    Business Scope

    + Product R&D

    + Prototype making

    + Insert molding

    + 2K molds

    + Reverse mold+ Over molding

    + Inset mold

    + Stack mold

    + Multi-cavity hot runner molds+ Mass production

    + Assembly

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    3/59

    One-stop Total Plastic Solution Provider

    History

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    4/59

    One-stop Total Plastic Solution Provider

    Organizational Chart

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    5/59

    One-stop Total Plastic Solution Provider

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    6/59

    One-stop Total Plastic Solution Provider

    Company Overview

    Company Overview

    > Locations

    > Markets and Turnover> Employee

    > Organization and Management

    > Global Network

    > Company Culture> Events Review

    1

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    7/59One-stop Total Plastic Solution Provider

    Locations

    A Main Factory 20,000 in Baoan,

    Shenzhen

    (45 minute drive from Shekou to Baoan)

    B Corporate Headquarters, Technology

    Building, Shekou, Shenzhen

    C Hong Kong Airport

    (40 minute ferry ride to Shekou)

    A

    B

    C

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    8/59One-stop Total Plastic Solution Provider

    Markets and Turnover

    510 employees, With Engineers in America and Mexico

    Sales Revenue of 2015 is expected to reach approximately

    $78,000,000USD

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    9/59One-stop Total Plastic Solution Provider

    Employee Statistics

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    10/59One-stop Total Plastic Solution Provider

    Organization and Management

    Functional Dept.Fareast MoldingBluestar MouldAuto PartsTool Manufacture

    Henley Li

    Director of HR

    &Finance

    Brown Huang

    Director of

    Admin

    Chen Yonghe

    Manager

    George YangDFM Manager

    Peter Luo

    VP

    Tony Wang

    Manager

    Kenny Wei

    Sales Manager

    Lloyd DeShane

    Sales DirectorAngela Wang

    Sales Director

    Guide Xu

    Technical

    Director

    Philip Huang

    BSM President

    Kevin Yang

    Director

    Adah Cao

    VP

    Neil Heppel

    Project Manager

    Mandy Qiao

    Manager

    John

    US Technical

    SupportFord

    Ge Gong

    Chief Engineer

    GeorgeConsultant

    (Ford

    Kamel

    Management

    Advisor

    You Jing

    Tooling

    Advisor

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    11/59

    One-stop Total Plastic Solution Provider

    Global Network

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    12/59

    One-stop Total Plastic Solution Provider

    Company Culture

    Mission: To create value for customers

    To bring benefits for employeesTo share the social responsibility

    Team Culture:

    Safety first

    Never give up

    Practical and hands-onBe innovative

    Philosophy: Sincerity, Self-discipline, Vision and Responsibility

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    13/59

    One-stop Total Plastic Solution Provider

    Exhibitions

    C biliti

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    14/59

    One-stop Total Plastic Solution Provider

    Capabilities

    Capabilities

    > Research and Development

    > Engineering and Analysis

    > Project Management Procedures

    >Tooling>Tool Trial Plant

    > Tool trial/trial-production flow chart

    > Molding

    > Quality

    > Testing Equipment

    > Component Suppliers

    > Capital Investments

    > Investment Plan

    2

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    15/59

    One-stop Total Plastic Solution Provider

    Research and Development

    Laboratory19 R&D staff mainly engaged in auto components, body

    parts, internal and external products research, design and

    development.

    Cooperate with Guangdong Mold Association and

    Automobile Research Institute in South China University of

    Technology.

    Test laboratoryabrasion resistance,

    moisture resistance,

    cold resistance,

    wet & heat cycle,

    hardy impact,

    light aging resistance,

    high temperature aging resistance,materials tensile,

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    16/59

    One-stop Total Plastic Solution Provider

    Engineering and Analysis

    Technical Dept. has 8 senior engineers, who are specialized to do DFM and

    Moldflow.

    TechnicalDept.

    Design Dept. has 40 design engineers, they use Pro Engineer, UG,

    SolidWork, AutoCAD and Master cam UG to design and program.DesignDept.

    Tooling Dept. has about 260 professional mold makers. We can produce700~800 sets of molds per year, from 150mmX150mm to 2.5mX3.5M, up

    to 40T.

    ToolingDept.

    We do trial-production and keep the mould running well in the machine

    for around 6 hours.Mold Trial

    Team

    Mold Checking Team has 10 Mold checking engineers. They check the

    manufacturing process and inspect the molds.Mold

    CheckingTeam

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    17/59

    One-stop Total Plastic Solution Provider

    Project Management Procedures

    MoldDesign

    Customer

    Project

    Team

    Sales

    Technical Dept.

    Design Dept.

    Tooling Dept.

    Outsource

    Purchasing

    Dept.

    Mold Trial Team

    Commercial

    Communication

    DFM

    Outsource processing

    Standard Parts

    Mold Base

    Raw Material

    Mold Trial

    Mold Checking

    Team

    Mold

    Building

    Checking

    Process

    Tool

    Inspection

    Project Team is the core part

    of entire project management

    system. It will lead and

    coordinate on each process

    One project team can follow up

    50~60 molds each time.

    For more projects, we can set up

    a second team.

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    18/59

    One-stop Total Plastic Solution Provider

    Tool Making Capacity

    CNC - 20 Machines

    Maximum machining capability 3.2 x 1.9m

    Mori Seiki CNC machine, 1500 x 600m, tolerance

    0.003mm Mikron CNC machine, 710 x 400mm, tolerance0.005mm

    Fanuc CNC machine, 500 x 400 x 200mm, tolerance0.005mm

    DMG 5Axes CNC Machine

    EDM 15 Machines

    Sodick mirror EDM machine, tolerance0.002mm

    Other EDM machinesWire-cut 9 Machines

    Makino Wire-cut machine , tolerance0.005mm

    Charmilles Wire-cut machine , tolerance0.005mm

    Sodick Wire-cut machine, tolerance0.002mm

    Tolerance0.002mm

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    19/59

    One-stop Total Plastic Solution Provider

    Tool Making Capacity

    l & i l l

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    20/59

    One-stop Total Plastic Solution Provider

    New Tool & Trial Plant

    1600T- 1set 850T - 1set

    560T - 1set

    450T - 1set

    360t - 1set

    350T - 2sets

    250T - 2sets

    168T - 1set

    1000M2 trial plant: 10 tool trial injection machines with robot from 168T to

    1600T

    l & i l l

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    21/59

    One-stop Total Plastic Solution Provider

    New Tool & Trial Plant

    3000M2 tool assembly area with big fitting machine and CNC machine, increase

    40% tool making capacity

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    22/59

    One-stop Total Plastic Solution Provider

    Injection Molding Capabilities

    43 injection machines with robot from 50T to 2000T

    Toshiba high speed injection machines from 100T to 350T

    Vertical injection molding machines

    Haitian injection machines

    Haitian SA530 Bi-injection

    High volume production

    ABS, PC, PC + ABS, POM, PMMA, PA, PPT, PE, PVC and other common

    materials and engineering plastics

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    23/59

    One-stop Total Plastic Solution Provider

    Quality Systems

    Certifications

    ISO9001:2008 since 2006

    ISO14001:2004 since 2008

    TS16949:2009 since 2010

    BSM have the systems in placeensure traceability down to everyprocess on a single part, componentand material; from design to delivery.

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    24/59

    One-stop Total Plastic Solution Provider

    Testing Equipment

    CMM-03 CMM-02 CMM-01

    24

    Hardness Guage Height Guage 2CMM

    li

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    25/59

    One-stop Total Plastic Solution Provider

    Component Suppliers

    Steel

    Hot

    runner

    Texture

    Mold base

    Resin

    Hydro-

    cylinder

    Standard

    parts

    201 i I

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    26/59

    One-stop Total Plastic Solution Provider

    2015 Equipment Investments

    $1,920,000USD investment fund was scheduled for 2015

    New Investment Fund in 2015

    NO. Equipment List Brand Model Work Spec Quantity DateCountryOrigin

    Supplier Condition Price

    1 Milling Machine GuiBei GM150 4501500200mm 1 2015.3 GuangXi On going US$5,000

    2 Milling Machine GuiBei GM150 4501500200mm 1 2015.3 GuangXi On going US$5,000

    3 Wire-cut Founder DK7740 400500400mm 1 2015.8 JiangSu Planning US$13,000

    4 Wire-cut Founder DK7750 500630600mm 1 2015.8 JiangSu Planning US$17,000

    5 CNC Machine OKUMA MB-56VA 1000*560*400 1 2015.3 Japan OKUMA On going US$200,000

    6 CNC Machine OKUMA MB-56VA 1000*560*400 1 2015.3 Japan OKUMA On going US$200,000

    7 CNC Machine DMGHSC-

    75LINEAR750*600*560 1 2015.5 Germany DMG Arrived US$500,000

    8 Graphite Machine SMD SMD-860 700*780*330 1 2015.9 Shenzhen SMD Planning US$500,000

    95Axes CNC

    MachineDMG 80EVO 800-700 1 2015.5 Germany DMG Arrived US$480,000

    Total US$1,920,000

    I Pl

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    27/59

    One-stop Total Plastic Solution Provider

    Investment Plan

    Investment plan BSM Industrial ParkFocus on automotive parts design and manufacturing.

    2014 K j t

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    28/59

    One-stop Total Plastic Solution Provider

    2014 Key Projects

    2014 Key projects

    3

    FORD PI

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    29/59

    One-stop Total Plastic Solution Provider

    FORD-PI

    In 2014, BSM set up an exclusive team on Ford-PI project and with exclusively designated

    skilled workers, machines and equipment for volume production while at the same time

    sticking to a very strict quality control policy.

    BSM joint-handedly developed the Interior Atmosphere Lamp with PI and had a verysmooth mass production of the lamp.

    ERP I t A t P t M ki

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    30/59

    One-stop Total Plastic Solution Provider

    ERP Into Auto Parts Making

    The year of 2014 witnessed a successful launch of the ERP system into BSM Auto Parts

    Dept. With this system, production planning, material procurement, warehouse

    management, shipment & delivery was able to smoothly carry through.

    ERP I t M ld M ki

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    31/59

    One-stop Total Plastic Solution Provider

    ERP Into Mould Making

    In the same year, B9 ERP System was also applied to BSM Mould Making Dept.

    for mould design, material procurement, production scheduling, process

    checking and mold manufacturing. The launch was proved to be very successful

    with positive comments from clients.

    M ld D i C t

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    32/59

    One-stop Total Plastic Solution Provider

    Mould Design Center

    BSM set up a mould design Center to offer customers and clients services on molding

    analysis, mould structuring solutions, mould flow analysis, mould secondary

    development and standards archiving.

    Standard Upgrade

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    33/59

    One-stop Total Plastic Solution Provider

    Standard Upgrade

    BSM upgraded mould design standards in 2014 while at the same time had a restudy

    on clients standards and expectations to make sure its design and manufacturing is

    100% in compliance with clients requirements.

    Auto Parts R&D Dept & Labs

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    34/59

    One-stop Total Plastic Solution Provider

    Auto Parts R&D Dept. & Labs

    BSM set up Auto Parts R&D Dept (with laboratory attached) with Guangdong Mould

    Association and Automotive Research Institute, South China Technology University to

    design, R&D and test on car parts (interior & exterior and component structures). The

    CAPSA, Thyssenkrup and PI were also developed and tested in the lab. Additionally, withthe participation of the GAC design team, the R&D capability was further upgraded.

    CASPA Fender

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    35/59

    One-stop Total Plastic Solution Provider

    CASPA Fender

    Front Fender L Front Fender R Rear Fender L Rear Fender R

    Nov, 2013 -Aug, 2014 BSM completed the design of CAPSA B751 Fenders, all together 4

    products-front fender(left and right), and rear fenders (left and right).

    Sept-Dec ,2014, moulds were completed.

    29th, Sept- 9th, Dec, 2014, testing devices were designed and manufactured and PASS

    report was issued.

    CASPA Project

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    36/59

    One-stop Total Plastic Solution Provider

    CASPA Project

    Item BSM project no.Part

    PictureCavity Material Color Part Size T1 Time

    1 97K12.3 BSM14289 1X2 PA6 BLACK 10*19*T0.8 2015-1-14

    2 97K12.14-1 BSM14222 1X2 PP BLACK 1000*360*560 2014-12-5

    3 97K12.14-2 BSM14221 1X2 PP BLACK 850*480*610 2014-12-5

    Fan project of DENSO Engine System

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    37/59

    One-stop Total Plastic Solution Provider

    Fan project of DENSO Engine System

    In 2014, BSM successfully launched the R&D of Denso/2BW engine fans.

    VW Intake Pipe for Euro Delphi

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    38/59

    One-stop Total Plastic Solution Provider

    VW Intake Pipe for Euro Delphi

    Moulds for VW Intake pipe (Delphi Euro) was successfully developed with 60 moulds

    and 110 products. The moulds were on-time delivered to client factories (Poland and

    Shenyang ) .

    Project Delphi Euro Total: 60 tooling sets

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    39/59

    One-stop Total Plastic Solution Provider

    Project Delphi Euro----Total: 60 tooling sets

    ItemBSM Mold

    No.Part

    PicturePart Name Cavity

    Steel&Hardness

    SurfaceRequest

    Color T1 Plan Updates

    1 88K11.46-1

    16476661-PAR02_001_MLB_VALVE_AI_

    OSA_LHD_140115

    2+2(2K)

    A&B

    :P20CO&CA:2343

    (48~52HRC)

    CA:600#CO:320#

    black 2015.1.5 Mold was

    transferred

    2 88K11.46-2

    16476662-PAR02_001_MLB_VALVE_AIR

    _RECIRCULATION_LHD_140115

    2+2(2K)

    A&B

    :P20CO&CA:2343(48~52HRC)

    CA:600#CO:320#

    black 2015.1.5 Mold was

    transferred

    3 88K11.46-5

    16476627-PAR02_001_MLB_T1_VALVE_TEMP_COLD_3RD_CUSTOME

    R_LEVEL_140115

    2+2(2K)

    A&B

    :P20CO&CA:2343(48~52HRC)

    CA:600#CO:320#

    black 2015.1.5 Mold was

    transferred

    4 88K11.46-6

    6476628-PAR02_001_MLB_T1_VALVE_

    TEMP_HOT_1401152+2(2K)

    A&B

    :P20CO&CA:2343(48~52HRC)

    CA:600#CO:320#

    black 2015.1.5 Mold wastransferred

    5 88K11.46-7

    16476643-PAR02_001_MLB_OUTLET_FO

    OT_REAR_1401152+2(2K)

    A&B

    :P20CO&CA:2343(48~52HRC)

    CA:600#CO:320#

    black 2015.1.5 Mold was

    transferred

    6 88K11.46-8

    16476644-PAR02_001_MLB_VALVE_VEN

    T_REAR_1401152+2(2K)

    A&B

    :P20CO&CA:2343(48~52HRC)

    CA:600#CO:320#

    black 2015.1.5 Mold was

    transferred

    7 88K11.46-9

    16476645-PAR02_001_MLB_FOOT_FRONT_LHS_140115+16476647-

    PAR02_001_MLB_FOOT_FRONT_RHS_140115

    2+2+2+2(2K)

    A&B

    :P20CO&CA:2343(48~52HRC)

    CA:600#CO:320#

    black 2015.1.5 Mold was

    transferred

    8 88K11.46-

    10

    16476646-PAR02_001_MLB_VALVE_SID

    E_VENT_1401152+2(2K)

    A&B

    :P20CO&CA:2343(48~52HRC)

    CA:600#CO:320#

    black 2015.1.5 Mold was

    tansfered

    A68 Side Skirt (Yanfeng Plastic Omnium

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    40/59

    One-stop Total Plastic Solution Provider

    A68 Side Skirt (Yanfeng Plastic Omnium

    One-stop Total Plastic Solution Provider.

    The R&D for A68 Side Skirt (Yanfeng Plastic Omnium) was successfully developed

    in the same year. Product test result showed satisfactory and production has also

    been put on 2000T injection machine.

    A28 Bumper (GAC Trumpchi)

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    41/59

    One-stop Total Plastic Solution Provider

    A28 Bumper (GAC Trumpchi)

    One-stop Total Plastic Solution Provider.

    A28 Bumper mould of GAC Trumpchi was developed with client satisfaction. The

    mould was delivered to Zhongxing Yanfeng factory and put on 2000T injection

    machine.

    Thyssenkrup

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    42/59

    One-stop Total Plastic Solution Provider

    Thyssenkrup

    In 2014, more than 30 auto parts categories for Thyssenkrupp made by BSM

    passed test and got customers approval, which are already put into production in

    BSMs workshop. Among them, project of Ford AFSAudi B80V, Fiat Giorgio and SZL

    Holder passed customers DA6.3 audit at the same time.

    Ford/Roush

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    43/59

    One-stop Total Plastic Solution Provider

    Ford/Roush

    One-stop Total Plastic Solution Provider.

    30 Ford/Roush moulds were developed in 2014 with all together 60 parts categories,

    all of which have been delivered to America for production.

    Ford/Roush ----Total: 30 sets toolings

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    44/59

    One-stop Total Plastic Solution Provider

    Ford/Roush ----Total: 30 sets toolings

    One-stop Total Plastic Solution Provider.

    Item BSM Mold No.CustomerMold No.

    Part Picture Cavity Material Color Part SizeT1 Lead

    Time

    1 BSM92K44.273-1 114857_01 2+2 Glass fill Nylon BLACK 122x100x46 2014-4-1

    2 BSM 92K44.273-2 114857_02 2+2 Glass fill Nylon BLACK 122x100x46 2014-4-1

    3 BSM 92K44.273-3 114857_03 1+1 Glass fill Nylon BLACK 330x130x99 2014-4-30

    4 BSM 92K44.273-4 114857_04 1+1 Glass fill Nylon BLACK 280x126x110 2014-4-30

    5 BSM 92K44.273-5 114857_05 2+2 Glass fill Nylon BLACK 120x120x65 2014-4-1

    6 BSM 92K44.297-1 114800-01_A

    Pillar Tweeter 1+1

    Basell SG802N

    PP BLACK 150x80x60 2014-2-20

    7 BSM 92K44.297-2 114800-02_A

    Pillar Defroster 1+1

    Basell SG802N

    PP BLACK 120x60x40 2014-3-22

    8 BSM 92K44.297-8

    114800-08 B

    Upper RibCartridge

    1+1 Basell SG802NPP Nature 360x250x66 2014-3-24

    9 BSM 92K44.297-9 114800-09 B

    Upper Slider 1X2

    Basell SG802N

    PP BLACK 200x48x5 2014-3-17

    10 BSM92K44.322-01 115331-01 1+1 PP7855 NATURE 440x350x89 2014-7-18

    Strategic Partnerships

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    45/59

    One-stop Total Plastic Solution Provider

    Strategic Partnerships

    Strategic Partnerships4

    Tier 1 and 2 suppliers to Toyota

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    46/59

    One-stop Total Plastic Solution Provider

    Tier 1 and 2 suppliers to Toyota

    One-stop Total Plastic Solution Provider.

    2 years of successful Partnerships with Tier 1

    Toyota suppliers

    Dedicated Project Management team

    70 tools in 2012 and 2013

    Current program 870A and 982A underwayCurrent Programs include;

    BSM >> Ecoplas >> 466A

    BSM >> Ecoplas >> 053A

    BSM >> Ecoplas >> 883A

    BSM >> Mecaplast >> 466ABSM >> Farplas >> 466A

    BSM >> Roush >> 760A

    Panel Sub Assy Instr

    Cluster FinisherControl Armrest Hinge

    Cup Holder

    Control Pillar Lower Holder, Hood StayFront Seat Cushion

    Inner Shield

    Front Seat CushionInner ShieldGrip Assy

    Instrument PanelUnder Cover RH

    Garnish Sub Assy InstrCluster Finisher Lower

    Front Door Armrest Insert

    Grill

    Seat Track Bracket

    Inner Cover

    Front Seat Cushion

    Edge ProtectorConsole Box Insert

    Cover Front Floor

    ROUSH/FORD/CHRYSLER

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    47/59

    One-stop Total Plastic Solution Provider

    ROUSH/FORD/CHRYSLER

    5 years of successful Partnership

    Dedicated Roush Project Management team

    90 tools in 2013, commitment for 120 tools in 2014

    2013 Euromold Partner to show strong China partner

    Full time dedicated Roush Engineer on staff with

    dedicated office space in Corporate facility and factory

    Daily transportation for engineers to & from the factory China cell phone and IT support

    BSM Engineering support in America for quick design

    approval and tooling trials.

    Global Projects, Duplicate tooling design for China,

    America and Europe

    Current Programs include;

    BSM >> Roush >> Toyota 760ABSM >> Roush >> (Interior trim) Ford

    BSM >> Roush >> Chrysler

    BSM >> Roush >> (exterior) Ford

    BSM >> Roush >> Honda

    BSM >> Roush >> Wilber

    BSM >> Roush >> Summit Polymers

    Partnership with PI

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    48/59

    One-stop Total Plastic Solution Provider

    Partnership with PI

    One-stop Total Plastic Solution Provider.

    5 years partnership for mold and molding

    Dedicated Pacific Insight Project Management team

    110 tools in 2013, commitment for 140 tools in 2014

    Rapid prototyping tooling and production tooling

    Molding

    We produce all molded parts and ship to

    Mexico for final assembly Transfer tooling from other Asian and Canadian

    molders

    We manage all logistics to Mexico and have a

    warehouse inside of PI to manage materials

    We have a dedicated BSM employee to manage

    quality and the warehouse in Mexico

    BSM Engineering support in America, full time BSMengineer on staff at Pacific Insight in Detroit, USA.

    Current Programs include;

    BSM >> Pacific Insight >> Ford

    BSM >> Pacific Insight >> GM

    BSM >> Pacific Insight >> Caterpillar

    Lamp project for Trucklite/wipac - 1

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    49/59

    One-stop Total Plastic Solution Provider

    Lamp project for Trucklite/wipac 1

    One-stop Total Plastic Solution Provider.

    Current Programs include

    BSM >> Trucklite>> cascadia + Bugatti

    BSM >> Trucklite>> Navistar

    BSM >> Trucklite>> Volvo project

    BSM >> Wipac >> Aston Martin One-77BSM >> Daimler

    Front lens

    Rear lamp reflector

    Housing

    Lens

    Head lamp Housing Housing

    Lens

    Housing

    Turnbody

    Lamp project for Trucklite/wipac - 2

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    50/59

    One-stop Total Plastic Solution ProviderOne-stop Total Plastic Solution Provider.

    Interior Lamps

    Headlamps

    Rear Lamps

    Signal Lighting

    Marker Lamps

    Numberplate

    Lamps/HoldersWarning LampsRectangular Front

    Fog Lamp

    Reflectors

    Lamp project for Trucklite/wipac 2

    Dedicated project management

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    51/59

    One-stop Total Plastic Solution Provider

    Dedicated project management

    One-stop Total Plastic Solution Provider.

    CAC tank CAC Tank Inlet & Outlet

    Central wheel

    Central panel

    Lateral L/R defrost

    cover

    Instrument panelSpeaker

    Glove box

    Radiator Outlet

    Radiator Inlet

    Middle Console for Skoda Rapid

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    52/59

    One-stop Total Plastic Solution Provider

    Middle Console for Skoda Rapid

    One-stop Total Plastic Solution Provider.

    B Pillar

    Wheel Cover

    Bar

    Middle Console Inner part

    Middle Console Outer part

    Middle Console AssemblyMiddle Console

    Main Customers

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    53/59

    One-stop Total Plastic Solution Provider

    Safety Awareness

    http://www.google.com.hk/url?q=http://www.tobalinaconsulting.com/&sa=U&ei=gIZQU77tGMiRiQe92oHwBA&ved=0CDMQ9QEwAw&usg=AFQjCNHeadh7HxRkgJ7Av0Yq6b7fkcJr5A
  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    54/59

    One-stop Total Plastic Solution Provider

    y

    Safety Awareness

    > House Keeping> Safety equipment for employees> Safety Education> Reduction in accidents

    5

    Housekeeping

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    55/59

    One-stop Total Plastic Solution Provider

    p g

    Clear walkways and clean floors to eliminate falls and injury

    Safety Equipment

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    56/59

    One-stop Total Plastic Solution Provider

    y q p

    Example of Fire safety Training

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    57/59

    One-stop Total Plastic Solution Provider

    p y g

    Reduction in accidents

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    58/59

    One-stop Total Plastic Solution Provider

    Yearly Injury Summary

    2011 2012 2013 2014

    All Accidents 34 32 23 93 day Accidents 10 7 6 4

    7 day Accidents 6 4 3 2

    0

    5

    10

    15

    20

    25

    30

    35

    40

    2011 2012 2013 2014

    All Accidents

    3 Day Accidents

    7 day Accidents

  • 7/23/2019 Mold Making & Injection Molding - Bluestar Mould Group 2015

    59/59

    We are here to provide

    the solution you are looking for!

    WE APPRECIATE YOUR SUPPORT!