188
Installation, Operation & Maintenance Manual (IOMM) GF-135 OMM-0089_0A USER MANUAL Installation, Operation and Maintenance GAS FIRED BOILER Natural Gas or Propane Gas Modulating & Condensing Hot Water Boiler: 06/19/2014 Page 1 of 188 AERCO International, Inc. 100 Oritani Dr. Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

Embed Size (px)

Citation preview

Page 1: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

Installation, Operation & Maintenance Manual (IOMM) GF-135

OMM-0089_0A

USER MANUAL Installation, Operation and Maintenance

GAS FIRED BOILER

Natural Gas or Propane Gas Modulating & Condensing Hot Water Boiler:

06/19/2014

Page 1 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 2: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation, Operation & Maintenance Manual

DISCLAIMER The information contained in this manual is subject to change without notice from AERCO International, Inc. AERCO makes no warranty of any kind with respect to this material, including, but not limited to, implied warranties of merchantability and fitness for a particular application. AERCO International is not liable for errors appearing in this manual, nor for incidental or consequential damages occurring in connection with the furnishing, performance, or use of these materials.

AERCO Technical Support: (Mon–Fri, 8am-5pm EST)

1 (800) 526-0288

AERCO Document Conventions In this document, some types of information are presented as shown in the following examples:

Message Type Example and Description

NOTES NOTE

NOTE messages indicate specific information related to the surrounding contextual information, and highlighted for special attention.

CAUTIONS CAUTION!

CAUTION messages inform of potential problems relating to the functioning of equipment, safety to persons, harm to the environment, and/or damage to property or equipment.

WARNINGS WARNING!

WARNING messages warn of potential dangerous situations that may result in serious injury and/or death to persons or animals. Text is red within a red box.

INSTRUCTIONS

How Instructions are Presented 1. Instructions are shown in a blue box with an underlined title.

2. All text, excepting in accompanying illustrations, is colored blue.

3. All procedures are listed in steps starting with “1.”, and using letters [a), b), c), etc.] to indicate sub-steps.

4. Steps that are continued on the next page have a “(Cont.)” appended to the instruction title.

Page 2 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 3: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation, Operation & Maintenance Manual

TABLE OF CONTENTS

CHAPTER 1: SAFETY PRECAUTIONS .............................................................................................. 9 1.1 WARNINGS & CAUTIONS ..................................................................................................................................... 9 1.2 EMERGENCY SHUTDOWN .................................................................................................................................. 10 1.3 PROLONGED SHUTDOWN .................................................................................................................................. 11

CHAPTER 2: INSTALLATION .......................................................................................................... 15 2.1 CODE COMPLIANCE ........................................................................................................................................... 15 2.2 DETERMINING PRODUCT LOCATION ................................................................................................................. 15 2.3 BOILER REPLACEMENT ....................................................................................................................................... 16 2.4 RECOMMENDED CLEARANCES .......................................................................................................................... 16 2.5 RESIDENTIAL GARAGE INSTALLATIONS .............................................................................................................. 17 2.6 BOILER FREEZE PROTECTION FEATURE.............................................................................................................. 17

CHAPTER 3: COMBUSTION AIR AND VENTING ............................................................................ 19 3.1 COMBUSTION AIR CONTAMINATION ................................................................................................................ 19 3.2 POTENTIAL CONTAMINATING PRODUCTS ......................................................................................................... 19

3.2.1 Areas Likely to Contain Contaminating Products ....................................................................................... 20 3.3 VENTILATION AND COMBUSTION AIR REQUIREMENTS - DIRECT VENT ............................................................ 20 3.4 VENTILATION AND COMBUSTION AIR REQUIREMENTS - CATEGORY IV ........................................................... 21 3.5 METHODS OF SUPPLYING COMBUSTION AIR TO A CONFINED SPACE - CATEGORY IV ...................................... 21

3.5.1 INDOOR COMBUSTION AIR......................................................................................................................... 22 3.5.2 OUTDOOR COMBUSTION AIR ..................................................................................................................... 23

3.5.2.1 Option 1: One Permanent Opening to Outside ................................................................................... 23 3.5.2.2 Option 2: Two Permanent Openings to Outside.................................................................................. 24

3.6 COMBINATION OF INDOOR AND OUTDOOR COMBUSTION AIR ....................................................................... 25 3.6.1 Outdoor Opening(s) Location ..................................................................................................................... 25 3.6.2 Outdoor Opening(s) Size ............................................................................................................................. 25

3.7 COMBUSTION AIR AND VENT PIPING ................................................................................................................ 25 3.8 REMOVAL OF AN EXISTING BOILER FROM A COMMON VENT SYSTEM .............................................................. 26

CHAPTER 4: UNIT PREPARATION.................................................................................................. 29 4.1 HANDLING INSTRUCTIONS................................................................................................................................. 29 4.2 WALL MOUNTING INSTALLATION...................................................................................................................... 29 4.3 WALL MOUNTING GUIDELINES.......................................................................................................................... 29 4.4 STUD WALL INSTALLATION ................................................................................................................................ 30 4.5 BOILER MOUNTING............................................................................................................................................ 30

CHAPTER 5: BOILER PIPING .......................................................................................................... 31 5.1 GENERAL PIPING REQUIREMENTS ..................................................................................................................... 31 5.2 PRESSURE RELIEF VALVE .................................................................................................................................... 31 5.3 BOILER AIR VENT................................................................................................................................................ 32 5.4 LOW WATER CUTOFF DEVICE ............................................................................................................................ 32 5.5 ADDITIONAL LIMIT CONTROL ............................................................................................................................ 33 5.6 BACKFLOW PREVENTER ..................................................................................................................................... 33 5.7 BOILER SYSTEM PIPING APPLICATIONS ............................................................................................................. 33 5.8 EXPANSION TANK AND MAKEUP WATER .......................................................................................................... 33

5.8.1 Diaphragm Expansion Tank ........................................................................................................................ 34 5.8.2 Closed-Type Expansion Tank ...................................................................................................................... 34

5.9 CIRCULATOR ...................................................................................................................................................... 34 5.10 SIZING PRIMARY PIPING .................................................................................................................................. 34 5.11 DOMESTIC HOT WATER SYSTEM PIPING ........................................................................................................ 34

Page 3 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 4: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation, Operation & Maintenance Manual

5.12 SYSTEM PIPING - ZONE CIRCULATORS ............................................................................................................. 34 5.13 SYSTEM PIPING - ZONE VALVES ....................................................................................................................... 35 5.14 SYSTEM PIPING - THROUGH BOILER ................................................................................................................ 35 5.15 SYSTEM PIPING - RADIANT HEATING ............................................................................................................... 35 5.16 SYSTEM PIPING—SPECIAL APPLICATIONS ....................................................................................................... 36 5.17 SYSTEM PIPING—MULTIPLE UNITS INSTALLATION ......................................................................................... 36

CHAPTER 6: INSTALLING VENT, AIR INTAKES, AND DRAIN ....................................................... 43 6.1 INSTALLING VENT AND COMBUSTION AIR INTAKE............................................................................................ 43 6.2 INSTALLING CONDENSATE DRAIN ASSEMBLY .................................................................................................... 43

CHAPTER 7: GAS PIPING ................................................................................................................ 45 7.1 GAS SUPPLY PIPING CONNECTION .................................................................................................................... 45 7.2 NATURAL GAS .................................................................................................................................................... 46

7.2.1 Pipe Sizing - Natural Gas ............................................................................................................................. 46 7.2.2 Natural Gas Supply Pressure Requirements ............................................................................................... 47

7.3 PROPANE GAS .................................................................................................................................................... 47 7.3.1 Pipe Sizing – Propane Gas ........................................................................................................................... 47 7.3.2 Propane Gas Supply Pressure Requirements.............................................................................................. 48

CHAPTER 8: INTERNAL WIRING..................................................................................................... 51 8.1 GENERAL REQUIREMENTS ................................................................................................................................. 51 8.2 FUSE LOCATIONS ............................................................................................................................................... 51

8.2.1 EZ-SETUP Controller Module Fuses Location.............................................................................................. 51 8.2.2 Line Voltage Fuses Location ........................................................................................................................ 52

CHAPTER 9: EXTERNAL WIRING ................................................................................................... 55 9.1 INSTALLATION COMPLIANCE ............................................................................................................................. 55 9.2 LINE VOLTAGE CONNECTIONS ........................................................................................................................... 55 9.3 CIRCULATOR WIRING ......................................................................................................................................... 56 9.4 ALARM WIRING.................................................................................................................................................. 57 9.5 LOW VOLTAGE CONNECTIONS .......................................................................................................................... 57 9.6 THERMOSTAT WIRING ....................................................................................................................................... 57 9.7 OUTDOOR SENSOR WIRING ............................................................................................................................... 58 9.8 DOMESTIC HOT WATER WIRING ....................................................................................................................... 58 9.9 ADDITIONAL BOILER LIMITS ............................................................................................................................... 58 9.10 EXTERNAL MODULATION CONTROL ................................................................................................................ 58 9.11 SYSTEM SENSOR WIRING ................................................................................................................................. 58 9.12 CASCADE WIRING ............................................................................................................................................ 59 9.13 MODBUS WIRING ............................................................................................................................................ 59

CHAPTER 10: BASIC EZ-SET CONTROLLER OPERATION ........................................................... 65 10.1 EZ-SET CONTROLLER INTRODUCTION.............................................................................................................. 65 10.2 EZ-SET CONTROLLER FEATURES AND FUNCTIONS........................................................................................... 65 10.3 CONTROLLER NAVIGATION .............................................................................................................................. 66 10.4 HOME SCREEN ................................................................................................................................................. 68 10.5 MAIN MENU .................................................................................................................................................... 70

10.6 EZ SETUP ................................................................................................................................................... 71

10.7 HEATING EZ SETUP ............................................................................................................................... 71 10.7.1 Select CH Demand (Default: Switch & Outdoor Reset) ............................................................................ 71 10.7.2 CH1 Setpoint (Default: 180°F [82°C]) ........................................................................................................ 72

Page 4 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 5: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation, Operation & Maintenance Manual

10.7.3 CH2 Setpoint (Default: 140°F [60°C]) ........................................................................................................ 72 10.7.4 Select CH1 Reset Curve (Default: Finned Tube Baseboard) ...................................................................... 72 10.7.5 Select CH2 Reset Curve (Default: Low Mass Radiant) .............................................................................. 72 10.7.6 Set Warm Weather Shutdown Temperature (Default: OFF) .................................................................... 73

10.8 DOMESTIC HOT WATER EZ SETUP ....................................................................................................... 74 10.8.1 Select DHW Demand (Default: Switch) ..................................................................................................... 74 10.8.2 Boiler DHW Setpoint (Default: 186°F [86°C])............................................................................................ 74 10.8.3 DHW Storage Setpoint (Default: 140°F [60°C]) ......................................................................................... 75 10.8.4 DHW Priority Timeout (Default: Off) ........................................................................................................ 75

10.9 EZ SETUP RESET .................................................................................................................................... 76

10.10 DISPLAY EZ SETUP ............................................................................................................................. 76

10.11 CH/DHW OPERATION ........................................................................................................................ 77

10.12 BOILER INFORMATION ............................................................................................................................. 77 10.12.1 Boiler Information Logging ..................................................................................................................... 79

10.13 LOCKOUT HISTORY......................................................................................................................................... 80 10.13.1 Lockout Details ....................................................................................................................................... 80

CHAPTER 11: START-UP PREPARATION ...................................................................................... 85 11.1 CHECK BOILER SYSTEM WATER CHEMISTRY .................................................................................................... 85

11.1.1 Water pH Level 6.0 to 8.0 ......................................................................................................................... 85 11.1.2 Water Hardness Less Than 7 Grains ......................................................................................................... 85 11.1.3 Chlorinated Water .................................................................................................................................... 85 11.1.4 Flush Boiler to Remove Sediment ............................................................................................................. 85 11.1.5 Check and Test Antifreeze ........................................................................................................................ 86 11.1.6 Use of Antifreeze in the Boiler System ..................................................................................................... 86

11.2 BOILER CLEANING ............................................................................................................................................ 86 11.2.1 Cleaning an Old Boiler and System ........................................................................................................... 86 11.2.2 Cleaning of New Boiler/System: ............................................................................................................... 87 11.2.3 Filling the Boiler System ........................................................................................................................... 87

11.3 CHECK LOW WATER CUT-OFF DEVICE ............................................................................................................. 87 11.4 CHECK FOR GAS LEAKS ..................................................................................................................................... 88 11.5 CHECK THERMOSTAT CIRCUIT ......................................................................................................................... 88 11.6 INSPECTION OF CONDENSATE DRAIN ASSEMBLY ............................................................................................ 89

CHAPTER 12: START-UP PROCEDURES ....................................................................................... 91 12.1 FINAL CHECKS BEFORE START-UP .................................................................................................................... 91 12.2 ESTEEM START-UP ........................................................................................................................................... 91 12.3 OPERATING INSTRUCTIONS (READ BEFORE OPERATING BOILER) .................................................................. 91

12.3.1 Troubleshooting Start-Up Problems ......................................................................................................... 93 12.4 INSPECTION OF THE ESTEEM BOILER AND SYSTEM......................................................................................... 93

12.4.1 Boiler Piping inspection ............................................................................................................................ 93 12.4.2 Vent Piping and Combustion Air Piping inspection .................................................................................. 93

Page 5 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 6: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation, Operation & Maintenance Manual

12.4.3 Gas Piping Inspection................................................................................................................................ 94 12.4.4 Flame Pattern and Combustion Verification ............................................................................................ 94 12.4.5 Measure and Verify Input Rating - Natural Gas Only................................................................................ 96 12.4.6 High Temperature Limit Testing ............................................................................................................... 97

CHAPTER 13: OUTDOOR RESET CONTROL .................................................................................. 99 13.1 OUTDOOR TEMPERATURE SENSOR INSTALLATION ....................................................................................... 100 13.2 OUTDOOR TEMPERATURE SENSOR WIRING ................................................................................................. 101

CHAPTER 14: EXTERNAL MODULATING CONTROL ................................................................... 103 14.1 WIRING THE EXTERNAL MODULATING CONTROLLER ................................................................................... 103 14.2 EZ-SETUP CONTROLLER PROGRAMMING FOR EXTERNAL 0-10V SIGNAL ...................................................... 103 14.3 EXTERNAL PROGRAMMING OF 0-10V MODULATING CONTROL ................................................................... 103

CHAPTER 15: CHECK-OUT PROCEDURES .................................................................................. 105

CHAPTER 16: MAINTENANCE SCHEDULE .................................................................................. 107 16.1 SERVICE TECHNICIAN MAINTENANCE ........................................................................................................... 107

16.1.1 General Maintenance ............................................................................................................................. 107 16.1.2 Poor Performance Maintenance ............................................................................................................ 107 16.1.3 Owner Maintenance ............................................................................................................................... 107

CHAPTER 17: MAINTENANCE PROCEDURES ............................................................................. 109 17.1 REPORTED PROBLEMS ................................................................................................................................... 109 17.2 SURROUNDING AREA INSPECTION ................................................................................................................ 109 17.3 BURNER AREA INSPECTION ........................................................................................................................... 109 17.4 SYSTEM PIPING INSPECTION .......................................................................................................................... 110 17.5 CLEAN CONDENSATE DRAIN ASSEMBLY ........................................................................................................ 110 17.6 VENTILATION AIR OPENINGS INSPECTION .................................................................................................... 110 17.7 VENT AND COMBUSTION AIR PIPING INSPECTION........................................................................................ 110 17.8 BOILER SYSTEM INSPECTION ......................................................................................................................... 111 17.9 EXPANSION TANK INSPECTION ...................................................................................................................... 111 17.10 BOILER RELIEF VALVE INSPECTION .............................................................................................................. 111 17.11 IGNITION ELECTRODE INSPECTION .............................................................................................................. 112 17.12 IGNITION WIRING AND GROUND WIRING INSPECTION .............................................................................. 112 17.13 CONTROL WIRING INSPECTION ................................................................................................................... 112 17.14 CONTROL SETTINGS INSPECTION ................................................................................................................ 112 17.15 PERFORM START-UP AND CHECKOUT PROCEDURES .................................................................................. 112 17.16 BURNER FLAME INSPECTION AND TROUBLESHOOTING ............................................................................. 113 17.17 FLAME SIGNAL INSPECTION ......................................................................................................................... 114 17.18 COMBUSTION LEVELS INSPECTION.............................................................................................................. 114 17.19 FLUE GAS TEMPERATURE CHECK ................................................................................................................ 114 17.20 HEAT EXCHANGER CLEANING...................................................................................................................... 115 17.21 REVIEWING MAINTENANCE REQUIREMENTS WITH OWNER ...................................................................... 115 17.22 Handling Previously Fired Combustion Chamber Insulation ....................................................................... 116

CHAPTER 18: EZ-SETUP CONTROLLER OPERATION AND SETTINGS ..................................... 117 18.1 ENTERING THE INSTALLER ACCESS CODE ...................................................................................................... 117 18.2 USING THE INSTALLER MENU ........................................................................................................................ 118

18.3 CH and DHW SETTINGS MENU ................................................................................................................ 121 18.3.1 Heating Operation (Default: Enabled) .................................................................................................... 121 18.3.2 Demand Type (Default: Switch & Outdoor Reset) .................................................................................. 122

Page 6 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 7: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation, Operation & Maintenance Manual

18.3.3 Absolute Max CH Setpoint (Default: 188°F [87°C]) ................................................................................. 123 18.3.4 CH1 Maximum Setpoint (Default: 180°F [82°C])..................................................................................... 123 18.3.5 CH1 Minimum Setpoint (Default: 120°F [49°C]) ..................................................................................... 124 18.3.6 Reset Curve Coldest Day (Default: 0°F [-18°C])....................................................................................... 124 18.3.7 Reset Curve Warmest Day (Default: 64°F [18°C]) ................................................................................... 124 18.3.8 CH2 Circuit (Default: Enabled) ................................................................................................................ 125 18.3.9 CH2 Maximum Setpoint (Default: 140°F [60°C])..................................................................................... 125 18.3.10 CH2 Minimum Setpoint (Default: 80°F [27°C]) ..................................................................................... 125 18.3.11 Warm Weather Shutdown (Default: Off).............................................................................................. 126 18.3.12 Pump Constant Circulation (Default: Disabled) .................................................................................... 126 18.3.13 CH Post Pump Time (Default: 1 Minute)............................................................................................... 127 18.3.14 Freeze Protection (Default: Enabled) ................................................................................................... 128 18.3.15 Frost Protection Setpoint (Default: -22°F [-30°C]) ................................................................................ 129 18.3.16 Parallel Shift Value (Default: 0°F [0°C]) ................................................................................................. 129 18.3.17 CH Call Blocking (Default: 1 Minute)..................................................................................................... 130 18.3.18 System Pump (Default: CH1/CH2) ........................................................................................................ 130

18.4 DHW SETTINGS MENU ....................................................................................................................... 135 18.4.1 DHW Operation (Default: Enabled) ........................................................................................................ 136 18.4.2 Demand Type (Default: Switch) .............................................................................................................. 137 18.4.3 Boiler DHW Setpoint (Default: 186°F [86°C]).......................................................................................... 137 18.4.4 DHW Storage Setpoint (Default: 140°F [60°C]) ....................................................................................... 137 18.4.5 DHW on Differential (Default: 6°F [3°C])............................................................................................... 138 18.4.6 DHW Storage Adder (Default: 46°F [25°C])............................................................................................ 139 18.4.7 DHW Post Pump Time (Default: 1 Minute) ............................................................................................ 139 18.4.8 DHW Priority Timeout (Default: OFF) .................................................................................................... 140 18.4.9 DHW Priority (Default: ENABLED) ......................................................................................................... 140 18.4.10 DHW Call Blocking (Default: 0 Minutes) ............................................................................................. 141 18.4.11 DHW to CH Call Blocking (Default: 1 Minute) ..................................................................................... 141 18.4.12 Antilegionella Function (Default: DISABLED) ...................................................................................... 142

18.5 BOILER SETTINGS MENU ...................................................................................................................... 143 18.5.1 Lockout Temp (Default: 210°F [99°C]) .................................................................................................... 143 18.5.2 Modbus Address (Default: 0=BCST) ........................................................................................................ 144

18.6 RESET ALL SETTINGS MENU ............................................................................................................... 144 18.7 CASCADE MENU AND OPERATING INFORMATION ........................................................................................ 146

18.7.1 Cascade Installation – System Piping ...................................................................................................... 148 18.7.2 Cascade Installation – System Sensor Installation .................................................................................. 148 18.7.3 Cascade Installation – Cascade Communication Cable........................................................................... 149 18.7.4 Cascade Installation – Low Voltage Wiring Connections ........................................................................ 149 18.7.5 Cascade Installation – Line Voltage Wiring Connections ........................................................................ 150

18.8 CASCADE AUTODETECTION MENU ...................................................................................................... 151 18.8.1 Cascade Operation – Lockouts ............................................................................................................... 151

Page 7 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 8: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation, Operation & Maintenance Manual

18.9 CASCADE INFORMATION MENU ......................................................................................................... 158 18.9.1 System Temperature Logging ................................................................................................................. 158

18.9.2 Cascade Settings Menu ................................................................................................................... 159 18.9.3 Stage Delay (Default: 60 Seconds) .......................................................................................................... 160 18.9.4 Minimum firing Rate (Default: 30%) ....................................................................................................... 160 18.9.5 Boiler Enabling Algorithm ....................................................................................................................... 161 18.9.6 Boiler Disabling Algorithm ...................................................................................................................... 161 18.9.7 Maximum Firing Rate (Default: 398 MBH).............................................................................................. 161 18.9.8 CH or DHW Boilers (Default: 0) ............................................................................................................... 162 18.9.9 Automatic Rotation (Default: Enabled) ................................................................................................. 163 18.9.10 CH Proportional Gain (Default: 7) ......................................................................................................... 164 18.9.11 CH Integral Gain (Default: 245) ............................................................................................................. 165 18.9.12 DHW Proportional Gain (Default: 7) ..................................................................................................... 166 18.9.13 DHW Integral Gain (Default: 245) ......................................................................................................... 167 18.9.14 Modbus Address (Default: 0 = BcST) .................................................................................................... 168 18.9.15 Modbus Interface ................................................................................................................................. 169

18.10 MANUAL OPERATION .................................................................................................................................. 171

18.10.1 Fan Parameter .............................................................................................................................. 171

18.10.2 CH CH1 Parameter ........................................................................................................................ 172

18.10.3 DHW Parameter............................................................................................................................ 172

18.10.4 SYS CH2 Parameter ....................................................................................................................... 173

APENNDIX A: PART AND DIMENSIONAL DRAWINGS.................................................................... 175

APENNDIX B: CIRCULATOR PRESSURE LOSS CHARTS .............................................................. 183

Page 8 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 9: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 1 OMM-0089_0A Installation, Operation & Maintenance Manual Safety Precautions

CHAPTER 1: SAFETY PRECAUTIONS

1.1 WARNINGS & CAUTIONS The following general warnings and cautions must be given the same attention as specific precautions included in these instructions. In addition to the requirements included in this Manual, the installation MUST conform with local building codes, or, in the absence of local codes, ANSI Z223.1 (National Fuel Gas Code Publication No. NFPA-54). Where ASME CSD-1 is required by local jurisdiction, the installation must conform to CSD-1.

Where applicable, the equipment must be installed in accordance with the current Installation Code for Gas Burning Appliances and Equipment, CGA B149, and applicable Provincial regulations for the class. Authorities having jurisdiction should be consulted before installations are made.

See the last two pages of this chapter for important information regarding installation of units within the Commonwealth of Massachusetts.

IMPORTANT! • This Instruction Manual is an integral part of the product and

must be maintained in legible condition. It must be given to the user by the installer and kept in a safe place for future reference.

• Installation and service must be performed by a qualified installer, service agency or the gas supplier.

WARNING!

• Do not use matches, candles, flames, or other sources of ignition to check for gas leaks.

• Prior to installing this product read all instructions included in this manual and all accompanying manuals/documents. Perform all installation steps required in these manuals in the proper order given. Failure to adhere to the guidelines within these manuals can result in severe personal injury, death or substantial property damage.

• Fluids under pressure may cause injury to personnel or damage to equipment when released. Be sure to shut off all incoming and outgoing water shutoff valves. Carefully decrease all trapped pressures to zero before performing maintenance.

• Before attempting to perform any maintenance on the unit, shut off all gas and electrical inputs to the unit.

• The exhaust vent pipe of the unit operates under a positive pressure and therefore must be completely sealed to prevent leakage of combustion products into living spaces.

• High electrical voltages are used in this equipment, therefore the cover on the unit’s power box must be installed at all times, except during maintenance and servicing.

Page 9 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 10: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 1 OMM-0089_0A Installation, Operation & Maintenance Manual Safety Precautions

WARNING!

A double-pole switch must be installed on the electrical supply line of the unit. The switch must be installed in an easily accessible position to quickly and safely disconnect electrical service. Do not affix switch to unit sheet metal enclosures.

CAUTION! • Many of the soaps used for gas pipe leak testing are corrosive

to metals. The piping must be rinsed thoroughly with clean water after leak checks have been completed.

• DO NOT use this boiler if any part has been under water. Call a qualified service technician to inspect and replace any part that has been under water.

WARNING!

Should overheating occur or the gas supply fails to shut off, turn OFF the manual gas control valve external to the appliance.

DO NOT add cold make up water when the boiler is hot. Thermal shock can cause potential cracks in the heat exchanger.

WARNING!

IF YOU SMELL GAS: • Do Not try to light any appliance

• Do Not touch any electrical switch

• Do Not use any phone or cell phone in your building.

• Immediately call your gas supplier from a different location.

• Follow the gas supplier’s instructions.

• If you cannot reach your gas supplier, call the fire department.

Please have the unit’s model number and the serial number from the rating label, on the backside of the control panel when inquiring about service or troubleshooting.

AERCO International accepts no liability for any damage resulting from incorrect installation or from the use of components or fittings not specified by AERCO International.

1.2 EMERGENCY SHUTDOWN Turn the service switch on the Esteem 399 Low NOx control panel to “OFF”

Page 10 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 11: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 1 OMM-0089_0A Installation, Operation & Maintenance Manual Safety Precautions

If overheating occurs or the gas supply fails to shut off, close the manual gas shutoff valve (Figure 1-1) located external to the unit.

Figure 1-1: Typical Manual Gas Shutoff Valve

1.3 PROLONGED SHUTDOWN After prolonged shutdown, it is recommended that the startup procedures and the safety device test procedures in Chapter 12 of this manual be performed, to verify all system-operating parameters.

If there is an emergency, turn off the electrical power supply to the AERCO boiler and close the manual gas valve located upstream from the unit.

The installer must identify the emergency shut-off device to those responsible for operation of the boiler.

NOTE The Installer must identify and indicate the location of the emergency shutdown manual gas valve to operating personnel.

Page 11 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 12: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 1 OMM-0089_0A Installation, Operation & Maintenance Manual Safety Precautions

IMPORTANT – FOR MASSACHUSETTS INSTALLATIONS Boiler Installations within the Commonwealth of Massachusetts must conform to the following requirements:

• Boiler must be installed by a plumber or a gas fitter who is licensed within the Commonwealth of Massachusetts.

• Prior to unit operation, the complete gas train and all connections must be leak tested using a non-corrosive soap.

• The vent termination must be located a minimum of 4 feet above grade level. If side-wall venting is used, the installation must conform to the following requirements extracted from 248 CMR 5.08 (2):

(a) For all side wall horizontally vented gas fueled equipment installed in every dwelling, building or structure used in whole or in part for residential purposes, including those owned or operated by the Commonwealth and where the side wall exhaust vent termination is less than seven (7) feet above finished grade in the area of the venting, including but not limited to decks and porches, the following requirements shall be satisfied:

• INSTALLATION OF CARBON MONOXIDE DETECTORS. At the time of installation of the side wall horizontal vented gas fueled equipment, the installing plumber or gasfitter shall observe that a hard wired carbon monoxide detector with an alarm and battery back-up is installed on the floor level where the gas equipment is to be installed. In addition, the installing plumber or gasfitter shall observe that a battery operated or hard wired carbon monoxide detector with an alarm is installed on each additional level of the dwelling, building or structure served by the side wall horizontal vented gas fueled equipment. It shall be the responsibility of the property owner to secure the services of qualified licensed professionals for the installation of hard wired carbon monoxide detectors.

a. In the event that the side wall horizontally vented gas fueled equipment is installed in a crawl space or an attic, the hard wired carbon monoxide detector with alarm and battery back-up may be installed on the next adjacent floor level.

b. In the event that the requirements of this subdivision cannot be met at the time of completion of installation, the owner shall have a period of thirty (30) days to comply with the above requirements; provided, however, that during said thirty (30) day period, a battery operated carbon monoxide detector with an alarm shall be installed.

2. APPROVED CARBON MONOXIDE DETECTORS. Each carbon monoxide detector as required in accordance with the above provisions shall comply with NFPA 720 and be ANSI/UL 2034 listed and IAS certified.

3. SIGNAGE. A metal or plastic identification plate shall be permanently mounted to the exterior of the building at a minimum height of eight (8) feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment. The sign shall read, in print size no less than one-half (1/2) inch in size, "GAS VENT DIRECTLY BELOW. KEEP CLEAR OF ALL OBSTRUCTIONS". 4. INSPECTION. The state or local gas inspector of the side wall horizontally vented gas fueled equipment shall not approve the installation unless, upon inspection, the inspector observes carbon monoxide detectors and signage installed in accordance with the provisions of 248 CMR 5.08(2)(a)1 through 4.

Page 12 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 13: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 1 OMM-0089_0A Installation, Operation & Maintenance Manual Safety Precautions

(b) EXEMPTIONS: The following equipment is exempt from 248 CMR 5.08(2)(a)1 through 4:

1. The equipment listed in Chapter 10 entitled "Equipment Not Required To Be Vented" in the most current edition of NFPA 54 as adopted by the Board; and

2. Product Approved side wall horizontally vented gas fueled equipment installed in a room or structure separate from the dwelling, building or structure used in whole or in part for residential purposes.

(c) MANUFACTURER REQUIREMENTS - GAS EQUIPMENT VENTING SYSTEM PROVIDED. When the manufacturer of Product Approved side wall horizontally vented gas equipment provides a venting system design or venting system components with the equipment, the instructions provided by the manufacturer for installation of the equipment and the venting system shall include:

1. Detailed instructions for the installation of the venting system design or the venting system components; and

2. A complete parts list for the venting system design or venting system.

(d) MANUFACTURER REQUIREMENTS - GAS EQUIPMENT VENTING SYSTEM NOT PROVIDED. When the manufacturer of a Product Approved side wall horizontally vented gas fueled equipment does not provide the parts for venting the flue gases, but identifies "special venting systems", the following requirements shall be satisfied by the manufacturer:

1. The referenced "special venting system" instructions shall be included with the appliance or equipment installation instructions; and

2. The "special venting systems" shall be Product Approved by the Board, and the instructions for that system shall include a parts list and detailed installation instructions.

(e) A copy of all installation instructions for all Product Approved side wall horizontally vented gas fueled equipment, all venting instructions, all parts lists for venting instructions, and/or all venting design instructions shall remain with the appliance or equipment at the completion of the installation.

[End of Extracted Information From 248 CMR 5.08 (2)]

Page 13 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 14: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 1 OMM-0089_0A Installation, Operation & Maintenance Manual Safety Precautions

(This page left intentionally blank)

Page 14 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 15: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 2 OMM-0089_0A Installation, Operation & Maintenance Manual Installation

CHAPTER 2: INSTALLATION

2.1 CODE COMPLIANCE This product must be installed in accordance to the following:

• All applicable local, state, national and provincial codes, ordinances, regulations and laws.

• For installations in Massachusetts, code requires the boiler to be installed by a licensed plumber or gas fitter, and if antifreeze is utilized, the installation of a reduced pressure backflow preventer device is required in the boiler’s cold water fill or make up water supply line.

• For installation in Massachusetts all direct vented appliances must comply with the guidelines as outlined in section 1.3 of Chapter 1.

• The National Fuel Gas Code NFPA54/ ANSI Z 223.1—Latest edition.

• National Electric Code ANSI/NFPA 70.

• For installations in Canada -“Installation Code for Gas Burning Equipment” CGA/B149.1 or B149.2 Canadian Electrical Code Part 1 CSA C22.1.

• Standards for Controls and Safety Devices for Automatically Fired Boilers, ANSI/ASME CSD-1, when required.

NOTE The Esteem 399 Low NOx boiler gas manifold and gas controls meet the safe lighting and other performance requirements as specified in ANSI Z21.13 latest edition.

2.2 DETERMINING PRODUCT LOCATION Before locating the Esteem 399 Low NOx check for convenient locations to:

• Heating system piping • Venting • Gas supply piping • Electrical service

Ensure the boiler location allows the combustion air/vent piping to be routed directly through the building and terminate properly outside with a minimum amount of length and bends.

Ensure the area chosen for the installation of the Esteem 399 is free of any combustible materials, gasoline and other flammable liquids.

The Esteem boiler is certified for indoor conditioned space only.

WARNING!

Failure to remove or maintain the area free of combustible materials, gasoline and other flammable liquids or vapors can result in severe personal injury, death or substantial property damage.

Ensure the Esteem 399 and its controls are protected from dripping or spraying water during normal operation or service.

Page 15 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 16: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 2 OMM-0089_0A Installation, Operation & Maintenance Manual Installation The Esteem 399 Low NOx should be installed in a location so that any water leaking from the boiler or piping connections or relief valve will not cause damage to the area surrounding the unit or any lower floors in the structure.

2.3 BOILER REPLACEMENT If the Esteem 399 is replacing an existing boiler, the following items should be checked and

corrected prior to installation:

• Boiler piping leaks and corrosion. • Improper location and sizing of the expansion tank on the boiler heating loop.

• If applicable, level and quality of freeze protection within the boiler system.

• See the warning in section 17.22 Handling Previously Fired Combustion Chamber Insulation.

2.4 RECOMMENDED CLEARANCES The Esteem 399 Low NOx is approved for zero clearance to combustibles, excluding vent and boiler piping.

• Boiler Piping - 1/4 inch from combustible materials.

• See Vent System Installation Supplement GF-125V for vent clearance requirements.

To provide service access to the unit it is recommended that the following clearances be maintained:

Surface Dimension

Top Jacket 24 inches [610 mm].

Front 24 inches [610 mm].

Rear 0 inches

Sides 6 inches [153 mm]

Bottom Piping 24 inches [610 mm].

WARNING!

If the clearances listed above cannot be maintained or the enclosure in which the boiler is installed is less than 85 cubic feet, the space must be ventilated. See chapter 3 for requirements.

NOTE When maintaining zero clearance or less than recommended clearances, some product labeling may become hidden and unreadable.

Page 16 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 17: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 2 OMM-0089_0A Installation, Operation & Maintenance Manual Installation

WARNING!

When installing the Esteem boiler in a confined space, sufficient air must be provided for proper combustion and venting and to allow, under normal operating conditions, proper air flow around the product to maintain ambient temperatures within safe limits to comply with the National Fuel Gas Code NFPA 54…Latest Edition.

2.5 RESIDENTIAL GARAGE INSTALLATIONS When installing the Esteem boiler in a residential garage, the following special precautions per NFPA 54/ANSI Z223.1 must be taken:

• Mount the unit a minimum 18 inches [458 mm] above the floor level of the garage.

• Ensure the burner and ignition devices / controls are no less than 18 inches [458 mm] above the floor level.

• Locate or protect the unit in a manner so it cannot be damaged by a moving vehicle.

2.6 BOILER FREEZE PROTECTION FEATURE The boiler control has a freeze protection feature built in. This feature monitors the boiler temperature and responds as follows when no call for heat is present:

• 46ºF [8ºC] CH (1) & Auxiliary Boiler Pumps ON

• 42ºF [6ºC] CH (1), Auxiliary Boiler & System Pumps ON, Burner operates at low fire

• 60ºF [15ºC] Freeze protection ends. Burner & all pumps OFF after completing CH Post Pump Time.

CAUTION! The boiler freeze protection feature is disabled during a hard lockout, however the space heating circulator will operate.

CAUTION! The boiler freeze protection feature is designed to protect the boiler. The boiler should be installed in a primary/secondary piping arrangement if it is installed in an unheated space or exposed to water temperatures of 46ºF or less. See “Chapter 5 Boiler Piping” for primary/secondary piping examples. See Section 11.1.6 for antifreeze guidelines.

Page 17 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 18: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 2 OMM-0089_0A Installation, Operation & Maintenance Manual Installation

(This page left intentionally blank)

Page 18 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 19: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 2 OMM-0089_0A Installation, Operation & Maintenance Manual Combustion Air/Venting

CHAPTER 3: COMBUSTION AIR AND VENTING

3.1 COMBUSTION AIR CONTAMINATION

WARNING!

If the Esteem boiler combustion air inlet is located in any area likely to cause or contain contamination, or if products, which would contaminate the air cannot be removed, the combustion air must be re-piped and terminated to another location. Contaminated combustion air will damage the unit and its burner system, resulting in possible severe personal injury, death or substantial property damage.

WARNING!

Do not operate the Esteem boiler if its combustion air inlet is located near a laundry room or pool facility. These areas will always contain hazardous contaminants.

Pool and laundry products and common household and hobby products often contain fluorine or chlorine compounds. When these chemicals pass through the burner and vent system, they can form strong acids. These acids can create corrosion of the heat exchanger, burner components and vent system, causing serious damage and presenting a possible threat of flue gas spillage or water leakage into the surrounding area.

Please read the information listed below. If contaminating chemicals are located near the area of the combustion air inlet, the installer should pipe the combustion air inlet to an outside area free of these chemicals per Chapter 5 of this installation manual.

3.2 POTENTIAL CONTAMINATING PRODUCTS • Spray cans containing chloro/fluorocarbons • Permanent Wave Solutions • Chlorinated wax • Chlorine—based swimming pool chemicals / cleaners • Calcium Chloride for melting ice • Sodium Chloride for water softening • Refrigerant leaks • Paint or varnish removers • Hydrochloric acid / muriatic acid • Cements and glues • Antistatic fabric softeners used in clothes dryers • Chlorine-type bleaches, detergents, and cleaning solvents found in household laundry

rooms • Adhesives used to fasten building products and other similar products

Page 19 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 20: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 2 OMM-0089_0A Installation, Operation & Maintenance Manual Combustion Air/Venting

3.2.1 Areas Likely to Contain Contaminating Products Areas likely to contain potential contaminants are as follows:

• Dry cleaning / laundry areas and establishments

• Beauty salons

• Metal fabrication shops

• Swimming pools and health spas

• Refrigeration Repair shops

• Photo processing plants

• Auto body shops

• Plastic manufacturing plants

• Furniture refinishing areas and establishments

• New building construction - Remodeling areas

• Garages with workshops

3.3 VENTILATION AND COMBUSTION AIR REQUIREMENTS - DIRECT VENT A Direct Vent appliance uses uncontaminated outdoor air (piped directly to the appliance) for combustion.

For Direct Vent installations, involving only the Esteem boiler, in which the minimum service clearances are maintained (see Recommended Clearances, section 2.4), no ventilation openings are required.

For Direct Vent, zero clearance installations involving only the Esteem boiler, the space / enclosure must have two openings for ventilation. The openings must be sized to provide 1 square inch of free area per 1,000 BTUH of boiler input. The openings must be placed 12 inches from the top of the space and 12 inches from the floor of the space.

For installations where the Esteem 399 Low NOx shares the space with air movers (exhaust fan, clothes dryers, fireplaces, etc.) and other combustion equipment (gas or oil) the space must be provided with adequate air openings to provide ventilation and combustion air to all the equipment. Sizing of the ventilation / combustion air openings must comply with the National Fuel Gas Code NFPA 54, ANSI Z223.1 for installations in the U.S. or CSA B149.1 and B149.2 for installations in Canada.

Page 20 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 21: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 2 OMM-0089_0A Installation, Operation & Maintenance Manual Combustion Air/Venting

WARNING!

The space must be provided with ventilation combustion air openings properly sized for all make-up air requirements (exhaust fans, clothes dryers, etc.), which includes the total input of all appliances located in the same space as the Esteem unit(s) using indirect vented air. Esteem units installed with direct vent air inputs are excluded from such consideration because they receive combustion air directly from the outside, and so additional free area for the openings is not required. Failure to provide properly sized openings could result in severe personal injury, death or property damage.

3.4 VENTILATION AND COMBUSTION AIR REQUIREMENTS - CATEGORY IV A Category IV appliance uses uncontaminated indoor or outdoor air (surrounding the appliance) for combustion.

Piping uncontaminated combustion air directly from the outdoors to the appliance is recommended. This reduces the risks associated with indoor contaminates, flammable vapors and tight housing construction. This practice also promotes higher system efficiency.

In installations where the Esteem boiler shares the space with air movers (exhaust fan, clothes dryers, fireplaces, etc.) and other combustion equipment (gas or oil), the space must be provided with adequate air openings to provide ventilation and combustion air to all the equipment. Sizing of the ventilation / combustion air openings must comply with the National Fuel Gas Code NFPA 54, ANSI Z223.1 for installations in the U.S. or CSA B149.1 and B149.2 for installations in Canada, as referenced in this chapter of the manual and titled Methods of Supplying Combustion Air to a Space.

3.5 METHODS OF SUPPLYING COMBUSTION AIR TO A CONFINED SPACE - CATEGORY IV

NOTE The methods listed in this section for accessing Indoor Combustion Air assume that the infiltration rate is adequate and not less than .40 ACH. For infiltration rates less than .40 ACH, reference the NFPA 54 National Fuel Gas Code for additional guidance.

Page 21 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 22: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 2 OMM-0089_0A Installation, Operation & Maintenance Manual Combustion Air/Venting

3.5.1 INDOOR COMBUSTION AIR Openings used to connect indoor spaces shall be sized and located in accordance with Figure 3-1.

Figure 3-1: All Combustion Air from Adjacent Indoor Spaces Through Indoor

Combustion Openings Each opening shall have a minimum free area of 1 sq. in./1000 Btu/hr. of the total input rating of all gas utilization equipment in the space, but not less than 100 sq. inches. One opening shall commence within 12 inches of the top, and one opening shall commence within 12 inches of the bottom of the enclosure. The minimum dimension of air openings shall be not less than 3 inches.

Combining spaces in different stories. The volumes of spaces in different stories shall be considered as communicating spaces where such spaces are connected by one or more openings in doors or floors having a total minimum free area of 2 sq. in./1000 Btu/hr. of total input rating of all gas utilization equipment.

Page 22 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 23: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 2 OMM-0089_0A Installation, Operation & Maintenance Manual Combustion Air/Venting

3.5.2 OUTDOOR COMBUSTION AIR The minimum dimension of air openings for outdoor combustion air venting shall be not less than 3 inches.

3.5.2.1 Option 1: One Permanent Opening to Outside Openings used to supply combustion and ventilation air shall be sized and located in accordance with the following:

• One Permanent Opening Method. See Figure 3-2.

• One permanent opening, commencing within 12 inches of the top of the enclosure, shall be provided. The equipment shall have clearances of at least 1 inch from the sides and 6 inches from the front of the appliance. The opening shall directly communicate with the outdoors or shall communicate through a vertical or horizontal duct to the outdoors or spaces that freely communicate with the outdoors and shall have a minimum free area of the following:

Figure 3-2: All Combustion Air from Outdoors Through One Permanent Air Opening

• 1 sq. in./3000 Btu/hr. of the total input rating of all equipment located in the enclosures,

and

• Not less than the sum of the areas of all vent connectors in the space.

Page 23 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 24: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 2 OMM-0089_0A Installation, Operation & Maintenance Manual Combustion Air/Venting 3.5.2.2 Option 2: Two Permanent Openings to Outside Two permanent openings, one commencing within 12 inches of the top and one commencing within 12 inches of the bottom of the enclosure, shall be provided. The openings shall communicate directly, or by ducts, with the outdoors or spaces that freely communicate with the outdoors, as follows:

• Where directly communicating with the outdoors or where communication to the outdoors is through vertical ducts, each opening shall have a minimum free area of 1 sq. in./4000 Btu/hr. of total input rating for all equipment in the enclosure. See Figure 3-3.

Figure 3-3: All Combustion Air from Outdoors Through Ventilated Attic

• Where communicating with the outdoors is through horizontal ducts, each opening shall have a minimum free area of not less than 1 sq. in./2000 Btu/hr. of total input rating of all equipment in the enclosure. See Figure 3-4.

Figure 3-4: All Combustion Air from Outdoors Through Horizontal Ducts

Page 24 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 25: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 2 OMM-0089_0A Installation, Operation & Maintenance Manual Combustion Air/Venting

3.6 COMBINATION OF INDOOR AND OUTDOOR COMBUSTION AIR Indoor Openings: Where used, openings connecting the interior spaces shall comply with the Indoor Combustion Air section 3.5.

3.6.1 Outdoor Opening(s) Location Outdoor opening(s) shall be located in accordance with the Outdoor Combustion Air section.

3.6.2 Outdoor Opening(s) Size Outdoor opening(s) shall be calculated in accordance with the following:

• The ratio of the interior spaces shall be the available volume of all communicating spaces divided by the required volume.

• The outdoor size reduction factor shall be 1 minus the ratio of interior spaces.

• The minimum size of outdoor opening(s) calculated in accordance with the above outdoor air section multiplied by the reduction factor. The minimum dimension of air openings shall not be less than 3 in.

WARNING!

Do not install the Esteem boiler into a common vent with other gas or oil appliances. This may cause flue gas spillage or appliance malfunction, resulting personal injury, death, and/or property damage.

3.7 COMBUSTION AIR AND VENT PIPING

WARNING!

Combustion air and vent piping must be sealed gas tight and meet all provided instructions and applicable codes, failure to comply will result in severe personal injury or death.

The Esteem boiler requires a Category IV venting system, which is designed for pressurized venting and condensate.

The Esteem boiler is certified per ANSI Z21.13 as a Category IV or Direct Vent (sealed combustion) appliance. A Category IV appliance uses uncontaminated indoor or outdoor air (surrounding the appliance) for combustion. A Direct Vent appliance uses uncontaminated outdoor air (piped directly to the appliance) for combustion.

Piping uncontaminated combustion air directly from the outdoors to the appliance is recommended. This reduces the risks associated with indoor contaminates, flammable vapors and tight housing construction. This practice also promotes higher system efficiency.

NOTE Install combustion air and vent pipe as detailed in the Esteem boiler Vent Supplement included in the boiler installation envelope. Refer to optional vent kit instructions for addition vent installation instructions.

Page 25 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 26: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 2 OMM-0089_0A Installation, Operation & Maintenance Manual Combustion Air/Venting

3.8 REMOVAL OF AN EXISTING BOILER FROM A COMMON VENT SYSTEM

WARNING!

Do not install the esteem unit into a common vent with other gas or oil appliances. This may cause flue gas spillage or appliance malfunction, resulting in possible severe personal injury, death or substantial property damage.

NOTE When an existing boiler is removed from a common venting system, the common venting system is likely to be too large for proper venting of the remaining appliances.

At the time of removal of an existing boiler, the following steps shall be followed with each appliance remaining connected to the common venting system placed in operation, while the other appliances remaining connected to the common venting system are not in operation.

• Seal any unused openings in the common venting system. • Visually inspect the venting system for proper size and horizontal pitch and determine

there is no blockage or restriction, leakage, corrosion and other deficiencies which could cause an unsafe condition.

• Insofar as is practical, close all building doors and windows and all doors between the space in which the appliances remaining connected to the common venting system are located and other spaces of the building. Turn on clothes dryers and any appliance not connected to the common venting system. Turn on any exhaust fans, such as range hoods and bathroom exhausts, so they will operate at maximum speed. Do not operate a summer exhaust fan. Close fireplace dampers.

• Operate the appliance being inspected. Follow the lighting instructions. Adjust thermostat so appliance will operate continuously.

• Test for spillage at the draft hood relief opening after 5 minutes of main burner operation. Use the flame of a match or candle, or smoke from a cigarette, cigar or pipe.

• After it has been determined that each appliance remaining connected to the common venting system properly vents when tested as outlined above, return doors, windows, exhaust fans, fireplace dampers, and any other gas-burning appliance to their previous condition of use.

• Any improper operation of the common venting system should be corrected so the installation conforms with the National Fuel Gas Code, ANSI Z223.1/NFPA 54 and/or CAN/CGA B149, Installation codes. When re-sizing any portion of the common venting system, the common venting system should be re-sized to approach the appropriate tables in Part II of the National Fuel Gas Code ANSI Z223.1/NFPA 54 and/or CAN/CGA B149, Installation codes.

Page 26 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 27: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 3 OMM-0089_0A Installation, Operation & Maintenance Manual Comb. Air & Venting

Commonwealth of Massachusetts Installations Only For direct-vent appliances, mechanical-vent heating appliances or domestic hot water equipment, where the bottom of the vent terminal and the air intake is installed below four feet above grade the following requirements must be satisfied:

1. If there is not one already present, on each floor level where there are bed-room(s), a carbon monoxide detector and alarm shall be placed in the living area outside the bedroom(s). The car-bon monoxide detector shall comply with NFPA 720 (2005 Edition).

2. A carbon monoxide detector shall also be located in the room that houses the appliance or equipment and shall:

a) Be powered by the same electrical circuit as the appliance or equipment such that only one service switch services both the appliance and the carbon monoxide detector.

b) Have battery back-up power.

c) Meet ANSI/UL 2034 Standards and comply with NFPA 720 (2005 Edition).

d) Have been approved and listed by the Nationally Recognized Testing Laboratory as recognized under 527 CMR.

3. A Product-approved vent terminal must be used, and if applicable, a Product-approved air intake must be used. Installation shall be in strict compliance with the manufacturer’s instructions. A copy of the installation instructions shall remain with the appliance or equipment at the completion of the installation.

4. A metal or plastic identification plate shall be mounted at the exterior of the building, four feet directly above the location of vent terminal. The plate shall be of sufficient size to be easily read from a distance of eight feet away, and read “Gas Vent Directly Below”.

NOTE Installer must provide tag identification plate and ensure the lettering meets code requirements.

For direct-vent appliances, mechanical-vent heating appliances or domestic hot water equipment, where the bottom of the vent terminal and the air intake are installed above four feet above grade the following requirements must be satisfied: 1. If there is not one already present, on each floor level where there are bed-room(s), a carbon

monoxide detector and alarm shall be placed in the living area outside the bedroom(s). The car-bon monoxide detector shall comply with NFPA 720 (2005 Edition).

2. A carbon monoxide detector shall:

a) Be located in the room that houses the appliances or equipment; b) Be either hard wired or battery powered or both; and

c) Shall comply with NFPA 720 (2005 Edition)

3. A Product-approved vent terminal must be used, and if applicable, a Product-approved air intake must be used. Installation shall be in strict compliance with the manufacturer’s instructions. A copy of the installation instructions shall remain with the appliance or equipment at the completion of the installation

Page 27 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 28: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 3 OMM-0089_0A Installation, Operation & Maintenance Manual Comb. Air & Venting

(This page intentionally blank)

Page 28 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 29: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 4 OMM-0089_0A Installation, Operation & Maintenance Manual Unit Preparation

CHAPTER 4: UNIT PREPARATION

4.1 HANDLING INSTRUCTIONS The Esteem 399 Low NOx boiler is generally easier to handle and maneuver once removed from the shipping carton. To remove the shipping carton, follow these instructions:

Removing the Esteem Boiler from the Shipping Carton

CAUTION! Use care not to lift the unit from, or place the unit on the front plastic control panel, damage can occur. Use care not to drop, bump or rotate the boiler upside down, as damage to the boiler will result.

1. Remove any shipping straps and open the side of the shipping carton. 2. Slide the unit with the foam inserts out of the carton.

3. Discard all packing materials.

4.2 WALL MOUNTING INSTALLATION The Esteem boiler should be wall mounted using the bracket provided with the boiler. The Esteem boiler is not designed for floor installation. If floor installation is required an optional floor stand is available through AERCO International.

WARNING! The wall used for mounting the Esteem 399 unit must be vertically plumbed and capable of supporting a minimum 250 pounds [115 kg]. Failure to comply with these requirements could result in personal injury, death or substantial property damage.

4.3 WALL MOUNTING GUIDELINES • The boiler is heavy and bulky. A minimum of 2 people is required for mounting the boiler.

• DO NOT mount or attempt to mount the wall bracket to hollow sheet rock or lath walls using anchors. Only install boiler to studs or equivalent wood structure.

• The wall-mounting bracket is designed for stud spacing of 12 inch or 16 inch on center. For unconventional stud spacing, a solid / secure mounting surface must be provided for installation of the bracket.

• For mounting on wood studs, install the bracket using the lag screws provided with the boiler. Ensure both lag screws are installed securely in the studs.

• For mounting on metal studs, install the bracket to the studs using 3/16” toggle bolts and washers.

• For mounting on solid walls (rock, concrete, brick, cinder block, etc.), install the wall bracket using anchors (double expansion shields) and bolts with washers provided with the boiler.

Page 29 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 30: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 4 OMM-0089_0A Installation, Operation & Maintenance Manual Unit Preparation

WARNING! Use extreme care not to drop the boiler or cause bodily injury while lifting or mounting the boiler onto the bracket. Once mounted verify that the boiler is securely attached to the bracket and wall. Failure to comply with the above guidelines could result in property damage, personal injury or death.

4.4 STUD WALL INSTALLATION • To distribute the weight of the boiler evenly when mounting onto a stud wall it is

recommended to use the Esteem 399 Low NOx boiler Wall Frame kit.

• When using the wall frame to mount the boiler reference the kit installation instructions and ensure the frame is securely fastened to the wall.

• If the structure of wall is questionable, in supporting a minimum weight of 250 pounds [115 kg.], it is recommended to use the optional floor stand.

• Wall Bracket Installation—Solid Walls

• Locate the general area of the boiler placement.

• Place the wall-mounting bracket on the wall ensuring the upper edge of the bracket is away from the wall.

• Level the bracket and use a pencil to mark the location of the mounting slots on the wall.

• Remove the bracket from the wall and drill a 5/8” diameter by 1-3/8” deep hole positioned in the center of each mark.

• Install the anchors (provided) flush or slightly recessed in the drilled holes with threaded side facing down.

• Reposition the bracket on the wall and align mounting slots/holes. Insert the two bolts (provided) through the mounting slots/holes and loosely tighten.

• Level bracket and tighten bolts securely.

4.5 BOILER MOUNTING • Obtain assistance in lifting the boiler onto the wall bracket.

• Install the boiler making sure the boiler mounting lip located along the upper edge of the rear jacket panel engages the wall-mounting bracket. Ensure the boiler is seated properly and is secure.

Page 30 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 31: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 5OMM-0089_0A Installation, Operation & Maintenance Manual Boiler Piping

CHAPTER 5: BOILER PIPING

5.1 GENERAL PIPING REQUIREMENTS • All plumbing must meet or exceed all local, state and national plumbing codes.

• Support all piping using hangers. DO NOT support piping by the unit or its components.

• Use isolation valves to isolate system components.

• Install unions for easy removal of the Esteem boiler from the system piping.

WARNING! Use a two wrench method when tightening piping onto the boiler connections. Use one wrench to prevent the boiler piping from turning/twisting. Failure to support the boiler piping and connections in this manner could cause damage to the boiler and its components.

5.2 PRESSURE RELIEF VALVE

WARNING! Failure to comply with the guidelines on installing the pressure relief valve and discharge piping can result in personal injury, death or substantial property damage.

• The Esteem 399 Low NOx boiler is supplied with a 45 psi pressure relief valve and must be piped using the PRV connection as shown in Figure 5-1.

• To avoid potential water damage to the surrounding area or potential scalding hazard dueto the operation of the relief valve, the discharge piping:

o Must be connected to the discharge outlet of the relief valve and directed to a safeplace of disposal.

o Length should be as short and direct as possible. The size of the discharge lineshould not be reduced, maintain the same size as the outlet of the relief valve.

o Should be directed downward towards the floor at all times. The piping shouldterminate at least 6 inches [153 mm] above any drain connection to allow clearvisibility of the discharge.

o Should terminate with a plain end, not with a threaded end. The material of the pipingshould have a serviceable temperature rating of 250ºF or greater.

o Should not be subject to conditions where freezing could occur.

o Should not contain any shut-off valves or obstructions. No shut-off valve should bepiped between the boiler and relief valve.

Page 31 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 32: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 5 OMM-0089_0A Installation, Operation & Maintenance Manual Boiler Piping

Figure 5-1: Pressure Relief valve and Boiler Drain Valve Installation

5.3 BOILER AIR VENT This boiler is supplied with a special automatic air vent that will provide reliable operation in purging air from the boiler. The hygroscopic cap supplied with the automatic air vent MUST remain tight at all times on the air vent body. The hygroscopic cap has a membrane which expands upon contact with water and seals the air vent until the membrane dries up due to new air forming in the air vent.

• Make sure to fully tighten the cap on the air vent on initial installation.

• Never loosen the hygroscopic cap to allow air to escape the air vent. Air will exit with the cap fully tightened in place.

• If the hygroscopic cap is not fully tightened, water may leak from the cap. Simply tighten

the cap securely.

5.4 LOW WATER CUTOFF DEVICE • The Esteem boiler is equipped with a factory installed pressure switch type Low Water Cut Off

device.

• The minimum operating system pressure allowable with this device is 10 psig.

• Check local codes if a Low Water Cutoff Device is required. If so, determine if this device meets the requirements of the local codes.

WARNING! The Esteem boiler control system senses the system water temperatures entering and exiting the heat exchanger to provide protection against low water conditions where local codes and jurisdiction do not accept a pressure device for low water protection, they may accept these integral control functions as a means of providing low water protection.

(Field Supplied)

Page 32 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 33: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 5 OMM-0089_0A Installation, Operation & Maintenance Manual Boiler Piping

5.5 ADDITIONAL LIMIT CONTROL If a separate LWCO device is required by certain local jurisdictions or when the boiler is installed above the system piping, the following guidelines must be followed:

• The LWCO device must be designed for water installations, electrode probe-type is recommended.

• The LWCO device must be installed in a tee connection on the boiler supply piping above the boiler.

• Wiring of the LWCO device to the Esteem boiler is done directly onto the 24V terminal strip. See Figure 8-3 for available terminals for an external limit (manual or auto reset).

If the installation is to comply with ASME or Canadian requirements, an additional high temperature limit may be needed. Consult local code requirements to determine compliance. The limit should be installed as follows:

• Install the limit in the boiler supply piping between the boiler and any isolation valve. • Consult heat exchanger for maximum set point of limit. • For wiring of the limit, see Figure 8-3 for using the external limit/manual reset terminals

on the 24V terminal strip. This will provide a “hard” lockout requiring a manual reset of the control.

5.6 BACKFLOW PREVENTER Use a backflow preventer valve in the make-up water supply to the unit as required by local codes.

5.7 BOILER SYSTEM PIPING APPLICATIONS NOTE

It is recommended on all piping applications to utilize a primary/secondary piping arrangement as a means to provide freeze protection of the boiler, which is an integral function of the boiler control. Maintain the minimum boiler flow rate (see the charts in Figure B-1 and B-2 in Appendix B). For other piping arrangements, consult the Engineering Department at AERCO International or consult other approved/recognized design arrangements.

NOTE On piping applications utilizing a single zone or other recognized piping design arrangements, it is recommended that the installer uses flow/check valves with weighted seats at or near the appliance to prevent gravity circulation.

5.8 EXPANSION TANK AND MAKEUP WATER Ensure the expansion tank is properly sized for the boiler volume 7 gallons [26 L] for Esteem 399 Low NOx boiler and the system volume and temperature.

WARNING! Undersized expansion tanks will cause system water to be lost through the pressure relief valve and cause additional makeup water to be added to the system. Eventual boiler heat exchanger failure can result due to this excessive makeup water addition.

The expansion tank must be located as shown in Figure 5-3 and Figure 5-4 when using a

Page 33 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 34: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 5 OMM-0089_0A Installation, Operation & Maintenance Manual Boiler Piping primary/secondary piping arrangement or as per recognized design methods. Refer to the expansion tank manufacturer instructions for additional installation details.

Connect the expansion tank to an air separator only if the air separator is located on the suction side (inlet) of the system circulator. Always locate and install the system fill connection at the same location as the expansion tank connection to the system.

5.8.1 Diaphragm Expansion Tank Always install an automatic air vent on the top of the air separator to remove residual air from the system.

5.8.2 Closed-Type Expansion Tank It is recommended to pitch any horizontal piping upwards toward the expansion tank 1 inch per 5 feet of piping. Use 3/4” piping for the expansion tank to allow air within the system to rise.

WARNING! Do not install automatic air vents on a closed-type expansion tank system. Air must remain in the system and be returned to the expansion tank to provide an air cushion. An automatic air vent would cause air to be vented from the system resulting in a water-logged expansion tank.

5.9 CIRCULATOR The Esteem boiler must be supplied with a Central Heating (CH) circulator. The circulator when wired directly to the Esteem boiler will allow for domestic hot water priority and to provide circulation for the freeze protection feature of the boiler control. See the charts in Figures B-1 and B-2 in Appendix B for pressure drop and minimum flow rate through the boiler.

5.10 SIZING PRIMARY PIPING See Figure 5-5 through Figure 5-10 on the following pages for recommended piping arrangements based on various applications. Size the piping and system components required in the space heating system, using recognized design methods.

5.11 DOMESTIC HOT WATER SYSTEM PIPING See Figure 5-5 through Figure 5-9 on the following pages for recommended piping to a DHW system. This recommended piping configuration ensures priority is given to the production and recovery of the DHW.

The piping for the DHW is separate from the boiler system piping and does not require a primary / secondary piping configuration. To wire the DHW circulator to the boiler control module, see Chapter 9, External Wiring.

5.12 SYSTEM PIPING - ZONE CIRCULATORS Connect the Esteem boiler to the system piping as shown in Figure 5-5 when zoning with zone circulators.

The installer must provide a separate circulator for each zone of space heating as well as the boiler circulator.

Page 34 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 35: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 5 OMM-0089_0A Installation, Operation & Maintenance Manual Boiler Piping

NOTE To ensure an adequate flow rate through the Esteem boiler, the boiler supply and return piping size must be a minimum 1-1/2 inches.

5.13 SYSTEM PIPING - ZONE VALVES Connect the Esteem boiler to the system piping as shown in Figure 5-6 when zoning with zone valves. The primary / secondary piping ensures that the boiler loop has sufficient flow.

5.14 SYSTEM PIPING - THROUGH BOILER In new or retrofit applications in which primary/secondary arrangement is not used, the Esteem boiler allows this flexibility due to a lower boiler pressure drop, see the charts in Figure B-1 and B-2 in Appendix B.

Figure 5-7 illustrates a multiple zone valve system with a single system/boiler circulator. A by-pass loop with a pressure differential valve must be installed on the system piping.

Figure 5-8 illustrates a single zone utilizing the boiler circulator as the system circulator.

5.15 SYSTEM PIPING - RADIANT HEATING The heat exchanger design of the Esteem 399 Low NOx boiler allows operation in a condensing mode. This feature requires no return water temperature regulation in radiant heating applications.

The design and construction of the Esteem heat exchanger allows the installation of the boiler on systems with non-oxygen barrier tubing.

CAUTION DO NOT install a water storage tank along with the unit in systems with non-oxygen barrier tubing. Failure to comply could result in premature failure of the storage tank.

A high temperature limit should be installed to ensure that the primary supply temperature does not exceed the maximum allowable temperature for the radiant tubing.

The addition of the high temperature limit is important if the Esteem boiler is connected to a domestic hot water system, which requires a high primary supply water temperature.

Size the system piping and circulator to provide the flow needed for the radiant system.

NOTES • To ensure an adequate flow rate through the Esteem 399 Low

NOx boiler, the boiler supply and return piping size must be a minimum of 1-1/2” (inches).

• The addition of the high temperature limit is important if the Esteem boiler is connected to a domestic hot water system, which requires a high primary supply water temperature.

Page 35 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 36: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 5 OMM-0089_0A Installation, Operation & Maintenance Manual Boiler Piping

5.16 SYSTEM PIPING—SPECIAL APPLICATIONS If the boiler is used in conjunction with a chilled water/medium system, the boiler and chiller must be piped in parallel. Install flow/check valves to prevent the chilled medium from entering into the boiler.

If the boiler is used to supply hot water to the heating coils of an air handler where they may be exposed to chilled air circulation, install flow/check valves or other automatic means to prevent gravity circulation of the boiler water during cooling cycles.

5.17 SYSTEM PIPING—MULTIPLE UNITS INSTALLATION Use a balanced manifold system as the primary / secondary connection to the space heating piping as shown in Figure 5-9.

Maintain a minimum of 6 inches [153 mm] of clearance between units to allow for servicing. Refer to Figure 5-3 and Figure 5-4 to install air separator and expansion tank.

For the space heating piping refer to the applications mentioned in this manual or use recognized design methods.

NOTE The boiler system piping shown must be a “closed” system to avoid any contamination and potential failure of any components in the system.

Figure 5-2: Piping Diagram Component Legend

Page 36 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 37: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 5 OMM-0089_0A Installation, Operation & Maintenance Manual Boiler Piping

Figure 5-3: Near Boiler Piping – Diaphragm Expansion Tank

Figure 5-4: Near Boiler Piping – Closed Type Expansion Tank

NOTE Pitch horizontal piping upwards (1” of pipe per 5 feet of piping) toward expansion tank.

Page 37 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 38: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 5 OMM-0089_0A Installation, Operation & Maintenance Manual Boiler Piping

Figure 5-5: System Piping – Zoning with Zone Circulators

Figure 5-6: System Piping – Zoning with Zone Valves

NOTE The boiler system piping shown must be a “closed” system to avoid any oxygen contamination and potential failure of the outer tank of the Smart.

Page 38 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 39: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 5 OMM-0089_0A Installation, Operation & Maintenance Manual Boiler Piping

Figure 5-7: System Piping – Multiple Zone Valve with Single System/Boiler Circulator

Figure 5-8: System Piping – Single Zone System with Single System/Boiler Circulator

NOTE Verify CH circulator is properly sized to overcome the system pressure drop and provide adequate flow through the boiler system.

NOTE Verify CH circulator is properly sized to overcome the system pressure drop and provide adequate flow through the boiler system.

NOTE Manifold mounted valve actuators may be used in lieu of zone valves.

NOTE The boiler system piping shown must be a “closed” system to avoid any oxygen contamination and potential failure of the outer tank of the Smart.

Page 39 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 40: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 5 OMM-0089_0A Installation, Operation & Maintenance Manual Boiler Piping

Figure 5-9: System Piping – Multiple Esteem Boiler Piping – Secondary/Primary

NO

TE

S

ee s

ectio

n 9.

12 in

Cha

pter

9

for

info

rmat

ion

on w

iring

an

d se

ctio

n 18

.8 in

Cha

pter

18

fo

r co

nfig

urin

g th

e bo

ilers

us

ing

the

built

-in

Cas

cade

func

tion.

Page 40 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 41: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 5 OMM-0089_0A Installation, Operation & Maintenance Manual Boiler Piping

Figure 5-10: CH System Piping – Radiant / Low Temperature Heating

1 = Esteem 399 Low NOx Boiler 2 = CH Circulator 3 = Flow/Check Valve 4 = Isolation Valve 5 = Zone Valve

5 = Zone Valve 6 = Drain/Purge Valve 7 = Pressure Relief Valve 8 = Air Separator 9 = Automatic Air Vent

Diagram Legend 10 = Diaphragm Expansion Tank 11 = Automatic Fill Valve 12 = System Circulator 13 = High Temp. Limit Control

Page 41 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 42: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 5 OMM-0089_0A Installation, Operation & Maintenance Manual Boiler Piping

(This page left intentionally blank)

Page 42 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 43: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 6 OMM-0089_0A Installation, Operation & Maintenance Manual Vents, Intake & Drain

CHAPTER 6: INSTALLING VENT, AIR INTAKES, AND DRAIN

6.1 INSTALLING VENT AND COMBUSTION AIR INTAKE

WARNING! The Esteem 399 Low NOx boiler must be vented and supplied with combustion air as instructed in the Esteem boiler Vent Application Guide (GF-125V or GF-125CV), which is included in the boiler installation envelope. Once installation is complete, inspect the vent and combustion air system thoroughly to ensure systems are airtight and comply with the instructions given in the venting guide and are within all requirements of applicable codes. Failure to comply with all installation requirements can cause severe personal injury or death.

6.2 INSTALLING CONDENSATE DRAIN ASSEMBLY Locate the condensate drain assembly and install as described below.

Installing the Condensate Drain Assembly

WARNING! Before operating the Esteem boiler, the condensate drain assembly MUST be filled with water at the fill plug, or else flue gases will escape creating a dangerous situation. It is recommended to fill the plug at this time, though it may be done any time prior to boiler operation.

1. Remove the retaining nut (with rubber seal) from the condensate drain assembly and slide this nut over the heat exchanger condensate drain nipple (Fig. 6-1, left image). Confirm that the metal washer is placed above the two rubber gaskets as shown in Figure 6-1, right image. Place the condensate drain assembly to the nipple and slide down retaining nut and tighten to the assembly. Hand tighten only!

Figure 6-1: Condensate Drain Assembly

Drain Outlet

Page 43 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 44: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 6 OMM-0089_0A Installation, Operation & Maintenance Manual Vents, Intake & Drain

Installing the Condensate Drain Assembly (Cont.)

WARNING! Ensure the condensate drain assembly contains the plastic seated ball. If the ball is lost or missing, do not install and replace entire assembly with new one.

2. Remove the compression nut (with rubber seal) from the drain outlet (Fig. 6-1).

3. Using 3/4” x 2’ flexible PVC tube provided, slide the compression nut and rubber seal over the pipe

NOTE The use of 3/4” PVC or CPVC pipe is also acceptable. If 3/4” pipe is used, de-burr and chamfer pipe to allow mating onto the drain assembly.

4. Thread the rubber seal into the compression nut to ease installation of the pipe to the drain assembly.

5. Seat the pipe onto the drain assembly and tighten the compression nut. Hand tight only!

NOTES • The installer may opt to use 13/16” ID tubing in lieu of rigid

piping.

• The drain line materials must be materials approved by the authority having jurisdiction. In absence of such authority, PVC and CPVC piping must comply with ASTM D1785 or D2845. The cement and primer used on the piping must comply with ASME D2564 or F493. For installations in Canada, use CSA or ULC certified PVC or CPVC pipe, fittings and cement/primer.

6. Continue the pipe from the drain assembly to a floor drain or condensate pump.

NOTE When selecting and installing a condensate pump, ensure the pump is approved for use with condensing boilers and furnaces. The pump should be equipped with an overflow switch to prevent property damage from potential condensate spillage.

7. The Esteem boiler will typically produce a condensate that is considered slightly acidic with a pH content below 3.0. Install a neutralizing filter if required by authority having jurisdiction.

WARNING! The condensate drain must remain filled and unobstructed and allow unrestricted flow of condensate. The condensate should not be subject to conditions where freezing could occur. If the condensate is subjected to freezing or becomes obstructed, it can leak, resulting in potential water damage to the boiler and surrounding area.

Page 44 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 45: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 7 OMM-0089_0A Installation, Operation & Maintenance Manual Gas Piping

CHAPTER 7: GAS PIPING

7.1 GAS SUPPLY PIPING CONNECTION Install the gas piping as described below.

Connecting the Gas Supply Piping

NOTE The gas supply piping must be installed in accordance to all local, state and national codes and utility requirements.

Figure 7-1: Recommended Gas Supply Piping

1. Install a 1” NPT for the pipe union at the factory supplied gas nipple, for ease of service.

2. Install a manual shutoff valve in the gas supply piping as shown in Figure 7-1. For Canadian installations the main shutoff valve must be tagged and identified by the installer.

3. Install a sediment trap (drip leg) on the gas supply line prior to connecting to the Esteem boiler gas train as shown in Figure 7-1.

4. Support the gas piping using hangers. Do not support the piping by the unit or its components.

5. Purge all air from the gas supply piping.

6. Before placing the boiler into operation, test all connections for leaks.

7. Close the manual shutoff valve during any pressure test with less than 13” W.C..

8. Disconnect the Esteem boiler and its gas valve from the gas supply piping during any pressure test greater than 13” W.C..

Page 45 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 46: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 7 OMM-0089_0A Installation, Operation & Maintenance Manual Gas Piping

Connecting the Gas Piping (Cont.)

WARNING! Do not check for gas leaks with an open flame. Use a gas detection device or bubble test. Failure to check for gas leaks can cause severe personal injury, death or substantial property damage.

9. Use pipe dope compatible with natural and propane gases. Apply sparingly only to the male threads of pipe joints so that pipe dope does not block gas flow.

WARNING! • Failure to apply pipe dope as detailed above can result in severe

personal injury, death or substantial property damage.

• Use a two-wrench method of tightening gas piping near the unit and its gas piping connection. Use one wrench to prevent the boiler gas line connection from turning and the second to tighten adjacent piping. Failure to support the boiler gas piping connection could damage the gas line components.

7.2 NATURAL GAS 7.2.1 Pipe Sizing - Natural Gas Refer to Table 7-1 for schedule 40 metallic pipe length and diameter requirements for natural gas, based on rated Esteem 399 Low NOx boiler input (divide by 1,000 to obtain cubic feet per hour).

• Table 7-1 is based on Natural Gas with a specific gravity of 0.60 and a pressure drop through the gas piping of 0.30”W.C..

• For additional gas piping sizing information, refer to ANSI Z223.1. For Canadian installations refer to B149.1 or B149.2.

Table 7-1: Natural Gas Piping Sizing

Length of Pipe in Feet

Capacity of Schedule 40 Metallic Pipe in Cubic Feet of Natural Gas Per Hour (based on 0.60 specific gravity, 0.30” W.C. pressure drop)

SCH 40 1/2” 3/4” 1” 1-1/4” 1-1/2” 10 132 278 520 1050 1600 20 92 190 350 730 1100 30 73 152 285 590 890 40 63 130 245 500 760 50 56 115 215 440 670 75 45 93 175 360 545 100 38 79 150 305 460 150 31 64 120 250 380

Page 46 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 47: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 7 OMM-0089_0A Installation, Operation & Maintenance Manual Gas Piping 7.2.2 Natural Gas Supply Pressure Requirements

• Pressure required at the gas valve inlet supply pressure port: o Maximum 13” W.C. at flow or no flow conditions to the burner. o Minimum 5” W.C. during flow conditions to the burner. Must be verified during start up

and with all other gas appliances operating within the building.

• Install 100% lockup gas pressure regulator in the gas supply line if inlet pressure can exceed 13” W.C. at any time. Adjust the lockup pressure regulator for 13”w.c maximum.

WARNING! Do not adjust or attempt to measure gas valve outlet pressure. The gas valve is factory-set for the correct outlet pressure. This setting is suitable for natural gas and propane and requires no field adjustment. Attempts by the installer to adjust or measure the gas valve outlet pressure could result in damage to the valve, causing potential severe personal injury, death or substantial property damage.

NOTE The natural gas orifice for the Esteem 399 Low NOx boiler is 0.339” (8.6 mm).

7.3 PROPANE GAS 7.3.1 Pipe Sizing – Propane Gas Contact the local propane gas supplier for recommended sizing of piping, tanks and 100% lockup gas regulator.

WARNING! The unit is shipped with a propane conversion kit, which is located on the top of the unit in the instruction packet. This kit includes all the necessary parts and instructions to perform the conversion from natural gas to propane gas. If this conversion kit is missing, please contact AERCO Technical Support before installing the Esteem boiler to use propane gas.

WARNING! Prior to start up, ensure the unit is set to fire propane.

Check the rating label for the type of fuel.

Check the gas valve for propane conversion label.

If there is a conflict or doubt on the burner set up, remove the gas valve and check for the propane orifice (Figure 7-2). Failure to ensure proper burner setup could result in severe personal injury, death or substantial property damage.

Page 47 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 48: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 7 OMM-0089_0A Installation, Operation & Maintenance Manual Gas Piping 7.3.2 Propane Gas Supply Pressure Requirements

1. Adjust the propane supply regulator provided by the gas supplier for 13” W.C. maximum pressure.

2. Pressure required at the gas valve inlet supply pressure port:

• Maximum 13” W.C. at flow or no flow conditions to the burner.

• Minimum 5” W.C. during flow conditions to the burner. Must be verified during start up and with all other gas appliances operating within the building.

WARNING! Do not adjust or attempt to measure gas valve outlet pressure. The gas valve is factory-set for the correct outlet pressure. This setting is suitable for natural gas and propane and requires no field adjustment. Attempts by the installer to adjust or measure the gas valve outlet pressure could result in damage to the valve, causing potential severe personal injury, death or substantial property damage.

WARNING! Prior to start up, ensure the unit is set to fire propane. Check the rating label for the type of fuel. Check the gas valve for propane conversion label. If there is a conflict or doubt on the burner set up, remove the gas valve and check for the propane orifice. See Figure 7-2. Failure to ensure proper burner setup could result in severe personal injury, death or substantial property damage.

NOTE The propane orifice required for the Esteem 399 Low NOx boiler is 0.264” (6.7 mm).

Page 48 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 49: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 7 OMM-0089_0A Installation, Operation & Maintenance Manual Gas Piping

Figure 7-2: Gas Valve and Component Locations (With Gas Valve Shown Separated From the Blower Assembly)

VENTURI

OFFSET PRESSURE COVER SCREW

GAS VALVE

GAS INLET ORIFACE (NATURAL GAS OR PROPANE)

GASKET

THROTTLE SCREW (RED PLASTIC SLEEVE)

INLET PRESSURE PORT

BLOWER ASSEMBLY

Page 49 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 50: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 7 OMM-0089_0A Installation, Operation & Maintenance Manual Gas Piping

(This page intentionally blank)

Page 50 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 51: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 8 OMM-0089_0A Installation, Operation & Maintenance Manual Internal Wiring

CHAPTER 8: INTERNAL WIRING

WARNING! ELECTRICAL SHOCK HAZARD. For your safety, disconnect electrical power supply to the unit before servicing or making any electrical connections to avoid possible electric shock hazard. Failure to do so can cause severe personal injury or death.

WARNING! Prior to servicing, label all wires before disconnecting. Wiring errors can cause improper and dangerous operation. Verify proper wiring and operation after servicing.

8.1 GENERAL REQUIREMENTS • Wiring must be NEC Class 1.

• If original wiring as supplied with the unit must be replaced, use only Type T 90ºC wire or equivalent as a minimum.

• The Esteem boiler must be electrically grounded as required by National Electrical Code ANSI/NFPA 70—latest edition and / or the Canadian Electrical Code Part 1, CSA C22.1, Electrical Code.

8.2 FUSE LOCATIONS

8.2.1 EZ-SETUP Controller Module Fuses Location The control module contains two (2) internal replaceable 5A fuses, as shown in Figure 8-1.

Figure 8-1: Control Module Fuse Location

Page 51 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 52: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 8 OMM-0089_0A Installation, Operation & Maintenance Manual Internal Wiring 8.2.2 Line Voltage Fuses Location Additional fuses are also located on the line voltage terminals as shown in Figure 8-2.

Fuse Size Terminals Purpose 2.5A 23,24,25 CH2 /System Pump 2.5A 26,27,28 Auxiliary Boiler Pump 2.5A 29,30,31 DHW Pump / Diverter Valve 2.5A 32,33,34 CH1 Pump/Diverter Valve 8.0A 35,36,37 Power Supply 2.5A 38,39,40 Alarm

Figure 8-2: Line Voltage Fuse Locations

Fuse Locations

Page 52 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 53: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 8 OMM-0089_0A Installation, Operation & Maintenance Manual Internal Wiring

Figure 8-3: Esteem Boiler Internal Wiring Diagram

Page 53 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 54: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 8 OMM-0089_0A Installation, Operation & Maintenance Manual Internal Wiring

(This page intentionally blank)

Page 54 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 55: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 9 OMM-0089_0A Installation, Operation & Maintenance Manual External Wiring

CHAPTER 9: EXTERNAL WIRING

9.1 INSTALLATION COMPLIANCE All field wiring made during installation must comply with:

• National Electrical Code NFPA 70 and any other national, state, provincial or local codes or requirements.

• In Canada, CSA C22.1 Canadian Electrical Code Part 1, and any other local codes.

WARNING! ELECTRICAL SHOCK HAZARD. Before making any electrical connections to the unit, disconnect electrical power supply at the service panel. Failure to comply can cause severe personal injury or death.

NOTE The line voltage terminals are located on the right set of terminals 23 through 40. The low voltage terminals are located on the left set of terminals 1 through 22.

9.2 LINE VOLTAGE CONNECTIONS To connect line voltage electrical power to the unit, perform the following.

Connecting Line Voltage to the Esteem Boiler 1. Connect a dedicated 120 VAC/15A service to the line voltage terminal strip on the wiring

panel below the Esteem boiler control module, as shown in Figure 8-3.

2. Route the incoming 120 VAC power wire through the provided openings in the bottom jacket panel.

3. The unit is provided with a service switch located on the front panel, check local code requirements for compliance.

NOTE If local codes or conditions require an additional service switch, the installer must install a fused disconnect for 15 amp (minimum) service switch.

MC1 06/04/13 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 • Ph: 800-526-0288 Page 55 of 158

Page 56: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 9 OMM-0089_0A Installation, Operation & Maintenance Manual External Wiring 9.3 CIRCULATOR WIRING To wire the circulator, perform the following.

Wiring the Circulator 1. Reference Table 9-1 to determine the appropriate circulator connections required. The

circulator connections used will depend on the systems piping layout.

Table 9-1: Circular Operation Default Settings

Call CH (1) Pump DHW Pump Auxiliary Boiler Pump

System Pump

CH 1 or CH 2 Call ON OFF (Note 1) ON ON DHW Call OFF (Note 1) ON ON OFF (Note 1)

NOTE 1 Domestic Hot Water Priority can be disabled in the Installer Menu which allows the CH (1) and DHW circulators to operate at the same time. Consult Chapter 10, Basic Esteem Controls, for more information.

NOTES • The system circulator can also been enabled during a DHW Call

in the Installer Menu. Consult Section 10, Basic Esteem Controls, for more information.

• Each circulator is individually fused with a 2.5A fuse located in the terminal strip. The total combined amp draw of the CH (1), DHW, and Auxiliary Boiler Circulators must not exceed 3 amps at any time for the Esteem boiler. Use an isolation relay to lower the total combined amp draw if exceeding these limits.

2. Connect the CH circulator to the line voltage terminal strip on the wiring panel below the Esteem control module, as shown in Figure 8-3. The CH circulator is enabled during a CH 1 or CH 2 call. This circulator is used to supply heat to the central/space heating loop.

3. Connect the DHW circulator to the line voltage terminal strip on the wiring panel below the Esteem control module, as shown in Figure 8-3. The DHW circulator is enabled during a DHW call. This circulator is used to supply heat to an indirect hot water heater.

4. Connect the Auxiliary Boiler circulator to the line voltage terminal strip on the wiring panel below the Esteem control module, as shown in Figure 8-3. The auxiliary boiler circulator is enabled during a CH or a DHW call. This circulator is typically used in retrofit applications where the CH and DHW systems are connected to a common boiler supply.

5. Connect the System circulator to the line voltage terminal strip on the wiring panel below the Esteem control module, as shown in Figure 8-3 The system circulator is enabled during a CH1 or CH2 call with the factory default settings. This circulator is typically used to circulate water in the secondary CH loop when zoning with zone valves.

Page 56 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 57: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 9 OMM-0089_0A Installation, Operation & Maintenance Manual External Wiring 9.4 ALARM WIRING The alarm contact closes whenever the Esteem is in a soft or hard lockout. This dry contact can be connected to an external monitoring system or other indicator to alert the operator that the Esteem is locked out.

Connect the external monitoring device to the line voltage terminal strip on the wiring panel below the Esteem control module, as shown in Figure 8-3.

NOTE The alarm contact is fused with a 2.5A fuse located in the terminal strip. An isolation relay is required if the external monitoring device draws more than 2.5A.

9.5 LOW VOLTAGE CONNECTIONS Line and Low Voltage wiring should be separated to prevent possible electrical noise on the low voltage circuits. Line and Low Voltage wiring should use separate electrical knockouts on the Esteem cabinet and should remain separated inside the Esteem.

CH and DHW call connections to the Esteem require a dry contact with no external voltage present. Ensure no external voltage is present on each set of wires before connecting to the Esteem. If external voltage is present, the use of an isolation relay is required to prevent damage to the Esteem EZ-SETUP controller.

9.6 THERMOSTAT WIRING The Esteem EZ-SETUP Controller has two thermostat call inputs for multiple zone / temperature systems. This allows each call to have its own outdoor reset curve and maximizes the efficiency of the system.

WARNING! Simultaneous CH1 and CH2 calls will result in the Esteem boiler operating at the highest target temperature. The use of a mixing device on the lower temperature zones may be required to protect the lower temperature zones from damage.

Wire a thermostat to the Esteem unit as follows.

Wiring the Thermostat to the Esteem Boiler 1. Connect the room thermostat or dry contact end switch to the low voltage terminal strip on

the wiring panel below the Esteem control module, as shown in Figure 8-3.

2. Follow thermostat manufacturer’s instructions for proper installation. Thermostat should be located on an inside wall away from any heat or cold influences such as drafts, lights, fireplaces, etc.

3. Set the thermostat anticipator (If applicable) as follows:

• Set for 0.2 amps when wired directly to the Esteem.

• Set to match the electrical power requirements of the connected device when wired to zone relays or other devices. Refer to the relay manufacturer’s specifications and the thermostat instructions for additional information on anticipator setting.

Page 57 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 58: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 9 OMM-0089_0A Installation, Operation & Maintenance Manual External Wiring 9.7 OUTDOOR SENSOR WIRING The Outdoor Reset function and Warm Weather Shutdown (WWSD) features require the connection of the included outdoor temperature sensor. See Chapter 13 for outdoor sensor installation and setup.

9.8 DOMESTIC HOT WATER WIRING The Domestic Hot Water terminals can accept either a call from an aquastat (switch) or temperature sensor. Use of the included indirect water heater sensor is recommended.

Connect the DHW aquastat or temperature sensor to the low voltage terminal strip on the wiring panel below the Esteem control module, as shown in Figure 8-3.

9.9 ADDITIONAL BOILER LIMITS Additional boiler limits (High Limit, LWCO, etc.) can be wired into either the Manual Reset Limit or Auto Reset Limit terminals of the Esteem. These limit connections will provide a “hard” lockout requiring a manual reset of the Esteem or a “soft” lockout in which the Esteem will automatically reset when the limit resets.

NOTE Manual Reset Limit and Auto Reset Limit connections to the Esteem require a dry contact with no external voltage present. Ensure no external volt-age is present on each set of wires before connecting to the Esteem. If external voltage is present, the use of an isolation relay is required to prevent damage to the controller.

Remove the factory installed jumper wire on the Manual Reset or Auto Reset terminals that will accept the additional boiler limit.

Connect the additional boiler limit to the low voltage terminal strip on the wiring panel below the Esteem control module, as shown in Figure 8-3.

9.10 EXTERNAL MODULATION CONTROL The Esteem firing rate can be controlled by an external modulating boiler controller. See Chapter 14, External Modulating Control, for external modulation signal wiring and setup.

9.11 SYSTEM SENSOR WIRING An optional system temperature sensor can be placed on the central heating loop to control the temperature in the central heating loop instead of the boiler loop. When connected, the Esteem will automatically modulate to maintain the target temperature in the central heating loop. The boiler supply temperature sensor will continue to be used as a high temperature limit.

WARNING! Locate the system temperature sensor where it can accurately measure the supply temperature to the heating system. Inaccurate system temperature readings could lead to overheating or under heating resulting in property damage.

Connect the system temperature sensor to the low voltage terminal strip on the wiring panel below the Esteem control module, as shown in Figure 8-3.

Page 58 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 59: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 9 OMM-0089_0A Installation, Operation & Maintenance Manual External Wiring 9.12 CASCADE WIRING The EZ-SETUP controller includes the ability to operate up to six boilers together as one without the need for external controllers. Consult Chapter 10, Basic Controller Operation, for more information.

9.13 MODBUS WIRING The EZ-SETUP controller includes the ability to communicate with building management systems (BMS) through a Modbus interface. Consult Section 10, Basic Controller Operation, for more information.

Page 59 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 60: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 9 OMM-0089_0A Installation, Operation & Maintenance Manual External Wiring

Figure 9-1: Multiple Zone Field Wiring Using Zone Valves

Page 60 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 61: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 9 OMM-0089_0A Installation, Operation & Maintenance Manual External Wiring

Figure 9-2: Multiple Zone Field Wiring Using Zone Circulators

MC1 06/04/13 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 • Ph: 800-526-0288 Page 61 of 158

Page 62: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 9 OMM-0089_0A Installation, Operation & Maintenance Manual External Wiring

Figure 9-3: Esteem 399 Wiring - Zoning with Zone Circulators

Figure 9-4: Esteem 399 Wiring - Zoning with Zone Valves

Page 62 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 63: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 9 OMM-0089_0A Installation, Operation & Maintenance Manual External Wiring

Figure 9-5: Esteem 399 Wiring – Multiple Zone Valve with Single System/Boiler Circulator

Figure 9-6: Esteem 399 Wiring – Single Zone System with Single System/Boiler Circulation

Page 63 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 64: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 9 OMM-0089_0A Installation, Operation & Maintenance Manual External Wiring

(This page intentionally blank)

Page 64 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 65: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 10 OMM-0089_0A Installation, Operation & Maintenance Manual EZ-SET Controller

CHAPTER 10: BASIC EZ-SET CONTROLLER OPERATION NOTE

This chapter describes the general operation of the EZ-SET controller. See Chapter 18 for in-depth information concerning controller installer setup, operation, and menus.

10.1 EZ-SET CONTROLLER INTRODUCTION The Esteem Boiler Management System is designed to be flexible yet easy to use. The controller monitors and controls the Esteem boiler to operate as efficiently as possible. The controller monitors the boiler supply, return and flue gas temperatures and operates the igniter, gas valve and blower and uses this information to modulate the boiler’s firing rate to maintain the required setpoint. All controller features are easy to use through a graphical display where information is presented either graphically or in plain English, so code charts are not required. Figure 10-1 shows an image of the EZ-SET controller front panel, including menu display, navigation buttons, ON/OFF switch, Installer button, and temperature gauge.

10.2 EZ-SET CONTROLLER FEATURES AND FUNCTIONS The EZ-SET controller offers many advanced control options, which may be adjusted for various applications to achieve optimum boiler efficiency and operation, and includes:

• Two central / space heating (CH) call inputs with separate outdoor reset curves. • Domestic Hot Water (DHW) call input with optional priority. • EZ Setup feature allows the installer to quickly customize the EZ-SET controller for each

installation. • Cascade function allows up to six boilers to operate together in a single heating system. • Modbus interface for integrating with building management systems.

These advanced features are adjustable in the Installer Menu after entering an access code.

Figure 10-1: EZ-SET Controller Front Panel Features

Installer Button

Navigation Buttons

ON/OFF Switch

Menu Display

Pressure Gauge

Page 65 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 66: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 10 OMM-0089_0A Installation, Operation & Maintenance Manual EZ-SET Controller 10.3 CONTROLLER NAVIGATION Navigation is performed through four arrow buttons UP, DOWN, LEFT, RIGHT with a center OK button for making selections and entering information. The INSTALLER button (the small round button) provides the installing contractor with full access to all available features after entering a password. Refer to Chapter 18 of this manual for Installer level menu functions.

Figure 10-2: EZ-SET Controller Navigation Buttons

The Main Menu can be entered from the Home Screen by pressing the OK button. The menu system utilizes icons to represent each selection. The current selected menu is displayed as a reversed image with a text description shown at the top of the display. Menus can be entered by highlighting the desired icon and pressing the OK button. The Home Screen ( ) icon at the bottom of each screen returns to the Home Screen when selected. The Previous Screen ( ) icon at the bottom of each screen returns to the previous screen when selected.

Page 66 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 67: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 10 OMM-0089_0A Installation, Operation & Maintenance Manual EZ-SET Controller

Figure 10-3: Controller Menu Structure

Page 67 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 68: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 10 OMM-0089_0A Installation, Operation & Maintenance Manual EZ-SET Controller 10.4 HOME SCREEN The Home Screen presents status information in a very user friendly way so that the current state of the boiler can be quickly accessed.

Figure 10-4: EZ-SETUP Controller Home Screen Menu The screen backlight will illuminate when any button is pressed and remain illuminated for five minutes. Press the UP or DOWN buttons to turn on the backlight while at the Home Screen without making any changes. The screen contrast can be adjusted at the Home Screen by pressing and holding the OK button then pressing and holding the LEFT arrow along with the OK button. The contrast can then be increased by pressing the UP button or decreased by pressing the DOWN button while holding in the OK button and LEFT arrow. All buttons must be released and the procedure performed again to switch between increasing and decreasing contrast.

The status line displays the current operating state of the Esteem boiler. See Table 10-1, for a list of all status line messages.

Page 68 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 69: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 10 OMM-0089_0A Installation, Operation & Maintenance Manual EZ-SET Controller

Table 10-1: EZ-SET Controller Status Line Messages

Status Line Message Description

Standby Indicates that the Esteem is ready to respond when a demand is received.

CH Demand A central heating call has been received. DHW Demand A domestic hot water call has been received.

CH / DHW Demand Central heating and domestic hot water calls are being received simultaneously. Both calls are being satisfied simultaneously because domestic hot water priority has been disabled.

DHW Priority Central heating and domestic hot water calls are being received simultaneously. Domestic hot water call is being satisfied first because it has priority over central heating calls.

Priority Timeout Central heating and domestic hot water calls are being received simultaneously. The domestic hot water priority time limit has been exceeded. Priority will now switch back and forth between central heating and domestic hot water calls until one call is satisfied.

External Demand An external modulation call has been received.

Slave Operation The Esteem is responding to a call from the master Esteem boiler in a cascade system.

Manual Operation The burner or circulators have manually been enabled in the Installer Menu.

CH Burner Delay The burner will not fire until the call blocking time has elapsed. DHW Burner Delay The burner will not fire until the call blocking time has elapsed.

CH Setpoint Reached The burner is not fired because the supply/system water temperature exceeds the setpoint. The central heating circulator continues to operate and the burner will fire again once the supply/system water temperature drops below the setpoint.

DHW Setpoint Reached The burner is not fired because the supply/system water temperature exceeds the setpoint. The domestic circulator continues to operate and the burner will fire again once the supply/system water temperature drops below the setpoint.

CH Post Pump The central heating circulator is running to remove heat from the Esteem at the completion of a call.

DHW Post Pump The domestic hot water circulator is running to remove heat from the Esteem at the completion of a call.

Freeze Protection The burner is fired because the freeze protection feature has been activated. Freeze protection will end once the supply/system water temperature is raised to 60ºF [16ºC].

Boiler Protection The burner firing rate is being reduced because of an excessive difference between the boiler supply and return temperatures. The firing rate will begin increasing once the temperature difference is less than 45ºF [25ºC].

Lockout Description The lockout which currently has the Esteem shut down is displayed.

Page 69 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 70: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 10 OMM-0089_0A Installation, Operation & Maintenance Manual EZ-SET Controller 10.5 MAIN MENU The Main Menu can be entered from the Home Screen by pressing the OK button. The menu system utilizes icons to represent each selection. The currently selected menu is displayed as a reversed image with a text description shown at the top of the display. Menus can be entered by highlighting the desired icon and pressing the OK button.

Figure 10-5: EZ-SETUP Controller Main Menu

Page 70 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 71: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 10 OMM-0089_0A Installation, Operation & Maintenance Manual EZ-SET Controller

10.6 EZ SETUP Navigation: Home Screen > Main Menu > EZ Setup The EZ Setup menus provide a simple way to quickly customize the controller for each installation. EZ Setup prompts the user to make selections which allows the Esteem 399 boiler to be setup very quickly without searching through long lists of settings and manually making adjustments.

10.7 HEATING EZ SETUP Navigation: Home Screen > Main Menu > EZ Setup > Heating EZ Setup Heating EZ Setup allows the installer to quickly customize the central heating settings for the application.

10.7.1 Select CH Demand (Default: Switch & Outdoor Reset) Select CH Demand prompts the installer to select how a CH Demand is generated. Press the UP or DOWN buttons to select the CH Demand type then press the OK button to store the setting. The Select CH Demand options are:

• Switch & Outdoor Reset: This option is only displayed when the outdoor temperature sensor is connected. A central heating call from a thermostat or zone panel will enable the Esteem and the setpoint will vary with the outdoor temperature for central heating calls.

• Switch & Setpoint: This option is only displayed when the outdoor temperature sensor is not connected. A central heating call from a thermostat or zone panel will enable the Esteem and the setpoint will be fixed for central heating calls

• Constant & Outdoor Reset: This option is only displayed when the outdoor temperature sensor is connected. The Esteem will maintain set-point without an external call from a thermostat or zone panel. The set-point will vary with the outdoor temperature for central heating calls.

• Constant & Setpoint: The Esteem will maintain setpoint without an external call from a thermostat or zone panel. The setpoint will be fixed for central heating calls.

• 0-10V Modulation Signal: This option allows the Esteem firing rate to be controlled by an external control system.

Figure 10-6: Select CH Demand Menu (with Outdoor Sensor & Without)

OR

Page 71 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 72: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 10 OMM-0089_0A Installation, Operation & Maintenance Manual EZ-SET Controller 10.7.2 CH1 Setpoint (Default: 180°F [82°C]) CH1 Setpoint prompts the installer to enter the fixed setpoint for a CH1 heating call when a Setpoint option is chosen in Select CH Demand. Press the LEFT or RIGHT buttons to adjust the CH1 Setpoint then press the OK button to store the setting.

Figure 10-7: Select CH1 Setpoint Menu (Same as CH2 Setpoint Menu)

10.7.3 CH2 Setpoint (Default: 140°F [60°C]) CH2 Setpoint prompts the installer to enter the fixed setpoint for a CH2 heating call when a Setpoint option is chosen in Select CH Demand. Press the LEFT or RIGHT buttons to adjust the CH2 Setpoint then press the OK button to store the setting.

10.7.4 Select CH1 Reset Curve (Default: Finned Tube Baseboard) Select CH1 Reset Curve prompts the installer to select an outdoor reset curve for a CH1 heating call when an Outdoor Reset option is chosen in Select CH Demand. Outdoor reset curve presets are available to cover most applications. The outdoor reset curve can also be adjusted to any desired settings in the Installer Menu. Press the UP or DOWN buttons to select the outdoor reset curve appropriate for the type of heating system then press the OK button to store the setting.

10.7.5 Select CH2 Reset Curve (Default: Low Mass Radiant) Select CH2 Reset Curve prompts the installer to select an outdoor reset curve for a CH2 heating call when an Outdoor Reset option is chosen in Select CH Demand. Outdoor reset curve presets are available to cover most applications. The outdoor reset curve can also be adjusted to any desired settings in the Installer Menu. Press the UP or DOWN buttons to select the outdoor reset curve appropriate for the type of heating system then press the OK button to store the setting.

Figure 10-8: Select CH1 Reset Curve Menu (Same as CH2 Reset Curve Menu)

Page 72 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 73: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 10 OMM-0089_0A Installation, Operation & Maintenance Manual EZ-SET Controller

Table 10-2: Outdoor Reset Preset Selections Preset Minimum Setpoint Maximum Setpoint

Low Mass Radiant 80ºF [27ºC] 140ºF [60ºC] High Mass Radiant 80ºF [27ºC] 120ºF [49ºC] Cast Iron Baseboard 100ºF [38ºC] 170ºF [77ºC] Finned Tube Baseboard 120ºF [49ºC] 180ºF [82ºC] Radiators 120ºF [49ºC] 170ºF [77ºC] Fan Coil 140ºF [60ºC] 180ºF [82ºC]

10.7.6 Set Warm Weather Shutdown Temperature (Default: OFF) Warm Weather Shutdown prompts the installer to enter an optional outdoor temperature at which to disable the central heating function. The Esteem will continue to respond to a domestic hot water call or a 0-10VModulation Signal when the outdoor temperature exceeds the Warm Weather Shutdown Temperature setting. Press the LEFT or RIGHT buttons to adjust the Warm Weather Shutdown Temperature then press the OK button to store the setting. The Warm

Weather Shutdown icon ( ) is displayed on the home screen when the outdoor temperature reaches the Warm Weather Shutdown Temperature.

Figure 10-9: Set Warm Weather Shutdown Temperature Menu

Page 73 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 74: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 10 OMM-0089_0A Installation, Operation & Maintenance Manual EZ-SET Controller

10.8 DOMESTIC HOT WATER EZ SETUP Navigation: Home Screen > Main Menu > EZ Setup > DHW EZ Setup Domestic Hot Water EZ Setup allows the installer to quickly customize the domestic hot water settings for the application.

10.8.1 Select DHW Demand (Default: Switch) Select DHW Demand prompts the installer to select the type of device which will generate a DHW call. Press the UP or DOWN buttons to select the DHW Demand type then press the OK button to store the setting. The Select DHW Demand options are:

• Switch: A domestic hot water call from an aquastat or dry contact switch will enable the Esteem with a fixed setpoint for a domestic hot water call.

• Sensor: This option requires the use of Indirect Water Heater Sensor 69107. The Esteem will monitor the DHW storage temperature and generate a domestic hot water call when the temperature drops below the DHW Storage Setpoint by 6ºF [3ºC].

Figure 10-10: Select DHW Demand Menu

10.8.2 Boiler DHW Setpoint (Default: 186°F [86°C]) Boiler DHW Setpoint prompts the installer to enter the fixed boiler setpoint temperature during a Domestic hot water call when the Switch option is chosen in Select DHW Demand. Press the LEFT or RIGHT buttons to adjust the Boiler DHW Setpoint then press the OK button to store the setting.

Figure 10-11: Boiler DHW Setpoint Menu

Page 74 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 75: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 10 OMM-0089_0A Installation, Operation & Maintenance Manual EZ-SET Controller 10.8.3 DHW Storage Setpoint (Default: 140°F [60°C]) DHW Storage Setpoint prompts the installer to enter the domestic hot water storage setpoint temperature when the Sensor option is chosen in Select DHW Demand. Press the LEFT or RIGHT buttons to adjust the DHW Storage Setpoint then press the OK button to store the setting.

Figure 10-12: DHW Storage Setpoint Menu

NOTE The Boiler DHW Setpoint will automatically be set 46°F [25°C] higher than the DHW Storage Setpoint setting.

10.8.4 DHW Priority Timeout (Default: Off) DHW Priority Timeout prompts the installer to enter an optional time limit that a domestic hot water call has priority over a central heating call. Press the LEFT or RIGHT buttons to adjust the DHW Priority Timeout then press the OK button to store the setting.

Figure 10-13: DHW Priority Timeout Menu

Page 75 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 76: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 10 OMM-0089_0A Installation, Operation & Maintenance Manual EZ-SET Controller

10.9 EZ SETUP RESET Navigation: Home Screen > Main Menu > EZ Setup > EZ Setup Reset EZ Setup Reset allows the installer to reset all EZ Setup settings back to the original factory defaults. Follow the onscreen instructions to reset all EZ Setup settings back to the original factory defaults.

Figure 10-14: EZ Setup Reset Menu

10.10 DISPLAY EZ SETUP Navigation: Home Screen > Main Menu > EZ Setup > Display EZ Setup Display EZ Setup allows the installer to select the type of temperature units displayed as well as the language used for all text. Press the UP or DOWN buttons to select then press the OK button to store the setting.

Figure 10-15: Display EZ Setup (Temperature Units Select) Menu

Page 76 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 77: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 10 OMM-0089_0A Installation, Operation & Maintenance Manual EZ-SET Controller

10.11 CH/DHW OPERATION Navigation: Home Screen > Main Menu > CH / DHW Operation CH / DHW Operation provides a simple way to disable either the central heating or domestic hot water functions of the Esteem. Operation can be enabled and disabled by selecting the central heating or domestic hot water icon then pressing the OK button to toggle between enabled and disabled. An icon with an X through it indicates that function has been disabled. The disabled icon is also displayed on the home screen when a function has been disabled.

Figure 10-16: Heating Enabled Menu

10.12 BOILER INFORMATION Navigation: Home Screen > Main Menu > Boiler Information > Boiler Information Boiler Information provides real time operating information of the Esteem boiler. Each line contains an information item followed by its current value. Six information items are displayed on the screen at one time. Press the UP or DOWN buttons to scroll through additional information items. See Table 10-3 on the next page for a list of all information items.

Figure 10-17: Boiler Information Menu

Page 77 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 78: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 10 OMM-0089_0A Installation, Operation & Maintenance Manual EZ-SET Controller

Table 10-3: Information Displayed Using Boiler Information Menu

Information Item Description

Boiler Status Displays the current operating state of the Esteem. This is the same as the status line on the home screen.

Heating Call Displays if a central heating call is present.

DHW Call Displays if a domestic hot water call is present

Boiler Firing Rate Displays the current firing rate of the Esteem.

Flame Ionization Current Displays the current flame ionization current from the igniter.

Boiler Setpoint Displays the current setpoint of the Esteem.

Boiler Supply Temperature Displays the current supply temperature of the Esteem.

Boiler Return Temperature Displays the current return temperature of the Esteem.

Boiler Flue Temperature Displays the current flue temperature of the Esteem.

Outdoor Temperature Displays the current outdoor temperature.

DHW Storage Temperature Displays the current DHW storage temperature when Indirect Water Heater Sensor 69107 is installed.

External Modulation Signal Displays the current external modulation signal being received from an external controller.

CH Ignitions Displays the number of central heating ignitions since the unit was installed. This counter increases in increments of twenty.

CH Runtime Displays the number of hours the Esteem has run for a central heating call since the unit was installed.

DHW Ignitions Displays the number of domestic hot water ignitions since the unit was installed. This counter increases in increments of twenty.

DHW Runtime Displays the number of hours the Esteem has run for a domestic hot water call since the unit was installed.

Page 78 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 79: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 10 OMM-0089_0A Installation, Operation & Maintenance Manual EZ-SET Controller 10.12.1 Boiler Information Logging Some information items include a logging function which records one sample every 12 minutes to produce a graph of the last 24 hours. Select the information item in Boiler Information then press the OK button to view its graph. The following items have a logging function:

• Boiler Firing Rate • Flame Ionization Current • Boiler Setpoint • Boiler Supply Temperature • Boiler Return Temperature • Boiler Flue Temperature • Outdoor Temperature • DHW Storage Temperature • External Modulation Signal

Figure 10-18: Boiler Information Menu

Page 79 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 80: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 10 OMM-0089_0A Installation, Operation & Maintenance Manual EZ-SET Controller 10.13 LOCKOUT HISTORY Navigation: Home Screen > Main Menu > Boiler Information > Lockout History Lockout History records the last eight lockouts. Each line contains a lock-out description followed by how long ago the lockout occurred. Six lock-outs are displayed on the screen at one time. Press the UP or DOWN buttons to scroll through additional lockouts. See Tables 10-4 and 10-5 for a list of lockouts and descriptions.

Figure 10-19: Lockout History Menu

10.13.1 Lockout Details Some information items are recorded at the time of a lockout to aid in diagnosing the cause of the lockout. Select the lockout description in Lockout History then press the OK button to view the recorded information. Press the UP or DOWN buttons to scroll through the recorded information. The following information items are recorded at the time of a lockout:

• Boiler Status • Heating Call • Domestic Call • Boiler Firing Rate • Flame Ionization Current • Boiler Setpoint • Boiler Supply Temperature • Boiler Return Temperature • Boiler Flue Temperature • Outdoor Temperature • System Temperature

Figure 10-20: Lockout Details Menu

Page 80 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 81: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 10 OMM-0089_0A Installation, Operation & Maintenance Manual EZ-SET Controller

Figure 10-21: Lockout Screen Information

Page 81 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 82: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 10 OMM-0089_0A Installation, Operation & Maintenance Manual EZ-SET Controller

Table 10-4: Manual Reset Hard Lockout Descriptions

Code Lockout Message Description

E1 Failed Ignition The burner failed to light after 5 ignition attempts.

E2 False Flame A flame is being detected prior to ignition.

E3 High Boiler Temperature Boiler temperature exceeds 212°F [100ºF]

E5 Blower Speed Blower is not at correct speed or speed signal is not being received by control module.

E8 Flame Circuit Error Flame circuit test failed.

E9 Gas Valve Circuit Error Gas valve circuit test failed.

E13 Reset Limit Reached Resets are limited to 5 every 15 minutes.

E15 Sensor Drift Supply or return sensor reading has drifted.

E16 Supply Sensor Stuck Supply sensor reading is not changing.

E17 Return Sensor Stuck Return sensor reading is not changing.

E18 Sensor Failure Supply or return sensor reading changed very rapidly.

E21 Internal Control Fault A / D conversion error.

E30 Supply Sensor Shorted A short circuit has been detected in the boiler supply temperature sensor circuit.

E31 Supply Sensor Open An open circuit has been detected in the boiler supply temperature sensor circuit.

E43 Return Sensor Shorted A short circuit has been detected in the boiler return temperature sensor circuit.

E44 Return Sensor Open An open circuit has been detected in the boiler return temperature sensor circuit.

E80 Return > Supply Return temperature is higher than supply temperature.

E87 External Limit Open An external manual reset limit has opened.

Page 82 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 83: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 10 OMM-0089_0A Installation, Operation & Maintenance Manual EZ-SET Controller

Table 10-5: Automatic Reset Soft Lockout Descriptions

Code Lockout Message Description E7 High Flue Temperature Flue temperature exceeds high limit. E12 Internal Control Fault EEPROM misconfiguration. E25 Internal Control Fault CRC check error.

E32 DHW Sensor Shorted A short circuit has been detected in the DHW temperature sensor circuit.

E33 DHW Sensor Open An open circuit has been detected in the DHW temperature sensor circuit.

E34 Low Voltage Line voltage has fallen below an acceptable operating level.

E37 Low Water Water level has fallen below an acceptable operating level.

E45 Flue Sensor Shorted A short circuit has been detected in the boiler flue temperature sensor circuit.

E46 Flue Sensor Open An open circuit has been detected in the boiler flue temperature sensor circuit.

E76 External Limit Open An external automatic reset boiler limit has opened. E81 Sensor Drift Supply and return temperatures are not equal. E89 Incorrect Setting A parameter setting is outside the settings range.

E90 Firmware Mismatch Control module and display firmware versions are incompatible.

E91 System Sensor Shorted A short circuit has been detected in the system temperature sensor circuit.

E92 System Sensor Open An open circuit has been detected in the system temperature sensor circuit.

E93 Outdoor Sensor Shorted A short circuit has been detected in the outdoor temperature sensor circuit.

E94 Internal Display Fault Display memory error. E95 Supply Sensor Error Supply sensor reading is invalid.

E96 Outdoor Sensor Open An open circuit has been detected in the outdoor temperature sensor circuit.

E97 Cascade Mismatch Cascade configuration has changed. E98 Cascade Bus Error Communication with other boilers has been lost.

E99 Controller Bus Error Communication between boiler display and control module has been lost.

Page 83 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 84: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 10 OMM-0089_0A Installation, Operation & Maintenance Manual Basic Controller

(This page intentionally blank)

MC1 06/04/13 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 • Ph: 800-526-0288 Page 84 of 158

Page 85: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 11 OMM-0089_0A Installation, Operation & Maintenance Manual Start-Up Preparation

CHAPTER 11: START-UP PREPARATION NOTE

Requirements below must be met for warranty coverage of Esteem heat exchangers. A thorough cleaning of any existing system, using approved heating system cleaning agents is required prior to installation of the Esteem boiler. System should be treated with an approved inhibitor after filling for long term protection.

11.1 CHECK BOILER SYSTEM WATER CHEMISTRY

WARNING! Do not use petroleum-based cleaning or sealing compounds in the boiler system. Damage to seals and gaskets in the sys-tem components could occur, resulting insubstantial property damage.

NOTE System water including additives must be practically non-toxic, having a toxicity rating or Class of 1, as listed in Clinical Toxicology of Commercial Products.

11.1.1 Water pH Level 6.0 to 8.0 Maintain the boiler water pH between 6.0 and 8.0. Check using litmus paper or contact a water treatment company for a chemical analysis.

If the pH does not meet this requirement, do not operate the Esteem or leave the unit filled until the condition is corrected.

11.1.2 Water Hardness Less Than 7 Grains For areas with unusually hard water (hardness above 7 grains) consult a water treatment company.

11.1.3 Chlorinated Water Do not use the Esteem 399 to heat a swimming pool or spa directly.

Maintain the chlorine level of the water at levels considered safe for drinking.

11.1.4 Flush Boiler to Remove Sediment The installer must flush the boiler system to remove any sediment to allow proper operation of the Esteem 399. Flush the systems until the water runs clean and is free of sediment.

For zoned systems, each zone should be flushed through a purge valve. Purge valves and isolation valves should be installed on each zone to allow proper flushing of the system.

Page 85 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 86: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 11 OMM-0089_0A Installation, Operation & Maintenance Manual Start-Up Preparation 11.1.5 Check and Test Antifreeze For boiler systems containing antifreeze solutions, follow the antifreeze manufacturer’s instructions in verifying the inhibitor level and to ensure the fluid characteristics are within specification requirements.

Due to the degradation of inhibitors over time, antifreeze fluids must be periodically replaced. Refer to the manufacturer of the antifreeze for additional instructions.

11.1.6 Use of Antifreeze in the Boiler System

WARNING! Never use automotive antifreeze, ethylene glycol antifreeze, or undiluted antifreeze, in the primary system as freeze protection. This can cause severe personal injury, death or substantial property damage.

Determine the antifreeze fluid quantity using the system water content volume and following the antifreeze manufacturer instructions.

The water volume of the Esteem 399 Low NOx boiler is approximately 7 gallons [26 L]. Remember to include the volume of the expansion tank.

Check with local codes requirements for the installation of backflow preventers or actual disconnection from the boiler’s cold water fill or make up water supply line.

NOTE Massachusetts Code requires the installation of a backflow preventer if antifreeze is used.

Ensure the concentration of antifreeze to water does not exceed a 50/50 ratio.

NOTE System water, including additives, must be practically non-toxic, having a toxicity rating or Class of 1, as listed in Clinical Toxicology of Commercial Products.

11.2 BOILER CLEANING

11.2.1 Cleaning an Old Boiler and System Perform the following to clean an old boiler and system.

Cleaning an Old Boiler and System 1. Drain the existing system. 2. Fill system with fresh water and cleaner.

3. Place existing boiler in operation and run all zones.

4. Follow manufacturer’s instructions for proper cleaner concentration and proper cleaning time.

5. Thoroughly drain and flush system with fresh water after cleaning.

Page 86 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 87: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 11 OMM-0089_0A Installation, Operation & Maintenance Manual Start-Up Preparation 11.2.2 Cleaning of New Boiler/System: Perform the following to clean a new boiler and system.

Cleaning a New Boiler and System 1. Install new boiler and flush system with cleaner water to remove any debris.

2. Fill system with fresh water and proper amount of inhibitor.

3. Verify pH and inhibitor level per inhibit or manufacturer’s specs; add inhibitor if necessary.

11.2.3 Filling the Boiler System Perform the following to fill the boiler system.

Filling the Boiler System 1. Close the boiler drain valve located on the bottom of the unit and any manual or automatic air

vent in the system.

2. Open all system isolation valves.

3. Fill the boiler system to correct system pressure. Correct pressure will vary with each application.

NOTE Typical residential system fill pressure is 12 psi. System pressure will increase when system temperature increases. Operating pressure of the system should never exceed 25 psi.

4. Purge air and sediment in each zone of the boiler system through the purge valve. Open air vents to allow air to be purged in the zones.

5. Once the system is completely filled and purged of all air and sediment, check the system pressure and check/repair any leaks.

WARNING! Unrepaired system leaks will cause continual makeup water to be added to the boiler. Continual makeup water will cause mineral buildup within the heat exchanger, reducing the heat transfer, causing possible heat buildup and eventual heat exchanger failure.

11.3 CHECK LOW WATER CUT-OFF DEVICE The Esteem boiler is provided with a factory installed LWCO device that measures system pressure of more than 10 psi.

Remove the front jacket panel and check for continuity across the low water cut-off device wire terminals. The contacts should be closed when system pressure is greater than 10 psi. See Figure A-2 in Appendix A for location of the LWCO (Item 6).

Page 87 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 88: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 11 OMM-0089_0A Installation, Operation & Maintenance Manual Start-Up Preparation 11.4 CHECK FOR GAS LEAKS

WARNING! Prior to start-up and during initial operation, smell near the floor and around the unit for gas odorant or any unusual odor. Do not proceed with the start-up if there is any indication of a gas leak. Any leaks found must be repaired immediately.

WARNING! Propane installations only: the propane supplier mixes an odorant with the propane to make its presence detectable. In some cases the odorant can fade and the gas may no longer have an odor. Prior to start-up of the unit and periodically after start-up have the propane supplier check and verify the odorant level.

11.5 CHECK THERMOSTAT CIRCUIT Perform the following to check the thermostat circuit.

Checking the Thermostat Circuit 1. Disconnect the external thermostat wires from the low voltage terminal strip.

2. Connect a voltmeter across the wire ends of the external thermostat wiring.

3. Close each thermostat, zone valve and relay in the external circuit one zone at a time and check the voltage reading across the wire ends.

4. There should NEVER be voltage measured at the wire ends.

5. If voltage is measured at the panel under any condition, check and correct the external wiring.

NOTE In systems using 3-wire zone valves, back-feed of voltage to the unit is a common problem. Use an isolation relay to prevent voltage from the external circuit entering the Esteem control panel.

6. Reconnect the external thermostat wires to the low voltage terminal strip.

Page 88 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 89: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 11 OMM-0089_0A Installation, Operation & Maintenance Manual Start-Up Preparation 11.6 INSPECTION OF CONDENSATE DRAIN ASSEMBLY Inspect the condensate drain assembly as follow.

Inspecting the Condensate Drain assembly 1. Inspect and ensure the Condensate Drain Assembly is properly installed as shown in

Figure 6-1 of Chapter 6.

2. Remove the plug from the Condensate Drain Assembly and fill with fresh water.

WARNING! The condensate drain assembly must be filled with water when the Esteem boiler is in operation. The condensate drain assembly prevents flue gas emissions from entering the condensate line. Failure to ensure trap is filled with water could result in severe personal injury or death.

3. Re-Install the plug into the condensate drain assembly.

Page 89 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 90: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 11 OMM-0089_0A Installation, Operation & Maintenance Manual Start-Up Preparation

(This page intentionally blank)

Page 90 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 91: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 12 OMM-0089_0A Installation, Operation & Maintenance Manual Start-Up Procedures

CHAPTER 12: START-UP PROCEDURES

12.1 FINAL CHECKS BEFORE START-UP • Read Chapter 10 regarding basic operation of the EZ-SETUP controller and refer to

Chapter 18 for initial installation and in-depth operation of the Boiler Management System.

• Verify the Esteem 399 and the boiler system are full of water and all system components are correctly set for operation, including the minimum flow rate through the boiler (see Appendix A).

• Verify Start-up Preparation items outlined in Chapter 11 have been completed.

• Verify all electrical connections are correct and securely fastened.

• Inspect vent and combustion air piping for signs of deterioration from corrosion, physical damage or sagging. Verify combustion air and vent piping are intact and correctly installed and supported. Reference the Esteem boiler vent supplement.

• Verify burner configuration - Propane only.

o Check for proper labeling on the gas valve and the rating label for propane configuration.

o If there is doubt on the burner configuration, remove the gas valve and check for proper propane gas orifice size: 0.264” (6.7 mm) for Esteem 399 Low NOx boiler. Refer to Figure 7-2 at the end of Chapter 7 for location of the propane gas orifice.

NOTE For natural gas applications the Esteem 399 requires an orifice in size of: 0.330” (8.6 mm)

• Ensure the vent Condensate Drain Assembly is filled with water.

12.2 ESTEEM START-UP To start up the Esteem boiler, perform the following.

Starting Up the Esteem Boiler

1. Press the ON-OFF button located on the front control panel to the OFF position. Turn ON the electrical supply/service to the unit.

2. Read and follow the Operating Instructions on the next page.

12.3 OPERATING INSTRUCTIONS (READ BEFORE OPERATING BOILER)

WARNING! If you do not follow these instructions, a fire or explosion may result causing property damage, personal injury, or loss of life.

Page 91 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 92: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 12 OMM-0089_0A Installation, Operation & Maintenance Manual Start-Up Procedures

READ BEFORE OPERATING A. This appliance does not have a pilot light. It is equipped with an ignition device, which

automatically lights the burner. Do NOT try to light the burner by hand.

B. BEFORE OPERATING smell all around the appliance area for gas. Be sure to smell next to the floor, as some gas is heavier than air and will settle on the floor.

WHAT TO DO IF YOU SMELL GAS: • Do not try to light any appliance • Do not touch or operate any electric switch • Do not use any phone in the building • Immediately call your gas supplier from a neighbors phone or

from outside with your cell phone and follow the gas supplier’s instructions.

• Call the fire department if the gas supplier cannot be reached.

C. Use only your hand to turn the gas ball-valve knob. Never use tools. If the knob will not turn by hand, do NOT try to repair it, but rather call a qualified service technician. Force or attempted repair may result in a fire or explosion

D. Do not use this appliance if any part has been submerged under water. Immediately call a qualified service technician to inspect the appliance and replace any part of the control system and any gas control device that has been submerged under water.

OPERATING INSTRUCTIONS 1. STOP! Read the safety information above.

This appliance is equipped with an ignition device which automatically lights the burner. DO NOT try to light the burner by hand.

2. Set room thermostat(s) to lowest setting. Turn the external manual gas valve handle clockwise to CLOSED position (valve handle shall be perpendicular to gas piping).

3. Turn the service switch on the Esteem control panel to OFF.

4. Remove the front jacket panel on the unit.

5. Turn the external manual gas valve handle counter clockwise to OPEN position (valve handle shall be parallel to gas piping).

6. Wait five (5) minutes to clear out any gas. If you then smell gas in the jacket enclosure or around the unit, STOP! Follow “B” in the

safety information above. If you don’t smell gas, go to the next step.

7. Turn the service switch on the Esteem control panel to “ON”.

8. Set room thermostat(s) to desired setting(s).

9. The Esteem control panel display will show a sequence of numbers (0,1,2,3,etc.) in the left digit. Sequence digit 3 or 4 indicates the boiler is firing. Sequence digit 0 means there is no call for heat (all external thermostats are satisfied).

10. If the unit will not operate with a call for heat and the system piping is not hot, follow the instructions “To Turn Off Gas to Appliance”, below and call your service technician or gas supplier.

TO TURN OFF GAS TO APPLIANCE

1. Set the thermostat to its lowest setting. 2. Turn off switch on Esteem control panel, and any downstream electrical service switches. 3. Close the external manual gas valve clock-wise to OFF position.

Page 92 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 93: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 12 OMM-0089_0A Installation, Operation & Maintenance Manual Start-Up Procedures

12.3.1 Troubleshooting Start-Up Problems If the Esteem boiler does not start correctly, follow the procedures below to troubleshoot the problem.

Troubleshooting Start-Up Problems 1. Check for loose electrical connections, blown fuses, (on control module and in terminals) or

an open service switch.

2. Verify CH and DHW operation is enabled. A radiator or faucet icon with an X through it indicates that function is disabled.

3. Check continuity across the LWCO device for a closed circuit. See item 6 in Figure A-2 in Appendix A.

4. Is an external limit control (if applicable) open? Ensure the external limit is reset to the closed position.

5. Are the gas supply valves open at the unit and meter?

6. Is incoming gas supply pressure at the unit more than 5”W.C. and less than 13” W.C. for natural or propane with all gas appliances ON or OFF.

7. Are the heating thermostats set above room temperature?

If none of these conditions correct the problem, refer to the Esteem boiler Trouble-Shooting Guide or contact AERCO Technical Services.

12.4 INSPECTION OF THE ESTEEM BOILER AND SYSTEM

12.4.1 Boiler Piping inspection Inspect the Boiler system piping and components for leaks. If found, shut down the unit and repair immediately.

Purge any remaining air from the system piping. Air in the system piping will interfere with circulation creating heat distribution problems and system noise.

12.4.2 Vent Piping and Combustion Air Piping inspection Inspect for gas-tight seals at every connection and seam of the venting and combustion air piping.

WARNING! Venting system must be sealed gas-tight to prevent flue gas spillage and potential carbon monoxide emissions, which will result in severe personal injury or death.

MC1 06/04/13 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 • Ph: 800-526-0288 Page 93 of 158

Page 94: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 12 OMM-0089_0A Installation, Operation & Maintenance Manual Start-Up Procedures 12.4.3 Gas Piping Inspection Inspect around the unit for gas odor following the procedure outlined in the operating instructions in Section 12.4 at the end of this chapter.

WARNING! If any gas leaks are found or suspected, shut the unit down immediately. Use a gas detection device or bubble test to locate the source of the gas leak and repair at once. Do not operate the unit until the leak is corrected. Failure to comply with this procedure could result in severe personal injury, death or property damage.

12.4.4 Flame Pattern and Combustion Verification To verify the flame pattern and combustion, perform the following procedure.

Verifying Correct Flame Pattern and Combustion 1. Verify the flame pattern through the inspection port of the heat exchanger. The flame should

be blue and stable. The flame should be the length of the burner head openings.

WARNING! The combustion testing and adjustments must be performed by a qualified installer, service agency or the gas supplier. All combustion measurements must be performed with calibrated equipment to ensure proper reading and accuracy.

2. Test for CO2 or O2 and for CO during high firing rate. The combustion readings should be within the range listed in Table 12-1. The CO level should not exceed 100 ppm when combustion is correct. Perform the following procedure to manually place the burner into high fire. a) Press the round INSTALLER button, as shown in Figure 12-1.

b) Enter the installer access code “054” by using the LEFT and RIGHT buttons to select a digit and the UP and DOWN buttons to change the digit. Press the OK button to enter the access code.

c) Press the RIGHT button to highlight the Manual Operation icon then press the OK button.

Figure 12-1: Installer Button (L) & Manual Operation Menu (R)

Installer Button

OK Button

Page 94 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 95: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 12 OMM-0089_0A Installation, Operation & Maintenance Manual Start-Up Procedures

Verifying Correct Flame Pattern and Combustion (Cont.) d) Press the OK button while the FAN icon is highlighted to manually fire the burner and

power the CH circulator. NOTE

An adequate CH load must be present to dissipate the heat generated during the combustion test. If an adequate CH load is not available, an indirect water heater can be used to dissipate the heat by creating a DHW call which will enable the DHW circulator.

Table 12-1: Recommended Combustion Levels

Combustion Gases Natural Gas Propane Gas

O2 Min. 2.30% 3.70% O2 Max. 5.30% 5.20% CO2 Min. 8.80% 10.00% CO2 Max. 10.50% 11.00% CO Max. 100 ppm 100 ppm

e) Press the LEFT and RIGHT buttons to adjust the firing rate from 1% to 100%.Hold down the LEFT or RIGHT but-ton to rapidly increase or decrease the firing rate.

f) Press the OK button while the FAN icon is highlighted to shut-down the burner.

g) Cycle power to the boiler once combustion testing is complete to return to normal operation.

WARNING! The combustion levels should be measured at high firing rate. If the combustion levels are outside the range given in Table 12-1 for the firing rate, shut the boiler down and contact AERCO Technical Support. Failure to comply with this requirement could result in severe personal injury, death, or substantial property damage.

3. If the combustion levels during high fire (100%) are outside the recommended combustion settings in Table 12-1, adjust the Throttle Screw (see Figure 12-2) as follows:

• Counter-clockwise rotation: O2 decreases and CO2 increases • Clock-wise rotation: O2 increases and CO2 decreases.

4. Once the combustion level is set at high fire (100%), manually place the boiler into low fire (1%) mode by pressing the LEFT button to adjust firing rate downward.

5. If the CO2 combustion level during low fire (1%) is not within +/- 0.2 of the combustion level measured at high fire, adjust the plastic Offset Pressure Screw under the cover screw on the top of the gas valve (see Figure 12-2).

6. Counter-clockwise adjustment of the Offset Pressure Screw at Low Fire:

• Counter-clockwise rotation: O2 decreases and CO2 increases • Clock-wise rotation: O2 increases and CO2 decreases.

Page 95 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 96: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 12 OMM-0089_0A Installation, Operation & Maintenance Manual Start-Up Procedures

Figure 12-2: Gas Valve / Venturi Assembly

12.4.5 Measure and Verify Input Rating - Natural Gas Only To measure and verify the input for Natural Gas (Only), perform the following procedure.

Measuring and Verifying Natural Gas Input Rating 1. Ensure the boiler is firing at maximum firing rate. To manually place the boiler into high fire

mode, refer to instructions in Section 12.3.4 of this chapter. 2. Operate the unit for approximately 10 minutes.

3. Turn off all gas appliances within the building, except the Esteem boiler.

4. At the gas meter, record the time required to use one cubic foot of gas.

5. Calculate Natural gas input using the following equation:

3600 x 1000 / number of second recorded for one cubic foot of gas = BTU/H.

6. The BTU/H calculated should approximate the input rating listed on the unit.

Offset Pressure Screw

Gas Valve

Orifice (Natural or Propane gas)

Gasket Venturi

Throttle Screw (Red Plastic Sleeve)

Inlet Gas Pressure Port

Page 96 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 97: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 12 OMM-0089_0A Installation, Operation & Maintenance Manual Start-Up Procedures 12.4.6 High Temperature Limit Testing To test the high temperature limit function, perform the following procedure.

Testing the High Temperature Limit Function

NOTE The high temperature limit can be temporarily lowered from 210ºF [99ºC] to 102ºF [39ºC] for testing.

1. Press the round INSTALLER button (See Figure 10-1).

2. Enter the installer access code “054” by using LEFT and RIGHT buttons to select a digit and the UP and DOWN buttons to change the digit. Press the OK button to enter the access code.

3. Press the OK button while CH & DHW Settings icon is highlighted.

4. Press the DOWN button to highlight the Boiler Settings icon then press the OK button.

5. Press the DOWN button to highlight Lockout Temperature then press the OK button.

6. Press the UP button to highlight 102ºF [39ºC] then press the OK button.

7. Press the DOWN button twice to highlight the Home Screen icon then press the OK button.

8. Initiate a CH or DHW call and confirm that a High Boiler Temperature lockout occurs once the supply temperature reaches 102ºF [39ºC].

9. Press any ARROW button to return to the Home Screen

10. Press the round INSTALLER button.

11. Press the OK button while the CH & DHW Settings icon is highlighted.

12. Press the DOWN button to highlight the Boiler Settings icon then press the OK button

13. Press the DOWN button to highlight Lockout Temperature, then press the OK button.

14. Press the DOWN button to highlight 210ºF [99ºC] then press the OK button.

15. Press the DOWN button twice to highlight the Home Screen icon then press the OK button.

16. Press the OK button to reset the lockout and return the unit to service.

Page 97 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 98: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 12 OMM-0089_0A Installation, Operation & Maintenance Manual Start-Up Procedures

(This page intentionally blank)

Page 98 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 99: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 13 OMM-0089_0A Installation, Operation & Maintenance Manual Outdoor Reset Control

CHAPTER 13: OUTDOOR RESET CONTROL The use of the outdoor reset function is required to optimize boiler efficiency. See the important notice below.

If the outdoor sensor is not installed before turning on the boiler, an Outdoor Sensor Open error (E96) will be displayed. The error will not prevent the boiler from operating. The error will automatically reset once the outdoor sensor is installed or if the outdoor reset function is disabled.

Reference section 10.6 for information on disabling the outdoor reset function using the EZ setup menu. The outdoor reset function can only be disabled if the boiler installation meets one of the exceptions listed in the following notice.

IMPORTANT NOTE! In accordance with Section 325 (f) (3) of the Energy Policy and Conservation Act, this boiler is equipped with a feature that saves energy by reducing the boiler water temperature as the heating load decreases. This feature is equipped with an override which is provided primarily to permit the use of an external energy management system that serves the same function.

THIS OVERRIDE MUST NOT BE USED UNLESS AT LEAST ONE OF THE FOLLOWING CONDITIONS IS TRUE.

• An external energy management system is installed that reduces the boiler water temperature as the heating load decreases.

• This boiler is not used for any space heating.

• This boiler is part of a modular or multiple boiler system having a total input of 300,000 BTU/hr. or greater.

• This boiler is equipped with a tankless coil.

Page 99 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 100: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 13 OMM-0089_0A Installation, Operation & Maintenance Manual Outdoor Reset Control 13.1 OUTDOOR TEMPERATURE SENSOR INSTALLATION To install the outdoor temperature sensor, perform the following procedure.

Installing the Outdoor Temperature Sensor 1. Remove the front cover and mounting screws / anchors from the sensor enclosure.

Figure 13-1: Outdoor Sensor Enclosure and Components

2. When mounting the enclosure, the exterior wall selected should represent the heat load of the building. Typically a northern or northeastern wall will suit most buildings. A southern facing wall for those buildings, which may have large glass walls or windows on the southern face.

3. Ensure the sensor enclosure is shielded from direct sunlight or the effects of heat or cold from other sources (exhaust fans, appliance vents...) to prevent false temperature sensing.

4. Mount the sensor enclosure at an elevation on the exterior wall to prevent accidental damage or tampering.

5. Avoid mounting the enclosure in areas subjected to excessive moisture.

6. Once an area on the exterior wall has been determined, follow the manufacturer’s mounting instructions included with the outdoor sensor.

Page 100 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 101: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 13 OMM-0089_0A Installation, Operation & Maintenance Manual Outdoor Reset Control 13.2 OUTDOOR TEMPERATURE SENSOR WIRING To wire the outdoor temperature sensor to the Esteem boiler

Wiring the Outdoor temperature Sensor to the Esteem Boiler 1. Cut a small slit in the seal gasket and route 18 AWG 2-wire cable or similar wire cable

through the seal gasket into the enclosure.

2. Route the sensor wire back to the Esteem boiler, ensuring the wires are not run parallel to telephone or power cables.

NOTE If the sensor wires are located in an area with sources of potential electromagnetic interference (EMI), the sensor wires should be shielded or the wires should be routed in a grounded metal conduit. If using shielded cable, the shielding should be connected to the common ground of the unit.

3. Connect the sensor wires to the outdoor sensor terminals on the low voltage terminal strip located inside the boiler enclosure (see boiler wiring diagram, Figure 8-3).

Page 101 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 102: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 13 OMM-0089_0A Installation, Operation & Maintenance Manual Outdoor Reset Control

(This page intentionally blank)

Page 102 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 103: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 14 OMM-0089_0A Installation, Operation & Maintenance Manual Ext. Modulating Control

CHAPTER 14: EXTERNAL MODULATING CONTROL The boiler can directly accept an analog 0-10VDC signal to control the firing rate from an external modulating boiler controller.

14.1 WIRING THE EXTERNAL MODULATING CONTROLLER Run two 18 gauge wires from the external modulating boiler controller’s 0-10 VDC boiler output to the modulation signal terminals on the low voltage terminal strip inside the boiler (see boiler wiring diagram, Figure 8-3). This signal will both enable and modulate the boiler. No wiring is required at the thermostat terminals.

NOTE Ensure that the polarity of the connections from the external modulating controller to the boiler are correct. Reversed polarity will lead to no response from the boiler.

14.2 EZ-SETUP CONTROLLER PROGRAMMING FOR EXTERNAL 0-10V SIGNAL The EZ-SETUP controller must be programmed to accept the 0-10 VDC signal from the external modulating boiler control.

Refer to Section 10.6 for how to use the Heating EZ Setup function to set the CH Demand to 0-10V Modulation Signal.

14.3 EXTERNAL PROGRAMMING OF 0-10V MODULATING CONTROL The external modulating control must be programmed to send 2 VDC to enable the boiler and run it at low fire, and 10 VDC to run the boiler at high fire. Once the control enables the boiler, it must wait 30 seconds to allow the burner to stabilize before modulating the boiler.

IMPORTANT NOTE! In accordance with Section 325 (f) (3) of the Energy Policy and Conservation Act, this boiler is equipped with a feature that saves energy by reducing the boiler water temperature as the heating load decreases. This feature is equipped with an override which is provided primarily to permit the use of an external energy management system that serves the same function.

THIS OVERRIDE MUST NOT BE USED UNLESS AT LEAST ONE OF THE FOLLOWING CONDITIONS IS TRUE.

• An external energy management system is installed that reduces the boiler water temperature as the heating load decreases.

• This boiler is not used for any space heating.

• This boiler is part of a modular or multiple boiler system having a total input of 300,000 BTU/hr. or greater.

• This boiler is equipped with a tankless coil.

Page 103 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 104: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 14 OMM-0089_0A Installation, Operation & Maintenance Manual Ext. Modulating Control

Table 14-1: Esteem Boiler Factory Settings

Heating Settings Factory Default EZ Setup Reset Installer Reset Heating Operation Enabled

Demand Switch & Outdoor Reset

Absolute Max CH Setpoint 194°F [90°C] CH1 Maximum Setpoint 180°F [82°C] CH1 Minimum Setpoint 120°F [49°C] Reset Curve Coldest Day 0°F [-18°C] Reset Curve Warmest Day 64°F [18°C] CH2 Circuit Enabled CH2 Maximum Setpoint 140°F 60°C] CH2 Minimum Setpoint 80°F [27°C] Warm Weather Shutdown OFF Pump Constant Circulation Disabled CH Post Pump Time 1 minute Freeze Protection Enabled Frost Protection Setpoint -22°F [-30°C] Parallel Shift Value 0°F [0°C] CH Call Blocking 1 minute System Pump CH1/CH2

Domestic Settings Factory Default EZ Setup Reset Installer Reset

DHW Operation Enabled

Esteem Model 399 Demand Switch Boiler DHW Setpoint 186°F [86°C] DHW Storage Setpoint 140°F [60°C] DHW On Differential 6°F [3°C] DHW Storage Adder 46°F [25°C] DHW Post Pump Time 1 minute DHW Priority Timeout OFF DHW Priority Enabled DHW Call Blocking 0 minute DHW to CH Call Blocking 1 minute Antilegionella Function Disabled

Boiler Settings Factory Default EZ Setup Reset Installer Reset Lockout Temperature 210°F [99°C] Modbus Address 0=BCST

Page 104 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 105: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 15 OMM-0089_0A Installation, Operation & Maintenance Manual Check Out Procedures

CHAPTER 15: CHECK-OUT PROCEDURES Perform all check-out procedures as outlined below. Check off items as completed When all procedures are completed, the installer should complete the installation record, which is placed at the very end of this manual for easy removal, and send by either of the below two methods.

Send it by U.S. Mail to:

AERCO International, Inc. 100 Oritani Drive Blauvelt, NY 10913

Or FAX it to:

(845) 580-8090

CHECK CHECK-OUT PROCEDURE Boiler system water chemistry checked and verified as outlined in Chapter 11.

Boiler system was completely flushed to remove any debris/sediment.

The boiler air vent and any automatic air vents placed within the system are open one full turn.

Air is purged from the heating zones and boiler system piping.

If applicable, confirm that the burner has been properly configured for Propane gas as outlined in Section 7.3 of Chapter 7.

Thermostat circuit wiring checked and verified that no voltage is present to the low voltage terminals as outlined in Section 11.5.

Operating Instructions in Section 12.4 were followed during start-up.

Combustion levels and flame pattern verified as outlined in Section 12.3.4.

Measured the rate of input on Natural Gas as outlined in Section 12.3.5.

Completed high temperature limit testing per Section 12.4.6.

Checked the incoming gas pressure to the Esteem to ensure a minimum pressure of 5” W.C. during flow conditions to all gas appliances and a maximum pressure of 13”w.c during non-flow conditions for Natural and Propane.

Adjusted balancing valves and system limit controls to provide design temperatures to the primary space heating system.

In multiple zone applications, adjusted for correct flow of boiler water to each zone.

Checked with the Esteem with the homeowner or maintenance personnel.

Ensured that multiple boiler cycles were observed functioning correctly.

Ensured that all manuals and other documents are returned to the Installation envelope and given to the owner for safekeeping.

Page 105 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 106: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 15 OMM-0089_0A Installation, Operation & Maintenance Manual Check Out Procedures

(This page intentionally blank)

Page 106 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 107: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 16 OMM-0089_0A Installation, Operation & Maintenance Manual Maintenance Schedule

CHAPTER 16: MAINTENANCE SCHEDULE

16.1 SERVICE TECHNICIAN MAINTENANCE At least on an annual basis the following maintenance should be performed by a qualified service technician:

16.1.1 General Maintenance • Attend to any reported problems.

• Inspect the interior of the boiler jacket area; clean and vacuum if necessary.

• Clean the condensate drain assembly and fill with fresh water.

• Check boiler water pH on systems with inhibitors and/or antifreeze.

• Check for leaks: water, gas, flue and condensate.

• Verify flue vent piping and air inlet piping are in good condition, sealed tight and properly supported.

• Check boiler water pressure, piping and expansion tank.

• Check control settings.

• Check ignition electrode (sand off any white oxide; clean and reposition).

• Check ignition wiring and ground wiring.

• Check all control wiring and connections.

• Check burner flame pattern (stable and uniform).

16.1.2 Poor Performance Maintenance Additional items if combustion or performance is poor:

• Clean heat exchanger and flue ways.

• Remove burner assembly and clean burner head using compressed air only.

Once the maintenance items are completed, review the service with the owner.

16.1.3 Owner Maintenance Periodically: • Check the area around the unit.

• Check and remove any blockage from the combustion air inlet and ventilation openings.

• Check the temperature and pressure gauges.

Monthly: • Check vent piping.

• Check combustion air inlet piping.

• Check the pressure relief valve.

• Check the condensate drain system.

Page 107 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 108: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 16 OMM-0089_0A Installation, Operation & Maintenance Manual Maintenance Schedule

Every Six (6) Months: • Check boiler piping and gas supply piping for corrosion or potential signs of leakage.

• Operate the pressure relief valve.

WARNING! Follow the maintenance procedures given throughout this manual. Failure to perform the service and maintenance or follow the directions in this manual could result in damage to the Esteem boiler or in system components, resulting in severe personal injury, death or substantial property damage.

Page 108 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 109: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 17 OMM-0089_0A Installation, Operation & Maintenance Manual Maint. Procedures

CHAPTER 17: MAINTENANCE PROCEDURES

WARNING! The Esteem boiler should be inspected and serviced annually, preferably at the start of the heating season, by a qualified service technician. In addition, the maintenance and care of the unit as out-lined in chapter 16, and further explained in this chapter, should be performed to assure maximum efficiency and reliability of the unit. Failure to service and maintain the Esteem boiler and the system components could result in equipment failure, causing possible severe personal injury, death or substantial property damage.

NOTE The following information provides detailed instruction for completing the maintenance items outlined in the maintenance schedule in Chapter 12. In addition to this maintenance, the Esteem boiler should be serviced at the beginning of the heating season by a qualified service technician.

17.1 REPORTED PROBLEMS Any problems reported by the owner should be checked, verified and corrected before proceeding with any maintenance procedures.

17.2 SURROUNDING AREA INSPECTION Verify that the area surrounding the Esteem boiler is free of combustible / flammable materials or flammable vapors or liquids. Remove immediately if found.

Verify that combustion air inlet area is free of any contaminates. Refer to the materials listed section 3.2 of Chapter 3 of this manual. If any of these products are in the area from which the unit takes its combustion air, they must be removed immediately or the combustion air intake must be relocated to another area.

17.3 BURNER AREA INSPECTION Remove the boiler front jacket panel and Venturi inlet elbow. Vacuum any dirt or debris from the burner/blower components. Re-install Venturi inlet elbow and front jacket panel when completed.

WARNING! Do not use solvents to clean any of the burner components. The components could be damaged, resulting in unreliable or unsafe operation.

MC1 06/04/13 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 • Ph: 800-526-0288 Page 109 of 158

Page 110: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 17 OMM-0089_0A Installation, Operation & Maintenance Manual Maint. Procedures 17.4 SYSTEM PIPING INSPECTION Inspect all piping (water and gas) on the boiler system for leaks and verify that the piping is leak free and properly supported. Inspect the fittings and components on the unit and verify they are leak free.

WARNING! Eliminate all boiler water system leaks. Continual fresh make-up water will reduce the heat exchanger life causing boiler failure. Leaking water may also cause severe property damage to the surrounding area. Inspect the gas supply piping using the procedure outlined in section 12.3.3.

17.5 CLEAN CONDENSATE DRAIN ASSEMBLY

Cleaning the Condensate Drain Assembly 1. Loosen the retaining nut from the condensate drain assembly and disconnect the assembly

from the boiler.

2. Empty any water from the trap and drain assembly. Flush with fresh water as necessary to clean.

3. Check the drain piping from the condensate drain assembly to the drain. Flush to clean as necessary.

4. Reassemble the condensate drain assembly onto the boiler by tightening the retaining nut with rubber seal onto the boiler. Hand tighten only.

5. Remove the fill plug on the condensate drain assembly and fill with water. See Figure 6-1.

6. Replace the fill plug on drain assembly.

17.6 VENTILATION AIR OPENINGS INSPECTION • Verify that all ventilation openings to the mechanical room or building are open and

unobstructed. Check the operation and wiring of any automatic ventilation dampers.

• Check and verify the vent discharge and the combustion air intake are free of debris and obstructions.

17.7 VENT AND COMBUSTION AIR PIPING INSPECTION • Visually inspect the venting system and combustion air piping for blockage, deterioration

or leakage. Repair any deficiencies.

• Verify that the combustion air inlet piping is connected, sealed and properly supported.

WARNING! Failure to inspect the vent system and combustion air inlet piping and to have any conditions repaired can result in severe personal injury or death.

Page 110 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 111: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 17 OMM-0089_0A Installation, Operation & Maintenance Manual Maint. Procedures 17.8 BOILER SYSTEM INSPECTION

• Verify all system components are correctly installed and operating properly.

• Check the cold fill pressure for the system, typical cold water fill pressure is 12 psig.

• Verify the system pressure, as the unit operates at high temperature, to ensure the pressure does not exceed 25 psig. Excessive pressure reading indicates expansion tank sizing is incorrect or system performance problems.

• Inspect air vent and air separators in the sys-tem. Remove the caps on automatic air vents and briefly depress the valve stem to flush vent. Replace the cap when completed. Ensure vents do not leak, replace any leaking vents.

• Verify boiler water pH level is between 6.0 and 8.0.

• Check and verify inhibitor /antifreeze concentration within the boiler water meets inhibitor/antifreeze manufacturer’s specifications.

• If necessary contact a boiler water treatment company for a chemical analysis.

17.9 EXPANSION TANK INSPECTION Refer to Chapter 5: Boiler Piping for recommended location of the expansion tank and air eliminators.

Closed -Type Tank: • Ensure tank is partially filled with water leaving an air gap as a cushion. Refer to the

manufacturer’s instruction for proper fill level.

• Ensure the tank is fitted with a device that reduces gravity circulation of air-saturated tank water back into the system. This device prevents air from bubbling up through the water as it returns from the system.

• Ensure no automatic air vents are used in the system. This will allow air to escape from the system instead of returning to the tank.

Diaphragm Tank: • Ensure the system contains a minimum of one automatic air vent. Recommended

location of the air vent should be atop an air eliminator.

• Remove the tank from the system and check the charge pressure. For residential applications the charge pressure is typically 12 psig. If tank does not hold a charge pressure, then the membrane is damaged and the tank should be replaced.

17.10 BOILER RELIEF VALVE INSPECTION Inspect the relief valve and lift the lever to verify flow at least annually or as recommended on the warning tag of the valve.

WARNING! Before manually operating the pressure relief valve, ensure the discharge piping is directed to a suitable place of disposal to avoid a potential scald hazard. The discharge piping must be full size without restriction and installed to permit complete drainage of both the valve and line.

Page 111 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 112: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 17 OMM-0089_0A Installation, Operation & Maintenance Manual Maint. Procedures If after closing the valve, the valve fails to seat properly or continually weeps, replace the relief valve. Ensure the cause of the relief valve to weep is the valve itself, not due to system over-pressurization caused by an expansion tank that is waterlogged or undersized.

17.11 IGNITION ELECTRODE INSPECTION • Remove the ignition electrode from the burner mounting plate. • Remove any white oxides accumulated on the electrode using fine grit sandpaper or steel

wool. If the electrode does not clean to a satisfactory condition, replace the igniter

• When replacing the ignition electrode, ensure the gasket is in good condition and correctly positioned, replace gasket if necessary.

17.12 IGNITION WIRING AND GROUND WIRING INSPECTION • Inspect the ignition cable from the igniter to the controller module. • Inspect the ground wire from the igniter to the boiler jacket ground terminals. • Ensure wiring is in good condition and securely connected. • Check ground continuity of the wiring to the boiler jacket or piping using a continuity

meter. • Replace and correct ground wire if ground continuity is not completed and satisfactory.

17.13 CONTROL WIRING INSPECTION Inspect all control wiring. Ensure wiring is in good condition and properly connected.

17.14 CONTROL SETTINGS INSPECTION • Review all boiler settings in the Heating & DHW EZ Setup menus. Adjust settings as

necessary. See sections 10.6 and 10.7 and associated sub-sections. • Check any external limit control settings (if used). Adjust settings as necessary.

17.15 PERFORM START-UP AND CHECKOUT PROCEDURES • Start the unit and perform the start-up procedure as listed in this manual. • Verify the cold water fill pressure is correct and the operating pressure of the boiler is

within normal operating range. • Complete the checkout procedures as referenced in this manual.

Page 112 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 113: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 17 OMM-0089_0A Installation, Operation & Maintenance Manual Maint. Procedures 17.16 BURNER FLAME INSPECTION AND TROUBLESHOOTING Inspect the burner flame through the observation port on the heat exchanger. If flame pattern is not fully blue and covers the entire burner surface during high fire, perform the following troubleshooting procedures.

Burner Flame Troubleshooting 1. Shut the unit down and allow it to cool thoroughly before disassembly.

2. Close the external manual gas valve on the gas supply line and disconnect the gas piping and gas valve wire harness connector.

3. Disconnect the wiring harness connectors from the blower and remove the blower retaining screws or nuts. Remove the blower from the unit.

4. Remove the mounting nuts securing the burner mounting plate to the heat exchanger and set aside.

5. Carefully remove the burner mounting plate assembly from the heat exchanger. Ensure combustion chamber insulation is not damaged during removal of burner mounting plate assembly. See warning in Section 17.22.

6. Remove the burner head mounting screws and remove the burner head. Inspect the burner head for deterioration. Use compressed air or a vacuum to clean the burner head.

7. Remove the Venturi and gas valve assembly from the blower.

8. Use a vacuum cleaner or compressed air to clean the interior of the blower assembly. Inspect the blower blades to ensure they are clean and not damaged.

9. Re-assemble the Venturi and gas valve onto the blower. Ensure the Venturi gasket is in good condition, positioned correctly and replace gasket if necessary.

10. Re-assemble the burner head onto the burner mounting plate. Ensure the burner head gasket is in good condition, positioned correctly and replace gasket if necessary.

11. Re-assemble the burner mounting plate assembly onto the heat exchanger. Ensure the burner plate gasket and combustion chamber insulation is in place and not damaged, replace gasket and insulation if necessary. See warning in Section 17.22.

12. Re-assemble the blower onto the burner mounting plate and reconnect the wiring harness connectors.

13. Re-assemble the gas supply connection and wire harness to gas valve. Open the external manual gas valve. Check gas piping for any leaks as outlined in Section 11.4 and Section 12.3.3 and repair if necessary. Place the unit back into service.

Page 113 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 114: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 17 OMM-0089_0A Installation, Operation & Maintenance Manual Maint. Procedures 17.17 FLAME SIGNAL INSPECTION The flame signal can be read from the Boiler Information screen. It should be a min. 1μ Α−DC.

• Check the igniter for fouling or damaged insulation if a low flame signal is observed.

• Check ground wiring and continuity as a cause for low flame signal. Replace igniter if conditions are satisfactory.

17.18 COMBUSTION LEVELS INSPECTION Refer to Section 12.3.4 of this manual for measuring combustion levels and burner adjustments.

17.19 FLUE GAS TEMPERATURE CHECK

Checking the Flue Gas Temperature 1. Manually place the boiler into high fire. See Section 12.3.4 for procedure.

2. Navigate to the Boiler Information Menu to observe the flue gas temperature. See Section 10-12 for procedure.

3. If the flue gas temperature is more than 54°F [30°C] above the supply water temperature, shut the boiler down and follow the heat exchanger cleaning procedure described in the next section.

Page 114 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 115: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 17 OMM-0089_0A Installation, Operation & Maintenance Manual Maint. Procedures 17.20 HEAT EXCHANGER CLEANING

Cleaning the Heat Exchanger

1. Shut down the boiler: • Follow the instructions in Section 12.4, "To Turn Off Gas to Appliance" • Do not drain the boiler unless the boiler will be subject to freezing conditions. • Do not drain the boiler if freeze protection fluid is used in the system.

2. Allow the boiler to cool down to room temperature before servicing. 3. Disconnect the gas piping and gas valve wire harness connector. 4. Disconnect the wiring harness connectors from the blower and remove the blower retaining

screws or nuts. Remove the blower from the unit. 5. Remove the mounting nuts securing the burner mounting plate to the heat exchanger and set

aside. 6. Carefully remove the burner mounting plate assembly from the heat exchanger. Ensure

combustion chamber insulation is not damaged during removal of burner mounting plate assembly. See warning in Section 17.22.

7. Carefully remove the combustion chamber insulation from the heat exchanger and set aside. See warning in Section 17.22.

8. Use a vacuum cleaner, compressed air or water to remove any accumulation from the heat exchanger flue ways. Do not use any solvent.

9. Re-install the combustion chamber insulation onto the heat exchanger. 10. Re-assemble the burner mounting plate assembly onto the heat exchanger. Ensure the

burner plate gasket and combustion chamber insulation is in place and not damaged, replace gasket and insulation if necessary. See warning in Section 17.22.

11. Re-assemble the blower onto the burner mounting plate and reconnect the wiring harness connectors.

12. Reconnect the gas piping and wire harness to gas valve. Check for leaks, repair if necessary. 13. Close isolation valves on the boiler water piping to isolate the boiler from the heating system. 14. Attach a hose to the boiler drain valve and flush the boiler thoroughly with freshwater by

using the purge valves to allow water to enter through the make-up waterline to the boiler. 15. Once the boiler has been completely flushed, return the boiler and system piping back to

operation. 16. Perform the required startup and checkout procedures as outlined in Chapters 11, 12, 13,

and 14.

17.21 REVIEWING MAINTENANCE REQUIREMENTS WITH OWNER Ensure the owner understands the importance to perform the maintenance schedule specified in this manual.

Remind the owner of the importance to call a licensed contractor should the unit or system exhibit any unusual behavior.

Page 115 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 116: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 17 OMM-0089_0A Installation, Operation & Maintenance Manual Maint. Procedures 17.22 Handling Previously Fired Combustion Chamber Insulation

WARNING! The combustion chamber insulation contains ceramic fibers, which are classified as a possible human carcinogen. When exposed to extremely high temperatures, the ceramic fibers, which contain crystalline silica, can be converted into cristobalite.

Avoid Breathing and Contact with Skin and Eyes.

When removing or repairing the combustion chamber insulation follow these precaution measures:

• Use a NIOSH approved respirator which meets OSHA requirements for cristobalite dust, similar to N95. Contact NIOSH at1-800-356-4676 or on the web atwww.cdc.gov/niosh for latest recommendations.

• Wear long sleeved, loose fitting clothing, gloves and eyes protection.

• Assure adequate ventilation.

• Wash with soap and water after contact.

• Wash potentially contaminated clothe separately from other laundry and rinse washing machine thoroughly.

• Discard used insulation in an air tight plastic bag.

NIOSH Stated First Aid: • Eye/Skin: Immediately irrigate

• Breathing: Clean fresh air

Page 116 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 117: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

CHAPTER 18: EZ-SETUP CONTROLLER OPERATION AND SETTINGS

When the EZ-SETUP controller is first turned on, the HOME screen is displayed (Figure 18-1).

Figure 18-1: HOME Screen Display

In order for the technician installing the Esteem boiler to properly configure and use the controller, an access code must first be entered.

18.1 ENTERING THE INSTALLER ACCESS CODE The INSTALLER button (the small round button shown in Figure 18-2) provides the installing technician with full access to all available features after entering an access code.

Figure 18-2: EZ-SETUP Controller Front Panel and Features

Installer Button

Page 117 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 118: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

To enter the access code, follow the instructions below.

Entering the Installer Access Code 1. Press the round INSTALLER button (Figure 18-1) to invoke the ACCESS CODE menu

(Figure 18-3).

2. Enter the installer access code “054” by using the LEFT and RIGHT buttons to select a digit and the UP and DOWN buttons to change the digit. Press the OK button to enter the access code.

3. The INSTALLER Menu (Figure 18-4) will be displayed after successfully entering the access code. The Home Screen (Figure 18-1) will be displayed if the access code is not entered correctly.

Figure 18-3: Access Code Entry Menu

NOTE

Entering the installer access code allows the installer to make adjustments for 30 minutes. After 30 minutes, the access code will need to be entered again to make any additional adjustments.

18.2 USING THE INSTALLER MENU After entering INSTALLER access code, the INSTALLER menu is displayed (Figure 18-4).

Figure 18-4: INSTALLER Menu

Page 118 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 119: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

The Installer Menu is divided into four selections as follows:

• CH and DHW Settings Menu:

Selections in the CH and DHW Settings Menu allow the installer to adjust the boilers central/space heating and domestic hot water settings for the application. See section 18.3.

• Reset All Settings: Pressing this allows you to choose to reset all CH, DHW, and Cascade settings back to the factory defaults. See Section 18.5.

• Cascade Menu: Selections in the Cascade Menu allow the installer to setup, adjust, and monitor the Cascade System. See Section 18.6.

• Manual Operation Menu:

Selections in the Manual operation Menu enable the burner and circulators to be manually enabled for testing. See Section 18.9.

The INSTALLER Menu structure is diagrammed on the next page (Figure 18-5).

Page 119 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 120: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

Figure 18-5: INSTALLER Menu Structure

Page 120 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 121: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

18.3 CH and DHW SETTINGS MENU Navigation: Home Screen > Installer Menu > CH & DHW Settings > CH Settings

When you press the symbol in the INSTALLER menu, you access the CH & DHW SETTINGS menu.

When you press the symbol in the CH & DHW SETTINGS menu you access the CH SETTINGS Menu. See Figure 18-6.

INSTALLER Menu CH & DHW SETTINGS Menu CH SETTINGS Menu

Figure 18-6: Navigation to the HEATING SETTINGS Menu

The CH Settings menu contains settings related to central heating operation (Figure 18-6). Each line contains a CH Setting followed by its current value. Six CH Settings are displayed on the screen at one time. Press the UP or DOWN buttons to scroll through additional CH Settings. See the following for a description of each of these settings.

=======================================================================

18.3.1 Heating Operation (Default: Enabled)

Figure 18-7: HEATING OPERATION Menu

Heating Operation allows the central heating function to be enabled and disabled. Press the UP or DOWN buttons to select Enabled or Disabled, then press the OK button to store the setting. Enabling and disabling this setting will do the following:

• Enabled: The boiler will respond to a central heating call.

• Disabled: The boiler will NOT respond to a central heating call. The heating operation

disabled icon is displayed on the home screen when central heating operation has been disabled.

Page 121 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 122: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

18.3.2 Demand Type (Default: Switch & Outdoor Reset)

Figure 18-8: DEMAND TYPE Menu

Demand Type allows the installer to select how a CH Demand is generated. Press the UP or DOWN buttons to select the CH Demand Type then press the OK button to store the setting. The CH Demand options are:

• Switch & Outdoor Reset: A central heating call from a dry contact switch will enable the boiler and the setpoint will vary with the outdoor temperature for central heating calls.

• Switch & Setpoint: A central heating call from a dry contact switch will enable the boiler and the setpoint will be fixed for central heating calls.

• Constant & Outdoor Reset: The boiler will maintain setpoint and the central heating circulators will be constantly enabled without an external call from a dry contact switch. The central heating circulators will be disabled when the outdoor temperature exceeds the Warm Weather Shutdown Temperature setting. The setpoint will vary with the outdoor temperature for central heating calls.

• Constant & Setpoint: The boiler will maintain setpoint and the central heating circulators will be constantly enabled without an external call from a dry contact switch. The central heating circulators will be disabled when the outdoor temperature exceeds the Warm Weather Shutdown Temperature setting. The setpoint will be fixed for central heating calls.

• 0-10V Modulation Signal: This option allows the boiler firing rate to be controlled by an external control system with a 0-10 VDC signal.

=======================================================================

Page 122 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 123: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

18.3.3 Absolute Max CH Setpoint (Default: 188°F [87°C])

Figure 18-9: ABSOLUTE MAX CH SETPOINT Menu

Absolute Max CH Setpoint limits the setpoint during a central heating call. This setting can be used to prevent a user from adjusting the central heating setpoint or outdoor reset curve above a safe operating temperature in the EZ Setup Menu. A warning screen will be displayed in EZ Setup if the user attempts to raise the setpoint above the Absolute Max CH Setpoint. The Absolute Max CH Setpoint will be displayed on the outdoor reset curve in EZ Setup if the user selects an outdoor reset curve which goes above the Absolute Max CH Setpoint. Press the LEFT or RIGHT buttons to adjust the Absolute Max CH Setpoint then press the OK button to store the setting.

=======================================================================

18.3.4 CH1 Maximum Setpoint (Default: 180°F [82°C])

Figure 18-10: CH1 MAXIMUM SETPOINT Menu

CH1 Maximum Setpoint is the maximum setpoint for a CH1 heating call when an Outdoor Reset option is chosen in CH Demand. CH1 Maximum Setpoint is the fixed setpoint for a CH1 heating call when a Setpoint option is chosen in CH Demand. Press the LEFT or RIGHT buttons to adjust the CH1 Maximum Setpoint then press the OK button to store the setting.

Page 123 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 124: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

18.3.5 CH1 Minimum Setpoint (Default: 120°F [49°C])

Figure 18-11: CH1 MAXIMUM SETPOINT Menu

CH1 Minimum Setpoint is the minimum setpoint for a CH1 heating call when an Outdoor Reset option is chosen in CH Demand. This setting is not applicable when a Setpoint option is chosen in CH Demand. Press the LEFT or RIGHT buttons to adjust the CH1 Minimum Setpoint then press the OK button to store the setting.

========================================================================

18.3.6 Reset Curve Coldest Day (Default: 0°F [-18°C])

Figure 18-12: RESET CURVE COLDEST DAY Menu

Reset Curve Coldest Day is the coldest outdoor design temperature of the heating system when an Outdoor Reset option is chosen in CH Demand. This setting is not applicable when a Setpoint option is chosen in CH Demand. Press the LEFT or RIGHT buttons to adjust the Reset Curve Coldest Day then press the OK button to store the setting.

========================================================================

18.3.7 Reset Curve Warmest Day (Default: 64°F [18°C])

Figure 18-13: RESET CURVE WARMEST DAY Menu

Reset Curve Warmest Day is the warmest outdoor design temperature of the heating system when an Outdoor Reset option is chosen in CH Demand. This setting is not applicable when a Setpoint option is chosen in CH Demand. Press the LEFT or RIGHT buttons to adjust the Reset Curve Warmest Day then press the OK button to store the setting.

Page 124 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 125: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

18.3.8 CH2 Circuit (Default: Enabled)

Figure 18-14: CH1 CIRCUIT Menu

CH2 Circuit allows the CH2 Maximum and Minimum Setpoints to be enabled and disabled. When disabled, the CH2 heating call will operate using the CH1 Maximum and Minimum Setpoints. Press the UP or DOWN buttons to select Enabled or Disabled, then press the OK button to store the setting.

• Enabled: A CH2 heating call will use CH2 Maximum and Minimum Setpoints.

• Disabled: A CH2 heating call will use CH1 Maximum and Minimum Setpoints.

========================================================================

18.3.9 CH2 Maximum Setpoint (Default: 140°F [60°C])

(For menu image, see section 18.3.4, Figure 18-10, CH1 Maximum Setpoint)

CH2 Maximum Setpoint is the maximum setpoint for a CH2 heating call when an Outdoor Reset option is chosen in CH Demand. CH2 Maximum Setpoint is the fixed setpoint for a CH2 heating call when a Setpoint option is chosen in CH Demand. Press the LEFT or RIGHT buttons to adjust the CH2 Maximum Setpoint then press the OK button to store the setting.

=======================================================================

18.3.10 CH2 Minimum Setpoint (Default: 80°F [27°C])

(For menu image, see section 18.3.5, Figure 18-11, CH1 Minimum Setpoint) CH2 Minimum Setpoint is the minimum setpoint for a CH2 heating call when an Outdoor Reset option is chosen in CH Demand. This setting is not applicable when a Setpoint option is chosen in CH Demand. Press the LEFT or RIGHT buttons to adjust the CH2 Minimum Setpoint then press the OK button to store the setting.

Page 125 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 126: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

18.3.11 Warm Weather Shutdown (Default: Off)

Figure 18-15: WARM WEATHER SHUTDOWN Menu

Warm Weather Shutdown allows the installer to enter an optional out-door temperature at which to disable the central heating function. The Esteem will continue to respond to a domestic hot water call or a 0-10V Modulation Signal when the outdoor temperature exceeds the Warm Weather Shutdown Temperature setting. Press the LEFT or RIGHT buttons to adjust the Warm Weather Shutdown Temperature then press the OK button to store the setting. The Warm

Weather Shutdown icon is displayed on the home screen when the outdoor temperature reaches the Warm Weather Shutdown Temperature.

========================================================================

18.3.12 Pump Constant Circulation (Default: Disabled)

Figure 18-16: PUMP CONSTANT CIRCULATION Menu

Pump Constant Circulation allows the central heating circulators to be constantly enabled even without a central heating call. A domestic hot water call will cause the circulators to be disabled during the domestic callas long as DHW Priority is enabled. Press the UP or DOWN buttons to select Enabled or Disabled then press the OK button to store the setting.

• Enabled: The central heating circulators will be enabled for constant circulation without a central heating call.

• Disabled: The central heating circulators will only be enabled during a central heating call.

Table 18-1: Circulator Operation with Pump Circulation = Enabled CH2 Pump/System Pump Auxiliary Boiler Pump DHW Pump CH (1) Pump

ON ON OFF ON

Page 126 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 127: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

18.3.13 CH Post Pump Time (Default: 1 Minute)

Figure 18-17: CH POST PUMP TIME Menu

CH Post Pump Time sets how long the central heating circulators will continue to operate at the completion of a heating call. Reference System Pump in CH Settings in section 18.3 to determine which circulators will continue to operate. Any call during the CH Post Pump Time will be ignored until the post pump has completed. The CH Post Pump feature allows the heat remaining in the boiler at the completion of a call to be sent to the heating system, which will improve the overall efficiency of the system. Press the LEFT or RIGHT buttons to adjust the CH Post Pump Time then press the OK button to store the setting. =======================================================================

Page 127 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 128: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

18.3.14 Freeze Protection (Default: Enabled)

Figure 18-18: FREEZE PROTECTION Menu

Freeze Protection allows the freeze protection feature to be enabled and disabled. Press the UP or DOWN buttons to select Enabled or Disabled then press the OK button to store the setting. Enabled: The Freeze Protection feature is enabled to protect the boiler from freezing. This feature monitors the boiler water temperature and responds as follows when no call is present:

• 46°F [8°C]: Auxiliary Boiler Pump ON

• 42°F [6°C]: CH(1), Auxiliary Boiler & System Pumps ON. Burner operates at low fire.

• 60°F [15°C]: Freeze protection ends. Burner & all pumps OFF after completing CH Post Pump Time.

Disabled: The Freeze Protection feature is disabled.

WARNING! • Freeze Protection should only be disabled when the system

contains antifreeze to prevent the system from freezing. Serious damage could occur to the boiler as well as the entire heating system if freeze Protection is disabled without antifreeze in the system.

• The boiler should NEVER be installed in a location where freezing could occur. Subjecting the boiler to freezing conditions could lead to freezing of the condensate, and the possibility of causing serious injury or death.

Page 128 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 129: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

18.3.15 Frost Protection Setpoint (Default: -22°F [-30°C])

Figure 18-19: FROST PROTECTION SETPOINT Menu

Frost Protection will enable the central heating circulators if the outdoor temperature falls below the Frost Protection Setpoint and no call is present. This feature requires using the outdoor temperature sensor and is always active and cannot be disabled. Press the LEFT or RIGHT buttons to adjust the Frost Protection Setpoint then press the OK button to store the setting.

Table 18-2: Frost Protection Circulator Operation CH2 Pump/System Pump Auxiliary Boiler Pump DHW Pump CH (1) Pump

ON ON OFF ON

========================================================================

18.3.16 Parallel Shift Value (Default: 0°F [0°C])

Figure 18-20: PARALLEL SHIFT VALUE Menu

Parallel Shift allows the CH setpoint to be externally adjusted when a Constant option is chosen in CH Demand. When a Constant option is chosen in CH Demand, continuous CH1 and CH2 heating calls are generated. Simultaneous CH1 and CH2 calls will result in the boiler operating at the highest CH1 or CH2 setpoint. The CH1 or CH2 Thermostat terminals with the highest setpoint will be used to adjust the setpoint. If the Thermostat terminals with the highest setpoint are open, the CH setpoint will decrease by the Parallel Shift Value. If the Thermostat terminals with the highest setpoint are closed, the CH setpoint will return to the highest CH1 or CH2setpoint. Press the LEFT or RIGHT buttons to adjust the Parallel Shift Value then press the OK button to store the setting.

Page 129 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 130: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

18.3.17 CH Call Blocking (Default: 1 Minute)

Figure 18-21: CH CALL BLOCKING Menu

CH Call Blocking sets the minimum time between burner firings for central heating calls. At the completion of a burner firing, the CH Call Blocking time will begin. The burner will not fire again until after the CH Call Blocking time has elapsed. The CH Call Blocking time only prevents the burner from firing, the central heating circulators will respond to a central heating call. This blocking time has no affect on domestic hot water calls. The CH Call Blocking feature prevents short cycling of the burner and extends the life of the burner components. Press the LEFT or RIGHT buttons to adjust the CH Call Blocking time then press the OK button to store the setting.

========================================================================

18.3.18 System Pump (Default: CH1/CH2)

Figure 18-22: SYSTEM PUMP Menu

System Pump allows the system pump operation to be adjusted for the application. Press the UP or DOWN buttons to select the desired System Pump operation then press the OK button to store the setting. The System Pump options are:

Page 130 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 131: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

Table 18-3: Circulator Operation with System Pump = CH1/CH2/DHW CH2 Pump/System Pump Auxiliary Boiler Pump DHW Pump CH (1) Pump

CH1 Call ON ON OFF (see note) ON

CH2 Call ON ON OFF (see note) ON

DHW Call ON ON ON OFF (see note)

NOTE CH1/CH2/DHW - The system pump will be enabled for any CH1, CH2, or DHW call. Figure 18-23 illustrates a typical existing system requiring this setting.

Table 18-4: Circulator Operation with System Pump = CH1/CH2 CH2 Pump/System Pump Auxiliary Boiler Pump DHW Pump CH (1) Pump

CH1 Call ON ON OFF (see note) ON

CH2 Call ON ON OFF (see note) ON

DHW Call OFF (see note) ON ON OFF (see note)

NOTE CH1/CH2 - The system pump will only be enabled for a CH1 or CH2 central heating call. Figure18-24 illustrates a system zoned with zone valves requiring this setting.

Table 18-5: Circulator Operation with System Pump = CH2 CH2 Pump/System Pump Auxiliary Boiler Pump DHW Pump CH (1) Pump

CH1 Call OFF ON OFF (see note) ON

CH2 Call ON ON OFF (see note) OFF

DHW Call OFF (see note) ON ON OFF (see note)

NOTE CH2 – The system pump will only be enabled for a CH2 central heating call. The CH(1) pump will only be enabled for a CH1 central heating call. Figure 18-25 illustrates a system zoned with zone circulators requiring this setting.

Page 131 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 132: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

Figure 18-23: System Piping with System Pump = CH1/CH2/DHW

Page 132 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 133: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

Figure 18-24: System Piping with System Pump = CH1/CH2

Page 133 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 134: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

Figure 18-25: System Piping with System Pump = CH2

Page 134 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 135: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

18.4 DHW SETTINGS MENU Navigation: Home Screen > Installer Menu > CH & DHW Settings > DHW Settings

When you press the symbol in the INSTALLER menu, you access the CH & DHW SETTINGS menu.

When you press the symbol in the CH & DHW SETTINGS menu you access the DHW SETTINGS Menu (Figure 18-26).

INSTALLER Menu CH & DHW SETTINGS Menu DHW SETTINGS Menu

Figure 18-26: Navigation to the HEATING SETTINGS Menu

The DHW Settings menu contains settings related to domestic hot water operation. Each line contains a DHW Setting followed by its current value. Six DHW Settings are displayed on the screen at one time. Press the UP or DOWN buttons to scroll through additional CH Settings. See the following for a description of each of these settings.

Page 135 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 136: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

18.4.1 DHW Operation (Default: Enabled)

Figure 18-27: DHW OPERATION Menu

DHW Operation allows the domestic hot water function to be enabled and disabled. Press the UP or DOWN buttons to select Enabled or Disabled then press the OK button to store the setting. Enabled: The boiler will respond to a domestic hot water call.

Disabled: The boiler will not respond to a domestic hot water call. The domestic hot water

operation disabled icon is displayed on the home screen when domestic hot water operation has been disabled.

Page 136 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 137: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

18.4.2 Demand Type (Default: Switch)

Figure 18-28: DEMAND TYPE Menu

Demand Type allows the installer to select the type of device which will generate a domestic hot water call. Press the UP or DOWN buttons to select the DHW Demand Type then press the OK button to store the set-ting. The DHW Demand options are:

• Switch: A domestic hot water call from an aquastat or dry contact switch will enable the Esteem with a fixed setpoint for a domestic hot water call.

• Sensor: This option requires the use of Indirect Water Heater Sensor 69107, which is included with every Esteem boiler. The Esteem will monitor the DHW storage temperature and generate a domestic hot water call when the temperature drops below the DHW Storage Setpoint - DHW On Differential.

========================================================================

18.4.3 Boiler DHW Setpoint (Default: 186°F [86°C])

Figure 18-29: BOILER DHW SETPOINT Menu

Boiler DHW Setpoint is the fixed boiler setpoint temperature during a domestic hot water call when the Switch option is chosen in DHW Demand. Press the LEFT or RIGHT buttons to adjust

the Boiler DHW Setpoint then press the OK button to store the setting.

18.4.4 DHW Storage Setpoint (Default: 140°F [60°C]) Page 137 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 138: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

Figure 18-30: DHW STORAGE SETPOINT Menu

DHW Storage Setpoint is the domestic hot water storage setpoint temperature when the Sensor option is chosen in DHW Demand. Press the LEFT or RIGHT buttons to adjust the DHW Storage Setpoint then press the OK button to store the setting.

NOTE The boiler setpoint is automatically set to the DHW Storage Setpoint + DHW Storage Adder when the Sensor option is chosen in DHW demand.

========================================================================

18.4.5 DHW on Differential (Default: 6°F [3°C])

Figure 18-31: DHW ON DIFFERENTIAL Menu

DHW On Differential sets how far the DHW storage temperature must fall below the DHW Storage Setpoint to create a domestic hot water call when the Sensor option is chosen in DHW Demand. The domestic hot water call will end when the DHW storage temperature rises above the DHW Storage Setpoint. Press the LEFT or RIGHT buttons to adjust the DHW On Differential then press the OK button to store the setting.

WARNING! The DHW on differential setting greatly affects the production of domestic hot water. A low setting could result in a rapid response to a domestic hot water call resulting in a potential scald hazard. It is strongly recommended that the installer utilize a thermostatic mixing valve on the hot water outlet of the indirect water heater. Failure to comply could result in severe personal injury, death, or substantial property damage.

Page 138 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 139: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

18.4.6 DHW Storage Adder (Default: 46°F [25°C])

Figure 18-32: DHW STORAGE ADDER Menu

DHW Storage Adder is used to compute the boiler setpoint when the Sensor option is chosen in DHW Demand. The boiler setpoint will be DHW Storage Setpoint + DHW Storage Adder for a domestic hot water call. Press the LEFT or RIGHT buttons to adjust the DHW Storage Adder then press the OK button to store the setting.

========================================================================

18.4.7 DHW Post Pump Time (Default: 1 Minute)

Figure 18-33: DHW POST PUMP TIME Menu

DHW Post Pump Time sets how long the domestic hot water circulator will continue to operate at the completion of a domestic hot water call. Any call during the DHW Post Pump Time will be ignored until the post pump has completed. The DHW Post Pump feature allows the heat remaining in the boiler at the completion of a call to be sent to the Indirect Water Heater, which will improve the overall efficiency of the system. Press the LEFT or RIGHT buttons to adjust the DHW Post Pump Time then press the OK button to store the setting.

Page 139 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 140: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

18.4.8 DHW Priority Timeout (Default: OFF)

Figure 18-34: DHW PRIORITY TIMEOUT Menu

DHW Priority Timeout allows the installer to enter an optional time limit that a domestic hot water call has priority over a central heating call when DHW Priority is set to Enabled. Press the LEFT or RIGHT buttons to adjust the DHW Priority Timeout then press the OK button to store the setting. ========================================================================

18.4.9 DHW Priority (Default: ENABLED)

Figure 18-35: DHW PRIORITY Menu

DHW Priority allows the domestic hot water priority function to be enabled or disabled. Press the UP or down buttons to select Enabled or Disabled then press the OK button to store the setting.

• Enabled: Domestic hot water calls will have priority over a central heating call. The boiler setpoint will be set to the domestic hot water setpoint during a domestic hot water call. The DHW circulator will be enabled and the heating circulators will be disabled during a domestic hot water call.

• Disabled: Domestic hot water calls will not have priority over a central heating call. The boiler setpoint will be set to the domestic hot water setpoint when only a domestic hot water call is present. The boiler setpoint will be set to the highest setpoint when simultaneous domestic hot water and central heating calls are present. The DHW circulator will be enabled during a domestic hot water call. The heating circulators will be enabled during a central heating call.

WARNING! Simultaneous domestic hot water and central heating calls will result in the boiler operating at the highest target temperature when DHW priority is set to disabled. The use of a mixing device on the lower temperature zones may be required to protect the lower temperature zones from damage.

Page 140 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 141: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

18.4.10 DHW Call Blocking (Default: 0 Minutes)

Figure 18-36: DHW CALL BLOCKING Menu

DHW Call Blocking sets the minimum time between burner firings for domestic hot water calls. At the completion of a burner firing, the DHW Call Blocking time will begin. The burner will not fire again until after the DHW Call Blocking time has elapsed. The DHW Call Blocking time only prevents the burner from firing, the domestic hot water circulator will respond to a domestic hot water call. This blocking time has no effect on central heating calls. The DHW Call Blocking feature prevents short cycling of the burner and extends the life of the burner components. Press the LEFT or RIGHT buttons to adjust the DHW Call Blocking time, then press the OK button to store the setting. ========================================================================

18.4.11 DHW to CH Call Blocking (Default: 1 Minute)

Figure 18-37: DHW to CH CALL BLOCKING Menu

DHW to CH Call Blocking sets the minimum time between a DHW burner firing and a CH burner firing. At the completion of a DHW burner firing, the DHW to CH Call Blocking time will begin. The burner will not fire again for a central heating call until after the DHW To CH Call Blocking time has elapsed. The DHW To CH Call Blocking time only prevents the burner from firing, the central heating circulators will respond to a central heating call. This blocking time has no effect on domestic hot water calls. The DHW To CH Call Blocking feature pre-vents the burner from firing when switching from a domestic hot water call to a central heating call. This allows the remaining heat in the heat exchanger to be dissipated and potentially satisfy the central heating call. Press the LEFT or RIGHT buttons to adjust the DHW To CH Call Blocking time then press the OK button to store the setting.

Page 141 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 142: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

18.4.12 Antilegionella Function (Default: DISABLED)

Figure 18-38: ANTILEGIONELLA FUNCTION Menu

The Antilegionella Function ensures that an Indirect Water Heater is heated at least once per week to prevent the growth of Legionella bacteria. Press the UP or DOWN buttons to select Enabled or Disabled then press the OK button to store the setting.

• Enabled: When the Switch option is chosen in DHW Demand, a domestic hot water call is generated for 15 minutes once per week to heat the Indirect Water Heater. When the Sensor option is chosen in DHW Demand, a domestic hot water call is generated until the DHW storage temperature reaches 140°F [60°C] once per week. When the Sensor option is chosen in DHW Demand, the weekly timer is reset whenever the DHW storage temperature reaches 140°F [60°C] to prevent unnecessary firings. This function will be active even if DHW Operation has been set to Disabled.

• Disabled: The boiler will only fire in DHW mode when a domestic hot water call is received.

WARNING! The Antilegionella function should only be enabled when an indirect water heater is installed. Enabling the Antilegionella function without an indirect water heater will result in the boiler firing once per week in DHW mode, which could cause a manual reset hard lockout resulting in substantial property damage.

NOTE The Antilegionella Function is most effective when the Sensor option is chosen in DHW demand. The use of an Indirect Water Heater Sensor ensures that the domestic hot water is heated to 140°f [60°c] at least once per week.

Page 142 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 143: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

18.5 BOILER SETTINGS MENU Navigation: Home Screen > Installer Menu > CH & DHW Settings > Boiler Settings

INSTALLER Menu CH & DHW SETTINGS Menu BOILER SETTINGS Menu

Figure 18-39: Navigation to the BOILER SETTINGS Menu

The Boiler Settings menu contains settings related to general boiler operation. Each line contains a Boiler Setting followed by its current value.

========================================================================

18.5.1 Lockout Temp (Default: 210°F [99°C]) Lockout Temp. allows the High Boiler Temperature lockout (E3) to be temporarily adjusted down to 102°F [39°C] for inspector demonstration. Press the UP or DOWN buttons to select 210°F [99°C] or 102°F [39°C], then press the OK button to store the setting.

Figure 18-40: LOCKOUT TEMP. Menu

• 102°F [39°C]: A High Boiler Temperature lockout (E3) will occur when the boiler temperature reaches 102°F [39°C].

• 210°F [99°C]: A High Boiler Temperature lockout (E3) will occur when the boiler temperature reaches 210°F [99°C].

Page 143 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 144: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

18.5.2 Modbus Address (Default: 0=BCST) Modbus Address assigns the boiler with a unique address in the Modbus control system. Press the LEFT or RIGHT buttons to change the Modbus Address then press the OK button to store the setting.

Figure 18-41: MODBUS ADDRESS Menu

========================================================================

18.6 RESET ALL SETTINGS MENU Navigation: Home Screen > Installer Menu > Reset All Settings When you press the Reset All Settings symbol in the INSTALLER menu, you access the RESET ALL SETTINGS menu.

INSTALLER Menu CH SETTINGS Menu

Figure 18-42: Navigation to the RESET ALL SETTINGS Menu

Reset All Settings allows the installer to reset all CH, DHW, and Cascade settings back to the original factory defaults. Follow the onscreen instructions to reset all settings back to the original factory defaults.

Select

Page 144 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 145: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

Table 18-6: EZ-SETUP Controller Factory Default Settings

Setting Factory Default

Min. Setting Max. Setting EZ

Setup Reset

Installer Reset

Heating Settings Heating Operation Enabled - - Demand Switch & Setpoint - - Absolute Max CH Setpoint 188°F [87° C] 68°F [20°C] 188° F [87° C] CH1 Maximum Setpoint 180° F [82° C] 68° F [20° C] 188° F [87° C] CH1 Minimum Setpoint 120° F [49° C] 60° F [15° C] 188° F [87° C] Reset Curve Coldest Day 0° F [-18° C] -30° F [-34° C] 50° F [10° C] Reset Curve Warmest Day 64° F [18° C] 60° F [15° C] 78° F [25° C] CH2 Circuit Enabled - - CH2 Maximum Setpoint 140°F [60° C] 68° F [20° C] 188° F [87° C] CH2 Minimum Setpoint 80°F [27° C] 60° F [15° C] 188° F [87° C] Warm Weather Shutdown OFF OFF 78° F [25° C] Pump Constant Circulation Disabled - - CH Post Pump Time 1 minute OFF 20 minute Freeze Protection Enabled - - Frost Protection Setpoint -22°F [-30° C] -22°F [-30° C] 50° F [10° C] Parallel Shift Value 0°F [0° C] 0° F [10° C] 144° F [80° C] CH Call Blocking 1 minute 0 minute 30 minutes System Pump CH1/CH2 - - Domestic Settings DHW operation Enabled - - Demand Switch - - Boiler DHW Setpoint 186°F [86° C] 96°F [35° C] 188°F [87° C] DHW Storage Setpoint 140°F [60° C] 68°F [20° C] 150°F [65° C] DHW On Differential 6°F [3° C] 4°F [2° C] 18°F [10° C] DHW Storage Adder 46°F [25° C] 0°F [0° C] 54°F [30° C] DHW Post Pump Time 1 minute OFF 30 minutes DHW Priority Timeout OFF OFF 120 minutes DHW Priority Enabled - - DHW Call Blocking 0 minute 0 minute 30 minutes DHW to CH Call Blocking 1 minute 0 minute 30 minutes Antilegionella Function Disabled Boiler Settings Lockout Temperature 210°F [99°C] Modbus Address 0=BCST 0 247 Cascade Settings Stage Delay 60 seconds 0 second 255 seconds Minimum Firing Rate 30% 0% 100% Maximum Firing Rate 398 MBH [117kW] 0 MBH [0kW] 869 MBH [255kW] CH or DHW Boilers 0 0 6 Automatic Rotation Enabled CH Proportional Gain 7 1 255 CH Integral Gain 245 1 255 DHW Proportional Gain 7 1 255 DHW Integral Gain 245 1 255

Page 145 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 146: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

18.7 CASCADE MENU AND OPERATING INFORMATION The Esteem Boiler Management System includes a Cascade function which allows multiple boilers to operate together without the need for an external controller. One boiler will be selected as the Master and will be wired to accept all the low voltage control signals. The other boilers will be designated as Slaves and will only have a communication cable connecting them to the other boilers in the Cascade System.

• The Cascade function allows up to six identical boilers to operate together in a single heating system.

• Parallel Modulation fires as many boilers as possible to maximize system efficiency.

• Lead Stage Automatic Rotation rotates the lead boiler to ensure even wear on each boiler in the Cascade System. This function can be disabled by the Automatic Rotation Setting.

The cascade Menu is divided into three sections as follows:

1. Cascade Information – Provides real time operating information of the Cascade System. See section 18.8.

2. Cascade Settings – Allows the installer to adjust the Cascade System settings for the application. See section 18.8.2.

3. Cascade Autodetection – Automatically finds and configures each boiler of the Cascade System. See section 18.7.

Page 146 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 147: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

Figure 18-43: Cascade Menu Structure

Page 147 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 148: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

18.7.1 Cascade Installation – System Piping Standard Cascade installations will utilize a balanced manifold system as the primary/secondary connection to the system piping as shown in Figure 18-47 or a reverse return piping arrangement as shown in Figure 18-49. Split Cascade installations will utilize a balanced manifold system as the primary / secondary connection to the central heating loop. Each boiler configured to respond to a domestic hot water call will also have a direct connection to the indirect water heater as shown in Figure 18-51.

18.7.2 Cascade Installation – System Sensor Installation Cascade operation requires a System Temperature Sensor to be installed on the common supply header downstream of all boilers in the system. Place the System Temperature Sensor within 10’ of the last boiler in the Cascade System for an accurate temperature reading. Proper placement and installation of the System Temperature Sensor is critical for reliable cascade operation. Three types of System Temperature Sensor are available:

a) Direct Immersion: A direct immersion temperature sensor (P/N MDRKIT05), as shown in Figure 18-44a, is the recommended type since it will provide the most accurate water temperature readings. Install the 1/2” NPT direct immersion temperature sensor in a tee on the common supply header downstream of all boilers in the system. Ensure that the temperature sensor probe is directly in the water flow but not touching the opposite side of the tee. Wire the sensor to terminals15 and 16 of the Master boiler.

NOTE A direct immersion sensor is recommended for accurate temperature control.

b) Dry Well Installation: A temperature sensor (P/N 69107) installed in a dry well, shown in Figure 18-44b, will measure up to 10°F [5°C] lower than the actual water temperature. All water setpoints must be lowered at the Master boiler by 10°F [5°C] from the desired setpoints for reliable Cascade operation. Install a 3/8” ID drywell in the common supply header downstream of all boilers in the system. The drywell should be long enough to be directly in the water flow for the most accurate temperature reading. Insert the temperature sensor into the well and wire to terminals 15 and 16 of the Master boiler.

a) Direct Immersion b) Dry Well

Figure 18-44: System Sensor Internal Installation Types

Page 148 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 149: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

c) Pipe Mounted Installation: A temperature sensor (P/N PTSENS12) can be directly strapped to the outside of a 1” to 3” pipe. Install the PTSENS12 sensor as follows:

Installing a Pipe Mounted System Temperature Sensor

1. Remove the white plastic cover from the PTSENS12 sensor.

2. Cut a small slit in the seal gasket on the end of the sensor.

3. Route 18 AWG 2-wire cable or similar cable through the seal gasket into the enclosure.

4. Push down on the orange wire terminal retainers to insert the wires into the sensor terminals. Release the orange wire terminal retainers and confirm that the wires are firmly attached to the sensor terminals.

5. Select a location for the sensor on the common supply header downstream of all boilers in the system. Clean the pipe with fine sandpaper or emery cloth to ensure the pipe is clean and sensor will make good contact with the pipe.

6. Press the white cover onto the sensor and strap the sensor to the pipe using the included wire tie.

7. Wire the sensor to terminals 15 and 16 of the Master boiler.

18.7.3 Cascade Installation – Cascade Communication Cable A communication cable (P/N PTCAB01) must be installed between each boiler in the Cascade System. The cable has a 6-pin Molex connector on one end and bare wires on the other end. The Molex connector plugs into the Cascade Slave connector of the Slave boiler. The bare wires terminate on the Cascade Master terminals of the Master boiler or prior Slave boiler in cascades of three or more boilers. Reference Figures 18-48, 18-50, and 18-52 for wiring details. The connections are as follows: • Red Wire to Terminal #17 • White Wire to Terminal #18 • Black Wire & Cable Shielding to Terminal #19

18.7.4 Cascade Installation – Low Voltage Wiring Connections • Thermostat Wiring: CH1 and CH2 calls must be wired into the Cascade Master. • Outdoor Sensor Wiring: The outdoor temperature sensor must be wired into the Cascade

Master. • Domestic Hot Water Wiring: A DHW call must be wired into the Cascade Master. • Additional Boiler Limits: Boiler Limits must be wired into each boiler in the Cascade

System. When a boiler limit opens, that particular boiler will lockout and will be removed from Cascade System operation. The other boilers in the Cascade System will continue to operate if they are not in a lockout.

• External Modulation Control: An External Modulation Signal must be wired into the Cascade Master. The modulation signal will control the firing rate of the entire Cascade System, not just the Cascade Master.

• Modbus Wiring: A building management system (BMS) connection must be wired into the Cascade Master.

Page 149 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 150: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

18.7.5 Cascade Installation – Line Voltage Wiring Connections • Circulator Wiring: Reference Figures 18-45, 18-47, and 18-49 for circulator wiring required

for each type of Cascade System. The circulator connections used will depend on the systems piping layout.

NOTE Each circulator is individually fused with a 2.5A fuse located in the terminal strip. The total combined amp draw of the CH (1), DHW, and auxiliary Boiler circulators must not exceed 3 amps at any time for the Esteem boiler. Use an isolation relay to lower the total combined amp draw if exceeding these limits.

• Power Supply: A dedicated 120 VAC / 15A minimum service must be used to power the boilers in the Cascade System. Multiple boilers in the Cascade System can be placed on the same electrical circuit. Each boiler can draw a maximum of 8 amps.

• Alarm Wiring: The alarm contact closes whenever that particular boiler is in a soft or hard lockout. The alarm contact will also close on the Master boiler when any of the Slave boilers are locked out.

Page 150 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 151: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

18.8 CASCADE AUTODETECTION MENU Navigation: Home Screen > Installer Menu > Cascade > Cascade Autodetection

INSTALLER Menu Cascade Menu Cascade Autodetection Menu

Figure 18-45: Navigation to the RESET ALL SETTINGS Menu The Cascade System must be configured after wiring is completed and any required adjustments are made in Cascade Settings. The Cascade Auto=detection function automatically finds and configures all boilers in the Cascade System. This eliminates the need to manually configure each boiler of the Cascade System. Select Cascade Auto=detection on the Master boiler then follow the onscreen instructions to perform Cascade Auto=detection. Once Cascade Auto=detection is finished, a message will be displayed indicating how many boilers have been found. If the number of boilers found is correct, press OK to finish Cascade Auto=detection. If the number of boilers found is not correct, check the cascade communication cables between the boilers and repeat Cascade Auto=detection.

18.8.1 Cascade Operation – Lockouts If a lockout occurs to a boiler in a Cascade System, it will be removed from Cascade System operation. The remainder of the Cascade System continues to operate and the next available boiler will fire if necessary. The Lockout Screen will be displayed on the locked out boiler as well as the Master boiler. The Master boiler Lockout Screen will also indicate which boiler in the Cascade System is locked out.

Figure 18-46: Cascade Lockout Displays

Page 151 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 152: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

Figure 18-47: Standard Primary Secondary Cascade System

NO

TE

R

efer

ence

Fig

ure

18-4

8 on

the

next

pag

e fo

r ca

scad

e w

iring

.

Page 152 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 153: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

Figure 18-48: Standard Primary Secondary Cascade Wiring

NOTE Reference Figure 18-47

on previous page for cascade piping.

Page 153 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 154: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

Figure 18-49: Standard Reverse Return Cascade System

NO

TE

R

efer

ence

Fig

ure

18-5

0 on

the

next

pag

e fo

r ca

scad

e w

iring

.

Page 154 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 155: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

Figure 18-50: Standard Reverse Return Cascade Wiring

NOTE Reference Figure 18-49

on previous page for cascade piping.

Page 155 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 156: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

Figure 18-51: Split Cascade System

NO

TE

R

efer

ence

Fig

ure

18-5

2 on

the

next

pag

e fo

r ca

scad

e w

iring

.

Page 156 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 157: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

Figure 18-52: Split Cascade Wiring

NOTE Reference Figure 18-51 on previous page for cascade piping.

Page 157 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 158: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

18.9 CASCADE INFORMATION MENU Navigation: Home Screen > Installer Menu > Cascade > Cascade Information

INSTALLER Menu Cascade Menu Cascade Information Menu

Figure 18-53: Cascade Information Menu Navigation Cascade Information provides real time operating information of the Cascade System. Each line contains an information item followed by its current value. See below for a list of all Cascade Information items.

18.9.1 System Temperature Logging The System Temperature selection in the Cascade Information Menu displays a logging function which records one sample every 12 minutes to produce a graph of the last 24 hours. Select System Temperature in Cascade Information then press the oK button to view the graph.

Table 18-7: Cascade Information Menu Items Menu Item Description

Cascade Role

Displays the current role of the boiler in the Cascade System. Cascade Role will be one of the following: • Master: Indicates this boiler is the Master boiler in the Cascade

System. • Slave: Indicates this boiler is a Slave boiler in the Cascade

System. • Standalone: Indicates this boiler is not part of a Cascade System.

System Temperature Displays the current system temperature reading wired to the Master boiler. If the system sensor is not wired in to the Master boiler,”--” is displayed.

Active Boilers Displays the current number of boilers fired in the Cascade System. Total Boilers Displays the total number of boilers in the Cascade System. Cascade Firing Rate Displays the current firing rate of the entire Cascade System.

Figure 18-54: System Temperature Logging Display

Page 158 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 159: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

18.9.2 Cascade Settings Menu Navigation: Home Screen > Installer Menu > Cascade > Cascade Settings

INSTALLER Menu Cascade Menu Cascade Information Menu

Figure 18-55: Cascade Settings Menu Navigation

The Cascade Settings menu contains settings related to cascade operation. Each line contains a Cascade Setting followed by its current value. Six Cascade Settings are displayed on the screen at one time. Press the UP or DOWN buttons to scroll through additional Cascade Settings.

NOTE Cascade setting changes must be made on the cascade Master. Cascade auto detection must be performed after making any changes to a cascade Setting before the change will take effect.

Page 159 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 160: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

18.9.3 Stage Delay (Default: 60 Seconds) Stage Delay sets the time delay before enabling or disabling a boiler in the Cascade System. The Stage Delay begins once the Master boiler determines that a boiler must be enabled to reach the setpoint or when the Master boiler deter-mines a boiler should be disabled because of a decreasing load.

Figure 18-56: Stage Delay Menu

Press the LEFT or RIGHT buttons to adjust the Stage Delay then press the OK button to store the setting. Adjusting the Stage Delay will have the following effects:

Increase Stage Delay: • Reaching the setpoint could take longer due to a longer delay between enabling boilers. • Overshooting the setpoint could occur due to boilers staying on longer before being

disabled. Decrease Stage Delay: • Overshooting the setpoint could occur due to boilers being enabled quicker. • Boilers will be disabled quicker, possibly increasing boiler cycling and decreasing runtimes.

========================================================================

18.9.4 Minimum firing Rate (Default: 30%) Minimum Firing Rate is the minimum firing rate of a single boiler in the Cascade System. The Master boiler uses this setting to determine when boilers can be enabled and disabled. Setting the Minimum Firing Rate below the recommended minimum will result in boilers being enabled too quickly which may cause sharp increases in temperature from the Cascade System. Setting the Minimum Firing Rate above the recommended minimum will delay the enabling of boilers which may lower the system efficiency.

Figure 18-57: Minimum Firing Rate Menu

Press the LEFT or RIGHT buttons to adjust the Minimum Firing Rate then press the OK button to store the setting.

NOTE The recommended minimum firing rate for the Esteem 399 is 30%

Page 160 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 161: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

18.9.5 Boiler Enabling Algorithm The Master boiler uses the following algorithm to determine when the next boiler can be enabled:

x Minimum Firing Rate = Individual Boiler Firing Rate Once the currently fired boilers reach the calculated firing rate, the next boiler can be enabled without affecting the overall cascade firing rate. For example, the calculation for a Cascade System consisting of two Esteem 399 boilers would be: x 30% = 60%

Once the first Esteem firing rate reaches 60%, the second Esteem can be enabled. Both will then fire at the minimum 30% firing rate so that the overall output from the Cascade System remains the same.

========================================================================

18.9.6 Boiler Disabling Algorithm Once the firing rate of all currently fired boilers decreases to the Minimum Firing Rate, a boiler can be disabled. The boilers which continue to fire will increase their firing rate if required to replace the output of the dis-abled boiler.

NOTE Stable cascade operation requires that all boilers in a cascade System be the same size. Mixing boiler sizes in a cascade System could lead to temperature fluctuations and erratic cascade operation.

========================================================================

18.9.7 Maximum Firing Rate (Default: 398 MBH) Maximum Firing Rate is the maximum firing rate of a single boiler in the Cascade System.

Figure 18-58: Maximum Firing Rate Menu

Press the LEFT or RIGHT buttons to adjust the Maximum Firing Rate then press the OK button to store the setting.

Number of Boilers Firing +1

Number of Boilers Firing

1 + 1 1

NOTE The recommended maximum firing rate for the Esteem 399 is 398 MBH.

Page 161 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 162: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

NOTE Stable cascade operation requires that all boilers in a cascade System be the same size. Mixing boiler sizes in a cascade System could lead to temperature fluctuations and erratic cascade operation.

18.9.8 CH or DHW Boilers (Default: 0) The CH or DHW Boilers setting specifies how many boilers in a Split Cascade System will respond to a domestic hot water call. The CH or DHW Boilers always include the Master boiler. The remaining boilers will only respond to central heating calls. This allows the Cascade System to satisfy both central heating and domestic hot water calls at the same time. At the completion of a domestic hot water call, the CH or DHW Boilers will again be available to respond to central heating calls. Press the LEFT or RIGHT buttons to adjust the CH or DHW Boilers setting then press the OK button to store the setting.

Figure 18-59: Maximum Firing Rate Menu

NOTE Splitting the cascade System into CH only and CH or DHW boilers requires the boilers to be piped as shown in Figure 18-48. The CH or DHW boilers must be piped to both CH and DHW loads directly for proper operation.

NOTE DHW Priority must be set to Enabled in DHW Settings of the cascade Master for proper operation.

NOTE All CH or DHW Boilers will respond to a domestic hot water call. It is important that the domestic load is capable of transferring all of the heat generated to prevent excessive boiler cycling.

Page 162 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 163: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

18.9.9 Automatic Rotation (Default: Enabled) Automatic Rotation allows the lead stage automatic rotation function to be disabled. Press the UP or DOWN buttons to select Enabled or Disabled then press the OK button to store the setting.

Figure 18-60: Automatic Rotation Menu

• Enabled: The lead boiler automatically rotates every time a call for heat is received when a Switch option is chosen in CH Demand or every 24 hours when a Constant option is chosen in CH Demand.

• Disabled: The lead boiler is always the Master boiler followed by each Slave boiler

Page 163 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 164: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

18.9.10 CH Proportional Gain (Default: 7) CH Proportional Gain allows the cascade response to be adjusted for a central heating call. CH Proportional Gain has the greatest influence when the system temperature is far away from the setpoint. Press the LEFT or RIGHT buttons to adjust the CH Proportional Gain then press the OK button to store the setting.

Figure 18-61: CH Proportional Gain Menu

Increase CH Proportional Gain: • The Cascade System will reach setpoint faster, but overshooting the setpoint may occur.

• To reach the setpoint faster, increase the CH Proportional Gain value by 2. Perform Cascade Auto-detection and initiate a central heating call. Observe the cascade response and make further adjustments if necessary.

Decrease CH Proportional Gain: • The Cascade System will take longer to reach the setpoint, but setpoint overshooting is

minimized.

• If the setpoint is reached too quickly, decrease the CH Proportional Gain value by 2. Perform Cascade Auto-detection and initiate a central heating call. Observe the cascade response and make further adjustments if necessary.

NOTE Only make adjustments to this setting after consulting AERCO Technical Support. Improper adjustment of CH Proportional Gain could lead to temperature fluctuations and erratic cascade operation.

Page 164 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 165: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

18.9.11 CH Integral Gain (Default: 245) CH Integral Gain allows the cascade response to be adjusted for a central heating call. CH Integral Gain has the greatest influence when the system temperature is close to the setpoint. Press the LEFT or RIGHT buttons to adjust the CH Integral Gain then press the OK button to store the setting.

Figure 18-82: CH Integral Gain Menu

Increase CH Integral Gain: • The Cascade System will take longer to reach the setpoint, but setpoint overshooting is

minimized.

• If the setpoint is reached too quickly, increase the CH Integral Gain value by 2. Perform Cascade Auto-detection and initiate a central heating call. Observe the cascade response and make further adjustments if necessary.

Decrease CH Integral Gain: • The Cascade System will reach setpoint faster, but overshooting the setpoint may occur.

• To reach the setpoint faster, decrease the CH Integral Gain value by 2. Perform Cascade Auto-detection and initiate a central heating call. Observe the cascade response and make further adjustments if necessary.

NOTE Only make adjustments to this setting after consulting AERCO Technical Support. Improper adjustment of CH Integral Gain could lead to temperature fluctuations and erratic cascade operation.

Page 165 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 166: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

18.9.12 DHW Proportional Gain (Default: 7) DHW Proportional Gain allows the cascade response to be adjusted for a domestic hot water call. DHW Proportional Gain has the greatest influence when the system temperature is far away from the setpoint. Press the LEFT or RIGHT buttons to adjust the DHW Proportional Gain then press the OK button to store the setting.

Figure 18-63: DHW Proportional Gain Menu

Increase DHW Proportional Gain: • The Cascade System will reach setpoint faster, but over shooting the setpoint may occur.

• To reach the setpoint faster, increase the DHW Proportional Gain value by 2. Perform Cascade Auto-detection and initiate a domestic hot water call. Observe the cascade response and make further adjustments if necessary.

Decrease DHW Proportional Gain: • The Cascade System will take longer to reach the setpoint, but setpoint overshooting is

minimized.

• If the setpoint is reached too quickly, decrease the DHW Proportional Gain value by 2. Perform Cascade Auto-detection and initiate a domestic hot water call. Observe the cascade response and make further adjustments if necessary.

NOTE Only make adjustments to this setting after consulting AERCO Technical Support. Improper adjustment of DHW Proportional Gain could lead to temperature fluctuations and erratic cascade operation.

========================================================================

Page 166 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 167: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

18.9.13 DHW Integral Gain (Default: 245) DHW Integral Gain allows the cascade response to be adjusted for a domestic hot water call. DHW Integral Gain has the greatest influence when the system temperature is close to the setpoint. Press the LEFT or RIGHT buttons to adjust the DHW Integral Gain then press the OK button to store the setting.

Figure 18-64: DHW Integral Gain Menu

Increase DHW Integral Gain:

• The Cascade System will take longer to reach the setpoint, but setpoint overshooting is minimized.

• If the setpoint is reached too quickly, increase the DHW Integral Gain value by 2. Perform Cascade Auto-detection and initiate a domestic hot water call. Observe the cascade response and make further adjustments if necessary.

Decrease DHW Integral Gain: • The Cascade System will reach setpoint faster, but overshooting the setpoint may occur.

• To reach the setpoint faster, decrease the DHW Integral Gain value by 2. Perform Cascade Auto-detection and initiate a domestic hot water call. Observe the cascade response and make further adjustments if necessary.

NOTE Only make adjustments to this setting after consulting AERCO Technical Support. Improper adjustment of DHW Integral Gain could lead to temperature fluctuations and erratic cascade operation.

Page 167 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 168: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

18.9.14 Modbus Address (Default: 0 = BcST) Modbus Address assigns the boiler with a unique address in the Modbus control system. Press the LEFT or RIGHT buttons to change the Modbus Address then press the OK button to store the setting.

Figure 18-65: DHW Integral Gain Menu

========================================================================

Page 168 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 169: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

18.9.15 Modbus Interface The Modbus Interface allows a Building Management System (BMS) to directly connect to the boiler. A BMS can read information from the boiler to determine its operating state, lockout status, sensor readings, etc. A BMS can also operate the boiler by providing a setpoint.

Table 18-8: Modbus Configuration Protocol MODBUS RTU Baud Rate 38400bps Data Length 8 Parity None Stop Bit 1 Physical Layer RS485 (2 wire)

Table 18-9: Supported Commands DEC HEX Description

03 0x03 Read Holding Registers 04 0x04 Read Input Registers 06 0x06 Write Single Register 16 0x10 Write Multiple Registers 17 0x11 Report Slave ID

Table 18-10: Holding Registers (Read/Write) Address

DEC (HEX) Supported Commands Description Byte:

Format Notes

512 (0x00200)

0x03 0x06 0x10

CH Demand

MB:U8

LB:U8

Writing: 0= Modbus CH1 Demand has priority over a DHW call. 255 = DHW call has priority over a Modbus CH1 Demand. Reading: 0 = No CH Calls Present. 255 = CH1 or CH2 Call Present. Writing: 0 = End CH1 Demand. 255= Begin CH1 Demand. A CH1 Demand lasts for 30 seconds from the last successful write.

513 (0x201) 0x03 0x06 0x10

Maximum Firing Rate LB:U8

Value = Maximum Firing Rate %. This register becomes active when 255is written to register 512 (0x0200)

Page 169 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 170: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

Table 18-10: Holding Registers (Read/Write) - Continued

Address DEC (HEX)

Supported Commands Description

Byte: Format Notes

514 (0x202)

0x03 0x06 0x10

CH Setpoint LB:U8 Value = CH Setpoint °C. This register becomes active when 255 is written to register 512 (0x0200).

1280 (0x0500) 0x03 CH1 Maximum Setpoint LB:U8 Value = °C

1281 (0x0501) 0x03 DHW Storage Setpoint LB:U8 Value = °C

0 (0x0000) 0x04 Boiler Status LB: Flag8

Bit: Description 0: PC Manual Mode 1: DHW Mode 2: CH Mode 3: Freeze Protection Mode 4: Flame Present 5: CH(1) Pump 6: DHW Pump 7: System / CH2 Pump 0 = Off, 1 = On

1 (0x0001) 0x04 Lockout Status

MB: Flag8

LB:U8

Bit: Description 1: Lockout Code Type 0 = Automatic Reset Lockout 1 = Manual Reset Lockout Value = Lockout Code

2 (0x0002) 0x04 Lockout Status LB:U8

0 = Single / Master Boiler 1 = Slave 1 2 = Slave 2 3 = Slave 3 4 = Slave 4 5 = Slave 5 F = Single / Master Display

768 (0x0300) 0x04

Boiler Supply Temperature /System Temperature

S16

Value = 0.1°C Invalid Value = 32768 (0x8000). Value is the Boiler Supply Temperature unless the System Temperature Sensor is installed.

769 (0x0301) 0x04 Boiler Return Temperature LB:S8 Value = °C.

Invalid Value = 65472 (0xFFC0).

770 (0x0302) 0x04 DHW Storage Temperature LB:S8 Value = °C.

Invalid Value = 32768 (0x8000).

771 (0x0303) 0x04 Boiler Flue Temperature LB:S8 Value = °C.

Invalid Value = 65472 (0xFFC0).

772 (0x0304) 0x04 Outdoor Temperature LB:S8 Value = °C.

Invalid Value = 32768 (0x8000). 773 (0x0305) 0x04 Future Use LB:U8

774 (0x0306) 0x04 Flame Ionization Current LB:U8 Value = Flame Current µA.

775 (0x0307) 0x04 Boiler / Cascade Firing Rate LB:U8 Value = Firing Rate %.

776 (0x0308) 0x04 Boiler Setpoint LB:U8 Value = °C. Invalid Value = 32768 (0x8000).

Page 170 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 171: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

18.10 MANUAL OPERATION Navigation: Home Screen > Installer Menu > Manual operation

The Manual Operation Screen allows the burner and circulators to be manually enabled for testing.

Figure 18-66: Manual Operation Menu ===============================================================================

18.10.1 Fan Parameter Press the OK button while the FAN icon is highlighted to manually fire the burner and power the CH (1) circulator. Press the LEFT and RIGHT buttons to adjust the firing rate from 1% (Low Fire) to 100% (High Fire). Hold down the LEFT or RIGHT buttons to rapidly increase or decrease the firing rate. Press the OK button again while the FAN icon is highlighted to shut down the burner when finished.

Figure 18-67: Manual Operation Menu with Fan Selected

NOTE An adequate CH load must be present to dissipate the heat generated while the burner is manually fired. If an adequate CH load is not avail-able, an indirect water heater can be used to dissipate the heat by creating a domestic hot water call which will enable the DHW circulator.

INSTALLER Menu MANUAL Menu

Page 171 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 172: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

18.10.2 CH CH1 Parameter Press the OK button while the CH CH1 icon is highlighted to manually power the CH (1) circulator. Press the OK button again while the CHCH1 icon is highlighted to shut down the CH (1) circulator.

Figure 18-68: Manual Operation Menu with CH CH1 Selected

NOTE The auxiliary Boiler circulator is also powered when the CH (1) circulator is manually enabled.

===============================================================================

18.10.3 DHW Parameter Press the OK button while the DHW icon is highlighted to manually power the DHW circulator. Press the OK button again while the DHW icon is highlighted to shut down the DHW circulator.

Figure 18-69: Manual Operation Menu with DHW Selected

NOTE The auxiliary Boiler circulator is also powered when the DHW circulator is manually enabled.

Page 172 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 173: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

18.10.4 SYS CH2 Parameter Press the OK button while the SYS CH2 icon is highlighted to manually power the System circulator. Press the OK button again while the SYSCH2 icon is highlighted to shut down the System circulator.

Figure 18-70: Manual Operation Menu with SYS CH2 Selected

Page 173 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 174: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Chapter 18 OMM-0089_0A Installation, Operation & Maintenance Manual Controller Operation

(This page intentionally blank)

Page 174 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 175: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Appendix A OMM-0089_0A Installation, Operation & Maintenance Manual Parts & Dimensions

APENNDIX A: PART AND DIMENSIONAL DRAWINGS

Page 175 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 176: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Appendix A OMM-0089_0A Installation, Operation & Maintenance Manual Parts & Dimensions

Figure A-1: Esteem 399 Enclosure Components

Item# Part Number Description 1 38037 Rear Panel 2 37051 Front Jacket Panel 3 69237 Control Enclosure Bezel 4 37123 Side Jacket Panel (Left or Right) 5 37124 Top Jacket Panel 6 37125 Top Jacket Access Panel 7 33113 Wall Mounting Bracket with Hardware 8 38038 Combustion Air Deflector

Page 176 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 177: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Appendix A OMM-0089_0A Installation, Operation & Maintenance Manual Parts & Dimensions

Figure A-2: Esteem 399 Internal Components

Item# Part Number Description 1 28568 Heat Exchanger Body 2 38039 Vent Outlet/ Combustion Air Inlet Adapter 3 94233 Polypropylene Vent Pipe 4 61022 Supply / Return Temperature Sensor 5 61045 Flue Temperature Sensor 6 60013 LWCO Pressure Device 7 22123 Condensate Drain Assembly 8 22124 Boiler Piping - Return Assembly 9 22125 Boiler Piping - Supply Assembly 10 41035 Polypropylene Pan

Page 177 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 178: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Appendix A OMM-0089_0A Installation, Operation & Maintenance Manual Parts & Dimensions

Figure A-3: Esteem 399 Burner Assembly Components

Item# Part Number Description 1 83025 Combustion Chamber Insulation 2 24230 Burner Head with Gasket 3 58026 Blower with Gasket 4 36059 Burner Plate 5 81194 Burner Plate Gasket (Not Shown) 6 92122 Gas Valve 7 43081 Venturi 8 58094 Igniter and Cable with Gasket 9 58028 Sight Glass Assembly (Glass, Gasket and Bracket) 10 22126 Gas Valve Piping

Page 178 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 179: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Appendix A OMM-0089_0A Installation, Operation & Maintenance Manual Parts & Dimensions

Figure A-4: EZ-SETUP Controller Components

Item# Part Number Description 1 67008 Pressure gauge and Fitting 2 60022 Power Switch 3 69217 Power Switch Cover 4 69218 Control Enclosure 5 69219 Control Module 6 69220 Display Module 7 69221 Control Enclosure Cover 8 89040 Igniter Cable Grommet 9 65171 Control Module 5A Fuse (Not Shown) 10 65172 Circulator 2.5A Fuses (Not Shown) 11 65173 In-Line Voltage 8A Fuse (Not Shown)

Page 179 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 180: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Appendix A OMM-0089_0A Installation, Operation & Maintenance Manual Parts & Dimensions

Figure A-5: Esteem 399 – Front View

Page 180 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 181: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Appendix A OMM-0089_0A Installation, Operation & Maintenance Manual Parts & Dimensions

Figure A-6: Esteem 399 – Side View

Page 181 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 182: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Appendix A OMM-0089_0A Installation, Operation & Maintenance Manual Parts & Dimensions

(This page intentionally blank)

Page 182 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 183: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Appendix B OMM-0089_0A Installation, Operation & Maintenance Manual Pressure Loss Charts

APENNDIX B: CIRCULATOR PRESSURE LOSS CHARTS

Page 183 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 184: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler Appendix B OMM-0089_0A Installation, Operation & Maintenance Manual Pressure Loss Charts

Figure B-1: Esteem 399 – Grundfos Circulator Pressure Drop Comparison Chart

Figure B-2: Esteem 399 – Tacos Circulator Pressure Drop Comparison Chart

Page 184 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 185: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation, Operation & Maintenance Manual

NOTES:

Page 185 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 186: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation, Operation & Maintenance Manual Change Log

Date Description Changed By

04/28/2014 Rev 97: Pre-Release Review Curtis Harvey

06/19/2014 Rev A: Released Curtis Harvey

© AERCO International, Inc., 2013

Page 186 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 187: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation, Operation & Maintenance Manual

Please complete one (1) form for each unit at the site and return to AERCO for warranty validation within 30 days of start-up. For your convenience, this information can be faxed to (845) 580-8090 or sent via US mail to: AERCO International, Inc., 100 Oritani Drive, Blauvelt, NY 10913. Completed By:______________________________________________ Date:___________

LOCATION Installation Name: __________________________________ SST Technician:_____________________ Street Address: ___________________________________ Company:__________________________ City, State, Zip: ___________________________________ Phone#:___________________________ AERCO Sales Rep.: _________________________________ Unit Serial#: _______________________

GENERAL INSTALLATION Number of units at site: ______ ______ ______ _______ _______ _______

Does condensate gravity drain? Yes No Is a condensate pump used? Yes No Is the relief valve piped to drain or within 12” of floor? Yes No Is there an electrical service switch at the unit? Yes No Is the unit’s drain piped to the floor or a drain? Yes No Is there any electrical conduit or piping attached to the unit’s sheet metal? Yes No Does any gas or water piping, or electrical conduit interfere with removal of the sheet metal covers? Yes No

GAS SUPPLY Type of Gas Supply: Natural Gas Propane Gas

Is an external gas supply regulator installed within two to six feet of the unit? …….......... Yes No

What are the make and model number of the external gas supply regulator? Make: _____________ Model: _____________

What is the static gas supply pressure to the external supply regulator? …….___________________ If this is a lock-up style external regulator, what is the size of the orifice? ……___________________

What is the supply regulator’s outlet spring range? …………………………….. ___________________

The external gas supply vent regulator lines are: Individually Run Manifolded together with other regulator vent lines. What is the BTU content of the gas? ___________________________________________________

What is the size of the gas supply header _______________________________________________ What is the length of gas pipe from the main meter? _______________________________________

STARTUP RECORD FOR ESTEEM 399 Low NOx BOILER

Page 187 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288

Page 188: Modulating & Condensing Hot USER MANUAL Water Boilerpreprod.aerco.com/sites/default/files/document/document/... · 2016-01-23 · GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation,

GF-135 Esteem 399 Low NOx Boiler OMM-0089_0A Installation, Operation & Maintenance Manual

STARTUP RECORD FOR ESTEEM 399 BOILER - (Continued)

Venting How many elbows are in the ducting? ____

Is the vent sealed with RTV? Yes No

Is the vent pitched back toward the boiler (1/4" per ft. length) per the AERCO Venting Guide? Yes No

Venting material used is: AL29-4C Other (please specify):

Venting manufacturer is:

Please describe venting configuration (check all that apply):*

Individual Vent Sidewall Termination Roof Termination

Breeched/Common (Units Vented Together)

Combustion Air Combustion air supplied through (check all that apply):

Louvers to outside wall vent Horizontal ducting Direct or Sealed Combustion

Louvers to another room Vertical ducting Combustion air fan

If using sealed combustion, what is the size of the ducting to the unit?

If using sealed combustion, is an AERCO Air Inlet Adapter installed? Yes No

If combustion air is ducted, are there two (2) ducts—one high and one low? Yes No

Boiler Installation

Are balancing valves or circuit setters installed? Yes No

Has the water flow been balanced between the units? Yes No

What is the maximum flow rate through the unit? GPM

Is the unit interlock utilized? Yes No

If yes, is it interlocked to: Flow switch Energy Management System

Damper end

switch

Other

Is the system:

Water Source Heat Pump

Primary/Secondary Pumping Used for Reheat

A Variable Flow

System

Other

Combustion Settings

CO2: _______________% Measured Rate of Input: _________________ Btu/hr

O2: _______________%

CO: _______________ppm

Page 188 of 188 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 OMM-0089_0A MC1 06/19/14 Ph.: 800-526-0288