Upload
vance-merrill
View
32
Download
1
Tags:
Embed Size (px)
DESCRIPTION
MODERN Final Review ENIAC-120003 MODERN Ref. Technical Annex MODERN_PartB Rev2 v3.7. WP1: Giuliana GangemiWP2: Andr é Juge WP3: Wilmar HeuvelmanWP4: Davide Pandini / Fabio Campi WP5: Loris Vendrame Coordinator: Jan van Gerwen Date: May 3 rd , 2012. Agenda (1). Welcome - PowerPoint PPT Presentation
Citation preview
MODERN Final Review ENIAC-120003 MODERN Ref. Technical Annex MODERN_PartB Rev2 v3.7
WP1: Giuliana Gangemi WP2: André Juge
WP3: Wilmar Heuvelman WP4: Davide Pandini / Fabio Campi
WP5: Loris Vendrame
Coordinator: Jan van Gerwen
Date: May 3rd, 2012
CONFIDENTIAL 2MODERN Final Review May 3rd, 2012
Agenda (1)Welcome
General information (Jan)– Objectives– Consortium– Resources planned and used– Overview of deliverables and milestones status– Cooperation, dissemination and exploitation– Project management: progress, problems and amendments– Relationship between workpackages– Other issues, Q&A
For WP1 (Giuliana), WP2 (André), WP3 (Wilmar) and WP4 (Davide / Fabio )– Link with other WPs and Tasks– Progress, highlights and lowlights– Technical status and achievements of deliverables (incl. changes)– Cooperation– Dissemination (publications, patents), exploitation– Other issues, Q&A
CONFIDENTIAL 3MODERN Final Review May 3rd, 2012
Agenda (2)
For WP5 (Loris and others)– Link with other WPs and Tasks– Progress, highlights and lowlights– Technical status and achievements of deliverables (incl. changes)– Cooperation– Dissemination (publications, patents), exploitation– Demo’s:
• Thales: Philippe Millet / Simon Heywood• …..
– Other issues, Q&A
CONFIDENTIAL 4MODERN Final Review May 3rd, 2012
Objectives
The objective of the MODERN project is to develop new paradigms in integrated circuit design that will enable the manufacturing of reliable, low cost, low EMI, high-yield complex products using unreliable and variable devices.
Specifically, the main goals of the project are: Advanced, yet accurate, models of process variations for
nanometre devices, circuits and complex architectures. Effective methods for evaluating the impact of process variations
on manufacturability, design reliability and circuit performance. oReliability, noise, EMC/EMI.oTiming, power and yield.
Design methods and tools to mitigate or tolerate the effects of process variations on those quantities applicable at the device, circuit and architectural levels.
Validation of the modelling and design methods and tools on a variety of silicon demonstrators.
1
23 4 5
Layout and strain induced variability (Synopsys)
CONFIDENTIAL 5MODERN Final Review May 3rd, 2012
Consortium
The MODERN Consortium features strong competence and expertise in the field of advanced technologies, with a well-balanced participation between Large Industries, SMEs, Research Centres and Universities from all over Europe.
CONFIDENTIAL 6MODERN Final Review May 3rd, 2012
Resources planned and used
Work
Package
Title
38 1 5 4 6 20 251 3 5 5 6 30 238 1 5 4 6 20 258 5 5 6 6 30 6
381 12 54 46 44 17 26 48 12 39 6 7 12 59566 13 54 48 60 24 25 48 18 48 10 32 12 174381 12 54 46 44 17 26 48 12 39 6 7 12 59639 19 54 84 60 24 42 48 18 48 23 32 12 174619 40 12 24 11 244 46 78 61 20 16 15 5 27 20687 36 12 24 27 204 66 102 108 18 16 15 12 27 20619 40 12 24 11 244 46 78 61 20 16 15 5 27 20695 36 13 24 27 204 66 102 108 18 23 15 12 27 20565 35 24 12 144 31 30 15 22 78 36 79 16 42553 66 36 12 78 31 30 16 36 72 60 58 16 42565 35 24 12 144 31 30 15 22 78 36 79 16 42570 66 36 12 78 36 30 21 36 72 60 58 23 42315 10 75 8 6 75 73 7 0 14 32 16242 14 63 8 3 54 24 10 0 12 38 16315 10 75 8 6 75 73 7 0 14 32 16274 14 63 19 6 54 24 10 18 12 38 16103 1 4 5 2 6 2 2 2 2 48 10 0 2 2 1 3 3 7100 2 6 5 2 6 6 2 2 3 30 12 3 6 2 1 3 3 6103 1 4 5 2 6 2 2 2 2 48 10 0 2 2 1 3 3 7110 5 6 5 2 6 6 2 2 6 30 12 3 6 2 4 3 3 6
2,020 35 24 28 12 125 56 46 150 46 69 56 63 421 80 298 14 40 96 61 20 32 7 33 30 64 30 852,199 66 32 42 12 109 56 48 84 66 77 56 79 342 120 288 23 68 72 108 18 38 32 33 30 186 30 842,020 35 24 28 12 125 56 46 150 46 69 56 63 421 80 298 14 40 96 61 20 32 7 33 30 64 30 852,346 66 43 42 12 109 56 84 84 66 95 56 108 342 120 288 36 90 72 108 18 38 32 50 30 186 30 84
'(*) NOT FUNDED IN ITALY
WP3
2. A
ustr
iaM
icro
syst
ems
AG
3. C
SE
M
4. E
last
ix (
▼pe
r 30
-6-1
1)PERIOD: m1 to m36
Actual total
TO
TA
LS
TOTAL
Actual totalPlan total
Cum. Act. totalCum. Plan total
31. U
nive
rsita
t Pol
itecn
ica
de C
atal
unya
WP4
Architectural to system level:
modeling, analysis, and
Cum.Plan total
Planned total
WP1
Target technologies,
application domains,
WP2
Process/device to compact modeling
Cum. Act. total
Physical/circuit to RT-level: PV-aware and PV-
robust
Actual totalPlanned total
Planned total
Cum. Act. totalCum.Plan total
22. T
IEM
PO
SA
S
21. T
hale
s S
A
28. U
nive
rsity
of C
alab
ria
29. T
he U
nive
rsity
of G
lasg
ow
23. D
elft
Uni
vers
ity
24. E
indh
oven
Uni
vers
ity
25. G
raz
Uni
vers
ity
27. A
lma
Mat
er S
tudi
orum
26. V
ienn
a U
nive
rsity
16. (
Coo
rdin
ator
) N
XP
-NL
18. P
olite
cnic
o di
Tor
ino
19. S
TM
icro
elec
tron
ics
S.r
.l.
20. S
ynop
sys
Sw
itzer
land
LLC
12. C
EA
-LE
TI
13. M
ontp
ellie
r La
bora
tory
15. M
icro
n / N
umon
yx
8. IM
EP
-LA
HC
Lab
orat
ory
TABLE 3. PERSON-MONTH STATUS TABLECONTRACT N°: 120003ACRONYM: MODERN
WP5
Test structures and
demonstrators Cum. Act. total
Cum.Plan total
Actual totalPlanned total
Cum. Act. totalCum.Plan total
Planned total10
. Int
egra
ted
Sys
tem
Dev
elop
men
t SA
Cum.Plan total11
. Con
sorz
io N
azio
nale
version: 3.1 (17-04-2012)
WP6
Management, dissemination
and exploitation
Planned totalCum. Act. total
Partner - Person-month per Workpackage
Cum.Plan total
Actual total
1. S
TM
icro
elec
tron
ics
(Gre
nobl
e2)
SA
S
9. S
TM
icro
elec
tron
ics
SA
S
Actual total
5. T
ekla
tech
Actual total
30. S
apie
nza
Uni
vers
ita d
e R
oma
Cum. Act. total
6. In
tel M
C (
Infin
eon)
CONFIDENTIAL 7MODERN Final Review May 3rd, 2012
Overview of deliverables and milestones status (1)DeliverablesDel. no. Deliverable name WP no. Task
leadNature Dissemin
ationlevel
Delivery date(proj.
month)
Contributors (lead)
Actual / Forecast
delivery date
Delivered
D1.3 Integration Specifications 1 ST-I R PP M18 ST-I, AMS, IFXA, NMX, NXP, THL
09/12/10 Yes
D2.1.1 First version of process simulator including treatment of PV for mainstream CMOS technologies, and Discrete Power Device,SiC,GaN/AlGaN technologies, interfaced to commercial TCAD tools
2 ST-I R CO M15 ST-I, AMS, TUW
15/06/10 yes
D2.2.3 Device simulation analysis of dominant variability sources in state-of-the-art Non-Volatile-Memory technologies
2 UNGL R CO M18 UNET, UNGL, NMX, SNPS
14/10/10 Yes
D2.3.2 Characterization of major sources of PV in SiC technologies/devices, and AlGaN/GaN HEMT devices.Report on 1/f noise dispersion behavior in 45nm bulk CMOS
2 NXP R CO M18 ST-I, NXP 23/11/10 Yes
D2.5.1 PV-aware circuit-level models for standard CMOS technologies (down to 45nm), and Non-Volatile-Memory technologies. State-of-the-art based statistical models, based on hardware and/or TCAD.
2 UNET R CO M18 UNGL, UNET, NXP, POLI, ST-I, STF2, NMX
20/10/10 Yes
D5.1.2 Design of test structures for analog design parameter monitoring
5 AMS R CO M18 TUGI, AMS 28/09/10 Yes
D6.1.6 Semi-annual project progress report 6 NXP R CO M18 NXP, all 02/11/10 Yes
D6.2.3 First report on dissemination activities 6 UNET R CO M18 ST-I, all 10/01/11 Yes
D6.2.4 First update of public part of the project web-site 6 UNET D PU M18 ST-I 11/10/10 Yes
D6.3.1 Dissemination and use plan (first version) 6 NXP R CO M18 UNET, NXP, all
11/10/10 Yes
CONFIDENTIAL 8MODERN Final Review May 3rd, 2012
Overview of deliverables and milestones status (2)Milestones
Milestone number
Milestone name Work package(s)
involved
Expected date (proj.
month)
Actual / Forecast
delivery date
Achieved Means of verification
M2.1 PV aware compact models available for bulk planar CMOS technologies down to 45nm, TCAD/hardware based
2 M18 20/10/10 Yes D2.1.1, D2.2.2, D2.3.1, D2.5.1
M2.2 Identification and description of major PV sources in non-foundry mainstream logic technologies, cross-technology- fertilization
2 M21 23/11/10 Yes D2.2.3D2.3.1/ D2.3.2D2.5.1
M6.2 Second project review by ENIAC all M14 29/06/10 Yes Reviewer’s feedback
Conclusion:
All Deliverables and Milestones due before 31-12-2010 (M22) are ready
M24 Deliverables and Milestones are on schedule
CONFIDENTIAL 9MODERN Final Review May 3rd, 2012
Cooperation, dissemination and exploitation
A Workshop at DATE 2010 with the theme ‘The Fruits of Variability Research in Europe’ was organized. This workshop was a co-operation of the UK EPSRC project, FP7 STREP project REALITY and MODERN
VARI Workshop, 2010 May 26-27, Montpellier, France
Contribution to the Workshop on Simulation and Characterisation of Statistical CMOS Variability and Reliability was presented, Sept. 9th 2010, Bologna, Italy
MODERN participated in the Poster & Demo Session at European Nanoelectronics Forum 2010 in Madrid, Spain
Large number of publications
Main meetings:– General meetings in Catania (Nov. 9&10, 2010) attended by 30+ persons
present and 10+ called in
Due to the travel restrictions that many companies/institutes still face most of the interaction between partners is by phone and email
CONFIDENTIAL 10MODERN Final Review May 3rd, 2012
Project management: progress, funding problems and amendments
Progress: All planned deliverables ready
Most uncertainties in countries causing funding and (national) administrative issues e.g. Italy, Swiss, Spain and Austria are resolved
Amendments:1. The change of project coordinator from ST to NXP and ST-Crolles being
replaced by ST-Grenoble2. The removal of some inconsistencies between some deliverables3. The subcontracting of work by Glasgow to GSS Ltd.4. CSEM withdraws due to lack of national funding as of 29-06-20105. To account for the leaving of some NXP employees and a related change
in direction of the NXP PDM group the deliverables D5.3.2 and D5.3.3 are (slightly) changed
6. To account for some technical difficulties encountered in the research activities within ST-I Tasks 3.1, 3.4 and 5.3 are (slightly) changed
7. Coming: partner #6 Infineon Technologies Austria AG is included in the transaction between Infineon and Intel
CONFIDENTIAL 11MODERN Final Review May 3rd, 2012
Relationship between workpackages
CONFIDENTIAL 12MODERN Final Review May 3rd, 2012
Other issues Q&A
?
CONFIDENTIAL 13MODERN Final Review May 3rd, 2012
WP1 agenda
Link with other WPs and Tasks
Progress, highlights and lowlights
Technical status and achievements of deliverables (incl. changes)
Cooperation
Dissemination (publications, patents), exploitation
Other issues, Q&A
CONFIDENTIAL 14MODERN Final Review May 3rd, 2012
CONFIDENTIAL 15MODERN Final Review May 3rd, 2012
WP2 agenda
Link with other WPs and Tasks
Progress, highlights and lowlights
Technical status and achievements of deliverables (incl. changes)
Cooperation
Dissemination (publications, patents), exploitation
Other issues, Q&A
CONFIDENTIAL 16MODERN Final Review May 3rd, 2012
CONFIDENTIAL
WP3 agenda
Link with other WPs and Tasks
Progress, highlights and lowlights
Technical status and achievements of deliverables (incl. changes)
Cooperation
Dissemination (publications, patents), exploitation
Other issues, Q&A
17MODERN Final Review May 3rd, 2012
CONFIDENTIAL 18MODERN Final Review May 3rd, 2012
CONFIDENTIAL
WP4: Outline
Link with other WPs and Tasks
Progress, highlights and lowlights
Technical status and achievements of deliverables (incl. changes)
Cooperation
Dissemination (publications, patents), exploitation
Other issues, Q&A
19MODERN Final Review May 3rd, 2012
CONFIDENTIAL 20MODERN Final Review May 3rd, 2012
CONFIDENTIAL
WP5 agenda
Link with other WPs and Tasks
Progress, highlights and lowlights
Technical status and achievements of deliverables (incl. changes)
Cooperation
Dissemination (publications, patents), exploitation
Demo’s:– Thales: Philippe Millet / Simon Heywood– …..
Other issues, Q&A
21MODERN Final Review May 3rd, 2012
CONFIDENTIAL 22MODERN Final Review May 3rd, 2012
CONFIDENTIAL 23MODERN Final Review May 3rd, 2012