MODERATE RISK WASTE FACILITY DESIGN EVOLUTION AT KING COUNTY
James Neely NAHMMA 2012 Northwest Conference
Slide 2
PART ONE: PILOT HHW FACILITY MADE SEMI-PERMANENT
Slide 3
Factoria Transfer Station Pre-Development 2001
Slide 4
Pilot MRW Facility Opened Sept. 2002
Slide 5
Slide 6
Slide 7
Failure of Retractable Awning
Slide 8
Slide 9
2004: Pilot to Semi-Permanent Facility
Slide 10
INITIAL RESULTS
Slide 11
BE PREPARED FOR THE EXOTICS
Slide 12
CONSIDER OUTDOOR STORAGE NEEDS Type 4 Outdoor Explosives
Magazine for Marine Flares
Slide 13
PART TWO: FINALLY A REAL FACILITY
Slide 14
REBUILT FACTORIA TRANSFER STATION AND MODERATE RISK WASTE
FACILITY Opening Planned for 2015
Slide 15
DESIGN CONSIDERATIONS SUMMARY Size Ventilation and Fire Safety
Ergonomics/Self Service Opportunities To Bulk or Not to Bulk Green
Building Employee Comfort