professional staff committed to enhancing the safety and quality of life of our community through education inspection enforcement community relations and emergency response
ouR goAL To provide quality service valued by staff and the community in delivery of education inspection enforcement community relations and emergency response
ouR chALLenges Developmentbuilding construction intensification city-wide Light Rail Transit (LRT) green building construction increased population of the city including long-term and temporary residents ongoing need for improved technology to augment existing resources increased student enrollment communication to students living off-campus
PROTECTIVE SERVICES DEPARTMENT
WATeRLoo FiRe Rescue division ouR goAL Waterloo Fire Rescue will continue to grow in response to community needs and expectations to provide the highest standard of service
ouR AchieveMenTs bull Completion of Station 4
bull Activity Tracking Program
bull Enhanced response times on the Cityrsquos east side
bull Measures used to optimize service delivery
ouR Future goALs incLude bull Deliver a fiscally responsible and sustainable service delivery model
bull Reviseupdate simplified risk assessment (3-year cycle)
bull Reviseupdate Fire Master Plan (5-year cycle)
bull Leverage technology to enhance overall effectiveness and efficiency
bull Collaborate with local business and the community to promote fire safety
bull Collaborate with post-secondary institutions to mitigate fire safety priorities
bull Reviseupdate Emergency Management Plan
bull Reviseupdate fire inspection service delivery model
bull Enhance tactical pre-planning
bull Enhance training programs
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
CAOrsquoS OffICE
coRPoRATe coMMunicATions ouR goAL To provide information to our residents and employees in order to inform them about their municipal government its services and the value that they receive for their tax dollars inspire them to help the City realize its vision and ensure that they are aware of all the ways that they can become active and engaged in their city
ouR AchieveMenTs bull Introduction of a social media strategy has provided a fast efficient and additional way to communicate with residents and businesses
bull Implementation of a media-monitoring program has allowed Council and senior management to stay informed on issues and to react more proactively
bull Development of a formal work plan has allowed Communications to prioritize align resources and find many efficienices
bull Establishing dedicated Communications Specialist to each department has allowed the team to proactively respond to issues and learn the challenges within each area
bull Moving team together in one location has improved communication among all members and streamlined teamrsquos ability to respond quickly on issues and tactics
bull Teamrsquos new location provides proximity to IMTS CAOrsquos office and Mayorrsquos office - which has enhanced relationship building with these key work groups while enabling faster communication and reaction to issues
ouR Future goALs incLude A better informed and engaged community by bull Enhanced strategic issues management
bull Proactive strategic communication planningleadership for key projects
bull More citizen engagement opportunities
bull Improved and enhanced website and social media channels
bull Distribution of community reports
bull Delivery of effective town hall meetings
A better informed and engaged employee base by bull Development of an internal communications strategy
bull Development of an intranet strategy
bull Implementation of measurement for communications strategies
bull Delivery of effective internal communications
bull Launch of corporate identity standards for the corporation
bull Report on projects to inform and engage employees
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT(CCRS) CCRS provides programs and services that contribute to a sense of community and improved quality of life for Waterloo residents and visitors through access to arts culture and heritage programs and services access to cemetery recreational facility space and programs that promote active and healthy lifestyles
ouR Mission To improve the quality of life for residents and visitors by providing enriching cultural recreational and leisure opportunities in conjunction with community partners and volunteers
ouR goAL To improve the quality of life for residents and visitors by ensuring a comprehensive array of quality programs services and facilities is available at a reasonable cost
ouR chALLenges Sustainability over course of the budget binding agreements compliance to changing legislation succession planning and training and evolving customer expectations
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT
sTRATegic PLAnning PRoMoTion And PeRFoRMAnce division ouR goAL To support the departmentrsquos strategic objectives and priorities by ensuring all policy business planning promotion and support services are provided in advance of department divisional and community needs
ouR AchieveMenTs bull Consolidated policy research and project management into one division for overall cohesive and supportive work program for department success
bull Consolidated work for corporate reporting into one division provides oversight and review opportunity that has departmentrsquos interests at heart
bull CCRS Service Delivery Policy provides clear direction for overall delivery of department services sets priorities and provides overall guidelines
bull Implemented online Program and Activity Guide that uses flip-page technology to reduce print quantities and cost
bull Initiated development of a policy manual for the City of Waterloo Museum Once completed it will support the operation of the museum and enhance our ability to seek external funding
ouR Future goALs incLude bull Space allocation policy and implementation
bull Initiate a comprehensive training program for CCRS supervisors
bull Development of a Neighbourhood Engagement Strategy
bull Develop a long-term Cultural Plan
bull Phased design and development of libraryYMCA sports fields
bull Biometric (finger print) scanning implementation at some facilities
bull Implement the Action Skate Park facility strategy
bull WebSocial Media Strategy for CCRS
bull Implement an Older Adult Services Strategy
bull Hire intern position for sales and sponsorship
bull Increase the number of revenue streams
bull Build and increase methods of interacting with clients
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT
coMMuniTy amp cuLTuRAL seRvices division ouR goAL To ensure that the citizens of the City of Waterloo have the opportunity to access a wide variety of recreation leisure activities programs and services
ouR AchieveMenTs bull New Intake business practices designed in the Fee Assistance Leisure Access Program
bull Aligning City of Waterloo grants under one department
bull Continued review of grants for efficiencies
bull Reorganization of adult programs and staffing resources
bull Development of work plan efficiencies with other provincially funded programs
bull Initiated development of ldquoCCRS Event Permitrdquo process to allow congruency and compliance between outdoor festivalseventsprograms and the Noise Bylaw
ouR Future goALs incLude bull Initiate development of a Collections Policy Older Adult Strategic Plan
Public Art Master Plan and cultural strategy
bull Development of a partnership with Parkwood Manor for senior programs
bull Develop and expand the role of the private sector for expansion of the public art collection
bull Develop a policy on guiding principles to meet provincial museum standards
bull Board development across all division committees and affiliated groups
bull Implement Affiliation Service Agreement
bull Participate in theVolunteer Engagement Strategy
bull Development of cost recovery charges for replacement of capital items
bull Identify and facilitate training opportunities for affiliated organizations
bull Completion of public art projects
bull Participate in and implement theVolunteer Engagement Strategy
bull Development of a staffing strategy for all areas of CCS
bull Leadership training for all staff
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT
RecReATion And FAciLiTy seRvices ouR goAL Recreation and Facility Services will deliver programs and services that align with the Corporate Strategic Plan and the Community Culture and Recreation Services Master Plan and Guiding Principles
Key goals include bull Effective and efficient programs services and operations bull Fiscal responsibility bull Increased communication and engagement of staff bull Customer service excellence
ouR AchieveMenTs bull Customer Service Strategy ndash delivering a consistent model across facilities
bull Operations Strategy ndash cross training to maximize the efficient use of staffing resources
bull Digital signage installationutilization at RIM Park
bull Building maintenance staff re-integration into day-to-day operations of facilities
ouR Future goALs incLude bull Ongoing divisional assistance in the implementation of recommen-
dations associated the community culture and Recreation services Master Plan
bull Cemetery Services - Bechtel Park Master Plan ndash continued implementation of council-approved recommendations
bull Review of operations and aquatics models
bull Ongoing joint service opportunities with the City of Kitchener cemetery division
bull Implementation of Health and Safety and Risk Assessment Audit recommendations
bull Ongoing implementation of ODA requirements for facilities and customer service
bull Continued support of green initiatives within facilities
bull Development and implementation of facility equipment replacement strategies
CORPORATE SERVICES DEPARTMENT The Corporate Services department is responsible for the co-ordination and delivery of services by the ClerksCorporate Secretary division Economic Development division Asset Management division Information Management and Technology Services division and Legal Services
ouR Mission To oversee a dedicated team of professional and technical staff that is committed to providing quality customer service to staff as a support function and to the taxpayer and Council who expect timely service
ouR goAL To provide quality services valued by staff and the community in the areas of facility maintenance information technology Council support economic and community information and legal services
ouR chALLenges Budget resources lack of staffing resources and expertise cross-departmental co-ordination on priorities and projects
CORPORATE SERVICES DEPARTMENT
CLERKSCORPORATE SECRETARY division ouR goAL ClerksCorporate Secretary will continue to improve upon its solid foundation of customer service excellence for Council the general public and staff This will include the continuation of quick and accurate responses to general questions personalized assistance applying analysis to research and inquiries and brainstorming ideas for improvement of general services
ouR AchieveMenTs committee orientation
bull Resulted in better awareness of the Committee Policy and related policies and by-laws which will reduce staff time responding to questions and issues
bull Provided networking opportunity for Committees
New FOI requestTracking Form bull Will save 2-3 days of work when creating the Annual Report bull Colour-coded requests to ensure the deadlines are met
Records Management bull Working group met to review requirements for annual records management transfer to Service Centre
bull Resulted in a more efficient and successful Records Management
corporate Policy Manual bull Will result in more efficient access to corporate policies with standardized information
ouR Future goALs incLude bull Review of dog licensing program
bull Review of business licensinghome businesses
bull Implementation of new records management systems and processes
bull Review of election process and voting methods
bull Review of agenda and report templates
bull Procedural Bylaw review
bull Review legal invoice approval and process
bull Implement required AODA legislative requirements
CORPORATE SERVICES DEPARTMENT
inFoRMATion MAnAgeMenT amp TECHNOLOGY SERVICES (IMTS) ouR goAL To play an active leadership role in delivering comprehensive information and technology-based solutions and services to support the Cityrsquos vision and goals
ouR AchieveMenTs bull Core Switching and network enhancements to increase efficiency
bull Implemented A to Z Service Directory of municipal and regional services on our website as an aid to external customers
bull PC refresh to increase efficiency
econoMic deveLoPMenT division ouR goAL Our goal is to implement the strategic imperatives of the City of Waterloo Strategic Plan Economic Development Strategy and the City-Owned Employment Lands Strategy
ouR AchieveMenTs bull Business Directory ndash now available online searchable and updatable by business ndash co-ordinated regionally
bull Business Calling Program ndash co-ordinated regionally
bull Creative Talent Steering Committee ndash pooled resources regionally
bull Urban Design Video
ouR Future goALs incLude inFoRMATion MAnAgeMenT amp TechnoLogy seRvices bull Possible relocation of server room to third-floor space
bull Implementation of Maximo II and III
bull Completion of corporate website strategy requirements and build
bull Completion of Disaster Recovery Continuity Plan
bull Continue expansion of the underground fibre optic backbone infrastructure
econoMic deveLoPMenT division bull Continued implementation of Economic Development Strategy
bull Implementation of City-Owned Employment Land Strategy
bull Sector collisions between tourism and high-tech industries
bull Continued provision of visitor services
bull Collaborate with other organizations on Talent Strategy and Research
CORPORATE SERVICES DEPARTMENT
AsseT MAnAgeMenT division ouR goAL The objective of Asset Management is sustainability ndash environmental financial and social ndash in the face of a changing world It embraces the concepts of life- cycle assessment the valuation and protection of assets and optimized long-term investment decisions
ouR AchieveMenTs bull LEED Silver designation for YMCALibrary facility
bull Installation of new HVAC system in City Hall reduces energy costs
bull Installation of lsquoEco Chillrsquo refrigeration system at Waterloo Memorial Recreation Complex
bull Replacement of boiler systems at Waterloo Memorial Recreation Complex ndash increased efficiency with a reduction in the carbon footprint
bull Completion of various RInC projects
ouR Future goALs incLude bull Completion of implementation of Maximo Phases II
bull Commence implementation of Maximo Phase III
bull Corporate space planning initiatives
bull Implementation of environmental strategies and initiatives
bull Comprehensive plan for life-cycle managment of corporate assets
bull Update asset conditions and facility condition index maintaining VFA
bull Better utilize corporate intranet ndash develop AM online library and services (including digitizing current hard copy data and drawings)
bull Continued project managment of city projects
bull Completion of various land-related activities and transactions
YMCASTORK FAMILY LIBRARY
DEVELOPMENT SERVICES DEPARTMENT Development Services is responsible for helping ensure that the City is planned developed and constructed in a manner that meets the existing and future goals of our community as well as satisfying legislative requirements associated with our services
ouR Mission As a department we strive to plan build and realize a safe and attractive sustainable community through the combined work of our four divisions
ouR goAL In Development Services our goal is to ensure that our community evolves appropriately for our citizens through professional land use advise to Council
ouR chALLenges Increase resources to provide expected level of services given an ever increasing level of development activity increase training opportunities to reflect changing work managing unanticipated projects
DEVELOPMENT SERVICES DEPARTMENT
buiLding sTAndARds division ouR goAL Our goal is to inform and assist our customers to ensure safe and orderly development and to provide efficient delivery of building approvals inspections and management systems
ouR AchieveMenTs bull Minor permits review completed from e-drawings
bull Completion of site plan approval process
bull Projects completed Balsillie School Perimeter Institute and several residential high-rises
DEVELOPMENT SERVICES DEPARTMENT
PoLicy deveLoPMenT division ouR goAL To work with Council and the community to foster a healthy and vibrant place for people to live work do business and play
ouR AchieveMenT bull Significant efforts focused on site plan process review
ouR Future goALs incLude buiLding sTAndARds division Advance the use of technology bull For online permit applications inspection booking bull Paperless permit application
bull Paperless plan examination for small to medium-size projects bull Improve records management from paper based to electronic bull Review of service level and applicable building permit fees bull Establish standard operating procedures to manage our service
level and establish best practice guidelines bull Build strong partnerships with the industry engage them in our process
creating an education program and participating in industry functions
PoLicy deveLoPMenT division bull Develop Official Plan monitoring protocol bull Consider brownfield incentives bull Initiate major transit station area planning bull Complete Northdale Land Use and Community Improvement
Plan study bull Complete North Waterloo District Plan
bull Complete Clean Water Act Implementation with PWS
bull Complete Clair Hills remnant hydro parcels landscaping bull Construct Westvale Park
DEVELOPMENT SERVICES DEPARTMENT
deveLoPMenT APPRovALs division ouR goAL To work in partnership with citizens and the development industry to help ensure that our city evolves in the direction that meets existing and future community needs and desires
ouR AchieveMenTs bull Continuous Improvement Zoning bylaw updates are accessible from the web Integrated Development Approvals Process
bull Complete application and preconsultation requirements (Zone change site plan demo control and C of A)
bull Systemization of performance measurement for Committee of Adjustment Site Plan Review Committee Sign Variance Committee
ouR Future goALs incLude bull Implementation of the new Official Plan
bull New zoning bylaw to align with the new Official Plan
Development ProjectsProposals bull Balsillie School of International Affairs complete Phase I
initiate Phase ii
bull BarrelYards implementation
bull RIM East Campus additional phases
bull NCR Master Plan
bull Core Re-urbanization Projects
bull West Side Employment Lands
bull Implementation of West Side Plans of Subdivision
bull OMB Hearings
bull 144 Park St Phase II
committees and customer service bull Continue to provide high quality and timely customer service related to zoning development and committee inquiries
bull New Sign Bylaw implementation
bull AMANDA link to site plan
DEVELOPMENT SERVICES DEPARTMENT
engineeRing And consTRucTion division ouR goAL The Engineering and Construction divisionrsquos goal is to work co-operatively with the development industry consultants and the public to promote the construction of new high-quality infrastructure (roads watermains sewers stormwater management)
ouR AchieveMenTs bull Implementing a major Continuous Improvement (CI) project for Site Plan Control
ouR Future goALs incLude bull Implementation of new major subdivision developments (West Side Lands Carriage CrossingWoolwich Estates)
bull Complete policy review for enhanced service delivery and improved efficiencies and incorporate into regular updates of the development Manual
bull Implement enhanced electronic tracking of development approvals leveraging existing technologies within the department using the AMAndA system
bull Initiate review of records management needs and implement necessary changes in conjunction with corporate initiatives
bull Participate in the identification of service capacity issues to identify infrastructure needs for the capital budget
bull Continue to adapt skill sets and core competencies to the ldquonewrdquo development reality in Waterloo which is focused on urban intensification and infill projects
bull Provide engineering review and inspection services for new major site plans in the uptown and other locations
FINANCE DEPARTMENT The Finance department supports the organization by assisting Council and the Corporate Management Team in the development of financial policies and strategic goals The department also advises and assists city departments in the timely and effective provision of accounting budgeting purchasing and revenue services
ouR Mission The Finance department is committed to excellence in providing sound financial management and consultative services Support and enhance operational effectiveness and efficiency
ouR goAL To provide reliable sound short- medium- and long-term financial strategies to ensure the long-term sustainable financial viability of the corporation
ouR chALLenges Declining assessment growth and multiple demands on scarce financial resources
FINANCE DEPARTMENT
AccounTing division ouR goAL To provide efficient reporting while safeguarding the assets of the corporation and providing financial information to Council CMT other departments and the community
ouR AchieveMenTs bull Initialization of new procedures and requirements for the reporting of TCA requirement
bull Upgrade of Peoplesoft Payroll Management System
bull Increased payment through electronic channels
ouR Future goALs incLude Further enhancement of Reporting bull Annual Report (2013) bull Ongoing development of Financial Reporting System (2012) bull Finance upgrade (2014) bull Portal type delivery of financial information
Increased Utilization of PeopleSoft Payroll Management System bull Security (2012-2014) bull Manager view of leave banks (2012-2014) bull Staff Association time entry (2012-2014) bull Work flow (2013) bull Electronic fund transfer payments for vendors (2012-2013) bull Epay (2012)
implementation of Recommendations from continuous improvement bull Payroll time cards bull Account Payable entry
FINANCE DEPARTMENT
budgeTs amp FinAnciAL PLAnningdivision ouR goAL To fulfill fiduciary and statutory requirements and provide reliable financial strategies to ensure the financial viability of the corporation while maintaining effective stewardship of financial resources
ouR AchieveMenTs bull Refined the 3-year budget process
bull Reserve and Reserve Fund Policy review
bull Rolled out budget software to web-based version
FINANCE DEPARTMENT
Revenue division ouR goAL Develop and implement an effective system of recording and collecting amounts due to the City using a corporate approach across multiple subsystems
ouR AchieveMenT bull Department is handling approximately 3000 incoming calls per month water amp sewer billing accounted for a 3-fold increase in the number of incoming calls
ouR Future goALs incLude bull Development Charge Bylaw update
bull Financial Control Bylaw
bull Implement PSAB (Public Sector Accounting Board) requirements for budgeting
bull Develop long term financial plan
bull Continue to develop dynamic financial planning policies to adapt to an environment of constantly shifting priorities
bull Review Investment Strategy and review potential for institutional pricing
bull Collecting amounts due to the City using a corporate approach across multiple subsystems
bull Continue to stress customer service excellence including multiple sites payment stations and promoting electronic payment options
bull Ongoing implementation of POS at selected City sites
bull Develop the Cityrsquos internal controls for cash handling
bull Recommend policy on the use of special services levies
bull Developing a Payment Card Industry Data Security Standard (PCIDSS) compliance plan
bull Reduce and rationalize the number of water billing sections
FINANCE DEPARTMENT
PuRchAsing division ouR goAL The goal of the Purchasing division is to follow the Cityrsquos Purchasing Bylaw and provincial and federal government law to acquire the best total cost for the products and services required by the City of Waterloo as well as providing a fair open and transparent purchasing process for the supply base
ouR AchieveMenTs bull Additional expansion of using procurement cards has reduced staff time spent on issuing purchase orders
bull Issuing of cheques through Accounts Payable has been reduced through the implementation of the procurement card program
bull Using e-commerce platforms reduces the time required to input data for the purchasing receipt and payment of invoices
bull Involvement with the provincial contracts (vendor of records) has reduced the cost of the services supplied (courier and cellular devices)
bull Involvement in co-operative and provincial contracts has increased purchasing efficiencies
ouR Future goALs incLude bull Computerization and bar coding of stockroom items
bull Implement the recommendations listed in the Purchasing Review Report
bull Work with the Environmental Strategy Implementation Steering committee to further enhance green procurement and a sustainable Waterloo
bull Review implement most cost effective municipal and provincial contracts for items such as telecommunications and courier services
bull Investigate the possibility of a third-party agency to host our bid opportunities
bull Establish a more centralized purchasing function at the city of Waterloo
bull Review and implement new cash discounts for the supply base to the city of Waterloo
HUMAN RESOURCES DEPARTMENT VOLUNTEER SERVICES The provision of Human Resources and Volunteer Services includes recruitment and selection labour and employee relations compensation and benefits sick and disability management training collective bargaining health and safety and organizational design
ouR Mission Engaged competent employees and volunteers are successful in accomplishing strategic and business plans within a vibrant corporate culture at the City of Waterloo
ouR goAL Human Resources and Volunteer Services departmentrsquos programs and services comply with regulatory and legislative requirements and align with the Cityrsquos values to enable staff to accomplish strategic and business plans
ouR chALLenges Build sufficient HR specialist expertise within a generalist model to support service excellence free-up HR capacity through operational efficiencies to enable project work and program design in key areas and training initiatives trends indicating decline of volunteerism requires innovative approaches
HUMAN RESOURCES DEPARTMENT voLunTeeR seRvices
ouR AchieveMenTs bull Completion of a market review of insurance carriers to ensure the cost competitiveness of our employee group benefit plan rates
bull Continued implementation of violence in the workplace programs with respectful workplace training and risk assessment surveys
bull Conducted an employee engagement survey to measure employee engagement in important aspects of work activities relationships and working conditions
bull Research and preparation of negotiations plans for Staff Association CUPE and WPFFA collective agreements
bull Use of technology to create efficiencies using online automated recruitment screening for high volume recruits and enhanced use of PeopleSoft functionality for management information reporting
bull Implementation of volunteer software system to enhance volunteer recruitment and placements
ouR Future goALs incLude Utilize information system data to measure efficiencies and effectiveness of hR and volunteer process improvement and practices
bull Develop a performance appraisal tool to measure competencies and accountabilities
bull Develop a corporate staff recognition program with individual and group components
bull Provide coaching project management and volunteer training and leadership development programming
bull Continue to enhance workplace health and safety with Respectful Workplace initiatives and implementation of Corporate Health and safety Audit recommendations
bull Bargain new agreements for labour groups and Staff Association
bull Implement job evaluation maintenance program
bull Develop corporate and department plans to address issues in the employee engagement survey to enhance employee engagement
bull Continue to implement the Volunteer Engagement Strategy
PROTECTIVE SERVICES DEPARTMENT Protective Services is responsible for the delivery of services by Fire Rescue Bylaw EnforcementProperty Standards and Community Relations
ouR Mission A team of dedicated and professional staff committed to enhancing the safety and quality of life of our community through education inspection enforcement community relations and emergency response
ouR goAL To provide quality service valued by staff and the community in delivery of education inspection enforcement community relations and emergency response
ouR chALLenges Developmentbuilding construction intensification city-wide Light Rail Transit (LRT) green building construction increased population of the city including long-term and temporary residents ongoing need for improved technology to augment existing resources increased student enrollment communication to students living off-campus
PROTECTIVE SERVICES DEPARTMENT
WATeRLoo FiRe Rescue division ouR goAL Waterloo Fire Rescue will continue to grow in response to community needs and expectations to provide the highest standard of service
ouR AchieveMenTs bull Completion of Station 4
bull Activity Tracking Program
bull Enhanced response times on the Cityrsquos east side
bull Measures used to optimize service delivery
ouR Future goALs incLude bull Deliver a fiscally responsible and sustainable service delivery model
bull Reviseupdate simplified risk assessment (3-year cycle)
bull Reviseupdate Fire Master Plan (5-year cycle)
bull Leverage technology to enhance overall effectiveness and efficiency
bull Collaborate with local business and the community to promote fire safety
bull Collaborate with post-secondary institutions to mitigate fire safety priorities
bull Reviseupdate Emergency Management Plan
bull Reviseupdate fire inspection service delivery model
bull Enhance tactical pre-planning
bull Enhance training programs
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
ouR Future goALs incLude A better informed and engaged community by bull Enhanced strategic issues management
bull Proactive strategic communication planningleadership for key projects
bull More citizen engagement opportunities
bull Improved and enhanced website and social media channels
bull Distribution of community reports
bull Delivery of effective town hall meetings
A better informed and engaged employee base by bull Development of an internal communications strategy
bull Development of an intranet strategy
bull Implementation of measurement for communications strategies
bull Delivery of effective internal communications
bull Launch of corporate identity standards for the corporation
bull Report on projects to inform and engage employees
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT(CCRS) CCRS provides programs and services that contribute to a sense of community and improved quality of life for Waterloo residents and visitors through access to arts culture and heritage programs and services access to cemetery recreational facility space and programs that promote active and healthy lifestyles
ouR Mission To improve the quality of life for residents and visitors by providing enriching cultural recreational and leisure opportunities in conjunction with community partners and volunteers
ouR goAL To improve the quality of life for residents and visitors by ensuring a comprehensive array of quality programs services and facilities is available at a reasonable cost
ouR chALLenges Sustainability over course of the budget binding agreements compliance to changing legislation succession planning and training and evolving customer expectations
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT
sTRATegic PLAnning PRoMoTion And PeRFoRMAnce division ouR goAL To support the departmentrsquos strategic objectives and priorities by ensuring all policy business planning promotion and support services are provided in advance of department divisional and community needs
ouR AchieveMenTs bull Consolidated policy research and project management into one division for overall cohesive and supportive work program for department success
bull Consolidated work for corporate reporting into one division provides oversight and review opportunity that has departmentrsquos interests at heart
bull CCRS Service Delivery Policy provides clear direction for overall delivery of department services sets priorities and provides overall guidelines
bull Implemented online Program and Activity Guide that uses flip-page technology to reduce print quantities and cost
bull Initiated development of a policy manual for the City of Waterloo Museum Once completed it will support the operation of the museum and enhance our ability to seek external funding
ouR Future goALs incLude bull Space allocation policy and implementation
bull Initiate a comprehensive training program for CCRS supervisors
bull Development of a Neighbourhood Engagement Strategy
bull Develop a long-term Cultural Plan
bull Phased design and development of libraryYMCA sports fields
bull Biometric (finger print) scanning implementation at some facilities
bull Implement the Action Skate Park facility strategy
bull WebSocial Media Strategy for CCRS
bull Implement an Older Adult Services Strategy
bull Hire intern position for sales and sponsorship
bull Increase the number of revenue streams
bull Build and increase methods of interacting with clients
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT
coMMuniTy amp cuLTuRAL seRvices division ouR goAL To ensure that the citizens of the City of Waterloo have the opportunity to access a wide variety of recreation leisure activities programs and services
ouR AchieveMenTs bull New Intake business practices designed in the Fee Assistance Leisure Access Program
bull Aligning City of Waterloo grants under one department
bull Continued review of grants for efficiencies
bull Reorganization of adult programs and staffing resources
bull Development of work plan efficiencies with other provincially funded programs
bull Initiated development of ldquoCCRS Event Permitrdquo process to allow congruency and compliance between outdoor festivalseventsprograms and the Noise Bylaw
ouR Future goALs incLude bull Initiate development of a Collections Policy Older Adult Strategic Plan
Public Art Master Plan and cultural strategy
bull Development of a partnership with Parkwood Manor for senior programs
bull Develop and expand the role of the private sector for expansion of the public art collection
bull Develop a policy on guiding principles to meet provincial museum standards
bull Board development across all division committees and affiliated groups
bull Implement Affiliation Service Agreement
bull Participate in theVolunteer Engagement Strategy
bull Development of cost recovery charges for replacement of capital items
bull Identify and facilitate training opportunities for affiliated organizations
bull Completion of public art projects
bull Participate in and implement theVolunteer Engagement Strategy
bull Development of a staffing strategy for all areas of CCS
bull Leadership training for all staff
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT
RecReATion And FAciLiTy seRvices ouR goAL Recreation and Facility Services will deliver programs and services that align with the Corporate Strategic Plan and the Community Culture and Recreation Services Master Plan and Guiding Principles
Key goals include bull Effective and efficient programs services and operations bull Fiscal responsibility bull Increased communication and engagement of staff bull Customer service excellence
ouR AchieveMenTs bull Customer Service Strategy ndash delivering a consistent model across facilities
bull Operations Strategy ndash cross training to maximize the efficient use of staffing resources
bull Digital signage installationutilization at RIM Park
bull Building maintenance staff re-integration into day-to-day operations of facilities
ouR Future goALs incLude bull Ongoing divisional assistance in the implementation of recommen-
dations associated the community culture and Recreation services Master Plan
bull Cemetery Services - Bechtel Park Master Plan ndash continued implementation of council-approved recommendations
bull Review of operations and aquatics models
bull Ongoing joint service opportunities with the City of Kitchener cemetery division
bull Implementation of Health and Safety and Risk Assessment Audit recommendations
bull Ongoing implementation of ODA requirements for facilities and customer service
bull Continued support of green initiatives within facilities
bull Development and implementation of facility equipment replacement strategies
CORPORATE SERVICES DEPARTMENT The Corporate Services department is responsible for the co-ordination and delivery of services by the ClerksCorporate Secretary division Economic Development division Asset Management division Information Management and Technology Services division and Legal Services
ouR Mission To oversee a dedicated team of professional and technical staff that is committed to providing quality customer service to staff as a support function and to the taxpayer and Council who expect timely service
ouR goAL To provide quality services valued by staff and the community in the areas of facility maintenance information technology Council support economic and community information and legal services
ouR chALLenges Budget resources lack of staffing resources and expertise cross-departmental co-ordination on priorities and projects
CORPORATE SERVICES DEPARTMENT
CLERKSCORPORATE SECRETARY division ouR goAL ClerksCorporate Secretary will continue to improve upon its solid foundation of customer service excellence for Council the general public and staff This will include the continuation of quick and accurate responses to general questions personalized assistance applying analysis to research and inquiries and brainstorming ideas for improvement of general services
ouR AchieveMenTs committee orientation
bull Resulted in better awareness of the Committee Policy and related policies and by-laws which will reduce staff time responding to questions and issues
bull Provided networking opportunity for Committees
New FOI requestTracking Form bull Will save 2-3 days of work when creating the Annual Report bull Colour-coded requests to ensure the deadlines are met
Records Management bull Working group met to review requirements for annual records management transfer to Service Centre
bull Resulted in a more efficient and successful Records Management
corporate Policy Manual bull Will result in more efficient access to corporate policies with standardized information
ouR Future goALs incLude bull Review of dog licensing program
bull Review of business licensinghome businesses
bull Implementation of new records management systems and processes
bull Review of election process and voting methods
bull Review of agenda and report templates
bull Procedural Bylaw review
bull Review legal invoice approval and process
bull Implement required AODA legislative requirements
CORPORATE SERVICES DEPARTMENT
inFoRMATion MAnAgeMenT amp TECHNOLOGY SERVICES (IMTS) ouR goAL To play an active leadership role in delivering comprehensive information and technology-based solutions and services to support the Cityrsquos vision and goals
ouR AchieveMenTs bull Core Switching and network enhancements to increase efficiency
bull Implemented A to Z Service Directory of municipal and regional services on our website as an aid to external customers
bull PC refresh to increase efficiency
econoMic deveLoPMenT division ouR goAL Our goal is to implement the strategic imperatives of the City of Waterloo Strategic Plan Economic Development Strategy and the City-Owned Employment Lands Strategy
ouR AchieveMenTs bull Business Directory ndash now available online searchable and updatable by business ndash co-ordinated regionally
bull Business Calling Program ndash co-ordinated regionally
bull Creative Talent Steering Committee ndash pooled resources regionally
bull Urban Design Video
ouR Future goALs incLude inFoRMATion MAnAgeMenT amp TechnoLogy seRvices bull Possible relocation of server room to third-floor space
bull Implementation of Maximo II and III
bull Completion of corporate website strategy requirements and build
bull Completion of Disaster Recovery Continuity Plan
bull Continue expansion of the underground fibre optic backbone infrastructure
econoMic deveLoPMenT division bull Continued implementation of Economic Development Strategy
bull Implementation of City-Owned Employment Land Strategy
bull Sector collisions between tourism and high-tech industries
bull Continued provision of visitor services
bull Collaborate with other organizations on Talent Strategy and Research
CORPORATE SERVICES DEPARTMENT
AsseT MAnAgeMenT division ouR goAL The objective of Asset Management is sustainability ndash environmental financial and social ndash in the face of a changing world It embraces the concepts of life- cycle assessment the valuation and protection of assets and optimized long-term investment decisions
ouR AchieveMenTs bull LEED Silver designation for YMCALibrary facility
bull Installation of new HVAC system in City Hall reduces energy costs
bull Installation of lsquoEco Chillrsquo refrigeration system at Waterloo Memorial Recreation Complex
bull Replacement of boiler systems at Waterloo Memorial Recreation Complex ndash increased efficiency with a reduction in the carbon footprint
bull Completion of various RInC projects
ouR Future goALs incLude bull Completion of implementation of Maximo Phases II
bull Commence implementation of Maximo Phase III
bull Corporate space planning initiatives
bull Implementation of environmental strategies and initiatives
bull Comprehensive plan for life-cycle managment of corporate assets
bull Update asset conditions and facility condition index maintaining VFA
bull Better utilize corporate intranet ndash develop AM online library and services (including digitizing current hard copy data and drawings)
bull Continued project managment of city projects
bull Completion of various land-related activities and transactions
YMCASTORK FAMILY LIBRARY
DEVELOPMENT SERVICES DEPARTMENT Development Services is responsible for helping ensure that the City is planned developed and constructed in a manner that meets the existing and future goals of our community as well as satisfying legislative requirements associated with our services
ouR Mission As a department we strive to plan build and realize a safe and attractive sustainable community through the combined work of our four divisions
ouR goAL In Development Services our goal is to ensure that our community evolves appropriately for our citizens through professional land use advise to Council
ouR chALLenges Increase resources to provide expected level of services given an ever increasing level of development activity increase training opportunities to reflect changing work managing unanticipated projects
DEVELOPMENT SERVICES DEPARTMENT
buiLding sTAndARds division ouR goAL Our goal is to inform and assist our customers to ensure safe and orderly development and to provide efficient delivery of building approvals inspections and management systems
ouR AchieveMenTs bull Minor permits review completed from e-drawings
bull Completion of site plan approval process
bull Projects completed Balsillie School Perimeter Institute and several residential high-rises
DEVELOPMENT SERVICES DEPARTMENT
PoLicy deveLoPMenT division ouR goAL To work with Council and the community to foster a healthy and vibrant place for people to live work do business and play
ouR AchieveMenT bull Significant efforts focused on site plan process review
ouR Future goALs incLude buiLding sTAndARds division Advance the use of technology bull For online permit applications inspection booking bull Paperless permit application
bull Paperless plan examination for small to medium-size projects bull Improve records management from paper based to electronic bull Review of service level and applicable building permit fees bull Establish standard operating procedures to manage our service
level and establish best practice guidelines bull Build strong partnerships with the industry engage them in our process
creating an education program and participating in industry functions
PoLicy deveLoPMenT division bull Develop Official Plan monitoring protocol bull Consider brownfield incentives bull Initiate major transit station area planning bull Complete Northdale Land Use and Community Improvement
Plan study bull Complete North Waterloo District Plan
bull Complete Clean Water Act Implementation with PWS
bull Complete Clair Hills remnant hydro parcels landscaping bull Construct Westvale Park
DEVELOPMENT SERVICES DEPARTMENT
deveLoPMenT APPRovALs division ouR goAL To work in partnership with citizens and the development industry to help ensure that our city evolves in the direction that meets existing and future community needs and desires
ouR AchieveMenTs bull Continuous Improvement Zoning bylaw updates are accessible from the web Integrated Development Approvals Process
bull Complete application and preconsultation requirements (Zone change site plan demo control and C of A)
bull Systemization of performance measurement for Committee of Adjustment Site Plan Review Committee Sign Variance Committee
ouR Future goALs incLude bull Implementation of the new Official Plan
bull New zoning bylaw to align with the new Official Plan
Development ProjectsProposals bull Balsillie School of International Affairs complete Phase I
initiate Phase ii
bull BarrelYards implementation
bull RIM East Campus additional phases
bull NCR Master Plan
bull Core Re-urbanization Projects
bull West Side Employment Lands
bull Implementation of West Side Plans of Subdivision
bull OMB Hearings
bull 144 Park St Phase II
committees and customer service bull Continue to provide high quality and timely customer service related to zoning development and committee inquiries
bull New Sign Bylaw implementation
bull AMANDA link to site plan
DEVELOPMENT SERVICES DEPARTMENT
engineeRing And consTRucTion division ouR goAL The Engineering and Construction divisionrsquos goal is to work co-operatively with the development industry consultants and the public to promote the construction of new high-quality infrastructure (roads watermains sewers stormwater management)
ouR AchieveMenTs bull Implementing a major Continuous Improvement (CI) project for Site Plan Control
ouR Future goALs incLude bull Implementation of new major subdivision developments (West Side Lands Carriage CrossingWoolwich Estates)
bull Complete policy review for enhanced service delivery and improved efficiencies and incorporate into regular updates of the development Manual
bull Implement enhanced electronic tracking of development approvals leveraging existing technologies within the department using the AMAndA system
bull Initiate review of records management needs and implement necessary changes in conjunction with corporate initiatives
bull Participate in the identification of service capacity issues to identify infrastructure needs for the capital budget
bull Continue to adapt skill sets and core competencies to the ldquonewrdquo development reality in Waterloo which is focused on urban intensification and infill projects
bull Provide engineering review and inspection services for new major site plans in the uptown and other locations
FINANCE DEPARTMENT The Finance department supports the organization by assisting Council and the Corporate Management Team in the development of financial policies and strategic goals The department also advises and assists city departments in the timely and effective provision of accounting budgeting purchasing and revenue services
ouR Mission The Finance department is committed to excellence in providing sound financial management and consultative services Support and enhance operational effectiveness and efficiency
ouR goAL To provide reliable sound short- medium- and long-term financial strategies to ensure the long-term sustainable financial viability of the corporation
ouR chALLenges Declining assessment growth and multiple demands on scarce financial resources
FINANCE DEPARTMENT
AccounTing division ouR goAL To provide efficient reporting while safeguarding the assets of the corporation and providing financial information to Council CMT other departments and the community
ouR AchieveMenTs bull Initialization of new procedures and requirements for the reporting of TCA requirement
bull Upgrade of Peoplesoft Payroll Management System
bull Increased payment through electronic channels
ouR Future goALs incLude Further enhancement of Reporting bull Annual Report (2013) bull Ongoing development of Financial Reporting System (2012) bull Finance upgrade (2014) bull Portal type delivery of financial information
Increased Utilization of PeopleSoft Payroll Management System bull Security (2012-2014) bull Manager view of leave banks (2012-2014) bull Staff Association time entry (2012-2014) bull Work flow (2013) bull Electronic fund transfer payments for vendors (2012-2013) bull Epay (2012)
implementation of Recommendations from continuous improvement bull Payroll time cards bull Account Payable entry
FINANCE DEPARTMENT
budgeTs amp FinAnciAL PLAnningdivision ouR goAL To fulfill fiduciary and statutory requirements and provide reliable financial strategies to ensure the financial viability of the corporation while maintaining effective stewardship of financial resources
ouR AchieveMenTs bull Refined the 3-year budget process
bull Reserve and Reserve Fund Policy review
bull Rolled out budget software to web-based version
FINANCE DEPARTMENT
Revenue division ouR goAL Develop and implement an effective system of recording and collecting amounts due to the City using a corporate approach across multiple subsystems
ouR AchieveMenT bull Department is handling approximately 3000 incoming calls per month water amp sewer billing accounted for a 3-fold increase in the number of incoming calls
ouR Future goALs incLude bull Development Charge Bylaw update
bull Financial Control Bylaw
bull Implement PSAB (Public Sector Accounting Board) requirements for budgeting
bull Develop long term financial plan
bull Continue to develop dynamic financial planning policies to adapt to an environment of constantly shifting priorities
bull Review Investment Strategy and review potential for institutional pricing
bull Collecting amounts due to the City using a corporate approach across multiple subsystems
bull Continue to stress customer service excellence including multiple sites payment stations and promoting electronic payment options
bull Ongoing implementation of POS at selected City sites
bull Develop the Cityrsquos internal controls for cash handling
bull Recommend policy on the use of special services levies
bull Developing a Payment Card Industry Data Security Standard (PCIDSS) compliance plan
bull Reduce and rationalize the number of water billing sections
FINANCE DEPARTMENT
PuRchAsing division ouR goAL The goal of the Purchasing division is to follow the Cityrsquos Purchasing Bylaw and provincial and federal government law to acquire the best total cost for the products and services required by the City of Waterloo as well as providing a fair open and transparent purchasing process for the supply base
ouR AchieveMenTs bull Additional expansion of using procurement cards has reduced staff time spent on issuing purchase orders
bull Issuing of cheques through Accounts Payable has been reduced through the implementation of the procurement card program
bull Using e-commerce platforms reduces the time required to input data for the purchasing receipt and payment of invoices
bull Involvement with the provincial contracts (vendor of records) has reduced the cost of the services supplied (courier and cellular devices)
bull Involvement in co-operative and provincial contracts has increased purchasing efficiencies
ouR Future goALs incLude bull Computerization and bar coding of stockroom items
bull Implement the recommendations listed in the Purchasing Review Report
bull Work with the Environmental Strategy Implementation Steering committee to further enhance green procurement and a sustainable Waterloo
bull Review implement most cost effective municipal and provincial contracts for items such as telecommunications and courier services
bull Investigate the possibility of a third-party agency to host our bid opportunities
bull Establish a more centralized purchasing function at the city of Waterloo
bull Review and implement new cash discounts for the supply base to the city of Waterloo
HUMAN RESOURCES DEPARTMENT VOLUNTEER SERVICES The provision of Human Resources and Volunteer Services includes recruitment and selection labour and employee relations compensation and benefits sick and disability management training collective bargaining health and safety and organizational design
ouR Mission Engaged competent employees and volunteers are successful in accomplishing strategic and business plans within a vibrant corporate culture at the City of Waterloo
ouR goAL Human Resources and Volunteer Services departmentrsquos programs and services comply with regulatory and legislative requirements and align with the Cityrsquos values to enable staff to accomplish strategic and business plans
ouR chALLenges Build sufficient HR specialist expertise within a generalist model to support service excellence free-up HR capacity through operational efficiencies to enable project work and program design in key areas and training initiatives trends indicating decline of volunteerism requires innovative approaches
HUMAN RESOURCES DEPARTMENT voLunTeeR seRvices
ouR AchieveMenTs bull Completion of a market review of insurance carriers to ensure the cost competitiveness of our employee group benefit plan rates
bull Continued implementation of violence in the workplace programs with respectful workplace training and risk assessment surveys
bull Conducted an employee engagement survey to measure employee engagement in important aspects of work activities relationships and working conditions
bull Research and preparation of negotiations plans for Staff Association CUPE and WPFFA collective agreements
bull Use of technology to create efficiencies using online automated recruitment screening for high volume recruits and enhanced use of PeopleSoft functionality for management information reporting
bull Implementation of volunteer software system to enhance volunteer recruitment and placements
ouR Future goALs incLude Utilize information system data to measure efficiencies and effectiveness of hR and volunteer process improvement and practices
bull Develop a performance appraisal tool to measure competencies and accountabilities
bull Develop a corporate staff recognition program with individual and group components
bull Provide coaching project management and volunteer training and leadership development programming
bull Continue to enhance workplace health and safety with Respectful Workplace initiatives and implementation of Corporate Health and safety Audit recommendations
bull Bargain new agreements for labour groups and Staff Association
bull Implement job evaluation maintenance program
bull Develop corporate and department plans to address issues in the employee engagement survey to enhance employee engagement
bull Continue to implement the Volunteer Engagement Strategy
PROTECTIVE SERVICES DEPARTMENT Protective Services is responsible for the delivery of services by Fire Rescue Bylaw EnforcementProperty Standards and Community Relations
ouR Mission A team of dedicated and professional staff committed to enhancing the safety and quality of life of our community through education inspection enforcement community relations and emergency response
ouR goAL To provide quality service valued by staff and the community in delivery of education inspection enforcement community relations and emergency response
ouR chALLenges Developmentbuilding construction intensification city-wide Light Rail Transit (LRT) green building construction increased population of the city including long-term and temporary residents ongoing need for improved technology to augment existing resources increased student enrollment communication to students living off-campus
PROTECTIVE SERVICES DEPARTMENT
WATeRLoo FiRe Rescue division ouR goAL Waterloo Fire Rescue will continue to grow in response to community needs and expectations to provide the highest standard of service
ouR AchieveMenTs bull Completion of Station 4
bull Activity Tracking Program
bull Enhanced response times on the Cityrsquos east side
bull Measures used to optimize service delivery
ouR Future goALs incLude bull Deliver a fiscally responsible and sustainable service delivery model
bull Reviseupdate simplified risk assessment (3-year cycle)
bull Reviseupdate Fire Master Plan (5-year cycle)
bull Leverage technology to enhance overall effectiveness and efficiency
bull Collaborate with local business and the community to promote fire safety
bull Collaborate with post-secondary institutions to mitigate fire safety priorities
bull Reviseupdate Emergency Management Plan
bull Reviseupdate fire inspection service delivery model
bull Enhance tactical pre-planning
bull Enhance training programs
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT(CCRS) CCRS provides programs and services that contribute to a sense of community and improved quality of life for Waterloo residents and visitors through access to arts culture and heritage programs and services access to cemetery recreational facility space and programs that promote active and healthy lifestyles
ouR Mission To improve the quality of life for residents and visitors by providing enriching cultural recreational and leisure opportunities in conjunction with community partners and volunteers
ouR goAL To improve the quality of life for residents and visitors by ensuring a comprehensive array of quality programs services and facilities is available at a reasonable cost
ouR chALLenges Sustainability over course of the budget binding agreements compliance to changing legislation succession planning and training and evolving customer expectations
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT
sTRATegic PLAnning PRoMoTion And PeRFoRMAnce division ouR goAL To support the departmentrsquos strategic objectives and priorities by ensuring all policy business planning promotion and support services are provided in advance of department divisional and community needs
ouR AchieveMenTs bull Consolidated policy research and project management into one division for overall cohesive and supportive work program for department success
bull Consolidated work for corporate reporting into one division provides oversight and review opportunity that has departmentrsquos interests at heart
bull CCRS Service Delivery Policy provides clear direction for overall delivery of department services sets priorities and provides overall guidelines
bull Implemented online Program and Activity Guide that uses flip-page technology to reduce print quantities and cost
bull Initiated development of a policy manual for the City of Waterloo Museum Once completed it will support the operation of the museum and enhance our ability to seek external funding
ouR Future goALs incLude bull Space allocation policy and implementation
bull Initiate a comprehensive training program for CCRS supervisors
bull Development of a Neighbourhood Engagement Strategy
bull Develop a long-term Cultural Plan
bull Phased design and development of libraryYMCA sports fields
bull Biometric (finger print) scanning implementation at some facilities
bull Implement the Action Skate Park facility strategy
bull WebSocial Media Strategy for CCRS
bull Implement an Older Adult Services Strategy
bull Hire intern position for sales and sponsorship
bull Increase the number of revenue streams
bull Build and increase methods of interacting with clients
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT
coMMuniTy amp cuLTuRAL seRvices division ouR goAL To ensure that the citizens of the City of Waterloo have the opportunity to access a wide variety of recreation leisure activities programs and services
ouR AchieveMenTs bull New Intake business practices designed in the Fee Assistance Leisure Access Program
bull Aligning City of Waterloo grants under one department
bull Continued review of grants for efficiencies
bull Reorganization of adult programs and staffing resources
bull Development of work plan efficiencies with other provincially funded programs
bull Initiated development of ldquoCCRS Event Permitrdquo process to allow congruency and compliance between outdoor festivalseventsprograms and the Noise Bylaw
ouR Future goALs incLude bull Initiate development of a Collections Policy Older Adult Strategic Plan
Public Art Master Plan and cultural strategy
bull Development of a partnership with Parkwood Manor for senior programs
bull Develop and expand the role of the private sector for expansion of the public art collection
bull Develop a policy on guiding principles to meet provincial museum standards
bull Board development across all division committees and affiliated groups
bull Implement Affiliation Service Agreement
bull Participate in theVolunteer Engagement Strategy
bull Development of cost recovery charges for replacement of capital items
bull Identify and facilitate training opportunities for affiliated organizations
bull Completion of public art projects
bull Participate in and implement theVolunteer Engagement Strategy
bull Development of a staffing strategy for all areas of CCS
bull Leadership training for all staff
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT
RecReATion And FAciLiTy seRvices ouR goAL Recreation and Facility Services will deliver programs and services that align with the Corporate Strategic Plan and the Community Culture and Recreation Services Master Plan and Guiding Principles
Key goals include bull Effective and efficient programs services and operations bull Fiscal responsibility bull Increased communication and engagement of staff bull Customer service excellence
ouR AchieveMenTs bull Customer Service Strategy ndash delivering a consistent model across facilities
bull Operations Strategy ndash cross training to maximize the efficient use of staffing resources
bull Digital signage installationutilization at RIM Park
bull Building maintenance staff re-integration into day-to-day operations of facilities
ouR Future goALs incLude bull Ongoing divisional assistance in the implementation of recommen-
dations associated the community culture and Recreation services Master Plan
bull Cemetery Services - Bechtel Park Master Plan ndash continued implementation of council-approved recommendations
bull Review of operations and aquatics models
bull Ongoing joint service opportunities with the City of Kitchener cemetery division
bull Implementation of Health and Safety and Risk Assessment Audit recommendations
bull Ongoing implementation of ODA requirements for facilities and customer service
bull Continued support of green initiatives within facilities
bull Development and implementation of facility equipment replacement strategies
CORPORATE SERVICES DEPARTMENT The Corporate Services department is responsible for the co-ordination and delivery of services by the ClerksCorporate Secretary division Economic Development division Asset Management division Information Management and Technology Services division and Legal Services
ouR Mission To oversee a dedicated team of professional and technical staff that is committed to providing quality customer service to staff as a support function and to the taxpayer and Council who expect timely service
ouR goAL To provide quality services valued by staff and the community in the areas of facility maintenance information technology Council support economic and community information and legal services
ouR chALLenges Budget resources lack of staffing resources and expertise cross-departmental co-ordination on priorities and projects
CORPORATE SERVICES DEPARTMENT
CLERKSCORPORATE SECRETARY division ouR goAL ClerksCorporate Secretary will continue to improve upon its solid foundation of customer service excellence for Council the general public and staff This will include the continuation of quick and accurate responses to general questions personalized assistance applying analysis to research and inquiries and brainstorming ideas for improvement of general services
ouR AchieveMenTs committee orientation
bull Resulted in better awareness of the Committee Policy and related policies and by-laws which will reduce staff time responding to questions and issues
bull Provided networking opportunity for Committees
New FOI requestTracking Form bull Will save 2-3 days of work when creating the Annual Report bull Colour-coded requests to ensure the deadlines are met
Records Management bull Working group met to review requirements for annual records management transfer to Service Centre
bull Resulted in a more efficient and successful Records Management
corporate Policy Manual bull Will result in more efficient access to corporate policies with standardized information
ouR Future goALs incLude bull Review of dog licensing program
bull Review of business licensinghome businesses
bull Implementation of new records management systems and processes
bull Review of election process and voting methods
bull Review of agenda and report templates
bull Procedural Bylaw review
bull Review legal invoice approval and process
bull Implement required AODA legislative requirements
CORPORATE SERVICES DEPARTMENT
inFoRMATion MAnAgeMenT amp TECHNOLOGY SERVICES (IMTS) ouR goAL To play an active leadership role in delivering comprehensive information and technology-based solutions and services to support the Cityrsquos vision and goals
ouR AchieveMenTs bull Core Switching and network enhancements to increase efficiency
bull Implemented A to Z Service Directory of municipal and regional services on our website as an aid to external customers
bull PC refresh to increase efficiency
econoMic deveLoPMenT division ouR goAL Our goal is to implement the strategic imperatives of the City of Waterloo Strategic Plan Economic Development Strategy and the City-Owned Employment Lands Strategy
ouR AchieveMenTs bull Business Directory ndash now available online searchable and updatable by business ndash co-ordinated regionally
bull Business Calling Program ndash co-ordinated regionally
bull Creative Talent Steering Committee ndash pooled resources regionally
bull Urban Design Video
ouR Future goALs incLude inFoRMATion MAnAgeMenT amp TechnoLogy seRvices bull Possible relocation of server room to third-floor space
bull Implementation of Maximo II and III
bull Completion of corporate website strategy requirements and build
bull Completion of Disaster Recovery Continuity Plan
bull Continue expansion of the underground fibre optic backbone infrastructure
econoMic deveLoPMenT division bull Continued implementation of Economic Development Strategy
bull Implementation of City-Owned Employment Land Strategy
bull Sector collisions between tourism and high-tech industries
bull Continued provision of visitor services
bull Collaborate with other organizations on Talent Strategy and Research
CORPORATE SERVICES DEPARTMENT
AsseT MAnAgeMenT division ouR goAL The objective of Asset Management is sustainability ndash environmental financial and social ndash in the face of a changing world It embraces the concepts of life- cycle assessment the valuation and protection of assets and optimized long-term investment decisions
ouR AchieveMenTs bull LEED Silver designation for YMCALibrary facility
bull Installation of new HVAC system in City Hall reduces energy costs
bull Installation of lsquoEco Chillrsquo refrigeration system at Waterloo Memorial Recreation Complex
bull Replacement of boiler systems at Waterloo Memorial Recreation Complex ndash increased efficiency with a reduction in the carbon footprint
bull Completion of various RInC projects
ouR Future goALs incLude bull Completion of implementation of Maximo Phases II
bull Commence implementation of Maximo Phase III
bull Corporate space planning initiatives
bull Implementation of environmental strategies and initiatives
bull Comprehensive plan for life-cycle managment of corporate assets
bull Update asset conditions and facility condition index maintaining VFA
bull Better utilize corporate intranet ndash develop AM online library and services (including digitizing current hard copy data and drawings)
bull Continued project managment of city projects
bull Completion of various land-related activities and transactions
YMCASTORK FAMILY LIBRARY
DEVELOPMENT SERVICES DEPARTMENT Development Services is responsible for helping ensure that the City is planned developed and constructed in a manner that meets the existing and future goals of our community as well as satisfying legislative requirements associated with our services
ouR Mission As a department we strive to plan build and realize a safe and attractive sustainable community through the combined work of our four divisions
ouR goAL In Development Services our goal is to ensure that our community evolves appropriately for our citizens through professional land use advise to Council
ouR chALLenges Increase resources to provide expected level of services given an ever increasing level of development activity increase training opportunities to reflect changing work managing unanticipated projects
DEVELOPMENT SERVICES DEPARTMENT
buiLding sTAndARds division ouR goAL Our goal is to inform and assist our customers to ensure safe and orderly development and to provide efficient delivery of building approvals inspections and management systems
ouR AchieveMenTs bull Minor permits review completed from e-drawings
bull Completion of site plan approval process
bull Projects completed Balsillie School Perimeter Institute and several residential high-rises
DEVELOPMENT SERVICES DEPARTMENT
PoLicy deveLoPMenT division ouR goAL To work with Council and the community to foster a healthy and vibrant place for people to live work do business and play
ouR AchieveMenT bull Significant efforts focused on site plan process review
ouR Future goALs incLude buiLding sTAndARds division Advance the use of technology bull For online permit applications inspection booking bull Paperless permit application
bull Paperless plan examination for small to medium-size projects bull Improve records management from paper based to electronic bull Review of service level and applicable building permit fees bull Establish standard operating procedures to manage our service
level and establish best practice guidelines bull Build strong partnerships with the industry engage them in our process
creating an education program and participating in industry functions
PoLicy deveLoPMenT division bull Develop Official Plan monitoring protocol bull Consider brownfield incentives bull Initiate major transit station area planning bull Complete Northdale Land Use and Community Improvement
Plan study bull Complete North Waterloo District Plan
bull Complete Clean Water Act Implementation with PWS
bull Complete Clair Hills remnant hydro parcels landscaping bull Construct Westvale Park
DEVELOPMENT SERVICES DEPARTMENT
deveLoPMenT APPRovALs division ouR goAL To work in partnership with citizens and the development industry to help ensure that our city evolves in the direction that meets existing and future community needs and desires
ouR AchieveMenTs bull Continuous Improvement Zoning bylaw updates are accessible from the web Integrated Development Approvals Process
bull Complete application and preconsultation requirements (Zone change site plan demo control and C of A)
bull Systemization of performance measurement for Committee of Adjustment Site Plan Review Committee Sign Variance Committee
ouR Future goALs incLude bull Implementation of the new Official Plan
bull New zoning bylaw to align with the new Official Plan
Development ProjectsProposals bull Balsillie School of International Affairs complete Phase I
initiate Phase ii
bull BarrelYards implementation
bull RIM East Campus additional phases
bull NCR Master Plan
bull Core Re-urbanization Projects
bull West Side Employment Lands
bull Implementation of West Side Plans of Subdivision
bull OMB Hearings
bull 144 Park St Phase II
committees and customer service bull Continue to provide high quality and timely customer service related to zoning development and committee inquiries
bull New Sign Bylaw implementation
bull AMANDA link to site plan
DEVELOPMENT SERVICES DEPARTMENT
engineeRing And consTRucTion division ouR goAL The Engineering and Construction divisionrsquos goal is to work co-operatively with the development industry consultants and the public to promote the construction of new high-quality infrastructure (roads watermains sewers stormwater management)
ouR AchieveMenTs bull Implementing a major Continuous Improvement (CI) project for Site Plan Control
ouR Future goALs incLude bull Implementation of new major subdivision developments (West Side Lands Carriage CrossingWoolwich Estates)
bull Complete policy review for enhanced service delivery and improved efficiencies and incorporate into regular updates of the development Manual
bull Implement enhanced electronic tracking of development approvals leveraging existing technologies within the department using the AMAndA system
bull Initiate review of records management needs and implement necessary changes in conjunction with corporate initiatives
bull Participate in the identification of service capacity issues to identify infrastructure needs for the capital budget
bull Continue to adapt skill sets and core competencies to the ldquonewrdquo development reality in Waterloo which is focused on urban intensification and infill projects
bull Provide engineering review and inspection services for new major site plans in the uptown and other locations
FINANCE DEPARTMENT The Finance department supports the organization by assisting Council and the Corporate Management Team in the development of financial policies and strategic goals The department also advises and assists city departments in the timely and effective provision of accounting budgeting purchasing and revenue services
ouR Mission The Finance department is committed to excellence in providing sound financial management and consultative services Support and enhance operational effectiveness and efficiency
ouR goAL To provide reliable sound short- medium- and long-term financial strategies to ensure the long-term sustainable financial viability of the corporation
ouR chALLenges Declining assessment growth and multiple demands on scarce financial resources
FINANCE DEPARTMENT
AccounTing division ouR goAL To provide efficient reporting while safeguarding the assets of the corporation and providing financial information to Council CMT other departments and the community
ouR AchieveMenTs bull Initialization of new procedures and requirements for the reporting of TCA requirement
bull Upgrade of Peoplesoft Payroll Management System
bull Increased payment through electronic channels
ouR Future goALs incLude Further enhancement of Reporting bull Annual Report (2013) bull Ongoing development of Financial Reporting System (2012) bull Finance upgrade (2014) bull Portal type delivery of financial information
Increased Utilization of PeopleSoft Payroll Management System bull Security (2012-2014) bull Manager view of leave banks (2012-2014) bull Staff Association time entry (2012-2014) bull Work flow (2013) bull Electronic fund transfer payments for vendors (2012-2013) bull Epay (2012)
implementation of Recommendations from continuous improvement bull Payroll time cards bull Account Payable entry
FINANCE DEPARTMENT
budgeTs amp FinAnciAL PLAnningdivision ouR goAL To fulfill fiduciary and statutory requirements and provide reliable financial strategies to ensure the financial viability of the corporation while maintaining effective stewardship of financial resources
ouR AchieveMenTs bull Refined the 3-year budget process
bull Reserve and Reserve Fund Policy review
bull Rolled out budget software to web-based version
FINANCE DEPARTMENT
Revenue division ouR goAL Develop and implement an effective system of recording and collecting amounts due to the City using a corporate approach across multiple subsystems
ouR AchieveMenT bull Department is handling approximately 3000 incoming calls per month water amp sewer billing accounted for a 3-fold increase in the number of incoming calls
ouR Future goALs incLude bull Development Charge Bylaw update
bull Financial Control Bylaw
bull Implement PSAB (Public Sector Accounting Board) requirements for budgeting
bull Develop long term financial plan
bull Continue to develop dynamic financial planning policies to adapt to an environment of constantly shifting priorities
bull Review Investment Strategy and review potential for institutional pricing
bull Collecting amounts due to the City using a corporate approach across multiple subsystems
bull Continue to stress customer service excellence including multiple sites payment stations and promoting electronic payment options
bull Ongoing implementation of POS at selected City sites
bull Develop the Cityrsquos internal controls for cash handling
bull Recommend policy on the use of special services levies
bull Developing a Payment Card Industry Data Security Standard (PCIDSS) compliance plan
bull Reduce and rationalize the number of water billing sections
FINANCE DEPARTMENT
PuRchAsing division ouR goAL The goal of the Purchasing division is to follow the Cityrsquos Purchasing Bylaw and provincial and federal government law to acquire the best total cost for the products and services required by the City of Waterloo as well as providing a fair open and transparent purchasing process for the supply base
ouR AchieveMenTs bull Additional expansion of using procurement cards has reduced staff time spent on issuing purchase orders
bull Issuing of cheques through Accounts Payable has been reduced through the implementation of the procurement card program
bull Using e-commerce platforms reduces the time required to input data for the purchasing receipt and payment of invoices
bull Involvement with the provincial contracts (vendor of records) has reduced the cost of the services supplied (courier and cellular devices)
bull Involvement in co-operative and provincial contracts has increased purchasing efficiencies
ouR Future goALs incLude bull Computerization and bar coding of stockroom items
bull Implement the recommendations listed in the Purchasing Review Report
bull Work with the Environmental Strategy Implementation Steering committee to further enhance green procurement and a sustainable Waterloo
bull Review implement most cost effective municipal and provincial contracts for items such as telecommunications and courier services
bull Investigate the possibility of a third-party agency to host our bid opportunities
bull Establish a more centralized purchasing function at the city of Waterloo
bull Review and implement new cash discounts for the supply base to the city of Waterloo
HUMAN RESOURCES DEPARTMENT VOLUNTEER SERVICES The provision of Human Resources and Volunteer Services includes recruitment and selection labour and employee relations compensation and benefits sick and disability management training collective bargaining health and safety and organizational design
ouR Mission Engaged competent employees and volunteers are successful in accomplishing strategic and business plans within a vibrant corporate culture at the City of Waterloo
ouR goAL Human Resources and Volunteer Services departmentrsquos programs and services comply with regulatory and legislative requirements and align with the Cityrsquos values to enable staff to accomplish strategic and business plans
ouR chALLenges Build sufficient HR specialist expertise within a generalist model to support service excellence free-up HR capacity through operational efficiencies to enable project work and program design in key areas and training initiatives trends indicating decline of volunteerism requires innovative approaches
HUMAN RESOURCES DEPARTMENT voLunTeeR seRvices
ouR AchieveMenTs bull Completion of a market review of insurance carriers to ensure the cost competitiveness of our employee group benefit plan rates
bull Continued implementation of violence in the workplace programs with respectful workplace training and risk assessment surveys
bull Conducted an employee engagement survey to measure employee engagement in important aspects of work activities relationships and working conditions
bull Research and preparation of negotiations plans for Staff Association CUPE and WPFFA collective agreements
bull Use of technology to create efficiencies using online automated recruitment screening for high volume recruits and enhanced use of PeopleSoft functionality for management information reporting
bull Implementation of volunteer software system to enhance volunteer recruitment and placements
ouR Future goALs incLude Utilize information system data to measure efficiencies and effectiveness of hR and volunteer process improvement and practices
bull Develop a performance appraisal tool to measure competencies and accountabilities
bull Develop a corporate staff recognition program with individual and group components
bull Provide coaching project management and volunteer training and leadership development programming
bull Continue to enhance workplace health and safety with Respectful Workplace initiatives and implementation of Corporate Health and safety Audit recommendations
bull Bargain new agreements for labour groups and Staff Association
bull Implement job evaluation maintenance program
bull Develop corporate and department plans to address issues in the employee engagement survey to enhance employee engagement
bull Continue to implement the Volunteer Engagement Strategy
PROTECTIVE SERVICES DEPARTMENT Protective Services is responsible for the delivery of services by Fire Rescue Bylaw EnforcementProperty Standards and Community Relations
ouR Mission A team of dedicated and professional staff committed to enhancing the safety and quality of life of our community through education inspection enforcement community relations and emergency response
ouR goAL To provide quality service valued by staff and the community in delivery of education inspection enforcement community relations and emergency response
ouR chALLenges Developmentbuilding construction intensification city-wide Light Rail Transit (LRT) green building construction increased population of the city including long-term and temporary residents ongoing need for improved technology to augment existing resources increased student enrollment communication to students living off-campus
PROTECTIVE SERVICES DEPARTMENT
WATeRLoo FiRe Rescue division ouR goAL Waterloo Fire Rescue will continue to grow in response to community needs and expectations to provide the highest standard of service
ouR AchieveMenTs bull Completion of Station 4
bull Activity Tracking Program
bull Enhanced response times on the Cityrsquos east side
bull Measures used to optimize service delivery
ouR Future goALs incLude bull Deliver a fiscally responsible and sustainable service delivery model
bull Reviseupdate simplified risk assessment (3-year cycle)
bull Reviseupdate Fire Master Plan (5-year cycle)
bull Leverage technology to enhance overall effectiveness and efficiency
bull Collaborate with local business and the community to promote fire safety
bull Collaborate with post-secondary institutions to mitigate fire safety priorities
bull Reviseupdate Emergency Management Plan
bull Reviseupdate fire inspection service delivery model
bull Enhance tactical pre-planning
bull Enhance training programs
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT
sTRATegic PLAnning PRoMoTion And PeRFoRMAnce division ouR goAL To support the departmentrsquos strategic objectives and priorities by ensuring all policy business planning promotion and support services are provided in advance of department divisional and community needs
ouR AchieveMenTs bull Consolidated policy research and project management into one division for overall cohesive and supportive work program for department success
bull Consolidated work for corporate reporting into one division provides oversight and review opportunity that has departmentrsquos interests at heart
bull CCRS Service Delivery Policy provides clear direction for overall delivery of department services sets priorities and provides overall guidelines
bull Implemented online Program and Activity Guide that uses flip-page technology to reduce print quantities and cost
bull Initiated development of a policy manual for the City of Waterloo Museum Once completed it will support the operation of the museum and enhance our ability to seek external funding
ouR Future goALs incLude bull Space allocation policy and implementation
bull Initiate a comprehensive training program for CCRS supervisors
bull Development of a Neighbourhood Engagement Strategy
bull Develop a long-term Cultural Plan
bull Phased design and development of libraryYMCA sports fields
bull Biometric (finger print) scanning implementation at some facilities
bull Implement the Action Skate Park facility strategy
bull WebSocial Media Strategy for CCRS
bull Implement an Older Adult Services Strategy
bull Hire intern position for sales and sponsorship
bull Increase the number of revenue streams
bull Build and increase methods of interacting with clients
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT
coMMuniTy amp cuLTuRAL seRvices division ouR goAL To ensure that the citizens of the City of Waterloo have the opportunity to access a wide variety of recreation leisure activities programs and services
ouR AchieveMenTs bull New Intake business practices designed in the Fee Assistance Leisure Access Program
bull Aligning City of Waterloo grants under one department
bull Continued review of grants for efficiencies
bull Reorganization of adult programs and staffing resources
bull Development of work plan efficiencies with other provincially funded programs
bull Initiated development of ldquoCCRS Event Permitrdquo process to allow congruency and compliance between outdoor festivalseventsprograms and the Noise Bylaw
ouR Future goALs incLude bull Initiate development of a Collections Policy Older Adult Strategic Plan
Public Art Master Plan and cultural strategy
bull Development of a partnership with Parkwood Manor for senior programs
bull Develop and expand the role of the private sector for expansion of the public art collection
bull Develop a policy on guiding principles to meet provincial museum standards
bull Board development across all division committees and affiliated groups
bull Implement Affiliation Service Agreement
bull Participate in theVolunteer Engagement Strategy
bull Development of cost recovery charges for replacement of capital items
bull Identify and facilitate training opportunities for affiliated organizations
bull Completion of public art projects
bull Participate in and implement theVolunteer Engagement Strategy
bull Development of a staffing strategy for all areas of CCS
bull Leadership training for all staff
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT
RecReATion And FAciLiTy seRvices ouR goAL Recreation and Facility Services will deliver programs and services that align with the Corporate Strategic Plan and the Community Culture and Recreation Services Master Plan and Guiding Principles
Key goals include bull Effective and efficient programs services and operations bull Fiscal responsibility bull Increased communication and engagement of staff bull Customer service excellence
ouR AchieveMenTs bull Customer Service Strategy ndash delivering a consistent model across facilities
bull Operations Strategy ndash cross training to maximize the efficient use of staffing resources
bull Digital signage installationutilization at RIM Park
bull Building maintenance staff re-integration into day-to-day operations of facilities
ouR Future goALs incLude bull Ongoing divisional assistance in the implementation of recommen-
dations associated the community culture and Recreation services Master Plan
bull Cemetery Services - Bechtel Park Master Plan ndash continued implementation of council-approved recommendations
bull Review of operations and aquatics models
bull Ongoing joint service opportunities with the City of Kitchener cemetery division
bull Implementation of Health and Safety and Risk Assessment Audit recommendations
bull Ongoing implementation of ODA requirements for facilities and customer service
bull Continued support of green initiatives within facilities
bull Development and implementation of facility equipment replacement strategies
CORPORATE SERVICES DEPARTMENT The Corporate Services department is responsible for the co-ordination and delivery of services by the ClerksCorporate Secretary division Economic Development division Asset Management division Information Management and Technology Services division and Legal Services
ouR Mission To oversee a dedicated team of professional and technical staff that is committed to providing quality customer service to staff as a support function and to the taxpayer and Council who expect timely service
ouR goAL To provide quality services valued by staff and the community in the areas of facility maintenance information technology Council support economic and community information and legal services
ouR chALLenges Budget resources lack of staffing resources and expertise cross-departmental co-ordination on priorities and projects
CORPORATE SERVICES DEPARTMENT
CLERKSCORPORATE SECRETARY division ouR goAL ClerksCorporate Secretary will continue to improve upon its solid foundation of customer service excellence for Council the general public and staff This will include the continuation of quick and accurate responses to general questions personalized assistance applying analysis to research and inquiries and brainstorming ideas for improvement of general services
ouR AchieveMenTs committee orientation
bull Resulted in better awareness of the Committee Policy and related policies and by-laws which will reduce staff time responding to questions and issues
bull Provided networking opportunity for Committees
New FOI requestTracking Form bull Will save 2-3 days of work when creating the Annual Report bull Colour-coded requests to ensure the deadlines are met
Records Management bull Working group met to review requirements for annual records management transfer to Service Centre
bull Resulted in a more efficient and successful Records Management
corporate Policy Manual bull Will result in more efficient access to corporate policies with standardized information
ouR Future goALs incLude bull Review of dog licensing program
bull Review of business licensinghome businesses
bull Implementation of new records management systems and processes
bull Review of election process and voting methods
bull Review of agenda and report templates
bull Procedural Bylaw review
bull Review legal invoice approval and process
bull Implement required AODA legislative requirements
CORPORATE SERVICES DEPARTMENT
inFoRMATion MAnAgeMenT amp TECHNOLOGY SERVICES (IMTS) ouR goAL To play an active leadership role in delivering comprehensive information and technology-based solutions and services to support the Cityrsquos vision and goals
ouR AchieveMenTs bull Core Switching and network enhancements to increase efficiency
bull Implemented A to Z Service Directory of municipal and regional services on our website as an aid to external customers
bull PC refresh to increase efficiency
econoMic deveLoPMenT division ouR goAL Our goal is to implement the strategic imperatives of the City of Waterloo Strategic Plan Economic Development Strategy and the City-Owned Employment Lands Strategy
ouR AchieveMenTs bull Business Directory ndash now available online searchable and updatable by business ndash co-ordinated regionally
bull Business Calling Program ndash co-ordinated regionally
bull Creative Talent Steering Committee ndash pooled resources regionally
bull Urban Design Video
ouR Future goALs incLude inFoRMATion MAnAgeMenT amp TechnoLogy seRvices bull Possible relocation of server room to third-floor space
bull Implementation of Maximo II and III
bull Completion of corporate website strategy requirements and build
bull Completion of Disaster Recovery Continuity Plan
bull Continue expansion of the underground fibre optic backbone infrastructure
econoMic deveLoPMenT division bull Continued implementation of Economic Development Strategy
bull Implementation of City-Owned Employment Land Strategy
bull Sector collisions between tourism and high-tech industries
bull Continued provision of visitor services
bull Collaborate with other organizations on Talent Strategy and Research
CORPORATE SERVICES DEPARTMENT
AsseT MAnAgeMenT division ouR goAL The objective of Asset Management is sustainability ndash environmental financial and social ndash in the face of a changing world It embraces the concepts of life- cycle assessment the valuation and protection of assets and optimized long-term investment decisions
ouR AchieveMenTs bull LEED Silver designation for YMCALibrary facility
bull Installation of new HVAC system in City Hall reduces energy costs
bull Installation of lsquoEco Chillrsquo refrigeration system at Waterloo Memorial Recreation Complex
bull Replacement of boiler systems at Waterloo Memorial Recreation Complex ndash increased efficiency with a reduction in the carbon footprint
bull Completion of various RInC projects
ouR Future goALs incLude bull Completion of implementation of Maximo Phases II
bull Commence implementation of Maximo Phase III
bull Corporate space planning initiatives
bull Implementation of environmental strategies and initiatives
bull Comprehensive plan for life-cycle managment of corporate assets
bull Update asset conditions and facility condition index maintaining VFA
bull Better utilize corporate intranet ndash develop AM online library and services (including digitizing current hard copy data and drawings)
bull Continued project managment of city projects
bull Completion of various land-related activities and transactions
YMCASTORK FAMILY LIBRARY
DEVELOPMENT SERVICES DEPARTMENT Development Services is responsible for helping ensure that the City is planned developed and constructed in a manner that meets the existing and future goals of our community as well as satisfying legislative requirements associated with our services
ouR Mission As a department we strive to plan build and realize a safe and attractive sustainable community through the combined work of our four divisions
ouR goAL In Development Services our goal is to ensure that our community evolves appropriately for our citizens through professional land use advise to Council
ouR chALLenges Increase resources to provide expected level of services given an ever increasing level of development activity increase training opportunities to reflect changing work managing unanticipated projects
DEVELOPMENT SERVICES DEPARTMENT
buiLding sTAndARds division ouR goAL Our goal is to inform and assist our customers to ensure safe and orderly development and to provide efficient delivery of building approvals inspections and management systems
ouR AchieveMenTs bull Minor permits review completed from e-drawings
bull Completion of site plan approval process
bull Projects completed Balsillie School Perimeter Institute and several residential high-rises
DEVELOPMENT SERVICES DEPARTMENT
PoLicy deveLoPMenT division ouR goAL To work with Council and the community to foster a healthy and vibrant place for people to live work do business and play
ouR AchieveMenT bull Significant efforts focused on site plan process review
ouR Future goALs incLude buiLding sTAndARds division Advance the use of technology bull For online permit applications inspection booking bull Paperless permit application
bull Paperless plan examination for small to medium-size projects bull Improve records management from paper based to electronic bull Review of service level and applicable building permit fees bull Establish standard operating procedures to manage our service
level and establish best practice guidelines bull Build strong partnerships with the industry engage them in our process
creating an education program and participating in industry functions
PoLicy deveLoPMenT division bull Develop Official Plan monitoring protocol bull Consider brownfield incentives bull Initiate major transit station area planning bull Complete Northdale Land Use and Community Improvement
Plan study bull Complete North Waterloo District Plan
bull Complete Clean Water Act Implementation with PWS
bull Complete Clair Hills remnant hydro parcels landscaping bull Construct Westvale Park
DEVELOPMENT SERVICES DEPARTMENT
deveLoPMenT APPRovALs division ouR goAL To work in partnership with citizens and the development industry to help ensure that our city evolves in the direction that meets existing and future community needs and desires
ouR AchieveMenTs bull Continuous Improvement Zoning bylaw updates are accessible from the web Integrated Development Approvals Process
bull Complete application and preconsultation requirements (Zone change site plan demo control and C of A)
bull Systemization of performance measurement for Committee of Adjustment Site Plan Review Committee Sign Variance Committee
ouR Future goALs incLude bull Implementation of the new Official Plan
bull New zoning bylaw to align with the new Official Plan
Development ProjectsProposals bull Balsillie School of International Affairs complete Phase I
initiate Phase ii
bull BarrelYards implementation
bull RIM East Campus additional phases
bull NCR Master Plan
bull Core Re-urbanization Projects
bull West Side Employment Lands
bull Implementation of West Side Plans of Subdivision
bull OMB Hearings
bull 144 Park St Phase II
committees and customer service bull Continue to provide high quality and timely customer service related to zoning development and committee inquiries
bull New Sign Bylaw implementation
bull AMANDA link to site plan
DEVELOPMENT SERVICES DEPARTMENT
engineeRing And consTRucTion division ouR goAL The Engineering and Construction divisionrsquos goal is to work co-operatively with the development industry consultants and the public to promote the construction of new high-quality infrastructure (roads watermains sewers stormwater management)
ouR AchieveMenTs bull Implementing a major Continuous Improvement (CI) project for Site Plan Control
ouR Future goALs incLude bull Implementation of new major subdivision developments (West Side Lands Carriage CrossingWoolwich Estates)
bull Complete policy review for enhanced service delivery and improved efficiencies and incorporate into regular updates of the development Manual
bull Implement enhanced electronic tracking of development approvals leveraging existing technologies within the department using the AMAndA system
bull Initiate review of records management needs and implement necessary changes in conjunction with corporate initiatives
bull Participate in the identification of service capacity issues to identify infrastructure needs for the capital budget
bull Continue to adapt skill sets and core competencies to the ldquonewrdquo development reality in Waterloo which is focused on urban intensification and infill projects
bull Provide engineering review and inspection services for new major site plans in the uptown and other locations
FINANCE DEPARTMENT The Finance department supports the organization by assisting Council and the Corporate Management Team in the development of financial policies and strategic goals The department also advises and assists city departments in the timely and effective provision of accounting budgeting purchasing and revenue services
ouR Mission The Finance department is committed to excellence in providing sound financial management and consultative services Support and enhance operational effectiveness and efficiency
ouR goAL To provide reliable sound short- medium- and long-term financial strategies to ensure the long-term sustainable financial viability of the corporation
ouR chALLenges Declining assessment growth and multiple demands on scarce financial resources
FINANCE DEPARTMENT
AccounTing division ouR goAL To provide efficient reporting while safeguarding the assets of the corporation and providing financial information to Council CMT other departments and the community
ouR AchieveMenTs bull Initialization of new procedures and requirements for the reporting of TCA requirement
bull Upgrade of Peoplesoft Payroll Management System
bull Increased payment through electronic channels
ouR Future goALs incLude Further enhancement of Reporting bull Annual Report (2013) bull Ongoing development of Financial Reporting System (2012) bull Finance upgrade (2014) bull Portal type delivery of financial information
Increased Utilization of PeopleSoft Payroll Management System bull Security (2012-2014) bull Manager view of leave banks (2012-2014) bull Staff Association time entry (2012-2014) bull Work flow (2013) bull Electronic fund transfer payments for vendors (2012-2013) bull Epay (2012)
implementation of Recommendations from continuous improvement bull Payroll time cards bull Account Payable entry
FINANCE DEPARTMENT
budgeTs amp FinAnciAL PLAnningdivision ouR goAL To fulfill fiduciary and statutory requirements and provide reliable financial strategies to ensure the financial viability of the corporation while maintaining effective stewardship of financial resources
ouR AchieveMenTs bull Refined the 3-year budget process
bull Reserve and Reserve Fund Policy review
bull Rolled out budget software to web-based version
FINANCE DEPARTMENT
Revenue division ouR goAL Develop and implement an effective system of recording and collecting amounts due to the City using a corporate approach across multiple subsystems
ouR AchieveMenT bull Department is handling approximately 3000 incoming calls per month water amp sewer billing accounted for a 3-fold increase in the number of incoming calls
ouR Future goALs incLude bull Development Charge Bylaw update
bull Financial Control Bylaw
bull Implement PSAB (Public Sector Accounting Board) requirements for budgeting
bull Develop long term financial plan
bull Continue to develop dynamic financial planning policies to adapt to an environment of constantly shifting priorities
bull Review Investment Strategy and review potential for institutional pricing
bull Collecting amounts due to the City using a corporate approach across multiple subsystems
bull Continue to stress customer service excellence including multiple sites payment stations and promoting electronic payment options
bull Ongoing implementation of POS at selected City sites
bull Develop the Cityrsquos internal controls for cash handling
bull Recommend policy on the use of special services levies
bull Developing a Payment Card Industry Data Security Standard (PCIDSS) compliance plan
bull Reduce and rationalize the number of water billing sections
FINANCE DEPARTMENT
PuRchAsing division ouR goAL The goal of the Purchasing division is to follow the Cityrsquos Purchasing Bylaw and provincial and federal government law to acquire the best total cost for the products and services required by the City of Waterloo as well as providing a fair open and transparent purchasing process for the supply base
ouR AchieveMenTs bull Additional expansion of using procurement cards has reduced staff time spent on issuing purchase orders
bull Issuing of cheques through Accounts Payable has been reduced through the implementation of the procurement card program
bull Using e-commerce platforms reduces the time required to input data for the purchasing receipt and payment of invoices
bull Involvement with the provincial contracts (vendor of records) has reduced the cost of the services supplied (courier and cellular devices)
bull Involvement in co-operative and provincial contracts has increased purchasing efficiencies
ouR Future goALs incLude bull Computerization and bar coding of stockroom items
bull Implement the recommendations listed in the Purchasing Review Report
bull Work with the Environmental Strategy Implementation Steering committee to further enhance green procurement and a sustainable Waterloo
bull Review implement most cost effective municipal and provincial contracts for items such as telecommunications and courier services
bull Investigate the possibility of a third-party agency to host our bid opportunities
bull Establish a more centralized purchasing function at the city of Waterloo
bull Review and implement new cash discounts for the supply base to the city of Waterloo
HUMAN RESOURCES DEPARTMENT VOLUNTEER SERVICES The provision of Human Resources and Volunteer Services includes recruitment and selection labour and employee relations compensation and benefits sick and disability management training collective bargaining health and safety and organizational design
ouR Mission Engaged competent employees and volunteers are successful in accomplishing strategic and business plans within a vibrant corporate culture at the City of Waterloo
ouR goAL Human Resources and Volunteer Services departmentrsquos programs and services comply with regulatory and legislative requirements and align with the Cityrsquos values to enable staff to accomplish strategic and business plans
ouR chALLenges Build sufficient HR specialist expertise within a generalist model to support service excellence free-up HR capacity through operational efficiencies to enable project work and program design in key areas and training initiatives trends indicating decline of volunteerism requires innovative approaches
HUMAN RESOURCES DEPARTMENT voLunTeeR seRvices
ouR AchieveMenTs bull Completion of a market review of insurance carriers to ensure the cost competitiveness of our employee group benefit plan rates
bull Continued implementation of violence in the workplace programs with respectful workplace training and risk assessment surveys
bull Conducted an employee engagement survey to measure employee engagement in important aspects of work activities relationships and working conditions
bull Research and preparation of negotiations plans for Staff Association CUPE and WPFFA collective agreements
bull Use of technology to create efficiencies using online automated recruitment screening for high volume recruits and enhanced use of PeopleSoft functionality for management information reporting
bull Implementation of volunteer software system to enhance volunteer recruitment and placements
ouR Future goALs incLude Utilize information system data to measure efficiencies and effectiveness of hR and volunteer process improvement and practices
bull Develop a performance appraisal tool to measure competencies and accountabilities
bull Develop a corporate staff recognition program with individual and group components
bull Provide coaching project management and volunteer training and leadership development programming
bull Continue to enhance workplace health and safety with Respectful Workplace initiatives and implementation of Corporate Health and safety Audit recommendations
bull Bargain new agreements for labour groups and Staff Association
bull Implement job evaluation maintenance program
bull Develop corporate and department plans to address issues in the employee engagement survey to enhance employee engagement
bull Continue to implement the Volunteer Engagement Strategy
PROTECTIVE SERVICES DEPARTMENT Protective Services is responsible for the delivery of services by Fire Rescue Bylaw EnforcementProperty Standards and Community Relations
ouR Mission A team of dedicated and professional staff committed to enhancing the safety and quality of life of our community through education inspection enforcement community relations and emergency response
ouR goAL To provide quality service valued by staff and the community in delivery of education inspection enforcement community relations and emergency response
ouR chALLenges Developmentbuilding construction intensification city-wide Light Rail Transit (LRT) green building construction increased population of the city including long-term and temporary residents ongoing need for improved technology to augment existing resources increased student enrollment communication to students living off-campus
PROTECTIVE SERVICES DEPARTMENT
WATeRLoo FiRe Rescue division ouR goAL Waterloo Fire Rescue will continue to grow in response to community needs and expectations to provide the highest standard of service
ouR AchieveMenTs bull Completion of Station 4
bull Activity Tracking Program
bull Enhanced response times on the Cityrsquos east side
bull Measures used to optimize service delivery
ouR Future goALs incLude bull Deliver a fiscally responsible and sustainable service delivery model
bull Reviseupdate simplified risk assessment (3-year cycle)
bull Reviseupdate Fire Master Plan (5-year cycle)
bull Leverage technology to enhance overall effectiveness and efficiency
bull Collaborate with local business and the community to promote fire safety
bull Collaborate with post-secondary institutions to mitigate fire safety priorities
bull Reviseupdate Emergency Management Plan
bull Reviseupdate fire inspection service delivery model
bull Enhance tactical pre-planning
bull Enhance training programs
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
ouR Future goALs incLude bull Space allocation policy and implementation
bull Initiate a comprehensive training program for CCRS supervisors
bull Development of a Neighbourhood Engagement Strategy
bull Develop a long-term Cultural Plan
bull Phased design and development of libraryYMCA sports fields
bull Biometric (finger print) scanning implementation at some facilities
bull Implement the Action Skate Park facility strategy
bull WebSocial Media Strategy for CCRS
bull Implement an Older Adult Services Strategy
bull Hire intern position for sales and sponsorship
bull Increase the number of revenue streams
bull Build and increase methods of interacting with clients
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT
coMMuniTy amp cuLTuRAL seRvices division ouR goAL To ensure that the citizens of the City of Waterloo have the opportunity to access a wide variety of recreation leisure activities programs and services
ouR AchieveMenTs bull New Intake business practices designed in the Fee Assistance Leisure Access Program
bull Aligning City of Waterloo grants under one department
bull Continued review of grants for efficiencies
bull Reorganization of adult programs and staffing resources
bull Development of work plan efficiencies with other provincially funded programs
bull Initiated development of ldquoCCRS Event Permitrdquo process to allow congruency and compliance between outdoor festivalseventsprograms and the Noise Bylaw
ouR Future goALs incLude bull Initiate development of a Collections Policy Older Adult Strategic Plan
Public Art Master Plan and cultural strategy
bull Development of a partnership with Parkwood Manor for senior programs
bull Develop and expand the role of the private sector for expansion of the public art collection
bull Develop a policy on guiding principles to meet provincial museum standards
bull Board development across all division committees and affiliated groups
bull Implement Affiliation Service Agreement
bull Participate in theVolunteer Engagement Strategy
bull Development of cost recovery charges for replacement of capital items
bull Identify and facilitate training opportunities for affiliated organizations
bull Completion of public art projects
bull Participate in and implement theVolunteer Engagement Strategy
bull Development of a staffing strategy for all areas of CCS
bull Leadership training for all staff
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT
RecReATion And FAciLiTy seRvices ouR goAL Recreation and Facility Services will deliver programs and services that align with the Corporate Strategic Plan and the Community Culture and Recreation Services Master Plan and Guiding Principles
Key goals include bull Effective and efficient programs services and operations bull Fiscal responsibility bull Increased communication and engagement of staff bull Customer service excellence
ouR AchieveMenTs bull Customer Service Strategy ndash delivering a consistent model across facilities
bull Operations Strategy ndash cross training to maximize the efficient use of staffing resources
bull Digital signage installationutilization at RIM Park
bull Building maintenance staff re-integration into day-to-day operations of facilities
ouR Future goALs incLude bull Ongoing divisional assistance in the implementation of recommen-
dations associated the community culture and Recreation services Master Plan
bull Cemetery Services - Bechtel Park Master Plan ndash continued implementation of council-approved recommendations
bull Review of operations and aquatics models
bull Ongoing joint service opportunities with the City of Kitchener cemetery division
bull Implementation of Health and Safety and Risk Assessment Audit recommendations
bull Ongoing implementation of ODA requirements for facilities and customer service
bull Continued support of green initiatives within facilities
bull Development and implementation of facility equipment replacement strategies
CORPORATE SERVICES DEPARTMENT The Corporate Services department is responsible for the co-ordination and delivery of services by the ClerksCorporate Secretary division Economic Development division Asset Management division Information Management and Technology Services division and Legal Services
ouR Mission To oversee a dedicated team of professional and technical staff that is committed to providing quality customer service to staff as a support function and to the taxpayer and Council who expect timely service
ouR goAL To provide quality services valued by staff and the community in the areas of facility maintenance information technology Council support economic and community information and legal services
ouR chALLenges Budget resources lack of staffing resources and expertise cross-departmental co-ordination on priorities and projects
CORPORATE SERVICES DEPARTMENT
CLERKSCORPORATE SECRETARY division ouR goAL ClerksCorporate Secretary will continue to improve upon its solid foundation of customer service excellence for Council the general public and staff This will include the continuation of quick and accurate responses to general questions personalized assistance applying analysis to research and inquiries and brainstorming ideas for improvement of general services
ouR AchieveMenTs committee orientation
bull Resulted in better awareness of the Committee Policy and related policies and by-laws which will reduce staff time responding to questions and issues
bull Provided networking opportunity for Committees
New FOI requestTracking Form bull Will save 2-3 days of work when creating the Annual Report bull Colour-coded requests to ensure the deadlines are met
Records Management bull Working group met to review requirements for annual records management transfer to Service Centre
bull Resulted in a more efficient and successful Records Management
corporate Policy Manual bull Will result in more efficient access to corporate policies with standardized information
ouR Future goALs incLude bull Review of dog licensing program
bull Review of business licensinghome businesses
bull Implementation of new records management systems and processes
bull Review of election process and voting methods
bull Review of agenda and report templates
bull Procedural Bylaw review
bull Review legal invoice approval and process
bull Implement required AODA legislative requirements
CORPORATE SERVICES DEPARTMENT
inFoRMATion MAnAgeMenT amp TECHNOLOGY SERVICES (IMTS) ouR goAL To play an active leadership role in delivering comprehensive information and technology-based solutions and services to support the Cityrsquos vision and goals
ouR AchieveMenTs bull Core Switching and network enhancements to increase efficiency
bull Implemented A to Z Service Directory of municipal and regional services on our website as an aid to external customers
bull PC refresh to increase efficiency
econoMic deveLoPMenT division ouR goAL Our goal is to implement the strategic imperatives of the City of Waterloo Strategic Plan Economic Development Strategy and the City-Owned Employment Lands Strategy
ouR AchieveMenTs bull Business Directory ndash now available online searchable and updatable by business ndash co-ordinated regionally
bull Business Calling Program ndash co-ordinated regionally
bull Creative Talent Steering Committee ndash pooled resources regionally
bull Urban Design Video
ouR Future goALs incLude inFoRMATion MAnAgeMenT amp TechnoLogy seRvices bull Possible relocation of server room to third-floor space
bull Implementation of Maximo II and III
bull Completion of corporate website strategy requirements and build
bull Completion of Disaster Recovery Continuity Plan
bull Continue expansion of the underground fibre optic backbone infrastructure
econoMic deveLoPMenT division bull Continued implementation of Economic Development Strategy
bull Implementation of City-Owned Employment Land Strategy
bull Sector collisions between tourism and high-tech industries
bull Continued provision of visitor services
bull Collaborate with other organizations on Talent Strategy and Research
CORPORATE SERVICES DEPARTMENT
AsseT MAnAgeMenT division ouR goAL The objective of Asset Management is sustainability ndash environmental financial and social ndash in the face of a changing world It embraces the concepts of life- cycle assessment the valuation and protection of assets and optimized long-term investment decisions
ouR AchieveMenTs bull LEED Silver designation for YMCALibrary facility
bull Installation of new HVAC system in City Hall reduces energy costs
bull Installation of lsquoEco Chillrsquo refrigeration system at Waterloo Memorial Recreation Complex
bull Replacement of boiler systems at Waterloo Memorial Recreation Complex ndash increased efficiency with a reduction in the carbon footprint
bull Completion of various RInC projects
ouR Future goALs incLude bull Completion of implementation of Maximo Phases II
bull Commence implementation of Maximo Phase III
bull Corporate space planning initiatives
bull Implementation of environmental strategies and initiatives
bull Comprehensive plan for life-cycle managment of corporate assets
bull Update asset conditions and facility condition index maintaining VFA
bull Better utilize corporate intranet ndash develop AM online library and services (including digitizing current hard copy data and drawings)
bull Continued project managment of city projects
bull Completion of various land-related activities and transactions
YMCASTORK FAMILY LIBRARY
DEVELOPMENT SERVICES DEPARTMENT Development Services is responsible for helping ensure that the City is planned developed and constructed in a manner that meets the existing and future goals of our community as well as satisfying legislative requirements associated with our services
ouR Mission As a department we strive to plan build and realize a safe and attractive sustainable community through the combined work of our four divisions
ouR goAL In Development Services our goal is to ensure that our community evolves appropriately for our citizens through professional land use advise to Council
ouR chALLenges Increase resources to provide expected level of services given an ever increasing level of development activity increase training opportunities to reflect changing work managing unanticipated projects
DEVELOPMENT SERVICES DEPARTMENT
buiLding sTAndARds division ouR goAL Our goal is to inform and assist our customers to ensure safe and orderly development and to provide efficient delivery of building approvals inspections and management systems
ouR AchieveMenTs bull Minor permits review completed from e-drawings
bull Completion of site plan approval process
bull Projects completed Balsillie School Perimeter Institute and several residential high-rises
DEVELOPMENT SERVICES DEPARTMENT
PoLicy deveLoPMenT division ouR goAL To work with Council and the community to foster a healthy and vibrant place for people to live work do business and play
ouR AchieveMenT bull Significant efforts focused on site plan process review
ouR Future goALs incLude buiLding sTAndARds division Advance the use of technology bull For online permit applications inspection booking bull Paperless permit application
bull Paperless plan examination for small to medium-size projects bull Improve records management from paper based to electronic bull Review of service level and applicable building permit fees bull Establish standard operating procedures to manage our service
level and establish best practice guidelines bull Build strong partnerships with the industry engage them in our process
creating an education program and participating in industry functions
PoLicy deveLoPMenT division bull Develop Official Plan monitoring protocol bull Consider brownfield incentives bull Initiate major transit station area planning bull Complete Northdale Land Use and Community Improvement
Plan study bull Complete North Waterloo District Plan
bull Complete Clean Water Act Implementation with PWS
bull Complete Clair Hills remnant hydro parcels landscaping bull Construct Westvale Park
DEVELOPMENT SERVICES DEPARTMENT
deveLoPMenT APPRovALs division ouR goAL To work in partnership with citizens and the development industry to help ensure that our city evolves in the direction that meets existing and future community needs and desires
ouR AchieveMenTs bull Continuous Improvement Zoning bylaw updates are accessible from the web Integrated Development Approvals Process
bull Complete application and preconsultation requirements (Zone change site plan demo control and C of A)
bull Systemization of performance measurement for Committee of Adjustment Site Plan Review Committee Sign Variance Committee
ouR Future goALs incLude bull Implementation of the new Official Plan
bull New zoning bylaw to align with the new Official Plan
Development ProjectsProposals bull Balsillie School of International Affairs complete Phase I
initiate Phase ii
bull BarrelYards implementation
bull RIM East Campus additional phases
bull NCR Master Plan
bull Core Re-urbanization Projects
bull West Side Employment Lands
bull Implementation of West Side Plans of Subdivision
bull OMB Hearings
bull 144 Park St Phase II
committees and customer service bull Continue to provide high quality and timely customer service related to zoning development and committee inquiries
bull New Sign Bylaw implementation
bull AMANDA link to site plan
DEVELOPMENT SERVICES DEPARTMENT
engineeRing And consTRucTion division ouR goAL The Engineering and Construction divisionrsquos goal is to work co-operatively with the development industry consultants and the public to promote the construction of new high-quality infrastructure (roads watermains sewers stormwater management)
ouR AchieveMenTs bull Implementing a major Continuous Improvement (CI) project for Site Plan Control
ouR Future goALs incLude bull Implementation of new major subdivision developments (West Side Lands Carriage CrossingWoolwich Estates)
bull Complete policy review for enhanced service delivery and improved efficiencies and incorporate into regular updates of the development Manual
bull Implement enhanced electronic tracking of development approvals leveraging existing technologies within the department using the AMAndA system
bull Initiate review of records management needs and implement necessary changes in conjunction with corporate initiatives
bull Participate in the identification of service capacity issues to identify infrastructure needs for the capital budget
bull Continue to adapt skill sets and core competencies to the ldquonewrdquo development reality in Waterloo which is focused on urban intensification and infill projects
bull Provide engineering review and inspection services for new major site plans in the uptown and other locations
FINANCE DEPARTMENT The Finance department supports the organization by assisting Council and the Corporate Management Team in the development of financial policies and strategic goals The department also advises and assists city departments in the timely and effective provision of accounting budgeting purchasing and revenue services
ouR Mission The Finance department is committed to excellence in providing sound financial management and consultative services Support and enhance operational effectiveness and efficiency
ouR goAL To provide reliable sound short- medium- and long-term financial strategies to ensure the long-term sustainable financial viability of the corporation
ouR chALLenges Declining assessment growth and multiple demands on scarce financial resources
FINANCE DEPARTMENT
AccounTing division ouR goAL To provide efficient reporting while safeguarding the assets of the corporation and providing financial information to Council CMT other departments and the community
ouR AchieveMenTs bull Initialization of new procedures and requirements for the reporting of TCA requirement
bull Upgrade of Peoplesoft Payroll Management System
bull Increased payment through electronic channels
ouR Future goALs incLude Further enhancement of Reporting bull Annual Report (2013) bull Ongoing development of Financial Reporting System (2012) bull Finance upgrade (2014) bull Portal type delivery of financial information
Increased Utilization of PeopleSoft Payroll Management System bull Security (2012-2014) bull Manager view of leave banks (2012-2014) bull Staff Association time entry (2012-2014) bull Work flow (2013) bull Electronic fund transfer payments for vendors (2012-2013) bull Epay (2012)
implementation of Recommendations from continuous improvement bull Payroll time cards bull Account Payable entry
FINANCE DEPARTMENT
budgeTs amp FinAnciAL PLAnningdivision ouR goAL To fulfill fiduciary and statutory requirements and provide reliable financial strategies to ensure the financial viability of the corporation while maintaining effective stewardship of financial resources
ouR AchieveMenTs bull Refined the 3-year budget process
bull Reserve and Reserve Fund Policy review
bull Rolled out budget software to web-based version
FINANCE DEPARTMENT
Revenue division ouR goAL Develop and implement an effective system of recording and collecting amounts due to the City using a corporate approach across multiple subsystems
ouR AchieveMenT bull Department is handling approximately 3000 incoming calls per month water amp sewer billing accounted for a 3-fold increase in the number of incoming calls
ouR Future goALs incLude bull Development Charge Bylaw update
bull Financial Control Bylaw
bull Implement PSAB (Public Sector Accounting Board) requirements for budgeting
bull Develop long term financial plan
bull Continue to develop dynamic financial planning policies to adapt to an environment of constantly shifting priorities
bull Review Investment Strategy and review potential for institutional pricing
bull Collecting amounts due to the City using a corporate approach across multiple subsystems
bull Continue to stress customer service excellence including multiple sites payment stations and promoting electronic payment options
bull Ongoing implementation of POS at selected City sites
bull Develop the Cityrsquos internal controls for cash handling
bull Recommend policy on the use of special services levies
bull Developing a Payment Card Industry Data Security Standard (PCIDSS) compliance plan
bull Reduce and rationalize the number of water billing sections
FINANCE DEPARTMENT
PuRchAsing division ouR goAL The goal of the Purchasing division is to follow the Cityrsquos Purchasing Bylaw and provincial and federal government law to acquire the best total cost for the products and services required by the City of Waterloo as well as providing a fair open and transparent purchasing process for the supply base
ouR AchieveMenTs bull Additional expansion of using procurement cards has reduced staff time spent on issuing purchase orders
bull Issuing of cheques through Accounts Payable has been reduced through the implementation of the procurement card program
bull Using e-commerce platforms reduces the time required to input data for the purchasing receipt and payment of invoices
bull Involvement with the provincial contracts (vendor of records) has reduced the cost of the services supplied (courier and cellular devices)
bull Involvement in co-operative and provincial contracts has increased purchasing efficiencies
ouR Future goALs incLude bull Computerization and bar coding of stockroom items
bull Implement the recommendations listed in the Purchasing Review Report
bull Work with the Environmental Strategy Implementation Steering committee to further enhance green procurement and a sustainable Waterloo
bull Review implement most cost effective municipal and provincial contracts for items such as telecommunications and courier services
bull Investigate the possibility of a third-party agency to host our bid opportunities
bull Establish a more centralized purchasing function at the city of Waterloo
bull Review and implement new cash discounts for the supply base to the city of Waterloo
HUMAN RESOURCES DEPARTMENT VOLUNTEER SERVICES The provision of Human Resources and Volunteer Services includes recruitment and selection labour and employee relations compensation and benefits sick and disability management training collective bargaining health and safety and organizational design
ouR Mission Engaged competent employees and volunteers are successful in accomplishing strategic and business plans within a vibrant corporate culture at the City of Waterloo
ouR goAL Human Resources and Volunteer Services departmentrsquos programs and services comply with regulatory and legislative requirements and align with the Cityrsquos values to enable staff to accomplish strategic and business plans
ouR chALLenges Build sufficient HR specialist expertise within a generalist model to support service excellence free-up HR capacity through operational efficiencies to enable project work and program design in key areas and training initiatives trends indicating decline of volunteerism requires innovative approaches
HUMAN RESOURCES DEPARTMENT voLunTeeR seRvices
ouR AchieveMenTs bull Completion of a market review of insurance carriers to ensure the cost competitiveness of our employee group benefit plan rates
bull Continued implementation of violence in the workplace programs with respectful workplace training and risk assessment surveys
bull Conducted an employee engagement survey to measure employee engagement in important aspects of work activities relationships and working conditions
bull Research and preparation of negotiations plans for Staff Association CUPE and WPFFA collective agreements
bull Use of technology to create efficiencies using online automated recruitment screening for high volume recruits and enhanced use of PeopleSoft functionality for management information reporting
bull Implementation of volunteer software system to enhance volunteer recruitment and placements
ouR Future goALs incLude Utilize information system data to measure efficiencies and effectiveness of hR and volunteer process improvement and practices
bull Develop a performance appraisal tool to measure competencies and accountabilities
bull Develop a corporate staff recognition program with individual and group components
bull Provide coaching project management and volunteer training and leadership development programming
bull Continue to enhance workplace health and safety with Respectful Workplace initiatives and implementation of Corporate Health and safety Audit recommendations
bull Bargain new agreements for labour groups and Staff Association
bull Implement job evaluation maintenance program
bull Develop corporate and department plans to address issues in the employee engagement survey to enhance employee engagement
bull Continue to implement the Volunteer Engagement Strategy
PROTECTIVE SERVICES DEPARTMENT Protective Services is responsible for the delivery of services by Fire Rescue Bylaw EnforcementProperty Standards and Community Relations
ouR Mission A team of dedicated and professional staff committed to enhancing the safety and quality of life of our community through education inspection enforcement community relations and emergency response
ouR goAL To provide quality service valued by staff and the community in delivery of education inspection enforcement community relations and emergency response
ouR chALLenges Developmentbuilding construction intensification city-wide Light Rail Transit (LRT) green building construction increased population of the city including long-term and temporary residents ongoing need for improved technology to augment existing resources increased student enrollment communication to students living off-campus
PROTECTIVE SERVICES DEPARTMENT
WATeRLoo FiRe Rescue division ouR goAL Waterloo Fire Rescue will continue to grow in response to community needs and expectations to provide the highest standard of service
ouR AchieveMenTs bull Completion of Station 4
bull Activity Tracking Program
bull Enhanced response times on the Cityrsquos east side
bull Measures used to optimize service delivery
ouR Future goALs incLude bull Deliver a fiscally responsible and sustainable service delivery model
bull Reviseupdate simplified risk assessment (3-year cycle)
bull Reviseupdate Fire Master Plan (5-year cycle)
bull Leverage technology to enhance overall effectiveness and efficiency
bull Collaborate with local business and the community to promote fire safety
bull Collaborate with post-secondary institutions to mitigate fire safety priorities
bull Reviseupdate Emergency Management Plan
bull Reviseupdate fire inspection service delivery model
bull Enhance tactical pre-planning
bull Enhance training programs
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT
coMMuniTy amp cuLTuRAL seRvices division ouR goAL To ensure that the citizens of the City of Waterloo have the opportunity to access a wide variety of recreation leisure activities programs and services
ouR AchieveMenTs bull New Intake business practices designed in the Fee Assistance Leisure Access Program
bull Aligning City of Waterloo grants under one department
bull Continued review of grants for efficiencies
bull Reorganization of adult programs and staffing resources
bull Development of work plan efficiencies with other provincially funded programs
bull Initiated development of ldquoCCRS Event Permitrdquo process to allow congruency and compliance between outdoor festivalseventsprograms and the Noise Bylaw
ouR Future goALs incLude bull Initiate development of a Collections Policy Older Adult Strategic Plan
Public Art Master Plan and cultural strategy
bull Development of a partnership with Parkwood Manor for senior programs
bull Develop and expand the role of the private sector for expansion of the public art collection
bull Develop a policy on guiding principles to meet provincial museum standards
bull Board development across all division committees and affiliated groups
bull Implement Affiliation Service Agreement
bull Participate in theVolunteer Engagement Strategy
bull Development of cost recovery charges for replacement of capital items
bull Identify and facilitate training opportunities for affiliated organizations
bull Completion of public art projects
bull Participate in and implement theVolunteer Engagement Strategy
bull Development of a staffing strategy for all areas of CCS
bull Leadership training for all staff
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT
RecReATion And FAciLiTy seRvices ouR goAL Recreation and Facility Services will deliver programs and services that align with the Corporate Strategic Plan and the Community Culture and Recreation Services Master Plan and Guiding Principles
Key goals include bull Effective and efficient programs services and operations bull Fiscal responsibility bull Increased communication and engagement of staff bull Customer service excellence
ouR AchieveMenTs bull Customer Service Strategy ndash delivering a consistent model across facilities
bull Operations Strategy ndash cross training to maximize the efficient use of staffing resources
bull Digital signage installationutilization at RIM Park
bull Building maintenance staff re-integration into day-to-day operations of facilities
ouR Future goALs incLude bull Ongoing divisional assistance in the implementation of recommen-
dations associated the community culture and Recreation services Master Plan
bull Cemetery Services - Bechtel Park Master Plan ndash continued implementation of council-approved recommendations
bull Review of operations and aquatics models
bull Ongoing joint service opportunities with the City of Kitchener cemetery division
bull Implementation of Health and Safety and Risk Assessment Audit recommendations
bull Ongoing implementation of ODA requirements for facilities and customer service
bull Continued support of green initiatives within facilities
bull Development and implementation of facility equipment replacement strategies
CORPORATE SERVICES DEPARTMENT The Corporate Services department is responsible for the co-ordination and delivery of services by the ClerksCorporate Secretary division Economic Development division Asset Management division Information Management and Technology Services division and Legal Services
ouR Mission To oversee a dedicated team of professional and technical staff that is committed to providing quality customer service to staff as a support function and to the taxpayer and Council who expect timely service
ouR goAL To provide quality services valued by staff and the community in the areas of facility maintenance information technology Council support economic and community information and legal services
ouR chALLenges Budget resources lack of staffing resources and expertise cross-departmental co-ordination on priorities and projects
CORPORATE SERVICES DEPARTMENT
CLERKSCORPORATE SECRETARY division ouR goAL ClerksCorporate Secretary will continue to improve upon its solid foundation of customer service excellence for Council the general public and staff This will include the continuation of quick and accurate responses to general questions personalized assistance applying analysis to research and inquiries and brainstorming ideas for improvement of general services
ouR AchieveMenTs committee orientation
bull Resulted in better awareness of the Committee Policy and related policies and by-laws which will reduce staff time responding to questions and issues
bull Provided networking opportunity for Committees
New FOI requestTracking Form bull Will save 2-3 days of work when creating the Annual Report bull Colour-coded requests to ensure the deadlines are met
Records Management bull Working group met to review requirements for annual records management transfer to Service Centre
bull Resulted in a more efficient and successful Records Management
corporate Policy Manual bull Will result in more efficient access to corporate policies with standardized information
ouR Future goALs incLude bull Review of dog licensing program
bull Review of business licensinghome businesses
bull Implementation of new records management systems and processes
bull Review of election process and voting methods
bull Review of agenda and report templates
bull Procedural Bylaw review
bull Review legal invoice approval and process
bull Implement required AODA legislative requirements
CORPORATE SERVICES DEPARTMENT
inFoRMATion MAnAgeMenT amp TECHNOLOGY SERVICES (IMTS) ouR goAL To play an active leadership role in delivering comprehensive information and technology-based solutions and services to support the Cityrsquos vision and goals
ouR AchieveMenTs bull Core Switching and network enhancements to increase efficiency
bull Implemented A to Z Service Directory of municipal and regional services on our website as an aid to external customers
bull PC refresh to increase efficiency
econoMic deveLoPMenT division ouR goAL Our goal is to implement the strategic imperatives of the City of Waterloo Strategic Plan Economic Development Strategy and the City-Owned Employment Lands Strategy
ouR AchieveMenTs bull Business Directory ndash now available online searchable and updatable by business ndash co-ordinated regionally
bull Business Calling Program ndash co-ordinated regionally
bull Creative Talent Steering Committee ndash pooled resources regionally
bull Urban Design Video
ouR Future goALs incLude inFoRMATion MAnAgeMenT amp TechnoLogy seRvices bull Possible relocation of server room to third-floor space
bull Implementation of Maximo II and III
bull Completion of corporate website strategy requirements and build
bull Completion of Disaster Recovery Continuity Plan
bull Continue expansion of the underground fibre optic backbone infrastructure
econoMic deveLoPMenT division bull Continued implementation of Economic Development Strategy
bull Implementation of City-Owned Employment Land Strategy
bull Sector collisions between tourism and high-tech industries
bull Continued provision of visitor services
bull Collaborate with other organizations on Talent Strategy and Research
CORPORATE SERVICES DEPARTMENT
AsseT MAnAgeMenT division ouR goAL The objective of Asset Management is sustainability ndash environmental financial and social ndash in the face of a changing world It embraces the concepts of life- cycle assessment the valuation and protection of assets and optimized long-term investment decisions
ouR AchieveMenTs bull LEED Silver designation for YMCALibrary facility
bull Installation of new HVAC system in City Hall reduces energy costs
bull Installation of lsquoEco Chillrsquo refrigeration system at Waterloo Memorial Recreation Complex
bull Replacement of boiler systems at Waterloo Memorial Recreation Complex ndash increased efficiency with a reduction in the carbon footprint
bull Completion of various RInC projects
ouR Future goALs incLude bull Completion of implementation of Maximo Phases II
bull Commence implementation of Maximo Phase III
bull Corporate space planning initiatives
bull Implementation of environmental strategies and initiatives
bull Comprehensive plan for life-cycle managment of corporate assets
bull Update asset conditions and facility condition index maintaining VFA
bull Better utilize corporate intranet ndash develop AM online library and services (including digitizing current hard copy data and drawings)
bull Continued project managment of city projects
bull Completion of various land-related activities and transactions
YMCASTORK FAMILY LIBRARY
DEVELOPMENT SERVICES DEPARTMENT Development Services is responsible for helping ensure that the City is planned developed and constructed in a manner that meets the existing and future goals of our community as well as satisfying legislative requirements associated with our services
ouR Mission As a department we strive to plan build and realize a safe and attractive sustainable community through the combined work of our four divisions
ouR goAL In Development Services our goal is to ensure that our community evolves appropriately for our citizens through professional land use advise to Council
ouR chALLenges Increase resources to provide expected level of services given an ever increasing level of development activity increase training opportunities to reflect changing work managing unanticipated projects
DEVELOPMENT SERVICES DEPARTMENT
buiLding sTAndARds division ouR goAL Our goal is to inform and assist our customers to ensure safe and orderly development and to provide efficient delivery of building approvals inspections and management systems
ouR AchieveMenTs bull Minor permits review completed from e-drawings
bull Completion of site plan approval process
bull Projects completed Balsillie School Perimeter Institute and several residential high-rises
DEVELOPMENT SERVICES DEPARTMENT
PoLicy deveLoPMenT division ouR goAL To work with Council and the community to foster a healthy and vibrant place for people to live work do business and play
ouR AchieveMenT bull Significant efforts focused on site plan process review
ouR Future goALs incLude buiLding sTAndARds division Advance the use of technology bull For online permit applications inspection booking bull Paperless permit application
bull Paperless plan examination for small to medium-size projects bull Improve records management from paper based to electronic bull Review of service level and applicable building permit fees bull Establish standard operating procedures to manage our service
level and establish best practice guidelines bull Build strong partnerships with the industry engage them in our process
creating an education program and participating in industry functions
PoLicy deveLoPMenT division bull Develop Official Plan monitoring protocol bull Consider brownfield incentives bull Initiate major transit station area planning bull Complete Northdale Land Use and Community Improvement
Plan study bull Complete North Waterloo District Plan
bull Complete Clean Water Act Implementation with PWS
bull Complete Clair Hills remnant hydro parcels landscaping bull Construct Westvale Park
DEVELOPMENT SERVICES DEPARTMENT
deveLoPMenT APPRovALs division ouR goAL To work in partnership with citizens and the development industry to help ensure that our city evolves in the direction that meets existing and future community needs and desires
ouR AchieveMenTs bull Continuous Improvement Zoning bylaw updates are accessible from the web Integrated Development Approvals Process
bull Complete application and preconsultation requirements (Zone change site plan demo control and C of A)
bull Systemization of performance measurement for Committee of Adjustment Site Plan Review Committee Sign Variance Committee
ouR Future goALs incLude bull Implementation of the new Official Plan
bull New zoning bylaw to align with the new Official Plan
Development ProjectsProposals bull Balsillie School of International Affairs complete Phase I
initiate Phase ii
bull BarrelYards implementation
bull RIM East Campus additional phases
bull NCR Master Plan
bull Core Re-urbanization Projects
bull West Side Employment Lands
bull Implementation of West Side Plans of Subdivision
bull OMB Hearings
bull 144 Park St Phase II
committees and customer service bull Continue to provide high quality and timely customer service related to zoning development and committee inquiries
bull New Sign Bylaw implementation
bull AMANDA link to site plan
DEVELOPMENT SERVICES DEPARTMENT
engineeRing And consTRucTion division ouR goAL The Engineering and Construction divisionrsquos goal is to work co-operatively with the development industry consultants and the public to promote the construction of new high-quality infrastructure (roads watermains sewers stormwater management)
ouR AchieveMenTs bull Implementing a major Continuous Improvement (CI) project for Site Plan Control
ouR Future goALs incLude bull Implementation of new major subdivision developments (West Side Lands Carriage CrossingWoolwich Estates)
bull Complete policy review for enhanced service delivery and improved efficiencies and incorporate into regular updates of the development Manual
bull Implement enhanced electronic tracking of development approvals leveraging existing technologies within the department using the AMAndA system
bull Initiate review of records management needs and implement necessary changes in conjunction with corporate initiatives
bull Participate in the identification of service capacity issues to identify infrastructure needs for the capital budget
bull Continue to adapt skill sets and core competencies to the ldquonewrdquo development reality in Waterloo which is focused on urban intensification and infill projects
bull Provide engineering review and inspection services for new major site plans in the uptown and other locations
FINANCE DEPARTMENT The Finance department supports the organization by assisting Council and the Corporate Management Team in the development of financial policies and strategic goals The department also advises and assists city departments in the timely and effective provision of accounting budgeting purchasing and revenue services
ouR Mission The Finance department is committed to excellence in providing sound financial management and consultative services Support and enhance operational effectiveness and efficiency
ouR goAL To provide reliable sound short- medium- and long-term financial strategies to ensure the long-term sustainable financial viability of the corporation
ouR chALLenges Declining assessment growth and multiple demands on scarce financial resources
FINANCE DEPARTMENT
AccounTing division ouR goAL To provide efficient reporting while safeguarding the assets of the corporation and providing financial information to Council CMT other departments and the community
ouR AchieveMenTs bull Initialization of new procedures and requirements for the reporting of TCA requirement
bull Upgrade of Peoplesoft Payroll Management System
bull Increased payment through electronic channels
ouR Future goALs incLude Further enhancement of Reporting bull Annual Report (2013) bull Ongoing development of Financial Reporting System (2012) bull Finance upgrade (2014) bull Portal type delivery of financial information
Increased Utilization of PeopleSoft Payroll Management System bull Security (2012-2014) bull Manager view of leave banks (2012-2014) bull Staff Association time entry (2012-2014) bull Work flow (2013) bull Electronic fund transfer payments for vendors (2012-2013) bull Epay (2012)
implementation of Recommendations from continuous improvement bull Payroll time cards bull Account Payable entry
FINANCE DEPARTMENT
budgeTs amp FinAnciAL PLAnningdivision ouR goAL To fulfill fiduciary and statutory requirements and provide reliable financial strategies to ensure the financial viability of the corporation while maintaining effective stewardship of financial resources
ouR AchieveMenTs bull Refined the 3-year budget process
bull Reserve and Reserve Fund Policy review
bull Rolled out budget software to web-based version
FINANCE DEPARTMENT
Revenue division ouR goAL Develop and implement an effective system of recording and collecting amounts due to the City using a corporate approach across multiple subsystems
ouR AchieveMenT bull Department is handling approximately 3000 incoming calls per month water amp sewer billing accounted for a 3-fold increase in the number of incoming calls
ouR Future goALs incLude bull Development Charge Bylaw update
bull Financial Control Bylaw
bull Implement PSAB (Public Sector Accounting Board) requirements for budgeting
bull Develop long term financial plan
bull Continue to develop dynamic financial planning policies to adapt to an environment of constantly shifting priorities
bull Review Investment Strategy and review potential for institutional pricing
bull Collecting amounts due to the City using a corporate approach across multiple subsystems
bull Continue to stress customer service excellence including multiple sites payment stations and promoting electronic payment options
bull Ongoing implementation of POS at selected City sites
bull Develop the Cityrsquos internal controls for cash handling
bull Recommend policy on the use of special services levies
bull Developing a Payment Card Industry Data Security Standard (PCIDSS) compliance plan
bull Reduce and rationalize the number of water billing sections
FINANCE DEPARTMENT
PuRchAsing division ouR goAL The goal of the Purchasing division is to follow the Cityrsquos Purchasing Bylaw and provincial and federal government law to acquire the best total cost for the products and services required by the City of Waterloo as well as providing a fair open and transparent purchasing process for the supply base
ouR AchieveMenTs bull Additional expansion of using procurement cards has reduced staff time spent on issuing purchase orders
bull Issuing of cheques through Accounts Payable has been reduced through the implementation of the procurement card program
bull Using e-commerce platforms reduces the time required to input data for the purchasing receipt and payment of invoices
bull Involvement with the provincial contracts (vendor of records) has reduced the cost of the services supplied (courier and cellular devices)
bull Involvement in co-operative and provincial contracts has increased purchasing efficiencies
ouR Future goALs incLude bull Computerization and bar coding of stockroom items
bull Implement the recommendations listed in the Purchasing Review Report
bull Work with the Environmental Strategy Implementation Steering committee to further enhance green procurement and a sustainable Waterloo
bull Review implement most cost effective municipal and provincial contracts for items such as telecommunications and courier services
bull Investigate the possibility of a third-party agency to host our bid opportunities
bull Establish a more centralized purchasing function at the city of Waterloo
bull Review and implement new cash discounts for the supply base to the city of Waterloo
HUMAN RESOURCES DEPARTMENT VOLUNTEER SERVICES The provision of Human Resources and Volunteer Services includes recruitment and selection labour and employee relations compensation and benefits sick and disability management training collective bargaining health and safety and organizational design
ouR Mission Engaged competent employees and volunteers are successful in accomplishing strategic and business plans within a vibrant corporate culture at the City of Waterloo
ouR goAL Human Resources and Volunteer Services departmentrsquos programs and services comply with regulatory and legislative requirements and align with the Cityrsquos values to enable staff to accomplish strategic and business plans
ouR chALLenges Build sufficient HR specialist expertise within a generalist model to support service excellence free-up HR capacity through operational efficiencies to enable project work and program design in key areas and training initiatives trends indicating decline of volunteerism requires innovative approaches
HUMAN RESOURCES DEPARTMENT voLunTeeR seRvices
ouR AchieveMenTs bull Completion of a market review of insurance carriers to ensure the cost competitiveness of our employee group benefit plan rates
bull Continued implementation of violence in the workplace programs with respectful workplace training and risk assessment surveys
bull Conducted an employee engagement survey to measure employee engagement in important aspects of work activities relationships and working conditions
bull Research and preparation of negotiations plans for Staff Association CUPE and WPFFA collective agreements
bull Use of technology to create efficiencies using online automated recruitment screening for high volume recruits and enhanced use of PeopleSoft functionality for management information reporting
bull Implementation of volunteer software system to enhance volunteer recruitment and placements
ouR Future goALs incLude Utilize information system data to measure efficiencies and effectiveness of hR and volunteer process improvement and practices
bull Develop a performance appraisal tool to measure competencies and accountabilities
bull Develop a corporate staff recognition program with individual and group components
bull Provide coaching project management and volunteer training and leadership development programming
bull Continue to enhance workplace health and safety with Respectful Workplace initiatives and implementation of Corporate Health and safety Audit recommendations
bull Bargain new agreements for labour groups and Staff Association
bull Implement job evaluation maintenance program
bull Develop corporate and department plans to address issues in the employee engagement survey to enhance employee engagement
bull Continue to implement the Volunteer Engagement Strategy
PROTECTIVE SERVICES DEPARTMENT Protective Services is responsible for the delivery of services by Fire Rescue Bylaw EnforcementProperty Standards and Community Relations
ouR Mission A team of dedicated and professional staff committed to enhancing the safety and quality of life of our community through education inspection enforcement community relations and emergency response
ouR goAL To provide quality service valued by staff and the community in delivery of education inspection enforcement community relations and emergency response
ouR chALLenges Developmentbuilding construction intensification city-wide Light Rail Transit (LRT) green building construction increased population of the city including long-term and temporary residents ongoing need for improved technology to augment existing resources increased student enrollment communication to students living off-campus
PROTECTIVE SERVICES DEPARTMENT
WATeRLoo FiRe Rescue division ouR goAL Waterloo Fire Rescue will continue to grow in response to community needs and expectations to provide the highest standard of service
ouR AchieveMenTs bull Completion of Station 4
bull Activity Tracking Program
bull Enhanced response times on the Cityrsquos east side
bull Measures used to optimize service delivery
ouR Future goALs incLude bull Deliver a fiscally responsible and sustainable service delivery model
bull Reviseupdate simplified risk assessment (3-year cycle)
bull Reviseupdate Fire Master Plan (5-year cycle)
bull Leverage technology to enhance overall effectiveness and efficiency
bull Collaborate with local business and the community to promote fire safety
bull Collaborate with post-secondary institutions to mitigate fire safety priorities
bull Reviseupdate Emergency Management Plan
bull Reviseupdate fire inspection service delivery model
bull Enhance tactical pre-planning
bull Enhance training programs
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
ouR Future goALs incLude bull Initiate development of a Collections Policy Older Adult Strategic Plan
Public Art Master Plan and cultural strategy
bull Development of a partnership with Parkwood Manor for senior programs
bull Develop and expand the role of the private sector for expansion of the public art collection
bull Develop a policy on guiding principles to meet provincial museum standards
bull Board development across all division committees and affiliated groups
bull Implement Affiliation Service Agreement
bull Participate in theVolunteer Engagement Strategy
bull Development of cost recovery charges for replacement of capital items
bull Identify and facilitate training opportunities for affiliated organizations
bull Completion of public art projects
bull Participate in and implement theVolunteer Engagement Strategy
bull Development of a staffing strategy for all areas of CCS
bull Leadership training for all staff
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT
RecReATion And FAciLiTy seRvices ouR goAL Recreation and Facility Services will deliver programs and services that align with the Corporate Strategic Plan and the Community Culture and Recreation Services Master Plan and Guiding Principles
Key goals include bull Effective and efficient programs services and operations bull Fiscal responsibility bull Increased communication and engagement of staff bull Customer service excellence
ouR AchieveMenTs bull Customer Service Strategy ndash delivering a consistent model across facilities
bull Operations Strategy ndash cross training to maximize the efficient use of staffing resources
bull Digital signage installationutilization at RIM Park
bull Building maintenance staff re-integration into day-to-day operations of facilities
ouR Future goALs incLude bull Ongoing divisional assistance in the implementation of recommen-
dations associated the community culture and Recreation services Master Plan
bull Cemetery Services - Bechtel Park Master Plan ndash continued implementation of council-approved recommendations
bull Review of operations and aquatics models
bull Ongoing joint service opportunities with the City of Kitchener cemetery division
bull Implementation of Health and Safety and Risk Assessment Audit recommendations
bull Ongoing implementation of ODA requirements for facilities and customer service
bull Continued support of green initiatives within facilities
bull Development and implementation of facility equipment replacement strategies
CORPORATE SERVICES DEPARTMENT The Corporate Services department is responsible for the co-ordination and delivery of services by the ClerksCorporate Secretary division Economic Development division Asset Management division Information Management and Technology Services division and Legal Services
ouR Mission To oversee a dedicated team of professional and technical staff that is committed to providing quality customer service to staff as a support function and to the taxpayer and Council who expect timely service
ouR goAL To provide quality services valued by staff and the community in the areas of facility maintenance information technology Council support economic and community information and legal services
ouR chALLenges Budget resources lack of staffing resources and expertise cross-departmental co-ordination on priorities and projects
CORPORATE SERVICES DEPARTMENT
CLERKSCORPORATE SECRETARY division ouR goAL ClerksCorporate Secretary will continue to improve upon its solid foundation of customer service excellence for Council the general public and staff This will include the continuation of quick and accurate responses to general questions personalized assistance applying analysis to research and inquiries and brainstorming ideas for improvement of general services
ouR AchieveMenTs committee orientation
bull Resulted in better awareness of the Committee Policy and related policies and by-laws which will reduce staff time responding to questions and issues
bull Provided networking opportunity for Committees
New FOI requestTracking Form bull Will save 2-3 days of work when creating the Annual Report bull Colour-coded requests to ensure the deadlines are met
Records Management bull Working group met to review requirements for annual records management transfer to Service Centre
bull Resulted in a more efficient and successful Records Management
corporate Policy Manual bull Will result in more efficient access to corporate policies with standardized information
ouR Future goALs incLude bull Review of dog licensing program
bull Review of business licensinghome businesses
bull Implementation of new records management systems and processes
bull Review of election process and voting methods
bull Review of agenda and report templates
bull Procedural Bylaw review
bull Review legal invoice approval and process
bull Implement required AODA legislative requirements
CORPORATE SERVICES DEPARTMENT
inFoRMATion MAnAgeMenT amp TECHNOLOGY SERVICES (IMTS) ouR goAL To play an active leadership role in delivering comprehensive information and technology-based solutions and services to support the Cityrsquos vision and goals
ouR AchieveMenTs bull Core Switching and network enhancements to increase efficiency
bull Implemented A to Z Service Directory of municipal and regional services on our website as an aid to external customers
bull PC refresh to increase efficiency
econoMic deveLoPMenT division ouR goAL Our goal is to implement the strategic imperatives of the City of Waterloo Strategic Plan Economic Development Strategy and the City-Owned Employment Lands Strategy
ouR AchieveMenTs bull Business Directory ndash now available online searchable and updatable by business ndash co-ordinated regionally
bull Business Calling Program ndash co-ordinated regionally
bull Creative Talent Steering Committee ndash pooled resources regionally
bull Urban Design Video
ouR Future goALs incLude inFoRMATion MAnAgeMenT amp TechnoLogy seRvices bull Possible relocation of server room to third-floor space
bull Implementation of Maximo II and III
bull Completion of corporate website strategy requirements and build
bull Completion of Disaster Recovery Continuity Plan
bull Continue expansion of the underground fibre optic backbone infrastructure
econoMic deveLoPMenT division bull Continued implementation of Economic Development Strategy
bull Implementation of City-Owned Employment Land Strategy
bull Sector collisions between tourism and high-tech industries
bull Continued provision of visitor services
bull Collaborate with other organizations on Talent Strategy and Research
CORPORATE SERVICES DEPARTMENT
AsseT MAnAgeMenT division ouR goAL The objective of Asset Management is sustainability ndash environmental financial and social ndash in the face of a changing world It embraces the concepts of life- cycle assessment the valuation and protection of assets and optimized long-term investment decisions
ouR AchieveMenTs bull LEED Silver designation for YMCALibrary facility
bull Installation of new HVAC system in City Hall reduces energy costs
bull Installation of lsquoEco Chillrsquo refrigeration system at Waterloo Memorial Recreation Complex
bull Replacement of boiler systems at Waterloo Memorial Recreation Complex ndash increased efficiency with a reduction in the carbon footprint
bull Completion of various RInC projects
ouR Future goALs incLude bull Completion of implementation of Maximo Phases II
bull Commence implementation of Maximo Phase III
bull Corporate space planning initiatives
bull Implementation of environmental strategies and initiatives
bull Comprehensive plan for life-cycle managment of corporate assets
bull Update asset conditions and facility condition index maintaining VFA
bull Better utilize corporate intranet ndash develop AM online library and services (including digitizing current hard copy data and drawings)
bull Continued project managment of city projects
bull Completion of various land-related activities and transactions
YMCASTORK FAMILY LIBRARY
DEVELOPMENT SERVICES DEPARTMENT Development Services is responsible for helping ensure that the City is planned developed and constructed in a manner that meets the existing and future goals of our community as well as satisfying legislative requirements associated with our services
ouR Mission As a department we strive to plan build and realize a safe and attractive sustainable community through the combined work of our four divisions
ouR goAL In Development Services our goal is to ensure that our community evolves appropriately for our citizens through professional land use advise to Council
ouR chALLenges Increase resources to provide expected level of services given an ever increasing level of development activity increase training opportunities to reflect changing work managing unanticipated projects
DEVELOPMENT SERVICES DEPARTMENT
buiLding sTAndARds division ouR goAL Our goal is to inform and assist our customers to ensure safe and orderly development and to provide efficient delivery of building approvals inspections and management systems
ouR AchieveMenTs bull Minor permits review completed from e-drawings
bull Completion of site plan approval process
bull Projects completed Balsillie School Perimeter Institute and several residential high-rises
DEVELOPMENT SERVICES DEPARTMENT
PoLicy deveLoPMenT division ouR goAL To work with Council and the community to foster a healthy and vibrant place for people to live work do business and play
ouR AchieveMenT bull Significant efforts focused on site plan process review
ouR Future goALs incLude buiLding sTAndARds division Advance the use of technology bull For online permit applications inspection booking bull Paperless permit application
bull Paperless plan examination for small to medium-size projects bull Improve records management from paper based to electronic bull Review of service level and applicable building permit fees bull Establish standard operating procedures to manage our service
level and establish best practice guidelines bull Build strong partnerships with the industry engage them in our process
creating an education program and participating in industry functions
PoLicy deveLoPMenT division bull Develop Official Plan monitoring protocol bull Consider brownfield incentives bull Initiate major transit station area planning bull Complete Northdale Land Use and Community Improvement
Plan study bull Complete North Waterloo District Plan
bull Complete Clean Water Act Implementation with PWS
bull Complete Clair Hills remnant hydro parcels landscaping bull Construct Westvale Park
DEVELOPMENT SERVICES DEPARTMENT
deveLoPMenT APPRovALs division ouR goAL To work in partnership with citizens and the development industry to help ensure that our city evolves in the direction that meets existing and future community needs and desires
ouR AchieveMenTs bull Continuous Improvement Zoning bylaw updates are accessible from the web Integrated Development Approvals Process
bull Complete application and preconsultation requirements (Zone change site plan demo control and C of A)
bull Systemization of performance measurement for Committee of Adjustment Site Plan Review Committee Sign Variance Committee
ouR Future goALs incLude bull Implementation of the new Official Plan
bull New zoning bylaw to align with the new Official Plan
Development ProjectsProposals bull Balsillie School of International Affairs complete Phase I
initiate Phase ii
bull BarrelYards implementation
bull RIM East Campus additional phases
bull NCR Master Plan
bull Core Re-urbanization Projects
bull West Side Employment Lands
bull Implementation of West Side Plans of Subdivision
bull OMB Hearings
bull 144 Park St Phase II
committees and customer service bull Continue to provide high quality and timely customer service related to zoning development and committee inquiries
bull New Sign Bylaw implementation
bull AMANDA link to site plan
DEVELOPMENT SERVICES DEPARTMENT
engineeRing And consTRucTion division ouR goAL The Engineering and Construction divisionrsquos goal is to work co-operatively with the development industry consultants and the public to promote the construction of new high-quality infrastructure (roads watermains sewers stormwater management)
ouR AchieveMenTs bull Implementing a major Continuous Improvement (CI) project for Site Plan Control
ouR Future goALs incLude bull Implementation of new major subdivision developments (West Side Lands Carriage CrossingWoolwich Estates)
bull Complete policy review for enhanced service delivery and improved efficiencies and incorporate into regular updates of the development Manual
bull Implement enhanced electronic tracking of development approvals leveraging existing technologies within the department using the AMAndA system
bull Initiate review of records management needs and implement necessary changes in conjunction with corporate initiatives
bull Participate in the identification of service capacity issues to identify infrastructure needs for the capital budget
bull Continue to adapt skill sets and core competencies to the ldquonewrdquo development reality in Waterloo which is focused on urban intensification and infill projects
bull Provide engineering review and inspection services for new major site plans in the uptown and other locations
FINANCE DEPARTMENT The Finance department supports the organization by assisting Council and the Corporate Management Team in the development of financial policies and strategic goals The department also advises and assists city departments in the timely and effective provision of accounting budgeting purchasing and revenue services
ouR Mission The Finance department is committed to excellence in providing sound financial management and consultative services Support and enhance operational effectiveness and efficiency
ouR goAL To provide reliable sound short- medium- and long-term financial strategies to ensure the long-term sustainable financial viability of the corporation
ouR chALLenges Declining assessment growth and multiple demands on scarce financial resources
FINANCE DEPARTMENT
AccounTing division ouR goAL To provide efficient reporting while safeguarding the assets of the corporation and providing financial information to Council CMT other departments and the community
ouR AchieveMenTs bull Initialization of new procedures and requirements for the reporting of TCA requirement
bull Upgrade of Peoplesoft Payroll Management System
bull Increased payment through electronic channels
ouR Future goALs incLude Further enhancement of Reporting bull Annual Report (2013) bull Ongoing development of Financial Reporting System (2012) bull Finance upgrade (2014) bull Portal type delivery of financial information
Increased Utilization of PeopleSoft Payroll Management System bull Security (2012-2014) bull Manager view of leave banks (2012-2014) bull Staff Association time entry (2012-2014) bull Work flow (2013) bull Electronic fund transfer payments for vendors (2012-2013) bull Epay (2012)
implementation of Recommendations from continuous improvement bull Payroll time cards bull Account Payable entry
FINANCE DEPARTMENT
budgeTs amp FinAnciAL PLAnningdivision ouR goAL To fulfill fiduciary and statutory requirements and provide reliable financial strategies to ensure the financial viability of the corporation while maintaining effective stewardship of financial resources
ouR AchieveMenTs bull Refined the 3-year budget process
bull Reserve and Reserve Fund Policy review
bull Rolled out budget software to web-based version
FINANCE DEPARTMENT
Revenue division ouR goAL Develop and implement an effective system of recording and collecting amounts due to the City using a corporate approach across multiple subsystems
ouR AchieveMenT bull Department is handling approximately 3000 incoming calls per month water amp sewer billing accounted for a 3-fold increase in the number of incoming calls
ouR Future goALs incLude bull Development Charge Bylaw update
bull Financial Control Bylaw
bull Implement PSAB (Public Sector Accounting Board) requirements for budgeting
bull Develop long term financial plan
bull Continue to develop dynamic financial planning policies to adapt to an environment of constantly shifting priorities
bull Review Investment Strategy and review potential for institutional pricing
bull Collecting amounts due to the City using a corporate approach across multiple subsystems
bull Continue to stress customer service excellence including multiple sites payment stations and promoting electronic payment options
bull Ongoing implementation of POS at selected City sites
bull Develop the Cityrsquos internal controls for cash handling
bull Recommend policy on the use of special services levies
bull Developing a Payment Card Industry Data Security Standard (PCIDSS) compliance plan
bull Reduce and rationalize the number of water billing sections
FINANCE DEPARTMENT
PuRchAsing division ouR goAL The goal of the Purchasing division is to follow the Cityrsquos Purchasing Bylaw and provincial and federal government law to acquire the best total cost for the products and services required by the City of Waterloo as well as providing a fair open and transparent purchasing process for the supply base
ouR AchieveMenTs bull Additional expansion of using procurement cards has reduced staff time spent on issuing purchase orders
bull Issuing of cheques through Accounts Payable has been reduced through the implementation of the procurement card program
bull Using e-commerce platforms reduces the time required to input data for the purchasing receipt and payment of invoices
bull Involvement with the provincial contracts (vendor of records) has reduced the cost of the services supplied (courier and cellular devices)
bull Involvement in co-operative and provincial contracts has increased purchasing efficiencies
ouR Future goALs incLude bull Computerization and bar coding of stockroom items
bull Implement the recommendations listed in the Purchasing Review Report
bull Work with the Environmental Strategy Implementation Steering committee to further enhance green procurement and a sustainable Waterloo
bull Review implement most cost effective municipal and provincial contracts for items such as telecommunications and courier services
bull Investigate the possibility of a third-party agency to host our bid opportunities
bull Establish a more centralized purchasing function at the city of Waterloo
bull Review and implement new cash discounts for the supply base to the city of Waterloo
HUMAN RESOURCES DEPARTMENT VOLUNTEER SERVICES The provision of Human Resources and Volunteer Services includes recruitment and selection labour and employee relations compensation and benefits sick and disability management training collective bargaining health and safety and organizational design
ouR Mission Engaged competent employees and volunteers are successful in accomplishing strategic and business plans within a vibrant corporate culture at the City of Waterloo
ouR goAL Human Resources and Volunteer Services departmentrsquos programs and services comply with regulatory and legislative requirements and align with the Cityrsquos values to enable staff to accomplish strategic and business plans
ouR chALLenges Build sufficient HR specialist expertise within a generalist model to support service excellence free-up HR capacity through operational efficiencies to enable project work and program design in key areas and training initiatives trends indicating decline of volunteerism requires innovative approaches
HUMAN RESOURCES DEPARTMENT voLunTeeR seRvices
ouR AchieveMenTs bull Completion of a market review of insurance carriers to ensure the cost competitiveness of our employee group benefit plan rates
bull Continued implementation of violence in the workplace programs with respectful workplace training and risk assessment surveys
bull Conducted an employee engagement survey to measure employee engagement in important aspects of work activities relationships and working conditions
bull Research and preparation of negotiations plans for Staff Association CUPE and WPFFA collective agreements
bull Use of technology to create efficiencies using online automated recruitment screening for high volume recruits and enhanced use of PeopleSoft functionality for management information reporting
bull Implementation of volunteer software system to enhance volunteer recruitment and placements
ouR Future goALs incLude Utilize information system data to measure efficiencies and effectiveness of hR and volunteer process improvement and practices
bull Develop a performance appraisal tool to measure competencies and accountabilities
bull Develop a corporate staff recognition program with individual and group components
bull Provide coaching project management and volunteer training and leadership development programming
bull Continue to enhance workplace health and safety with Respectful Workplace initiatives and implementation of Corporate Health and safety Audit recommendations
bull Bargain new agreements for labour groups and Staff Association
bull Implement job evaluation maintenance program
bull Develop corporate and department plans to address issues in the employee engagement survey to enhance employee engagement
bull Continue to implement the Volunteer Engagement Strategy
PROTECTIVE SERVICES DEPARTMENT Protective Services is responsible for the delivery of services by Fire Rescue Bylaw EnforcementProperty Standards and Community Relations
ouR Mission A team of dedicated and professional staff committed to enhancing the safety and quality of life of our community through education inspection enforcement community relations and emergency response
ouR goAL To provide quality service valued by staff and the community in delivery of education inspection enforcement community relations and emergency response
ouR chALLenges Developmentbuilding construction intensification city-wide Light Rail Transit (LRT) green building construction increased population of the city including long-term and temporary residents ongoing need for improved technology to augment existing resources increased student enrollment communication to students living off-campus
PROTECTIVE SERVICES DEPARTMENT
WATeRLoo FiRe Rescue division ouR goAL Waterloo Fire Rescue will continue to grow in response to community needs and expectations to provide the highest standard of service
ouR AchieveMenTs bull Completion of Station 4
bull Activity Tracking Program
bull Enhanced response times on the Cityrsquos east side
bull Measures used to optimize service delivery
ouR Future goALs incLude bull Deliver a fiscally responsible and sustainable service delivery model
bull Reviseupdate simplified risk assessment (3-year cycle)
bull Reviseupdate Fire Master Plan (5-year cycle)
bull Leverage technology to enhance overall effectiveness and efficiency
bull Collaborate with local business and the community to promote fire safety
bull Collaborate with post-secondary institutions to mitigate fire safety priorities
bull Reviseupdate Emergency Management Plan
bull Reviseupdate fire inspection service delivery model
bull Enhance tactical pre-planning
bull Enhance training programs
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
COMMUNITY CULTURE AND RECREATION SERVICES DEPARTMENT
RecReATion And FAciLiTy seRvices ouR goAL Recreation and Facility Services will deliver programs and services that align with the Corporate Strategic Plan and the Community Culture and Recreation Services Master Plan and Guiding Principles
Key goals include bull Effective and efficient programs services and operations bull Fiscal responsibility bull Increased communication and engagement of staff bull Customer service excellence
ouR AchieveMenTs bull Customer Service Strategy ndash delivering a consistent model across facilities
bull Operations Strategy ndash cross training to maximize the efficient use of staffing resources
bull Digital signage installationutilization at RIM Park
bull Building maintenance staff re-integration into day-to-day operations of facilities
ouR Future goALs incLude bull Ongoing divisional assistance in the implementation of recommen-
dations associated the community culture and Recreation services Master Plan
bull Cemetery Services - Bechtel Park Master Plan ndash continued implementation of council-approved recommendations
bull Review of operations and aquatics models
bull Ongoing joint service opportunities with the City of Kitchener cemetery division
bull Implementation of Health and Safety and Risk Assessment Audit recommendations
bull Ongoing implementation of ODA requirements for facilities and customer service
bull Continued support of green initiatives within facilities
bull Development and implementation of facility equipment replacement strategies
CORPORATE SERVICES DEPARTMENT The Corporate Services department is responsible for the co-ordination and delivery of services by the ClerksCorporate Secretary division Economic Development division Asset Management division Information Management and Technology Services division and Legal Services
ouR Mission To oversee a dedicated team of professional and technical staff that is committed to providing quality customer service to staff as a support function and to the taxpayer and Council who expect timely service
ouR goAL To provide quality services valued by staff and the community in the areas of facility maintenance information technology Council support economic and community information and legal services
ouR chALLenges Budget resources lack of staffing resources and expertise cross-departmental co-ordination on priorities and projects
CORPORATE SERVICES DEPARTMENT
CLERKSCORPORATE SECRETARY division ouR goAL ClerksCorporate Secretary will continue to improve upon its solid foundation of customer service excellence for Council the general public and staff This will include the continuation of quick and accurate responses to general questions personalized assistance applying analysis to research and inquiries and brainstorming ideas for improvement of general services
ouR AchieveMenTs committee orientation
bull Resulted in better awareness of the Committee Policy and related policies and by-laws which will reduce staff time responding to questions and issues
bull Provided networking opportunity for Committees
New FOI requestTracking Form bull Will save 2-3 days of work when creating the Annual Report bull Colour-coded requests to ensure the deadlines are met
Records Management bull Working group met to review requirements for annual records management transfer to Service Centre
bull Resulted in a more efficient and successful Records Management
corporate Policy Manual bull Will result in more efficient access to corporate policies with standardized information
ouR Future goALs incLude bull Review of dog licensing program
bull Review of business licensinghome businesses
bull Implementation of new records management systems and processes
bull Review of election process and voting methods
bull Review of agenda and report templates
bull Procedural Bylaw review
bull Review legal invoice approval and process
bull Implement required AODA legislative requirements
CORPORATE SERVICES DEPARTMENT
inFoRMATion MAnAgeMenT amp TECHNOLOGY SERVICES (IMTS) ouR goAL To play an active leadership role in delivering comprehensive information and technology-based solutions and services to support the Cityrsquos vision and goals
ouR AchieveMenTs bull Core Switching and network enhancements to increase efficiency
bull Implemented A to Z Service Directory of municipal and regional services on our website as an aid to external customers
bull PC refresh to increase efficiency
econoMic deveLoPMenT division ouR goAL Our goal is to implement the strategic imperatives of the City of Waterloo Strategic Plan Economic Development Strategy and the City-Owned Employment Lands Strategy
ouR AchieveMenTs bull Business Directory ndash now available online searchable and updatable by business ndash co-ordinated regionally
bull Business Calling Program ndash co-ordinated regionally
bull Creative Talent Steering Committee ndash pooled resources regionally
bull Urban Design Video
ouR Future goALs incLude inFoRMATion MAnAgeMenT amp TechnoLogy seRvices bull Possible relocation of server room to third-floor space
bull Implementation of Maximo II and III
bull Completion of corporate website strategy requirements and build
bull Completion of Disaster Recovery Continuity Plan
bull Continue expansion of the underground fibre optic backbone infrastructure
econoMic deveLoPMenT division bull Continued implementation of Economic Development Strategy
bull Implementation of City-Owned Employment Land Strategy
bull Sector collisions between tourism and high-tech industries
bull Continued provision of visitor services
bull Collaborate with other organizations on Talent Strategy and Research
CORPORATE SERVICES DEPARTMENT
AsseT MAnAgeMenT division ouR goAL The objective of Asset Management is sustainability ndash environmental financial and social ndash in the face of a changing world It embraces the concepts of life- cycle assessment the valuation and protection of assets and optimized long-term investment decisions
ouR AchieveMenTs bull LEED Silver designation for YMCALibrary facility
bull Installation of new HVAC system in City Hall reduces energy costs
bull Installation of lsquoEco Chillrsquo refrigeration system at Waterloo Memorial Recreation Complex
bull Replacement of boiler systems at Waterloo Memorial Recreation Complex ndash increased efficiency with a reduction in the carbon footprint
bull Completion of various RInC projects
ouR Future goALs incLude bull Completion of implementation of Maximo Phases II
bull Commence implementation of Maximo Phase III
bull Corporate space planning initiatives
bull Implementation of environmental strategies and initiatives
bull Comprehensive plan for life-cycle managment of corporate assets
bull Update asset conditions and facility condition index maintaining VFA
bull Better utilize corporate intranet ndash develop AM online library and services (including digitizing current hard copy data and drawings)
bull Continued project managment of city projects
bull Completion of various land-related activities and transactions
YMCASTORK FAMILY LIBRARY
DEVELOPMENT SERVICES DEPARTMENT Development Services is responsible for helping ensure that the City is planned developed and constructed in a manner that meets the existing and future goals of our community as well as satisfying legislative requirements associated with our services
ouR Mission As a department we strive to plan build and realize a safe and attractive sustainable community through the combined work of our four divisions
ouR goAL In Development Services our goal is to ensure that our community evolves appropriately for our citizens through professional land use advise to Council
ouR chALLenges Increase resources to provide expected level of services given an ever increasing level of development activity increase training opportunities to reflect changing work managing unanticipated projects
DEVELOPMENT SERVICES DEPARTMENT
buiLding sTAndARds division ouR goAL Our goal is to inform and assist our customers to ensure safe and orderly development and to provide efficient delivery of building approvals inspections and management systems
ouR AchieveMenTs bull Minor permits review completed from e-drawings
bull Completion of site plan approval process
bull Projects completed Balsillie School Perimeter Institute and several residential high-rises
DEVELOPMENT SERVICES DEPARTMENT
PoLicy deveLoPMenT division ouR goAL To work with Council and the community to foster a healthy and vibrant place for people to live work do business and play
ouR AchieveMenT bull Significant efforts focused on site plan process review
ouR Future goALs incLude buiLding sTAndARds division Advance the use of technology bull For online permit applications inspection booking bull Paperless permit application
bull Paperless plan examination for small to medium-size projects bull Improve records management from paper based to electronic bull Review of service level and applicable building permit fees bull Establish standard operating procedures to manage our service
level and establish best practice guidelines bull Build strong partnerships with the industry engage them in our process
creating an education program and participating in industry functions
PoLicy deveLoPMenT division bull Develop Official Plan monitoring protocol bull Consider brownfield incentives bull Initiate major transit station area planning bull Complete Northdale Land Use and Community Improvement
Plan study bull Complete North Waterloo District Plan
bull Complete Clean Water Act Implementation with PWS
bull Complete Clair Hills remnant hydro parcels landscaping bull Construct Westvale Park
DEVELOPMENT SERVICES DEPARTMENT
deveLoPMenT APPRovALs division ouR goAL To work in partnership with citizens and the development industry to help ensure that our city evolves in the direction that meets existing and future community needs and desires
ouR AchieveMenTs bull Continuous Improvement Zoning bylaw updates are accessible from the web Integrated Development Approvals Process
bull Complete application and preconsultation requirements (Zone change site plan demo control and C of A)
bull Systemization of performance measurement for Committee of Adjustment Site Plan Review Committee Sign Variance Committee
ouR Future goALs incLude bull Implementation of the new Official Plan
bull New zoning bylaw to align with the new Official Plan
Development ProjectsProposals bull Balsillie School of International Affairs complete Phase I
initiate Phase ii
bull BarrelYards implementation
bull RIM East Campus additional phases
bull NCR Master Plan
bull Core Re-urbanization Projects
bull West Side Employment Lands
bull Implementation of West Side Plans of Subdivision
bull OMB Hearings
bull 144 Park St Phase II
committees and customer service bull Continue to provide high quality and timely customer service related to zoning development and committee inquiries
bull New Sign Bylaw implementation
bull AMANDA link to site plan
DEVELOPMENT SERVICES DEPARTMENT
engineeRing And consTRucTion division ouR goAL The Engineering and Construction divisionrsquos goal is to work co-operatively with the development industry consultants and the public to promote the construction of new high-quality infrastructure (roads watermains sewers stormwater management)
ouR AchieveMenTs bull Implementing a major Continuous Improvement (CI) project for Site Plan Control
ouR Future goALs incLude bull Implementation of new major subdivision developments (West Side Lands Carriage CrossingWoolwich Estates)
bull Complete policy review for enhanced service delivery and improved efficiencies and incorporate into regular updates of the development Manual
bull Implement enhanced electronic tracking of development approvals leveraging existing technologies within the department using the AMAndA system
bull Initiate review of records management needs and implement necessary changes in conjunction with corporate initiatives
bull Participate in the identification of service capacity issues to identify infrastructure needs for the capital budget
bull Continue to adapt skill sets and core competencies to the ldquonewrdquo development reality in Waterloo which is focused on urban intensification and infill projects
bull Provide engineering review and inspection services for new major site plans in the uptown and other locations
FINANCE DEPARTMENT The Finance department supports the organization by assisting Council and the Corporate Management Team in the development of financial policies and strategic goals The department also advises and assists city departments in the timely and effective provision of accounting budgeting purchasing and revenue services
ouR Mission The Finance department is committed to excellence in providing sound financial management and consultative services Support and enhance operational effectiveness and efficiency
ouR goAL To provide reliable sound short- medium- and long-term financial strategies to ensure the long-term sustainable financial viability of the corporation
ouR chALLenges Declining assessment growth and multiple demands on scarce financial resources
FINANCE DEPARTMENT
AccounTing division ouR goAL To provide efficient reporting while safeguarding the assets of the corporation and providing financial information to Council CMT other departments and the community
ouR AchieveMenTs bull Initialization of new procedures and requirements for the reporting of TCA requirement
bull Upgrade of Peoplesoft Payroll Management System
bull Increased payment through electronic channels
ouR Future goALs incLude Further enhancement of Reporting bull Annual Report (2013) bull Ongoing development of Financial Reporting System (2012) bull Finance upgrade (2014) bull Portal type delivery of financial information
Increased Utilization of PeopleSoft Payroll Management System bull Security (2012-2014) bull Manager view of leave banks (2012-2014) bull Staff Association time entry (2012-2014) bull Work flow (2013) bull Electronic fund transfer payments for vendors (2012-2013) bull Epay (2012)
implementation of Recommendations from continuous improvement bull Payroll time cards bull Account Payable entry
FINANCE DEPARTMENT
budgeTs amp FinAnciAL PLAnningdivision ouR goAL To fulfill fiduciary and statutory requirements and provide reliable financial strategies to ensure the financial viability of the corporation while maintaining effective stewardship of financial resources
ouR AchieveMenTs bull Refined the 3-year budget process
bull Reserve and Reserve Fund Policy review
bull Rolled out budget software to web-based version
FINANCE DEPARTMENT
Revenue division ouR goAL Develop and implement an effective system of recording and collecting amounts due to the City using a corporate approach across multiple subsystems
ouR AchieveMenT bull Department is handling approximately 3000 incoming calls per month water amp sewer billing accounted for a 3-fold increase in the number of incoming calls
ouR Future goALs incLude bull Development Charge Bylaw update
bull Financial Control Bylaw
bull Implement PSAB (Public Sector Accounting Board) requirements for budgeting
bull Develop long term financial plan
bull Continue to develop dynamic financial planning policies to adapt to an environment of constantly shifting priorities
bull Review Investment Strategy and review potential for institutional pricing
bull Collecting amounts due to the City using a corporate approach across multiple subsystems
bull Continue to stress customer service excellence including multiple sites payment stations and promoting electronic payment options
bull Ongoing implementation of POS at selected City sites
bull Develop the Cityrsquos internal controls for cash handling
bull Recommend policy on the use of special services levies
bull Developing a Payment Card Industry Data Security Standard (PCIDSS) compliance plan
bull Reduce and rationalize the number of water billing sections
FINANCE DEPARTMENT
PuRchAsing division ouR goAL The goal of the Purchasing division is to follow the Cityrsquos Purchasing Bylaw and provincial and federal government law to acquire the best total cost for the products and services required by the City of Waterloo as well as providing a fair open and transparent purchasing process for the supply base
ouR AchieveMenTs bull Additional expansion of using procurement cards has reduced staff time spent on issuing purchase orders
bull Issuing of cheques through Accounts Payable has been reduced through the implementation of the procurement card program
bull Using e-commerce platforms reduces the time required to input data for the purchasing receipt and payment of invoices
bull Involvement with the provincial contracts (vendor of records) has reduced the cost of the services supplied (courier and cellular devices)
bull Involvement in co-operative and provincial contracts has increased purchasing efficiencies
ouR Future goALs incLude bull Computerization and bar coding of stockroom items
bull Implement the recommendations listed in the Purchasing Review Report
bull Work with the Environmental Strategy Implementation Steering committee to further enhance green procurement and a sustainable Waterloo
bull Review implement most cost effective municipal and provincial contracts for items such as telecommunications and courier services
bull Investigate the possibility of a third-party agency to host our bid opportunities
bull Establish a more centralized purchasing function at the city of Waterloo
bull Review and implement new cash discounts for the supply base to the city of Waterloo
HUMAN RESOURCES DEPARTMENT VOLUNTEER SERVICES The provision of Human Resources and Volunteer Services includes recruitment and selection labour and employee relations compensation and benefits sick and disability management training collective bargaining health and safety and organizational design
ouR Mission Engaged competent employees and volunteers are successful in accomplishing strategic and business plans within a vibrant corporate culture at the City of Waterloo
ouR goAL Human Resources and Volunteer Services departmentrsquos programs and services comply with regulatory and legislative requirements and align with the Cityrsquos values to enable staff to accomplish strategic and business plans
ouR chALLenges Build sufficient HR specialist expertise within a generalist model to support service excellence free-up HR capacity through operational efficiencies to enable project work and program design in key areas and training initiatives trends indicating decline of volunteerism requires innovative approaches
HUMAN RESOURCES DEPARTMENT voLunTeeR seRvices
ouR AchieveMenTs bull Completion of a market review of insurance carriers to ensure the cost competitiveness of our employee group benefit plan rates
bull Continued implementation of violence in the workplace programs with respectful workplace training and risk assessment surveys
bull Conducted an employee engagement survey to measure employee engagement in important aspects of work activities relationships and working conditions
bull Research and preparation of negotiations plans for Staff Association CUPE and WPFFA collective agreements
bull Use of technology to create efficiencies using online automated recruitment screening for high volume recruits and enhanced use of PeopleSoft functionality for management information reporting
bull Implementation of volunteer software system to enhance volunteer recruitment and placements
ouR Future goALs incLude Utilize information system data to measure efficiencies and effectiveness of hR and volunteer process improvement and practices
bull Develop a performance appraisal tool to measure competencies and accountabilities
bull Develop a corporate staff recognition program with individual and group components
bull Provide coaching project management and volunteer training and leadership development programming
bull Continue to enhance workplace health and safety with Respectful Workplace initiatives and implementation of Corporate Health and safety Audit recommendations
bull Bargain new agreements for labour groups and Staff Association
bull Implement job evaluation maintenance program
bull Develop corporate and department plans to address issues in the employee engagement survey to enhance employee engagement
bull Continue to implement the Volunteer Engagement Strategy
PROTECTIVE SERVICES DEPARTMENT Protective Services is responsible for the delivery of services by Fire Rescue Bylaw EnforcementProperty Standards and Community Relations
ouR Mission A team of dedicated and professional staff committed to enhancing the safety and quality of life of our community through education inspection enforcement community relations and emergency response
ouR goAL To provide quality service valued by staff and the community in delivery of education inspection enforcement community relations and emergency response
ouR chALLenges Developmentbuilding construction intensification city-wide Light Rail Transit (LRT) green building construction increased population of the city including long-term and temporary residents ongoing need for improved technology to augment existing resources increased student enrollment communication to students living off-campus
PROTECTIVE SERVICES DEPARTMENT
WATeRLoo FiRe Rescue division ouR goAL Waterloo Fire Rescue will continue to grow in response to community needs and expectations to provide the highest standard of service
ouR AchieveMenTs bull Completion of Station 4
bull Activity Tracking Program
bull Enhanced response times on the Cityrsquos east side
bull Measures used to optimize service delivery
ouR Future goALs incLude bull Deliver a fiscally responsible and sustainable service delivery model
bull Reviseupdate simplified risk assessment (3-year cycle)
bull Reviseupdate Fire Master Plan (5-year cycle)
bull Leverage technology to enhance overall effectiveness and efficiency
bull Collaborate with local business and the community to promote fire safety
bull Collaborate with post-secondary institutions to mitigate fire safety priorities
bull Reviseupdate Emergency Management Plan
bull Reviseupdate fire inspection service delivery model
bull Enhance tactical pre-planning
bull Enhance training programs
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
ouR Future goALs incLude bull Ongoing divisional assistance in the implementation of recommen-
dations associated the community culture and Recreation services Master Plan
bull Cemetery Services - Bechtel Park Master Plan ndash continued implementation of council-approved recommendations
bull Review of operations and aquatics models
bull Ongoing joint service opportunities with the City of Kitchener cemetery division
bull Implementation of Health and Safety and Risk Assessment Audit recommendations
bull Ongoing implementation of ODA requirements for facilities and customer service
bull Continued support of green initiatives within facilities
bull Development and implementation of facility equipment replacement strategies
CORPORATE SERVICES DEPARTMENT The Corporate Services department is responsible for the co-ordination and delivery of services by the ClerksCorporate Secretary division Economic Development division Asset Management division Information Management and Technology Services division and Legal Services
ouR Mission To oversee a dedicated team of professional and technical staff that is committed to providing quality customer service to staff as a support function and to the taxpayer and Council who expect timely service
ouR goAL To provide quality services valued by staff and the community in the areas of facility maintenance information technology Council support economic and community information and legal services
ouR chALLenges Budget resources lack of staffing resources and expertise cross-departmental co-ordination on priorities and projects
CORPORATE SERVICES DEPARTMENT
CLERKSCORPORATE SECRETARY division ouR goAL ClerksCorporate Secretary will continue to improve upon its solid foundation of customer service excellence for Council the general public and staff This will include the continuation of quick and accurate responses to general questions personalized assistance applying analysis to research and inquiries and brainstorming ideas for improvement of general services
ouR AchieveMenTs committee orientation
bull Resulted in better awareness of the Committee Policy and related policies and by-laws which will reduce staff time responding to questions and issues
bull Provided networking opportunity for Committees
New FOI requestTracking Form bull Will save 2-3 days of work when creating the Annual Report bull Colour-coded requests to ensure the deadlines are met
Records Management bull Working group met to review requirements for annual records management transfer to Service Centre
bull Resulted in a more efficient and successful Records Management
corporate Policy Manual bull Will result in more efficient access to corporate policies with standardized information
ouR Future goALs incLude bull Review of dog licensing program
bull Review of business licensinghome businesses
bull Implementation of new records management systems and processes
bull Review of election process and voting methods
bull Review of agenda and report templates
bull Procedural Bylaw review
bull Review legal invoice approval and process
bull Implement required AODA legislative requirements
CORPORATE SERVICES DEPARTMENT
inFoRMATion MAnAgeMenT amp TECHNOLOGY SERVICES (IMTS) ouR goAL To play an active leadership role in delivering comprehensive information and technology-based solutions and services to support the Cityrsquos vision and goals
ouR AchieveMenTs bull Core Switching and network enhancements to increase efficiency
bull Implemented A to Z Service Directory of municipal and regional services on our website as an aid to external customers
bull PC refresh to increase efficiency
econoMic deveLoPMenT division ouR goAL Our goal is to implement the strategic imperatives of the City of Waterloo Strategic Plan Economic Development Strategy and the City-Owned Employment Lands Strategy
ouR AchieveMenTs bull Business Directory ndash now available online searchable and updatable by business ndash co-ordinated regionally
bull Business Calling Program ndash co-ordinated regionally
bull Creative Talent Steering Committee ndash pooled resources regionally
bull Urban Design Video
ouR Future goALs incLude inFoRMATion MAnAgeMenT amp TechnoLogy seRvices bull Possible relocation of server room to third-floor space
bull Implementation of Maximo II and III
bull Completion of corporate website strategy requirements and build
bull Completion of Disaster Recovery Continuity Plan
bull Continue expansion of the underground fibre optic backbone infrastructure
econoMic deveLoPMenT division bull Continued implementation of Economic Development Strategy
bull Implementation of City-Owned Employment Land Strategy
bull Sector collisions between tourism and high-tech industries
bull Continued provision of visitor services
bull Collaborate with other organizations on Talent Strategy and Research
CORPORATE SERVICES DEPARTMENT
AsseT MAnAgeMenT division ouR goAL The objective of Asset Management is sustainability ndash environmental financial and social ndash in the face of a changing world It embraces the concepts of life- cycle assessment the valuation and protection of assets and optimized long-term investment decisions
ouR AchieveMenTs bull LEED Silver designation for YMCALibrary facility
bull Installation of new HVAC system in City Hall reduces energy costs
bull Installation of lsquoEco Chillrsquo refrigeration system at Waterloo Memorial Recreation Complex
bull Replacement of boiler systems at Waterloo Memorial Recreation Complex ndash increased efficiency with a reduction in the carbon footprint
bull Completion of various RInC projects
ouR Future goALs incLude bull Completion of implementation of Maximo Phases II
bull Commence implementation of Maximo Phase III
bull Corporate space planning initiatives
bull Implementation of environmental strategies and initiatives
bull Comprehensive plan for life-cycle managment of corporate assets
bull Update asset conditions and facility condition index maintaining VFA
bull Better utilize corporate intranet ndash develop AM online library and services (including digitizing current hard copy data and drawings)
bull Continued project managment of city projects
bull Completion of various land-related activities and transactions
YMCASTORK FAMILY LIBRARY
DEVELOPMENT SERVICES DEPARTMENT Development Services is responsible for helping ensure that the City is planned developed and constructed in a manner that meets the existing and future goals of our community as well as satisfying legislative requirements associated with our services
ouR Mission As a department we strive to plan build and realize a safe and attractive sustainable community through the combined work of our four divisions
ouR goAL In Development Services our goal is to ensure that our community evolves appropriately for our citizens through professional land use advise to Council
ouR chALLenges Increase resources to provide expected level of services given an ever increasing level of development activity increase training opportunities to reflect changing work managing unanticipated projects
DEVELOPMENT SERVICES DEPARTMENT
buiLding sTAndARds division ouR goAL Our goal is to inform and assist our customers to ensure safe and orderly development and to provide efficient delivery of building approvals inspections and management systems
ouR AchieveMenTs bull Minor permits review completed from e-drawings
bull Completion of site plan approval process
bull Projects completed Balsillie School Perimeter Institute and several residential high-rises
DEVELOPMENT SERVICES DEPARTMENT
PoLicy deveLoPMenT division ouR goAL To work with Council and the community to foster a healthy and vibrant place for people to live work do business and play
ouR AchieveMenT bull Significant efforts focused on site plan process review
ouR Future goALs incLude buiLding sTAndARds division Advance the use of technology bull For online permit applications inspection booking bull Paperless permit application
bull Paperless plan examination for small to medium-size projects bull Improve records management from paper based to electronic bull Review of service level and applicable building permit fees bull Establish standard operating procedures to manage our service
level and establish best practice guidelines bull Build strong partnerships with the industry engage them in our process
creating an education program and participating in industry functions
PoLicy deveLoPMenT division bull Develop Official Plan monitoring protocol bull Consider brownfield incentives bull Initiate major transit station area planning bull Complete Northdale Land Use and Community Improvement
Plan study bull Complete North Waterloo District Plan
bull Complete Clean Water Act Implementation with PWS
bull Complete Clair Hills remnant hydro parcels landscaping bull Construct Westvale Park
DEVELOPMENT SERVICES DEPARTMENT
deveLoPMenT APPRovALs division ouR goAL To work in partnership with citizens and the development industry to help ensure that our city evolves in the direction that meets existing and future community needs and desires
ouR AchieveMenTs bull Continuous Improvement Zoning bylaw updates are accessible from the web Integrated Development Approvals Process
bull Complete application and preconsultation requirements (Zone change site plan demo control and C of A)
bull Systemization of performance measurement for Committee of Adjustment Site Plan Review Committee Sign Variance Committee
ouR Future goALs incLude bull Implementation of the new Official Plan
bull New zoning bylaw to align with the new Official Plan
Development ProjectsProposals bull Balsillie School of International Affairs complete Phase I
initiate Phase ii
bull BarrelYards implementation
bull RIM East Campus additional phases
bull NCR Master Plan
bull Core Re-urbanization Projects
bull West Side Employment Lands
bull Implementation of West Side Plans of Subdivision
bull OMB Hearings
bull 144 Park St Phase II
committees and customer service bull Continue to provide high quality and timely customer service related to zoning development and committee inquiries
bull New Sign Bylaw implementation
bull AMANDA link to site plan
DEVELOPMENT SERVICES DEPARTMENT
engineeRing And consTRucTion division ouR goAL The Engineering and Construction divisionrsquos goal is to work co-operatively with the development industry consultants and the public to promote the construction of new high-quality infrastructure (roads watermains sewers stormwater management)
ouR AchieveMenTs bull Implementing a major Continuous Improvement (CI) project for Site Plan Control
ouR Future goALs incLude bull Implementation of new major subdivision developments (West Side Lands Carriage CrossingWoolwich Estates)
bull Complete policy review for enhanced service delivery and improved efficiencies and incorporate into regular updates of the development Manual
bull Implement enhanced electronic tracking of development approvals leveraging existing technologies within the department using the AMAndA system
bull Initiate review of records management needs and implement necessary changes in conjunction with corporate initiatives
bull Participate in the identification of service capacity issues to identify infrastructure needs for the capital budget
bull Continue to adapt skill sets and core competencies to the ldquonewrdquo development reality in Waterloo which is focused on urban intensification and infill projects
bull Provide engineering review and inspection services for new major site plans in the uptown and other locations
FINANCE DEPARTMENT The Finance department supports the organization by assisting Council and the Corporate Management Team in the development of financial policies and strategic goals The department also advises and assists city departments in the timely and effective provision of accounting budgeting purchasing and revenue services
ouR Mission The Finance department is committed to excellence in providing sound financial management and consultative services Support and enhance operational effectiveness and efficiency
ouR goAL To provide reliable sound short- medium- and long-term financial strategies to ensure the long-term sustainable financial viability of the corporation
ouR chALLenges Declining assessment growth and multiple demands on scarce financial resources
FINANCE DEPARTMENT
AccounTing division ouR goAL To provide efficient reporting while safeguarding the assets of the corporation and providing financial information to Council CMT other departments and the community
ouR AchieveMenTs bull Initialization of new procedures and requirements for the reporting of TCA requirement
bull Upgrade of Peoplesoft Payroll Management System
bull Increased payment through electronic channels
ouR Future goALs incLude Further enhancement of Reporting bull Annual Report (2013) bull Ongoing development of Financial Reporting System (2012) bull Finance upgrade (2014) bull Portal type delivery of financial information
Increased Utilization of PeopleSoft Payroll Management System bull Security (2012-2014) bull Manager view of leave banks (2012-2014) bull Staff Association time entry (2012-2014) bull Work flow (2013) bull Electronic fund transfer payments for vendors (2012-2013) bull Epay (2012)
implementation of Recommendations from continuous improvement bull Payroll time cards bull Account Payable entry
FINANCE DEPARTMENT
budgeTs amp FinAnciAL PLAnningdivision ouR goAL To fulfill fiduciary and statutory requirements and provide reliable financial strategies to ensure the financial viability of the corporation while maintaining effective stewardship of financial resources
ouR AchieveMenTs bull Refined the 3-year budget process
bull Reserve and Reserve Fund Policy review
bull Rolled out budget software to web-based version
FINANCE DEPARTMENT
Revenue division ouR goAL Develop and implement an effective system of recording and collecting amounts due to the City using a corporate approach across multiple subsystems
ouR AchieveMenT bull Department is handling approximately 3000 incoming calls per month water amp sewer billing accounted for a 3-fold increase in the number of incoming calls
ouR Future goALs incLude bull Development Charge Bylaw update
bull Financial Control Bylaw
bull Implement PSAB (Public Sector Accounting Board) requirements for budgeting
bull Develop long term financial plan
bull Continue to develop dynamic financial planning policies to adapt to an environment of constantly shifting priorities
bull Review Investment Strategy and review potential for institutional pricing
bull Collecting amounts due to the City using a corporate approach across multiple subsystems
bull Continue to stress customer service excellence including multiple sites payment stations and promoting electronic payment options
bull Ongoing implementation of POS at selected City sites
bull Develop the Cityrsquos internal controls for cash handling
bull Recommend policy on the use of special services levies
bull Developing a Payment Card Industry Data Security Standard (PCIDSS) compliance plan
bull Reduce and rationalize the number of water billing sections
FINANCE DEPARTMENT
PuRchAsing division ouR goAL The goal of the Purchasing division is to follow the Cityrsquos Purchasing Bylaw and provincial and federal government law to acquire the best total cost for the products and services required by the City of Waterloo as well as providing a fair open and transparent purchasing process for the supply base
ouR AchieveMenTs bull Additional expansion of using procurement cards has reduced staff time spent on issuing purchase orders
bull Issuing of cheques through Accounts Payable has been reduced through the implementation of the procurement card program
bull Using e-commerce platforms reduces the time required to input data for the purchasing receipt and payment of invoices
bull Involvement with the provincial contracts (vendor of records) has reduced the cost of the services supplied (courier and cellular devices)
bull Involvement in co-operative and provincial contracts has increased purchasing efficiencies
ouR Future goALs incLude bull Computerization and bar coding of stockroom items
bull Implement the recommendations listed in the Purchasing Review Report
bull Work with the Environmental Strategy Implementation Steering committee to further enhance green procurement and a sustainable Waterloo
bull Review implement most cost effective municipal and provincial contracts for items such as telecommunications and courier services
bull Investigate the possibility of a third-party agency to host our bid opportunities
bull Establish a more centralized purchasing function at the city of Waterloo
bull Review and implement new cash discounts for the supply base to the city of Waterloo
HUMAN RESOURCES DEPARTMENT VOLUNTEER SERVICES The provision of Human Resources and Volunteer Services includes recruitment and selection labour and employee relations compensation and benefits sick and disability management training collective bargaining health and safety and organizational design
ouR Mission Engaged competent employees and volunteers are successful in accomplishing strategic and business plans within a vibrant corporate culture at the City of Waterloo
ouR goAL Human Resources and Volunteer Services departmentrsquos programs and services comply with regulatory and legislative requirements and align with the Cityrsquos values to enable staff to accomplish strategic and business plans
ouR chALLenges Build sufficient HR specialist expertise within a generalist model to support service excellence free-up HR capacity through operational efficiencies to enable project work and program design in key areas and training initiatives trends indicating decline of volunteerism requires innovative approaches
HUMAN RESOURCES DEPARTMENT voLunTeeR seRvices
ouR AchieveMenTs bull Completion of a market review of insurance carriers to ensure the cost competitiveness of our employee group benefit plan rates
bull Continued implementation of violence in the workplace programs with respectful workplace training and risk assessment surveys
bull Conducted an employee engagement survey to measure employee engagement in important aspects of work activities relationships and working conditions
bull Research and preparation of negotiations plans for Staff Association CUPE and WPFFA collective agreements
bull Use of technology to create efficiencies using online automated recruitment screening for high volume recruits and enhanced use of PeopleSoft functionality for management information reporting
bull Implementation of volunteer software system to enhance volunteer recruitment and placements
ouR Future goALs incLude Utilize information system data to measure efficiencies and effectiveness of hR and volunteer process improvement and practices
bull Develop a performance appraisal tool to measure competencies and accountabilities
bull Develop a corporate staff recognition program with individual and group components
bull Provide coaching project management and volunteer training and leadership development programming
bull Continue to enhance workplace health and safety with Respectful Workplace initiatives and implementation of Corporate Health and safety Audit recommendations
bull Bargain new agreements for labour groups and Staff Association
bull Implement job evaluation maintenance program
bull Develop corporate and department plans to address issues in the employee engagement survey to enhance employee engagement
bull Continue to implement the Volunteer Engagement Strategy
PROTECTIVE SERVICES DEPARTMENT Protective Services is responsible for the delivery of services by Fire Rescue Bylaw EnforcementProperty Standards and Community Relations
ouR Mission A team of dedicated and professional staff committed to enhancing the safety and quality of life of our community through education inspection enforcement community relations and emergency response
ouR goAL To provide quality service valued by staff and the community in delivery of education inspection enforcement community relations and emergency response
ouR chALLenges Developmentbuilding construction intensification city-wide Light Rail Transit (LRT) green building construction increased population of the city including long-term and temporary residents ongoing need for improved technology to augment existing resources increased student enrollment communication to students living off-campus
PROTECTIVE SERVICES DEPARTMENT
WATeRLoo FiRe Rescue division ouR goAL Waterloo Fire Rescue will continue to grow in response to community needs and expectations to provide the highest standard of service
ouR AchieveMenTs bull Completion of Station 4
bull Activity Tracking Program
bull Enhanced response times on the Cityrsquos east side
bull Measures used to optimize service delivery
ouR Future goALs incLude bull Deliver a fiscally responsible and sustainable service delivery model
bull Reviseupdate simplified risk assessment (3-year cycle)
bull Reviseupdate Fire Master Plan (5-year cycle)
bull Leverage technology to enhance overall effectiveness and efficiency
bull Collaborate with local business and the community to promote fire safety
bull Collaborate with post-secondary institutions to mitigate fire safety priorities
bull Reviseupdate Emergency Management Plan
bull Reviseupdate fire inspection service delivery model
bull Enhance tactical pre-planning
bull Enhance training programs
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
CORPORATE SERVICES DEPARTMENT The Corporate Services department is responsible for the co-ordination and delivery of services by the ClerksCorporate Secretary division Economic Development division Asset Management division Information Management and Technology Services division and Legal Services
ouR Mission To oversee a dedicated team of professional and technical staff that is committed to providing quality customer service to staff as a support function and to the taxpayer and Council who expect timely service
ouR goAL To provide quality services valued by staff and the community in the areas of facility maintenance information technology Council support economic and community information and legal services
ouR chALLenges Budget resources lack of staffing resources and expertise cross-departmental co-ordination on priorities and projects
CORPORATE SERVICES DEPARTMENT
CLERKSCORPORATE SECRETARY division ouR goAL ClerksCorporate Secretary will continue to improve upon its solid foundation of customer service excellence for Council the general public and staff This will include the continuation of quick and accurate responses to general questions personalized assistance applying analysis to research and inquiries and brainstorming ideas for improvement of general services
ouR AchieveMenTs committee orientation
bull Resulted in better awareness of the Committee Policy and related policies and by-laws which will reduce staff time responding to questions and issues
bull Provided networking opportunity for Committees
New FOI requestTracking Form bull Will save 2-3 days of work when creating the Annual Report bull Colour-coded requests to ensure the deadlines are met
Records Management bull Working group met to review requirements for annual records management transfer to Service Centre
bull Resulted in a more efficient and successful Records Management
corporate Policy Manual bull Will result in more efficient access to corporate policies with standardized information
ouR Future goALs incLude bull Review of dog licensing program
bull Review of business licensinghome businesses
bull Implementation of new records management systems and processes
bull Review of election process and voting methods
bull Review of agenda and report templates
bull Procedural Bylaw review
bull Review legal invoice approval and process
bull Implement required AODA legislative requirements
CORPORATE SERVICES DEPARTMENT
inFoRMATion MAnAgeMenT amp TECHNOLOGY SERVICES (IMTS) ouR goAL To play an active leadership role in delivering comprehensive information and technology-based solutions and services to support the Cityrsquos vision and goals
ouR AchieveMenTs bull Core Switching and network enhancements to increase efficiency
bull Implemented A to Z Service Directory of municipal and regional services on our website as an aid to external customers
bull PC refresh to increase efficiency
econoMic deveLoPMenT division ouR goAL Our goal is to implement the strategic imperatives of the City of Waterloo Strategic Plan Economic Development Strategy and the City-Owned Employment Lands Strategy
ouR AchieveMenTs bull Business Directory ndash now available online searchable and updatable by business ndash co-ordinated regionally
bull Business Calling Program ndash co-ordinated regionally
bull Creative Talent Steering Committee ndash pooled resources regionally
bull Urban Design Video
ouR Future goALs incLude inFoRMATion MAnAgeMenT amp TechnoLogy seRvices bull Possible relocation of server room to third-floor space
bull Implementation of Maximo II and III
bull Completion of corporate website strategy requirements and build
bull Completion of Disaster Recovery Continuity Plan
bull Continue expansion of the underground fibre optic backbone infrastructure
econoMic deveLoPMenT division bull Continued implementation of Economic Development Strategy
bull Implementation of City-Owned Employment Land Strategy
bull Sector collisions between tourism and high-tech industries
bull Continued provision of visitor services
bull Collaborate with other organizations on Talent Strategy and Research
CORPORATE SERVICES DEPARTMENT
AsseT MAnAgeMenT division ouR goAL The objective of Asset Management is sustainability ndash environmental financial and social ndash in the face of a changing world It embraces the concepts of life- cycle assessment the valuation and protection of assets and optimized long-term investment decisions
ouR AchieveMenTs bull LEED Silver designation for YMCALibrary facility
bull Installation of new HVAC system in City Hall reduces energy costs
bull Installation of lsquoEco Chillrsquo refrigeration system at Waterloo Memorial Recreation Complex
bull Replacement of boiler systems at Waterloo Memorial Recreation Complex ndash increased efficiency with a reduction in the carbon footprint
bull Completion of various RInC projects
ouR Future goALs incLude bull Completion of implementation of Maximo Phases II
bull Commence implementation of Maximo Phase III
bull Corporate space planning initiatives
bull Implementation of environmental strategies and initiatives
bull Comprehensive plan for life-cycle managment of corporate assets
bull Update asset conditions and facility condition index maintaining VFA
bull Better utilize corporate intranet ndash develop AM online library and services (including digitizing current hard copy data and drawings)
bull Continued project managment of city projects
bull Completion of various land-related activities and transactions
YMCASTORK FAMILY LIBRARY
DEVELOPMENT SERVICES DEPARTMENT Development Services is responsible for helping ensure that the City is planned developed and constructed in a manner that meets the existing and future goals of our community as well as satisfying legislative requirements associated with our services
ouR Mission As a department we strive to plan build and realize a safe and attractive sustainable community through the combined work of our four divisions
ouR goAL In Development Services our goal is to ensure that our community evolves appropriately for our citizens through professional land use advise to Council
ouR chALLenges Increase resources to provide expected level of services given an ever increasing level of development activity increase training opportunities to reflect changing work managing unanticipated projects
DEVELOPMENT SERVICES DEPARTMENT
buiLding sTAndARds division ouR goAL Our goal is to inform and assist our customers to ensure safe and orderly development and to provide efficient delivery of building approvals inspections and management systems
ouR AchieveMenTs bull Minor permits review completed from e-drawings
bull Completion of site plan approval process
bull Projects completed Balsillie School Perimeter Institute and several residential high-rises
DEVELOPMENT SERVICES DEPARTMENT
PoLicy deveLoPMenT division ouR goAL To work with Council and the community to foster a healthy and vibrant place for people to live work do business and play
ouR AchieveMenT bull Significant efforts focused on site plan process review
ouR Future goALs incLude buiLding sTAndARds division Advance the use of technology bull For online permit applications inspection booking bull Paperless permit application
bull Paperless plan examination for small to medium-size projects bull Improve records management from paper based to electronic bull Review of service level and applicable building permit fees bull Establish standard operating procedures to manage our service
level and establish best practice guidelines bull Build strong partnerships with the industry engage them in our process
creating an education program and participating in industry functions
PoLicy deveLoPMenT division bull Develop Official Plan monitoring protocol bull Consider brownfield incentives bull Initiate major transit station area planning bull Complete Northdale Land Use and Community Improvement
Plan study bull Complete North Waterloo District Plan
bull Complete Clean Water Act Implementation with PWS
bull Complete Clair Hills remnant hydro parcels landscaping bull Construct Westvale Park
DEVELOPMENT SERVICES DEPARTMENT
deveLoPMenT APPRovALs division ouR goAL To work in partnership with citizens and the development industry to help ensure that our city evolves in the direction that meets existing and future community needs and desires
ouR AchieveMenTs bull Continuous Improvement Zoning bylaw updates are accessible from the web Integrated Development Approvals Process
bull Complete application and preconsultation requirements (Zone change site plan demo control and C of A)
bull Systemization of performance measurement for Committee of Adjustment Site Plan Review Committee Sign Variance Committee
ouR Future goALs incLude bull Implementation of the new Official Plan
bull New zoning bylaw to align with the new Official Plan
Development ProjectsProposals bull Balsillie School of International Affairs complete Phase I
initiate Phase ii
bull BarrelYards implementation
bull RIM East Campus additional phases
bull NCR Master Plan
bull Core Re-urbanization Projects
bull West Side Employment Lands
bull Implementation of West Side Plans of Subdivision
bull OMB Hearings
bull 144 Park St Phase II
committees and customer service bull Continue to provide high quality and timely customer service related to zoning development and committee inquiries
bull New Sign Bylaw implementation
bull AMANDA link to site plan
DEVELOPMENT SERVICES DEPARTMENT
engineeRing And consTRucTion division ouR goAL The Engineering and Construction divisionrsquos goal is to work co-operatively with the development industry consultants and the public to promote the construction of new high-quality infrastructure (roads watermains sewers stormwater management)
ouR AchieveMenTs bull Implementing a major Continuous Improvement (CI) project for Site Plan Control
ouR Future goALs incLude bull Implementation of new major subdivision developments (West Side Lands Carriage CrossingWoolwich Estates)
bull Complete policy review for enhanced service delivery and improved efficiencies and incorporate into regular updates of the development Manual
bull Implement enhanced electronic tracking of development approvals leveraging existing technologies within the department using the AMAndA system
bull Initiate review of records management needs and implement necessary changes in conjunction with corporate initiatives
bull Participate in the identification of service capacity issues to identify infrastructure needs for the capital budget
bull Continue to adapt skill sets and core competencies to the ldquonewrdquo development reality in Waterloo which is focused on urban intensification and infill projects
bull Provide engineering review and inspection services for new major site plans in the uptown and other locations
FINANCE DEPARTMENT The Finance department supports the organization by assisting Council and the Corporate Management Team in the development of financial policies and strategic goals The department also advises and assists city departments in the timely and effective provision of accounting budgeting purchasing and revenue services
ouR Mission The Finance department is committed to excellence in providing sound financial management and consultative services Support and enhance operational effectiveness and efficiency
ouR goAL To provide reliable sound short- medium- and long-term financial strategies to ensure the long-term sustainable financial viability of the corporation
ouR chALLenges Declining assessment growth and multiple demands on scarce financial resources
FINANCE DEPARTMENT
AccounTing division ouR goAL To provide efficient reporting while safeguarding the assets of the corporation and providing financial information to Council CMT other departments and the community
ouR AchieveMenTs bull Initialization of new procedures and requirements for the reporting of TCA requirement
bull Upgrade of Peoplesoft Payroll Management System
bull Increased payment through electronic channels
ouR Future goALs incLude Further enhancement of Reporting bull Annual Report (2013) bull Ongoing development of Financial Reporting System (2012) bull Finance upgrade (2014) bull Portal type delivery of financial information
Increased Utilization of PeopleSoft Payroll Management System bull Security (2012-2014) bull Manager view of leave banks (2012-2014) bull Staff Association time entry (2012-2014) bull Work flow (2013) bull Electronic fund transfer payments for vendors (2012-2013) bull Epay (2012)
implementation of Recommendations from continuous improvement bull Payroll time cards bull Account Payable entry
FINANCE DEPARTMENT
budgeTs amp FinAnciAL PLAnningdivision ouR goAL To fulfill fiduciary and statutory requirements and provide reliable financial strategies to ensure the financial viability of the corporation while maintaining effective stewardship of financial resources
ouR AchieveMenTs bull Refined the 3-year budget process
bull Reserve and Reserve Fund Policy review
bull Rolled out budget software to web-based version
FINANCE DEPARTMENT
Revenue division ouR goAL Develop and implement an effective system of recording and collecting amounts due to the City using a corporate approach across multiple subsystems
ouR AchieveMenT bull Department is handling approximately 3000 incoming calls per month water amp sewer billing accounted for a 3-fold increase in the number of incoming calls
ouR Future goALs incLude bull Development Charge Bylaw update
bull Financial Control Bylaw
bull Implement PSAB (Public Sector Accounting Board) requirements for budgeting
bull Develop long term financial plan
bull Continue to develop dynamic financial planning policies to adapt to an environment of constantly shifting priorities
bull Review Investment Strategy and review potential for institutional pricing
bull Collecting amounts due to the City using a corporate approach across multiple subsystems
bull Continue to stress customer service excellence including multiple sites payment stations and promoting electronic payment options
bull Ongoing implementation of POS at selected City sites
bull Develop the Cityrsquos internal controls for cash handling
bull Recommend policy on the use of special services levies
bull Developing a Payment Card Industry Data Security Standard (PCIDSS) compliance plan
bull Reduce and rationalize the number of water billing sections
FINANCE DEPARTMENT
PuRchAsing division ouR goAL The goal of the Purchasing division is to follow the Cityrsquos Purchasing Bylaw and provincial and federal government law to acquire the best total cost for the products and services required by the City of Waterloo as well as providing a fair open and transparent purchasing process for the supply base
ouR AchieveMenTs bull Additional expansion of using procurement cards has reduced staff time spent on issuing purchase orders
bull Issuing of cheques through Accounts Payable has been reduced through the implementation of the procurement card program
bull Using e-commerce platforms reduces the time required to input data for the purchasing receipt and payment of invoices
bull Involvement with the provincial contracts (vendor of records) has reduced the cost of the services supplied (courier and cellular devices)
bull Involvement in co-operative and provincial contracts has increased purchasing efficiencies
ouR Future goALs incLude bull Computerization and bar coding of stockroom items
bull Implement the recommendations listed in the Purchasing Review Report
bull Work with the Environmental Strategy Implementation Steering committee to further enhance green procurement and a sustainable Waterloo
bull Review implement most cost effective municipal and provincial contracts for items such as telecommunications and courier services
bull Investigate the possibility of a third-party agency to host our bid opportunities
bull Establish a more centralized purchasing function at the city of Waterloo
bull Review and implement new cash discounts for the supply base to the city of Waterloo
HUMAN RESOURCES DEPARTMENT VOLUNTEER SERVICES The provision of Human Resources and Volunteer Services includes recruitment and selection labour and employee relations compensation and benefits sick and disability management training collective bargaining health and safety and organizational design
ouR Mission Engaged competent employees and volunteers are successful in accomplishing strategic and business plans within a vibrant corporate culture at the City of Waterloo
ouR goAL Human Resources and Volunteer Services departmentrsquos programs and services comply with regulatory and legislative requirements and align with the Cityrsquos values to enable staff to accomplish strategic and business plans
ouR chALLenges Build sufficient HR specialist expertise within a generalist model to support service excellence free-up HR capacity through operational efficiencies to enable project work and program design in key areas and training initiatives trends indicating decline of volunteerism requires innovative approaches
HUMAN RESOURCES DEPARTMENT voLunTeeR seRvices
ouR AchieveMenTs bull Completion of a market review of insurance carriers to ensure the cost competitiveness of our employee group benefit plan rates
bull Continued implementation of violence in the workplace programs with respectful workplace training and risk assessment surveys
bull Conducted an employee engagement survey to measure employee engagement in important aspects of work activities relationships and working conditions
bull Research and preparation of negotiations plans for Staff Association CUPE and WPFFA collective agreements
bull Use of technology to create efficiencies using online automated recruitment screening for high volume recruits and enhanced use of PeopleSoft functionality for management information reporting
bull Implementation of volunteer software system to enhance volunteer recruitment and placements
ouR Future goALs incLude Utilize information system data to measure efficiencies and effectiveness of hR and volunteer process improvement and practices
bull Develop a performance appraisal tool to measure competencies and accountabilities
bull Develop a corporate staff recognition program with individual and group components
bull Provide coaching project management and volunteer training and leadership development programming
bull Continue to enhance workplace health and safety with Respectful Workplace initiatives and implementation of Corporate Health and safety Audit recommendations
bull Bargain new agreements for labour groups and Staff Association
bull Implement job evaluation maintenance program
bull Develop corporate and department plans to address issues in the employee engagement survey to enhance employee engagement
bull Continue to implement the Volunteer Engagement Strategy
PROTECTIVE SERVICES DEPARTMENT Protective Services is responsible for the delivery of services by Fire Rescue Bylaw EnforcementProperty Standards and Community Relations
ouR Mission A team of dedicated and professional staff committed to enhancing the safety and quality of life of our community through education inspection enforcement community relations and emergency response
ouR goAL To provide quality service valued by staff and the community in delivery of education inspection enforcement community relations and emergency response
ouR chALLenges Developmentbuilding construction intensification city-wide Light Rail Transit (LRT) green building construction increased population of the city including long-term and temporary residents ongoing need for improved technology to augment existing resources increased student enrollment communication to students living off-campus
PROTECTIVE SERVICES DEPARTMENT
WATeRLoo FiRe Rescue division ouR goAL Waterloo Fire Rescue will continue to grow in response to community needs and expectations to provide the highest standard of service
ouR AchieveMenTs bull Completion of Station 4
bull Activity Tracking Program
bull Enhanced response times on the Cityrsquos east side
bull Measures used to optimize service delivery
ouR Future goALs incLude bull Deliver a fiscally responsible and sustainable service delivery model
bull Reviseupdate simplified risk assessment (3-year cycle)
bull Reviseupdate Fire Master Plan (5-year cycle)
bull Leverage technology to enhance overall effectiveness and efficiency
bull Collaborate with local business and the community to promote fire safety
bull Collaborate with post-secondary institutions to mitigate fire safety priorities
bull Reviseupdate Emergency Management Plan
bull Reviseupdate fire inspection service delivery model
bull Enhance tactical pre-planning
bull Enhance training programs
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
CORPORATE SERVICES DEPARTMENT
CLERKSCORPORATE SECRETARY division ouR goAL ClerksCorporate Secretary will continue to improve upon its solid foundation of customer service excellence for Council the general public and staff This will include the continuation of quick and accurate responses to general questions personalized assistance applying analysis to research and inquiries and brainstorming ideas for improvement of general services
ouR AchieveMenTs committee orientation
bull Resulted in better awareness of the Committee Policy and related policies and by-laws which will reduce staff time responding to questions and issues
bull Provided networking opportunity for Committees
New FOI requestTracking Form bull Will save 2-3 days of work when creating the Annual Report bull Colour-coded requests to ensure the deadlines are met
Records Management bull Working group met to review requirements for annual records management transfer to Service Centre
bull Resulted in a more efficient and successful Records Management
corporate Policy Manual bull Will result in more efficient access to corporate policies with standardized information
ouR Future goALs incLude bull Review of dog licensing program
bull Review of business licensinghome businesses
bull Implementation of new records management systems and processes
bull Review of election process and voting methods
bull Review of agenda and report templates
bull Procedural Bylaw review
bull Review legal invoice approval and process
bull Implement required AODA legislative requirements
CORPORATE SERVICES DEPARTMENT
inFoRMATion MAnAgeMenT amp TECHNOLOGY SERVICES (IMTS) ouR goAL To play an active leadership role in delivering comprehensive information and technology-based solutions and services to support the Cityrsquos vision and goals
ouR AchieveMenTs bull Core Switching and network enhancements to increase efficiency
bull Implemented A to Z Service Directory of municipal and regional services on our website as an aid to external customers
bull PC refresh to increase efficiency
econoMic deveLoPMenT division ouR goAL Our goal is to implement the strategic imperatives of the City of Waterloo Strategic Plan Economic Development Strategy and the City-Owned Employment Lands Strategy
ouR AchieveMenTs bull Business Directory ndash now available online searchable and updatable by business ndash co-ordinated regionally
bull Business Calling Program ndash co-ordinated regionally
bull Creative Talent Steering Committee ndash pooled resources regionally
bull Urban Design Video
ouR Future goALs incLude inFoRMATion MAnAgeMenT amp TechnoLogy seRvices bull Possible relocation of server room to third-floor space
bull Implementation of Maximo II and III
bull Completion of corporate website strategy requirements and build
bull Completion of Disaster Recovery Continuity Plan
bull Continue expansion of the underground fibre optic backbone infrastructure
econoMic deveLoPMenT division bull Continued implementation of Economic Development Strategy
bull Implementation of City-Owned Employment Land Strategy
bull Sector collisions between tourism and high-tech industries
bull Continued provision of visitor services
bull Collaborate with other organizations on Talent Strategy and Research
CORPORATE SERVICES DEPARTMENT
AsseT MAnAgeMenT division ouR goAL The objective of Asset Management is sustainability ndash environmental financial and social ndash in the face of a changing world It embraces the concepts of life- cycle assessment the valuation and protection of assets and optimized long-term investment decisions
ouR AchieveMenTs bull LEED Silver designation for YMCALibrary facility
bull Installation of new HVAC system in City Hall reduces energy costs
bull Installation of lsquoEco Chillrsquo refrigeration system at Waterloo Memorial Recreation Complex
bull Replacement of boiler systems at Waterloo Memorial Recreation Complex ndash increased efficiency with a reduction in the carbon footprint
bull Completion of various RInC projects
ouR Future goALs incLude bull Completion of implementation of Maximo Phases II
bull Commence implementation of Maximo Phase III
bull Corporate space planning initiatives
bull Implementation of environmental strategies and initiatives
bull Comprehensive plan for life-cycle managment of corporate assets
bull Update asset conditions and facility condition index maintaining VFA
bull Better utilize corporate intranet ndash develop AM online library and services (including digitizing current hard copy data and drawings)
bull Continued project managment of city projects
bull Completion of various land-related activities and transactions
YMCASTORK FAMILY LIBRARY
DEVELOPMENT SERVICES DEPARTMENT Development Services is responsible for helping ensure that the City is planned developed and constructed in a manner that meets the existing and future goals of our community as well as satisfying legislative requirements associated with our services
ouR Mission As a department we strive to plan build and realize a safe and attractive sustainable community through the combined work of our four divisions
ouR goAL In Development Services our goal is to ensure that our community evolves appropriately for our citizens through professional land use advise to Council
ouR chALLenges Increase resources to provide expected level of services given an ever increasing level of development activity increase training opportunities to reflect changing work managing unanticipated projects
DEVELOPMENT SERVICES DEPARTMENT
buiLding sTAndARds division ouR goAL Our goal is to inform and assist our customers to ensure safe and orderly development and to provide efficient delivery of building approvals inspections and management systems
ouR AchieveMenTs bull Minor permits review completed from e-drawings
bull Completion of site plan approval process
bull Projects completed Balsillie School Perimeter Institute and several residential high-rises
DEVELOPMENT SERVICES DEPARTMENT
PoLicy deveLoPMenT division ouR goAL To work with Council and the community to foster a healthy and vibrant place for people to live work do business and play
ouR AchieveMenT bull Significant efforts focused on site plan process review
ouR Future goALs incLude buiLding sTAndARds division Advance the use of technology bull For online permit applications inspection booking bull Paperless permit application
bull Paperless plan examination for small to medium-size projects bull Improve records management from paper based to electronic bull Review of service level and applicable building permit fees bull Establish standard operating procedures to manage our service
level and establish best practice guidelines bull Build strong partnerships with the industry engage them in our process
creating an education program and participating in industry functions
PoLicy deveLoPMenT division bull Develop Official Plan monitoring protocol bull Consider brownfield incentives bull Initiate major transit station area planning bull Complete Northdale Land Use and Community Improvement
Plan study bull Complete North Waterloo District Plan
bull Complete Clean Water Act Implementation with PWS
bull Complete Clair Hills remnant hydro parcels landscaping bull Construct Westvale Park
DEVELOPMENT SERVICES DEPARTMENT
deveLoPMenT APPRovALs division ouR goAL To work in partnership with citizens and the development industry to help ensure that our city evolves in the direction that meets existing and future community needs and desires
ouR AchieveMenTs bull Continuous Improvement Zoning bylaw updates are accessible from the web Integrated Development Approvals Process
bull Complete application and preconsultation requirements (Zone change site plan demo control and C of A)
bull Systemization of performance measurement for Committee of Adjustment Site Plan Review Committee Sign Variance Committee
ouR Future goALs incLude bull Implementation of the new Official Plan
bull New zoning bylaw to align with the new Official Plan
Development ProjectsProposals bull Balsillie School of International Affairs complete Phase I
initiate Phase ii
bull BarrelYards implementation
bull RIM East Campus additional phases
bull NCR Master Plan
bull Core Re-urbanization Projects
bull West Side Employment Lands
bull Implementation of West Side Plans of Subdivision
bull OMB Hearings
bull 144 Park St Phase II
committees and customer service bull Continue to provide high quality and timely customer service related to zoning development and committee inquiries
bull New Sign Bylaw implementation
bull AMANDA link to site plan
DEVELOPMENT SERVICES DEPARTMENT
engineeRing And consTRucTion division ouR goAL The Engineering and Construction divisionrsquos goal is to work co-operatively with the development industry consultants and the public to promote the construction of new high-quality infrastructure (roads watermains sewers stormwater management)
ouR AchieveMenTs bull Implementing a major Continuous Improvement (CI) project for Site Plan Control
ouR Future goALs incLude bull Implementation of new major subdivision developments (West Side Lands Carriage CrossingWoolwich Estates)
bull Complete policy review for enhanced service delivery and improved efficiencies and incorporate into regular updates of the development Manual
bull Implement enhanced electronic tracking of development approvals leveraging existing technologies within the department using the AMAndA system
bull Initiate review of records management needs and implement necessary changes in conjunction with corporate initiatives
bull Participate in the identification of service capacity issues to identify infrastructure needs for the capital budget
bull Continue to adapt skill sets and core competencies to the ldquonewrdquo development reality in Waterloo which is focused on urban intensification and infill projects
bull Provide engineering review and inspection services for new major site plans in the uptown and other locations
FINANCE DEPARTMENT The Finance department supports the organization by assisting Council and the Corporate Management Team in the development of financial policies and strategic goals The department also advises and assists city departments in the timely and effective provision of accounting budgeting purchasing and revenue services
ouR Mission The Finance department is committed to excellence in providing sound financial management and consultative services Support and enhance operational effectiveness and efficiency
ouR goAL To provide reliable sound short- medium- and long-term financial strategies to ensure the long-term sustainable financial viability of the corporation
ouR chALLenges Declining assessment growth and multiple demands on scarce financial resources
FINANCE DEPARTMENT
AccounTing division ouR goAL To provide efficient reporting while safeguarding the assets of the corporation and providing financial information to Council CMT other departments and the community
ouR AchieveMenTs bull Initialization of new procedures and requirements for the reporting of TCA requirement
bull Upgrade of Peoplesoft Payroll Management System
bull Increased payment through electronic channels
ouR Future goALs incLude Further enhancement of Reporting bull Annual Report (2013) bull Ongoing development of Financial Reporting System (2012) bull Finance upgrade (2014) bull Portal type delivery of financial information
Increased Utilization of PeopleSoft Payroll Management System bull Security (2012-2014) bull Manager view of leave banks (2012-2014) bull Staff Association time entry (2012-2014) bull Work flow (2013) bull Electronic fund transfer payments for vendors (2012-2013) bull Epay (2012)
implementation of Recommendations from continuous improvement bull Payroll time cards bull Account Payable entry
FINANCE DEPARTMENT
budgeTs amp FinAnciAL PLAnningdivision ouR goAL To fulfill fiduciary and statutory requirements and provide reliable financial strategies to ensure the financial viability of the corporation while maintaining effective stewardship of financial resources
ouR AchieveMenTs bull Refined the 3-year budget process
bull Reserve and Reserve Fund Policy review
bull Rolled out budget software to web-based version
FINANCE DEPARTMENT
Revenue division ouR goAL Develop and implement an effective system of recording and collecting amounts due to the City using a corporate approach across multiple subsystems
ouR AchieveMenT bull Department is handling approximately 3000 incoming calls per month water amp sewer billing accounted for a 3-fold increase in the number of incoming calls
ouR Future goALs incLude bull Development Charge Bylaw update
bull Financial Control Bylaw
bull Implement PSAB (Public Sector Accounting Board) requirements for budgeting
bull Develop long term financial plan
bull Continue to develop dynamic financial planning policies to adapt to an environment of constantly shifting priorities
bull Review Investment Strategy and review potential for institutional pricing
bull Collecting amounts due to the City using a corporate approach across multiple subsystems
bull Continue to stress customer service excellence including multiple sites payment stations and promoting electronic payment options
bull Ongoing implementation of POS at selected City sites
bull Develop the Cityrsquos internal controls for cash handling
bull Recommend policy on the use of special services levies
bull Developing a Payment Card Industry Data Security Standard (PCIDSS) compliance plan
bull Reduce and rationalize the number of water billing sections
FINANCE DEPARTMENT
PuRchAsing division ouR goAL The goal of the Purchasing division is to follow the Cityrsquos Purchasing Bylaw and provincial and federal government law to acquire the best total cost for the products and services required by the City of Waterloo as well as providing a fair open and transparent purchasing process for the supply base
ouR AchieveMenTs bull Additional expansion of using procurement cards has reduced staff time spent on issuing purchase orders
bull Issuing of cheques through Accounts Payable has been reduced through the implementation of the procurement card program
bull Using e-commerce platforms reduces the time required to input data for the purchasing receipt and payment of invoices
bull Involvement with the provincial contracts (vendor of records) has reduced the cost of the services supplied (courier and cellular devices)
bull Involvement in co-operative and provincial contracts has increased purchasing efficiencies
ouR Future goALs incLude bull Computerization and bar coding of stockroom items
bull Implement the recommendations listed in the Purchasing Review Report
bull Work with the Environmental Strategy Implementation Steering committee to further enhance green procurement and a sustainable Waterloo
bull Review implement most cost effective municipal and provincial contracts for items such as telecommunications and courier services
bull Investigate the possibility of a third-party agency to host our bid opportunities
bull Establish a more centralized purchasing function at the city of Waterloo
bull Review and implement new cash discounts for the supply base to the city of Waterloo
HUMAN RESOURCES DEPARTMENT VOLUNTEER SERVICES The provision of Human Resources and Volunteer Services includes recruitment and selection labour and employee relations compensation and benefits sick and disability management training collective bargaining health and safety and organizational design
ouR Mission Engaged competent employees and volunteers are successful in accomplishing strategic and business plans within a vibrant corporate culture at the City of Waterloo
ouR goAL Human Resources and Volunteer Services departmentrsquos programs and services comply with regulatory and legislative requirements and align with the Cityrsquos values to enable staff to accomplish strategic and business plans
ouR chALLenges Build sufficient HR specialist expertise within a generalist model to support service excellence free-up HR capacity through operational efficiencies to enable project work and program design in key areas and training initiatives trends indicating decline of volunteerism requires innovative approaches
HUMAN RESOURCES DEPARTMENT voLunTeeR seRvices
ouR AchieveMenTs bull Completion of a market review of insurance carriers to ensure the cost competitiveness of our employee group benefit plan rates
bull Continued implementation of violence in the workplace programs with respectful workplace training and risk assessment surveys
bull Conducted an employee engagement survey to measure employee engagement in important aspects of work activities relationships and working conditions
bull Research and preparation of negotiations plans for Staff Association CUPE and WPFFA collective agreements
bull Use of technology to create efficiencies using online automated recruitment screening for high volume recruits and enhanced use of PeopleSoft functionality for management information reporting
bull Implementation of volunteer software system to enhance volunteer recruitment and placements
ouR Future goALs incLude Utilize information system data to measure efficiencies and effectiveness of hR and volunteer process improvement and practices
bull Develop a performance appraisal tool to measure competencies and accountabilities
bull Develop a corporate staff recognition program with individual and group components
bull Provide coaching project management and volunteer training and leadership development programming
bull Continue to enhance workplace health and safety with Respectful Workplace initiatives and implementation of Corporate Health and safety Audit recommendations
bull Bargain new agreements for labour groups and Staff Association
bull Implement job evaluation maintenance program
bull Develop corporate and department plans to address issues in the employee engagement survey to enhance employee engagement
bull Continue to implement the Volunteer Engagement Strategy
PROTECTIVE SERVICES DEPARTMENT Protective Services is responsible for the delivery of services by Fire Rescue Bylaw EnforcementProperty Standards and Community Relations
ouR Mission A team of dedicated and professional staff committed to enhancing the safety and quality of life of our community through education inspection enforcement community relations and emergency response
ouR goAL To provide quality service valued by staff and the community in delivery of education inspection enforcement community relations and emergency response
ouR chALLenges Developmentbuilding construction intensification city-wide Light Rail Transit (LRT) green building construction increased population of the city including long-term and temporary residents ongoing need for improved technology to augment existing resources increased student enrollment communication to students living off-campus
PROTECTIVE SERVICES DEPARTMENT
WATeRLoo FiRe Rescue division ouR goAL Waterloo Fire Rescue will continue to grow in response to community needs and expectations to provide the highest standard of service
ouR AchieveMenTs bull Completion of Station 4
bull Activity Tracking Program
bull Enhanced response times on the Cityrsquos east side
bull Measures used to optimize service delivery
ouR Future goALs incLude bull Deliver a fiscally responsible and sustainable service delivery model
bull Reviseupdate simplified risk assessment (3-year cycle)
bull Reviseupdate Fire Master Plan (5-year cycle)
bull Leverage technology to enhance overall effectiveness and efficiency
bull Collaborate with local business and the community to promote fire safety
bull Collaborate with post-secondary institutions to mitigate fire safety priorities
bull Reviseupdate Emergency Management Plan
bull Reviseupdate fire inspection service delivery model
bull Enhance tactical pre-planning
bull Enhance training programs
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
ouR Future goALs incLude bull Review of dog licensing program
bull Review of business licensinghome businesses
bull Implementation of new records management systems and processes
bull Review of election process and voting methods
bull Review of agenda and report templates
bull Procedural Bylaw review
bull Review legal invoice approval and process
bull Implement required AODA legislative requirements
CORPORATE SERVICES DEPARTMENT
inFoRMATion MAnAgeMenT amp TECHNOLOGY SERVICES (IMTS) ouR goAL To play an active leadership role in delivering comprehensive information and technology-based solutions and services to support the Cityrsquos vision and goals
ouR AchieveMenTs bull Core Switching and network enhancements to increase efficiency
bull Implemented A to Z Service Directory of municipal and regional services on our website as an aid to external customers
bull PC refresh to increase efficiency
econoMic deveLoPMenT division ouR goAL Our goal is to implement the strategic imperatives of the City of Waterloo Strategic Plan Economic Development Strategy and the City-Owned Employment Lands Strategy
ouR AchieveMenTs bull Business Directory ndash now available online searchable and updatable by business ndash co-ordinated regionally
bull Business Calling Program ndash co-ordinated regionally
bull Creative Talent Steering Committee ndash pooled resources regionally
bull Urban Design Video
ouR Future goALs incLude inFoRMATion MAnAgeMenT amp TechnoLogy seRvices bull Possible relocation of server room to third-floor space
bull Implementation of Maximo II and III
bull Completion of corporate website strategy requirements and build
bull Completion of Disaster Recovery Continuity Plan
bull Continue expansion of the underground fibre optic backbone infrastructure
econoMic deveLoPMenT division bull Continued implementation of Economic Development Strategy
bull Implementation of City-Owned Employment Land Strategy
bull Sector collisions between tourism and high-tech industries
bull Continued provision of visitor services
bull Collaborate with other organizations on Talent Strategy and Research
CORPORATE SERVICES DEPARTMENT
AsseT MAnAgeMenT division ouR goAL The objective of Asset Management is sustainability ndash environmental financial and social ndash in the face of a changing world It embraces the concepts of life- cycle assessment the valuation and protection of assets and optimized long-term investment decisions
ouR AchieveMenTs bull LEED Silver designation for YMCALibrary facility
bull Installation of new HVAC system in City Hall reduces energy costs
bull Installation of lsquoEco Chillrsquo refrigeration system at Waterloo Memorial Recreation Complex
bull Replacement of boiler systems at Waterloo Memorial Recreation Complex ndash increased efficiency with a reduction in the carbon footprint
bull Completion of various RInC projects
ouR Future goALs incLude bull Completion of implementation of Maximo Phases II
bull Commence implementation of Maximo Phase III
bull Corporate space planning initiatives
bull Implementation of environmental strategies and initiatives
bull Comprehensive plan for life-cycle managment of corporate assets
bull Update asset conditions and facility condition index maintaining VFA
bull Better utilize corporate intranet ndash develop AM online library and services (including digitizing current hard copy data and drawings)
bull Continued project managment of city projects
bull Completion of various land-related activities and transactions
YMCASTORK FAMILY LIBRARY
DEVELOPMENT SERVICES DEPARTMENT Development Services is responsible for helping ensure that the City is planned developed and constructed in a manner that meets the existing and future goals of our community as well as satisfying legislative requirements associated with our services
ouR Mission As a department we strive to plan build and realize a safe and attractive sustainable community through the combined work of our four divisions
ouR goAL In Development Services our goal is to ensure that our community evolves appropriately for our citizens through professional land use advise to Council
ouR chALLenges Increase resources to provide expected level of services given an ever increasing level of development activity increase training opportunities to reflect changing work managing unanticipated projects
DEVELOPMENT SERVICES DEPARTMENT
buiLding sTAndARds division ouR goAL Our goal is to inform and assist our customers to ensure safe and orderly development and to provide efficient delivery of building approvals inspections and management systems
ouR AchieveMenTs bull Minor permits review completed from e-drawings
bull Completion of site plan approval process
bull Projects completed Balsillie School Perimeter Institute and several residential high-rises
DEVELOPMENT SERVICES DEPARTMENT
PoLicy deveLoPMenT division ouR goAL To work with Council and the community to foster a healthy and vibrant place for people to live work do business and play
ouR AchieveMenT bull Significant efforts focused on site plan process review
ouR Future goALs incLude buiLding sTAndARds division Advance the use of technology bull For online permit applications inspection booking bull Paperless permit application
bull Paperless plan examination for small to medium-size projects bull Improve records management from paper based to electronic bull Review of service level and applicable building permit fees bull Establish standard operating procedures to manage our service
level and establish best practice guidelines bull Build strong partnerships with the industry engage them in our process
creating an education program and participating in industry functions
PoLicy deveLoPMenT division bull Develop Official Plan monitoring protocol bull Consider brownfield incentives bull Initiate major transit station area planning bull Complete Northdale Land Use and Community Improvement
Plan study bull Complete North Waterloo District Plan
bull Complete Clean Water Act Implementation with PWS
bull Complete Clair Hills remnant hydro parcels landscaping bull Construct Westvale Park
DEVELOPMENT SERVICES DEPARTMENT
deveLoPMenT APPRovALs division ouR goAL To work in partnership with citizens and the development industry to help ensure that our city evolves in the direction that meets existing and future community needs and desires
ouR AchieveMenTs bull Continuous Improvement Zoning bylaw updates are accessible from the web Integrated Development Approvals Process
bull Complete application and preconsultation requirements (Zone change site plan demo control and C of A)
bull Systemization of performance measurement for Committee of Adjustment Site Plan Review Committee Sign Variance Committee
ouR Future goALs incLude bull Implementation of the new Official Plan
bull New zoning bylaw to align with the new Official Plan
Development ProjectsProposals bull Balsillie School of International Affairs complete Phase I
initiate Phase ii
bull BarrelYards implementation
bull RIM East Campus additional phases
bull NCR Master Plan
bull Core Re-urbanization Projects
bull West Side Employment Lands
bull Implementation of West Side Plans of Subdivision
bull OMB Hearings
bull 144 Park St Phase II
committees and customer service bull Continue to provide high quality and timely customer service related to zoning development and committee inquiries
bull New Sign Bylaw implementation
bull AMANDA link to site plan
DEVELOPMENT SERVICES DEPARTMENT
engineeRing And consTRucTion division ouR goAL The Engineering and Construction divisionrsquos goal is to work co-operatively with the development industry consultants and the public to promote the construction of new high-quality infrastructure (roads watermains sewers stormwater management)
ouR AchieveMenTs bull Implementing a major Continuous Improvement (CI) project for Site Plan Control
ouR Future goALs incLude bull Implementation of new major subdivision developments (West Side Lands Carriage CrossingWoolwich Estates)
bull Complete policy review for enhanced service delivery and improved efficiencies and incorporate into regular updates of the development Manual
bull Implement enhanced electronic tracking of development approvals leveraging existing technologies within the department using the AMAndA system
bull Initiate review of records management needs and implement necessary changes in conjunction with corporate initiatives
bull Participate in the identification of service capacity issues to identify infrastructure needs for the capital budget
bull Continue to adapt skill sets and core competencies to the ldquonewrdquo development reality in Waterloo which is focused on urban intensification and infill projects
bull Provide engineering review and inspection services for new major site plans in the uptown and other locations
FINANCE DEPARTMENT The Finance department supports the organization by assisting Council and the Corporate Management Team in the development of financial policies and strategic goals The department also advises and assists city departments in the timely and effective provision of accounting budgeting purchasing and revenue services
ouR Mission The Finance department is committed to excellence in providing sound financial management and consultative services Support and enhance operational effectiveness and efficiency
ouR goAL To provide reliable sound short- medium- and long-term financial strategies to ensure the long-term sustainable financial viability of the corporation
ouR chALLenges Declining assessment growth and multiple demands on scarce financial resources
FINANCE DEPARTMENT
AccounTing division ouR goAL To provide efficient reporting while safeguarding the assets of the corporation and providing financial information to Council CMT other departments and the community
ouR AchieveMenTs bull Initialization of new procedures and requirements for the reporting of TCA requirement
bull Upgrade of Peoplesoft Payroll Management System
bull Increased payment through electronic channels
ouR Future goALs incLude Further enhancement of Reporting bull Annual Report (2013) bull Ongoing development of Financial Reporting System (2012) bull Finance upgrade (2014) bull Portal type delivery of financial information
Increased Utilization of PeopleSoft Payroll Management System bull Security (2012-2014) bull Manager view of leave banks (2012-2014) bull Staff Association time entry (2012-2014) bull Work flow (2013) bull Electronic fund transfer payments for vendors (2012-2013) bull Epay (2012)
implementation of Recommendations from continuous improvement bull Payroll time cards bull Account Payable entry
FINANCE DEPARTMENT
budgeTs amp FinAnciAL PLAnningdivision ouR goAL To fulfill fiduciary and statutory requirements and provide reliable financial strategies to ensure the financial viability of the corporation while maintaining effective stewardship of financial resources
ouR AchieveMenTs bull Refined the 3-year budget process
bull Reserve and Reserve Fund Policy review
bull Rolled out budget software to web-based version
FINANCE DEPARTMENT
Revenue division ouR goAL Develop and implement an effective system of recording and collecting amounts due to the City using a corporate approach across multiple subsystems
ouR AchieveMenT bull Department is handling approximately 3000 incoming calls per month water amp sewer billing accounted for a 3-fold increase in the number of incoming calls
ouR Future goALs incLude bull Development Charge Bylaw update
bull Financial Control Bylaw
bull Implement PSAB (Public Sector Accounting Board) requirements for budgeting
bull Develop long term financial plan
bull Continue to develop dynamic financial planning policies to adapt to an environment of constantly shifting priorities
bull Review Investment Strategy and review potential for institutional pricing
bull Collecting amounts due to the City using a corporate approach across multiple subsystems
bull Continue to stress customer service excellence including multiple sites payment stations and promoting electronic payment options
bull Ongoing implementation of POS at selected City sites
bull Develop the Cityrsquos internal controls for cash handling
bull Recommend policy on the use of special services levies
bull Developing a Payment Card Industry Data Security Standard (PCIDSS) compliance plan
bull Reduce and rationalize the number of water billing sections
FINANCE DEPARTMENT
PuRchAsing division ouR goAL The goal of the Purchasing division is to follow the Cityrsquos Purchasing Bylaw and provincial and federal government law to acquire the best total cost for the products and services required by the City of Waterloo as well as providing a fair open and transparent purchasing process for the supply base
ouR AchieveMenTs bull Additional expansion of using procurement cards has reduced staff time spent on issuing purchase orders
bull Issuing of cheques through Accounts Payable has been reduced through the implementation of the procurement card program
bull Using e-commerce platforms reduces the time required to input data for the purchasing receipt and payment of invoices
bull Involvement with the provincial contracts (vendor of records) has reduced the cost of the services supplied (courier and cellular devices)
bull Involvement in co-operative and provincial contracts has increased purchasing efficiencies
ouR Future goALs incLude bull Computerization and bar coding of stockroom items
bull Implement the recommendations listed in the Purchasing Review Report
bull Work with the Environmental Strategy Implementation Steering committee to further enhance green procurement and a sustainable Waterloo
bull Review implement most cost effective municipal and provincial contracts for items such as telecommunications and courier services
bull Investigate the possibility of a third-party agency to host our bid opportunities
bull Establish a more centralized purchasing function at the city of Waterloo
bull Review and implement new cash discounts for the supply base to the city of Waterloo
HUMAN RESOURCES DEPARTMENT VOLUNTEER SERVICES The provision of Human Resources and Volunteer Services includes recruitment and selection labour and employee relations compensation and benefits sick and disability management training collective bargaining health and safety and organizational design
ouR Mission Engaged competent employees and volunteers are successful in accomplishing strategic and business plans within a vibrant corporate culture at the City of Waterloo
ouR goAL Human Resources and Volunteer Services departmentrsquos programs and services comply with regulatory and legislative requirements and align with the Cityrsquos values to enable staff to accomplish strategic and business plans
ouR chALLenges Build sufficient HR specialist expertise within a generalist model to support service excellence free-up HR capacity through operational efficiencies to enable project work and program design in key areas and training initiatives trends indicating decline of volunteerism requires innovative approaches
HUMAN RESOURCES DEPARTMENT voLunTeeR seRvices
ouR AchieveMenTs bull Completion of a market review of insurance carriers to ensure the cost competitiveness of our employee group benefit plan rates
bull Continued implementation of violence in the workplace programs with respectful workplace training and risk assessment surveys
bull Conducted an employee engagement survey to measure employee engagement in important aspects of work activities relationships and working conditions
bull Research and preparation of negotiations plans for Staff Association CUPE and WPFFA collective agreements
bull Use of technology to create efficiencies using online automated recruitment screening for high volume recruits and enhanced use of PeopleSoft functionality for management information reporting
bull Implementation of volunteer software system to enhance volunteer recruitment and placements
ouR Future goALs incLude Utilize information system data to measure efficiencies and effectiveness of hR and volunteer process improvement and practices
bull Develop a performance appraisal tool to measure competencies and accountabilities
bull Develop a corporate staff recognition program with individual and group components
bull Provide coaching project management and volunteer training and leadership development programming
bull Continue to enhance workplace health and safety with Respectful Workplace initiatives and implementation of Corporate Health and safety Audit recommendations
bull Bargain new agreements for labour groups and Staff Association
bull Implement job evaluation maintenance program
bull Develop corporate and department plans to address issues in the employee engagement survey to enhance employee engagement
bull Continue to implement the Volunteer Engagement Strategy
PROTECTIVE SERVICES DEPARTMENT Protective Services is responsible for the delivery of services by Fire Rescue Bylaw EnforcementProperty Standards and Community Relations
ouR Mission A team of dedicated and professional staff committed to enhancing the safety and quality of life of our community through education inspection enforcement community relations and emergency response
ouR goAL To provide quality service valued by staff and the community in delivery of education inspection enforcement community relations and emergency response
ouR chALLenges Developmentbuilding construction intensification city-wide Light Rail Transit (LRT) green building construction increased population of the city including long-term and temporary residents ongoing need for improved technology to augment existing resources increased student enrollment communication to students living off-campus
PROTECTIVE SERVICES DEPARTMENT
WATeRLoo FiRe Rescue division ouR goAL Waterloo Fire Rescue will continue to grow in response to community needs and expectations to provide the highest standard of service
ouR AchieveMenTs bull Completion of Station 4
bull Activity Tracking Program
bull Enhanced response times on the Cityrsquos east side
bull Measures used to optimize service delivery
ouR Future goALs incLude bull Deliver a fiscally responsible and sustainable service delivery model
bull Reviseupdate simplified risk assessment (3-year cycle)
bull Reviseupdate Fire Master Plan (5-year cycle)
bull Leverage technology to enhance overall effectiveness and efficiency
bull Collaborate with local business and the community to promote fire safety
bull Collaborate with post-secondary institutions to mitigate fire safety priorities
bull Reviseupdate Emergency Management Plan
bull Reviseupdate fire inspection service delivery model
bull Enhance tactical pre-planning
bull Enhance training programs
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
CORPORATE SERVICES DEPARTMENT
inFoRMATion MAnAgeMenT amp TECHNOLOGY SERVICES (IMTS) ouR goAL To play an active leadership role in delivering comprehensive information and technology-based solutions and services to support the Cityrsquos vision and goals
ouR AchieveMenTs bull Core Switching and network enhancements to increase efficiency
bull Implemented A to Z Service Directory of municipal and regional services on our website as an aid to external customers
bull PC refresh to increase efficiency
econoMic deveLoPMenT division ouR goAL Our goal is to implement the strategic imperatives of the City of Waterloo Strategic Plan Economic Development Strategy and the City-Owned Employment Lands Strategy
ouR AchieveMenTs bull Business Directory ndash now available online searchable and updatable by business ndash co-ordinated regionally
bull Business Calling Program ndash co-ordinated regionally
bull Creative Talent Steering Committee ndash pooled resources regionally
bull Urban Design Video
ouR Future goALs incLude inFoRMATion MAnAgeMenT amp TechnoLogy seRvices bull Possible relocation of server room to third-floor space
bull Implementation of Maximo II and III
bull Completion of corporate website strategy requirements and build
bull Completion of Disaster Recovery Continuity Plan
bull Continue expansion of the underground fibre optic backbone infrastructure
econoMic deveLoPMenT division bull Continued implementation of Economic Development Strategy
bull Implementation of City-Owned Employment Land Strategy
bull Sector collisions between tourism and high-tech industries
bull Continued provision of visitor services
bull Collaborate with other organizations on Talent Strategy and Research
CORPORATE SERVICES DEPARTMENT
AsseT MAnAgeMenT division ouR goAL The objective of Asset Management is sustainability ndash environmental financial and social ndash in the face of a changing world It embraces the concepts of life- cycle assessment the valuation and protection of assets and optimized long-term investment decisions
ouR AchieveMenTs bull LEED Silver designation for YMCALibrary facility
bull Installation of new HVAC system in City Hall reduces energy costs
bull Installation of lsquoEco Chillrsquo refrigeration system at Waterloo Memorial Recreation Complex
bull Replacement of boiler systems at Waterloo Memorial Recreation Complex ndash increased efficiency with a reduction in the carbon footprint
bull Completion of various RInC projects
ouR Future goALs incLude bull Completion of implementation of Maximo Phases II
bull Commence implementation of Maximo Phase III
bull Corporate space planning initiatives
bull Implementation of environmental strategies and initiatives
bull Comprehensive plan for life-cycle managment of corporate assets
bull Update asset conditions and facility condition index maintaining VFA
bull Better utilize corporate intranet ndash develop AM online library and services (including digitizing current hard copy data and drawings)
bull Continued project managment of city projects
bull Completion of various land-related activities and transactions
YMCASTORK FAMILY LIBRARY
DEVELOPMENT SERVICES DEPARTMENT Development Services is responsible for helping ensure that the City is planned developed and constructed in a manner that meets the existing and future goals of our community as well as satisfying legislative requirements associated with our services
ouR Mission As a department we strive to plan build and realize a safe and attractive sustainable community through the combined work of our four divisions
ouR goAL In Development Services our goal is to ensure that our community evolves appropriately for our citizens through professional land use advise to Council
ouR chALLenges Increase resources to provide expected level of services given an ever increasing level of development activity increase training opportunities to reflect changing work managing unanticipated projects
DEVELOPMENT SERVICES DEPARTMENT
buiLding sTAndARds division ouR goAL Our goal is to inform and assist our customers to ensure safe and orderly development and to provide efficient delivery of building approvals inspections and management systems
ouR AchieveMenTs bull Minor permits review completed from e-drawings
bull Completion of site plan approval process
bull Projects completed Balsillie School Perimeter Institute and several residential high-rises
DEVELOPMENT SERVICES DEPARTMENT
PoLicy deveLoPMenT division ouR goAL To work with Council and the community to foster a healthy and vibrant place for people to live work do business and play
ouR AchieveMenT bull Significant efforts focused on site plan process review
ouR Future goALs incLude buiLding sTAndARds division Advance the use of technology bull For online permit applications inspection booking bull Paperless permit application
bull Paperless plan examination for small to medium-size projects bull Improve records management from paper based to electronic bull Review of service level and applicable building permit fees bull Establish standard operating procedures to manage our service
level and establish best practice guidelines bull Build strong partnerships with the industry engage them in our process
creating an education program and participating in industry functions
PoLicy deveLoPMenT division bull Develop Official Plan monitoring protocol bull Consider brownfield incentives bull Initiate major transit station area planning bull Complete Northdale Land Use and Community Improvement
Plan study bull Complete North Waterloo District Plan
bull Complete Clean Water Act Implementation with PWS
bull Complete Clair Hills remnant hydro parcels landscaping bull Construct Westvale Park
DEVELOPMENT SERVICES DEPARTMENT
deveLoPMenT APPRovALs division ouR goAL To work in partnership with citizens and the development industry to help ensure that our city evolves in the direction that meets existing and future community needs and desires
ouR AchieveMenTs bull Continuous Improvement Zoning bylaw updates are accessible from the web Integrated Development Approvals Process
bull Complete application and preconsultation requirements (Zone change site plan demo control and C of A)
bull Systemization of performance measurement for Committee of Adjustment Site Plan Review Committee Sign Variance Committee
ouR Future goALs incLude bull Implementation of the new Official Plan
bull New zoning bylaw to align with the new Official Plan
Development ProjectsProposals bull Balsillie School of International Affairs complete Phase I
initiate Phase ii
bull BarrelYards implementation
bull RIM East Campus additional phases
bull NCR Master Plan
bull Core Re-urbanization Projects
bull West Side Employment Lands
bull Implementation of West Side Plans of Subdivision
bull OMB Hearings
bull 144 Park St Phase II
committees and customer service bull Continue to provide high quality and timely customer service related to zoning development and committee inquiries
bull New Sign Bylaw implementation
bull AMANDA link to site plan
DEVELOPMENT SERVICES DEPARTMENT
engineeRing And consTRucTion division ouR goAL The Engineering and Construction divisionrsquos goal is to work co-operatively with the development industry consultants and the public to promote the construction of new high-quality infrastructure (roads watermains sewers stormwater management)
ouR AchieveMenTs bull Implementing a major Continuous Improvement (CI) project for Site Plan Control
ouR Future goALs incLude bull Implementation of new major subdivision developments (West Side Lands Carriage CrossingWoolwich Estates)
bull Complete policy review for enhanced service delivery and improved efficiencies and incorporate into regular updates of the development Manual
bull Implement enhanced electronic tracking of development approvals leveraging existing technologies within the department using the AMAndA system
bull Initiate review of records management needs and implement necessary changes in conjunction with corporate initiatives
bull Participate in the identification of service capacity issues to identify infrastructure needs for the capital budget
bull Continue to adapt skill sets and core competencies to the ldquonewrdquo development reality in Waterloo which is focused on urban intensification and infill projects
bull Provide engineering review and inspection services for new major site plans in the uptown and other locations
FINANCE DEPARTMENT The Finance department supports the organization by assisting Council and the Corporate Management Team in the development of financial policies and strategic goals The department also advises and assists city departments in the timely and effective provision of accounting budgeting purchasing and revenue services
ouR Mission The Finance department is committed to excellence in providing sound financial management and consultative services Support and enhance operational effectiveness and efficiency
ouR goAL To provide reliable sound short- medium- and long-term financial strategies to ensure the long-term sustainable financial viability of the corporation
ouR chALLenges Declining assessment growth and multiple demands on scarce financial resources
FINANCE DEPARTMENT
AccounTing division ouR goAL To provide efficient reporting while safeguarding the assets of the corporation and providing financial information to Council CMT other departments and the community
ouR AchieveMenTs bull Initialization of new procedures and requirements for the reporting of TCA requirement
bull Upgrade of Peoplesoft Payroll Management System
bull Increased payment through electronic channels
ouR Future goALs incLude Further enhancement of Reporting bull Annual Report (2013) bull Ongoing development of Financial Reporting System (2012) bull Finance upgrade (2014) bull Portal type delivery of financial information
Increased Utilization of PeopleSoft Payroll Management System bull Security (2012-2014) bull Manager view of leave banks (2012-2014) bull Staff Association time entry (2012-2014) bull Work flow (2013) bull Electronic fund transfer payments for vendors (2012-2013) bull Epay (2012)
implementation of Recommendations from continuous improvement bull Payroll time cards bull Account Payable entry
FINANCE DEPARTMENT
budgeTs amp FinAnciAL PLAnningdivision ouR goAL To fulfill fiduciary and statutory requirements and provide reliable financial strategies to ensure the financial viability of the corporation while maintaining effective stewardship of financial resources
ouR AchieveMenTs bull Refined the 3-year budget process
bull Reserve and Reserve Fund Policy review
bull Rolled out budget software to web-based version
FINANCE DEPARTMENT
Revenue division ouR goAL Develop and implement an effective system of recording and collecting amounts due to the City using a corporate approach across multiple subsystems
ouR AchieveMenT bull Department is handling approximately 3000 incoming calls per month water amp sewer billing accounted for a 3-fold increase in the number of incoming calls
ouR Future goALs incLude bull Development Charge Bylaw update
bull Financial Control Bylaw
bull Implement PSAB (Public Sector Accounting Board) requirements for budgeting
bull Develop long term financial plan
bull Continue to develop dynamic financial planning policies to adapt to an environment of constantly shifting priorities
bull Review Investment Strategy and review potential for institutional pricing
bull Collecting amounts due to the City using a corporate approach across multiple subsystems
bull Continue to stress customer service excellence including multiple sites payment stations and promoting electronic payment options
bull Ongoing implementation of POS at selected City sites
bull Develop the Cityrsquos internal controls for cash handling
bull Recommend policy on the use of special services levies
bull Developing a Payment Card Industry Data Security Standard (PCIDSS) compliance plan
bull Reduce and rationalize the number of water billing sections
FINANCE DEPARTMENT
PuRchAsing division ouR goAL The goal of the Purchasing division is to follow the Cityrsquos Purchasing Bylaw and provincial and federal government law to acquire the best total cost for the products and services required by the City of Waterloo as well as providing a fair open and transparent purchasing process for the supply base
ouR AchieveMenTs bull Additional expansion of using procurement cards has reduced staff time spent on issuing purchase orders
bull Issuing of cheques through Accounts Payable has been reduced through the implementation of the procurement card program
bull Using e-commerce platforms reduces the time required to input data for the purchasing receipt and payment of invoices
bull Involvement with the provincial contracts (vendor of records) has reduced the cost of the services supplied (courier and cellular devices)
bull Involvement in co-operative and provincial contracts has increased purchasing efficiencies
ouR Future goALs incLude bull Computerization and bar coding of stockroom items
bull Implement the recommendations listed in the Purchasing Review Report
bull Work with the Environmental Strategy Implementation Steering committee to further enhance green procurement and a sustainable Waterloo
bull Review implement most cost effective municipal and provincial contracts for items such as telecommunications and courier services
bull Investigate the possibility of a third-party agency to host our bid opportunities
bull Establish a more centralized purchasing function at the city of Waterloo
bull Review and implement new cash discounts for the supply base to the city of Waterloo
HUMAN RESOURCES DEPARTMENT VOLUNTEER SERVICES The provision of Human Resources and Volunteer Services includes recruitment and selection labour and employee relations compensation and benefits sick and disability management training collective bargaining health and safety and organizational design
ouR Mission Engaged competent employees and volunteers are successful in accomplishing strategic and business plans within a vibrant corporate culture at the City of Waterloo
ouR goAL Human Resources and Volunteer Services departmentrsquos programs and services comply with regulatory and legislative requirements and align with the Cityrsquos values to enable staff to accomplish strategic and business plans
ouR chALLenges Build sufficient HR specialist expertise within a generalist model to support service excellence free-up HR capacity through operational efficiencies to enable project work and program design in key areas and training initiatives trends indicating decline of volunteerism requires innovative approaches
HUMAN RESOURCES DEPARTMENT voLunTeeR seRvices
ouR AchieveMenTs bull Completion of a market review of insurance carriers to ensure the cost competitiveness of our employee group benefit plan rates
bull Continued implementation of violence in the workplace programs with respectful workplace training and risk assessment surveys
bull Conducted an employee engagement survey to measure employee engagement in important aspects of work activities relationships and working conditions
bull Research and preparation of negotiations plans for Staff Association CUPE and WPFFA collective agreements
bull Use of technology to create efficiencies using online automated recruitment screening for high volume recruits and enhanced use of PeopleSoft functionality for management information reporting
bull Implementation of volunteer software system to enhance volunteer recruitment and placements
ouR Future goALs incLude Utilize information system data to measure efficiencies and effectiveness of hR and volunteer process improvement and practices
bull Develop a performance appraisal tool to measure competencies and accountabilities
bull Develop a corporate staff recognition program with individual and group components
bull Provide coaching project management and volunteer training and leadership development programming
bull Continue to enhance workplace health and safety with Respectful Workplace initiatives and implementation of Corporate Health and safety Audit recommendations
bull Bargain new agreements for labour groups and Staff Association
bull Implement job evaluation maintenance program
bull Develop corporate and department plans to address issues in the employee engagement survey to enhance employee engagement
bull Continue to implement the Volunteer Engagement Strategy
PROTECTIVE SERVICES DEPARTMENT Protective Services is responsible for the delivery of services by Fire Rescue Bylaw EnforcementProperty Standards and Community Relations
ouR Mission A team of dedicated and professional staff committed to enhancing the safety and quality of life of our community through education inspection enforcement community relations and emergency response
ouR goAL To provide quality service valued by staff and the community in delivery of education inspection enforcement community relations and emergency response
ouR chALLenges Developmentbuilding construction intensification city-wide Light Rail Transit (LRT) green building construction increased population of the city including long-term and temporary residents ongoing need for improved technology to augment existing resources increased student enrollment communication to students living off-campus
PROTECTIVE SERVICES DEPARTMENT
WATeRLoo FiRe Rescue division ouR goAL Waterloo Fire Rescue will continue to grow in response to community needs and expectations to provide the highest standard of service
ouR AchieveMenTs bull Completion of Station 4
bull Activity Tracking Program
bull Enhanced response times on the Cityrsquos east side
bull Measures used to optimize service delivery
ouR Future goALs incLude bull Deliver a fiscally responsible and sustainable service delivery model
bull Reviseupdate simplified risk assessment (3-year cycle)
bull Reviseupdate Fire Master Plan (5-year cycle)
bull Leverage technology to enhance overall effectiveness and efficiency
bull Collaborate with local business and the community to promote fire safety
bull Collaborate with post-secondary institutions to mitigate fire safety priorities
bull Reviseupdate Emergency Management Plan
bull Reviseupdate fire inspection service delivery model
bull Enhance tactical pre-planning
bull Enhance training programs
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
ouR Future goALs incLude inFoRMATion MAnAgeMenT amp TechnoLogy seRvices bull Possible relocation of server room to third-floor space
bull Implementation of Maximo II and III
bull Completion of corporate website strategy requirements and build
bull Completion of Disaster Recovery Continuity Plan
bull Continue expansion of the underground fibre optic backbone infrastructure
econoMic deveLoPMenT division bull Continued implementation of Economic Development Strategy
bull Implementation of City-Owned Employment Land Strategy
bull Sector collisions between tourism and high-tech industries
bull Continued provision of visitor services
bull Collaborate with other organizations on Talent Strategy and Research
CORPORATE SERVICES DEPARTMENT
AsseT MAnAgeMenT division ouR goAL The objective of Asset Management is sustainability ndash environmental financial and social ndash in the face of a changing world It embraces the concepts of life- cycle assessment the valuation and protection of assets and optimized long-term investment decisions
ouR AchieveMenTs bull LEED Silver designation for YMCALibrary facility
bull Installation of new HVAC system in City Hall reduces energy costs
bull Installation of lsquoEco Chillrsquo refrigeration system at Waterloo Memorial Recreation Complex
bull Replacement of boiler systems at Waterloo Memorial Recreation Complex ndash increased efficiency with a reduction in the carbon footprint
bull Completion of various RInC projects
ouR Future goALs incLude bull Completion of implementation of Maximo Phases II
bull Commence implementation of Maximo Phase III
bull Corporate space planning initiatives
bull Implementation of environmental strategies and initiatives
bull Comprehensive plan for life-cycle managment of corporate assets
bull Update asset conditions and facility condition index maintaining VFA
bull Better utilize corporate intranet ndash develop AM online library and services (including digitizing current hard copy data and drawings)
bull Continued project managment of city projects
bull Completion of various land-related activities and transactions
YMCASTORK FAMILY LIBRARY
DEVELOPMENT SERVICES DEPARTMENT Development Services is responsible for helping ensure that the City is planned developed and constructed in a manner that meets the existing and future goals of our community as well as satisfying legislative requirements associated with our services
ouR Mission As a department we strive to plan build and realize a safe and attractive sustainable community through the combined work of our four divisions
ouR goAL In Development Services our goal is to ensure that our community evolves appropriately for our citizens through professional land use advise to Council
ouR chALLenges Increase resources to provide expected level of services given an ever increasing level of development activity increase training opportunities to reflect changing work managing unanticipated projects
DEVELOPMENT SERVICES DEPARTMENT
buiLding sTAndARds division ouR goAL Our goal is to inform and assist our customers to ensure safe and orderly development and to provide efficient delivery of building approvals inspections and management systems
ouR AchieveMenTs bull Minor permits review completed from e-drawings
bull Completion of site plan approval process
bull Projects completed Balsillie School Perimeter Institute and several residential high-rises
DEVELOPMENT SERVICES DEPARTMENT
PoLicy deveLoPMenT division ouR goAL To work with Council and the community to foster a healthy and vibrant place for people to live work do business and play
ouR AchieveMenT bull Significant efforts focused on site plan process review
ouR Future goALs incLude buiLding sTAndARds division Advance the use of technology bull For online permit applications inspection booking bull Paperless permit application
bull Paperless plan examination for small to medium-size projects bull Improve records management from paper based to electronic bull Review of service level and applicable building permit fees bull Establish standard operating procedures to manage our service
level and establish best practice guidelines bull Build strong partnerships with the industry engage them in our process
creating an education program and participating in industry functions
PoLicy deveLoPMenT division bull Develop Official Plan monitoring protocol bull Consider brownfield incentives bull Initiate major transit station area planning bull Complete Northdale Land Use and Community Improvement
Plan study bull Complete North Waterloo District Plan
bull Complete Clean Water Act Implementation with PWS
bull Complete Clair Hills remnant hydro parcels landscaping bull Construct Westvale Park
DEVELOPMENT SERVICES DEPARTMENT
deveLoPMenT APPRovALs division ouR goAL To work in partnership with citizens and the development industry to help ensure that our city evolves in the direction that meets existing and future community needs and desires
ouR AchieveMenTs bull Continuous Improvement Zoning bylaw updates are accessible from the web Integrated Development Approvals Process
bull Complete application and preconsultation requirements (Zone change site plan demo control and C of A)
bull Systemization of performance measurement for Committee of Adjustment Site Plan Review Committee Sign Variance Committee
ouR Future goALs incLude bull Implementation of the new Official Plan
bull New zoning bylaw to align with the new Official Plan
Development ProjectsProposals bull Balsillie School of International Affairs complete Phase I
initiate Phase ii
bull BarrelYards implementation
bull RIM East Campus additional phases
bull NCR Master Plan
bull Core Re-urbanization Projects
bull West Side Employment Lands
bull Implementation of West Side Plans of Subdivision
bull OMB Hearings
bull 144 Park St Phase II
committees and customer service bull Continue to provide high quality and timely customer service related to zoning development and committee inquiries
bull New Sign Bylaw implementation
bull AMANDA link to site plan
DEVELOPMENT SERVICES DEPARTMENT
engineeRing And consTRucTion division ouR goAL The Engineering and Construction divisionrsquos goal is to work co-operatively with the development industry consultants and the public to promote the construction of new high-quality infrastructure (roads watermains sewers stormwater management)
ouR AchieveMenTs bull Implementing a major Continuous Improvement (CI) project for Site Plan Control
ouR Future goALs incLude bull Implementation of new major subdivision developments (West Side Lands Carriage CrossingWoolwich Estates)
bull Complete policy review for enhanced service delivery and improved efficiencies and incorporate into regular updates of the development Manual
bull Implement enhanced electronic tracking of development approvals leveraging existing technologies within the department using the AMAndA system
bull Initiate review of records management needs and implement necessary changes in conjunction with corporate initiatives
bull Participate in the identification of service capacity issues to identify infrastructure needs for the capital budget
bull Continue to adapt skill sets and core competencies to the ldquonewrdquo development reality in Waterloo which is focused on urban intensification and infill projects
bull Provide engineering review and inspection services for new major site plans in the uptown and other locations
FINANCE DEPARTMENT The Finance department supports the organization by assisting Council and the Corporate Management Team in the development of financial policies and strategic goals The department also advises and assists city departments in the timely and effective provision of accounting budgeting purchasing and revenue services
ouR Mission The Finance department is committed to excellence in providing sound financial management and consultative services Support and enhance operational effectiveness and efficiency
ouR goAL To provide reliable sound short- medium- and long-term financial strategies to ensure the long-term sustainable financial viability of the corporation
ouR chALLenges Declining assessment growth and multiple demands on scarce financial resources
FINANCE DEPARTMENT
AccounTing division ouR goAL To provide efficient reporting while safeguarding the assets of the corporation and providing financial information to Council CMT other departments and the community
ouR AchieveMenTs bull Initialization of new procedures and requirements for the reporting of TCA requirement
bull Upgrade of Peoplesoft Payroll Management System
bull Increased payment through electronic channels
ouR Future goALs incLude Further enhancement of Reporting bull Annual Report (2013) bull Ongoing development of Financial Reporting System (2012) bull Finance upgrade (2014) bull Portal type delivery of financial information
Increased Utilization of PeopleSoft Payroll Management System bull Security (2012-2014) bull Manager view of leave banks (2012-2014) bull Staff Association time entry (2012-2014) bull Work flow (2013) bull Electronic fund transfer payments for vendors (2012-2013) bull Epay (2012)
implementation of Recommendations from continuous improvement bull Payroll time cards bull Account Payable entry
FINANCE DEPARTMENT
budgeTs amp FinAnciAL PLAnningdivision ouR goAL To fulfill fiduciary and statutory requirements and provide reliable financial strategies to ensure the financial viability of the corporation while maintaining effective stewardship of financial resources
ouR AchieveMenTs bull Refined the 3-year budget process
bull Reserve and Reserve Fund Policy review
bull Rolled out budget software to web-based version
FINANCE DEPARTMENT
Revenue division ouR goAL Develop and implement an effective system of recording and collecting amounts due to the City using a corporate approach across multiple subsystems
ouR AchieveMenT bull Department is handling approximately 3000 incoming calls per month water amp sewer billing accounted for a 3-fold increase in the number of incoming calls
ouR Future goALs incLude bull Development Charge Bylaw update
bull Financial Control Bylaw
bull Implement PSAB (Public Sector Accounting Board) requirements for budgeting
bull Develop long term financial plan
bull Continue to develop dynamic financial planning policies to adapt to an environment of constantly shifting priorities
bull Review Investment Strategy and review potential for institutional pricing
bull Collecting amounts due to the City using a corporate approach across multiple subsystems
bull Continue to stress customer service excellence including multiple sites payment stations and promoting electronic payment options
bull Ongoing implementation of POS at selected City sites
bull Develop the Cityrsquos internal controls for cash handling
bull Recommend policy on the use of special services levies
bull Developing a Payment Card Industry Data Security Standard (PCIDSS) compliance plan
bull Reduce and rationalize the number of water billing sections
FINANCE DEPARTMENT
PuRchAsing division ouR goAL The goal of the Purchasing division is to follow the Cityrsquos Purchasing Bylaw and provincial and federal government law to acquire the best total cost for the products and services required by the City of Waterloo as well as providing a fair open and transparent purchasing process for the supply base
ouR AchieveMenTs bull Additional expansion of using procurement cards has reduced staff time spent on issuing purchase orders
bull Issuing of cheques through Accounts Payable has been reduced through the implementation of the procurement card program
bull Using e-commerce platforms reduces the time required to input data for the purchasing receipt and payment of invoices
bull Involvement with the provincial contracts (vendor of records) has reduced the cost of the services supplied (courier and cellular devices)
bull Involvement in co-operative and provincial contracts has increased purchasing efficiencies
ouR Future goALs incLude bull Computerization and bar coding of stockroom items
bull Implement the recommendations listed in the Purchasing Review Report
bull Work with the Environmental Strategy Implementation Steering committee to further enhance green procurement and a sustainable Waterloo
bull Review implement most cost effective municipal and provincial contracts for items such as telecommunications and courier services
bull Investigate the possibility of a third-party agency to host our bid opportunities
bull Establish a more centralized purchasing function at the city of Waterloo
bull Review and implement new cash discounts for the supply base to the city of Waterloo
HUMAN RESOURCES DEPARTMENT VOLUNTEER SERVICES The provision of Human Resources and Volunteer Services includes recruitment and selection labour and employee relations compensation and benefits sick and disability management training collective bargaining health and safety and organizational design
ouR Mission Engaged competent employees and volunteers are successful in accomplishing strategic and business plans within a vibrant corporate culture at the City of Waterloo
ouR goAL Human Resources and Volunteer Services departmentrsquos programs and services comply with regulatory and legislative requirements and align with the Cityrsquos values to enable staff to accomplish strategic and business plans
ouR chALLenges Build sufficient HR specialist expertise within a generalist model to support service excellence free-up HR capacity through operational efficiencies to enable project work and program design in key areas and training initiatives trends indicating decline of volunteerism requires innovative approaches
HUMAN RESOURCES DEPARTMENT voLunTeeR seRvices
ouR AchieveMenTs bull Completion of a market review of insurance carriers to ensure the cost competitiveness of our employee group benefit plan rates
bull Continued implementation of violence in the workplace programs with respectful workplace training and risk assessment surveys
bull Conducted an employee engagement survey to measure employee engagement in important aspects of work activities relationships and working conditions
bull Research and preparation of negotiations plans for Staff Association CUPE and WPFFA collective agreements
bull Use of technology to create efficiencies using online automated recruitment screening for high volume recruits and enhanced use of PeopleSoft functionality for management information reporting
bull Implementation of volunteer software system to enhance volunteer recruitment and placements
ouR Future goALs incLude Utilize information system data to measure efficiencies and effectiveness of hR and volunteer process improvement and practices
bull Develop a performance appraisal tool to measure competencies and accountabilities
bull Develop a corporate staff recognition program with individual and group components
bull Provide coaching project management and volunteer training and leadership development programming
bull Continue to enhance workplace health and safety with Respectful Workplace initiatives and implementation of Corporate Health and safety Audit recommendations
bull Bargain new agreements for labour groups and Staff Association
bull Implement job evaluation maintenance program
bull Develop corporate and department plans to address issues in the employee engagement survey to enhance employee engagement
bull Continue to implement the Volunteer Engagement Strategy
PROTECTIVE SERVICES DEPARTMENT Protective Services is responsible for the delivery of services by Fire Rescue Bylaw EnforcementProperty Standards and Community Relations
ouR Mission A team of dedicated and professional staff committed to enhancing the safety and quality of life of our community through education inspection enforcement community relations and emergency response
ouR goAL To provide quality service valued by staff and the community in delivery of education inspection enforcement community relations and emergency response
ouR chALLenges Developmentbuilding construction intensification city-wide Light Rail Transit (LRT) green building construction increased population of the city including long-term and temporary residents ongoing need for improved technology to augment existing resources increased student enrollment communication to students living off-campus
PROTECTIVE SERVICES DEPARTMENT
WATeRLoo FiRe Rescue division ouR goAL Waterloo Fire Rescue will continue to grow in response to community needs and expectations to provide the highest standard of service
ouR AchieveMenTs bull Completion of Station 4
bull Activity Tracking Program
bull Enhanced response times on the Cityrsquos east side
bull Measures used to optimize service delivery
ouR Future goALs incLude bull Deliver a fiscally responsible and sustainable service delivery model
bull Reviseupdate simplified risk assessment (3-year cycle)
bull Reviseupdate Fire Master Plan (5-year cycle)
bull Leverage technology to enhance overall effectiveness and efficiency
bull Collaborate with local business and the community to promote fire safety
bull Collaborate with post-secondary institutions to mitigate fire safety priorities
bull Reviseupdate Emergency Management Plan
bull Reviseupdate fire inspection service delivery model
bull Enhance tactical pre-planning
bull Enhance training programs
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
CORPORATE SERVICES DEPARTMENT
AsseT MAnAgeMenT division ouR goAL The objective of Asset Management is sustainability ndash environmental financial and social ndash in the face of a changing world It embraces the concepts of life- cycle assessment the valuation and protection of assets and optimized long-term investment decisions
ouR AchieveMenTs bull LEED Silver designation for YMCALibrary facility
bull Installation of new HVAC system in City Hall reduces energy costs
bull Installation of lsquoEco Chillrsquo refrigeration system at Waterloo Memorial Recreation Complex
bull Replacement of boiler systems at Waterloo Memorial Recreation Complex ndash increased efficiency with a reduction in the carbon footprint
bull Completion of various RInC projects
ouR Future goALs incLude bull Completion of implementation of Maximo Phases II
bull Commence implementation of Maximo Phase III
bull Corporate space planning initiatives
bull Implementation of environmental strategies and initiatives
bull Comprehensive plan for life-cycle managment of corporate assets
bull Update asset conditions and facility condition index maintaining VFA
bull Better utilize corporate intranet ndash develop AM online library and services (including digitizing current hard copy data and drawings)
bull Continued project managment of city projects
bull Completion of various land-related activities and transactions
YMCASTORK FAMILY LIBRARY
DEVELOPMENT SERVICES DEPARTMENT Development Services is responsible for helping ensure that the City is planned developed and constructed in a manner that meets the existing and future goals of our community as well as satisfying legislative requirements associated with our services
ouR Mission As a department we strive to plan build and realize a safe and attractive sustainable community through the combined work of our four divisions
ouR goAL In Development Services our goal is to ensure that our community evolves appropriately for our citizens through professional land use advise to Council
ouR chALLenges Increase resources to provide expected level of services given an ever increasing level of development activity increase training opportunities to reflect changing work managing unanticipated projects
DEVELOPMENT SERVICES DEPARTMENT
buiLding sTAndARds division ouR goAL Our goal is to inform and assist our customers to ensure safe and orderly development and to provide efficient delivery of building approvals inspections and management systems
ouR AchieveMenTs bull Minor permits review completed from e-drawings
bull Completion of site plan approval process
bull Projects completed Balsillie School Perimeter Institute and several residential high-rises
DEVELOPMENT SERVICES DEPARTMENT
PoLicy deveLoPMenT division ouR goAL To work with Council and the community to foster a healthy and vibrant place for people to live work do business and play
ouR AchieveMenT bull Significant efforts focused on site plan process review
ouR Future goALs incLude buiLding sTAndARds division Advance the use of technology bull For online permit applications inspection booking bull Paperless permit application
bull Paperless plan examination for small to medium-size projects bull Improve records management from paper based to electronic bull Review of service level and applicable building permit fees bull Establish standard operating procedures to manage our service
level and establish best practice guidelines bull Build strong partnerships with the industry engage them in our process
creating an education program and participating in industry functions
PoLicy deveLoPMenT division bull Develop Official Plan monitoring protocol bull Consider brownfield incentives bull Initiate major transit station area planning bull Complete Northdale Land Use and Community Improvement
Plan study bull Complete North Waterloo District Plan
bull Complete Clean Water Act Implementation with PWS
bull Complete Clair Hills remnant hydro parcels landscaping bull Construct Westvale Park
DEVELOPMENT SERVICES DEPARTMENT
deveLoPMenT APPRovALs division ouR goAL To work in partnership with citizens and the development industry to help ensure that our city evolves in the direction that meets existing and future community needs and desires
ouR AchieveMenTs bull Continuous Improvement Zoning bylaw updates are accessible from the web Integrated Development Approvals Process
bull Complete application and preconsultation requirements (Zone change site plan demo control and C of A)
bull Systemization of performance measurement for Committee of Adjustment Site Plan Review Committee Sign Variance Committee
ouR Future goALs incLude bull Implementation of the new Official Plan
bull New zoning bylaw to align with the new Official Plan
Development ProjectsProposals bull Balsillie School of International Affairs complete Phase I
initiate Phase ii
bull BarrelYards implementation
bull RIM East Campus additional phases
bull NCR Master Plan
bull Core Re-urbanization Projects
bull West Side Employment Lands
bull Implementation of West Side Plans of Subdivision
bull OMB Hearings
bull 144 Park St Phase II
committees and customer service bull Continue to provide high quality and timely customer service related to zoning development and committee inquiries
bull New Sign Bylaw implementation
bull AMANDA link to site plan
DEVELOPMENT SERVICES DEPARTMENT
engineeRing And consTRucTion division ouR goAL The Engineering and Construction divisionrsquos goal is to work co-operatively with the development industry consultants and the public to promote the construction of new high-quality infrastructure (roads watermains sewers stormwater management)
ouR AchieveMenTs bull Implementing a major Continuous Improvement (CI) project for Site Plan Control
ouR Future goALs incLude bull Implementation of new major subdivision developments (West Side Lands Carriage CrossingWoolwich Estates)
bull Complete policy review for enhanced service delivery and improved efficiencies and incorporate into regular updates of the development Manual
bull Implement enhanced electronic tracking of development approvals leveraging existing technologies within the department using the AMAndA system
bull Initiate review of records management needs and implement necessary changes in conjunction with corporate initiatives
bull Participate in the identification of service capacity issues to identify infrastructure needs for the capital budget
bull Continue to adapt skill sets and core competencies to the ldquonewrdquo development reality in Waterloo which is focused on urban intensification and infill projects
bull Provide engineering review and inspection services for new major site plans in the uptown and other locations
FINANCE DEPARTMENT The Finance department supports the organization by assisting Council and the Corporate Management Team in the development of financial policies and strategic goals The department also advises and assists city departments in the timely and effective provision of accounting budgeting purchasing and revenue services
ouR Mission The Finance department is committed to excellence in providing sound financial management and consultative services Support and enhance operational effectiveness and efficiency
ouR goAL To provide reliable sound short- medium- and long-term financial strategies to ensure the long-term sustainable financial viability of the corporation
ouR chALLenges Declining assessment growth and multiple demands on scarce financial resources
FINANCE DEPARTMENT
AccounTing division ouR goAL To provide efficient reporting while safeguarding the assets of the corporation and providing financial information to Council CMT other departments and the community
ouR AchieveMenTs bull Initialization of new procedures and requirements for the reporting of TCA requirement
bull Upgrade of Peoplesoft Payroll Management System
bull Increased payment through electronic channels
ouR Future goALs incLude Further enhancement of Reporting bull Annual Report (2013) bull Ongoing development of Financial Reporting System (2012) bull Finance upgrade (2014) bull Portal type delivery of financial information
Increased Utilization of PeopleSoft Payroll Management System bull Security (2012-2014) bull Manager view of leave banks (2012-2014) bull Staff Association time entry (2012-2014) bull Work flow (2013) bull Electronic fund transfer payments for vendors (2012-2013) bull Epay (2012)
implementation of Recommendations from continuous improvement bull Payroll time cards bull Account Payable entry
FINANCE DEPARTMENT
budgeTs amp FinAnciAL PLAnningdivision ouR goAL To fulfill fiduciary and statutory requirements and provide reliable financial strategies to ensure the financial viability of the corporation while maintaining effective stewardship of financial resources
ouR AchieveMenTs bull Refined the 3-year budget process
bull Reserve and Reserve Fund Policy review
bull Rolled out budget software to web-based version
FINANCE DEPARTMENT
Revenue division ouR goAL Develop and implement an effective system of recording and collecting amounts due to the City using a corporate approach across multiple subsystems
ouR AchieveMenT bull Department is handling approximately 3000 incoming calls per month water amp sewer billing accounted for a 3-fold increase in the number of incoming calls
ouR Future goALs incLude bull Development Charge Bylaw update
bull Financial Control Bylaw
bull Implement PSAB (Public Sector Accounting Board) requirements for budgeting
bull Develop long term financial plan
bull Continue to develop dynamic financial planning policies to adapt to an environment of constantly shifting priorities
bull Review Investment Strategy and review potential for institutional pricing
bull Collecting amounts due to the City using a corporate approach across multiple subsystems
bull Continue to stress customer service excellence including multiple sites payment stations and promoting electronic payment options
bull Ongoing implementation of POS at selected City sites
bull Develop the Cityrsquos internal controls for cash handling
bull Recommend policy on the use of special services levies
bull Developing a Payment Card Industry Data Security Standard (PCIDSS) compliance plan
bull Reduce and rationalize the number of water billing sections
FINANCE DEPARTMENT
PuRchAsing division ouR goAL The goal of the Purchasing division is to follow the Cityrsquos Purchasing Bylaw and provincial and federal government law to acquire the best total cost for the products and services required by the City of Waterloo as well as providing a fair open and transparent purchasing process for the supply base
ouR AchieveMenTs bull Additional expansion of using procurement cards has reduced staff time spent on issuing purchase orders
bull Issuing of cheques through Accounts Payable has been reduced through the implementation of the procurement card program
bull Using e-commerce platforms reduces the time required to input data for the purchasing receipt and payment of invoices
bull Involvement with the provincial contracts (vendor of records) has reduced the cost of the services supplied (courier and cellular devices)
bull Involvement in co-operative and provincial contracts has increased purchasing efficiencies
ouR Future goALs incLude bull Computerization and bar coding of stockroom items
bull Implement the recommendations listed in the Purchasing Review Report
bull Work with the Environmental Strategy Implementation Steering committee to further enhance green procurement and a sustainable Waterloo
bull Review implement most cost effective municipal and provincial contracts for items such as telecommunications and courier services
bull Investigate the possibility of a third-party agency to host our bid opportunities
bull Establish a more centralized purchasing function at the city of Waterloo
bull Review and implement new cash discounts for the supply base to the city of Waterloo
HUMAN RESOURCES DEPARTMENT VOLUNTEER SERVICES The provision of Human Resources and Volunteer Services includes recruitment and selection labour and employee relations compensation and benefits sick and disability management training collective bargaining health and safety and organizational design
ouR Mission Engaged competent employees and volunteers are successful in accomplishing strategic and business plans within a vibrant corporate culture at the City of Waterloo
ouR goAL Human Resources and Volunteer Services departmentrsquos programs and services comply with regulatory and legislative requirements and align with the Cityrsquos values to enable staff to accomplish strategic and business plans
ouR chALLenges Build sufficient HR specialist expertise within a generalist model to support service excellence free-up HR capacity through operational efficiencies to enable project work and program design in key areas and training initiatives trends indicating decline of volunteerism requires innovative approaches
HUMAN RESOURCES DEPARTMENT voLunTeeR seRvices
ouR AchieveMenTs bull Completion of a market review of insurance carriers to ensure the cost competitiveness of our employee group benefit plan rates
bull Continued implementation of violence in the workplace programs with respectful workplace training and risk assessment surveys
bull Conducted an employee engagement survey to measure employee engagement in important aspects of work activities relationships and working conditions
bull Research and preparation of negotiations plans for Staff Association CUPE and WPFFA collective agreements
bull Use of technology to create efficiencies using online automated recruitment screening for high volume recruits and enhanced use of PeopleSoft functionality for management information reporting
bull Implementation of volunteer software system to enhance volunteer recruitment and placements
ouR Future goALs incLude Utilize information system data to measure efficiencies and effectiveness of hR and volunteer process improvement and practices
bull Develop a performance appraisal tool to measure competencies and accountabilities
bull Develop a corporate staff recognition program with individual and group components
bull Provide coaching project management and volunteer training and leadership development programming
bull Continue to enhance workplace health and safety with Respectful Workplace initiatives and implementation of Corporate Health and safety Audit recommendations
bull Bargain new agreements for labour groups and Staff Association
bull Implement job evaluation maintenance program
bull Develop corporate and department plans to address issues in the employee engagement survey to enhance employee engagement
bull Continue to implement the Volunteer Engagement Strategy
PROTECTIVE SERVICES DEPARTMENT Protective Services is responsible for the delivery of services by Fire Rescue Bylaw EnforcementProperty Standards and Community Relations
ouR Mission A team of dedicated and professional staff committed to enhancing the safety and quality of life of our community through education inspection enforcement community relations and emergency response
ouR goAL To provide quality service valued by staff and the community in delivery of education inspection enforcement community relations and emergency response
ouR chALLenges Developmentbuilding construction intensification city-wide Light Rail Transit (LRT) green building construction increased population of the city including long-term and temporary residents ongoing need for improved technology to augment existing resources increased student enrollment communication to students living off-campus
PROTECTIVE SERVICES DEPARTMENT
WATeRLoo FiRe Rescue division ouR goAL Waterloo Fire Rescue will continue to grow in response to community needs and expectations to provide the highest standard of service
ouR AchieveMenTs bull Completion of Station 4
bull Activity Tracking Program
bull Enhanced response times on the Cityrsquos east side
bull Measures used to optimize service delivery
ouR Future goALs incLude bull Deliver a fiscally responsible and sustainable service delivery model
bull Reviseupdate simplified risk assessment (3-year cycle)
bull Reviseupdate Fire Master Plan (5-year cycle)
bull Leverage technology to enhance overall effectiveness and efficiency
bull Collaborate with local business and the community to promote fire safety
bull Collaborate with post-secondary institutions to mitigate fire safety priorities
bull Reviseupdate Emergency Management Plan
bull Reviseupdate fire inspection service delivery model
bull Enhance tactical pre-planning
bull Enhance training programs
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
ouR Future goALs incLude bull Completion of implementation of Maximo Phases II
bull Commence implementation of Maximo Phase III
bull Corporate space planning initiatives
bull Implementation of environmental strategies and initiatives
bull Comprehensive plan for life-cycle managment of corporate assets
bull Update asset conditions and facility condition index maintaining VFA
bull Better utilize corporate intranet ndash develop AM online library and services (including digitizing current hard copy data and drawings)
bull Continued project managment of city projects
bull Completion of various land-related activities and transactions
YMCASTORK FAMILY LIBRARY
DEVELOPMENT SERVICES DEPARTMENT Development Services is responsible for helping ensure that the City is planned developed and constructed in a manner that meets the existing and future goals of our community as well as satisfying legislative requirements associated with our services
ouR Mission As a department we strive to plan build and realize a safe and attractive sustainable community through the combined work of our four divisions
ouR goAL In Development Services our goal is to ensure that our community evolves appropriately for our citizens through professional land use advise to Council
ouR chALLenges Increase resources to provide expected level of services given an ever increasing level of development activity increase training opportunities to reflect changing work managing unanticipated projects
DEVELOPMENT SERVICES DEPARTMENT
buiLding sTAndARds division ouR goAL Our goal is to inform and assist our customers to ensure safe and orderly development and to provide efficient delivery of building approvals inspections and management systems
ouR AchieveMenTs bull Minor permits review completed from e-drawings
bull Completion of site plan approval process
bull Projects completed Balsillie School Perimeter Institute and several residential high-rises
DEVELOPMENT SERVICES DEPARTMENT
PoLicy deveLoPMenT division ouR goAL To work with Council and the community to foster a healthy and vibrant place for people to live work do business and play
ouR AchieveMenT bull Significant efforts focused on site plan process review
ouR Future goALs incLude buiLding sTAndARds division Advance the use of technology bull For online permit applications inspection booking bull Paperless permit application
bull Paperless plan examination for small to medium-size projects bull Improve records management from paper based to electronic bull Review of service level and applicable building permit fees bull Establish standard operating procedures to manage our service
level and establish best practice guidelines bull Build strong partnerships with the industry engage them in our process
creating an education program and participating in industry functions
PoLicy deveLoPMenT division bull Develop Official Plan monitoring protocol bull Consider brownfield incentives bull Initiate major transit station area planning bull Complete Northdale Land Use and Community Improvement
Plan study bull Complete North Waterloo District Plan
bull Complete Clean Water Act Implementation with PWS
bull Complete Clair Hills remnant hydro parcels landscaping bull Construct Westvale Park
DEVELOPMENT SERVICES DEPARTMENT
deveLoPMenT APPRovALs division ouR goAL To work in partnership with citizens and the development industry to help ensure that our city evolves in the direction that meets existing and future community needs and desires
ouR AchieveMenTs bull Continuous Improvement Zoning bylaw updates are accessible from the web Integrated Development Approvals Process
bull Complete application and preconsultation requirements (Zone change site plan demo control and C of A)
bull Systemization of performance measurement for Committee of Adjustment Site Plan Review Committee Sign Variance Committee
ouR Future goALs incLude bull Implementation of the new Official Plan
bull New zoning bylaw to align with the new Official Plan
Development ProjectsProposals bull Balsillie School of International Affairs complete Phase I
initiate Phase ii
bull BarrelYards implementation
bull RIM East Campus additional phases
bull NCR Master Plan
bull Core Re-urbanization Projects
bull West Side Employment Lands
bull Implementation of West Side Plans of Subdivision
bull OMB Hearings
bull 144 Park St Phase II
committees and customer service bull Continue to provide high quality and timely customer service related to zoning development and committee inquiries
bull New Sign Bylaw implementation
bull AMANDA link to site plan
DEVELOPMENT SERVICES DEPARTMENT
engineeRing And consTRucTion division ouR goAL The Engineering and Construction divisionrsquos goal is to work co-operatively with the development industry consultants and the public to promote the construction of new high-quality infrastructure (roads watermains sewers stormwater management)
ouR AchieveMenTs bull Implementing a major Continuous Improvement (CI) project for Site Plan Control
ouR Future goALs incLude bull Implementation of new major subdivision developments (West Side Lands Carriage CrossingWoolwich Estates)
bull Complete policy review for enhanced service delivery and improved efficiencies and incorporate into regular updates of the development Manual
bull Implement enhanced electronic tracking of development approvals leveraging existing technologies within the department using the AMAndA system
bull Initiate review of records management needs and implement necessary changes in conjunction with corporate initiatives
bull Participate in the identification of service capacity issues to identify infrastructure needs for the capital budget
bull Continue to adapt skill sets and core competencies to the ldquonewrdquo development reality in Waterloo which is focused on urban intensification and infill projects
bull Provide engineering review and inspection services for new major site plans in the uptown and other locations
FINANCE DEPARTMENT The Finance department supports the organization by assisting Council and the Corporate Management Team in the development of financial policies and strategic goals The department also advises and assists city departments in the timely and effective provision of accounting budgeting purchasing and revenue services
ouR Mission The Finance department is committed to excellence in providing sound financial management and consultative services Support and enhance operational effectiveness and efficiency
ouR goAL To provide reliable sound short- medium- and long-term financial strategies to ensure the long-term sustainable financial viability of the corporation
ouR chALLenges Declining assessment growth and multiple demands on scarce financial resources
FINANCE DEPARTMENT
AccounTing division ouR goAL To provide efficient reporting while safeguarding the assets of the corporation and providing financial information to Council CMT other departments and the community
ouR AchieveMenTs bull Initialization of new procedures and requirements for the reporting of TCA requirement
bull Upgrade of Peoplesoft Payroll Management System
bull Increased payment through electronic channels
ouR Future goALs incLude Further enhancement of Reporting bull Annual Report (2013) bull Ongoing development of Financial Reporting System (2012) bull Finance upgrade (2014) bull Portal type delivery of financial information
Increased Utilization of PeopleSoft Payroll Management System bull Security (2012-2014) bull Manager view of leave banks (2012-2014) bull Staff Association time entry (2012-2014) bull Work flow (2013) bull Electronic fund transfer payments for vendors (2012-2013) bull Epay (2012)
implementation of Recommendations from continuous improvement bull Payroll time cards bull Account Payable entry
FINANCE DEPARTMENT
budgeTs amp FinAnciAL PLAnningdivision ouR goAL To fulfill fiduciary and statutory requirements and provide reliable financial strategies to ensure the financial viability of the corporation while maintaining effective stewardship of financial resources
ouR AchieveMenTs bull Refined the 3-year budget process
bull Reserve and Reserve Fund Policy review
bull Rolled out budget software to web-based version
FINANCE DEPARTMENT
Revenue division ouR goAL Develop and implement an effective system of recording and collecting amounts due to the City using a corporate approach across multiple subsystems
ouR AchieveMenT bull Department is handling approximately 3000 incoming calls per month water amp sewer billing accounted for a 3-fold increase in the number of incoming calls
ouR Future goALs incLude bull Development Charge Bylaw update
bull Financial Control Bylaw
bull Implement PSAB (Public Sector Accounting Board) requirements for budgeting
bull Develop long term financial plan
bull Continue to develop dynamic financial planning policies to adapt to an environment of constantly shifting priorities
bull Review Investment Strategy and review potential for institutional pricing
bull Collecting amounts due to the City using a corporate approach across multiple subsystems
bull Continue to stress customer service excellence including multiple sites payment stations and promoting electronic payment options
bull Ongoing implementation of POS at selected City sites
bull Develop the Cityrsquos internal controls for cash handling
bull Recommend policy on the use of special services levies
bull Developing a Payment Card Industry Data Security Standard (PCIDSS) compliance plan
bull Reduce and rationalize the number of water billing sections
FINANCE DEPARTMENT
PuRchAsing division ouR goAL The goal of the Purchasing division is to follow the Cityrsquos Purchasing Bylaw and provincial and federal government law to acquire the best total cost for the products and services required by the City of Waterloo as well as providing a fair open and transparent purchasing process for the supply base
ouR AchieveMenTs bull Additional expansion of using procurement cards has reduced staff time spent on issuing purchase orders
bull Issuing of cheques through Accounts Payable has been reduced through the implementation of the procurement card program
bull Using e-commerce platforms reduces the time required to input data for the purchasing receipt and payment of invoices
bull Involvement with the provincial contracts (vendor of records) has reduced the cost of the services supplied (courier and cellular devices)
bull Involvement in co-operative and provincial contracts has increased purchasing efficiencies
ouR Future goALs incLude bull Computerization and bar coding of stockroom items
bull Implement the recommendations listed in the Purchasing Review Report
bull Work with the Environmental Strategy Implementation Steering committee to further enhance green procurement and a sustainable Waterloo
bull Review implement most cost effective municipal and provincial contracts for items such as telecommunications and courier services
bull Investigate the possibility of a third-party agency to host our bid opportunities
bull Establish a more centralized purchasing function at the city of Waterloo
bull Review and implement new cash discounts for the supply base to the city of Waterloo
HUMAN RESOURCES DEPARTMENT VOLUNTEER SERVICES The provision of Human Resources and Volunteer Services includes recruitment and selection labour and employee relations compensation and benefits sick and disability management training collective bargaining health and safety and organizational design
ouR Mission Engaged competent employees and volunteers are successful in accomplishing strategic and business plans within a vibrant corporate culture at the City of Waterloo
ouR goAL Human Resources and Volunteer Services departmentrsquos programs and services comply with regulatory and legislative requirements and align with the Cityrsquos values to enable staff to accomplish strategic and business plans
ouR chALLenges Build sufficient HR specialist expertise within a generalist model to support service excellence free-up HR capacity through operational efficiencies to enable project work and program design in key areas and training initiatives trends indicating decline of volunteerism requires innovative approaches
HUMAN RESOURCES DEPARTMENT voLunTeeR seRvices
ouR AchieveMenTs bull Completion of a market review of insurance carriers to ensure the cost competitiveness of our employee group benefit plan rates
bull Continued implementation of violence in the workplace programs with respectful workplace training and risk assessment surveys
bull Conducted an employee engagement survey to measure employee engagement in important aspects of work activities relationships and working conditions
bull Research and preparation of negotiations plans for Staff Association CUPE and WPFFA collective agreements
bull Use of technology to create efficiencies using online automated recruitment screening for high volume recruits and enhanced use of PeopleSoft functionality for management information reporting
bull Implementation of volunteer software system to enhance volunteer recruitment and placements
ouR Future goALs incLude Utilize information system data to measure efficiencies and effectiveness of hR and volunteer process improvement and practices
bull Develop a performance appraisal tool to measure competencies and accountabilities
bull Develop a corporate staff recognition program with individual and group components
bull Provide coaching project management and volunteer training and leadership development programming
bull Continue to enhance workplace health and safety with Respectful Workplace initiatives and implementation of Corporate Health and safety Audit recommendations
bull Bargain new agreements for labour groups and Staff Association
bull Implement job evaluation maintenance program
bull Develop corporate and department plans to address issues in the employee engagement survey to enhance employee engagement
bull Continue to implement the Volunteer Engagement Strategy
PROTECTIVE SERVICES DEPARTMENT Protective Services is responsible for the delivery of services by Fire Rescue Bylaw EnforcementProperty Standards and Community Relations
ouR Mission A team of dedicated and professional staff committed to enhancing the safety and quality of life of our community through education inspection enforcement community relations and emergency response
ouR goAL To provide quality service valued by staff and the community in delivery of education inspection enforcement community relations and emergency response
ouR chALLenges Developmentbuilding construction intensification city-wide Light Rail Transit (LRT) green building construction increased population of the city including long-term and temporary residents ongoing need for improved technology to augment existing resources increased student enrollment communication to students living off-campus
PROTECTIVE SERVICES DEPARTMENT
WATeRLoo FiRe Rescue division ouR goAL Waterloo Fire Rescue will continue to grow in response to community needs and expectations to provide the highest standard of service
ouR AchieveMenTs bull Completion of Station 4
bull Activity Tracking Program
bull Enhanced response times on the Cityrsquos east side
bull Measures used to optimize service delivery
ouR Future goALs incLude bull Deliver a fiscally responsible and sustainable service delivery model
bull Reviseupdate simplified risk assessment (3-year cycle)
bull Reviseupdate Fire Master Plan (5-year cycle)
bull Leverage technology to enhance overall effectiveness and efficiency
bull Collaborate with local business and the community to promote fire safety
bull Collaborate with post-secondary institutions to mitigate fire safety priorities
bull Reviseupdate Emergency Management Plan
bull Reviseupdate fire inspection service delivery model
bull Enhance tactical pre-planning
bull Enhance training programs
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
YMCASTORK FAMILY LIBRARY
DEVELOPMENT SERVICES DEPARTMENT Development Services is responsible for helping ensure that the City is planned developed and constructed in a manner that meets the existing and future goals of our community as well as satisfying legislative requirements associated with our services
ouR Mission As a department we strive to plan build and realize a safe and attractive sustainable community through the combined work of our four divisions
ouR goAL In Development Services our goal is to ensure that our community evolves appropriately for our citizens through professional land use advise to Council
ouR chALLenges Increase resources to provide expected level of services given an ever increasing level of development activity increase training opportunities to reflect changing work managing unanticipated projects
DEVELOPMENT SERVICES DEPARTMENT
buiLding sTAndARds division ouR goAL Our goal is to inform and assist our customers to ensure safe and orderly development and to provide efficient delivery of building approvals inspections and management systems
ouR AchieveMenTs bull Minor permits review completed from e-drawings
bull Completion of site plan approval process
bull Projects completed Balsillie School Perimeter Institute and several residential high-rises
DEVELOPMENT SERVICES DEPARTMENT
PoLicy deveLoPMenT division ouR goAL To work with Council and the community to foster a healthy and vibrant place for people to live work do business and play
ouR AchieveMenT bull Significant efforts focused on site plan process review
ouR Future goALs incLude buiLding sTAndARds division Advance the use of technology bull For online permit applications inspection booking bull Paperless permit application
bull Paperless plan examination for small to medium-size projects bull Improve records management from paper based to electronic bull Review of service level and applicable building permit fees bull Establish standard operating procedures to manage our service
level and establish best practice guidelines bull Build strong partnerships with the industry engage them in our process
creating an education program and participating in industry functions
PoLicy deveLoPMenT division bull Develop Official Plan monitoring protocol bull Consider brownfield incentives bull Initiate major transit station area planning bull Complete Northdale Land Use and Community Improvement
Plan study bull Complete North Waterloo District Plan
bull Complete Clean Water Act Implementation with PWS
bull Complete Clair Hills remnant hydro parcels landscaping bull Construct Westvale Park
DEVELOPMENT SERVICES DEPARTMENT
deveLoPMenT APPRovALs division ouR goAL To work in partnership with citizens and the development industry to help ensure that our city evolves in the direction that meets existing and future community needs and desires
ouR AchieveMenTs bull Continuous Improvement Zoning bylaw updates are accessible from the web Integrated Development Approvals Process
bull Complete application and preconsultation requirements (Zone change site plan demo control and C of A)
bull Systemization of performance measurement for Committee of Adjustment Site Plan Review Committee Sign Variance Committee
ouR Future goALs incLude bull Implementation of the new Official Plan
bull New zoning bylaw to align with the new Official Plan
Development ProjectsProposals bull Balsillie School of International Affairs complete Phase I
initiate Phase ii
bull BarrelYards implementation
bull RIM East Campus additional phases
bull NCR Master Plan
bull Core Re-urbanization Projects
bull West Side Employment Lands
bull Implementation of West Side Plans of Subdivision
bull OMB Hearings
bull 144 Park St Phase II
committees and customer service bull Continue to provide high quality and timely customer service related to zoning development and committee inquiries
bull New Sign Bylaw implementation
bull AMANDA link to site plan
DEVELOPMENT SERVICES DEPARTMENT
engineeRing And consTRucTion division ouR goAL The Engineering and Construction divisionrsquos goal is to work co-operatively with the development industry consultants and the public to promote the construction of new high-quality infrastructure (roads watermains sewers stormwater management)
ouR AchieveMenTs bull Implementing a major Continuous Improvement (CI) project for Site Plan Control
ouR Future goALs incLude bull Implementation of new major subdivision developments (West Side Lands Carriage CrossingWoolwich Estates)
bull Complete policy review for enhanced service delivery and improved efficiencies and incorporate into regular updates of the development Manual
bull Implement enhanced electronic tracking of development approvals leveraging existing technologies within the department using the AMAndA system
bull Initiate review of records management needs and implement necessary changes in conjunction with corporate initiatives
bull Participate in the identification of service capacity issues to identify infrastructure needs for the capital budget
bull Continue to adapt skill sets and core competencies to the ldquonewrdquo development reality in Waterloo which is focused on urban intensification and infill projects
bull Provide engineering review and inspection services for new major site plans in the uptown and other locations
FINANCE DEPARTMENT The Finance department supports the organization by assisting Council and the Corporate Management Team in the development of financial policies and strategic goals The department also advises and assists city departments in the timely and effective provision of accounting budgeting purchasing and revenue services
ouR Mission The Finance department is committed to excellence in providing sound financial management and consultative services Support and enhance operational effectiveness and efficiency
ouR goAL To provide reliable sound short- medium- and long-term financial strategies to ensure the long-term sustainable financial viability of the corporation
ouR chALLenges Declining assessment growth and multiple demands on scarce financial resources
FINANCE DEPARTMENT
AccounTing division ouR goAL To provide efficient reporting while safeguarding the assets of the corporation and providing financial information to Council CMT other departments and the community
ouR AchieveMenTs bull Initialization of new procedures and requirements for the reporting of TCA requirement
bull Upgrade of Peoplesoft Payroll Management System
bull Increased payment through electronic channels
ouR Future goALs incLude Further enhancement of Reporting bull Annual Report (2013) bull Ongoing development of Financial Reporting System (2012) bull Finance upgrade (2014) bull Portal type delivery of financial information
Increased Utilization of PeopleSoft Payroll Management System bull Security (2012-2014) bull Manager view of leave banks (2012-2014) bull Staff Association time entry (2012-2014) bull Work flow (2013) bull Electronic fund transfer payments for vendors (2012-2013) bull Epay (2012)
implementation of Recommendations from continuous improvement bull Payroll time cards bull Account Payable entry
FINANCE DEPARTMENT
budgeTs amp FinAnciAL PLAnningdivision ouR goAL To fulfill fiduciary and statutory requirements and provide reliable financial strategies to ensure the financial viability of the corporation while maintaining effective stewardship of financial resources
ouR AchieveMenTs bull Refined the 3-year budget process
bull Reserve and Reserve Fund Policy review
bull Rolled out budget software to web-based version
FINANCE DEPARTMENT
Revenue division ouR goAL Develop and implement an effective system of recording and collecting amounts due to the City using a corporate approach across multiple subsystems
ouR AchieveMenT bull Department is handling approximately 3000 incoming calls per month water amp sewer billing accounted for a 3-fold increase in the number of incoming calls
ouR Future goALs incLude bull Development Charge Bylaw update
bull Financial Control Bylaw
bull Implement PSAB (Public Sector Accounting Board) requirements for budgeting
bull Develop long term financial plan
bull Continue to develop dynamic financial planning policies to adapt to an environment of constantly shifting priorities
bull Review Investment Strategy and review potential for institutional pricing
bull Collecting amounts due to the City using a corporate approach across multiple subsystems
bull Continue to stress customer service excellence including multiple sites payment stations and promoting electronic payment options
bull Ongoing implementation of POS at selected City sites
bull Develop the Cityrsquos internal controls for cash handling
bull Recommend policy on the use of special services levies
bull Developing a Payment Card Industry Data Security Standard (PCIDSS) compliance plan
bull Reduce and rationalize the number of water billing sections
FINANCE DEPARTMENT
PuRchAsing division ouR goAL The goal of the Purchasing division is to follow the Cityrsquos Purchasing Bylaw and provincial and federal government law to acquire the best total cost for the products and services required by the City of Waterloo as well as providing a fair open and transparent purchasing process for the supply base
ouR AchieveMenTs bull Additional expansion of using procurement cards has reduced staff time spent on issuing purchase orders
bull Issuing of cheques through Accounts Payable has been reduced through the implementation of the procurement card program
bull Using e-commerce platforms reduces the time required to input data for the purchasing receipt and payment of invoices
bull Involvement with the provincial contracts (vendor of records) has reduced the cost of the services supplied (courier and cellular devices)
bull Involvement in co-operative and provincial contracts has increased purchasing efficiencies
ouR Future goALs incLude bull Computerization and bar coding of stockroom items
bull Implement the recommendations listed in the Purchasing Review Report
bull Work with the Environmental Strategy Implementation Steering committee to further enhance green procurement and a sustainable Waterloo
bull Review implement most cost effective municipal and provincial contracts for items such as telecommunications and courier services
bull Investigate the possibility of a third-party agency to host our bid opportunities
bull Establish a more centralized purchasing function at the city of Waterloo
bull Review and implement new cash discounts for the supply base to the city of Waterloo
HUMAN RESOURCES DEPARTMENT VOLUNTEER SERVICES The provision of Human Resources and Volunteer Services includes recruitment and selection labour and employee relations compensation and benefits sick and disability management training collective bargaining health and safety and organizational design
ouR Mission Engaged competent employees and volunteers are successful in accomplishing strategic and business plans within a vibrant corporate culture at the City of Waterloo
ouR goAL Human Resources and Volunteer Services departmentrsquos programs and services comply with regulatory and legislative requirements and align with the Cityrsquos values to enable staff to accomplish strategic and business plans
ouR chALLenges Build sufficient HR specialist expertise within a generalist model to support service excellence free-up HR capacity through operational efficiencies to enable project work and program design in key areas and training initiatives trends indicating decline of volunteerism requires innovative approaches
HUMAN RESOURCES DEPARTMENT voLunTeeR seRvices
ouR AchieveMenTs bull Completion of a market review of insurance carriers to ensure the cost competitiveness of our employee group benefit plan rates
bull Continued implementation of violence in the workplace programs with respectful workplace training and risk assessment surveys
bull Conducted an employee engagement survey to measure employee engagement in important aspects of work activities relationships and working conditions
bull Research and preparation of negotiations plans for Staff Association CUPE and WPFFA collective agreements
bull Use of technology to create efficiencies using online automated recruitment screening for high volume recruits and enhanced use of PeopleSoft functionality for management information reporting
bull Implementation of volunteer software system to enhance volunteer recruitment and placements
ouR Future goALs incLude Utilize information system data to measure efficiencies and effectiveness of hR and volunteer process improvement and practices
bull Develop a performance appraisal tool to measure competencies and accountabilities
bull Develop a corporate staff recognition program with individual and group components
bull Provide coaching project management and volunteer training and leadership development programming
bull Continue to enhance workplace health and safety with Respectful Workplace initiatives and implementation of Corporate Health and safety Audit recommendations
bull Bargain new agreements for labour groups and Staff Association
bull Implement job evaluation maintenance program
bull Develop corporate and department plans to address issues in the employee engagement survey to enhance employee engagement
bull Continue to implement the Volunteer Engagement Strategy
PROTECTIVE SERVICES DEPARTMENT Protective Services is responsible for the delivery of services by Fire Rescue Bylaw EnforcementProperty Standards and Community Relations
ouR Mission A team of dedicated and professional staff committed to enhancing the safety and quality of life of our community through education inspection enforcement community relations and emergency response
ouR goAL To provide quality service valued by staff and the community in delivery of education inspection enforcement community relations and emergency response
ouR chALLenges Developmentbuilding construction intensification city-wide Light Rail Transit (LRT) green building construction increased population of the city including long-term and temporary residents ongoing need for improved technology to augment existing resources increased student enrollment communication to students living off-campus
PROTECTIVE SERVICES DEPARTMENT
WATeRLoo FiRe Rescue division ouR goAL Waterloo Fire Rescue will continue to grow in response to community needs and expectations to provide the highest standard of service
ouR AchieveMenTs bull Completion of Station 4
bull Activity Tracking Program
bull Enhanced response times on the Cityrsquos east side
bull Measures used to optimize service delivery
ouR Future goALs incLude bull Deliver a fiscally responsible and sustainable service delivery model
bull Reviseupdate simplified risk assessment (3-year cycle)
bull Reviseupdate Fire Master Plan (5-year cycle)
bull Leverage technology to enhance overall effectiveness and efficiency
bull Collaborate with local business and the community to promote fire safety
bull Collaborate with post-secondary institutions to mitigate fire safety priorities
bull Reviseupdate Emergency Management Plan
bull Reviseupdate fire inspection service delivery model
bull Enhance tactical pre-planning
bull Enhance training programs
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
DEVELOPMENT SERVICES DEPARTMENT Development Services is responsible for helping ensure that the City is planned developed and constructed in a manner that meets the existing and future goals of our community as well as satisfying legislative requirements associated with our services
ouR Mission As a department we strive to plan build and realize a safe and attractive sustainable community through the combined work of our four divisions
ouR goAL In Development Services our goal is to ensure that our community evolves appropriately for our citizens through professional land use advise to Council
ouR chALLenges Increase resources to provide expected level of services given an ever increasing level of development activity increase training opportunities to reflect changing work managing unanticipated projects
DEVELOPMENT SERVICES DEPARTMENT
buiLding sTAndARds division ouR goAL Our goal is to inform and assist our customers to ensure safe and orderly development and to provide efficient delivery of building approvals inspections and management systems
ouR AchieveMenTs bull Minor permits review completed from e-drawings
bull Completion of site plan approval process
bull Projects completed Balsillie School Perimeter Institute and several residential high-rises
DEVELOPMENT SERVICES DEPARTMENT
PoLicy deveLoPMenT division ouR goAL To work with Council and the community to foster a healthy and vibrant place for people to live work do business and play
ouR AchieveMenT bull Significant efforts focused on site plan process review
ouR Future goALs incLude buiLding sTAndARds division Advance the use of technology bull For online permit applications inspection booking bull Paperless permit application
bull Paperless plan examination for small to medium-size projects bull Improve records management from paper based to electronic bull Review of service level and applicable building permit fees bull Establish standard operating procedures to manage our service
level and establish best practice guidelines bull Build strong partnerships with the industry engage them in our process
creating an education program and participating in industry functions
PoLicy deveLoPMenT division bull Develop Official Plan monitoring protocol bull Consider brownfield incentives bull Initiate major transit station area planning bull Complete Northdale Land Use and Community Improvement
Plan study bull Complete North Waterloo District Plan
bull Complete Clean Water Act Implementation with PWS
bull Complete Clair Hills remnant hydro parcels landscaping bull Construct Westvale Park
DEVELOPMENT SERVICES DEPARTMENT
deveLoPMenT APPRovALs division ouR goAL To work in partnership with citizens and the development industry to help ensure that our city evolves in the direction that meets existing and future community needs and desires
ouR AchieveMenTs bull Continuous Improvement Zoning bylaw updates are accessible from the web Integrated Development Approvals Process
bull Complete application and preconsultation requirements (Zone change site plan demo control and C of A)
bull Systemization of performance measurement for Committee of Adjustment Site Plan Review Committee Sign Variance Committee
ouR Future goALs incLude bull Implementation of the new Official Plan
bull New zoning bylaw to align with the new Official Plan
Development ProjectsProposals bull Balsillie School of International Affairs complete Phase I
initiate Phase ii
bull BarrelYards implementation
bull RIM East Campus additional phases
bull NCR Master Plan
bull Core Re-urbanization Projects
bull West Side Employment Lands
bull Implementation of West Side Plans of Subdivision
bull OMB Hearings
bull 144 Park St Phase II
committees and customer service bull Continue to provide high quality and timely customer service related to zoning development and committee inquiries
bull New Sign Bylaw implementation
bull AMANDA link to site plan
DEVELOPMENT SERVICES DEPARTMENT
engineeRing And consTRucTion division ouR goAL The Engineering and Construction divisionrsquos goal is to work co-operatively with the development industry consultants and the public to promote the construction of new high-quality infrastructure (roads watermains sewers stormwater management)
ouR AchieveMenTs bull Implementing a major Continuous Improvement (CI) project for Site Plan Control
ouR Future goALs incLude bull Implementation of new major subdivision developments (West Side Lands Carriage CrossingWoolwich Estates)
bull Complete policy review for enhanced service delivery and improved efficiencies and incorporate into regular updates of the development Manual
bull Implement enhanced electronic tracking of development approvals leveraging existing technologies within the department using the AMAndA system
bull Initiate review of records management needs and implement necessary changes in conjunction with corporate initiatives
bull Participate in the identification of service capacity issues to identify infrastructure needs for the capital budget
bull Continue to adapt skill sets and core competencies to the ldquonewrdquo development reality in Waterloo which is focused on urban intensification and infill projects
bull Provide engineering review and inspection services for new major site plans in the uptown and other locations
FINANCE DEPARTMENT The Finance department supports the organization by assisting Council and the Corporate Management Team in the development of financial policies and strategic goals The department also advises and assists city departments in the timely and effective provision of accounting budgeting purchasing and revenue services
ouR Mission The Finance department is committed to excellence in providing sound financial management and consultative services Support and enhance operational effectiveness and efficiency
ouR goAL To provide reliable sound short- medium- and long-term financial strategies to ensure the long-term sustainable financial viability of the corporation
ouR chALLenges Declining assessment growth and multiple demands on scarce financial resources
FINANCE DEPARTMENT
AccounTing division ouR goAL To provide efficient reporting while safeguarding the assets of the corporation and providing financial information to Council CMT other departments and the community
ouR AchieveMenTs bull Initialization of new procedures and requirements for the reporting of TCA requirement
bull Upgrade of Peoplesoft Payroll Management System
bull Increased payment through electronic channels
ouR Future goALs incLude Further enhancement of Reporting bull Annual Report (2013) bull Ongoing development of Financial Reporting System (2012) bull Finance upgrade (2014) bull Portal type delivery of financial information
Increased Utilization of PeopleSoft Payroll Management System bull Security (2012-2014) bull Manager view of leave banks (2012-2014) bull Staff Association time entry (2012-2014) bull Work flow (2013) bull Electronic fund transfer payments for vendors (2012-2013) bull Epay (2012)
implementation of Recommendations from continuous improvement bull Payroll time cards bull Account Payable entry
FINANCE DEPARTMENT
budgeTs amp FinAnciAL PLAnningdivision ouR goAL To fulfill fiduciary and statutory requirements and provide reliable financial strategies to ensure the financial viability of the corporation while maintaining effective stewardship of financial resources
ouR AchieveMenTs bull Refined the 3-year budget process
bull Reserve and Reserve Fund Policy review
bull Rolled out budget software to web-based version
FINANCE DEPARTMENT
Revenue division ouR goAL Develop and implement an effective system of recording and collecting amounts due to the City using a corporate approach across multiple subsystems
ouR AchieveMenT bull Department is handling approximately 3000 incoming calls per month water amp sewer billing accounted for a 3-fold increase in the number of incoming calls
ouR Future goALs incLude bull Development Charge Bylaw update
bull Financial Control Bylaw
bull Implement PSAB (Public Sector Accounting Board) requirements for budgeting
bull Develop long term financial plan
bull Continue to develop dynamic financial planning policies to adapt to an environment of constantly shifting priorities
bull Review Investment Strategy and review potential for institutional pricing
bull Collecting amounts due to the City using a corporate approach across multiple subsystems
bull Continue to stress customer service excellence including multiple sites payment stations and promoting electronic payment options
bull Ongoing implementation of POS at selected City sites
bull Develop the Cityrsquos internal controls for cash handling
bull Recommend policy on the use of special services levies
bull Developing a Payment Card Industry Data Security Standard (PCIDSS) compliance plan
bull Reduce and rationalize the number of water billing sections
FINANCE DEPARTMENT
PuRchAsing division ouR goAL The goal of the Purchasing division is to follow the Cityrsquos Purchasing Bylaw and provincial and federal government law to acquire the best total cost for the products and services required by the City of Waterloo as well as providing a fair open and transparent purchasing process for the supply base
ouR AchieveMenTs bull Additional expansion of using procurement cards has reduced staff time spent on issuing purchase orders
bull Issuing of cheques through Accounts Payable has been reduced through the implementation of the procurement card program
bull Using e-commerce platforms reduces the time required to input data for the purchasing receipt and payment of invoices
bull Involvement with the provincial contracts (vendor of records) has reduced the cost of the services supplied (courier and cellular devices)
bull Involvement in co-operative and provincial contracts has increased purchasing efficiencies
ouR Future goALs incLude bull Computerization and bar coding of stockroom items
bull Implement the recommendations listed in the Purchasing Review Report
bull Work with the Environmental Strategy Implementation Steering committee to further enhance green procurement and a sustainable Waterloo
bull Review implement most cost effective municipal and provincial contracts for items such as telecommunications and courier services
bull Investigate the possibility of a third-party agency to host our bid opportunities
bull Establish a more centralized purchasing function at the city of Waterloo
bull Review and implement new cash discounts for the supply base to the city of Waterloo
HUMAN RESOURCES DEPARTMENT VOLUNTEER SERVICES The provision of Human Resources and Volunteer Services includes recruitment and selection labour and employee relations compensation and benefits sick and disability management training collective bargaining health and safety and organizational design
ouR Mission Engaged competent employees and volunteers are successful in accomplishing strategic and business plans within a vibrant corporate culture at the City of Waterloo
ouR goAL Human Resources and Volunteer Services departmentrsquos programs and services comply with regulatory and legislative requirements and align with the Cityrsquos values to enable staff to accomplish strategic and business plans
ouR chALLenges Build sufficient HR specialist expertise within a generalist model to support service excellence free-up HR capacity through operational efficiencies to enable project work and program design in key areas and training initiatives trends indicating decline of volunteerism requires innovative approaches
HUMAN RESOURCES DEPARTMENT voLunTeeR seRvices
ouR AchieveMenTs bull Completion of a market review of insurance carriers to ensure the cost competitiveness of our employee group benefit plan rates
bull Continued implementation of violence in the workplace programs with respectful workplace training and risk assessment surveys
bull Conducted an employee engagement survey to measure employee engagement in important aspects of work activities relationships and working conditions
bull Research and preparation of negotiations plans for Staff Association CUPE and WPFFA collective agreements
bull Use of technology to create efficiencies using online automated recruitment screening for high volume recruits and enhanced use of PeopleSoft functionality for management information reporting
bull Implementation of volunteer software system to enhance volunteer recruitment and placements
ouR Future goALs incLude Utilize information system data to measure efficiencies and effectiveness of hR and volunteer process improvement and practices
bull Develop a performance appraisal tool to measure competencies and accountabilities
bull Develop a corporate staff recognition program with individual and group components
bull Provide coaching project management and volunteer training and leadership development programming
bull Continue to enhance workplace health and safety with Respectful Workplace initiatives and implementation of Corporate Health and safety Audit recommendations
bull Bargain new agreements for labour groups and Staff Association
bull Implement job evaluation maintenance program
bull Develop corporate and department plans to address issues in the employee engagement survey to enhance employee engagement
bull Continue to implement the Volunteer Engagement Strategy
PROTECTIVE SERVICES DEPARTMENT Protective Services is responsible for the delivery of services by Fire Rescue Bylaw EnforcementProperty Standards and Community Relations
ouR Mission A team of dedicated and professional staff committed to enhancing the safety and quality of life of our community through education inspection enforcement community relations and emergency response
ouR goAL To provide quality service valued by staff and the community in delivery of education inspection enforcement community relations and emergency response
ouR chALLenges Developmentbuilding construction intensification city-wide Light Rail Transit (LRT) green building construction increased population of the city including long-term and temporary residents ongoing need for improved technology to augment existing resources increased student enrollment communication to students living off-campus
PROTECTIVE SERVICES DEPARTMENT
WATeRLoo FiRe Rescue division ouR goAL Waterloo Fire Rescue will continue to grow in response to community needs and expectations to provide the highest standard of service
ouR AchieveMenTs bull Completion of Station 4
bull Activity Tracking Program
bull Enhanced response times on the Cityrsquos east side
bull Measures used to optimize service delivery
ouR Future goALs incLude bull Deliver a fiscally responsible and sustainable service delivery model
bull Reviseupdate simplified risk assessment (3-year cycle)
bull Reviseupdate Fire Master Plan (5-year cycle)
bull Leverage technology to enhance overall effectiveness and efficiency
bull Collaborate with local business and the community to promote fire safety
bull Collaborate with post-secondary institutions to mitigate fire safety priorities
bull Reviseupdate Emergency Management Plan
bull Reviseupdate fire inspection service delivery model
bull Enhance tactical pre-planning
bull Enhance training programs
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
DEVELOPMENT SERVICES DEPARTMENT
buiLding sTAndARds division ouR goAL Our goal is to inform and assist our customers to ensure safe and orderly development and to provide efficient delivery of building approvals inspections and management systems
ouR AchieveMenTs bull Minor permits review completed from e-drawings
bull Completion of site plan approval process
bull Projects completed Balsillie School Perimeter Institute and several residential high-rises
DEVELOPMENT SERVICES DEPARTMENT
PoLicy deveLoPMenT division ouR goAL To work with Council and the community to foster a healthy and vibrant place for people to live work do business and play
ouR AchieveMenT bull Significant efforts focused on site plan process review
ouR Future goALs incLude buiLding sTAndARds division Advance the use of technology bull For online permit applications inspection booking bull Paperless permit application
bull Paperless plan examination for small to medium-size projects bull Improve records management from paper based to electronic bull Review of service level and applicable building permit fees bull Establish standard operating procedures to manage our service
level and establish best practice guidelines bull Build strong partnerships with the industry engage them in our process
creating an education program and participating in industry functions
PoLicy deveLoPMenT division bull Develop Official Plan monitoring protocol bull Consider brownfield incentives bull Initiate major transit station area planning bull Complete Northdale Land Use and Community Improvement
Plan study bull Complete North Waterloo District Plan
bull Complete Clean Water Act Implementation with PWS
bull Complete Clair Hills remnant hydro parcels landscaping bull Construct Westvale Park
DEVELOPMENT SERVICES DEPARTMENT
deveLoPMenT APPRovALs division ouR goAL To work in partnership with citizens and the development industry to help ensure that our city evolves in the direction that meets existing and future community needs and desires
ouR AchieveMenTs bull Continuous Improvement Zoning bylaw updates are accessible from the web Integrated Development Approvals Process
bull Complete application and preconsultation requirements (Zone change site plan demo control and C of A)
bull Systemization of performance measurement for Committee of Adjustment Site Plan Review Committee Sign Variance Committee
ouR Future goALs incLude bull Implementation of the new Official Plan
bull New zoning bylaw to align with the new Official Plan
Development ProjectsProposals bull Balsillie School of International Affairs complete Phase I
initiate Phase ii
bull BarrelYards implementation
bull RIM East Campus additional phases
bull NCR Master Plan
bull Core Re-urbanization Projects
bull West Side Employment Lands
bull Implementation of West Side Plans of Subdivision
bull OMB Hearings
bull 144 Park St Phase II
committees and customer service bull Continue to provide high quality and timely customer service related to zoning development and committee inquiries
bull New Sign Bylaw implementation
bull AMANDA link to site plan
DEVELOPMENT SERVICES DEPARTMENT
engineeRing And consTRucTion division ouR goAL The Engineering and Construction divisionrsquos goal is to work co-operatively with the development industry consultants and the public to promote the construction of new high-quality infrastructure (roads watermains sewers stormwater management)
ouR AchieveMenTs bull Implementing a major Continuous Improvement (CI) project for Site Plan Control
ouR Future goALs incLude bull Implementation of new major subdivision developments (West Side Lands Carriage CrossingWoolwich Estates)
bull Complete policy review for enhanced service delivery and improved efficiencies and incorporate into regular updates of the development Manual
bull Implement enhanced electronic tracking of development approvals leveraging existing technologies within the department using the AMAndA system
bull Initiate review of records management needs and implement necessary changes in conjunction with corporate initiatives
bull Participate in the identification of service capacity issues to identify infrastructure needs for the capital budget
bull Continue to adapt skill sets and core competencies to the ldquonewrdquo development reality in Waterloo which is focused on urban intensification and infill projects
bull Provide engineering review and inspection services for new major site plans in the uptown and other locations
FINANCE DEPARTMENT The Finance department supports the organization by assisting Council and the Corporate Management Team in the development of financial policies and strategic goals The department also advises and assists city departments in the timely and effective provision of accounting budgeting purchasing and revenue services
ouR Mission The Finance department is committed to excellence in providing sound financial management and consultative services Support and enhance operational effectiveness and efficiency
ouR goAL To provide reliable sound short- medium- and long-term financial strategies to ensure the long-term sustainable financial viability of the corporation
ouR chALLenges Declining assessment growth and multiple demands on scarce financial resources
FINANCE DEPARTMENT
AccounTing division ouR goAL To provide efficient reporting while safeguarding the assets of the corporation and providing financial information to Council CMT other departments and the community
ouR AchieveMenTs bull Initialization of new procedures and requirements for the reporting of TCA requirement
bull Upgrade of Peoplesoft Payroll Management System
bull Increased payment through electronic channels
ouR Future goALs incLude Further enhancement of Reporting bull Annual Report (2013) bull Ongoing development of Financial Reporting System (2012) bull Finance upgrade (2014) bull Portal type delivery of financial information
Increased Utilization of PeopleSoft Payroll Management System bull Security (2012-2014) bull Manager view of leave banks (2012-2014) bull Staff Association time entry (2012-2014) bull Work flow (2013) bull Electronic fund transfer payments for vendors (2012-2013) bull Epay (2012)
implementation of Recommendations from continuous improvement bull Payroll time cards bull Account Payable entry
FINANCE DEPARTMENT
budgeTs amp FinAnciAL PLAnningdivision ouR goAL To fulfill fiduciary and statutory requirements and provide reliable financial strategies to ensure the financial viability of the corporation while maintaining effective stewardship of financial resources
ouR AchieveMenTs bull Refined the 3-year budget process
bull Reserve and Reserve Fund Policy review
bull Rolled out budget software to web-based version
FINANCE DEPARTMENT
Revenue division ouR goAL Develop and implement an effective system of recording and collecting amounts due to the City using a corporate approach across multiple subsystems
ouR AchieveMenT bull Department is handling approximately 3000 incoming calls per month water amp sewer billing accounted for a 3-fold increase in the number of incoming calls
ouR Future goALs incLude bull Development Charge Bylaw update
bull Financial Control Bylaw
bull Implement PSAB (Public Sector Accounting Board) requirements for budgeting
bull Develop long term financial plan
bull Continue to develop dynamic financial planning policies to adapt to an environment of constantly shifting priorities
bull Review Investment Strategy and review potential for institutional pricing
bull Collecting amounts due to the City using a corporate approach across multiple subsystems
bull Continue to stress customer service excellence including multiple sites payment stations and promoting electronic payment options
bull Ongoing implementation of POS at selected City sites
bull Develop the Cityrsquos internal controls for cash handling
bull Recommend policy on the use of special services levies
bull Developing a Payment Card Industry Data Security Standard (PCIDSS) compliance plan
bull Reduce and rationalize the number of water billing sections
FINANCE DEPARTMENT
PuRchAsing division ouR goAL The goal of the Purchasing division is to follow the Cityrsquos Purchasing Bylaw and provincial and federal government law to acquire the best total cost for the products and services required by the City of Waterloo as well as providing a fair open and transparent purchasing process for the supply base
ouR AchieveMenTs bull Additional expansion of using procurement cards has reduced staff time spent on issuing purchase orders
bull Issuing of cheques through Accounts Payable has been reduced through the implementation of the procurement card program
bull Using e-commerce platforms reduces the time required to input data for the purchasing receipt and payment of invoices
bull Involvement with the provincial contracts (vendor of records) has reduced the cost of the services supplied (courier and cellular devices)
bull Involvement in co-operative and provincial contracts has increased purchasing efficiencies
ouR Future goALs incLude bull Computerization and bar coding of stockroom items
bull Implement the recommendations listed in the Purchasing Review Report
bull Work with the Environmental Strategy Implementation Steering committee to further enhance green procurement and a sustainable Waterloo
bull Review implement most cost effective municipal and provincial contracts for items such as telecommunications and courier services
bull Investigate the possibility of a third-party agency to host our bid opportunities
bull Establish a more centralized purchasing function at the city of Waterloo
bull Review and implement new cash discounts for the supply base to the city of Waterloo
HUMAN RESOURCES DEPARTMENT VOLUNTEER SERVICES The provision of Human Resources and Volunteer Services includes recruitment and selection labour and employee relations compensation and benefits sick and disability management training collective bargaining health and safety and organizational design
ouR Mission Engaged competent employees and volunteers are successful in accomplishing strategic and business plans within a vibrant corporate culture at the City of Waterloo
ouR goAL Human Resources and Volunteer Services departmentrsquos programs and services comply with regulatory and legislative requirements and align with the Cityrsquos values to enable staff to accomplish strategic and business plans
ouR chALLenges Build sufficient HR specialist expertise within a generalist model to support service excellence free-up HR capacity through operational efficiencies to enable project work and program design in key areas and training initiatives trends indicating decline of volunteerism requires innovative approaches
HUMAN RESOURCES DEPARTMENT voLunTeeR seRvices
ouR AchieveMenTs bull Completion of a market review of insurance carriers to ensure the cost competitiveness of our employee group benefit plan rates
bull Continued implementation of violence in the workplace programs with respectful workplace training and risk assessment surveys
bull Conducted an employee engagement survey to measure employee engagement in important aspects of work activities relationships and working conditions
bull Research and preparation of negotiations plans for Staff Association CUPE and WPFFA collective agreements
bull Use of technology to create efficiencies using online automated recruitment screening for high volume recruits and enhanced use of PeopleSoft functionality for management information reporting
bull Implementation of volunteer software system to enhance volunteer recruitment and placements
ouR Future goALs incLude Utilize information system data to measure efficiencies and effectiveness of hR and volunteer process improvement and practices
bull Develop a performance appraisal tool to measure competencies and accountabilities
bull Develop a corporate staff recognition program with individual and group components
bull Provide coaching project management and volunteer training and leadership development programming
bull Continue to enhance workplace health and safety with Respectful Workplace initiatives and implementation of Corporate Health and safety Audit recommendations
bull Bargain new agreements for labour groups and Staff Association
bull Implement job evaluation maintenance program
bull Develop corporate and department plans to address issues in the employee engagement survey to enhance employee engagement
bull Continue to implement the Volunteer Engagement Strategy
PROTECTIVE SERVICES DEPARTMENT Protective Services is responsible for the delivery of services by Fire Rescue Bylaw EnforcementProperty Standards and Community Relations
ouR Mission A team of dedicated and professional staff committed to enhancing the safety and quality of life of our community through education inspection enforcement community relations and emergency response
ouR goAL To provide quality service valued by staff and the community in delivery of education inspection enforcement community relations and emergency response
ouR chALLenges Developmentbuilding construction intensification city-wide Light Rail Transit (LRT) green building construction increased population of the city including long-term and temporary residents ongoing need for improved technology to augment existing resources increased student enrollment communication to students living off-campus
PROTECTIVE SERVICES DEPARTMENT
WATeRLoo FiRe Rescue division ouR goAL Waterloo Fire Rescue will continue to grow in response to community needs and expectations to provide the highest standard of service
ouR AchieveMenTs bull Completion of Station 4
bull Activity Tracking Program
bull Enhanced response times on the Cityrsquos east side
bull Measures used to optimize service delivery
ouR Future goALs incLude bull Deliver a fiscally responsible and sustainable service delivery model
bull Reviseupdate simplified risk assessment (3-year cycle)
bull Reviseupdate Fire Master Plan (5-year cycle)
bull Leverage technology to enhance overall effectiveness and efficiency
bull Collaborate with local business and the community to promote fire safety
bull Collaborate with post-secondary institutions to mitigate fire safety priorities
bull Reviseupdate Emergency Management Plan
bull Reviseupdate fire inspection service delivery model
bull Enhance tactical pre-planning
bull Enhance training programs
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
ouR Future goALs incLude buiLding sTAndARds division Advance the use of technology bull For online permit applications inspection booking bull Paperless permit application
bull Paperless plan examination for small to medium-size projects bull Improve records management from paper based to electronic bull Review of service level and applicable building permit fees bull Establish standard operating procedures to manage our service
level and establish best practice guidelines bull Build strong partnerships with the industry engage them in our process
creating an education program and participating in industry functions
PoLicy deveLoPMenT division bull Develop Official Plan monitoring protocol bull Consider brownfield incentives bull Initiate major transit station area planning bull Complete Northdale Land Use and Community Improvement
Plan study bull Complete North Waterloo District Plan
bull Complete Clean Water Act Implementation with PWS
bull Complete Clair Hills remnant hydro parcels landscaping bull Construct Westvale Park
DEVELOPMENT SERVICES DEPARTMENT
deveLoPMenT APPRovALs division ouR goAL To work in partnership with citizens and the development industry to help ensure that our city evolves in the direction that meets existing and future community needs and desires
ouR AchieveMenTs bull Continuous Improvement Zoning bylaw updates are accessible from the web Integrated Development Approvals Process
bull Complete application and preconsultation requirements (Zone change site plan demo control and C of A)
bull Systemization of performance measurement for Committee of Adjustment Site Plan Review Committee Sign Variance Committee
ouR Future goALs incLude bull Implementation of the new Official Plan
bull New zoning bylaw to align with the new Official Plan
Development ProjectsProposals bull Balsillie School of International Affairs complete Phase I
initiate Phase ii
bull BarrelYards implementation
bull RIM East Campus additional phases
bull NCR Master Plan
bull Core Re-urbanization Projects
bull West Side Employment Lands
bull Implementation of West Side Plans of Subdivision
bull OMB Hearings
bull 144 Park St Phase II
committees and customer service bull Continue to provide high quality and timely customer service related to zoning development and committee inquiries
bull New Sign Bylaw implementation
bull AMANDA link to site plan
DEVELOPMENT SERVICES DEPARTMENT
engineeRing And consTRucTion division ouR goAL The Engineering and Construction divisionrsquos goal is to work co-operatively with the development industry consultants and the public to promote the construction of new high-quality infrastructure (roads watermains sewers stormwater management)
ouR AchieveMenTs bull Implementing a major Continuous Improvement (CI) project for Site Plan Control
ouR Future goALs incLude bull Implementation of new major subdivision developments (West Side Lands Carriage CrossingWoolwich Estates)
bull Complete policy review for enhanced service delivery and improved efficiencies and incorporate into regular updates of the development Manual
bull Implement enhanced electronic tracking of development approvals leveraging existing technologies within the department using the AMAndA system
bull Initiate review of records management needs and implement necessary changes in conjunction with corporate initiatives
bull Participate in the identification of service capacity issues to identify infrastructure needs for the capital budget
bull Continue to adapt skill sets and core competencies to the ldquonewrdquo development reality in Waterloo which is focused on urban intensification and infill projects
bull Provide engineering review and inspection services for new major site plans in the uptown and other locations
FINANCE DEPARTMENT The Finance department supports the organization by assisting Council and the Corporate Management Team in the development of financial policies and strategic goals The department also advises and assists city departments in the timely and effective provision of accounting budgeting purchasing and revenue services
ouR Mission The Finance department is committed to excellence in providing sound financial management and consultative services Support and enhance operational effectiveness and efficiency
ouR goAL To provide reliable sound short- medium- and long-term financial strategies to ensure the long-term sustainable financial viability of the corporation
ouR chALLenges Declining assessment growth and multiple demands on scarce financial resources
FINANCE DEPARTMENT
AccounTing division ouR goAL To provide efficient reporting while safeguarding the assets of the corporation and providing financial information to Council CMT other departments and the community
ouR AchieveMenTs bull Initialization of new procedures and requirements for the reporting of TCA requirement
bull Upgrade of Peoplesoft Payroll Management System
bull Increased payment through electronic channels
ouR Future goALs incLude Further enhancement of Reporting bull Annual Report (2013) bull Ongoing development of Financial Reporting System (2012) bull Finance upgrade (2014) bull Portal type delivery of financial information
Increased Utilization of PeopleSoft Payroll Management System bull Security (2012-2014) bull Manager view of leave banks (2012-2014) bull Staff Association time entry (2012-2014) bull Work flow (2013) bull Electronic fund transfer payments for vendors (2012-2013) bull Epay (2012)
implementation of Recommendations from continuous improvement bull Payroll time cards bull Account Payable entry
FINANCE DEPARTMENT
budgeTs amp FinAnciAL PLAnningdivision ouR goAL To fulfill fiduciary and statutory requirements and provide reliable financial strategies to ensure the financial viability of the corporation while maintaining effective stewardship of financial resources
ouR AchieveMenTs bull Refined the 3-year budget process
bull Reserve and Reserve Fund Policy review
bull Rolled out budget software to web-based version
FINANCE DEPARTMENT
Revenue division ouR goAL Develop and implement an effective system of recording and collecting amounts due to the City using a corporate approach across multiple subsystems
ouR AchieveMenT bull Department is handling approximately 3000 incoming calls per month water amp sewer billing accounted for a 3-fold increase in the number of incoming calls
ouR Future goALs incLude bull Development Charge Bylaw update
bull Financial Control Bylaw
bull Implement PSAB (Public Sector Accounting Board) requirements for budgeting
bull Develop long term financial plan
bull Continue to develop dynamic financial planning policies to adapt to an environment of constantly shifting priorities
bull Review Investment Strategy and review potential for institutional pricing
bull Collecting amounts due to the City using a corporate approach across multiple subsystems
bull Continue to stress customer service excellence including multiple sites payment stations and promoting electronic payment options
bull Ongoing implementation of POS at selected City sites
bull Develop the Cityrsquos internal controls for cash handling
bull Recommend policy on the use of special services levies
bull Developing a Payment Card Industry Data Security Standard (PCIDSS) compliance plan
bull Reduce and rationalize the number of water billing sections
FINANCE DEPARTMENT
PuRchAsing division ouR goAL The goal of the Purchasing division is to follow the Cityrsquos Purchasing Bylaw and provincial and federal government law to acquire the best total cost for the products and services required by the City of Waterloo as well as providing a fair open and transparent purchasing process for the supply base
ouR AchieveMenTs bull Additional expansion of using procurement cards has reduced staff time spent on issuing purchase orders
bull Issuing of cheques through Accounts Payable has been reduced through the implementation of the procurement card program
bull Using e-commerce platforms reduces the time required to input data for the purchasing receipt and payment of invoices
bull Involvement with the provincial contracts (vendor of records) has reduced the cost of the services supplied (courier and cellular devices)
bull Involvement in co-operative and provincial contracts has increased purchasing efficiencies
ouR Future goALs incLude bull Computerization and bar coding of stockroom items
bull Implement the recommendations listed in the Purchasing Review Report
bull Work with the Environmental Strategy Implementation Steering committee to further enhance green procurement and a sustainable Waterloo
bull Review implement most cost effective municipal and provincial contracts for items such as telecommunications and courier services
bull Investigate the possibility of a third-party agency to host our bid opportunities
bull Establish a more centralized purchasing function at the city of Waterloo
bull Review and implement new cash discounts for the supply base to the city of Waterloo
HUMAN RESOURCES DEPARTMENT VOLUNTEER SERVICES The provision of Human Resources and Volunteer Services includes recruitment and selection labour and employee relations compensation and benefits sick and disability management training collective bargaining health and safety and organizational design
ouR Mission Engaged competent employees and volunteers are successful in accomplishing strategic and business plans within a vibrant corporate culture at the City of Waterloo
ouR goAL Human Resources and Volunteer Services departmentrsquos programs and services comply with regulatory and legislative requirements and align with the Cityrsquos values to enable staff to accomplish strategic and business plans
ouR chALLenges Build sufficient HR specialist expertise within a generalist model to support service excellence free-up HR capacity through operational efficiencies to enable project work and program design in key areas and training initiatives trends indicating decline of volunteerism requires innovative approaches
HUMAN RESOURCES DEPARTMENT voLunTeeR seRvices
ouR AchieveMenTs bull Completion of a market review of insurance carriers to ensure the cost competitiveness of our employee group benefit plan rates
bull Continued implementation of violence in the workplace programs with respectful workplace training and risk assessment surveys
bull Conducted an employee engagement survey to measure employee engagement in important aspects of work activities relationships and working conditions
bull Research and preparation of negotiations plans for Staff Association CUPE and WPFFA collective agreements
bull Use of technology to create efficiencies using online automated recruitment screening for high volume recruits and enhanced use of PeopleSoft functionality for management information reporting
bull Implementation of volunteer software system to enhance volunteer recruitment and placements
ouR Future goALs incLude Utilize information system data to measure efficiencies and effectiveness of hR and volunteer process improvement and practices
bull Develop a performance appraisal tool to measure competencies and accountabilities
bull Develop a corporate staff recognition program with individual and group components
bull Provide coaching project management and volunteer training and leadership development programming
bull Continue to enhance workplace health and safety with Respectful Workplace initiatives and implementation of Corporate Health and safety Audit recommendations
bull Bargain new agreements for labour groups and Staff Association
bull Implement job evaluation maintenance program
bull Develop corporate and department plans to address issues in the employee engagement survey to enhance employee engagement
bull Continue to implement the Volunteer Engagement Strategy
PROTECTIVE SERVICES DEPARTMENT Protective Services is responsible for the delivery of services by Fire Rescue Bylaw EnforcementProperty Standards and Community Relations
ouR Mission A team of dedicated and professional staff committed to enhancing the safety and quality of life of our community through education inspection enforcement community relations and emergency response
ouR goAL To provide quality service valued by staff and the community in delivery of education inspection enforcement community relations and emergency response
ouR chALLenges Developmentbuilding construction intensification city-wide Light Rail Transit (LRT) green building construction increased population of the city including long-term and temporary residents ongoing need for improved technology to augment existing resources increased student enrollment communication to students living off-campus
PROTECTIVE SERVICES DEPARTMENT
WATeRLoo FiRe Rescue division ouR goAL Waterloo Fire Rescue will continue to grow in response to community needs and expectations to provide the highest standard of service
ouR AchieveMenTs bull Completion of Station 4
bull Activity Tracking Program
bull Enhanced response times on the Cityrsquos east side
bull Measures used to optimize service delivery
ouR Future goALs incLude bull Deliver a fiscally responsible and sustainable service delivery model
bull Reviseupdate simplified risk assessment (3-year cycle)
bull Reviseupdate Fire Master Plan (5-year cycle)
bull Leverage technology to enhance overall effectiveness and efficiency
bull Collaborate with local business and the community to promote fire safety
bull Collaborate with post-secondary institutions to mitigate fire safety priorities
bull Reviseupdate Emergency Management Plan
bull Reviseupdate fire inspection service delivery model
bull Enhance tactical pre-planning
bull Enhance training programs
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
DEVELOPMENT SERVICES DEPARTMENT
deveLoPMenT APPRovALs division ouR goAL To work in partnership with citizens and the development industry to help ensure that our city evolves in the direction that meets existing and future community needs and desires
ouR AchieveMenTs bull Continuous Improvement Zoning bylaw updates are accessible from the web Integrated Development Approvals Process
bull Complete application and preconsultation requirements (Zone change site plan demo control and C of A)
bull Systemization of performance measurement for Committee of Adjustment Site Plan Review Committee Sign Variance Committee
ouR Future goALs incLude bull Implementation of the new Official Plan
bull New zoning bylaw to align with the new Official Plan
Development ProjectsProposals bull Balsillie School of International Affairs complete Phase I
initiate Phase ii
bull BarrelYards implementation
bull RIM East Campus additional phases
bull NCR Master Plan
bull Core Re-urbanization Projects
bull West Side Employment Lands
bull Implementation of West Side Plans of Subdivision
bull OMB Hearings
bull 144 Park St Phase II
committees and customer service bull Continue to provide high quality and timely customer service related to zoning development and committee inquiries
bull New Sign Bylaw implementation
bull AMANDA link to site plan
DEVELOPMENT SERVICES DEPARTMENT
engineeRing And consTRucTion division ouR goAL The Engineering and Construction divisionrsquos goal is to work co-operatively with the development industry consultants and the public to promote the construction of new high-quality infrastructure (roads watermains sewers stormwater management)
ouR AchieveMenTs bull Implementing a major Continuous Improvement (CI) project for Site Plan Control
ouR Future goALs incLude bull Implementation of new major subdivision developments (West Side Lands Carriage CrossingWoolwich Estates)
bull Complete policy review for enhanced service delivery and improved efficiencies and incorporate into regular updates of the development Manual
bull Implement enhanced electronic tracking of development approvals leveraging existing technologies within the department using the AMAndA system
bull Initiate review of records management needs and implement necessary changes in conjunction with corporate initiatives
bull Participate in the identification of service capacity issues to identify infrastructure needs for the capital budget
bull Continue to adapt skill sets and core competencies to the ldquonewrdquo development reality in Waterloo which is focused on urban intensification and infill projects
bull Provide engineering review and inspection services for new major site plans in the uptown and other locations
FINANCE DEPARTMENT The Finance department supports the organization by assisting Council and the Corporate Management Team in the development of financial policies and strategic goals The department also advises and assists city departments in the timely and effective provision of accounting budgeting purchasing and revenue services
ouR Mission The Finance department is committed to excellence in providing sound financial management and consultative services Support and enhance operational effectiveness and efficiency
ouR goAL To provide reliable sound short- medium- and long-term financial strategies to ensure the long-term sustainable financial viability of the corporation
ouR chALLenges Declining assessment growth and multiple demands on scarce financial resources
FINANCE DEPARTMENT
AccounTing division ouR goAL To provide efficient reporting while safeguarding the assets of the corporation and providing financial information to Council CMT other departments and the community
ouR AchieveMenTs bull Initialization of new procedures and requirements for the reporting of TCA requirement
bull Upgrade of Peoplesoft Payroll Management System
bull Increased payment through electronic channels
ouR Future goALs incLude Further enhancement of Reporting bull Annual Report (2013) bull Ongoing development of Financial Reporting System (2012) bull Finance upgrade (2014) bull Portal type delivery of financial information
Increased Utilization of PeopleSoft Payroll Management System bull Security (2012-2014) bull Manager view of leave banks (2012-2014) bull Staff Association time entry (2012-2014) bull Work flow (2013) bull Electronic fund transfer payments for vendors (2012-2013) bull Epay (2012)
implementation of Recommendations from continuous improvement bull Payroll time cards bull Account Payable entry
FINANCE DEPARTMENT
budgeTs amp FinAnciAL PLAnningdivision ouR goAL To fulfill fiduciary and statutory requirements and provide reliable financial strategies to ensure the financial viability of the corporation while maintaining effective stewardship of financial resources
ouR AchieveMenTs bull Refined the 3-year budget process
bull Reserve and Reserve Fund Policy review
bull Rolled out budget software to web-based version
FINANCE DEPARTMENT
Revenue division ouR goAL Develop and implement an effective system of recording and collecting amounts due to the City using a corporate approach across multiple subsystems
ouR AchieveMenT bull Department is handling approximately 3000 incoming calls per month water amp sewer billing accounted for a 3-fold increase in the number of incoming calls
ouR Future goALs incLude bull Development Charge Bylaw update
bull Financial Control Bylaw
bull Implement PSAB (Public Sector Accounting Board) requirements for budgeting
bull Develop long term financial plan
bull Continue to develop dynamic financial planning policies to adapt to an environment of constantly shifting priorities
bull Review Investment Strategy and review potential for institutional pricing
bull Collecting amounts due to the City using a corporate approach across multiple subsystems
bull Continue to stress customer service excellence including multiple sites payment stations and promoting electronic payment options
bull Ongoing implementation of POS at selected City sites
bull Develop the Cityrsquos internal controls for cash handling
bull Recommend policy on the use of special services levies
bull Developing a Payment Card Industry Data Security Standard (PCIDSS) compliance plan
bull Reduce and rationalize the number of water billing sections
FINANCE DEPARTMENT
PuRchAsing division ouR goAL The goal of the Purchasing division is to follow the Cityrsquos Purchasing Bylaw and provincial and federal government law to acquire the best total cost for the products and services required by the City of Waterloo as well as providing a fair open and transparent purchasing process for the supply base
ouR AchieveMenTs bull Additional expansion of using procurement cards has reduced staff time spent on issuing purchase orders
bull Issuing of cheques through Accounts Payable has been reduced through the implementation of the procurement card program
bull Using e-commerce platforms reduces the time required to input data for the purchasing receipt and payment of invoices
bull Involvement with the provincial contracts (vendor of records) has reduced the cost of the services supplied (courier and cellular devices)
bull Involvement in co-operative and provincial contracts has increased purchasing efficiencies
ouR Future goALs incLude bull Computerization and bar coding of stockroom items
bull Implement the recommendations listed in the Purchasing Review Report
bull Work with the Environmental Strategy Implementation Steering committee to further enhance green procurement and a sustainable Waterloo
bull Review implement most cost effective municipal and provincial contracts for items such as telecommunications and courier services
bull Investigate the possibility of a third-party agency to host our bid opportunities
bull Establish a more centralized purchasing function at the city of Waterloo
bull Review and implement new cash discounts for the supply base to the city of Waterloo
HUMAN RESOURCES DEPARTMENT VOLUNTEER SERVICES The provision of Human Resources and Volunteer Services includes recruitment and selection labour and employee relations compensation and benefits sick and disability management training collective bargaining health and safety and organizational design
ouR Mission Engaged competent employees and volunteers are successful in accomplishing strategic and business plans within a vibrant corporate culture at the City of Waterloo
ouR goAL Human Resources and Volunteer Services departmentrsquos programs and services comply with regulatory and legislative requirements and align with the Cityrsquos values to enable staff to accomplish strategic and business plans
ouR chALLenges Build sufficient HR specialist expertise within a generalist model to support service excellence free-up HR capacity through operational efficiencies to enable project work and program design in key areas and training initiatives trends indicating decline of volunteerism requires innovative approaches
HUMAN RESOURCES DEPARTMENT voLunTeeR seRvices
ouR AchieveMenTs bull Completion of a market review of insurance carriers to ensure the cost competitiveness of our employee group benefit plan rates
bull Continued implementation of violence in the workplace programs with respectful workplace training and risk assessment surveys
bull Conducted an employee engagement survey to measure employee engagement in important aspects of work activities relationships and working conditions
bull Research and preparation of negotiations plans for Staff Association CUPE and WPFFA collective agreements
bull Use of technology to create efficiencies using online automated recruitment screening for high volume recruits and enhanced use of PeopleSoft functionality for management information reporting
bull Implementation of volunteer software system to enhance volunteer recruitment and placements
ouR Future goALs incLude Utilize information system data to measure efficiencies and effectiveness of hR and volunteer process improvement and practices
bull Develop a performance appraisal tool to measure competencies and accountabilities
bull Develop a corporate staff recognition program with individual and group components
bull Provide coaching project management and volunteer training and leadership development programming
bull Continue to enhance workplace health and safety with Respectful Workplace initiatives and implementation of Corporate Health and safety Audit recommendations
bull Bargain new agreements for labour groups and Staff Association
bull Implement job evaluation maintenance program
bull Develop corporate and department plans to address issues in the employee engagement survey to enhance employee engagement
bull Continue to implement the Volunteer Engagement Strategy
PROTECTIVE SERVICES DEPARTMENT Protective Services is responsible for the delivery of services by Fire Rescue Bylaw EnforcementProperty Standards and Community Relations
ouR Mission A team of dedicated and professional staff committed to enhancing the safety and quality of life of our community through education inspection enforcement community relations and emergency response
ouR goAL To provide quality service valued by staff and the community in delivery of education inspection enforcement community relations and emergency response
ouR chALLenges Developmentbuilding construction intensification city-wide Light Rail Transit (LRT) green building construction increased population of the city including long-term and temporary residents ongoing need for improved technology to augment existing resources increased student enrollment communication to students living off-campus
PROTECTIVE SERVICES DEPARTMENT
WATeRLoo FiRe Rescue division ouR goAL Waterloo Fire Rescue will continue to grow in response to community needs and expectations to provide the highest standard of service
ouR AchieveMenTs bull Completion of Station 4
bull Activity Tracking Program
bull Enhanced response times on the Cityrsquos east side
bull Measures used to optimize service delivery
ouR Future goALs incLude bull Deliver a fiscally responsible and sustainable service delivery model
bull Reviseupdate simplified risk assessment (3-year cycle)
bull Reviseupdate Fire Master Plan (5-year cycle)
bull Leverage technology to enhance overall effectiveness and efficiency
bull Collaborate with local business and the community to promote fire safety
bull Collaborate with post-secondary institutions to mitigate fire safety priorities
bull Reviseupdate Emergency Management Plan
bull Reviseupdate fire inspection service delivery model
bull Enhance tactical pre-planning
bull Enhance training programs
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
ouR Future goALs incLude bull Implementation of the new Official Plan
bull New zoning bylaw to align with the new Official Plan
Development ProjectsProposals bull Balsillie School of International Affairs complete Phase I
initiate Phase ii
bull BarrelYards implementation
bull RIM East Campus additional phases
bull NCR Master Plan
bull Core Re-urbanization Projects
bull West Side Employment Lands
bull Implementation of West Side Plans of Subdivision
bull OMB Hearings
bull 144 Park St Phase II
committees and customer service bull Continue to provide high quality and timely customer service related to zoning development and committee inquiries
bull New Sign Bylaw implementation
bull AMANDA link to site plan
DEVELOPMENT SERVICES DEPARTMENT
engineeRing And consTRucTion division ouR goAL The Engineering and Construction divisionrsquos goal is to work co-operatively with the development industry consultants and the public to promote the construction of new high-quality infrastructure (roads watermains sewers stormwater management)
ouR AchieveMenTs bull Implementing a major Continuous Improvement (CI) project for Site Plan Control
ouR Future goALs incLude bull Implementation of new major subdivision developments (West Side Lands Carriage CrossingWoolwich Estates)
bull Complete policy review for enhanced service delivery and improved efficiencies and incorporate into regular updates of the development Manual
bull Implement enhanced electronic tracking of development approvals leveraging existing technologies within the department using the AMAndA system
bull Initiate review of records management needs and implement necessary changes in conjunction with corporate initiatives
bull Participate in the identification of service capacity issues to identify infrastructure needs for the capital budget
bull Continue to adapt skill sets and core competencies to the ldquonewrdquo development reality in Waterloo which is focused on urban intensification and infill projects
bull Provide engineering review and inspection services for new major site plans in the uptown and other locations
FINANCE DEPARTMENT The Finance department supports the organization by assisting Council and the Corporate Management Team in the development of financial policies and strategic goals The department also advises and assists city departments in the timely and effective provision of accounting budgeting purchasing and revenue services
ouR Mission The Finance department is committed to excellence in providing sound financial management and consultative services Support and enhance operational effectiveness and efficiency
ouR goAL To provide reliable sound short- medium- and long-term financial strategies to ensure the long-term sustainable financial viability of the corporation
ouR chALLenges Declining assessment growth and multiple demands on scarce financial resources
FINANCE DEPARTMENT
AccounTing division ouR goAL To provide efficient reporting while safeguarding the assets of the corporation and providing financial information to Council CMT other departments and the community
ouR AchieveMenTs bull Initialization of new procedures and requirements for the reporting of TCA requirement
bull Upgrade of Peoplesoft Payroll Management System
bull Increased payment through electronic channels
ouR Future goALs incLude Further enhancement of Reporting bull Annual Report (2013) bull Ongoing development of Financial Reporting System (2012) bull Finance upgrade (2014) bull Portal type delivery of financial information
Increased Utilization of PeopleSoft Payroll Management System bull Security (2012-2014) bull Manager view of leave banks (2012-2014) bull Staff Association time entry (2012-2014) bull Work flow (2013) bull Electronic fund transfer payments for vendors (2012-2013) bull Epay (2012)
implementation of Recommendations from continuous improvement bull Payroll time cards bull Account Payable entry
FINANCE DEPARTMENT
budgeTs amp FinAnciAL PLAnningdivision ouR goAL To fulfill fiduciary and statutory requirements and provide reliable financial strategies to ensure the financial viability of the corporation while maintaining effective stewardship of financial resources
ouR AchieveMenTs bull Refined the 3-year budget process
bull Reserve and Reserve Fund Policy review
bull Rolled out budget software to web-based version
FINANCE DEPARTMENT
Revenue division ouR goAL Develop and implement an effective system of recording and collecting amounts due to the City using a corporate approach across multiple subsystems
ouR AchieveMenT bull Department is handling approximately 3000 incoming calls per month water amp sewer billing accounted for a 3-fold increase in the number of incoming calls
ouR Future goALs incLude bull Development Charge Bylaw update
bull Financial Control Bylaw
bull Implement PSAB (Public Sector Accounting Board) requirements for budgeting
bull Develop long term financial plan
bull Continue to develop dynamic financial planning policies to adapt to an environment of constantly shifting priorities
bull Review Investment Strategy and review potential for institutional pricing
bull Collecting amounts due to the City using a corporate approach across multiple subsystems
bull Continue to stress customer service excellence including multiple sites payment stations and promoting electronic payment options
bull Ongoing implementation of POS at selected City sites
bull Develop the Cityrsquos internal controls for cash handling
bull Recommend policy on the use of special services levies
bull Developing a Payment Card Industry Data Security Standard (PCIDSS) compliance plan
bull Reduce and rationalize the number of water billing sections
FINANCE DEPARTMENT
PuRchAsing division ouR goAL The goal of the Purchasing division is to follow the Cityrsquos Purchasing Bylaw and provincial and federal government law to acquire the best total cost for the products and services required by the City of Waterloo as well as providing a fair open and transparent purchasing process for the supply base
ouR AchieveMenTs bull Additional expansion of using procurement cards has reduced staff time spent on issuing purchase orders
bull Issuing of cheques through Accounts Payable has been reduced through the implementation of the procurement card program
bull Using e-commerce platforms reduces the time required to input data for the purchasing receipt and payment of invoices
bull Involvement with the provincial contracts (vendor of records) has reduced the cost of the services supplied (courier and cellular devices)
bull Involvement in co-operative and provincial contracts has increased purchasing efficiencies
ouR Future goALs incLude bull Computerization and bar coding of stockroom items
bull Implement the recommendations listed in the Purchasing Review Report
bull Work with the Environmental Strategy Implementation Steering committee to further enhance green procurement and a sustainable Waterloo
bull Review implement most cost effective municipal and provincial contracts for items such as telecommunications and courier services
bull Investigate the possibility of a third-party agency to host our bid opportunities
bull Establish a more centralized purchasing function at the city of Waterloo
bull Review and implement new cash discounts for the supply base to the city of Waterloo
HUMAN RESOURCES DEPARTMENT VOLUNTEER SERVICES The provision of Human Resources and Volunteer Services includes recruitment and selection labour and employee relations compensation and benefits sick and disability management training collective bargaining health and safety and organizational design
ouR Mission Engaged competent employees and volunteers are successful in accomplishing strategic and business plans within a vibrant corporate culture at the City of Waterloo
ouR goAL Human Resources and Volunteer Services departmentrsquos programs and services comply with regulatory and legislative requirements and align with the Cityrsquos values to enable staff to accomplish strategic and business plans
ouR chALLenges Build sufficient HR specialist expertise within a generalist model to support service excellence free-up HR capacity through operational efficiencies to enable project work and program design in key areas and training initiatives trends indicating decline of volunteerism requires innovative approaches
HUMAN RESOURCES DEPARTMENT voLunTeeR seRvices
ouR AchieveMenTs bull Completion of a market review of insurance carriers to ensure the cost competitiveness of our employee group benefit plan rates
bull Continued implementation of violence in the workplace programs with respectful workplace training and risk assessment surveys
bull Conducted an employee engagement survey to measure employee engagement in important aspects of work activities relationships and working conditions
bull Research and preparation of negotiations plans for Staff Association CUPE and WPFFA collective agreements
bull Use of technology to create efficiencies using online automated recruitment screening for high volume recruits and enhanced use of PeopleSoft functionality for management information reporting
bull Implementation of volunteer software system to enhance volunteer recruitment and placements
ouR Future goALs incLude Utilize information system data to measure efficiencies and effectiveness of hR and volunteer process improvement and practices
bull Develop a performance appraisal tool to measure competencies and accountabilities
bull Develop a corporate staff recognition program with individual and group components
bull Provide coaching project management and volunteer training and leadership development programming
bull Continue to enhance workplace health and safety with Respectful Workplace initiatives and implementation of Corporate Health and safety Audit recommendations
bull Bargain new agreements for labour groups and Staff Association
bull Implement job evaluation maintenance program
bull Develop corporate and department plans to address issues in the employee engagement survey to enhance employee engagement
bull Continue to implement the Volunteer Engagement Strategy
PROTECTIVE SERVICES DEPARTMENT Protective Services is responsible for the delivery of services by Fire Rescue Bylaw EnforcementProperty Standards and Community Relations
ouR Mission A team of dedicated and professional staff committed to enhancing the safety and quality of life of our community through education inspection enforcement community relations and emergency response
ouR goAL To provide quality service valued by staff and the community in delivery of education inspection enforcement community relations and emergency response
ouR chALLenges Developmentbuilding construction intensification city-wide Light Rail Transit (LRT) green building construction increased population of the city including long-term and temporary residents ongoing need for improved technology to augment existing resources increased student enrollment communication to students living off-campus
PROTECTIVE SERVICES DEPARTMENT
WATeRLoo FiRe Rescue division ouR goAL Waterloo Fire Rescue will continue to grow in response to community needs and expectations to provide the highest standard of service
ouR AchieveMenTs bull Completion of Station 4
bull Activity Tracking Program
bull Enhanced response times on the Cityrsquos east side
bull Measures used to optimize service delivery
ouR Future goALs incLude bull Deliver a fiscally responsible and sustainable service delivery model
bull Reviseupdate simplified risk assessment (3-year cycle)
bull Reviseupdate Fire Master Plan (5-year cycle)
bull Leverage technology to enhance overall effectiveness and efficiency
bull Collaborate with local business and the community to promote fire safety
bull Collaborate with post-secondary institutions to mitigate fire safety priorities
bull Reviseupdate Emergency Management Plan
bull Reviseupdate fire inspection service delivery model
bull Enhance tactical pre-planning
bull Enhance training programs
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
DEVELOPMENT SERVICES DEPARTMENT
engineeRing And consTRucTion division ouR goAL The Engineering and Construction divisionrsquos goal is to work co-operatively with the development industry consultants and the public to promote the construction of new high-quality infrastructure (roads watermains sewers stormwater management)
ouR AchieveMenTs bull Implementing a major Continuous Improvement (CI) project for Site Plan Control
ouR Future goALs incLude bull Implementation of new major subdivision developments (West Side Lands Carriage CrossingWoolwich Estates)
bull Complete policy review for enhanced service delivery and improved efficiencies and incorporate into regular updates of the development Manual
bull Implement enhanced electronic tracking of development approvals leveraging existing technologies within the department using the AMAndA system
bull Initiate review of records management needs and implement necessary changes in conjunction with corporate initiatives
bull Participate in the identification of service capacity issues to identify infrastructure needs for the capital budget
bull Continue to adapt skill sets and core competencies to the ldquonewrdquo development reality in Waterloo which is focused on urban intensification and infill projects
bull Provide engineering review and inspection services for new major site plans in the uptown and other locations
FINANCE DEPARTMENT The Finance department supports the organization by assisting Council and the Corporate Management Team in the development of financial policies and strategic goals The department also advises and assists city departments in the timely and effective provision of accounting budgeting purchasing and revenue services
ouR Mission The Finance department is committed to excellence in providing sound financial management and consultative services Support and enhance operational effectiveness and efficiency
ouR goAL To provide reliable sound short- medium- and long-term financial strategies to ensure the long-term sustainable financial viability of the corporation
ouR chALLenges Declining assessment growth and multiple demands on scarce financial resources
FINANCE DEPARTMENT
AccounTing division ouR goAL To provide efficient reporting while safeguarding the assets of the corporation and providing financial information to Council CMT other departments and the community
ouR AchieveMenTs bull Initialization of new procedures and requirements for the reporting of TCA requirement
bull Upgrade of Peoplesoft Payroll Management System
bull Increased payment through electronic channels
ouR Future goALs incLude Further enhancement of Reporting bull Annual Report (2013) bull Ongoing development of Financial Reporting System (2012) bull Finance upgrade (2014) bull Portal type delivery of financial information
Increased Utilization of PeopleSoft Payroll Management System bull Security (2012-2014) bull Manager view of leave banks (2012-2014) bull Staff Association time entry (2012-2014) bull Work flow (2013) bull Electronic fund transfer payments for vendors (2012-2013) bull Epay (2012)
implementation of Recommendations from continuous improvement bull Payroll time cards bull Account Payable entry
FINANCE DEPARTMENT
budgeTs amp FinAnciAL PLAnningdivision ouR goAL To fulfill fiduciary and statutory requirements and provide reliable financial strategies to ensure the financial viability of the corporation while maintaining effective stewardship of financial resources
ouR AchieveMenTs bull Refined the 3-year budget process
bull Reserve and Reserve Fund Policy review
bull Rolled out budget software to web-based version
FINANCE DEPARTMENT
Revenue division ouR goAL Develop and implement an effective system of recording and collecting amounts due to the City using a corporate approach across multiple subsystems
ouR AchieveMenT bull Department is handling approximately 3000 incoming calls per month water amp sewer billing accounted for a 3-fold increase in the number of incoming calls
ouR Future goALs incLude bull Development Charge Bylaw update
bull Financial Control Bylaw
bull Implement PSAB (Public Sector Accounting Board) requirements for budgeting
bull Develop long term financial plan
bull Continue to develop dynamic financial planning policies to adapt to an environment of constantly shifting priorities
bull Review Investment Strategy and review potential for institutional pricing
bull Collecting amounts due to the City using a corporate approach across multiple subsystems
bull Continue to stress customer service excellence including multiple sites payment stations and promoting electronic payment options
bull Ongoing implementation of POS at selected City sites
bull Develop the Cityrsquos internal controls for cash handling
bull Recommend policy on the use of special services levies
bull Developing a Payment Card Industry Data Security Standard (PCIDSS) compliance plan
bull Reduce and rationalize the number of water billing sections
FINANCE DEPARTMENT
PuRchAsing division ouR goAL The goal of the Purchasing division is to follow the Cityrsquos Purchasing Bylaw and provincial and federal government law to acquire the best total cost for the products and services required by the City of Waterloo as well as providing a fair open and transparent purchasing process for the supply base
ouR AchieveMenTs bull Additional expansion of using procurement cards has reduced staff time spent on issuing purchase orders
bull Issuing of cheques through Accounts Payable has been reduced through the implementation of the procurement card program
bull Using e-commerce platforms reduces the time required to input data for the purchasing receipt and payment of invoices
bull Involvement with the provincial contracts (vendor of records) has reduced the cost of the services supplied (courier and cellular devices)
bull Involvement in co-operative and provincial contracts has increased purchasing efficiencies
ouR Future goALs incLude bull Computerization and bar coding of stockroom items
bull Implement the recommendations listed in the Purchasing Review Report
bull Work with the Environmental Strategy Implementation Steering committee to further enhance green procurement and a sustainable Waterloo
bull Review implement most cost effective municipal and provincial contracts for items such as telecommunications and courier services
bull Investigate the possibility of a third-party agency to host our bid opportunities
bull Establish a more centralized purchasing function at the city of Waterloo
bull Review and implement new cash discounts for the supply base to the city of Waterloo
HUMAN RESOURCES DEPARTMENT VOLUNTEER SERVICES The provision of Human Resources and Volunteer Services includes recruitment and selection labour and employee relations compensation and benefits sick and disability management training collective bargaining health and safety and organizational design
ouR Mission Engaged competent employees and volunteers are successful in accomplishing strategic and business plans within a vibrant corporate culture at the City of Waterloo
ouR goAL Human Resources and Volunteer Services departmentrsquos programs and services comply with regulatory and legislative requirements and align with the Cityrsquos values to enable staff to accomplish strategic and business plans
ouR chALLenges Build sufficient HR specialist expertise within a generalist model to support service excellence free-up HR capacity through operational efficiencies to enable project work and program design in key areas and training initiatives trends indicating decline of volunteerism requires innovative approaches
HUMAN RESOURCES DEPARTMENT voLunTeeR seRvices
ouR AchieveMenTs bull Completion of a market review of insurance carriers to ensure the cost competitiveness of our employee group benefit plan rates
bull Continued implementation of violence in the workplace programs with respectful workplace training and risk assessment surveys
bull Conducted an employee engagement survey to measure employee engagement in important aspects of work activities relationships and working conditions
bull Research and preparation of negotiations plans for Staff Association CUPE and WPFFA collective agreements
bull Use of technology to create efficiencies using online automated recruitment screening for high volume recruits and enhanced use of PeopleSoft functionality for management information reporting
bull Implementation of volunteer software system to enhance volunteer recruitment and placements
ouR Future goALs incLude Utilize information system data to measure efficiencies and effectiveness of hR and volunteer process improvement and practices
bull Develop a performance appraisal tool to measure competencies and accountabilities
bull Develop a corporate staff recognition program with individual and group components
bull Provide coaching project management and volunteer training and leadership development programming
bull Continue to enhance workplace health and safety with Respectful Workplace initiatives and implementation of Corporate Health and safety Audit recommendations
bull Bargain new agreements for labour groups and Staff Association
bull Implement job evaluation maintenance program
bull Develop corporate and department plans to address issues in the employee engagement survey to enhance employee engagement
bull Continue to implement the Volunteer Engagement Strategy
PROTECTIVE SERVICES DEPARTMENT Protective Services is responsible for the delivery of services by Fire Rescue Bylaw EnforcementProperty Standards and Community Relations
ouR Mission A team of dedicated and professional staff committed to enhancing the safety and quality of life of our community through education inspection enforcement community relations and emergency response
ouR goAL To provide quality service valued by staff and the community in delivery of education inspection enforcement community relations and emergency response
ouR chALLenges Developmentbuilding construction intensification city-wide Light Rail Transit (LRT) green building construction increased population of the city including long-term and temporary residents ongoing need for improved technology to augment existing resources increased student enrollment communication to students living off-campus
PROTECTIVE SERVICES DEPARTMENT
WATeRLoo FiRe Rescue division ouR goAL Waterloo Fire Rescue will continue to grow in response to community needs and expectations to provide the highest standard of service
ouR AchieveMenTs bull Completion of Station 4
bull Activity Tracking Program
bull Enhanced response times on the Cityrsquos east side
bull Measures used to optimize service delivery
ouR Future goALs incLude bull Deliver a fiscally responsible and sustainable service delivery model
bull Reviseupdate simplified risk assessment (3-year cycle)
bull Reviseupdate Fire Master Plan (5-year cycle)
bull Leverage technology to enhance overall effectiveness and efficiency
bull Collaborate with local business and the community to promote fire safety
bull Collaborate with post-secondary institutions to mitigate fire safety priorities
bull Reviseupdate Emergency Management Plan
bull Reviseupdate fire inspection service delivery model
bull Enhance tactical pre-planning
bull Enhance training programs
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
ouR Future goALs incLude bull Implementation of new major subdivision developments (West Side Lands Carriage CrossingWoolwich Estates)
bull Complete policy review for enhanced service delivery and improved efficiencies and incorporate into regular updates of the development Manual
bull Implement enhanced electronic tracking of development approvals leveraging existing technologies within the department using the AMAndA system
bull Initiate review of records management needs and implement necessary changes in conjunction with corporate initiatives
bull Participate in the identification of service capacity issues to identify infrastructure needs for the capital budget
bull Continue to adapt skill sets and core competencies to the ldquonewrdquo development reality in Waterloo which is focused on urban intensification and infill projects
bull Provide engineering review and inspection services for new major site plans in the uptown and other locations
FINANCE DEPARTMENT The Finance department supports the organization by assisting Council and the Corporate Management Team in the development of financial policies and strategic goals The department also advises and assists city departments in the timely and effective provision of accounting budgeting purchasing and revenue services
ouR Mission The Finance department is committed to excellence in providing sound financial management and consultative services Support and enhance operational effectiveness and efficiency
ouR goAL To provide reliable sound short- medium- and long-term financial strategies to ensure the long-term sustainable financial viability of the corporation
ouR chALLenges Declining assessment growth and multiple demands on scarce financial resources
FINANCE DEPARTMENT
AccounTing division ouR goAL To provide efficient reporting while safeguarding the assets of the corporation and providing financial information to Council CMT other departments and the community
ouR AchieveMenTs bull Initialization of new procedures and requirements for the reporting of TCA requirement
bull Upgrade of Peoplesoft Payroll Management System
bull Increased payment through electronic channels
ouR Future goALs incLude Further enhancement of Reporting bull Annual Report (2013) bull Ongoing development of Financial Reporting System (2012) bull Finance upgrade (2014) bull Portal type delivery of financial information
Increased Utilization of PeopleSoft Payroll Management System bull Security (2012-2014) bull Manager view of leave banks (2012-2014) bull Staff Association time entry (2012-2014) bull Work flow (2013) bull Electronic fund transfer payments for vendors (2012-2013) bull Epay (2012)
implementation of Recommendations from continuous improvement bull Payroll time cards bull Account Payable entry
FINANCE DEPARTMENT
budgeTs amp FinAnciAL PLAnningdivision ouR goAL To fulfill fiduciary and statutory requirements and provide reliable financial strategies to ensure the financial viability of the corporation while maintaining effective stewardship of financial resources
ouR AchieveMenTs bull Refined the 3-year budget process
bull Reserve and Reserve Fund Policy review
bull Rolled out budget software to web-based version
FINANCE DEPARTMENT
Revenue division ouR goAL Develop and implement an effective system of recording and collecting amounts due to the City using a corporate approach across multiple subsystems
ouR AchieveMenT bull Department is handling approximately 3000 incoming calls per month water amp sewer billing accounted for a 3-fold increase in the number of incoming calls
ouR Future goALs incLude bull Development Charge Bylaw update
bull Financial Control Bylaw
bull Implement PSAB (Public Sector Accounting Board) requirements for budgeting
bull Develop long term financial plan
bull Continue to develop dynamic financial planning policies to adapt to an environment of constantly shifting priorities
bull Review Investment Strategy and review potential for institutional pricing
bull Collecting amounts due to the City using a corporate approach across multiple subsystems
bull Continue to stress customer service excellence including multiple sites payment stations and promoting electronic payment options
bull Ongoing implementation of POS at selected City sites
bull Develop the Cityrsquos internal controls for cash handling
bull Recommend policy on the use of special services levies
bull Developing a Payment Card Industry Data Security Standard (PCIDSS) compliance plan
bull Reduce and rationalize the number of water billing sections
FINANCE DEPARTMENT
PuRchAsing division ouR goAL The goal of the Purchasing division is to follow the Cityrsquos Purchasing Bylaw and provincial and federal government law to acquire the best total cost for the products and services required by the City of Waterloo as well as providing a fair open and transparent purchasing process for the supply base
ouR AchieveMenTs bull Additional expansion of using procurement cards has reduced staff time spent on issuing purchase orders
bull Issuing of cheques through Accounts Payable has been reduced through the implementation of the procurement card program
bull Using e-commerce platforms reduces the time required to input data for the purchasing receipt and payment of invoices
bull Involvement with the provincial contracts (vendor of records) has reduced the cost of the services supplied (courier and cellular devices)
bull Involvement in co-operative and provincial contracts has increased purchasing efficiencies
ouR Future goALs incLude bull Computerization and bar coding of stockroom items
bull Implement the recommendations listed in the Purchasing Review Report
bull Work with the Environmental Strategy Implementation Steering committee to further enhance green procurement and a sustainable Waterloo
bull Review implement most cost effective municipal and provincial contracts for items such as telecommunications and courier services
bull Investigate the possibility of a third-party agency to host our bid opportunities
bull Establish a more centralized purchasing function at the city of Waterloo
bull Review and implement new cash discounts for the supply base to the city of Waterloo
HUMAN RESOURCES DEPARTMENT VOLUNTEER SERVICES The provision of Human Resources and Volunteer Services includes recruitment and selection labour and employee relations compensation and benefits sick and disability management training collective bargaining health and safety and organizational design
ouR Mission Engaged competent employees and volunteers are successful in accomplishing strategic and business plans within a vibrant corporate culture at the City of Waterloo
ouR goAL Human Resources and Volunteer Services departmentrsquos programs and services comply with regulatory and legislative requirements and align with the Cityrsquos values to enable staff to accomplish strategic and business plans
ouR chALLenges Build sufficient HR specialist expertise within a generalist model to support service excellence free-up HR capacity through operational efficiencies to enable project work and program design in key areas and training initiatives trends indicating decline of volunteerism requires innovative approaches
HUMAN RESOURCES DEPARTMENT voLunTeeR seRvices
ouR AchieveMenTs bull Completion of a market review of insurance carriers to ensure the cost competitiveness of our employee group benefit plan rates
bull Continued implementation of violence in the workplace programs with respectful workplace training and risk assessment surveys
bull Conducted an employee engagement survey to measure employee engagement in important aspects of work activities relationships and working conditions
bull Research and preparation of negotiations plans for Staff Association CUPE and WPFFA collective agreements
bull Use of technology to create efficiencies using online automated recruitment screening for high volume recruits and enhanced use of PeopleSoft functionality for management information reporting
bull Implementation of volunteer software system to enhance volunteer recruitment and placements
ouR Future goALs incLude Utilize information system data to measure efficiencies and effectiveness of hR and volunteer process improvement and practices
bull Develop a performance appraisal tool to measure competencies and accountabilities
bull Develop a corporate staff recognition program with individual and group components
bull Provide coaching project management and volunteer training and leadership development programming
bull Continue to enhance workplace health and safety with Respectful Workplace initiatives and implementation of Corporate Health and safety Audit recommendations
bull Bargain new agreements for labour groups and Staff Association
bull Implement job evaluation maintenance program
bull Develop corporate and department plans to address issues in the employee engagement survey to enhance employee engagement
bull Continue to implement the Volunteer Engagement Strategy
PROTECTIVE SERVICES DEPARTMENT Protective Services is responsible for the delivery of services by Fire Rescue Bylaw EnforcementProperty Standards and Community Relations
ouR Mission A team of dedicated and professional staff committed to enhancing the safety and quality of life of our community through education inspection enforcement community relations and emergency response
ouR goAL To provide quality service valued by staff and the community in delivery of education inspection enforcement community relations and emergency response
ouR chALLenges Developmentbuilding construction intensification city-wide Light Rail Transit (LRT) green building construction increased population of the city including long-term and temporary residents ongoing need for improved technology to augment existing resources increased student enrollment communication to students living off-campus
PROTECTIVE SERVICES DEPARTMENT
WATeRLoo FiRe Rescue division ouR goAL Waterloo Fire Rescue will continue to grow in response to community needs and expectations to provide the highest standard of service
ouR AchieveMenTs bull Completion of Station 4
bull Activity Tracking Program
bull Enhanced response times on the Cityrsquos east side
bull Measures used to optimize service delivery
ouR Future goALs incLude bull Deliver a fiscally responsible and sustainable service delivery model
bull Reviseupdate simplified risk assessment (3-year cycle)
bull Reviseupdate Fire Master Plan (5-year cycle)
bull Leverage technology to enhance overall effectiveness and efficiency
bull Collaborate with local business and the community to promote fire safety
bull Collaborate with post-secondary institutions to mitigate fire safety priorities
bull Reviseupdate Emergency Management Plan
bull Reviseupdate fire inspection service delivery model
bull Enhance tactical pre-planning
bull Enhance training programs
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
FINANCE DEPARTMENT The Finance department supports the organization by assisting Council and the Corporate Management Team in the development of financial policies and strategic goals The department also advises and assists city departments in the timely and effective provision of accounting budgeting purchasing and revenue services
ouR Mission The Finance department is committed to excellence in providing sound financial management and consultative services Support and enhance operational effectiveness and efficiency
ouR goAL To provide reliable sound short- medium- and long-term financial strategies to ensure the long-term sustainable financial viability of the corporation
ouR chALLenges Declining assessment growth and multiple demands on scarce financial resources
FINANCE DEPARTMENT
AccounTing division ouR goAL To provide efficient reporting while safeguarding the assets of the corporation and providing financial information to Council CMT other departments and the community
ouR AchieveMenTs bull Initialization of new procedures and requirements for the reporting of TCA requirement
bull Upgrade of Peoplesoft Payroll Management System
bull Increased payment through electronic channels
ouR Future goALs incLude Further enhancement of Reporting bull Annual Report (2013) bull Ongoing development of Financial Reporting System (2012) bull Finance upgrade (2014) bull Portal type delivery of financial information
Increased Utilization of PeopleSoft Payroll Management System bull Security (2012-2014) bull Manager view of leave banks (2012-2014) bull Staff Association time entry (2012-2014) bull Work flow (2013) bull Electronic fund transfer payments for vendors (2012-2013) bull Epay (2012)
implementation of Recommendations from continuous improvement bull Payroll time cards bull Account Payable entry
FINANCE DEPARTMENT
budgeTs amp FinAnciAL PLAnningdivision ouR goAL To fulfill fiduciary and statutory requirements and provide reliable financial strategies to ensure the financial viability of the corporation while maintaining effective stewardship of financial resources
ouR AchieveMenTs bull Refined the 3-year budget process
bull Reserve and Reserve Fund Policy review
bull Rolled out budget software to web-based version
FINANCE DEPARTMENT
Revenue division ouR goAL Develop and implement an effective system of recording and collecting amounts due to the City using a corporate approach across multiple subsystems
ouR AchieveMenT bull Department is handling approximately 3000 incoming calls per month water amp sewer billing accounted for a 3-fold increase in the number of incoming calls
ouR Future goALs incLude bull Development Charge Bylaw update
bull Financial Control Bylaw
bull Implement PSAB (Public Sector Accounting Board) requirements for budgeting
bull Develop long term financial plan
bull Continue to develop dynamic financial planning policies to adapt to an environment of constantly shifting priorities
bull Review Investment Strategy and review potential for institutional pricing
bull Collecting amounts due to the City using a corporate approach across multiple subsystems
bull Continue to stress customer service excellence including multiple sites payment stations and promoting electronic payment options
bull Ongoing implementation of POS at selected City sites
bull Develop the Cityrsquos internal controls for cash handling
bull Recommend policy on the use of special services levies
bull Developing a Payment Card Industry Data Security Standard (PCIDSS) compliance plan
bull Reduce and rationalize the number of water billing sections
FINANCE DEPARTMENT
PuRchAsing division ouR goAL The goal of the Purchasing division is to follow the Cityrsquos Purchasing Bylaw and provincial and federal government law to acquire the best total cost for the products and services required by the City of Waterloo as well as providing a fair open and transparent purchasing process for the supply base
ouR AchieveMenTs bull Additional expansion of using procurement cards has reduced staff time spent on issuing purchase orders
bull Issuing of cheques through Accounts Payable has been reduced through the implementation of the procurement card program
bull Using e-commerce platforms reduces the time required to input data for the purchasing receipt and payment of invoices
bull Involvement with the provincial contracts (vendor of records) has reduced the cost of the services supplied (courier and cellular devices)
bull Involvement in co-operative and provincial contracts has increased purchasing efficiencies
ouR Future goALs incLude bull Computerization and bar coding of stockroom items
bull Implement the recommendations listed in the Purchasing Review Report
bull Work with the Environmental Strategy Implementation Steering committee to further enhance green procurement and a sustainable Waterloo
bull Review implement most cost effective municipal and provincial contracts for items such as telecommunications and courier services
bull Investigate the possibility of a third-party agency to host our bid opportunities
bull Establish a more centralized purchasing function at the city of Waterloo
bull Review and implement new cash discounts for the supply base to the city of Waterloo
HUMAN RESOURCES DEPARTMENT VOLUNTEER SERVICES The provision of Human Resources and Volunteer Services includes recruitment and selection labour and employee relations compensation and benefits sick and disability management training collective bargaining health and safety and organizational design
ouR Mission Engaged competent employees and volunteers are successful in accomplishing strategic and business plans within a vibrant corporate culture at the City of Waterloo
ouR goAL Human Resources and Volunteer Services departmentrsquos programs and services comply with regulatory and legislative requirements and align with the Cityrsquos values to enable staff to accomplish strategic and business plans
ouR chALLenges Build sufficient HR specialist expertise within a generalist model to support service excellence free-up HR capacity through operational efficiencies to enable project work and program design in key areas and training initiatives trends indicating decline of volunteerism requires innovative approaches
HUMAN RESOURCES DEPARTMENT voLunTeeR seRvices
ouR AchieveMenTs bull Completion of a market review of insurance carriers to ensure the cost competitiveness of our employee group benefit plan rates
bull Continued implementation of violence in the workplace programs with respectful workplace training and risk assessment surveys
bull Conducted an employee engagement survey to measure employee engagement in important aspects of work activities relationships and working conditions
bull Research and preparation of negotiations plans for Staff Association CUPE and WPFFA collective agreements
bull Use of technology to create efficiencies using online automated recruitment screening for high volume recruits and enhanced use of PeopleSoft functionality for management information reporting
bull Implementation of volunteer software system to enhance volunteer recruitment and placements
ouR Future goALs incLude Utilize information system data to measure efficiencies and effectiveness of hR and volunteer process improvement and practices
bull Develop a performance appraisal tool to measure competencies and accountabilities
bull Develop a corporate staff recognition program with individual and group components
bull Provide coaching project management and volunteer training and leadership development programming
bull Continue to enhance workplace health and safety with Respectful Workplace initiatives and implementation of Corporate Health and safety Audit recommendations
bull Bargain new agreements for labour groups and Staff Association
bull Implement job evaluation maintenance program
bull Develop corporate and department plans to address issues in the employee engagement survey to enhance employee engagement
bull Continue to implement the Volunteer Engagement Strategy
PROTECTIVE SERVICES DEPARTMENT Protective Services is responsible for the delivery of services by Fire Rescue Bylaw EnforcementProperty Standards and Community Relations
ouR Mission A team of dedicated and professional staff committed to enhancing the safety and quality of life of our community through education inspection enforcement community relations and emergency response
ouR goAL To provide quality service valued by staff and the community in delivery of education inspection enforcement community relations and emergency response
ouR chALLenges Developmentbuilding construction intensification city-wide Light Rail Transit (LRT) green building construction increased population of the city including long-term and temporary residents ongoing need for improved technology to augment existing resources increased student enrollment communication to students living off-campus
PROTECTIVE SERVICES DEPARTMENT
WATeRLoo FiRe Rescue division ouR goAL Waterloo Fire Rescue will continue to grow in response to community needs and expectations to provide the highest standard of service
ouR AchieveMenTs bull Completion of Station 4
bull Activity Tracking Program
bull Enhanced response times on the Cityrsquos east side
bull Measures used to optimize service delivery
ouR Future goALs incLude bull Deliver a fiscally responsible and sustainable service delivery model
bull Reviseupdate simplified risk assessment (3-year cycle)
bull Reviseupdate Fire Master Plan (5-year cycle)
bull Leverage technology to enhance overall effectiveness and efficiency
bull Collaborate with local business and the community to promote fire safety
bull Collaborate with post-secondary institutions to mitigate fire safety priorities
bull Reviseupdate Emergency Management Plan
bull Reviseupdate fire inspection service delivery model
bull Enhance tactical pre-planning
bull Enhance training programs
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
FINANCE DEPARTMENT
AccounTing division ouR goAL To provide efficient reporting while safeguarding the assets of the corporation and providing financial information to Council CMT other departments and the community
ouR AchieveMenTs bull Initialization of new procedures and requirements for the reporting of TCA requirement
bull Upgrade of Peoplesoft Payroll Management System
bull Increased payment through electronic channels
ouR Future goALs incLude Further enhancement of Reporting bull Annual Report (2013) bull Ongoing development of Financial Reporting System (2012) bull Finance upgrade (2014) bull Portal type delivery of financial information
Increased Utilization of PeopleSoft Payroll Management System bull Security (2012-2014) bull Manager view of leave banks (2012-2014) bull Staff Association time entry (2012-2014) bull Work flow (2013) bull Electronic fund transfer payments for vendors (2012-2013) bull Epay (2012)
implementation of Recommendations from continuous improvement bull Payroll time cards bull Account Payable entry
FINANCE DEPARTMENT
budgeTs amp FinAnciAL PLAnningdivision ouR goAL To fulfill fiduciary and statutory requirements and provide reliable financial strategies to ensure the financial viability of the corporation while maintaining effective stewardship of financial resources
ouR AchieveMenTs bull Refined the 3-year budget process
bull Reserve and Reserve Fund Policy review
bull Rolled out budget software to web-based version
FINANCE DEPARTMENT
Revenue division ouR goAL Develop and implement an effective system of recording and collecting amounts due to the City using a corporate approach across multiple subsystems
ouR AchieveMenT bull Department is handling approximately 3000 incoming calls per month water amp sewer billing accounted for a 3-fold increase in the number of incoming calls
ouR Future goALs incLude bull Development Charge Bylaw update
bull Financial Control Bylaw
bull Implement PSAB (Public Sector Accounting Board) requirements for budgeting
bull Develop long term financial plan
bull Continue to develop dynamic financial planning policies to adapt to an environment of constantly shifting priorities
bull Review Investment Strategy and review potential for institutional pricing
bull Collecting amounts due to the City using a corporate approach across multiple subsystems
bull Continue to stress customer service excellence including multiple sites payment stations and promoting electronic payment options
bull Ongoing implementation of POS at selected City sites
bull Develop the Cityrsquos internal controls for cash handling
bull Recommend policy on the use of special services levies
bull Developing a Payment Card Industry Data Security Standard (PCIDSS) compliance plan
bull Reduce and rationalize the number of water billing sections
FINANCE DEPARTMENT
PuRchAsing division ouR goAL The goal of the Purchasing division is to follow the Cityrsquos Purchasing Bylaw and provincial and federal government law to acquire the best total cost for the products and services required by the City of Waterloo as well as providing a fair open and transparent purchasing process for the supply base
ouR AchieveMenTs bull Additional expansion of using procurement cards has reduced staff time spent on issuing purchase orders
bull Issuing of cheques through Accounts Payable has been reduced through the implementation of the procurement card program
bull Using e-commerce platforms reduces the time required to input data for the purchasing receipt and payment of invoices
bull Involvement with the provincial contracts (vendor of records) has reduced the cost of the services supplied (courier and cellular devices)
bull Involvement in co-operative and provincial contracts has increased purchasing efficiencies
ouR Future goALs incLude bull Computerization and bar coding of stockroom items
bull Implement the recommendations listed in the Purchasing Review Report
bull Work with the Environmental Strategy Implementation Steering committee to further enhance green procurement and a sustainable Waterloo
bull Review implement most cost effective municipal and provincial contracts for items such as telecommunications and courier services
bull Investigate the possibility of a third-party agency to host our bid opportunities
bull Establish a more centralized purchasing function at the city of Waterloo
bull Review and implement new cash discounts for the supply base to the city of Waterloo
HUMAN RESOURCES DEPARTMENT VOLUNTEER SERVICES The provision of Human Resources and Volunteer Services includes recruitment and selection labour and employee relations compensation and benefits sick and disability management training collective bargaining health and safety and organizational design
ouR Mission Engaged competent employees and volunteers are successful in accomplishing strategic and business plans within a vibrant corporate culture at the City of Waterloo
ouR goAL Human Resources and Volunteer Services departmentrsquos programs and services comply with regulatory and legislative requirements and align with the Cityrsquos values to enable staff to accomplish strategic and business plans
ouR chALLenges Build sufficient HR specialist expertise within a generalist model to support service excellence free-up HR capacity through operational efficiencies to enable project work and program design in key areas and training initiatives trends indicating decline of volunteerism requires innovative approaches
HUMAN RESOURCES DEPARTMENT voLunTeeR seRvices
ouR AchieveMenTs bull Completion of a market review of insurance carriers to ensure the cost competitiveness of our employee group benefit plan rates
bull Continued implementation of violence in the workplace programs with respectful workplace training and risk assessment surveys
bull Conducted an employee engagement survey to measure employee engagement in important aspects of work activities relationships and working conditions
bull Research and preparation of negotiations plans for Staff Association CUPE and WPFFA collective agreements
bull Use of technology to create efficiencies using online automated recruitment screening for high volume recruits and enhanced use of PeopleSoft functionality for management information reporting
bull Implementation of volunteer software system to enhance volunteer recruitment and placements
ouR Future goALs incLude Utilize information system data to measure efficiencies and effectiveness of hR and volunteer process improvement and practices
bull Develop a performance appraisal tool to measure competencies and accountabilities
bull Develop a corporate staff recognition program with individual and group components
bull Provide coaching project management and volunteer training and leadership development programming
bull Continue to enhance workplace health and safety with Respectful Workplace initiatives and implementation of Corporate Health and safety Audit recommendations
bull Bargain new agreements for labour groups and Staff Association
bull Implement job evaluation maintenance program
bull Develop corporate and department plans to address issues in the employee engagement survey to enhance employee engagement
bull Continue to implement the Volunteer Engagement Strategy
PROTECTIVE SERVICES DEPARTMENT Protective Services is responsible for the delivery of services by Fire Rescue Bylaw EnforcementProperty Standards and Community Relations
ouR Mission A team of dedicated and professional staff committed to enhancing the safety and quality of life of our community through education inspection enforcement community relations and emergency response
ouR goAL To provide quality service valued by staff and the community in delivery of education inspection enforcement community relations and emergency response
ouR chALLenges Developmentbuilding construction intensification city-wide Light Rail Transit (LRT) green building construction increased population of the city including long-term and temporary residents ongoing need for improved technology to augment existing resources increased student enrollment communication to students living off-campus
PROTECTIVE SERVICES DEPARTMENT
WATeRLoo FiRe Rescue division ouR goAL Waterloo Fire Rescue will continue to grow in response to community needs and expectations to provide the highest standard of service
ouR AchieveMenTs bull Completion of Station 4
bull Activity Tracking Program
bull Enhanced response times on the Cityrsquos east side
bull Measures used to optimize service delivery
ouR Future goALs incLude bull Deliver a fiscally responsible and sustainable service delivery model
bull Reviseupdate simplified risk assessment (3-year cycle)
bull Reviseupdate Fire Master Plan (5-year cycle)
bull Leverage technology to enhance overall effectiveness and efficiency
bull Collaborate with local business and the community to promote fire safety
bull Collaborate with post-secondary institutions to mitigate fire safety priorities
bull Reviseupdate Emergency Management Plan
bull Reviseupdate fire inspection service delivery model
bull Enhance tactical pre-planning
bull Enhance training programs
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
ouR Future goALs incLude Further enhancement of Reporting bull Annual Report (2013) bull Ongoing development of Financial Reporting System (2012) bull Finance upgrade (2014) bull Portal type delivery of financial information
Increased Utilization of PeopleSoft Payroll Management System bull Security (2012-2014) bull Manager view of leave banks (2012-2014) bull Staff Association time entry (2012-2014) bull Work flow (2013) bull Electronic fund transfer payments for vendors (2012-2013) bull Epay (2012)
implementation of Recommendations from continuous improvement bull Payroll time cards bull Account Payable entry
FINANCE DEPARTMENT
budgeTs amp FinAnciAL PLAnningdivision ouR goAL To fulfill fiduciary and statutory requirements and provide reliable financial strategies to ensure the financial viability of the corporation while maintaining effective stewardship of financial resources
ouR AchieveMenTs bull Refined the 3-year budget process
bull Reserve and Reserve Fund Policy review
bull Rolled out budget software to web-based version
FINANCE DEPARTMENT
Revenue division ouR goAL Develop and implement an effective system of recording and collecting amounts due to the City using a corporate approach across multiple subsystems
ouR AchieveMenT bull Department is handling approximately 3000 incoming calls per month water amp sewer billing accounted for a 3-fold increase in the number of incoming calls
ouR Future goALs incLude bull Development Charge Bylaw update
bull Financial Control Bylaw
bull Implement PSAB (Public Sector Accounting Board) requirements for budgeting
bull Develop long term financial plan
bull Continue to develop dynamic financial planning policies to adapt to an environment of constantly shifting priorities
bull Review Investment Strategy and review potential for institutional pricing
bull Collecting amounts due to the City using a corporate approach across multiple subsystems
bull Continue to stress customer service excellence including multiple sites payment stations and promoting electronic payment options
bull Ongoing implementation of POS at selected City sites
bull Develop the Cityrsquos internal controls for cash handling
bull Recommend policy on the use of special services levies
bull Developing a Payment Card Industry Data Security Standard (PCIDSS) compliance plan
bull Reduce and rationalize the number of water billing sections
FINANCE DEPARTMENT
PuRchAsing division ouR goAL The goal of the Purchasing division is to follow the Cityrsquos Purchasing Bylaw and provincial and federal government law to acquire the best total cost for the products and services required by the City of Waterloo as well as providing a fair open and transparent purchasing process for the supply base
ouR AchieveMenTs bull Additional expansion of using procurement cards has reduced staff time spent on issuing purchase orders
bull Issuing of cheques through Accounts Payable has been reduced through the implementation of the procurement card program
bull Using e-commerce platforms reduces the time required to input data for the purchasing receipt and payment of invoices
bull Involvement with the provincial contracts (vendor of records) has reduced the cost of the services supplied (courier and cellular devices)
bull Involvement in co-operative and provincial contracts has increased purchasing efficiencies
ouR Future goALs incLude bull Computerization and bar coding of stockroom items
bull Implement the recommendations listed in the Purchasing Review Report
bull Work with the Environmental Strategy Implementation Steering committee to further enhance green procurement and a sustainable Waterloo
bull Review implement most cost effective municipal and provincial contracts for items such as telecommunications and courier services
bull Investigate the possibility of a third-party agency to host our bid opportunities
bull Establish a more centralized purchasing function at the city of Waterloo
bull Review and implement new cash discounts for the supply base to the city of Waterloo
HUMAN RESOURCES DEPARTMENT VOLUNTEER SERVICES The provision of Human Resources and Volunteer Services includes recruitment and selection labour and employee relations compensation and benefits sick and disability management training collective bargaining health and safety and organizational design
ouR Mission Engaged competent employees and volunteers are successful in accomplishing strategic and business plans within a vibrant corporate culture at the City of Waterloo
ouR goAL Human Resources and Volunteer Services departmentrsquos programs and services comply with regulatory and legislative requirements and align with the Cityrsquos values to enable staff to accomplish strategic and business plans
ouR chALLenges Build sufficient HR specialist expertise within a generalist model to support service excellence free-up HR capacity through operational efficiencies to enable project work and program design in key areas and training initiatives trends indicating decline of volunteerism requires innovative approaches
HUMAN RESOURCES DEPARTMENT voLunTeeR seRvices
ouR AchieveMenTs bull Completion of a market review of insurance carriers to ensure the cost competitiveness of our employee group benefit plan rates
bull Continued implementation of violence in the workplace programs with respectful workplace training and risk assessment surveys
bull Conducted an employee engagement survey to measure employee engagement in important aspects of work activities relationships and working conditions
bull Research and preparation of negotiations plans for Staff Association CUPE and WPFFA collective agreements
bull Use of technology to create efficiencies using online automated recruitment screening for high volume recruits and enhanced use of PeopleSoft functionality for management information reporting
bull Implementation of volunteer software system to enhance volunteer recruitment and placements
ouR Future goALs incLude Utilize information system data to measure efficiencies and effectiveness of hR and volunteer process improvement and practices
bull Develop a performance appraisal tool to measure competencies and accountabilities
bull Develop a corporate staff recognition program with individual and group components
bull Provide coaching project management and volunteer training and leadership development programming
bull Continue to enhance workplace health and safety with Respectful Workplace initiatives and implementation of Corporate Health and safety Audit recommendations
bull Bargain new agreements for labour groups and Staff Association
bull Implement job evaluation maintenance program
bull Develop corporate and department plans to address issues in the employee engagement survey to enhance employee engagement
bull Continue to implement the Volunteer Engagement Strategy
PROTECTIVE SERVICES DEPARTMENT Protective Services is responsible for the delivery of services by Fire Rescue Bylaw EnforcementProperty Standards and Community Relations
ouR Mission A team of dedicated and professional staff committed to enhancing the safety and quality of life of our community through education inspection enforcement community relations and emergency response
ouR goAL To provide quality service valued by staff and the community in delivery of education inspection enforcement community relations and emergency response
ouR chALLenges Developmentbuilding construction intensification city-wide Light Rail Transit (LRT) green building construction increased population of the city including long-term and temporary residents ongoing need for improved technology to augment existing resources increased student enrollment communication to students living off-campus
PROTECTIVE SERVICES DEPARTMENT
WATeRLoo FiRe Rescue division ouR goAL Waterloo Fire Rescue will continue to grow in response to community needs and expectations to provide the highest standard of service
ouR AchieveMenTs bull Completion of Station 4
bull Activity Tracking Program
bull Enhanced response times on the Cityrsquos east side
bull Measures used to optimize service delivery
ouR Future goALs incLude bull Deliver a fiscally responsible and sustainable service delivery model
bull Reviseupdate simplified risk assessment (3-year cycle)
bull Reviseupdate Fire Master Plan (5-year cycle)
bull Leverage technology to enhance overall effectiveness and efficiency
bull Collaborate with local business and the community to promote fire safety
bull Collaborate with post-secondary institutions to mitigate fire safety priorities
bull Reviseupdate Emergency Management Plan
bull Reviseupdate fire inspection service delivery model
bull Enhance tactical pre-planning
bull Enhance training programs
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
FINANCE DEPARTMENT
budgeTs amp FinAnciAL PLAnningdivision ouR goAL To fulfill fiduciary and statutory requirements and provide reliable financial strategies to ensure the financial viability of the corporation while maintaining effective stewardship of financial resources
ouR AchieveMenTs bull Refined the 3-year budget process
bull Reserve and Reserve Fund Policy review
bull Rolled out budget software to web-based version
FINANCE DEPARTMENT
Revenue division ouR goAL Develop and implement an effective system of recording and collecting amounts due to the City using a corporate approach across multiple subsystems
ouR AchieveMenT bull Department is handling approximately 3000 incoming calls per month water amp sewer billing accounted for a 3-fold increase in the number of incoming calls
ouR Future goALs incLude bull Development Charge Bylaw update
bull Financial Control Bylaw
bull Implement PSAB (Public Sector Accounting Board) requirements for budgeting
bull Develop long term financial plan
bull Continue to develop dynamic financial planning policies to adapt to an environment of constantly shifting priorities
bull Review Investment Strategy and review potential for institutional pricing
bull Collecting amounts due to the City using a corporate approach across multiple subsystems
bull Continue to stress customer service excellence including multiple sites payment stations and promoting electronic payment options
bull Ongoing implementation of POS at selected City sites
bull Develop the Cityrsquos internal controls for cash handling
bull Recommend policy on the use of special services levies
bull Developing a Payment Card Industry Data Security Standard (PCIDSS) compliance plan
bull Reduce and rationalize the number of water billing sections
FINANCE DEPARTMENT
PuRchAsing division ouR goAL The goal of the Purchasing division is to follow the Cityrsquos Purchasing Bylaw and provincial and federal government law to acquire the best total cost for the products and services required by the City of Waterloo as well as providing a fair open and transparent purchasing process for the supply base
ouR AchieveMenTs bull Additional expansion of using procurement cards has reduced staff time spent on issuing purchase orders
bull Issuing of cheques through Accounts Payable has been reduced through the implementation of the procurement card program
bull Using e-commerce platforms reduces the time required to input data for the purchasing receipt and payment of invoices
bull Involvement with the provincial contracts (vendor of records) has reduced the cost of the services supplied (courier and cellular devices)
bull Involvement in co-operative and provincial contracts has increased purchasing efficiencies
ouR Future goALs incLude bull Computerization and bar coding of stockroom items
bull Implement the recommendations listed in the Purchasing Review Report
bull Work with the Environmental Strategy Implementation Steering committee to further enhance green procurement and a sustainable Waterloo
bull Review implement most cost effective municipal and provincial contracts for items such as telecommunications and courier services
bull Investigate the possibility of a third-party agency to host our bid opportunities
bull Establish a more centralized purchasing function at the city of Waterloo
bull Review and implement new cash discounts for the supply base to the city of Waterloo
HUMAN RESOURCES DEPARTMENT VOLUNTEER SERVICES The provision of Human Resources and Volunteer Services includes recruitment and selection labour and employee relations compensation and benefits sick and disability management training collective bargaining health and safety and organizational design
ouR Mission Engaged competent employees and volunteers are successful in accomplishing strategic and business plans within a vibrant corporate culture at the City of Waterloo
ouR goAL Human Resources and Volunteer Services departmentrsquos programs and services comply with regulatory and legislative requirements and align with the Cityrsquos values to enable staff to accomplish strategic and business plans
ouR chALLenges Build sufficient HR specialist expertise within a generalist model to support service excellence free-up HR capacity through operational efficiencies to enable project work and program design in key areas and training initiatives trends indicating decline of volunteerism requires innovative approaches
HUMAN RESOURCES DEPARTMENT voLunTeeR seRvices
ouR AchieveMenTs bull Completion of a market review of insurance carriers to ensure the cost competitiveness of our employee group benefit plan rates
bull Continued implementation of violence in the workplace programs with respectful workplace training and risk assessment surveys
bull Conducted an employee engagement survey to measure employee engagement in important aspects of work activities relationships and working conditions
bull Research and preparation of negotiations plans for Staff Association CUPE and WPFFA collective agreements
bull Use of technology to create efficiencies using online automated recruitment screening for high volume recruits and enhanced use of PeopleSoft functionality for management information reporting
bull Implementation of volunteer software system to enhance volunteer recruitment and placements
ouR Future goALs incLude Utilize information system data to measure efficiencies and effectiveness of hR and volunteer process improvement and practices
bull Develop a performance appraisal tool to measure competencies and accountabilities
bull Develop a corporate staff recognition program with individual and group components
bull Provide coaching project management and volunteer training and leadership development programming
bull Continue to enhance workplace health and safety with Respectful Workplace initiatives and implementation of Corporate Health and safety Audit recommendations
bull Bargain new agreements for labour groups and Staff Association
bull Implement job evaluation maintenance program
bull Develop corporate and department plans to address issues in the employee engagement survey to enhance employee engagement
bull Continue to implement the Volunteer Engagement Strategy
PROTECTIVE SERVICES DEPARTMENT Protective Services is responsible for the delivery of services by Fire Rescue Bylaw EnforcementProperty Standards and Community Relations
ouR Mission A team of dedicated and professional staff committed to enhancing the safety and quality of life of our community through education inspection enforcement community relations and emergency response
ouR goAL To provide quality service valued by staff and the community in delivery of education inspection enforcement community relations and emergency response
ouR chALLenges Developmentbuilding construction intensification city-wide Light Rail Transit (LRT) green building construction increased population of the city including long-term and temporary residents ongoing need for improved technology to augment existing resources increased student enrollment communication to students living off-campus
PROTECTIVE SERVICES DEPARTMENT
WATeRLoo FiRe Rescue division ouR goAL Waterloo Fire Rescue will continue to grow in response to community needs and expectations to provide the highest standard of service
ouR AchieveMenTs bull Completion of Station 4
bull Activity Tracking Program
bull Enhanced response times on the Cityrsquos east side
bull Measures used to optimize service delivery
ouR Future goALs incLude bull Deliver a fiscally responsible and sustainable service delivery model
bull Reviseupdate simplified risk assessment (3-year cycle)
bull Reviseupdate Fire Master Plan (5-year cycle)
bull Leverage technology to enhance overall effectiveness and efficiency
bull Collaborate with local business and the community to promote fire safety
bull Collaborate with post-secondary institutions to mitigate fire safety priorities
bull Reviseupdate Emergency Management Plan
bull Reviseupdate fire inspection service delivery model
bull Enhance tactical pre-planning
bull Enhance training programs
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
ouR Future goALs incLude bull Development Charge Bylaw update
bull Financial Control Bylaw
bull Implement PSAB (Public Sector Accounting Board) requirements for budgeting
bull Develop long term financial plan
bull Continue to develop dynamic financial planning policies to adapt to an environment of constantly shifting priorities
bull Review Investment Strategy and review potential for institutional pricing
bull Collecting amounts due to the City using a corporate approach across multiple subsystems
bull Continue to stress customer service excellence including multiple sites payment stations and promoting electronic payment options
bull Ongoing implementation of POS at selected City sites
bull Develop the Cityrsquos internal controls for cash handling
bull Recommend policy on the use of special services levies
bull Developing a Payment Card Industry Data Security Standard (PCIDSS) compliance plan
bull Reduce and rationalize the number of water billing sections
FINANCE DEPARTMENT
PuRchAsing division ouR goAL The goal of the Purchasing division is to follow the Cityrsquos Purchasing Bylaw and provincial and federal government law to acquire the best total cost for the products and services required by the City of Waterloo as well as providing a fair open and transparent purchasing process for the supply base
ouR AchieveMenTs bull Additional expansion of using procurement cards has reduced staff time spent on issuing purchase orders
bull Issuing of cheques through Accounts Payable has been reduced through the implementation of the procurement card program
bull Using e-commerce platforms reduces the time required to input data for the purchasing receipt and payment of invoices
bull Involvement with the provincial contracts (vendor of records) has reduced the cost of the services supplied (courier and cellular devices)
bull Involvement in co-operative and provincial contracts has increased purchasing efficiencies
ouR Future goALs incLude bull Computerization and bar coding of stockroom items
bull Implement the recommendations listed in the Purchasing Review Report
bull Work with the Environmental Strategy Implementation Steering committee to further enhance green procurement and a sustainable Waterloo
bull Review implement most cost effective municipal and provincial contracts for items such as telecommunications and courier services
bull Investigate the possibility of a third-party agency to host our bid opportunities
bull Establish a more centralized purchasing function at the city of Waterloo
bull Review and implement new cash discounts for the supply base to the city of Waterloo
HUMAN RESOURCES DEPARTMENT VOLUNTEER SERVICES The provision of Human Resources and Volunteer Services includes recruitment and selection labour and employee relations compensation and benefits sick and disability management training collective bargaining health and safety and organizational design
ouR Mission Engaged competent employees and volunteers are successful in accomplishing strategic and business plans within a vibrant corporate culture at the City of Waterloo
ouR goAL Human Resources and Volunteer Services departmentrsquos programs and services comply with regulatory and legislative requirements and align with the Cityrsquos values to enable staff to accomplish strategic and business plans
ouR chALLenges Build sufficient HR specialist expertise within a generalist model to support service excellence free-up HR capacity through operational efficiencies to enable project work and program design in key areas and training initiatives trends indicating decline of volunteerism requires innovative approaches
HUMAN RESOURCES DEPARTMENT voLunTeeR seRvices
ouR AchieveMenTs bull Completion of a market review of insurance carriers to ensure the cost competitiveness of our employee group benefit plan rates
bull Continued implementation of violence in the workplace programs with respectful workplace training and risk assessment surveys
bull Conducted an employee engagement survey to measure employee engagement in important aspects of work activities relationships and working conditions
bull Research and preparation of negotiations plans for Staff Association CUPE and WPFFA collective agreements
bull Use of technology to create efficiencies using online automated recruitment screening for high volume recruits and enhanced use of PeopleSoft functionality for management information reporting
bull Implementation of volunteer software system to enhance volunteer recruitment and placements
ouR Future goALs incLude Utilize information system data to measure efficiencies and effectiveness of hR and volunteer process improvement and practices
bull Develop a performance appraisal tool to measure competencies and accountabilities
bull Develop a corporate staff recognition program with individual and group components
bull Provide coaching project management and volunteer training and leadership development programming
bull Continue to enhance workplace health and safety with Respectful Workplace initiatives and implementation of Corporate Health and safety Audit recommendations
bull Bargain new agreements for labour groups and Staff Association
bull Implement job evaluation maintenance program
bull Develop corporate and department plans to address issues in the employee engagement survey to enhance employee engagement
bull Continue to implement the Volunteer Engagement Strategy
PROTECTIVE SERVICES DEPARTMENT Protective Services is responsible for the delivery of services by Fire Rescue Bylaw EnforcementProperty Standards and Community Relations
ouR Mission A team of dedicated and professional staff committed to enhancing the safety and quality of life of our community through education inspection enforcement community relations and emergency response
ouR goAL To provide quality service valued by staff and the community in delivery of education inspection enforcement community relations and emergency response
ouR chALLenges Developmentbuilding construction intensification city-wide Light Rail Transit (LRT) green building construction increased population of the city including long-term and temporary residents ongoing need for improved technology to augment existing resources increased student enrollment communication to students living off-campus
PROTECTIVE SERVICES DEPARTMENT
WATeRLoo FiRe Rescue division ouR goAL Waterloo Fire Rescue will continue to grow in response to community needs and expectations to provide the highest standard of service
ouR AchieveMenTs bull Completion of Station 4
bull Activity Tracking Program
bull Enhanced response times on the Cityrsquos east side
bull Measures used to optimize service delivery
ouR Future goALs incLude bull Deliver a fiscally responsible and sustainable service delivery model
bull Reviseupdate simplified risk assessment (3-year cycle)
bull Reviseupdate Fire Master Plan (5-year cycle)
bull Leverage technology to enhance overall effectiveness and efficiency
bull Collaborate with local business and the community to promote fire safety
bull Collaborate with post-secondary institutions to mitigate fire safety priorities
bull Reviseupdate Emergency Management Plan
bull Reviseupdate fire inspection service delivery model
bull Enhance tactical pre-planning
bull Enhance training programs
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
FINANCE DEPARTMENT
PuRchAsing division ouR goAL The goal of the Purchasing division is to follow the Cityrsquos Purchasing Bylaw and provincial and federal government law to acquire the best total cost for the products and services required by the City of Waterloo as well as providing a fair open and transparent purchasing process for the supply base
ouR AchieveMenTs bull Additional expansion of using procurement cards has reduced staff time spent on issuing purchase orders
bull Issuing of cheques through Accounts Payable has been reduced through the implementation of the procurement card program
bull Using e-commerce platforms reduces the time required to input data for the purchasing receipt and payment of invoices
bull Involvement with the provincial contracts (vendor of records) has reduced the cost of the services supplied (courier and cellular devices)
bull Involvement in co-operative and provincial contracts has increased purchasing efficiencies
ouR Future goALs incLude bull Computerization and bar coding of stockroom items
bull Implement the recommendations listed in the Purchasing Review Report
bull Work with the Environmental Strategy Implementation Steering committee to further enhance green procurement and a sustainable Waterloo
bull Review implement most cost effective municipal and provincial contracts for items such as telecommunications and courier services
bull Investigate the possibility of a third-party agency to host our bid opportunities
bull Establish a more centralized purchasing function at the city of Waterloo
bull Review and implement new cash discounts for the supply base to the city of Waterloo
HUMAN RESOURCES DEPARTMENT VOLUNTEER SERVICES The provision of Human Resources and Volunteer Services includes recruitment and selection labour and employee relations compensation and benefits sick and disability management training collective bargaining health and safety and organizational design
ouR Mission Engaged competent employees and volunteers are successful in accomplishing strategic and business plans within a vibrant corporate culture at the City of Waterloo
ouR goAL Human Resources and Volunteer Services departmentrsquos programs and services comply with regulatory and legislative requirements and align with the Cityrsquos values to enable staff to accomplish strategic and business plans
ouR chALLenges Build sufficient HR specialist expertise within a generalist model to support service excellence free-up HR capacity through operational efficiencies to enable project work and program design in key areas and training initiatives trends indicating decline of volunteerism requires innovative approaches
HUMAN RESOURCES DEPARTMENT voLunTeeR seRvices
ouR AchieveMenTs bull Completion of a market review of insurance carriers to ensure the cost competitiveness of our employee group benefit plan rates
bull Continued implementation of violence in the workplace programs with respectful workplace training and risk assessment surveys
bull Conducted an employee engagement survey to measure employee engagement in important aspects of work activities relationships and working conditions
bull Research and preparation of negotiations plans for Staff Association CUPE and WPFFA collective agreements
bull Use of technology to create efficiencies using online automated recruitment screening for high volume recruits and enhanced use of PeopleSoft functionality for management information reporting
bull Implementation of volunteer software system to enhance volunteer recruitment and placements
ouR Future goALs incLude Utilize information system data to measure efficiencies and effectiveness of hR and volunteer process improvement and practices
bull Develop a performance appraisal tool to measure competencies and accountabilities
bull Develop a corporate staff recognition program with individual and group components
bull Provide coaching project management and volunteer training and leadership development programming
bull Continue to enhance workplace health and safety with Respectful Workplace initiatives and implementation of Corporate Health and safety Audit recommendations
bull Bargain new agreements for labour groups and Staff Association
bull Implement job evaluation maintenance program
bull Develop corporate and department plans to address issues in the employee engagement survey to enhance employee engagement
bull Continue to implement the Volunteer Engagement Strategy
PROTECTIVE SERVICES DEPARTMENT Protective Services is responsible for the delivery of services by Fire Rescue Bylaw EnforcementProperty Standards and Community Relations
ouR Mission A team of dedicated and professional staff committed to enhancing the safety and quality of life of our community through education inspection enforcement community relations and emergency response
ouR goAL To provide quality service valued by staff and the community in delivery of education inspection enforcement community relations and emergency response
ouR chALLenges Developmentbuilding construction intensification city-wide Light Rail Transit (LRT) green building construction increased population of the city including long-term and temporary residents ongoing need for improved technology to augment existing resources increased student enrollment communication to students living off-campus
PROTECTIVE SERVICES DEPARTMENT
WATeRLoo FiRe Rescue division ouR goAL Waterloo Fire Rescue will continue to grow in response to community needs and expectations to provide the highest standard of service
ouR AchieveMenTs bull Completion of Station 4
bull Activity Tracking Program
bull Enhanced response times on the Cityrsquos east side
bull Measures used to optimize service delivery
ouR Future goALs incLude bull Deliver a fiscally responsible and sustainable service delivery model
bull Reviseupdate simplified risk assessment (3-year cycle)
bull Reviseupdate Fire Master Plan (5-year cycle)
bull Leverage technology to enhance overall effectiveness and efficiency
bull Collaborate with local business and the community to promote fire safety
bull Collaborate with post-secondary institutions to mitigate fire safety priorities
bull Reviseupdate Emergency Management Plan
bull Reviseupdate fire inspection service delivery model
bull Enhance tactical pre-planning
bull Enhance training programs
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
ouR Future goALs incLude bull Computerization and bar coding of stockroom items
bull Implement the recommendations listed in the Purchasing Review Report
bull Work with the Environmental Strategy Implementation Steering committee to further enhance green procurement and a sustainable Waterloo
bull Review implement most cost effective municipal and provincial contracts for items such as telecommunications and courier services
bull Investigate the possibility of a third-party agency to host our bid opportunities
bull Establish a more centralized purchasing function at the city of Waterloo
bull Review and implement new cash discounts for the supply base to the city of Waterloo
HUMAN RESOURCES DEPARTMENT VOLUNTEER SERVICES The provision of Human Resources and Volunteer Services includes recruitment and selection labour and employee relations compensation and benefits sick and disability management training collective bargaining health and safety and organizational design
ouR Mission Engaged competent employees and volunteers are successful in accomplishing strategic and business plans within a vibrant corporate culture at the City of Waterloo
ouR goAL Human Resources and Volunteer Services departmentrsquos programs and services comply with regulatory and legislative requirements and align with the Cityrsquos values to enable staff to accomplish strategic and business plans
ouR chALLenges Build sufficient HR specialist expertise within a generalist model to support service excellence free-up HR capacity through operational efficiencies to enable project work and program design in key areas and training initiatives trends indicating decline of volunteerism requires innovative approaches
HUMAN RESOURCES DEPARTMENT voLunTeeR seRvices
ouR AchieveMenTs bull Completion of a market review of insurance carriers to ensure the cost competitiveness of our employee group benefit plan rates
bull Continued implementation of violence in the workplace programs with respectful workplace training and risk assessment surveys
bull Conducted an employee engagement survey to measure employee engagement in important aspects of work activities relationships and working conditions
bull Research and preparation of negotiations plans for Staff Association CUPE and WPFFA collective agreements
bull Use of technology to create efficiencies using online automated recruitment screening for high volume recruits and enhanced use of PeopleSoft functionality for management information reporting
bull Implementation of volunteer software system to enhance volunteer recruitment and placements
ouR Future goALs incLude Utilize information system data to measure efficiencies and effectiveness of hR and volunteer process improvement and practices
bull Develop a performance appraisal tool to measure competencies and accountabilities
bull Develop a corporate staff recognition program with individual and group components
bull Provide coaching project management and volunteer training and leadership development programming
bull Continue to enhance workplace health and safety with Respectful Workplace initiatives and implementation of Corporate Health and safety Audit recommendations
bull Bargain new agreements for labour groups and Staff Association
bull Implement job evaluation maintenance program
bull Develop corporate and department plans to address issues in the employee engagement survey to enhance employee engagement
bull Continue to implement the Volunteer Engagement Strategy
PROTECTIVE SERVICES DEPARTMENT Protective Services is responsible for the delivery of services by Fire Rescue Bylaw EnforcementProperty Standards and Community Relations
ouR Mission A team of dedicated and professional staff committed to enhancing the safety and quality of life of our community through education inspection enforcement community relations and emergency response
ouR goAL To provide quality service valued by staff and the community in delivery of education inspection enforcement community relations and emergency response
ouR chALLenges Developmentbuilding construction intensification city-wide Light Rail Transit (LRT) green building construction increased population of the city including long-term and temporary residents ongoing need for improved technology to augment existing resources increased student enrollment communication to students living off-campus
PROTECTIVE SERVICES DEPARTMENT
WATeRLoo FiRe Rescue division ouR goAL Waterloo Fire Rescue will continue to grow in response to community needs and expectations to provide the highest standard of service
ouR AchieveMenTs bull Completion of Station 4
bull Activity Tracking Program
bull Enhanced response times on the Cityrsquos east side
bull Measures used to optimize service delivery
ouR Future goALs incLude bull Deliver a fiscally responsible and sustainable service delivery model
bull Reviseupdate simplified risk assessment (3-year cycle)
bull Reviseupdate Fire Master Plan (5-year cycle)
bull Leverage technology to enhance overall effectiveness and efficiency
bull Collaborate with local business and the community to promote fire safety
bull Collaborate with post-secondary institutions to mitigate fire safety priorities
bull Reviseupdate Emergency Management Plan
bull Reviseupdate fire inspection service delivery model
bull Enhance tactical pre-planning
bull Enhance training programs
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
HUMAN RESOURCES DEPARTMENT VOLUNTEER SERVICES The provision of Human Resources and Volunteer Services includes recruitment and selection labour and employee relations compensation and benefits sick and disability management training collective bargaining health and safety and organizational design
ouR Mission Engaged competent employees and volunteers are successful in accomplishing strategic and business plans within a vibrant corporate culture at the City of Waterloo
ouR goAL Human Resources and Volunteer Services departmentrsquos programs and services comply with regulatory and legislative requirements and align with the Cityrsquos values to enable staff to accomplish strategic and business plans
ouR chALLenges Build sufficient HR specialist expertise within a generalist model to support service excellence free-up HR capacity through operational efficiencies to enable project work and program design in key areas and training initiatives trends indicating decline of volunteerism requires innovative approaches
HUMAN RESOURCES DEPARTMENT voLunTeeR seRvices
ouR AchieveMenTs bull Completion of a market review of insurance carriers to ensure the cost competitiveness of our employee group benefit plan rates
bull Continued implementation of violence in the workplace programs with respectful workplace training and risk assessment surveys
bull Conducted an employee engagement survey to measure employee engagement in important aspects of work activities relationships and working conditions
bull Research and preparation of negotiations plans for Staff Association CUPE and WPFFA collective agreements
bull Use of technology to create efficiencies using online automated recruitment screening for high volume recruits and enhanced use of PeopleSoft functionality for management information reporting
bull Implementation of volunteer software system to enhance volunteer recruitment and placements
ouR Future goALs incLude Utilize information system data to measure efficiencies and effectiveness of hR and volunteer process improvement and practices
bull Develop a performance appraisal tool to measure competencies and accountabilities
bull Develop a corporate staff recognition program with individual and group components
bull Provide coaching project management and volunteer training and leadership development programming
bull Continue to enhance workplace health and safety with Respectful Workplace initiatives and implementation of Corporate Health and safety Audit recommendations
bull Bargain new agreements for labour groups and Staff Association
bull Implement job evaluation maintenance program
bull Develop corporate and department plans to address issues in the employee engagement survey to enhance employee engagement
bull Continue to implement the Volunteer Engagement Strategy
PROTECTIVE SERVICES DEPARTMENT Protective Services is responsible for the delivery of services by Fire Rescue Bylaw EnforcementProperty Standards and Community Relations
ouR Mission A team of dedicated and professional staff committed to enhancing the safety and quality of life of our community through education inspection enforcement community relations and emergency response
ouR goAL To provide quality service valued by staff and the community in delivery of education inspection enforcement community relations and emergency response
ouR chALLenges Developmentbuilding construction intensification city-wide Light Rail Transit (LRT) green building construction increased population of the city including long-term and temporary residents ongoing need for improved technology to augment existing resources increased student enrollment communication to students living off-campus
PROTECTIVE SERVICES DEPARTMENT
WATeRLoo FiRe Rescue division ouR goAL Waterloo Fire Rescue will continue to grow in response to community needs and expectations to provide the highest standard of service
ouR AchieveMenTs bull Completion of Station 4
bull Activity Tracking Program
bull Enhanced response times on the Cityrsquos east side
bull Measures used to optimize service delivery
ouR Future goALs incLude bull Deliver a fiscally responsible and sustainable service delivery model
bull Reviseupdate simplified risk assessment (3-year cycle)
bull Reviseupdate Fire Master Plan (5-year cycle)
bull Leverage technology to enhance overall effectiveness and efficiency
bull Collaborate with local business and the community to promote fire safety
bull Collaborate with post-secondary institutions to mitigate fire safety priorities
bull Reviseupdate Emergency Management Plan
bull Reviseupdate fire inspection service delivery model
bull Enhance tactical pre-planning
bull Enhance training programs
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
HUMAN RESOURCES DEPARTMENT voLunTeeR seRvices
ouR AchieveMenTs bull Completion of a market review of insurance carriers to ensure the cost competitiveness of our employee group benefit plan rates
bull Continued implementation of violence in the workplace programs with respectful workplace training and risk assessment surveys
bull Conducted an employee engagement survey to measure employee engagement in important aspects of work activities relationships and working conditions
bull Research and preparation of negotiations plans for Staff Association CUPE and WPFFA collective agreements
bull Use of technology to create efficiencies using online automated recruitment screening for high volume recruits and enhanced use of PeopleSoft functionality for management information reporting
bull Implementation of volunteer software system to enhance volunteer recruitment and placements
ouR Future goALs incLude Utilize information system data to measure efficiencies and effectiveness of hR and volunteer process improvement and practices
bull Develop a performance appraisal tool to measure competencies and accountabilities
bull Develop a corporate staff recognition program with individual and group components
bull Provide coaching project management and volunteer training and leadership development programming
bull Continue to enhance workplace health and safety with Respectful Workplace initiatives and implementation of Corporate Health and safety Audit recommendations
bull Bargain new agreements for labour groups and Staff Association
bull Implement job evaluation maintenance program
bull Develop corporate and department plans to address issues in the employee engagement survey to enhance employee engagement
bull Continue to implement the Volunteer Engagement Strategy
PROTECTIVE SERVICES DEPARTMENT Protective Services is responsible for the delivery of services by Fire Rescue Bylaw EnforcementProperty Standards and Community Relations
ouR Mission A team of dedicated and professional staff committed to enhancing the safety and quality of life of our community through education inspection enforcement community relations and emergency response
ouR goAL To provide quality service valued by staff and the community in delivery of education inspection enforcement community relations and emergency response
ouR chALLenges Developmentbuilding construction intensification city-wide Light Rail Transit (LRT) green building construction increased population of the city including long-term and temporary residents ongoing need for improved technology to augment existing resources increased student enrollment communication to students living off-campus
PROTECTIVE SERVICES DEPARTMENT
WATeRLoo FiRe Rescue division ouR goAL Waterloo Fire Rescue will continue to grow in response to community needs and expectations to provide the highest standard of service
ouR AchieveMenTs bull Completion of Station 4
bull Activity Tracking Program
bull Enhanced response times on the Cityrsquos east side
bull Measures used to optimize service delivery
ouR Future goALs incLude bull Deliver a fiscally responsible and sustainable service delivery model
bull Reviseupdate simplified risk assessment (3-year cycle)
bull Reviseupdate Fire Master Plan (5-year cycle)
bull Leverage technology to enhance overall effectiveness and efficiency
bull Collaborate with local business and the community to promote fire safety
bull Collaborate with post-secondary institutions to mitigate fire safety priorities
bull Reviseupdate Emergency Management Plan
bull Reviseupdate fire inspection service delivery model
bull Enhance tactical pre-planning
bull Enhance training programs
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
ouR Future goALs incLude Utilize information system data to measure efficiencies and effectiveness of hR and volunteer process improvement and practices
bull Develop a performance appraisal tool to measure competencies and accountabilities
bull Develop a corporate staff recognition program with individual and group components
bull Provide coaching project management and volunteer training and leadership development programming
bull Continue to enhance workplace health and safety with Respectful Workplace initiatives and implementation of Corporate Health and safety Audit recommendations
bull Bargain new agreements for labour groups and Staff Association
bull Implement job evaluation maintenance program
bull Develop corporate and department plans to address issues in the employee engagement survey to enhance employee engagement
bull Continue to implement the Volunteer Engagement Strategy
PROTECTIVE SERVICES DEPARTMENT Protective Services is responsible for the delivery of services by Fire Rescue Bylaw EnforcementProperty Standards and Community Relations
ouR Mission A team of dedicated and professional staff committed to enhancing the safety and quality of life of our community through education inspection enforcement community relations and emergency response
ouR goAL To provide quality service valued by staff and the community in delivery of education inspection enforcement community relations and emergency response
ouR chALLenges Developmentbuilding construction intensification city-wide Light Rail Transit (LRT) green building construction increased population of the city including long-term and temporary residents ongoing need for improved technology to augment existing resources increased student enrollment communication to students living off-campus
PROTECTIVE SERVICES DEPARTMENT
WATeRLoo FiRe Rescue division ouR goAL Waterloo Fire Rescue will continue to grow in response to community needs and expectations to provide the highest standard of service
ouR AchieveMenTs bull Completion of Station 4
bull Activity Tracking Program
bull Enhanced response times on the Cityrsquos east side
bull Measures used to optimize service delivery
ouR Future goALs incLude bull Deliver a fiscally responsible and sustainable service delivery model
bull Reviseupdate simplified risk assessment (3-year cycle)
bull Reviseupdate Fire Master Plan (5-year cycle)
bull Leverage technology to enhance overall effectiveness and efficiency
bull Collaborate with local business and the community to promote fire safety
bull Collaborate with post-secondary institutions to mitigate fire safety priorities
bull Reviseupdate Emergency Management Plan
bull Reviseupdate fire inspection service delivery model
bull Enhance tactical pre-planning
bull Enhance training programs
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
PROTECTIVE SERVICES DEPARTMENT Protective Services is responsible for the delivery of services by Fire Rescue Bylaw EnforcementProperty Standards and Community Relations
ouR Mission A team of dedicated and professional staff committed to enhancing the safety and quality of life of our community through education inspection enforcement community relations and emergency response
ouR goAL To provide quality service valued by staff and the community in delivery of education inspection enforcement community relations and emergency response
ouR chALLenges Developmentbuilding construction intensification city-wide Light Rail Transit (LRT) green building construction increased population of the city including long-term and temporary residents ongoing need for improved technology to augment existing resources increased student enrollment communication to students living off-campus
PROTECTIVE SERVICES DEPARTMENT
WATeRLoo FiRe Rescue division ouR goAL Waterloo Fire Rescue will continue to grow in response to community needs and expectations to provide the highest standard of service
ouR AchieveMenTs bull Completion of Station 4
bull Activity Tracking Program
bull Enhanced response times on the Cityrsquos east side
bull Measures used to optimize service delivery
ouR Future goALs incLude bull Deliver a fiscally responsible and sustainable service delivery model
bull Reviseupdate simplified risk assessment (3-year cycle)
bull Reviseupdate Fire Master Plan (5-year cycle)
bull Leverage technology to enhance overall effectiveness and efficiency
bull Collaborate with local business and the community to promote fire safety
bull Collaborate with post-secondary institutions to mitigate fire safety priorities
bull Reviseupdate Emergency Management Plan
bull Reviseupdate fire inspection service delivery model
bull Enhance tactical pre-planning
bull Enhance training programs
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
PROTECTIVE SERVICES DEPARTMENT
WATeRLoo FiRe Rescue division ouR goAL Waterloo Fire Rescue will continue to grow in response to community needs and expectations to provide the highest standard of service
ouR AchieveMenTs bull Completion of Station 4
bull Activity Tracking Program
bull Enhanced response times on the Cityrsquos east side
bull Measures used to optimize service delivery
ouR Future goALs incLude bull Deliver a fiscally responsible and sustainable service delivery model
bull Reviseupdate simplified risk assessment (3-year cycle)
bull Reviseupdate Fire Master Plan (5-year cycle)
bull Leverage technology to enhance overall effectiveness and efficiency
bull Collaborate with local business and the community to promote fire safety
bull Collaborate with post-secondary institutions to mitigate fire safety priorities
bull Reviseupdate Emergency Management Plan
bull Reviseupdate fire inspection service delivery model
bull Enhance tactical pre-planning
bull Enhance training programs
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
ouR Future goALs incLude bull Deliver a fiscally responsible and sustainable service delivery model
bull Reviseupdate simplified risk assessment (3-year cycle)
bull Reviseupdate Fire Master Plan (5-year cycle)
bull Leverage technology to enhance overall effectiveness and efficiency
bull Collaborate with local business and the community to promote fire safety
bull Collaborate with post-secondary institutions to mitigate fire safety priorities
bull Reviseupdate Emergency Management Plan
bull Reviseupdate fire inspection service delivery model
bull Enhance tactical pre-planning
bull Enhance training programs
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
PROTECTIVE SERVICES DEPARTMENT
byLAW enFoRceMenT division And coMMuniTy ReLATions dePARTMenT ouR goAL bylaw enforcement - To be recognized as leaders and innovators in municipal law enforcement and education
community Relations - To provide in a leadership role the best resolution of conflict management for the benefit of all citizens
ouR AchieveMenTs bull Implementation of the AMANDA system
bull Enhanced education initiatives through the ldquoRental Living Guiderdquo available online to all tenants in the City of Waterloo with useful information on living in rental housing Development and delivery of the ldquoStudentrsquos Guide to Living in Waterloordquo for 1st year students intending to live off-campus in subsequent years of study
bull Continue research in partnership opportunities for town and gown community
bull Assist the Safe and Healthy Community Advisory Committee in the development of their work with Council
bull Participate in additional training opportunities in alternative dispute resolution
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
ouR Future goALs incLude bull Creation of a new Fence Bylaw and Fire Route Bylaw
bull Creation of Licensing Appeal Tribunal for residential rental licensing matters
bull Further development of staff rsquos capacity to deal with court-related matters including minor prosecutions
bull Work to develop risk mitigation strategies to off-set identified safety concerns
bull Collect data and measure performance against OMBI (Ontario Municipal Benchmarking Initiative) to compare and improve performance
bull Report to Council annually from the Safe and Healthy Community Advisory Committee and any support they require
bull Address initiatives and proposals of Safe and Healthy Community Advisory committee
bull Create video on Waterloo being a town and gown community and what it means to the different stakeholders
bull Continue to pursue town and gown outreach program in partnerships with universities in accordance with the approved recommendation in the northdale vision Report
bull Continue to work provincially and internationally in collaboration and partnerships on town and gown concerns and initiatives
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
PUBLIC WORKS SERVICES DEPARTMENT Public Works Services delivers hard and soft services to the residents of Waterloo and visitors Our department has stewardship responsibility for approximately $380 million in infrastructure assets such as roads water and sewer systems parks equipment and open spaces We are guided by Council-approved policies legislative requirements and various technical standards and master plans
ouR Mission Public Works Services mandate is to plan manage operate maintain rehabilitate and replace the municipal road system storm and sanitary collection systemswater distribution systems open spaces street lighting parks fleetwood lots and urban forests
ouR goAL To protect the integrity of critical infrastructure that delivers essential services to city residents and businesses ndash water roads sidewalks parks woodlots and open spaces
ouR chALLenges Budget reductions Ministry regulations and controls large seasonal workforce responding to infrastructure needs resulting from aging infrastructure and shift to increased density limited staffing succession planning and training
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
PUBLIC WORKS SERVICES DEPARTMENT
cAPiTAL PRoJecTs And seRvices division ouR goAL To deliver infrastructure renewals and replacement programs at its best life-cycle schedule so that the renewal cost quality of service timing of delivery and safety to the public are all in alignment with the fiscal commitment of Council
ouR AchieveMenTs bull Pavement Management System to streamline maintenance work more effectively
bull Reports of Maximo work order system incorporated into the infrastructure assessment process
bull Improvements on Global Positioning System surveying instruments enabled the data collection speed and accuracy for Capital Projects and Services staff
bull Capital Projects and Services handle over 80 projects at any one time with a limited support staff
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
ouR Future goALs incLude bull Fleet software installation
bull Implementation of phase II and III of Maximo software application
bull Beaver Creek Pumping Station upgrades
bull Colonial Creek Pumping Station upgrades ndash detail design and phase 1 construction
bull High Street ndash design in 2011 construction for 2012
bull Implementation of inflow and infiltration reduction program
bull Establish a water distribution model as a decision support tool
bull Implementation of capital planning tool to manage capital projects across the corporation (Continuous Improvement recommendation)
bull To meet the objectives of the Environmental Strategic Plan climate change and air quality reduce emissions and Green infrastructure Policy
bull Servicing of Waterloo North Campus Lands
bull Wind energy - implementation of recommendation of a demonstration site
bull Clair Creek Subwatershed rehabilitation
bull Clair Lake detail design and construction of Clair Lake and Reaches 2 amp 3
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
PUBLIC WORKS SERVICES DEPARTMENT
enviRonMenT amp PARKs seRvices division ouR goAL To deliver and maintain high-quality service for the Cityrsquos green spaces and urban environment along with promoting and encouraging environmental awareness and stewardship through various community programs and events
ouR AchieveMenTs bull Obtained efficiencies in Parks Watch pilot in Eastbridge
bull Enhancement to the Partners in Parks Community Guide to outline the use of common garden tools
bull Creation of maintenance agreements for Carriage Crossing Subdivision
bull Naturalization of previously-mowed grass areas at city facilities
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
ouR Future goALs incLude bull Implement Environmental Strategic Plan Greenspace initiatives
bull Increase community events and promote stewardship through community-based social marketing
Forestry and horticulture bull Implement the response plan for the Emerald Ash Borer threat to
the urban forest
bull Update Urban Forestry Policy
Parks Operations bull Update the Parks Bylaw
bull Integrate maintenance operations forYMCA-Library
bull Playground replacements
bull Pedestrian bridge replacements
bull Integrate operation for the Action Sports Park
bull Design fund and construct new accessible playground at Waterloo Park
bull Implement 2 community vegetable gardens on parkland
bull Formalize joint-use agreement with Waterloo Region District school board
bull Update quality standards for sidewalk snow control
bull Expansion of Parks Watch program
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
PUBLIC WORKS SERVICES DEPARTMENT
oFFice oF The geneRAL MAnAgeR ouR goAL Our goal is to deliver and maintain high-quality customer service and service delivery through a combination of technology and employee excellence Our focus is dedicated to the continued delivery of high-quality customer service through a corporate customer call management system and 247 responsiveness
ouR AchieveMenTs bull Continue to gain efficiencies in Maximo Work Order System
bull Electronic customer service request log
bull Elevated customer service by processing water billing and other payments
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
ouR Future goALs incLude bull Continue to phase in Maximo implementation
bull Continue PWS file system re-organization
bull Automated voice attendance system pilot once new phone system is installed
bull Increased efficiencies and sales through additional installation of point of sale terminal and reconfiguration of office layouts through the service centre renovation
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
PUBLIC WORKS SERVICES DEPARTMENT
TRAnsPoRTATion division ouR goAL To provide the City of Waterloo with a sustainable and reliable transportation network that is accessible and safe for all users pedestrians cyclists transit riders and vehicle drivers
ouR AchieveMenTs bull City work permit implementation has resulted in increased knowledge of contractorutility work and provided the City with a working database for quicker restoration of the sites
bull Enhanced data collection storage and retrieval of road condition information through implementation of software and vehicle location technology to map each defect and produce work orders to repair the defectsThis enables us to address maintenance needs identified more effectively as well as retrieve information in a timely manner when required (ie claims response)
Operational efficiency of winter control activity achieved through
bull Utilization of GIS mapping to rebalance our snow plow and salt routes resulting in reduced pressure to expand our number of routes
bull Incorporating GIS mapping vehicle location technology and weather information to better adapt winter control activities to changing conditions in order to minimize response times
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
ouR Future goALs incLude bull Accommodate increasing numbers of people in our uptown while
reducing the number of vehicles with the implementation of Transportation demand Management practices
bull Develop policies and strategies in support of the Environmental strategic Plan to reduce transportation-related green house gas emissions
bull Further reduce road salt application rates on city streets regional roads and City parking lots
bull Implement components of Infrastructure Management System for transportation
bull Reduce demand for parking to support rapid transit use within the central Transit corridor
bull Implement Complete Streets Policy for the safety of all road users pedestrians cyclists transit riders and vehicle operators
bull With the assistance of the data collected from the sidewalk inventory implement a plan to repair the deficiencies
bull Continue with traffic studies in various neighbourhoods within the City
bull Develop Transportation Impact Study Guidelines to outline requirements for development applications
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
PUBLIC WORKS SERVICES DEPARTMENT
WATeR seRvices division ouR goAL To provide the City of Waterloo with a sustainable water services systems
ouR AchieveMenTs bull Through the shift to water utility in-house billing the ability to shut-off water as a tool to obtain payment of outstanding bills has decreased the amount of outstanding revenues
bull Utilization of existing systems and processes for developing stormwater rate billing method
bull Backflow prevention program business model developed which shifts funding to a cost recovery model based on program fee revenue
bull Initiated two joint services initiatives projects with the City of Kitchener for water and sanitary sewer rate structure review and stormwater credit
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo
ouR Future goALs incLude bull Develop and implement a stormwater credit and rebate program to
provide incentives for installation and maintenance of stormwater environmental best practices on private properties
bull Undertake a pilot project on pond sediment utilization and disposal in partnership with Ministry of environment and other municipalities
bull Pilot zoom camera program to provide a more efficient inspection program for sanitary mains
bull Begin implementing Colonial Sanitary Pumping Station upgrades
bull Continued testing and analysis of the Unidirectional Flushing Program through collaboration with university researchers to refine the flushing program to create efficiencies
bull Prepare and submit the financial plan for the City of Waterloorsquos drinking water system in accordance with the Ontario Regulation 45307
bull Complete a water and sewer rate review to better align fixed costs with fixed rate revenue and variable costs with variable rate revenue to ensure the long-term financial sustainability of water distribution and wastewater collection systems
bull Perform costbenefit analysis on implementing smart water metering technologies
bull Undertake a Water Distribution Master Plan and an update to the sanitary sewer Master Plan to guide business operations and capital infrastructure renewal
bull Continued focus on customer service
wwwwaterlooca
wwwfacebookcomcitywaterloo wwwtwittercomcitywaterloo wwwyoutubecitywaterloo