26
This workshop was generously supported by the American people through the United States Department of Agriculture (USDA) Forest Service and the United States Agency for International Development (USAID), under the terms of the TransLinks Cooperative Agreement No.EPP-A-00-06-00014-00 to the Wildlife Conservation Society (WCS). TransLinks is a partnership of WCS, The Earth Institute, Enterprise Works/VITA, Forest Trends and the Land Tenure Center. The contents are the responsibility of the authors and do not necessarily reflect the views of USAID or the United States government. Presentation given the TransLinks workshop: Modeling and Managing Watersheds September 13-16, 2011 Kigali, Rwanda Umubano Hotel, Boulevard de l'umuganda This workshop was hosted by the Wildlife Conservation Society, the United States Forest Service (USFS) and the United States Agency for International Development (USAID)

Modeling and Managing Watersheds

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Modeling and Managing Watersheds

This workshop was generously supported by the American people through the United States Department of Agriculture (USDA) Forest Service and the United States Agency for International Development (USAID), under the terms of the TransLinks Cooperative Agreement No.EPP-A-00-06-00014-00 to the Wildlife Conservation Society (WCS). TransLinks is a partnership of WCS, The Earth Institute, Enterprise Works/VITA, Forest Trends and the Land Tenure Center. The contents are the responsibility of the authors and do not necessarily reflect the views of USAID or the United States government.

Presentation given the TransLinks workshop:

Modeling and Managing Watersheds

September 13-16, 2011

Kigali, Rwanda Umubano Hotel, Boulevard de l'umuganda This workshop was hosted by the Wildlife Conservation Society, the United States Forest Service (USFS) and the United States Agency for International Development (USAID)

Page 2: Modeling and Managing Watersheds

NILE BASIN INITIATIVE

Initiative du Bassin du Nil

Nile Equatorial Lakes

Subsidiary Action Program

Modeling and Managing watershed workshop

13-14 Sept 2011

Page 3: Modeling and Managing Watersheds

NILE BASIN INITIATIVE

Initiative du Bassin du Nil

Structure of Presentation

• Introduction to the NELSAP

• Characteristics of the NEL region

• NEL region major threats/cases of Mara, Kagera and SMM basins

• Transboundary Response to National Challenges (NELSAP Investment Projects including Water monitoring and DSS tool)

• Management tools (environmental and climate-adaptation guidelines)

• Key challenges

Page 4: Modeling and Managing Watersheds

NILE BASIN INITIATIVE

Initiative du Bassin du Nil

The Nile Basin and the NELSAP

Page 5: Modeling and Managing Watersheds

NILE BASIN INITIATIVE

Initiative du Bassin du Nil

The Nile Basin Initiative

NBI created by council of Ministers in charge of water in 1999, in Dar-es-Salaam.

Shared Vision Program (SVP)

Technical Assistance type projects to create an enabling environment for cooperative investments, build trust and action on the ground, within a basin-wide framework.

• Subsidiary Action Program (SAP)

– Investment projects planned at the lowest appropriate level - within the basin-wide framework

– Aimed at poverty reduction, economic development & reversal of environmental degradation

Shared Vision

Action on the ground

Shared Vision

Program

Subsidiary

Action Prog.

Page 6: Modeling and Managing Watersheds

NILE BASIN INITIATIVE

Initiative du Bassin du Nil

What is NELSAP

NELSAP’s role is to facilitate pre-investment planning (institutions and Projects) and resource mobilization. Future role of the currently expanded NELSAP is being explored through the IDS and other related studies that are ongoing (NELSAP Strategic Plan, Inter-country sub-basin agreements).

NELSAP‟s mission it to “…Contribute to the eradication of poverty, promote economic growth and Reverse environmental degradation in the NEL region.”

NELSAP addresses development issues in the NEL Region in two key areas (i) Natural Resources Management and Development (ii) Power Development and Trade

Page 7: Modeling and Managing Watersheds

NILE BASIN INITIATIVE

Initiative du Bassin du Nil

What are the key characteristics of NEL Region?

• A rich hydrology of lakes and tributaries that forms a transboundary system draining to the Lake Victoria and Albert nile and tributaries from South Sudan to form the White Nile.

• Major tributaries generated from rain mountain forests which are the last remaining in Africa = water towers (Mau escarpment, Virunga complex, Nyungwe/Kibira forest, Mont Elgon and Mont Ruhenzori…)

• Include several lakes and wetlands of global importance (lake Victoria, Sudd…)

• Several protected areas of international importance (Masai-Mara& Serengeti, Virunga complex,…)

Page 8: Modeling and Managing Watersheds

NILE BASIN INITIATIVE

Initiative du Bassin du Nil

What are the threats in the NEL region? Increasing Water Stress

0

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

1962 1969 1979 1989 1999 2006m

3 p

er

pers

on

Per capita Water availability

(LVNCA), Source CMS

Per Capity Annual Renewable Freshwater

Availability

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

1955 1990 2025

m3

Uganda

Tanzania

Kenya

Per Capita Annual Renewable

Freshwater Availability 1955-2025

Uganda, Kenya and Tanzania

Page 9: Modeling and Managing Watersheds

NILE BASIN INITIATIVE

Initiative du Bassin du Nil

Rainfall(mm/year)

2,500

2,000

1,500

1,000

500

0

ETo(mm/year)

3,0002,5002,0001,5001,000

500

What are the threats in the NEL region? Water Development, Hostage to Hydrology

Page 10: Modeling and Managing Watersheds

NILE BASIN INITIATIVE

Initiative du Bassin du Nil

What are the threats in the NEL region? Water Development, hostage to population Growth

• Growing population needs improved water resources management:– Safe water supply and sanitation, – Increasing food needs, Secure inputs for industrial processes– Use for hydropower and Maintenance of ecosystems

Projected population (million)

0

20

40

60

80

100

120

140

160

180

1990

1995

2000

2005

2010

2015

2020

2025

2030

2035

2040

2045

2050

Egypt

Ethiopia

Eritrea

Sudan

Uganda

Congo

Kenya

Tanzania

Burundi

Rwanda

Page 11: Modeling and Managing Watersheds

NILE BASIN INITIATIVE

Initiative du Bassin du Nil

18

4

85

21

12

6

55

38

29

20

4

11

4

58

1

90

0

43

0

2108

0

200

400

600

800

1,000

1,200

1,400

1,600

1,800

2,000C

am

ero

on

Nig

eri

a

Eth

iop

ia

Ke

nya

Ta

nza

nia

Ug

an

da

Bu

rkin

a F

aso

Gh

an

a

Se

ne

ga

l

Alg

eri

a

Eg

yp

t

Mo

rocco

Wo

rld

Ave

rag

e

Ele

c c

on

su

mp

tio

n (

kW

h/yr)

/C

ap

ita

500 kWh/capita/year minimum consumption for reasonable quality of life

Energy use per person in Africa

United States consumption – 12000kWh/capita/yr

What are the threats in the NEL region? Infrastructure gap: Access to electricity

Page 12: Modeling and Managing Watersheds

NILE BASIN INITIATIVE

Initiative du Bassin du Nil

What are the threats in the NEL region?

Destruction of environment: RBM Projects

Page 13: Modeling and Managing Watersheds

NILE BASIN INITIATIVE

Initiative du Bassin du Nil

Sio-Malaba-Malakisi river basin

Page 14: Modeling and Managing Watersheds

NILE BASIN INITIATIVE

Initiative du Bassin du Nil

Mara river basin

Over the last 15 years, the

400,000 ha Mau Forests Complex

has lost over 107,000 hectares

Page 15: Modeling and Managing Watersheds

NILE BASIN INITIATIVE

Initiative du Bassin du Nil

Kagera river basin

Page 16: Modeling and Managing Watersheds

NILE BASIN INITIATIVE

Initiative du Bassin du Nil

What is the Value added by the NELSAP?

• NELSAP broadens cooperation by:

– providing a vehicle for consensus, consultation, cooperation in Nile development projects

– strengthening economic growth and reduction of poverty by identifying and preparing investment projects for the development of shared water resources

– Facilitating multi country agreements for investment financing and for future management through the national agencies

– promoting „beyond the river‟ cooperation (ag. trade, Power trade)

– expanding existing regional frameworks

• Cooperation enhances regional integration through

– regional and sub regional cooperation programs on regional water infrastructure;

– trade and investment cooperation and integration;

– monetary and financial cooperation and integration; and

– Cooperation in regional public goods

Page 17: Modeling and Managing Watersheds

NILE BASIN INITIATIVE

Initiative du Bassin du Nil

NEL-COM

NEL-TAC

NILE-SEC/NELSAP-CU

Implementation of

Nile investment

projects at country

level

Coordination – consultation

Consensus

Track 3in-country

RPSC

(Multi-country Government

representation)For each project

Regional Project

Management Unit

(PMU)

For each project

Regional and/or

National Institutions

Public/private

Track 1 & 2 inter-country

Cooperative

NELSAP Projects

National

Institutions

Public/private

Government

Multi-sectoral

project

management

mechanisms

Consultative

Nile Projects

Cooperative

Nile Projects

RPSC

(Multi-country

Government

Representation)

Regional

PMU

Regional

and/or

National

Institutions

Public/private

How are Projects Prepared and Implemented?

Page 18: Modeling and Managing Watersheds

NILE BASIN INITIATIVE

Initiative du Bassin du Nil

NELSAP Track 1 Projects

Environment & Natural Resources Management & Development

• 3 River Basin Management Projects (Mara, Kagera, Sio-Malaba-Malakisi)sustainable framework for the joint management and development of the water resources

• Fisheries & Catchment Management Project for Lake Albert and Lake Edward

• Regional Agriculture project: Opportunities for cooperation in the Nile Basin through private investment, public-private partnerships and enhanced trade, in the field of high value crops and produce, and will identify steps to increase food security through increased investment, income generation and pro-poor growth.

Power Trade & Development

Power Master Plan of NEL countries through SSEA of Power Options completed in 2007

Rusumo Falls HEP & Multi-purpose Development project:,

Production of about 90 MW to be

shared between three countries and

develop related project area.

Four Transmission

interconnection projects: Ken-

Uga; DRC-Bur-Rwa; Bur-Rwa;

Uga-Rwa : Objective to strengthen

existing and new interconnections

between the NEL countries. Project

funded by 80% by AfDB 350 M USD

Page 19: Modeling and Managing Watersheds

NILE BASIN INITIATIVE

Initiative du Bassin du Nil

NEL-WRD Sub program, Tracks II and IIIScaling Up Projects Portfolio

Lake Victoria

Lake George

Lake Edward

Lake Albert

Lake Kyoga

Lake Victoria

Lake George

Lake Edward

Lake Albert

Lake Kyoga

DRC and Uganda: Lakes Edward, George, Semliki WRD Project

Sudan and Uganda: Aswa basin development project

Uganda: Lake Kyoga basin Flood management & Multipurpose WRD project

Kenya: Yala/Sio Flood Management and Multipurpose WRD Project

Kenya: Gucha-Migori –Kano Flood/drought Management and Multipurpose WRD Project

Rwanda/Burundi: Bugesera Transboundary Water Management Project Tanzania: Water

Resources and Irrigation Project

Page 20: Modeling and Managing Watersheds

NILE BASIN INITIATIVE

Initiative du Bassin du Nil

River Basin Projects

Objectives: establish a sustainable framework for the joint

management and development, prepare investment

plans based on the resources endowments in the basins

and strengthen national capacities for sustainable water

resources management.

1. Developing Transboundary Cooperative Framework

2. Investment Studies- 3 feasibility studies for integrated watershed management projects ongoing - Feasibility studies for 8 small dams for multipurpose use in the three basins have started. independent ESIA for the multipurpose small dams under procurement

Page 21: Modeling and Managing Watersheds

NILE BASIN INITIATIVE

Initiative du Bassin du Nil

River Basin Projects

3. Improvement in water resources information systems28 strategic hydrological stations under installation

Training program on water monitoring and management organized for countries.

The 3 RBM Projects with operational database connected to the Nile-DSS. All the data collected by projects have to follow the Mike Basin system.

4. Projects on natural resources management and conservation ( Mau Forest restoration, Sio-Siteko wetlands management)

5. Climate change adaptation: downscale model and develop guidelines for water infrastructure proofing

Immediate Requirement for Investment US$ 450million

Page 22: Modeling and Managing Watersheds

NILE BASIN INITIATIVE

Initiative du Bassin du Nil

NELSAP Project on Kagera river

• 3 major projects in the Kagera sub-basin:

– Rusumo Falls Hydropower Plant: Barrage on Kagera river and water reservoir of 97 M m3. 90 Mw to be shared within three countries. Multipurpose dimension to address the sub-catchment management issue. 450 M USD

– Kagera Tabu-Gakomere (Mwogo river) small multipurpose dam of 8.1 M m3: irrigation, water supply purpose.

– Bugesera IWRM (GIRET Project). Wetland conservation and fishery development.

Page 23: Modeling and Managing Watersheds

NILE BASIN INITIATIVE

Initiative du Bassin du Nil

Key Challenges

• Conflicts in the region affecting effective participation of countries and timely implementation of projects

• legal recognition: Need for the CFA to be signed• Broadening participation at the country level -

through projects and multiplier effect, and other activities including partnership for watershed management

• Increase country contribution and financial sustainability of the institution

• Linkages SAPs/other national and regional initiatives and programs.

• Sustained long term donor support

Page 24: Modeling and Managing Watersheds

NILE BASIN INITIATIVE

Initiative du Bassin du Nil

Key Challenges

• Resource mobilisation: several investments with feasibility studies under completion, need for investments at larger scale

• availability of reliable data insufficient => can not help governments in appropriate decision making

• Institutional arrangements at country level for improving data collection and management: government to invest in water and related resources monitoring and effectively share data.

• Insufficient data related to environmental and social in the DSS model

Page 25: Modeling and Managing Watersheds

NILE BASIN INITIATIVE

Initiative du Bassin du Nil

Financing and Sustainability Issues

• Pre-Investment Mobilised to date: US$ 70 million• Investment mobilised for implementation: US$ 512 million• Ratio of Pre-investment: investment to date is approx 1: 7

NEL Investment Perspective

-

500.0

1,000.0

1,500.0

2,000.0

2,500.0

3,000.0

3,500.0

4,000.0

2002

2004

2006

2008

2010

2012

2014

2016

2018

2020

2022

Years

Am

ou

nt

(millio

ns, U

S$)

Cumm Pre-investment (m, US$) Cumm. Investment (m,US$)

-

50.00

100.00

150.00

200.00

250.00

300.00

WB

NB

TF

WB

(ID

A)

GT

Z

Sw

eden

Norw

ay

AfD

B

KfW

JIC

A

Neth

erlands

Development Partners

Resource Mobilisation todate, Partner

Contribution (m, US$)

Pre-Investment Investment

Page 26: Modeling and Managing Watersheds

NILE BASIN INITIATIVE

Initiative du Bassin du Nil

Thank you for your attention