Government of Nepal Ministry of Federal Affairs and Local Development OFFICE OF THE DISTRICT COORDINATION COMMITTEE Dhading Earthquake Housing Reconstruction Project (EHRP) Environmental and Social Screening Report (ESSR) Cluster level Screening: Total Number of settlement 8 Siddalek Rural Municipality Municipality-2 (Former Nalang VDC ward no.1-5 Date: December, 2017

mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

Government of Nepal

Ministry of Federal Affairs and Local Development

OFFICE OF THE DISTRICT COORDINATION COMMITTEE

Dhading

Earthquake Housing Reconstruction Project

(EHRP)

Environmental and Social Screening Report (ESSR) Cluster level Screening: Total Number of settlement 8

Siddalek Rural Municipality Municipality-2 (Former Nalang VDC ward no.1-5

Date: December, 2017

Page 2: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page i

Acronyms and Abbreviation

CBS Central Bureau of Statistics CFUG Community Forest User Group CL-PIU Central Level - Project Implementation Unit DCC District Coordination Committee DDC District Development Committee DL-PIU District Level – Project Implementation Unit DTO District Technical Office DUDBC Department of Urban Development and Building Construction EHRP Earthquake Housing Reconstruction Project EIA Environment Impact Assessment ENRC Energy and Natural Resource Committee ESMF Environmental and Social Management Framework ESMP Environmental and Social Management Plan ESSR Environment and Social Screening Report GPS Global Positioning System HHs Households ICS Improved Cooking Stove IEE Initial Environment Examination IPDP Indigenous People Development Plan LGCDP Local Governance Community Development Programme LF Leasehold forest MoFALD Ministry of Federal Affairs and Local Development MoFSC Ministry of Forest and Soil Conservation MoUD Ministry of Urban Development NRA National Reconstruction Authority NTFP Non-Timber Forest Product PIU Project Implementation Unit RAP Resettlement Action Plan VCDP Vulnerable Community Development Plan VDC Village Development Committee WASH Water Sanitation and Hygiene

Page 3: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page ii

Table of Contents ACRONYMS AND ABBREVIATION ................................................................................................................... I

1. BACKGROUND ..................................................................................................................................... 1

2. SCOPE OF EHRP .................................................................................................................................... 1

3. SUB PROJECT (SETTLEMENTS) .............................................................................................................. 2

4. SOCIAL AND ENVIRONMENTAL SCREENING AND ITS OBJECTIVES .......................................................... 3

5. METHODOLOGY ................................................................................................................................... 3

6. ISSUES, FINDINGS AND RECOMMENDATIONS: ....................................................................................... I

6.1 DUMRIBOT ........................................................................................................................................................ I6.2 APRICHAP ........................................................................................................................................................ II6.3 KUWAPANITAR ................................................................................................................................................ III6.4 BALEUTETAR ................................................................................................................................................... IV6.5 DUWADIGAUN ................................................................................................................................................. V6.6 PHALE ........................................................................................................................................................... VI6.7 BISTARI ......................................................................................................................................................... VII6.8 JYAMIRSWARA ............................................................................................................................................... VIII

ANNEX ........................................................................................................................................................ IX

ANNEX 1: SYNOPSIS OF 8 SETTLEMENTS ...................................................................................................................... IX1.1TABLE SHOWING SOCIO- DEMOGRAPHIC INFORMATION ........................................................................................... IX1.2 TABLE SHOWING EXISTING RESOURCES AND FACILITIES ............................................................................................. X1.3 TABLE SHOWING MATERIALS AND AVAILABLE SOURCES .......................................................................................... XIIANNEX 2: SCREENING CHECKLISTS AND DATA SHEETS OF SIDDALEK RM WARD NO. 2 (8 SETTLEMENTS OF FORMER NALANG VDC

1-5 WARD) ......................................................................................................................................................... XIVSETTLEMENT NO1: DUMRIBOT (ID:30-33-1-0) ....................................................................................................... XIVANNEX 2.1.1: ENVIRONMENTAL AND SOCIAL SCREENING CHECKLIST ............................................................................. XIVANNEX 2.1.2: LIST OF PUBLIC CONSULTATION ......................................................................................................... XVIIISETTLEMENT NO2:APRICHAP (ID:30-33-2-0) ......................................................................................................... XIXANNEX 2.2.1: ENVIRONMENTAL AND SOCIAL SCREENING CHECKLIST ............................................................................. XIXANNEX 2.2.2: LIST OF PUBLIC CONSULTATION ......................................................................................................... XXIIISETTLEMENT NO 3: KUWAPANITAR (ID:30-33-2-0) ............................................................................................... XXIVANNEX 2.3.1: ENVIRONMENTAL AND SOCIAL SCREENING CHECKLIST ........................................................................... XXIVANNEX 2.3.2: LIST OF PUBLIC CONSULTATION ....................................................................................................... XXVIIISETTLEMENT NO4: BALEUTETAR (ID:30-33-3-0) .................................................................................................... XXIXANNEX 2.4.1: ENVIRONMENTAL AND SOCIAL SCREENING CHECKLIST ........................................................................... XXIXANNEX 2.4.2: LIST OF PUBLIC CONSULTATION ....................................................................................................... XXXIIISETTLEMENT NO5: DUWADIGAUN (ID:30-33-4-0) ............................................................................................... XXXIVANNEX 2.5.1: ENVIRONMENTAL AND SOCIAL SCREENING CHECKLIST ......................................................................... XXXIVANNEX 2.5.2: LIST OF PUBLIC CONSULTATION ..................................................................................................... XXXVIIISETTLEMENT NO6: PHALE (ID:30-33-5-0) ......................................................................................................... XXXIXANNEX 2.6.1: ENVIRONMENTAL AND SOCIAL SCREENING CHECKLIST ......................................................................... XXXIXANNEX 2.6.2: LIST OF PUBLIC CONSULTATION .......................................................................................................... XLVSETTLEMENT NO7: BISTARI (ID:30-33-5-0) ........................................................................................................... XLVI

Page 4: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page iii

ANNEX 2.7.1: ENVIRONMENTAL AND SOCIAL SCREENING CHECKLIST ........................................................................... XLVIANNEX 2.7.2: LIST OF PUBLIC CONSULTATION ............................................................................................................ LIISETTLEMENT NO 8: JYAMISARA (ID:30-33-5-0) ....................................................................................................... LIIIANNEX 2.8.1: ENVIRONMENTAL AND SOCIAL SCREENING CHECKLIST ............................................................................. LIIIANNEX 2.8.2: LIST OF PUBLIC CONSULTATION ........................................................................................................... LIX

Page 5: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page 1

1. Background

Nepal Earthquake of April 2015 and subsequent aftershocks including of May 2015, caused wide spread destruction of residential houses, heritage sites, water supply system, government building, rural road, health posts etc in many districts. Dhading is one of the worst earthquake affected district. According to National Reconstruction Authority (NRA), the total number of houses damaged in Dhading district is 88,441 of which 81,313 are fully damaged and 7,128 are partially damaged. .Dhading district is administratively divided into 11 Rural Municipality and 2 municipalities (former: 50 VDCs & 1 Municipalities). The total population residing in the Dhading district is about 336,067. in 73,851 households (HH) with an average HH size of 4.88. The female population (178,233) in the districts is higher than that of male population (157,834). The sex ratio of the district is 88.6 (CBS, 2012).

Government of Nepal has selected Dhading district as one of the three districts to be supported under the World Bank funded Earthquake Housing Reconstruction Project (EHRP). The main objective of the EHRP is to restore earthquake-affected houses with multi-hazard resistant core housing units in targeted districts (Nuwakot, Dolkha and Dhading districts) and to enhance the government's ability to improve long-term disaster resilience. The project has four components: (1) Improved Housing Reconstruction, (2) Disaster Risk Management Systems, (3) Project Implementation Support and (4) Contingency Emergency Response.

2. Scope of EHRP EHRP supports only reconstruction of owners built houses. Government, through EHRP, provides grants to households for construction of residential houses following ‘owner-driven’ housing construction model.

EHRP approach includes:

• Beneficiary households will build their houses on their own land. Thus, land acquisition and resettlement is not envisaged under the project. • Residential houses will be small and constructed by the beneficiary household themselves using EHRP's design criteria. • Not all the houses will be constructed at the same time. Beneficiary households are expected to build their houses in their own pace. • No contractors will be used for construction works. Households have option to hire skilled and unskilled laborers as needed. • In Nepal, community members also come together to help each other to build their houses and community help is also provided to the vulnerable households. • General awareness/orientation on building earthquake resilient houses, environment and social safeguards and “Build Back Better Opportunity” measures are embedded in the project design. Accordingly government has developed the EHRP program to support the effected households. This is described in the following paragraph (Government's overall approach for earthquake disaster recovery in Nepal. • EHRP (housing component) does not support reconstruction of heritage/cultural sites, schools and other physical and social infrastructure and services.

Government’s overall approach for earthquake disaster recovery in Nepal includes:

• Skilled-training (mason, carpentry, plumbing, electrical) as a part of overall strategies are being provided by Department of Urban Development and Building Construction (DUDBC) in coordination with other line agencies and NGOs/INGOs. All interested community members and beneficiaries including those from vulnerable groups can take the training. NRA has already finalized the earthquake resilient house construction design parameters. Based on the design parameter DUDBC

Page 6: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page 2

engineer verifies earthquake resilient house reconstruction and beneficiaries are entitled to receive the payments in different tranches. • Government recognizes the need for supplementary top-up financial assistance worth Rs 50,000 for vulnerable households which could be in the form of materials and labor support among others. This supplementary financial support will be provided by partner organizations1

• Housing construction support of Rs 25,000 will also be extended as part of housing grant to promote sanitations and renewable energy (including solar power, Improved Cooking Stoves (ICS) or bio-gas etc. As such, the sanitation part of the settlement is likely to improve. However, this cash support in conditional subject to the construction of toilet or installation of alternative energy provision by the beneficiary households.

. Currently, the government is preparing the guideline for vulnerable support package to the affected households by partner organizations.

3. Sub Project (Settlements) Environmental and Social Screening was done at settlement level. Under EHRP-Settlement or sub project is defined based on a combination of following criteria: administrative boundary (such as a ward, or a former VDC), name of the village/place (such as Tole)/ community, natural or topographical boundary, and contiguity. It is to be noted that the former Village Development Committees (VDCs) and Municipalities are restructured as Rural Municipality and Urban Municipality according to new restructuring under the federalism of Nepal.

The total number of beneficiaries HHs considered as beneficiaries identified be the National Reconstruction Authority (NRA) for “Nepal Earthquake 2015” are 668 HHs in 8 settlements (Dmribot, Aprichap, Kuwapanitar, Baleutetar, Duwadigaun, Phale, Bistari, Jyamirswara). Refer Annex 2.1 for detail information.

Fig.1: Map Showing All 8 Settlements in Siddalek Rural Municipality, Ward- 2 (former Nalang

VDC 1-5)

1 Sector Plans and Financial Projection, May 2016, NRA.

Page 7: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page 3

4. Social and Environmental Screening and its Objectives ESMF requires Environmental and Social screening of each subproject/ settlement. The objectives of screenings are:

• To identify potential environmental and social issues/risks (physical, biological, social –cultural specific to the area) related to the subprojects and its activities, • To identify the need to obtain any regulatory clearances like for clearing/felling of trees from Ministry of Forest and Soil Conservation (MoFSC), for approval of quarry sites from local government (District Coordination Committee (DCC)/Municipality/ Rural Municipality) etc, • To check if the proposed location and activity meets the exclusion criteria, • To establish the need to carry out any further investigation/survey/ assessment for preparation of safeguard document like ESMPs, Resettlement Action Plan (RAP), Vulnerable Community Development Plan (VCDP), or any specific study and to provide guidance regarding environmental and social requirements and steps that needs to be taken for addressing identified issues, and • To explore opportunities for creating linkage for enhancing benefits, building better and synergy.

5. Methodology • Desk study: Documents such as district profile, former VDC profile, CBS publication and publication of line agencies at district level and other project related reports were reviewed. Besides topographic maps of 1:25000 scale and regional geological map including Google earth map were used as references for the overview of the sub project area. • Field visit and consultation: An elaborated Environmental and Social screening checklist was used (Annex-2) for recording information. Walkover survey for recording information was also carried out at settlement level. Free, prior and informed consultation with beneficiaries and local informants was undertaken on July 21 of 2017. During the consultations, they were informed about the project support provisions and information on socioeconomic setting including physical and biological features. Discussions were also held with district and local sectoral agencies including District Technical Office (DTO), ward secretary of rural municipality, communities’ groups- CFUGs and CBO active in sub project area. • Further consultations and discussions were held with and among EHRP Consultants; consultant engineers from Ministry of Urban Development (MoUD), Local Governance and Community Development Programme (LGCDP) Social Mobilizers.

Page 8: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page I

6. Issues, Findings and Recommendations:

6.1 Dumribot • The screening checklist (Annex 2.1.1) demonstrates that there no significant environmental and social issues identified. • Construction materials such as Timber, stone have to be either purchased from local market or collected from surroundings. • Dhadingbesi , Malekhu and Gajuri are the local markets for the supply of construction materials such as Timber, Cement, Iron rod, Bricks etc. • Local people can also harvest timber from own and Dalinsidda, Devdanda Community Forest and remaining within the allowed government relazation quantity quota; • Drinking water supply is adequate and sanitation condition is fair in the settlement; • The findings of screening indicate that each owner manages his/her own solid waste. However, there would be aggregated impacts related to solid waste from the construction of 66 houses. It requires corresponding mitigation procedures to properly handle and dispose the solid waste during and after construction • There are no known physical cultural sensitive area and any area/spot in and around the settlement that is known for critical natural habitat for wildlife/bird and wildlife movement and renowned habitats for a aquatic life in Gyallma River. • There are no land acquisition and involuntary resettlement issues in this settlement. • There are altogether 66 beneficiary households in the settlement which include Newar (31HHs), Gurung-(8HHs) and Magar (2 HHs) who are IPs and Dalit-(17HHs). Besides, there are 15 women headed HHs in the settlement and; • Due to the sub project implementation, environmental and social impacts envisaged are nominal or will have no significant adverse impacts. However, given the type of activities to be conducted, it is recommended that a simple cluster level ESMP addressing the common adverse potential impacts focusing on, but not limited to, additional pressure on demand of timber, stone and aggregates, health and safety etc will be prepared with site specific mitigation

Page 9: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page II

measures, cost and implemented through common program at Rural Municipality. There is no need for preparation of Initial Environmental Examination (IEE) and Environmental Impact Assessment (EIA) study.

6.2 Aprichap • The screening checklist (Annex 2.2.1) demonstrates that there no significant environmental and social issues identified. • Construction materials such as Timber, stone have to be either purchased from local market or collected from surroundings. • Gajuri, Dhadingbesi and Malekhu are the local markets for the supply of construction materials such as Timber, Cement, Iron rod, Bricks etc. • Local people can also harvest timber from own and Jangepakha Community Forest remaining within the allowed government relaxation quantity quota; • Drinking water supply is adequate and sanitation condition is fair in the settlement; • The findings of screening indicate that each owner manages his/her own solid waste. However, there would be aggregated impacts related to solid waste from the construction of 73 houses. It requires corresponding mitigation procedures to properly handle and dispose the solid waste during and after construction • There are no known physical cultural sensitive area and any area/spot in and around the settlement that is known for critical natural habitat for wildlife/bird and wildlife movement and renowned habitats for aquatic life in Bungchung River. • There are no land acquisition and involuntary resettlement issues in this settlement. • There are altogether 73 beneficiary households in the settlement among which Magar (21HHs) , Newar(2HHs)who are IPs and Dalit (3HHs). Besides, there are 29 women headed HHs in the settlement and; • Due to the sub project implementation, environmental and social impacts envisaged are nominal or will have no significant adverse impacts. However, given the type of activities to be conducted, it is recommended that a simple cluster level ESMP addressing the common adverse potential impacts focusing on, but not limited to, additional pressure on demand of timber, stone and aggregates, health and safety etc will be prepared with site specific mitigation

Page 10: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page III

measures, cost and implemented through common program at Rural Municipality. There is no need for preparation of Initial Environmental Examination (IEE) and Environmental Impact Assessment (EIA) study.

6.3 Kuwapanitar • The screening checklist (Annex 2.3.1) demonstrates that there no significant environmental and social issues identified. • Construction materials such as Timber, stone have to be either purchased from local market or collected from surroundings. • Gajuri, Dhadingbesi and Malekhu are the local markets for the supply of construction materials such as Timber, Cement, Iron rod, Bricks etc. • Local people can also harvest timber from own and Alenursery and Bimale Community Forest remaining within the allowed government relaxation quantity quota; • Drinking water supply is adequate and sanitation condition is fair in the settlement; • The findings of screening indicate that each owner manages his/her own solid waste. However, there would be aggregated impacts related to solid waste from the construction of 86 houses. It requires corresponding mitigation procedures to properly handle and dispose the solid waste during and after construction • There are no known physical cultural sensitive area and any area/spot in and around the settlement that is known for critical natural habitat for wildlife/bird and wildlife movement and renowned habitats for aquatic life in Gyalma River. • There are no land acquisition and involuntary resettlement issues in this settlement. • There are altogether 86 beneficiary households in the settlement which include Magar (3HHs), Newar(9HHs) and Newar(1HH) who are IPs and Dalit(28HHs) . Besides, there are 45 women headed HHs in the settlement and; • Due to the sub project implementation, environmental and social impacts envisaged are nominal or will have no significant adverse impacts. However, given the type of activities to be conducted, it is recommended that a simple cluster level ESMP addressing the common adverse potential impacts focusing on, but not limited to, additional pressure on demand of timber, stone and aggregates, health's and safety etc will be prepared with site specific mitigation

Page 11: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page IV

measures, cost and implemented through common program at Rural Municipality. There is no need for preparation of Initial Environmental Examination (IEE) and Environmental Impact Assessment (EIA) study. s

6.4 Baleutetar • The screening checklist (Annex 2.4.1) demonstrates that there no significant environmental and social issues identified. • Construction materials such as Timber, stone have to be either purchased from local market or collected from surroundings. • Gajuri, Dhadingbesi and Malekhu are the local markets for the supply of construction materials such as Timber, Cement, Iron rod, Bricks etc. • Local people can also harvest timber from own and Pokharidanda, Bhimapakha, Beltarkanlo Community Forest remaining within the allowed government relazation quantity quota; • Drinking water supply is inadequate and sanitation condition is poor in the settlement; • The findings of screening indicate that each owner manages his/her own solid waste. However, there would be aggregated impacts related to solid waste from the construction of 286 houses. It requires corresponding mitigation procedures to properly handle and dispose the solid waste during and after constructionThere are no known physical cultural sensitive area and any area/spot in and around the settlement that is known for critical natural habitat for wildlife/bird and wildlife movement and renowned habitats for aquatic life in Bungchung River. • There are no land acquisition and involuntary resettlement issues in this settlement. • There are altogether 286 beneficiary households in the settlement which include Magar (33HHs), Newar(19HHs) and Tamang (1 HH) who are IPs and Dalit(42HHs). Besides, there are 106women headed HHs in the settlement and; • Due to the sub project implementation, environmental and social impacts envisaged are nominal or will have no significant adverse impacts. However, given the type of activities to be conducted, it is recommended that a simple cluster level ESMP addressing the common adverse potential impacts focusing on, but not limited to, additional pressure on demand of timber, stone and aggregates, health and safety etc will be prepared with site specific mitigation

Page 12: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page V

measures, cost and implemented through common program at Rural Municipality. There is no need for preparation of Initial Environmental Examination (IEE) and Environmental Impact Assessment (EIA) study.

6.5 Duwadigaun • The screening checklist (Annex 2.5.1) demonstrates that there no significant environmental and social issues identified. • Construction materials such as Timber, stone have to be either purchased from local market or collected from surroundings. • Malekhu, Dhadingbesi and Gajuri are the local markets for the supply of construction materials such as Timber, Cement, Iron rod, Bricks etc. • Local people can also harvest timber from own and Paharedanda Community Forest remaining within the allowed government relaxation quantity quota; • Drinking water supply is inadequate and sanitation condition is poor in the settlement; • The findings of screening indicate that each owner manages his/her own solid waste. However, there would be aggregated impacts related to solid waste from the construction of 50 houses. It requires corresponding mitigation procedures to properly handle and dispose the solid waste during and after construction. There are no known physical cultural sensitive area and any area/spot in and around the settlement that is known for critical natural habitat for wildlife/bird and wildlife movement and renowned habitats for aquatic life in Bungchung River. • There are no land acquisition and involuntary resettlement issues in this settlement. • There are altogether 50 beneficiary households in the settlement which include Gurung(23HHs), Newar( 4HHs) who are IPs and Dalit(8HHs). Besides, there are 14 women headed HHs in the settlement and; • Due to the sub project implementation, environmental and social impacts envisaged are nominal or will have no significant adverse impacts. However, given the type of activities to be conducted, it is recommended that a simple cluster level ESMP addressing the common adverse potential impacts focusing

Page 13: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page VI

on, but not limited to, additional pressure on demand of timber, stone and aggregates, health and safety etc will be prepared with site specific mitigation measures, cost and implemented through common program at Rural Municipality. There is no need for preparation of Initial Environmental Examination (IEE) and Environmental Impact Assessment (EIA) study.

6.6 Phale • The screening checklist (Annex 2.6.1) demonstrates that there no significant environmental and social issues identified. • Construction materials such as Timber, stone have to be either purchased from local market or collected from surroundings. • Gajuri, Dhadingbesi and Malekhu are the local markets for the supply of construction materials such as Timber, Cement, Iron rod, Bricks etc. • Local people can also harvest timber from own and Shahidanda Patapari Community Forest remaining within the allowed government relaxation quantity quota; • Drinking water supply is inadequate and sanitation condition is poor in the settlement; • The findings of screening indicate that each owner manages his/her own solid waste. However, there would be aggregated impacts related to solid waste from the construction of 29 houses. It requires corresponding mitigation procedures to properly handle and dispose the solid waste during and after construction. • There are no known physical cultural sensitive area and any area/spot in and around the settlement that is known for critical natural habitat for wildlife/bird and wildlife movement and renowned habitats for aquatic life in Chyandu River. • There are no land acquisition and involuntary resettlement issues in this settlement. • There are altogether 29 beneficiary households in the settlement which include Magar (2HHs), Newar(3HHs), Gurung(1HH) who are IPs and Dalit(3HHs). Besides, there are 9 women headed HHs in the settlement and;

Page 14: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page VII

• Due to the sub project implementation, environmental and social impacts envisaged are nominal or will have no significant adverse impacts. However, given the type of activities to be conducted, it is recommended that a simple cluster level ESMP addressing the common adverse potential impacts focusing on, but not limited to, additional pressure on demand of timber, stone and aggregates, health and safety etc will be prepared with site specific mitigation measures, cost and implemented through common program at Rural Municipality. There is no need for preparation of Initial Environmental Examination (IEE) and Environmental Impact Assessment (EIA) study.

6.7 Bistari • The screening checklist (Annex 2.7.1) demonstrates that there no significant environmental and social issues identified. • Construction materials such as Timber, stone have to be either purchased from local market or collected from surroundings. • Malekhu, Dhadingbesi and Gajuri are the local markets for the supply of construction materials such as Timber, Cement, Iron rod, Bricks etc. • Local people can also harvest timber from own and Jangepakha Community Forest remaining within the allowed government relaxation quantity quota; • Drinking water supply is inadequate and sanitation condition is poor in the settlement; • The findings of screening indicate that each owner manages his/her own solid waste. However, there would be aggregated impacts related to solid waste from the construction of 37 houses. It requires corresponding mitigation procedures to properly handle and dispose the solid waste during and after construction. • There are no known physical cultural sensitive area and any area/spot in and around the settlement that is known for critical natural habitat for wildlife/bird and wildlife movement and renowned habitats for aquatic life in Chyandu River. • There are no land acquisition and involuntary resettlement issues in this settlement.

Page 15: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page VIII

• There are altogether 37 beneficiary households in the settlement which include Magar (4HHs), Gurung(1HH), Newar(1HH) who are IPs and Dalit(1HH). Besides, there are 12 women headed HHs in the settlement and; • Due to the sub project implementation, environmental and social impacts envisaged are nominal or will have no significant adverse impacts. However, given the type of activities to be conducted, it is recommended that a simple cluster level ESMP addressing the common adverse potential impacts focusing on, but not limited to, additional pressure on demand of timber, stone and aggregates, health and safety etc will be prepared with site specific mitigation measures, cost and implemented through common program at Rural Municipality. There is no need for preparation of Initial Environmental Examination (IEE) and Environmental Impact Assessment (EIA) study.

6.8 Jyamirswara • The screening checklist (Annex 2.8.1) demonstrates that there no significant environmental and social issues identified. • Construction materials such as Timber, stone have to be either purchased from local market or collected from surroundings. • Gajuri, Dhadingbesi and Malekkhu are the local markets for the supply of construction materials such as Timber, Cement, Iron rod, Bricks etc. • Local people can also harvest timber from own and Jaibhadrepakha Community Forest remaining within the allowed government relaxation quantity quota; • Drinking water supply is inadequate and sanitation condition is poor in the settlement; • The findings of screening indicate that each owner manages his/her own solid waste. However, there would be aggregated impacts related to solid waste from the construction of 41 houses. It requires corresponding mitigation procedures to properly handle and dispose the solid waste during and after construction. • There are no known physical cultural sensitive area and any area/spot in and around the settlement that is known for critical natural habitat for wildlife/bird and wildlife movement and renowned habitats for aquatic life in Chyandu River.

Page 16: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page IX

• There are no land acquisition and involuntary resettlement issues in this settlement. • There are altogether 41 beneficiary households in the settlement which include Magar (1HH), Newar(7HHs)who are IPs and Dalit(8HHs). Besides, there are 8 women headed HHs in the settlement and; • Due to the sub project implementation, environmental and social impacts envisaged are nominal or will have no significant adverse impacts. However, given the type of activities to be conducted, it is recommended that a simple cluster level ESMP addressing the common adverse potential impacts focusing on, but not limited to, additional pressure on demand of timber, stone and aggregates, health and safety etc will be prepared with site specific mitigation measures, cost and implemented through common program at Rural Municipality. There is no need for preparation of Initial Environmental Examination (IEE) and Environmental Impact Assessment (EIA) study.

Annex

Annex 1: Synopsis of 8 settlements

1.1Table Showing Socio- Demographic Information

S.No. Name of Settlement Settlement

ID

Name of Rural Municipality/Muni

cipality-Ward

Beneficiaries HHs Landless HHs

Affected HHs from

Resettlement

Remarks

Total Vulnerable Group

IP Da WH Ma Other

1 Dumribot 30-33-1-0 Siddalek RM-1 66 41 17 15 NA 8 NA NA Newar-31HHs, Gurung-8HHs, Magar-2HHs

2 Aprichap 30-33-2-0 Siddalek RM-1 73 23 3 29 NA 47 NA NA Magar-21HHs, Newar-2HHs, Dalit-3HHs

3 Kuwapanitar 30-33-2-0 Siddalek RM-1 86 12 28 45 NA 43 NA NA Newar-9HHs, Magar-3HHs, Dalit-28HHs

4 Baleutetar 30-33-3-0 Siddalek RM-1 286 53 42 106 NA 191 NA NA Magar-33HHs, Newar-19HHs, Tamang-1HH, Dalit-42HHs

Page 17: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page X

5 Duwadigaun 30-33-4-0 Siddalek RM-1 50 27 8 15 NA 14 NA NA Gurung-23HHs, Newar-4HHs, Dalit-8HHs

6 Phale 30-33-5-0 Siddalek RM-1 29 6 3 9 NA 20 NA NA Newar-3HHs, Magar-2HHs, Gurung-1HH, Dalit-3HHs

7 Bistari 30-33-5-0 Siddalek RM-1 37 6 1 12 NA 30 NA NA Magar-4HHs, Gurung-1HH, Newar-1HH, Dalit-1HH

8 Jyamiswara 30-33-5-0 Siddalek RM-1 41 8 8 8 NA 25 NA NA Newar-7HHs, Magar-1HH, Dalit-8HHs

Total 668 176 110 239 NA 378 NA NA

Note: -Settlement ID:- District code-VDC code-Ward code-Settlement code

IP: Indigenous People, Da: Dalit, WH: Women Headed, Ma: Marginalized

1.2 Table Showing Existing Resources and Facilities

S.No. Name of Settlement

Physical Cultural Resources

Existing Facilities and Accessibility

Remarks

Water & Sanitation Road Health Others

1 Dumribot Siddasthan

Adequate Drinking water supply, Satisfactory sanitation

Baireni Thati Khirke Kamalwari,

Kalupandey Highway

Health post Primary School s

2 Aprichap -

Adequate Drinking water supply, Satisfactory sanitation

Baireni Thati Khirke Kamalwari,Kalupand

ay Highway - Primary School

Health post are located within one hour walking

distance

Page 18: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page XI

3 Kuwapanitar -

Adequate Drinking water supply, Satisfactory sanitation

Thanti Aprichap road - Primary School Health post are located within one hour walking

distance

4 Baleutetar -

Adequate Drinking water supply, Satisfactory sanitation

Thanti Aprichap road - Lower Secondary School

Health post are located within one hour walking distance

5 Duwadigaun

Siddababa Temple,

Dhewadanda cliff,

Siddababaand Chatumaithan

Adequate Drinking water supply, Satisfactory sanitation

Baireni Thati Khirke Kamalwari,Kalupand

ey Highway - -

Health post and School are located within one hour walking distance

6 Phale -

Adequate Drinking water supply, Satisfactory sanitation

Prithivi Highway Road

- Primary School Health post are located within one hour walking distance

7 Bistari -

Adequate Drinking water supply, Satisfactory sanitation

Prithivi Highway Road

- Primary School Health post are located within one hour walking distance

8 Jyamiswara -

Adequate Drinking water supply, Satisfactory sanitation

Prithivi Highway Road

- - Health post and School are located within one hour walking distance

Page 19: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page XII

1.3 Table Showing Materials and Available Sources

S.No. Name of Settlement

Total Additional Demand of Construction Materials After Deducting Re-usable Issues

Debris/Solid Waste

Management

Further Plan Required

(Geotechnical Study, VCDP, ESMP, RAP)

Remarks Stone (m3

Nearest Source Stone ) Timber(ft3 Nearest Source Timber ) Forest and

wild life Physical Impacts

Other Sensitive

Site

1 Dumribot 369

Own Farm Land

17853

Own Farm Land, Dalinsidda and

Devdanda community forest and nearest

market place

NA

NA

NA Managed in –situ

and solid waste like

cement bags, metal scraps are

re will have

useable and hence

and minimal impact

NA

2 Aprichap 4088

Own Farm Land

19747

Own Farm Land, Jangepakha community

forest and nearest market place

NA

NA

NA

NA

3 Kuwapanitar 4816

Own Farm Land

23264

Own Farm Land, Alenursery and Bimale community forest and nearest market place

NA

NA

NA NA

4 Baleutetar 16016

Own Farm Land

77366

Own Farm Land, Pokharianda,

Bhimalepakha, Beltarkanla community

forest and nearest market place

NA

NA

NA NA

5 Duwadigaun 2800

Own Farm Land

13525

Own Farm Land, Paharedandacommunity

forest and nearest market place

NA

NA

NA NA

6 Phale 1624 Own Farm 7844

Own Farm Land, Shahidandpatapari

community forest and

NA

Page 20: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page XIII

Land nearest market place NA NA NA

7 Bistari 2072

Own Farm Land

10008

Own Farm Land, Jangepakha community

forest and nearest market place

NA

NA

NA

NA

8 Jyamiswara 2296

Own Farm Land

11090

Own Farm Land, Jaibhadrepakha

community forest and nearest market place

NA

NA

NA

NA

Note: Calculation of additional demand of construction materials was done on the different house models prepared for the reconstruction.

Page 21: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page XIV

Annex 2: Screening Checklists and Data Sheets of Siddalek RM Ward No. 2 (8 Settlements of former Nalang VDC 1-5 ward)

Settlement No1: Dumribot (ID:30-33-1-0)

Annex 2.1.1: Environmental and Social Screening Checklist 1. Project Title Earthquake Housing and Reconstruction Project (EHRP) 2. Project District Dhading 3. Name of the VDC/Municipality Nalang-1/Siddhalekh RM-2 4 Name of the Settlement, Ward No. Dumribot-1 5 Number of eligible households: 66- HHs 6 Altitude of the Settlement (in meters) NA 7 Nearest road head/highway/headquarter Baireni Thati Khirke Kamalwari, Kalupandey Highway 8 Settlement ID/no 30-33-1-0 9 Proposed Date of Commencement of

Work: ________________________ NA

Number of houses damaged 66 Number of houses to be reconstructed 66 Quantity of debris generated (by type) Stone (4290m3). Timber(21120cft3) Quantity of reusable materials (by type) Stone (2145m3). Timber(8448cft3) Quantity of debris that needs to be

disposed NA, with very few exception most of the generated debris are already managed in-situ by the beneficiaries household, Stone and timber salvaged are being packed properly and being used wisely

Quantity of construction materials needed (Timber, sand, gravel, stone, etc)

Stone (3696m3). Timber(17853cft3) and detail will be analyzed in cluster level ESMP

Any hazardous materials mixed with debris (e.g. from damaged health-posts, medicines, from agro-vet shops/ service etc)

None:, soil as binding materials are properly disposed and leveled in the adjoining cultivated land

10. Exclusion criteria: Shelter/house should not be located in

the risky spots (having ground slope of more than 30 degree, known flood risk spot, on top of or adjacent to known fault-line, etc).

NA

House/ shelter should not be located in protected area, and forest.

NA

Any activity, including material quarrying, resulting significant conversation or degradation of critical natural habitat is not permitted

NA

Page 22: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page XV

Use of any public PCR in private home reconstruction is not permitted.

NA

S.No ISSUES YES NO DO

NOT KNOW/remarks

1 Is the proposed sub-project likely to have minimal or no adverse environmental impacts?

2 Is the proposed subproject likely to have adverse environmental impacts that are site specific; few if any of them are irreversible, and mitigation measures are readily known or can be designed?

√ √

3. Is the proposed subproject likely to have adverse impacts on the health and quality of forests or rights and welfare of people and their level of dependence upon or interaction with forests? Is the proposed subproject likely to bring about changes in the management, protection or utilization of natural forests or plantations?

The quantity distributed as per approve government quota will not have adverse impact on forest.

Minor increase in utilization is expected with minimal impact

4 Will the sub-project be supporting reconstruction, management, or preservation of physical cultural resources? Is the subproject located in, or in the vicinity of, cultural sites? Will the sub-project likely adversely impact physical cultural resources?

√ √

Siddhalekh &Dhewadada.

5. Will the sub-project involve significant conversion or degradation of critical or non-critical natural habitats?

6 Does the sub-project involve involuntary land acquisition or prior acquisition of land or demolition of existing structures?

7 i) Are there any ethnic minority communities present in the project area?

ii) Are likely to be affected by the proposed sub-project?

Newar-31HHs, Gurung-8HHs, Magar-2HHs, Dalit-17HHs

Physical features 1 Is the settlement/subproject located in an area susceptible to

landslides, rock fall or erosion, flood prone areas and extreme climatic conditions, fogs, avalanche, snow-fall, etc?

2 Is the settlement located close to groundwater sources, √ Gyalma river

Page 23: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page XVI

springs, surface water bodies, riverbank, and watercourses? 3 How is the terrain? –flat, ridge, undulating, terraced, valley,

tar etc. √

Terraced

4 Any history of erosion, flashflood, landslides, earthquake in the area/ vicinity?

5 Current land use practice (agriculture, grazing, barren, forest, shrubs-----)

Agricultural & forest land

6 Is the subproject located on prime agricultural land? √ 7 Does the sub project involve significant extraction, diversion

or containment of surface or ground water for the local people or agriculture?

8 Any existing/approved/ potential quarry sites (sand, aggregate, stone, slates, boulders) in the vicinity of the sub-project?

9 Are there any potential sites/land for debris management/ solid waste management/ reclamation for future use?

10 Are there any areas or features of high landscape or scenic value on or spots with unique feature in and around the location which could be affected by the project? (examples, viewing point/ ridge/ peak, water-fall, cave, cliff etc)

11 Any risks (health and safety, location- cliff, ridge etc.) associated with the setting of the sub-project which needs to be taken care?

Biological features 1 Any critical habitat or ecosystem of importance?

Is the subproject located in or adjacent to a protected areas/ national forests, wilderness areas, wetlands (Ramsar), biodiversity, critical habitats?

2 If the subproject is located near the forest, what is the category of the forest- national, community, leasehold, religious etc.?

Dalensiddha and Devdada Community Forest

3 Any area/ spot in and around the subproject/ settlement that is known as/for wildlife/ bird habitat (examples – bear, langur monkey, red panda, deer, trees where vulture or bats nests, cliff where wild beehives, etc)

Macaca sps, Cervidae sps. Semnopithecus, Funambulus, Canic sps, Lophura Sps, Hystixindic sps

Is the settlement/ subproject area a known wildlife movement/ migration route or bird migration route?

Is there any water body, river, wetland etc known as important habitat (or renowned) for fishes or aquatic life? Any Ramsar site in the vicinity of the settlement/ subproject?

4 Would the sub-project potentially cause adverse impacts to habitats (e.g. modified, natural, and critical habitats) and/or ecosystems and ecosystem services?

Page 24: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page XVII

5 Does the Project involve changes to the use of lands and resources that may have adverse impacts on habitats, ecosystems, and/or livelihoods?

6 Are there any areas/ spots used by the protected, important sensitive species of flora and fauna for breeding, nesting, foraging, resting and for migration?

7 Would Project activities pose risks to endangered species or their habitat?

8 Does the sub-project implementation leads to harvesting of natural forests, timber, plantation development, or deforestation?

9 Any NTFP or medicinal plants in and around the sub-project? √

Debre kamai, different types of medicinal herbs.(Kurilo,Pakhanbed)

Socio-economic and Cultural Features 1 Is the subproject located in a densely populated area? √ 2 How many people comprise a typical household? √ 5 person per/HH 3 How many households are without any land/shelter, any

squatters? √

4 Is the subproject located near to the sites of archaeological/historical or cultural importance?

√ Siddhathan

5 Presence of minority/vulnerable/indigenous population in the area?

√ Newar-31HHs, Gurung-8HHs, Magar-2HHs, Dalits-17HHs, Other-8HHs

6 Is the sub-project located near cultural or religious place of importance including sacred hill/ peak, sacred cliff, cave and/ or sacred tree?

7 What household and livelihood support activities typically take place within the affected community?

Agriculture, Government Employment and Labor work.

8 What are the typical building practices of the affected people and what are the different materials have they used in the past?

Mostly 2-3 storied traditional building made up of Stone, Mud, CGI Sheets

9 Will the project require displacement or relocation of persons in the affected area?

10 Who are the vulnerable people in the population, also considering those affected by HIV/AIDS etc.?

√ IPs , Dalits and Women Headed HHsare different Vulnerable People

11 What is the current availability of water for drinking and personal hygiene,

Satisfactory Supply of Water and sanitation

Page 25: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page XVIII

12 What is the current provision of social/infrastructure facilities (health posts, sub-health posts, schools, communications, road etc?)

√ Health-post, Primary School and Telecommunication Service.

13 Are there any roads on around the location which causes congestion, environmental problems during project implementation?

14 Are there any open space, industries, recreation areas which could be affected by the project?

15 Are there any women headed HH (No. of HHs to be identified) in the settlement.

√ 15 HHs

16 Are there any conflicts about the use of local resources √

What are the programs/ activities ongoing or planned in the settlement/ VDC or subproject area that may be coordinated, linked, and/or worked together for synergy and for ‘building better’? Examples: Biogas, improved smokeless stoves, sanitation, micro-hydropower, catchment area/ soil erosion protection, community forest, buffer zone management, trail development, agriculture, composting, flood protection, river training, etc?)

√ Medical Team International(DHO)-Health &Sanitation Program

Helvetas-Safer Migration

Identification of ‘no go’ or ‘do not disturb’ area/ spots/ features based on hazards potential, protected or protection worthy area, common resources, and cultural values.

NA

Annex 2.1.2: List of public consultation SN Name of Participants Tole Remarks

1 Eak Narayan Shretha Dumribot 2 Eak Narayan Shretha Dumribot 3 Samundra Kunwar Dumribot 4 Pahal Man Shretha Dumribot 5 Dilnath Yogi Dumribot 6 Amrit Kumar Gurung Dumribot 7 Tilak Bahadur Yogi Dumribot 8 Dipak Kunwar Dumribot 10 Mehar Man Shretha Dumribot

Page 26: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page XIX

Settlement No2:Aprichap (ID:30-33-2-0)

Annex 2.2.1: Environmental and Social Screening Checklist 1. Project Title Earthquake Housing and Reconstruction Project (EHRP) 2. Project District Dhading 3. Name of the VDC/Municipality Nalang-2/Siddhalekh Gaupalika-2 4 Name of the Settlement, Ward No. Aprichhap-2 5 Number of eligible households: 73- HHs 6 Altitude of the Settlement (in meters) NA 7 Nearest road head/highway/headquarter Baireni Thati Khirke Kamalwari,Kalupanday Highway 8 Settlement ID/no 30-33-1-0 9 Proposed Date of Commencement of

Work: ________________________ NA

Number of houses damaged 73 Number of houses to be reconstructed 73 Quantity of debris generated (by type) Stone (4745m3). Timber(23360cft3)

Quantity of reusable materials (by type) Stone (2372m3). Timber (19747cft3)

Quantity of debris that needs to be

disposed NA, with very few exception most of the generated debris are already managed in-situ by the beneficiaries household, Stone and timber salvaged are being packed properly and being used wisely

Quantity of construction materials needed (Timber, sand, gravel, stone, etc)

Stone (4088m3). Timber(19747cft3) and detail will be analyzed in cluster level ESMP

Any hazardous materials mixed with debris (e.g. from damaged health-posts, medicines, from agro-vet shops/ service etc)

None:, soil as binding materials are properly disposed and leveled in the adjoining cultivated land

10. Exclusion criteria: Shelter/house should not be located in

the risky spots (having ground slope of more than 30 degree, known flood risk spot, on top of or adjacent to known fault-line, etc).

NA

House/ shelter should not be located in protected area, and forest.

NA

Any activity, including material quarrying, resulting significant conversation or degradation of critical natural habitat is not permitted

NA

Use of any public PCR in private home NA

Page 27: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page XX

reconstruction is not permitted.

S.No ISSUES YES NO DO NOT KNOW/Remarks

1 Is the proposed sub-project likely to have minimal or no adverse environmental impacts?

2 Is the proposed subproject likely to have adverse environmental impacts that are site specific; few if any of them are irreversible, and mitigation measures are readily known or can be designed?

3. Is the proposed subproject likely to have adverse impacts on the health and quality of forests or rights and welfare of people and their level of dependence upon or interaction with forests? Is the proposed subproject likely to bring about changes in the management, protection or utilization of natural forests or plantations?

The quantity distributed as per approve government quota will not have adverse impact on forest.

Minor increase in utilization is expected with minimal impact

4 Will the sub-project be supporting reconstruction, management, or preservation of physical cultural resources? Is the subproject located in, or in the vicinity of, cultural sites? Will the sub-project likely adversely impact physical cultural resources?

√ √

5. Will the sub-project involve significant conversion or degradation of critical or non-critical natural habitats?

6 Does the sub-project involve involuntary land acquisition or prior acquisition of land or demolition of existing structures?

7 i) Are there any ethnic minority communities present in the project area?

ii) Are likely to be affected by the proposed sub-project?

Magar-21HHs, Newar-2HHs, Dalit-3HHs

Physical features 1 Is the settlement/subproject located in an area susceptible to

landslides, rock fall or erosion, flood prone areas and extreme climatic conditions, fogs, avalanche, snow-fall, etc?

2 Is the settlement located close to groundwater sources, springs, surface water bodies, riverbank, and watercourses?

√ Bungchung river

3 How is the terrain? –flat, ridge, undulating, terraced, valley, tar etc.

√ Terraced

Page 28: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page XXI

4 Any history of erosion, flashflood, landslides, earthquake in

the area/ vicinity? √

5 Current land use practice (agriculture, grazing, barren, forest, shrubs-----)

Agricultural and forest land

6 Is the subproject located on prime agricultural land? √ 7 Does the sub project involve significant extraction, diversion

or containment of surface or ground water for the local people or agriculture?

8 Any existing/approved/ potential quarry sites (sand, aggregate, stone, slates, boulders) in the vicinity of the sub-project?

9 Are there any potential sites/land for debris management/ solid waste management/ reclamation for future use?

10 Are there any areas or features of high landscape or scenic value on or spots with unique feature in and around the location which could be affected by the project? (examples, viewing point/ ridge/ peak, water-fall, cave, cliff etc)

11 Any risks (health and safety, location- cliff, ridge etc.) associated with the setting of the sub-project which needs to be taken care?

Biological features 1 Any critical habitat or ecosystem of importance?

Is the subproject located in or adjacent to a protected areas/ national forests, wilderness areas, wetlands (Ramsar), biodiversity, critical habitats?

2 If the subproject is located near the forest, what is the category of the forest- national, community, leasehold, religious etc.?

Jangepakha CF

3 Any area/ spot in and around the subproject/ settlement that is known as/for wildlife/ bird habitat (examples – bear, langur monkey, red panda, deer, trees where vulture or bats nests, cliff where wild beehives, etc)

Macaca sps, Cervidae sps. Semnopithecus, Funambulus, Canic sps, Lophura Sps, Hystixindic sps.

Is the settlement/ subproject area a known wildlife movement/ migration route or bird migration route?

Is there any water body, river, wetland etc known as important habitat (or renowned) for fishes or aquatic life? Any Ramsar site in the vicinity of the settlement/ subproject?

4 Would the sub-project potentially cause adverse impacts to habitats (e.g. modified, natural, and critical habitats) and/or ecosystems and ecosystem services?

5 Does the Project involve changes to the use of lands and resources that may have adverse impacts on habitats,

Page 29: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page XXII

ecosystems, and/or livelihoods? 6 Are there any areas/ spots used by the protected, important

sensitive species of flora and fauna for breeding, nesting, foraging, resting and for migration?

7 Would Project activities pose risks to endangered species or their habitat?

8 Does the sub-project implementation leads to harvesting of natural forests, timber, plantation development, or deforestation?

9 Any NTFP or medicinal plants in and around the sub-project? √

Medicinal herbs (Kurilo, Debre kamai, bojho)

Socio-economic and Cultural Features 1 Is the subproject located in a densely populated area? √ 2 How many people comprise a typical household? √ 5person per/HH 3 How many households are without any land/shelter, any

squatters? √

4 Is the subproject located near to the sites of archaeological/historical or cultural importance?

5 Presence of minority/vulnerable/indigenous population in the area?

√ Magar-21HHs, Newar-2HHs, Dalit-3HHs, Other-47HHs

6 Is the sub-project located near cultural or religious place of importance including sacred hill/ peak, sacred cliff, cave and/ or sacred tree?

√ Siddhalekh

7 What household and livelihood support activities typically take place within the affected community?

Agriculture, Government Employment and Labor work.

8 What are the typical building practices of the affected people and what are the different materials have they used in the past?

Mostly 2-3 storied traditional building made up of Stone, Mud, CGI Sheets

9 Will the project require displacement or relocation of persons in the affected area?

10 Who are the vulnerable people in the population, also considering those affected by HIV/AIDS etc.?

√ IPs , Dalits and Women Headed HHsare different Vulnerable People

11 What is the current availability of water for drinking and personal hygiene,

Satisfactory supply of water source and sanitation

12 What is the current provision of social/infrastructure facilities (health posts, sub-health posts, schools, communications, road etc?)

√ VDC Road/Primary School and telecommunication Service.

13 Are there any roads on around the location which causes congestion, environmental problems during project

Page 30: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page XXIII

implementation? 14 Are there any open space, industries, recreation areas which

could be affected by the project? √

15 Are there any women headed HH (No. of HHs to be identified) in the settlement.

√ 29 HHs

16 Are there any conflicts about the use of local resources √

What are the programs/ activities ongoing or planned in the settlement/ VDC or subproject area that may be coordinated, linked, and/or worked together for synergy and for ‘building better’? Examples: Biogas, improved smokeless stoves, sanitation, micro-hydropower, catchment area/ soil erosion protection, community forest, buffer zone management, trail development, agriculture, composting, flood protection, river training, etc?)

√ Medical Team International(DHO)-Health &Sanitation Program

Helvetas-Safer Migration

Identification of ‘no go’ or ‘do not disturb’ area/ spots/ features based on hazards potential, protected or protection worthy area, common resources, and cultural values.

NA

Annex 2.2.2: List of Public Consultation SN Name of Participants Tole Remarks

1 Ram Bahadur Aryal Aprichap 2 Til Kumari Aryal Aprichap

3 Parbati Aryal Aprichap

4 Umadebi Aryal Aprichap

5 Narmta Debi Aryal Aprichap

6 Mitra Parsad Aryal Aprichap

7 Resham Bahadur Aryal Aprichap

8 Durga Parsad Aryal Aprichap

10 Sitadebi Aryal Aprichap

11 Krishna Kumari Aryal Aprichap

Page 31: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page XXIV

Settlement No 3: Kuwapanitar (ID:30-33-2-0)

Annex 2.3.1: Environmental and Social Screening Checklist 1. Project Title Earthquake Housing and Reconstruction Project (EHRP) 2. Project District Dhading 3. Name of the VDC/Municipality Nalang-2/Siddhalekh Gaupalika-2 4 Name of the Settlement, Ward No. Kuwapantar-2 5 Number of eligible households: 86- HHs 6 Altitude of the Settlement (in meters) NA 7 Nearest road head/highway/headquarter Thanti Aprichap road 8 Settlement ID/no 30-33-2-0 9 Proposed Date of Commencement of

Work: ________________________ NA

Number of houses damaged 86 Number of houses to be reconstructed 86 Quantity of debris generated (by type) Stone (5590m3). Timber(27520cft3) Quantity of reusable materials (by type) Stone (2795m3). Timber(11008cft3) Quantity of debris that needs to be

disposed NA, with very few exception most of the generated debris are already managed in-situ by the beneficiaries household, Stone and timber salvaged are being packed properly and being used wisely

Quantity of construction materials needed (Timber, sand, gravel, stone, etc)

Stone (4816m3). Timber(23264cft3) and detail will be analyzed in cluster level ESMP

Any hazardous materials mixed with debris (e.g. from damaged health-posts, medicines, from agro-vet shops/ service etc)

None:, soil as binding materials are properly disposed and leveled in the adjoining cultivated land

10. Exclusion criteria: Shelter/house should not be located in

the risky spots (having ground slope of more than 30 degree, known flood risk spot, on top of or adjacent to known fault-line, etc).

NA

House/ shelter should not be located in protected area, and forest.

NA

Any activity, including material quarrying, resulting significant conversation or degradation of critical natural habitat is not permitted

NA

Use of any public PCR in private home reconstruction is not permitted.

NA

Page 32: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page XXV

S.No ISSUES YES NO DO NOT KNOW/Remarks

1 Is the proposed sub-project likely to have minimal or no adverse environmental impacts?

2 Is the proposed subproject likely to have adverse environmental impacts that are site specific; few if any of them are irreversible, and mitigation measures are readily known or can be designed?

√ √

3. Is the proposed subproject likely to have adverse impacts on the health and quality of forests or rights and welfare of people and their level of dependence upon or interaction with forests? Is the proposed subproject likely to bring about changes in the management, protection or utilization of natural forests or plantations?

The quantity distributed as per approve government quota will not have adverse impact on forest.

Minor increase in utilization is expected with minimal impact

4 Will the sub-project be supporting reconstruction, management, or preservation of physical cultural resources? Is the subproject located in, or in the vicinity of, cultural sites? Will the sub-project likely adversely impact physical cultural resources?

√ √ √

5. Will the sub-project involve significant conversion or degradation of critical or non-critical natural habitats?

6 Does the sub-project involve involuntary land acquisition or prior acquisition of land or demolition of existing structures?

7 i) Are there any ethnic minority communities present in the project area?

ii) Are likely to be affected by the proposed sub-project?

Magar- 12HHs, Newar-3HHs, Dalit-28HHs

Physical features 1 Is the settlement/subproject located in an area susceptible to

landslides, rock fall or erosion, flood prone areas and extreme climatic conditions, fogs, avalanche, snow-fall, etc?

2 Is the settlement located close to groundwater sources, springs, surface water bodies, riverbank, and watercourses?

√ Bungchung river

3 How is the terrain? –flat, ridge, undulating, terraced, valley, tar etc.

Terraced

4 Any history of erosion, flashflood, landslides, earthquake in √

Page 33: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page XXVI

the area/ vicinity? 5 Current land use practice (agriculture, grazing, barren, forest,

shrubs-----) √

Agricultural & forest land

6 Is the subproject located on prime agricultural land? √ 7 Does the sub project involve significant extraction, diversion

or containment of surface or ground water for the local people or agriculture?

8 Any existing/approved/ potential quarry sites (sand, aggregate, stone, slates, boulders) in the vicinity of the sub-project?

9 Are there any potential sites/land for debris management/ solid waste management/ reclamation for future use?

10 Are there any areas or features of high landscape or scenic value on or spots with unique feature in and around the location which could be affected by the project? (examples, viewing point/ ridge/ peak, water-fall, cave, cliff etc)

11 Any risks (health and safety, location- cliff, ridge etc.) associated with the setting of the sub-project which needs to be taken care?

Biological features 1 Any critical habitat or ecosystem of importance?

Is the subproject located in or adjacent to a protected areas/ national forests, wilderness areas, wetlands (Ramsar), biodiversity, critical habitats?

2 If the subproject is located near the forest, what is the category of the forest- national, community, leasehold, religious etc.?

Ale Nursery and Bhimale CF

3 Any area/ spot in and around the subproject/ settlement that is known as/for wildlife/ bird habitat (examples – bear, langur monkey, red panda, deer, trees where vulture or bats nests, cliff where wild beehives, etc)

Macaca sps, Cervidae sps. Semnopithecus, Funambulus, Canic sps, Lophura Sps, Hystixindic sps.

Is the settlement/ subproject area a known wildlife movement/ migration route or bird migration route?

Is there any water body, river, wetland etc known as important habitat (or renowned) for fishes or aquatic life? Any Ramsar site in the vicinity of the settlement/ subproject?

4 Would the sub-project potentially cause adverse impacts to habitats (e.g. modified, natural, and critical habitats) and/or ecosystems and ecosystem services?

5 Does the Project involve changes to the use of lands and resources that may have adverse impacts on habitats, ecosystems, and/or livelihoods?

6 Are there any areas/ spots used by the protected, important √

Page 34: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page XXVII

sensitive species of flora and fauna for breeding, nesting, foraging, resting and for migration?

7 Would Project activities pose risks to endangered species or their habitat?

8 Does the sub-project implementation leads to harvesting of natural forests, timber, plantation development, or deforestation?

9 Any NTFP or medicinal plants in and around the sub-project? √

Debre kamai, different types of medicinal herbs.(Kurilo,Pakhanbed)

Socio-economic and Cultural Features 1 Is the subproject located in a densely populated area? √ 2 How many people comprise a typical household? √ 5person per/ HH 3 How many households are without any land/shelter, any

squatters? √

4 Is the subproject located near to the sites of archaeological/historical or cultural importance?

√ Chatara Devi temple

5 Presence of minority/vulnerable/indigenous population in the area?

√ Magar- 12HHs, Newar-3HHs, Dalit-28HHs,Other- 43HHs

6 Is the sub-project located near cultural or religious place of importance including sacred hill/ peak, sacred cliff, cave and/ or sacred tree?

7 What household and livelihood support activities typically take place within the affected community?

Agriculture, Government Employment and Labor work, small business, livestock

8 What are the typical building practices of the affected people and what are the different materials have they used in the past?

Mostly 2-3 storied traditional building made up of Stone, Mud, CGI Sheets

9 Will the project require displacement or relocation of persons in the affected area?

10 Who are the vulnerable people in the population, also considering those affected by HIV/AIDS etc.?

√ IPs , Dalits and Women Headed HHs are different Vulnerable People

11 What is the current availability of water for drinking and personal hygiene,

Satisfactory supply of water and sanitation

12 What is the current provision of social/infrastructure facilities (health posts, sub-health posts, schools, communications, road etc?)

√ Primary School and telecommunication .

13 Are there any roads on around the location which causes congestion, environmental problems during project

Page 35: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page XXVIII

implementation? 14 Are there any open space, industries, recreation areas which

could be affected by the project? √

15 Are there any women headed HH (No. of HHs to be identified) in the settlement.

√ 45 HHs

16 Are there any conflicts about the use of local resources √

What are the programs/ activities ongoing or planned in the settlement/ VDC or subproject area that may be coordinated, linked, and/or worked together for synergy and for ‘building better’? Examples: Biogas, improved smokeless stoves, sanitation, micro-hydropower, catchment area/ soil erosion protection, community forest, buffer zone management, trail development, agriculture, composting, flood protection, river training, etc?)

√ Medical Team International(DHO)-Health &Sanitation Program

Identification of ‘no go’ or ‘do not disturb’ area/ spots/ features based on hazards potential, protected or protection worthy area, common resources, and cultural values.

NA

Annex 2.3.2: List of Public Consultation SN Name of participants Tole Remarks

1 Balram Aryal Kuwapanitar

2 Kalpana Magar Kuwapanitar

3 Rajesh Aryal Kuwapanitar

4 Tankanatha Aryal Kuwapanitar

5 Nabaraj Aryal Kuwapanitar

6 Aka Raj Aryal Kuwapanitar

7 Dhanrupa Thapamagar Kuwapanitar

8 Murali Bahadur Magar Kuwapanitar

Page 36: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page XXIX

Settlement No4: Baleutetar (ID:30-33-3-0)

Annex 2.4.1: Environmental and Social Screening Checklist 1. Project Title Earthquake Housing and Reconstruction Project (EHRP) 2. Project District Dhading 3. Name of the VDC/Municipality Nalang-3/Siddhalekh Gaupalika-2 4 Name of the Settlement, Ward No. Baleutetar-3 5 Number of eligible households: 286- HHs 6 Altitude of the Settlement (in meters) NA 7 Nearest road head/highway/headquarter Thanti Aprichap road 8 Settlement ID/no 30-33-3-0 9 Proposed Date of Commencement of

Work: ________________________ NA

Number of houses damaged 286 Number of houses to be reconstructed 286 Quantity of debris generated (by type) Stone (18590m3). Timber(91520cft3) Quantity of reusable materials (by type) Stone (9295m3). Timber(36608cft3) Quantity of debris that needs to be

disposed NA, with very few exception most of the generated debris are already managed in-situ by the beneficiaries household, Stone and timber salvaged are being packed properly and being used wisely

Quantity of construction materials needed (Timber, sand, gravel, stone, etc)

Stone (16016m3). Timber(77366cft3) and detail will be analyzed in cluster level ESMP

Any hazardous materials mixed with debris (e.g. from damaged health-posts, medicines, from agro-vet shops/ service etc)

None:, soil as binding materials are properly disposed and leveled in the adjoining cultivated land

10. Exclusion criteria: Shelter/house should not be located in

the risky spots (having ground slope of more than 30 degree, known flood risk spot, on top of or adjacent to known fault-line, etc).

NA

House/ shelter should not be located in protected area, and forest.

NA

Any activity, including material quarrying, resulting significant conversation or degradation of critical natural habitat is not permitted

NA

Use of any public PCR in private home reconstruction is not permitted.

NA

Page 37: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page XXX

S.No ISSUES YES NO DO NOT KNOW/Remarks

1 Is the proposed sub-project likely to have minimal or no adverse environmental impacts?

2 Is the proposed subproject likely to have adverse environmental impacts that are site specific; few if any of them are irreversible, and mitigation measures are readily known or can be designed?

√ √

3. Is the proposed subproject likely to have adverse impacts on the health and quality of forests or rights and welfare of people and their level of dependence upon or interaction with forests? Is the proposed subproject likely to bring about changes in the management, protection or utilization of natural forests or plantations?

The quantity distributed as per approve government quota will not have adverse impact on forest.

Minor increase in utilization is expected with minimal impact

4 Will the sub-project be supporting reconstruction, management, or preservation of physical cultural resources? Is the subproject located in, or in the vicinity of, cultural sites? Will the sub-project likely adversely impact physical cultural resources?

√ √ √

5. Will the sub-project involve significant conversion or degradation of critical or non-critical natural habitats?

6 Does the sub-project involve involuntary land acquisition or prior acquisition of land or demolition of existing structures?

7 i) Are there any ethnic minority communities present in the project area?

ii) Are likely to be affected by the proposed sub-project?

Magar-33Hhs, Newar-19HHs, Tamang-1HH, Dalit-42HHs

Physical features 1 Is the settlement/subproject located in an area susceptible to

landslides, rock fall or erosion, flood prone areas and extreme climatic conditions, fogs, avalanche, snow-fall, etc?

2 Is the settlement located close to groundwater sources, springs, surface water bodies, riverbank, and watercourses?

√ Gyalma River

3 How is the terrain? –flat, ridge, undulating, terraced, valley, tar etc.

Terraced

4 Any history of erosion, flashflood, landslides, earthquake in √

Page 38: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page XXXI

the area/ vicinity? 5 Current land use practice (agriculture, grazing, barren, forest,

shrubs-----) √

Agricultural & forest land

6 Is the subproject located on prime agricultural land? √ 7 Does the sub project involve significant extraction, diversion

or containment of surface or ground water for the local people or agriculture?

8 Any existing/approved/ potential quarry sites (sand, aggregate, stone, slates, boulders) in the vicinity of the sub-project?

9 Are there any potential sites/land for debris management/ solid waste management/ reclamation for future use?

10 Are there any areas or features of high landscape or scenic value on or spots with unique feature in and around the location which could be affected by the project? (examples, viewing point/ ridge/ peak, water-fall, cave, cliff etc)

11 Any risks (health and safety, location- cliff, ridge etc.) associated with the setting of the sub-project which needs to be taken care?

Biological features 1 Any critical habitat or ecosystem of importance?

Is the subproject located in or adjacent to a protected areas/ national forests, wilderness areas, wetlands (Ramsar), biodiversity, critical habitats?

2 If the subproject is located near the forest, what is the category of the forest- national, community, leasehold, religious etc.?

Beltarkanlo, Bhimalepakha, Pokkharidanda CF

3 Any area/ spot in and around the subproject/ settlement that is known as/for wildlife/ bird habitat (examples – bear, langur monkey, red panda, deer, trees where vulture or bats nests, cliff where wild beehives, etc)

Macaca sps, Cervidae sps. Semnopithecus, Funambulus, Canic sps, Lophura Sps, Hystixindic sps.

Is the settlement/ subproject area a known wildlife movement/ migration route or bird migration route?

Is there any water body, river, wetland etc known as important habitat (or renowned) for fishes or aquatic life? Any Ramsar site in the vicinity of the settlement/ subproject?

4 Would the sub-project potentially cause adverse impacts to habitats (e.g. modified, natural, and critical habitats) and/or ecosystems and ecosystem services?

5 Does the Project involve changes to the use of lands and resources that may have adverse impacts on habitats, ecosystems, and/or livelihoods?

Page 39: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page XXXII

6 Are there any areas/ spots used by the protected, important sensitive species of flora and fauna for breeding, nesting, foraging, resting and for migration?

7 Would Project activities pose risks to endangered species or their habitat?

8 Does the sub-project implementation leads to harvesting of natural forests, timber, plantation development, or deforestation?

9 Any NTFP or medicinal plants in and around the sub-project? √

Debre kamai, different types of medicinal herbs.(Kurilo,Pakhanbed)

Socio-economic and Cultural Features 1 Is the subproject located in a densely populated area? √ 2 How many people comprise a typical household? √ 5person per/ HH 3 How many households are without any land/shelter, any

squatters? √

4 Is the subproject located near to the sites of archaeological/historical or cultural importance?

5 Presence of minority/vulnerable/indigenous population in the area?

√ Magar-33Hhs, Newar-19HHs, Tamang-1HH, Dalit-42HHs,Other- 191HHs

6 Is the sub-project located near cultural or religious place of importance including sacred hill/ peak, sacred cliff, cave and/ or sacred tree?

7 What household and livelihood support activities typically take place within the affected community?

Agriculture, Government Employment and Labor work, small business, livestock

8 What are the typical building practices of the affected people and what are the different materials have they used in the past?

Mostly 2-3 storied traditional building made up of Stone, Mud, CGI Sheets

9 Will the project require displacement or relocation of persons in the affected area?

10 Who are the vulnerable people in the population, also considering those affected by HIV/AIDS etc.?

√ IPs , Dalits and Women Headed HHs are different Vulnerable People

11 What is the current availability of water for drinking and personal hygiene,

Satisfactory supply of water and sanitation

12 What is the current provision of social/infrastructure facilities (health posts, sub-health posts, schools, communications,

√ School and telecommunication.

Page 40: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page XXXIII

road etc?) 13 Are there any roads on around the location which causes

congestion, environmental problems during project implementation?

14 Are there any open space, industries, recreation areas which could be affected by the project?

15 Are there any women headed HH (No. of HHs to be identified) in the settlement.

√ 45 HHs

16 Are there any conflicts about the use of local resources √

What are the programs/ activities ongoing or planned in the settlement/ VDC or subproject area that may be coordinated, linked, and/or worked together for synergy and for ‘building better’? Examples: Biogas, improved smokeless stoves, sanitation, micro-hydropower, catchment area/ soil erosion protection, community forest, buffer zone management, trail development, agriculture, composting, flood protection, river training, etc?)

√ Medical Team International(DHO)-Health &Sanitation Program

Identification of ‘no go’ or ‘do not disturb’ area/ spots/ features based on hazards potential, protected or protection worthy area, common resources, and cultural values.

NA

Annex 2.4.2: List of Public Consultation SN Name of Participants Tole Remarks

1 Daya Ram Sherestha Baleutetar

2 Ri Maya Nepali Baleutetar

3 Bala Bahadur Newar Baleutetar

4 Anita Nepali Baleutetar

5 Santa Kumari Sherestha Baleutetar

6 Madu Kumari Itani Baleutetar

7 Bahadur Sarki Baleutetar

Page 41: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page XXXIV

Settlement No5: Duwadigaun (ID:30-33-4-0)

Annex 2.5.1: Environmental and Social Screening Checklist 1. Project Title Earthquake Housing and Reconstruction Project (EHRP) 2. Project District Dhading 3. Name of the VDC/Municipality Nalang-4/Siddhalekh Gaupalika-2 4 Name of the Settlement, Ward No. Duwadigaun-4 5 Number of eligible households: 50- HHs 6 Altitude of the Settlement (in meters) NA 7 Nearest road head/highway/headquarter Baireni Thati Khirke Kamalwari,Kalupandey Highway 8 Settlement ID/no 30-33-4-0 9 Proposed Date of Commencement of

Work: ________________________ NA

Number of houses damaged 50 Number of houses to be reconstructed 50 Quantity of debris generated (by type) Stone (3250m3). Timber(16000cft3) Quantity of reusable materials (by type) Stone (1625m3). Timber(6400cft3) Quantity of debris that needs to be

disposed NA, with very few exception most of the generated debris are already managed in-situ by the beneficiaries household, Stone and timber salvaged are being packed properly and being used wisely

Quantity of construction materials needed (Timber, sand, gravel, stone, etc)

Stone (2800m3). Timber(13525cft3) and detail will be analyzed in cluster level ESMP

Any hazardous materials mixed with debris (e.g. from damaged health-posts, medicines, from agro-vet shops/ service etc)

None:, soil as binding materials are properly disposed and leveled in the adjoining cultivated land

10. Exclusion criteria: Shelter/house should not be located in

the risky spots (having ground slope of more than 30 degree, known flood risk spot, on top of or adjacent to known fault-line, etc).

NA

House/ shelter should not be located in protected area, and forest.

NA

Any activity, including material quarrying, resulting significant conversation or degradation of critical natural habitat is not permitted

NA

Use of any public PCR in private home reconstruction is not permitted.

NA

Page 42: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page XXXV

S.No ISSUES YES NO DO NOT KNOW/Remarks

1 Is the proposed sub-project likely to have minimal or no adverse environmental impacts?

2 Is the proposed subproject likely to have adverse environmental impacts that are site specific; few if any of them are irreversible, and mitigation measures are readily known or can be designed?

3. Is the proposed subproject likely to have adverse impacts on the health and quality of forests or rights and welfare of people and their level of dependence upon or interaction with forests? Is the proposed subproject likely to bring about changes in the management, protection or utilization of natural forests or plantations?

The quantity distributed as per approve government quota will not have adverse impact on forest.

Minor increase in utilization is expected with minimal impact

4 Will the sub-project be supporting reconstruction, management, or preservation of physical cultural resources? Is the subproject located in, or in the vicinity of, cultural sites? Will the sub-project likely adversely impact physical cultural resources?

√ √

Siddababa Chaturmaithan

5. Will the sub-project involve significant conversion or degradation of critical or non-critical natural habitats?

6 Does the sub-project involve involuntary land acquisition or prior acquisition of land or demolition of existing structures?

7 i) Are there any ethnic minority communities present in the project area?

ii) Are likely to be affected by the proposed sub-project?

√ √

Gurung-23HHs, Newar-4HHs, Bhujel-1HH, Dalit-8HHs

Physical features 1 Is the settlement/subproject located in an area susceptible to

landslides, rock fall or erosion, flood prone areas and extreme climatic conditions, fogs, avalanche, snow-fall, etc?

2 Is the settlement located close to groundwater sources, springs, surface water bodies, riverbank, and watercourses?

√ Bungchung river

3 How is the terrain? –flat, ridge, undulating, terraced, valley, tar etc.

Terraced

4 Any history of erosion, flashflood, landslides, earthquake in the area/ vicinity?

5 Current land use practice (agriculture, grazing, barren, forest, √ Agricultural &

Page 43: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page XXXVI

shrubs-----) forest land

6 Is the subproject located on prime agricultural land? √ 7 Does the sub project involve significant extraction, diversion

or containment of surface or ground water for the local people or agriculture?

8 Any existing/approved/ potential quarry sites (sand, aggregate, stone, slates, boulders) in the vicinity of the sub-project?

9 Are there any potential sites/land for debris management/ solid waste management/ reclamation for future use?

10 Are there any areas or features of high landscape or scenic value on or spots with unique feature in and around the location which could be affected by the project? (examples, viewing point/ ridge/ peak, water-fall, cave, cliff etc)

√ Dhewa cliff

11 Any risks (health and safety, location- cliff, ridge etc.) associated with the setting of the sub-project which needs to be taken care?

Biological features 1 Any critical habitat or ecosystem of importance?

Is the subproject located in or adjacent to a protected areas/ national forests, wilderness areas, wetlands (Ramsar), biodiversity, critical habitats?

2 If the subproject is located near the forest, what is the category of the forest- national, community, leasehold, religious etc.?

Paharedanda CF

3 Any area/ spot in and around the subproject/ settlement that is known as/for wildlife/ bird habitat (examples – bear, langur monkey, red panda, deer, trees where vulture or bats nests, cliff where wild beehives, etc)

Macacasps, Cervidaesps. Semnopithecus, Funambulus, Canicsps, LophuraSps, Hystixindicsps.

Is the settlement/ subproject area a known wildlife movement/ migration route or bird migration route?

Is there any water body, river, wetland etc known as important habitat (or renowned) for fishes or aquatic life? Any Ramsar site in the vicinity of the settlement/ subproject?

4 Would the sub-project potentially cause adverse impacts to habitats (e.g. modified, natural, and critical habitats) and/or ecosystems and ecosystem services?

5 Does the Project involve changes to the use of lands and resources that may have adverse impacts on habitats, ecosystems, and/or livelihoods?

6 Are there any areas/ spots used by the protected, important sensitive species of flora and fauna for breeding, nesting,

Page 44: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page XXXVII

foraging, resting and for migration? 7 Would Project activities pose risks to endangered species or

their habitat? √

8 Does the sub-project implementation leads to harvesting of natural forests, timber, plantation development, or deforestation?

9 Any NTFP or medicinal plants in and around the sub-project? √

Debre kamai, Gudargano,Hadchul etc.

Socio-economic and Cultural Features 1 Is the subproject located in a densely populated area? √ 2 How many people comprise a typical household? √ 5person per/HH 3 How many households are without any land/shelter, any

squatters? √

4 Is the subproject located near to the sites of archaeological/historical or cultural importance?

√ Siddababa temple

5 Presence of minority/vulnerable/indigenous population in the area?

√ Gurung-23HHs, Newar-4HHs, Bhujel-1HH, Dalit-8HHs and Other -14HHs

6 Is the sub-project located near cultural or religious place of importance including sacred hill/ peak, sacred cliff, cave and/ or sacred tree?

√ Dhewa cliff

7 What household and livelihood support activities typically take place within the affected community?

Agriculture, Government Employment and Labor work.

8 What are the typical building practices of the affected people and what are the different materials have they used in the past?

Mostly 2-3 storied traditional building made up of Stone, Mud, CGI Sheets

9 Will the project require displacement or relocation of persons in the affected area?

10 Who are the vulnerable people in the population, also considering those affected by HIV/AIDS etc.?

√ IPs , Dalits and Women Headed HHsare different Vulnerable People

11 What is the current availability of water for drinking and personal hygiene,

Satisfactory supply of water.

12 What is the current provision of social/infrastructure facilities (health posts, sub-health posts, schools, communications, road etc?)

√ School /telecommunication Service.

13 Are there any roads on around the location which causes congestion, environmental problems during project implementation?

14 Are there any open space, industries, recreation areas which could be affected by the project?

Page 45: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page XXXVIII

15 Are there any women headed HH (No. of HHs to be identified) in the settlement.

√ 14 HHs

16 Are there any conflicts about the use of local resources √

What are the programs/ activities ongoing or planned in the settlement/ VDC or subproject area that may be coordinated, linked, and/or worked together for synergy and for ‘building better’? Examples: Biogas, improved smokeless stoves, sanitation, micro-hydropower, catchment area/ soil erosion protection, community forest, buffer zone management, trail development, agriculture, composting, flood protection, river training, etc?)

√ Medical Team International(DHO)-Health &Sanitation Program

Identification of ‘no go’ or ‘do not disturb’ area/ spots/ features based on hazards potential, protected or protection worthy area, common resources, and cultural values.

NA

Annex 2.5.2: List of Public Consultation SN Name of Participants Tole Remarks 1 Hira Lal Naharki Duwadigaun 2 Purna Bahadur Gurung Duwadigaun 3 Lok Bahadur Bhujel Duwadigaun 4 Shyam Prasad Duwadi Duwadigaun 5 Netra Prasad Duwadi Duwadigaun 6 Chanamaya Shrestha Duwadigaun 7 Sumitra Naharki Duwadigaun 8 Rambabu Duwadi Duwadigaun 9 Chandra Kanta Duwadi Duwadigaun

Page 46: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page XXXIX

Settlement No6: Phale (ID:30-33-5-0)

Annex 2.6.1: Environmental and Social Screening Checklist

1. Project Title Earthquake Housing Reconstruction Project

2. Project District Dhading

3. Name of the VDC/Municipality Nalang -5/ Siddalek RM-2

4 Name of the Settlement, Ward No. Phale- 5

5 Number of eligible households: 29 HHs

6 Altitude of the Settlement (in meters) NA

7 Nearest road head/highway/headquarter Prithivi Highway Road

8 Settlement ID/no 30-33-5-0

9 Proposed Date of Commencement of Work: ________________________

NA

Number of houses damaged 29.

Number of houses to be reconstructed 29.

Quantity of debris generated (by type)

Stone (1885m3). Timber(9280cft3)

Quantity of reusable materials (by type)

Stone (942m3). Timber (3712cft3)

Quantity of debris that needs to be disposed

NA, with very few exception most of the generated debris are already managed in-situ by the beneficiaries household, Stone and timber salvaged are being packed properly and being used wisely

Quantity of construction materials needed (Timber, sand, gravel, stone, etc)

Stone (1624m3). Timber(7844cft3) and detail will be analyzed in cluster level ESMP

Page 47: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page XL

Any hazardous materials mixed with debris (e.g. from damaged health-posts, medicines, from agro-vet shops/ service etc)

NA

10.

Exclusion criteria:

Shelter/house should not be located in the risky spots (having ground slope of more than 30 degree, known flood risk spot, on top of or adjacent to known fault-line, etc).

NA

House/ shelter should not be located in protected area, and forest.

NA

Any activity, including material quarrying, resulting significant conversation or degradation of critical natural habitat is not permitted

NA

Use of any public PCR in private home reconstruction is not permitted.

NA

S.No ISSUES YES NO

DO NOT KNOW/Remarks

1 Is the proposed sub-project likely to have minimal or no adverse environmental impacts?

2 Is the proposed subproject likely to have adverse environmental impacts that are site specific; few if any of them are irreversible, and mitigation measures are readily known or can be designed?

3. Is the proposed subproject likely to have adverse impacts on the health and quality of forests or rights and welfare of people and their level of dependence upon or interaction with forests?

Is the proposed subproject likely to bring about changes in the management, protection or utilization of natural forests or plantations?

The quantity distributed as per approve government quota will not have adverse impact on forest.

Minor increase in utilization is

Page 48: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page XLI

expected with minimal impact

4 Will the sub-project be supporting reconstruction, management, or preservation of physical cultural resources?

Is the subproject located in, or in the vicinity of, cultural sites?

Will the sub-project likely adversely impact physical cultural resources?2

5. Will the sub-project involve significant conversion or degradation of critical or non-critical natural habitats?3

6 Does the sub-project involve involuntary land acquisition or prior acquisition of land or demolition of existing structures?

7 i) Are there any ethnic minority communities present in the project area?

ii) Are likely to be affected by the proposed sub-project?

√ Newar-3HH, Magar-2HHs, Gurung-1Hh, Dalit-3HHs

Physical features

1 Is the settlement/subproject located in an area susceptible to landslides, rock fall or erosion, flood prone areas and extreme climatic conditions, fogs, avalanche, snow-fall, etc? (show in map)

2 Is the settlement located close to groundwater sources, springs, surface water bodies, riverbank, and watercourses?

Chyandu River

3 How is the terrain? –flat, ridge, undulating, terraced, valley, tar etc.

Terraced

4 Any history of erosion, flashflood, landslides, earthquake in the area/ vicinity?

2Examples of physical cultural resources are archaeological or historical sites, including historic urban areas, religious monuments, structures and/or cemeteries particularly sites recognized by the government. 3 Critical natural habitats include those habitats that are legally protected, officially proposed for protection, identified by authoritative sources for their high conservation value, or recognized as protected by traditional local communities.

Page 49: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page XLII

5 Current land use practice (agriculture, grazing, barren, forest, shrubs-----)

Agriculture, and Forest Land

6 Is the subproject located on prime agricultural land?

7 Does the sub project involve significant extraction, diversion or containment of surface or ground water for the local people or agriculture?

8 Any existing/approved/ potential quarry sites (sand, aggregate, stone, slates, boulders) in the vicinity of the sub-project?

9 Are there any potential sites/land for debris management/ solid waste management/ reclamation for future use?

10 Are there any areas or features of high landscape or scenic value on or spots with unique feature in and around the location which could be affected by the project? (examples, viewing point/ ridge/ peak, water-fall, cave, cliff etc)

11 Any risks (health and safety, location- cliff, ridge etc.) associated with the setting of the sub-project which needs to be taken care?

Biological features

1 Any critical habitat or ecosystem of importance?

Is the subproject located in or adjacent to a protected areas/ national forests, wilderness areas, wetlands (Ramsar), biodiversity, critical habitats?

2 If the subproject is located near the forest, what is the category of the forest- national, community, leasehold, religious etc.?

Shahidanda Patapari CF

3 Any area/ spot in and around the subproject/ settlement that is known as/for wildlife/ bird habitat (examples – bear, langur monkey, red panda, deer, trees where vulture or bats nests, cliff

Macca sps fascicularis, Erethizon sps. ,

Page 50: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page XLIII

where wild beehives,etc) Odocoileus sps. and Panthera sps

Is the settlement/ subproject area a known wildlife movement/ migration route or bird migration route?

Is there any water body, river, wetland etc known as important habitat (or renowned) for fishes or aquatic life?

Any Ramsar site in the vicinity of the settlement/ subproject?

4 Would the sub-project potentially cause adverse impacts to habitats (e.g. modified, natural, and critical habitats) and/or ecosystems and ecosystem services?

5 Does the Project involve changes to the use of lands and resources that may have adverse impacts on habitats, ecosystems, and/or livelihoods?

6 Are there any areas/ spots used by the protected, important sensitive species of flora and fauna for breeding, nesting, foraging, resting and for migration?

7 Would Project activities pose risks to endangered species or their habitat?

8 Does the sub-project implementation leads to harvesting of natural forests, timber, plantation development, or deforestation?

9 Any NTFP or medicinal plants in and around the sub-project? √

Medicinal plant Debrekumai, Gurjogano, Kurilo.

Socio-economic and Cultural Features

1 Is the subproject located in a densely populated area? √

2 How many people comprise a typical household? √

5 person per /HH

3 How many households are without any land/shelter, any squatters?

Page 51: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page XLIV

4 Is the subproject located near to the sites of archaeological/historical or cultural importance?

5 Presence of minority/vulnerable/indigenous population in the area?

√ Gurungs (1HH), Newars (3HHs), Magar (2HHs), Dalits (3HH) Other- (20 HHs)

6 Is the sub-project located near cultural or religious place of importance including sacred hill/ peak, sacred cliff, cave and/ or sacred tree?

7 What household and livelihood support activities typically take place within the affected community?

Traditional farming, foreign employment and small scale business

8 What are the typical building practices of the affected people and what are the different materials have they used in the past?

Mostly 2-3 storied traditional building made up of Stone, Mud, CGI Sheets

9 Will the project require displacement or relocation of persons in the affected area?

10 Who are the vulnerable people in the population, also considering those affected by HIV/AIDS etc.?

√ IPs , Dalits and Women Headed HHs are different Vulnerable People

11 What is the current availability of water for drinking and personal hygiene,

Satisfactory water supply and sanitation

12 What is the current provision of social/infrastructure facilities (health posts, sub-health posts, schools, communications, road etc?)

School/telecommunication

13 Are there any roads on around the location which causes congestion, environmental problems during project implementation?

14 Are there any open space, industries, recreation areas which could be affected by the project?

Page 52: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page XLV

15 Are there any women headed HH (No. of HHs to be identified) in the settlement.

√ 9 HHs

16 Are there any conflicts about the use of local resources √

What are the programs/ activities ongoing or planned in the settlement/ VDC or subproject area that may be coordinated, linked, and/or worked together for synergy and for ‘building better’? Examples: Biogas, improved smokeless stoves, sanitation, micro-hydropower, catchment area/ soil erosion protection, community forest, buffer zone management, trail development, agriculture, composting, flood protection, river training, etc?)

NA

Identification of ‘no go’ or ‘do not disturb’ area/ spots/ features based on hazards potential, protected or protection worthy area, common resources, and cultural values.

NA

Annex 2.6.2: List of Public Consultation SN Name of participants Tole Remarks 1 Dille Sarki Phale 2 Prem Bahadur Giri Phale 3 Sanukanchh Giri Phale 4 Hasta Bahadur Giri Phale 5 Sabitri Sunar Phale 6 Sabitri Sunar Phale 7 Padam Kumari Subedi Phale

Page 53: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page XLVI

Settlement No7: Bistari (ID:30-33-5-0)

Annex 2.7.1: Environmental and Social Screening Checklist

1. Project Title Earthquake Housing Reconstruction Project

2. Project District Dhading

3. Name of the VDC/Municipality Nalang -5/ Siddalek RM-2

4 Name of the Settlement, Ward No. Bistari- 5

5 Number of eligible households: 37 HHs

6 Altitude of the Settlement (in meters) NA

7 Nearest road head/highway/headquarter Prithivi Highway Road

8 Settlement ID/no 30-33-5-0

9 Proposed Date of Commencement of Work: ________________________

NA

Number of houses damaged 37.

Number of houses to be reconstructed 37.

Quantity of debris generated (by type)

Stone (2405m3). Timber(11840cft3)

Quantity of reusable materials (by type)

Stone (1202m3). Timber (4736cft3)

Quantity of debris that needs to be disposed

NA, with very few exception most of the generated debris are already managed in-situ by the beneficiaries household, Stone and timber salvaged are being packed properly and being used wisely

Quantity of construction materials needed (Timber, sand, gravel, stone, etc)

Stone (2072m3). Timber(10008cft3) and detail will be analyzed in cluster level ESMP

Page 54: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page XLVII

Any hazardous materials mixed with debris (e.g. from damaged health-posts, medicines, from agro-vet shops/ service etc)

NA

10.

Exclusion criteria:

Shelter/house should not be located in the risky spots (having ground slope of more than 30 degree, known flood risk spot, on top of or adjacent to known fault-line, etc).

NA

House/ shelter should not be located in protected area, and forest.

NA

Any activity, including material quarrying, resulting significant conversation or degradation of critical natural habitat is not permitted

NA

Use of any public PCR in private home reconstruction is not permitted.

NA

S.No ISSUES YES NO

DO NOT KNOW/Remarks

1 Is the proposed sub-project likely to have minimal or no adverse environmental impacts?

2 Is the proposed subproject likely to have adverse environmental impacts that are site specific; few if any of them are irreversible, and mitigation measures are readily known or can be designed?

3. Is the proposed subproject likely to have adverse impacts on the health and quality of forests or rights and welfare of people and their level of dependence upon or interaction with forests?

Is the proposed subproject likely to bring about changes in the management, protection or utilization of natural forests or plantations?

The quantity distributed as per approve government quota will not have adverse impact on forest.

Minor increase in utilization is

Page 55: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page XLVIII

expected with minimal impact

4 Will the sub-project be supporting reconstruction, management, or preservation of physical cultural resources?

Is the subproject located in, or in the vicinity of, cultural sites?

Will the sub-project likely adversely impact physical cultural resources?4

5. Will the sub-project involve significant conversion or degradation of critical or non-critical natural habitats?5

6 Does the sub-project involve involuntary land acquisition or prior acquisition of land or demolition of existing structures?

7 i) Are there any ethnic minority communities present in the project area?

ii) Are likely to be affected by the proposed sub-project?

Newar-1HH, Magar-4HHs, Gurung-1HHs, Dalit-1HH

Physical features

1 Is the settlement/subproject located in an area susceptible to landslides, rock fall or erosion, flood prone areas and extreme climatic conditions, fogs, avalanche, snow-fall, etc? (show in map)

2 Is the settlement located close to groundwater sources, springs, surface water bodies, riverbank, and watercourses?

Chyandu River

3 How is the terrain? –flat, ridge, undulating, terraced, valley, tar etc.

Terraced

4 Any history of erosion, flashflood, landslides, earthquake in the area/ vicinity?

5 Current land use practice (agriculture, grazing, barren, forest,

Agriculture, and

4Examples of physical cultural resources are archaeological or historical sites, including historic urban areas, religious monuments, structures and/or cemeteries particularly sites recognized by the government. 5 Critical natural habitats include those habitats that are legally protected, officially proposed for protection, identified by authoritative sources for their high conservation value, or recognized as protected by traditional local communities.

Page 56: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page XLIX

shrubs-----) Forest Land

6 Is the subproject located on prime agricultural land? √

7 Does the sub project involve significant extraction, diversion or containment of surface or ground water for the local people or agriculture?

8 Any existing/approved/ potential quarry sites (sand, aggregate, stone, slates, boulders) in the vicinity of the sub-project?

9 Are there any potential sites/land for debris management/ solid waste management/ reclamation for future use?

10 Are there any areas or features of high landscape or scenic value on or spots with unique feature in and around the location which could be affected by the project? (examples, viewing point/ ridge/ peak, water-fall, cave, cliff etc)

11 Any risks (health and safety, location- cliff, ridge etc.) associated with the setting of the sub-project which needs to be taken care?

Biological features

1 Any critical habitat or ecosystem of importance?

Is the subproject located in or adjacent to a protected areas/ national forests, wilderness areas, wetlands (Ramsar), biodiversity, critical habitats?

2 If the subproject is located near the forest, what is the category of the forest- national, community, leasehold, religious etc.?

Jungepakha Thulotar CF

3 Any area/ spot in and around the subproject/ settlement that is known as/for wildlife/ bird habitat (examples – bear, langur monkey, red panda, deer, trees where vulture or bats nests, cliff where wild beehives,etc)

Macca fascicularis, Erethizon sps. , Odocoileus sps. and Panthera sps

Page 57: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page L

Is the settlement/ subproject area a known wildlife movement/ migration route or bird migration route?

Is there any water body, river, wetland etc known as important habitat (or renowned) for fishes or aquatic life?

Any Ramsar site in the vicinity of the settlement/ subproject?

4 Would the sub-project potentially cause adverse impacts to habitats (e.g. modified, natural, and critical habitats) and/or ecosystems and ecosystem services?

5 Does the Project involve changes to the use of lands and resources that may have adverse impacts on habitats, ecosystems, and/or livelihoods?

6 Are there any areas/ spots used by the protected, important sensitive species of flora and fauna for breeding, nesting, foraging, resting and for migration?

7 Would Project activities pose risks to endangered species or their habitat?

8 Does the sub-project implementation leads to harvesting of natural forests, timber, plantation development, or deforestation?

9 Any NTFP or medicinal plants in and around the sub-project? √

Medicinal plant Debrekumai, Gurjogano, Kurilo.

Socio-economic and Cultural Features

1 Is the subproject located in a densely populated area? √

2 How many people comprise a typical household? √

5 person per /HH

3 How many households are without any land/shelter, any squatters?

4 Is the subproject located near to the sites of archaeological/historical or cultural importance?

Page 58: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page LI

5 Presence of minority/vulnerable/indigenous population in the area?

√ Newar-1HH, Magar-4HHs, Gurung-1HHs, Dalit-1HH Other- 30 HHs

6 Is the sub-project located near cultural or religious place of importance including sacred hill/ peak, sacred cliff, cave and/ or sacred tree?

7 What household and livelihood support activities typically take place within the affected community?

Traditional farming, foreign employment and small scale business

8 What are the typical building practices of the affected people and what are the different materials have they used in the past?

Mostly 2-3 storied traditional building made up of Stone, Mud, CGI Sheets

9 Will the project require displacement or relocation of persons in the affected area?

10 Who are the vulnerable people in the population, also considering those affected by HIV/AIDS etc.?

√ IPs , Dalits and Women Headed HHs are different Vulnerable People

11 What is the current availability of water for drinking and personal hygiene,

Satisfactory water supply and sanitation

12 What is the current provision of social/infrastructure facilities (health posts, sub-health posts, schools, communications, road etc?)

School/telecommunication

13 Are there any roads on around the location which causes congestion, environmental problems during project implementation?

14 Are there any open space, industries, recreation areas which could be affected by the project?

15 Are there any women headed HH (No. of HHs to be identified) in the settlement.

√ 12 HHs

Page 59: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page LII

16 Are there any conflicts about the use of local resources √

What are the programs/ activities ongoing or planned in the settlement/ VDC or subproject area that may be coordinated, linked, and/or worked together for synergy and for ‘building better’? Examples: Biogas, improved smokeless stoves, sanitation, micro-hydropower, catchment area/ soil erosion protection, community forest, buffer zone management, trail development, agriculture, composting, flood protection, river training, etc?)

NA

Identification of ‘no go’ or ‘do not disturb’ area/ spots/ features based on hazards potential, protected or protection worthy area, common resources, and cultural values.

NA

Annex 2.7.2: List of Public Consultation SN Name of participants Tole Remarks 1 Dambar Bahadur Thakuri Bistari 2 Bhimkant Silawal Bistari 3 Bir Bahadur Silawal Bistari 4 Bhim Bahadur Silawal Bistari 5 Dharma Bahadur Silawal Bistari 6 Bishnu Bahadur Silawal Bistari 7 Madan Kumar Silawal Bistari 8 Bhakta Kumari Thakuri Bistari 9 Bhur Bahadur Silawal Bistari 10 Dev Kumari Bhatta Bistari

Page 60: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page LIII

Settlement No 8: Jyamisara (ID:30-33-5-0)

Annex 2.8.1: Environmental and Social Screening Checklist

1. Project Title Earthquake Housing Reconstruction Project

2. Project District Dhading

3. Name of the VDC/Municipality Nalang -5/ Siddalek RM-2

4 Name of the Settlement, Ward No. Jyamirswara- 5

5 Number of eligible households: 41 HHs

6 Altitude of the Settlement (in meters) NA

7 Nearest road head/highway/headquarter Prithivi Highway Road

8 Settlement ID/no 30-33-5-0

9 Proposed Date of Commencement of Work: ________________________

NA

Number of houses damaged 41.

Number of houses to be reconstructed 41.

Quantity of debris generated (by type)

Stone (2666m3). Timber(13120cft3)

Quantity of reusable materials (by type)

Stone (1332m3). Timber (5248cft3)

Quantity of debris that needs to be disposed

NA, with very few exception most of the generated debris are already managed in-situ by the beneficiaries household, Stone and timber salvaged are being packed properly and being used wisely

Quantity of construction materials needed (Timber, sand, gravel, stone, etc)

Stone (2296m3). Timber(11090cft3) and detail will be analyzed in cluster level ESMP

Page 61: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page LIV

Any hazardous materials mixed with debris (e.g. from damaged health-posts, medicines, from agro-vet shops/ service etc)

NA

10.

Exclusion criteria:

Shelter/house should not be located in the risky spots (having ground slope of more than 30 degree, known flood risk spot, on top of or adjacent to known fault-line, etc).

NA

House/ shelter should not be located in protected area, and forest.

NA

Any activity, including material quarrying, resulting significant conversation or degradation of critical natural habitat is not permitted

NA

Use of any public PCR in private home reconstruction is not permitted.

NA

S.No ISSUES YES NO

DO NOT KNOW/Remarks

1 Is the proposed sub-project likely to have minimal or no adverse environmental impacts?

2 Is the proposed subproject likely to have adverse environmental impacts that are site specific; few if any of them are irreversible, and mitigation measures are readily known or can be designed?

3. Is the proposed subproject likely to have adverse impacts on the health and quality of forests or rights and welfare of people and their level of dependence upon or interaction with forests?

Is the proposed subproject likely to bring about changes in the management, protection or utilization of natural forests or plantations?

The quantity distributed as per approve government quota will not have adverse impact on forest.

Minor increase in utilization is expected with

Page 62: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page LV

minimal impact

4 Will the sub-project be supporting reconstruction, management, or preservation of physical cultural resources?

Is the subproject located in, or in the vicinity of, cultural sites?

Will the sub-project likely adversely impact physical cultural resources?6

5. Will the sub-project involve significant conversion or degradation of critical or non-critical natural habitats?7

6 Does the sub-project involve involuntary land acquisition or prior acquisition of land or demolition of existing structures?

7 i) Are there any ethnic minority communities present in the project area?

ii) Are likely to be affected by the proposed sub-project?

Newar-7HH, Magar-1HH, Dalit-8HHs

Physical features

1 Is the settlement/subproject located in an area susceptible to landslides, rock fall or erosion, flood prone areas and extreme climatic conditions, fogs, avalanche, snow-fall, etc? (show in map)

2 Is the settlement located close to groundwater sources, springs, surface water bodies, riverbank, and watercourses?

Chyandu River

3 How is the terrain? –flat, ridge, undulating, terraced, valley, tar etc.

Terraced

4 Any history of erosion, flashflood, landslides, earthquake in the area/ vicinity?

5 Current land use practice (agriculture, grazing, barren, forest, shrubs-----)

Agriculture, and Forest Land

6Examples of physical cultural resources are archaeological or historical sites, including historic urban areas, religious monuments, structures and/or cemeteries particularly sites recognized by the government. 7 Critical natural habitats include those habitats that are legally protected, officially proposed for protection, identified by authoritative sources for their high conservation value, or recognized as protected by traditional local communities.

Page 63: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page LVI

6 Is the subproject located on prime agricultural land? √

7 Does the sub project involve significant extraction, diversion or containment of surface or ground water for the local people or agriculture?

8 Any existing/approved/ potential quarry sites (sand, aggregate, stone, slates, boulders) in the vicinity of the sub-project?

9 Are there any potential sites/land for debris management/ solid waste management/ reclamation for future use?

10 Are there any areas or features of high landscape or scenic value on or spots with unique feature in and around the location which could be affected by the project? (examples, viewing point/ ridge/ peak, water-fall, cave, cliff etc)

11 Any risks (health and safety, location- cliff, ridge etc.) associated with the setting of the sub-project which needs to be taken care?

Biological features

1 Any critical habitat or ecosystem of importance?

Is the subproject located in or adjacent to a protected areas/ national forests, wilderness areas, wetlands (Ramsar), biodiversity, critical habitats?

2 If the subproject is located near the forest, what is the category of the forest- national, community, leasehold, religious etc.?

Jaibhadrepakha CF

3 Any area/ spot in and around the subproject/ settlement that is known as/for wildlife/ bird habitat (examples – bear, langur monkey, red panda, deer, trees where vulture or bats nests, cliff where wild beehives,etc)

Macca fascicularis, Erethizon sps. , Odocoileus sps. and Panthera sps

Page 64: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page LVII

Is the settlement/ subproject area a known wildlife movement/ migration route or bird migration route?

Is there any water body, river, wetland etc known as important habitat (or renowned) for fishes or aquatic life?

Any Ramsar site in the vicinity of the settlement/ subproject?

4 Would the sub-project potentially cause adverse impacts to habitats (e.g. modified, natural, and critical habitats) and/or ecosystems and ecosystem services?

5 Does the Project involve changes to the use of lands and resources that may have adverse impacts on habitats, ecosystems, and/or livelihoods?

6 Are there any areas/ spots used by the protected, important sensitive species of flora and fauna for breeding, nesting, foraging, resting and for migration?

7 Would Project activities pose risks to endangered species or their habitat?

8 Does the sub-project implementation leads to harvesting of natural forests, timber, plantation development, or deforestation?

9 Any NTFP or medicinal plants in and around the sub-project?

Medicinal plant Debrekumai, Gurjogano, Kurilo.

Socio-economic and Cultural Features

1 Is the subproject located in a densely populated area?

2 How many people comprise a typical household?

5 person per /HH

Page 65: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page LVIII

3 How many households are without any land/shelter, any squatters?

4 Is the subproject located near to the sites of archaeological/historical or cultural importance?

5 Presence of minority/vulnerable/indigenous population in the area?

Newar-7HH, Magar-1HH, Dalit-8HHs ,Other- 25 HHs

6 Is the sub-project located near cultural or religious place of importance including sacred hill/ peak, sacred cliff, cave and/ or sacred tree?

7 What household and livelihood support activities typically take place within the affected community?

Traditional farming, foreign employment and small scale business

8 What are the typical building practices of the affected people and what are the different materials have they used in the past?

Mostly 2-3 storied traditional building made up of Stone, Mud, CGI Sheets

9 Will the project require displacement or relocation of persons in the affected area?

10 Who are the vulnerable people in the population, also considering those affected by HIV/AIDS etc.?

IPs , Dalits and Women Headed HHs are different Vulnerable People

11 What is the current availability of water for drinking and personal hygiene,

Satisfactory water supply and sanitation

12 What is the current provision of social/infrastructure facilities (health posts, sub-health posts, schools, communications, road etc?)

telecommunication

Page 66: mofald-clpiu.gov.npmofald-clpiu.gov.np/public/kcfinder/upload/files/DHD_EHRP_ESSR_Siddalekh RM-2_Nalang...ESSR of Siddalek RM Ward No. 1 EHRP/DLPIU-Dhading Page i Acronyms and Abbreviation

ESSR of Siddalek RM Ward No. 1

EHRP/DLPIU-Dhading Page LIX

13 Are there any roads on around the location which causes congestion, environmental problems during project implementation?

14 Are there any open space, industries, recreation areas which could be affected by the project?

15 Are there any women headed HH (No. of HHs to be identified) in the settlement.

8 HHs

16 Are there any conflicts about the use of local resources

What are the programs/ activities ongoing or planned in the settlement/ VDC or subproject area that may be coordinated, linked, and/or worked together for synergy and for ‘building better’? Examples: Biogas, improved smokeless stoves, sanitation, micro-hydropower, catchment area/ soil erosion protection, community forest, buffer zone management, trail development, agriculture, composting, flood protection, river training, etc?)

NA

Identification of ‘no go’ or ‘do not disturb’ area/ spots/ features based on hazards potential, protected or protection worthy area, common resources, and cultural values.

NA

Annex 2.8.2: List of Public Consultation SN Name of Participants Tole Remarks 1 Khil Bahadur Silwal Jyamirswara 2 Bir Bahadur Duwadi Jyamirswara 3 Balkrishna Silwal Jyamirswara 4 Man Bahadur Silwal Jyamirswara 5 Surendra Regmi Jyamirswara 6 Shibaram Regmi Jyamirswara 7 Januka Silwal Jyamirswara 8 Tara Devi Bhatta Jyamirswara 9 Chhanda Prasad Silwal Jyamirswara 10 Prem Kumari Silwal Jyamirswara 11 Jyamirswara