DEVELOPMENT OF U-BEAM PRESTRESSED CONCRETE
DESIGN STANDARDS
Engineering Consultants, Inc.
2018 LOUISIANA TRANSPORTATION CONFERENCESunday, February 25 - Wednesday, February 28, 2018
Mohsen Shahawy, PHD, PE
SDR Engineering Consultants, Inc.
SDREngineering.com
LOUISIANA U-GIRDER DEVELOPMENT
Task 1: General: Design, Detailing – LU Girders
Task 2: Distribution Factors for LU Girders Larger than 65 in.
Task 3: Design Aids – LU Girders
PHASE I:
Task 4: Design Aids – Bearing
PHASE II:
Task 5: Development Of Lu Girder Standards And Special Details
PHASE I: OBJECTIVE
• Evaluation of the current practice in other states to determine
the most appropriate shape for the LU-girders.
• Development of Live Load Distribution Factors for LU-girders
with depths exceeding 65 in.
WORK PLANFRAMING PLANS
Three girder sections LU-72, LU-78 and LU-84
Bridge consists of three (3) LU-girders
SENSITIVITY STUDYMODELING TECHNIQUES
1- Grillage Model
(Transverse element for deck)
2- Planar Model
(Plate element for deck)
SENSITIVITY STUDY
Comparison of Modeling Techniques
Girder Feature Grillage Planar Shell
Exterior Moment (kip ft.) 5705 5632 5638
Interior Moment (kip ft.) 5592 5535 5575
SENSITIVITY STUDY
FindingsGrillage models yields results as accurate as the
sophisticated 3-D shell model.
Planar models yields results as accurate as the
sophisticated 3-D shell model.
Conclusion Planar models with ~2.5 ft. longitudinal elements will be
used in the parametric study.
Span Length (4 Variations)
• 100 ft., 110 ft., 120 ft. and 130 ft. for LU-72 girder
• 105 ft., 115 ft., 125 ft. and 135 ft. for LU-78 girder
• 110 ft., 120 ft., 130 ft. and 140 ft. for LU-84 girder
Girder Spacing (4 Variations)
• 12 ft., 14 ft., 16 ft. and 18 ft.
Overhang Width (2 Variations)
• 5 ft. and 7 ft.
Girder Stiffness (3 Variations)
• LU-72
• LU-78
• LU-84
WORK PLANPARAMETERS
Total No. of FE Models = 4 x 4 x 2 x3 = 96
WORK PLANCASES OF LOADING FOR EXTERIOR GIRDER
Case 1: One (1) Design Lane Loaded
Ext. Girder
Multi-Lane Presence Factor included
WORK PLANCASES OF LOADING FOR EXTERIOR GIRDER
Case 2: Two (2) Design Lanes Loaded
Ext. Girder
Multi-Lane Presence Factor included
WORK PLANCASES OF LOADING FOR INTERIOR GIRDER
Case 1: One (1) Design Lane Loaded Multi-Lane Presence Factor included
Int. Girder
WORK PLANCASES OF LOADING FOR INTERIOR GIRDER
Case 2: Three (3) Design Lanes Loaded Multi-Lane Presence Factor included
Int. Girder
WORK PLANMOMENT DISTRIBUTION FACTORS
LANES 1+2+3
Interior Girder
LANES 1+2
Exterior Girder
Service Live Load Moment from FE (MFE)
WORK PLANMOMENT DISTRIBUTION FACTORS
Lane Moment for LADV11 using Influence Line (MLANE)
32 k 32 k 8 k
Wlane = 0.64 kip/ft
• Impact factor included
• Magnification factor for LADV11 included
WORK PLANMOMENT DISTRIBUTION FACTORS
Moment Distribution Factors were determined as follows:
• 𝐷𝐹 (𝑜𝑛𝑒 𝑙𝑎𝑛𝑒 𝑙𝑜𝑎𝑑𝑒𝑑) =𝑀𝐹𝐸 (1 𝑙𝑎𝑛𝑒)
𝑀𝐿𝐴𝑁𝐸
• 𝐷𝐹 (𝑡𝑤𝑜 𝑜𝑟 𝑚𝑜𝑟𝑒 𝑙𝑎𝑛𝑒𝑠 𝑙𝑜𝑎𝑑𝑒𝑑) =𝑀𝐹𝐸 (2 𝑜𝑟 3 𝑙𝑎𝑛𝑒𝑠)
𝑀𝐿𝐴𝑁𝐸
MOMENT DISTRIBUTION FACTORSEFFECT OF SPAN LENGTH
0.70
0.80
0.90
1.00
1.10
1.20
1.30
1.40
12 14 16 18
Dis
trib
uti
on
Fac
tor
Spacing (ft.)
130 FT
120 FT
110 FT
100 FT
0.70
0.80
0.90
1.00
1.10
1.20
1.30
1.40
12 14 16 18
Dis
trib
uti
on
Fac
tor
Spacing (ft.)
130 FT
120 FT
110 FT
100 FT
LU-72 Bridges
Interior Girder Exterior Girder
MOMENT DISTRIBUTION FACTORSEFFECT OF SPAN LENGTH
LU-78 Bridges
Interior Girder Exterior Girder
0.70
0.80
0.90
1.00
1.10
1.20
1.30
1.40
12 14 16 18
Dis
trib
uti
on
Fac
tor
Spacing (ft.)
135 FT
125 FT
115 FT
105 FT
0.70
0.80
0.90
1.00
1.10
1.20
1.30
1.40
12 14 16 18
Dis
trib
uti
on
Fac
tor
Spacing (ft.)
135 FT
125 FT
115 FT
105 FT
MOMENT DISTRIBUTION FACTORS EFFECT OF SPAN LENGTH
LU-84 Bridges
Interior Girder Exterior Girder
0.70
0.80
0.90
1.00
1.10
1.20
1.30
1.40
12 14 16 18
Dis
trib
uti
on
Fac
tor
Spacing (ft.)
140 FT
130 FT
120 FT
110 FT
0.70
0.80
0.90
1.00
1.10
1.20
1.30
1.40
12 14 16 18
Dis
trib
uti
on
Fac
tor
Spacing (ft.)
140 FT
130 FT
120 FT
110 FT
MOMENT DISTRIBUTION FACTORS EFFECT OF GIRDER SPACING
LU-72 Bridges
Interior Girder Exterior Girder
0.70
0.80
0.90
1.00
1.10
1.20
1.30
1.40
100 105 110 115 120 125 130 135 140
Dis
trib
uti
on
Fac
tor
Span (ft.)
S 18 FT.
S 16 FT.
S 14 FT.
S 12 FT.
0.70
0.80
0.90
1.00
1.10
1.20
1.30
1.40
100 105 110 115 120 125 130 135 140
Dis
trib
uti
on
Fac
tor
Span (ft.)
S 18 FT.
S 16 FT.
S 14 FT.
S 12 FT.
SAME BEHAVIOR OBSERVED FOR LU-78 AND LU-84 BRIDGES
MOMENT DISTRIBUTION FACTORS EFFECT OF GIRDER STIFFNESS
Interior Girder Exterior Girder
0.70
0.80
0.90
1.00
1.10
1.20
1.30
1.40
100 105 110 115 120 125 130 135 140
Dis
trib
uti
on
Fac
tor
Span (ft.)
72 IN. DEPTH
78 IN. DEPTH
84 IN. DEPTH
0.70
0.80
0.90
1.00
1.10
1.20
1.30
1.40
100 105 110 115 120 125 130 135 140
Dis
trib
uti
on
Fac
tor
Span (ft.)
72 IN. DEPTH
78 IN. DEPTH
84 IN. DEPTH
Girder spacing = 18 ft.
SAME BEHAVIOR OBSERVED FOR GIRDER SPACINGS 12, 14 AND 16 FT.
MOMENT DISTRIBUTION FACTORS EFFECT OF OVERHANG WIDTH
Interior Girder Exterior Girder
0.70
0.80
0.90
1.00
1.10
1.20
1.30
1.40
12 14 16 18
Dis
trib
uti
on
Fac
tor
Spacing (ft.)
OV 5 FT
OV 6 FT
OV 7 FT.
OV 8 FT.
OV 9 FT.
130 ft. Span
LU-72 Bridges
0.70
0.80
0.90
1.00
1.10
1.20
1.30
1.40
12 14 16 18
Dis
trib
uti
on
Fac
tor
Spacing (ft.)
OV 5 FT
OV 6 FT
OV 7 FT.
OV 8 FT.
OV 9 FT.
130 ft. Span
MOMENT DISTRIBUTION FACTORS COMPARISON WITH AASHTO LRFD CURRENT PRACTICE
Interior Girder Exterior Girder
LU-72 Bridges
130 ft. Span
0.00
0.20
0.40
0.60
0.80
1.00
12 14 16 18
Dis
trib
uti
on
Fac
tor
Spacing (ft.)
FE ANALYSIS
AASHTO
1 LANE LOADED
130 ft. Span
0.00
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
1.80
2.00
12 14 16 18
Dis
trib
uti
on
Fac
tor
Spacing (ft.)
FE ANALYSIS
AASHTO
1 LANE LOADED
130 ft. Span
ONE LANE LOADED
MOMENT DISTRIBUTION FACTORS COMPARISON WITH AASHTO LRFD CURRENT PRACTICE
Interior Girder Exterior Girder
LU-78 Bridges
0.00
0.20
0.40
0.60
0.80
1.00
12 14 16 18
Dis
trib
uti
on
Fac
tor
Spacing (ft.)
FE ANALYSIS
AASHTO
1 LANE LOADED
135 ft. Span
0.00
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
1.80
2.00
12 14 16 18
Dis
trib
uti
on
Fac
tor
Spacing (ft.)
FE ANALYSIS
AASHTO
1 LANE LOADED
135 ft. Span
ONE LANE LOADED
MOMENT DISTRIBUTION FACTORS COMPARISON WITH AASHTO LRFD CURRENT PRACTICE
Interior Girder Exterior Girder
LU-84 Bridges
140 ft. Span
0.00
0.20
0.40
0.60
0.80
1.00
12 14 16 18
Dis
trib
uti
on
Fac
tor
Spacing (ft.)
FE ANALYSIS
AASHTO
1 LANE LOADED
140 ft. Span
0.00
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
1.80
2.00
12 14 16 18
Dis
trib
uti
on
Fac
tor
Spacing (ft.)
FE ANALYSIS
AASHTO1 LANE LOADED
140 ft. Span
ONE LANE LOADED
Observations
MOMENT DISTRIBUTION FACTORSCOMPARISON WITH AASHTO LRFD CURRENT PRACTICE
For one design loaded lane, AASHTO formulas are
unconservative in their prediction for the moment distribution
factors for interior LU-girders with depths higher than 65 in.
For one design loaded lane, the lever rule provide overly
conservative prediction for the moment distribution factor for the
exterior LU-girders with depths higher than 65 in.
New formulas are proposed to determine the moment distribution
factors for interior and exterior LU-girders
MOMENT DISTRIBUTION FACTORSPROPOSED FORMULAS
Interior Girder (One Loaded Lane)
AASHTO FORMULA PROPOSED FORMULA
𝑆
3.0
0.35𝑆𝑑
12 𝐿2
0.25𝑆
2.0
0.30𝑆𝑑
8.3 𝐿2
0.25
Exterior Girder (One Loaded Lane)
𝑺 ∶ Girder spacing
𝑳 ∶ Span length
𝒅 ∶ Girder depth
𝒅𝒆: Distance from the centerline of the exterior web of exteriorbeam at the deck level to the interior edge of the barrier
AASHTO FORMULA PROPOSED FORMULA
𝐿𝑒𝑣𝑒𝑟 𝑅𝑢𝑙𝑒 (1.28 + 𝑑𝑒/16.0)𝑆
2.0
0.30𝑆𝑑
8.3 𝐿2
0.25
MOMENT DISTRIBUTION FACTORSPROPOSED FORMULAS
Proposed Formula / FE Results (One Loaded Lane)
Interior Girder Exterior Girder
0.30
0.40
0.50
0.60
0.70
0.80
0.90
1.00
12 14 16 18
Dis
trib
uti
on
Fac
tor
Spacing (ft.)
FE ANALYSIS
PROPOSED
1 LANE LOADED
130 ft. Span
72 in. Depth
Interior Girder
0.30
0.40
0.50
0.60
0.70
0.80
0.90
1.00
12 14 16 18
Dis
trib
uti
on
Fac
tor
Spacing (ft.)
FE ANALYSIS
PROPOSED
1 LANE LOADED
130 ft. Span
72 in. Depth
Interior Girder
MOMENT DISTRIBUTION FACTORSCOMPARISON WITH AASHTO LRFD CURRENT PRACTICE
Interior Girder Exterior Girder
LU-72 Bridges
0.60
0.80
1.00
1.20
1.40
1.60
12 14 16 18
Dis
trib
uti
on
Fac
tor
Spacing (ft.)
FE ANALYSIS
AASHTO
2 OR MORE
LANES LOADED
0.60
0.80
1.00
1.20
1.40
1.60
12 14 16 18
Dis
trib
uti
on
Fac
tor
Spacing (ft.)
FE ANALYSIS
AASHTO
2 LANES LOADED
130 ft. Span 130 ft. Span
TWO OR MORE LOADED LANES
MOMENT DISTRIBUTION FACTORS COMPARISON WITH AASHTO LRFD CURRENT PRACTICE
Interior GirderExterior Girder
LU-78 Bridges
0.60
0.80
1.00
1.20
1.40
1.60
12 14 16 18
Dis
trib
uti
on
Fac
tor
Spacing (ft.)
FE ANALYSIS
AASHTO
2 OR MORE LANES
LOADED
135 ft. Span
0.60
0.80
1.00
1.20
1.40
1.60
12 14 16 18
Dis
trib
uti
on
Fac
tor
Spacing (ft.)
FE ANALYSIS
AASHTO
2 LANES LOADED
135 ft. Span
TWO OR MORE LOADED LANES
MOMENT DISTRIBUTION FACTORS COMPARISON WITH AASHTO LRFD CURRENT PRACTICE
Interior Girder Exterior Girder
LU-84 Bridges
140 ft. Span
0.60
0.80
1.00
1.20
1.40
1.60
12 14 16 18
Dis
trib
uti
on
Fac
tor
Spacing (ft.)
FE ANALYSIS
AASHTO
2 OR MORE LANES LOADED
140 ft. Span
0.60
0.80
1.00
1.20
1.40
1.60
12 14 16 18
Dis
trib
uti
on
Fac
tor
Spacing (ft.)
FE ANALYSIS
AASHTO
2 LANES LOADED
140 ft. Span
TWO OR MORE LOADED LANES
Observations
MOMENT DISTRIBUTION FACTORSCOMPARISON WITH AASHTO LRFD CURRENT PRACTICE
For the case of two or more loaded lanes, AASHTO formulas are
unconservative in their prediction for the moment distribution
factors for interior and exterior LU-girders with depths higher than
65 in.
New formulas are proposed to determine the moment distribution
factors for interior and exterior LU-girders with depths higher than
65 in.
MOMENT DISTRIBUTION FACTORSPROPOSED FORMULAS
AASHTO FORMULA PROPOSED FORMULA
(0.97 + 𝑑𝑒/28.5)𝑆
6.3
0.60𝑆𝑑
12𝐿2
0.125
(0.92 + 𝑑𝑒/16.0)𝑆
3.6
0.35𝑆𝑑
12 𝐿2
0.10 1.2
Interior Girder (Two or More Loaded Lanes)
AASHTO FORMULA PROPOSED FORMULA
𝑆
6.3
0.60𝑆𝑑
12𝐿2
0.125𝑆
3.6
0.35𝑆𝑑
12 𝐿2
0.10
Exterior Girder (Two or More Loaded Lanes)
𝑺 ∶ Girder spacing
𝑳 ∶ Span length
𝒅 ∶ Girder depth
𝒅𝒆: Distance from the centerline of the exterior web of exteriorbeam at the deck level to the interior edge of the barrier
MOMENT DISTRIBUTION FACTORSPROPOSED FORMULAS
Interior Girder Exterior Girder
Proposed Formula / FE Results (Two or More Loaded Lanes)
0.70
0.80
0.90
1.00
1.10
1.20
1.30
1.40
12 14 16 18
Dis
trib
uti
on
Fac
tor
Spacing (ft.)
FE ANALYSIS
PROPOSED
2 OR MORE LANES
LOADED
130 ft. Span
72 in. Depth
Interior Girder
0.70
0.80
0.90
1.00
1.10
1.20
1.30
1.40
12 14 16 18
Dis
trib
uti
on
Fac
tor
Spacing (ft.)
FE ANALYSIS
PROPOSED
2 OR MORE LANES
LOADED
130 ft. Span
72 in. Depth
Interior Girder
SHEAR DISTRIBUTION FACTORS
• Service Live Load Shear was determined from FE (VFE)
• Lane Moment for LADV11 determined using Influence Line
(VLANE)
• 𝐷𝐹 (𝑜𝑛𝑒 𝑙𝑎𝑛𝑒 𝑙𝑜𝑎𝑑𝑒𝑑) =𝑉𝐹𝐸 (1 𝑙𝑜𝑎𝑑𝑒𝑑 𝑙𝑎𝑛𝑒)
𝑀𝐿𝐴𝑁𝐸
• 𝐷𝐹 (𝑡𝑤𝑜 𝑜𝑟 𝑚𝑜𝑟𝑒 𝑙𝑎𝑛𝑒𝑠 𝑙𝑜𝑎𝑑𝑒𝑑) =𝑉𝐹𝐸 (2 𝑜𝑟 𝑚𝑜𝑟𝑒 𝑙𝑎𝑛𝑒𝑠)
𝑀𝐿𝐴𝑁𝐸
SHEAR DISTRIBUTION FACTORS COMPARISON WITH AASHTO LRFD CURRENT PRACTICE
Interior GirderExterior Girder
LU-72 Bridges
130 ft. Span
ONE LANE LOADED
0.00
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
12 14 16 18
Dis
trib
uti
on
Fac
tor
Spacing (ft.)
FE ANALYSIS
AASHTO
1 LANE
LOADED
0.00
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
12 14 16 18
Dis
trib
uti
on
Fac
tor
Spacing (ft.)
FE ANALYSIS
AASHTO
1 LANE
LEVER RULE
130 ft. Span 130 ft. Span
Observations
SHEAR DISTRIBUTION FACTORSCOMPARISON WITH AASHTO LRFD CURRENT PRACTICE
For one loaded lane, AASHTO formulas are very conservative in
their prediction for the shear distribution factors for interior and
exterior LU-girders with depths higher than 65 in.
New formulas are proposed to accurately predict the shear
distribution factors for U-girders.
SHEAR DISTRIBUTION FACTORSPROPOSED FORMULAS
Interior Girder (One Loaded Lane)
AASHTO FORMULA PROPOSED FORMULA
𝑆
10
0.6𝑑
12 𝐿
0.1
No Change
Exterior Girder (One Loaded Lane)
𝑺 ∶ Girder spacing
𝑳 ∶ Span length
𝒅 ∶ Girder depth
𝒅𝒆: Distance from the centerline of the exterior web of exteriorbeam at the deck level to the interior edge of the barrier
AASHTO FORMULA PROPOSED FORMULA
Lever Rule (1.09 + 𝑑𝑒/16)𝑆
10
0.6𝑑
12 𝐿
0.1 0.80
SHEAR DISTRIBUTION FACTORSPROPOSED FORMULAS
Proposed Formula / FE Results (One Lane Loaded)
Interior Girder Exterior Girder
0.70
0.80
0.90
1.00
1.10
1.20
1.30
1.40
1.50
1.60
12 14 16 18
Dis
trib
uti
on
Fac
tor
Spacing (ft.)
FE ANALYSIS
PROPOSED
1 LANE LOADED
130 ft. span
72 in. depth
Exterior girder
0.40
0.50
0.60
0.70
0.80
0.90
1.00
1.10
1.20
1.30
12 14 16 18
Dis
trib
uti
on
Fac
tor
Spacing (ft.)
FE ANALYSIS
RPOPOSED
1 LANE LOADED
130 ft. span
72 in. depth
Interior girder
SHEAR DISTRIBUTION FACTORS COMPARISON WITH AASHTO LRFD CURRENT PRACTICE
Interior Girder Exterior Girder
LU-72 Bridges
130 ft. Span
0.60
0.80
1.00
1.20
1.40
1.60
12 14 16 18
Dis
trib
uti
on
Fac
tor
Spacing (ft.)
FE ANALYSIS
AASHTO
2 OR MORE
LANES
LOADED
0.60
0.80
1.00
1.20
1.40
1.60
12 14 16 18D
istr
ibu
tio
n F
acto
rSpacing (ft.)
FE ANALYSIS
AASHTO
2 LANES
LOADED
130 ft. Span
TWO OR MORE LOADED LANES
130 ft. Span
SHEAR DISTRIBUTION FACTORSCOMPARISON WITH AASHTO LRFD CURRENT PRACTICE
Interior GirderExterior Girder
LU-78 Bridges
135 ft. Span
0.60
0.80
1.00
1.20
1.40
1.60
12 14 16 18
Dis
trib
uti
on
Fac
tor
Spacing (ft.)
FE ANALYSIS
AASHTO
2 OR MORE
LANES
LOADED
0.60
0.80
1.00
1.20
1.40
1.60
12 14 16 18
Dis
trib
uti
on
Fac
tor
Spacing (ft.)
FE ANALYSIS
AASHTO
2 LANES
LOADED
TWO OR MORE LOADED LANES
135 ft. Span 135 ft. Span
SHEAR DISTRIBUTION FACTORS COMPARISON WITH AASHTO LRFD CURRENT PRACTICE
Interior Girder Exterior Girder
LU-84 Bridges
140 ft. Span
0.60
0.80
1.00
1.20
1.40
1.60
12 14 16 18
Dis
trib
uti
on
Fac
tor
Spacing (ft.)
FE ANALYSIS
AASHTO
2 OR MORE
LANES
LOADED
0.60
0.80
1.00
1.20
1.40
1.60
12 14 16 18D
istr
ibu
tio
n F
acto
rSpacing (ft.)
FE ANALYSIS
AASHTO
2 LANES
LOADED
TWO OR MORE LOADED LANES
140 ft. Span 140 ft. Span
Observations
SHEAR DISTRIBUTION FACTORSCOMPARISON WITH AASHTO LRFD CURRENT PRACTICE
For two or more loaded lanes, AASHTO formulas are very
conservative in their prediction for the shear distribution factors
for interior and exterior LU-girders with depths higher than 65 in.
New formulas are proposed to accurately predict the shear
distribution factors for U-girders.
SHEAR DISTRIBUTION FACTORSPROPOSED FORMULAS
AASHTO FORMULA PROPOSED FORMULA
(0.80 + 𝑑𝑒/10)𝑆
7.4
0.8𝑑
12 𝐿
0.10
(0.90 + 𝑑𝑒/14)𝑆
7.1
0.65𝑑
12 𝐿
0.125 0.80
Interior Girder (Two or More Loaded Lanes)
AASHTO FORMULA PROPOSED FORMULA
𝑆
7.4
0.8𝑑
12 𝐿
0.10𝑆
7.1
0.65𝑑
12 𝐿
0.125
Exterior Girder (Two or More Loaded Lanes)
𝑺 ∶ Girder spacing
𝑳 ∶ Span length
𝒅 ∶ Girder depth
𝒅𝒆: Distance from the centerline of the exterior web of exteriorbeam at the deck level to the interior edge of the barrier
SHEAR DISTRIBUTION FACTORSPROPOSED FORMULAS
Proposed Formula / FE Results (Two or More Lanes Loaded)
Interior Girder Exterior Girder
0.70
0.80
0.90
1.00
1.10
1.20
1.30
1.40
1.50
1.60
12 14 16 18
Dis
trib
uti
on
Fac
tor
Spacing (ft.)
FE ANALYSIS
PROPOSED
2 OR MORE LANES
LOADED
130 ft. span
72 in. depth
Interior girder
0.70
0.80
0.90
1.00
1.10
1.20
1.30
1.40
1.50
1.60
12 14 16 18
Dis
trib
uti
on
Fac
tor
Spacing (ft.)
FE ANALYSIS
PROPOSED
2 OR MORE LANES
LOADED
130 ft. span
72 in. depth
Exterior girder
CONCLUSIONSSUMMARY OF OBSERVATIONS
AASHTO formulas were found to be unconservative or very
conservative in their prediction for the moment and shear
distribution factors for interior and exterior LU-girders with
depths higher than 65 in.
New formulas are proposed to accurately predict the moment
and shear distribution factors for interior and exterior LU-
girders.