Module CC3002 Post Implementation Issues Lecture for Week 2 AY 2013 Spring

Module CC3002 Post Implementation Issues Lecture for Week 2 AY 2013 Spring

Embed Size (px)

Citation preview

Module CC3002

Post Implementation IssuesLecture for Week 2

AY 2013 Spring

Installation

• System Installation• Data Migration• Deployment• Business Change• Training• Documentation

Installation Issues

• Technical Issues: Installing IS Components– Hardware– Software– Network/Communication– Data Migration/Set-up

Installation Issues

• Social Issues: Human Factors– Training Users– Educating People (Selling System)– Business Change

• Overall Deployment Strategy

Client Server Architecture

• Client connects to Server for required remote processing e.g. data access• Remote processing on the Server• Local Processing on Client• Processing is shared between

Client and Server

Client Server Architecture

Software - Category

• System Software–Operating System–Utility Software

• Application Software–General Purpose–Specific Purpose

Chaffey(2003)

Technical Installation/Configuration

• May need to install and configure hardware (server/client)• May need to install (part of) network

(for IS, some/all hardware, network may be in place)• Will need to install (server

application software, database, client application software)

Software Modules

• Application specific software is often developed in a modular fashion:–Lead Management Module–Requisition Management Module–Student Module–RTE Module–Financial Module

Possible to Install some modules without having to install all modules

Software Migration

• How is software migrated to operational environment?• Typical Software Migration Process

Development Test Production

Data Migration

• Existing Source of Data ?–Existing Paper Records–Existing Information Systems–New Data

• Data May be Converted using ETL Process

Extract-Transform-Load

Existing System

TransformationProcess

New System

Data Migration- Transfer

• Change Structure• Change Format• Add New Attribute(s)• Remove Existing Attribute(s)• Change Sequence (order of attribute)

Data Migration- Example

Staff Details: Old Record

Staff Details: New Record

Data Migration- Example

Data Migration- Example

Data Migration- Example

Data Migration- Example

Data Migration- Example

Data Migration- Example

Data Migration- Example

Deployment OptionsExisting System L

ive

New System

Direct Change Over/ Immediate Cut Over

Deployment OptionsExisting System L

ive

New System

Parallel Running

Deployment OptionsExisting System L

ive

New System

Phased Modules

Deployment OptionsExisting System L

ive

New System

Phased Geographic

Deployment OptionsExisting System L

ive

New System

Pilot Running

Deployment Options

• Consider the Impact Of–Staffing–Workload–Cost–Time–Updates–Discontinuing of System

Business Issues during Installation

• Business Continuity–Cannot stop all work for installation

• Successful Installation–Key Process Testing

• Contingency Plan–What to do if things go wrong?

• Business and Organizational Change

Business & Organizational Change

• Change Causes Disruption to Staff–Changes to pattern of work–New roles/responsibilities–Risk of redundancy–Feel threatened by new technology–Users make mistakes–Need training–New system isn’t PERFECT either

Phases of Change

Phases of Change

Phases of Change

Phases of Change

Change Program

• Should run alongside system development project• Get users involved in the process• Project Management– Identify a user project management to

coordinate the business change management– Identify champions and change agents

Training

• Who to train?– Identify Users–What do the users need to know

• What to train?–Different users have different

requirement–Tailor training to specific user groups

Training

• Planning the training–Who, How and Where?–Development Team, online, on the job

• Conducting the training–Train the trainers–Timing (when is system going LIVE?)

Documentation

• Maintenance of System–Why was this done?–How was this done?–Why was it done this way?

• For End Users–How do I get system to do ….?–What does this error message mean?

Summary – Need to Consider

• Technical Aspects–Hardware/Software–Data/Documentation

• Human Aspects– Impact on Staff/Workload–Training– Impact on Business