This workshop was generously supported by the American people through the United States Department of Agriculture (USDA) Forest Service and the United States Agency for International Development (USAID), under the terms of the TransLinks Cooperative Agreement No.EPP-A-00-06-00014-00 to the Wildlife Conservation Society (WCS). TransLinks is a partnership of WCS, The Earth Institute, Enterprise Works/VITA, Forest Trends and the Land Tenure Center. The contents are the responsibility of the authors and do not necessarily reflect the views of USAID or the United States government.
Presentation given the TransLinks workshop:
Modeling and Managing Watersheds
September 13-16, 2011
Kigali, Rwanda Umubano Hotel, Boulevard de l'umuganda This workshop was hosted by the Wildlife Conservation Society, the United States Forest Service (USFS) and the United States Agency for International Development (USAID)
NILE BASIN INITIATIVE
Initiative du Bassin du Nil
Nile Equatorial Lakes
Subsidiary Action Program
Modeling and Managing watershed workshop
13-14 Sept 2011
NILE BASIN INITIATIVE
Initiative du Bassin du Nil
Structure of Presentation
• Introduction to the NELSAP
• Characteristics of the NEL region
• NEL region major threats/cases of Mara, Kagera and SMM basins
• Transboundary Response to National Challenges (NELSAP Investment Projects including Water monitoring and DSS tool)
• Management tools (environmental and climate-adaptation guidelines)
• Key challenges
NILE BASIN INITIATIVE
Initiative du Bassin du Nil
The Nile Basin and the NELSAP
NILE BASIN INITIATIVE
Initiative du Bassin du Nil
The Nile Basin Initiative
NBI created by council of Ministers in charge of water in 1999, in Dar-es-Salaam.
Shared Vision Program (SVP)
Technical Assistance type projects to create an enabling environment for cooperative investments, build trust and action on the ground, within a basin-wide framework.
• Subsidiary Action Program (SAP)
– Investment projects planned at the lowest appropriate level - within the basin-wide framework
– Aimed at poverty reduction, economic development & reversal of environmental degradation
Shared Vision
Action on the ground
Shared Vision
Program
Subsidiary
Action Prog.
NILE BASIN INITIATIVE
Initiative du Bassin du Nil
What is NELSAP
NELSAP’s role is to facilitate pre-investment planning (institutions and Projects) and resource mobilization. Future role of the currently expanded NELSAP is being explored through the IDS and other related studies that are ongoing (NELSAP Strategic Plan, Inter-country sub-basin agreements).
NELSAP‟s mission it to “…Contribute to the eradication of poverty, promote economic growth and Reverse environmental degradation in the NEL region.”
NELSAP addresses development issues in the NEL Region in two key areas (i) Natural Resources Management and Development (ii) Power Development and Trade
NILE BASIN INITIATIVE
Initiative du Bassin du Nil
What are the key characteristics of NEL Region?
• A rich hydrology of lakes and tributaries that forms a transboundary system draining to the Lake Victoria and Albert nile and tributaries from South Sudan to form the White Nile.
• Major tributaries generated from rain mountain forests which are the last remaining in Africa = water towers (Mau escarpment, Virunga complex, Nyungwe/Kibira forest, Mont Elgon and Mont Ruhenzori…)
• Include several lakes and wetlands of global importance (lake Victoria, Sudd…)
• Several protected areas of international importance (Masai-Mara& Serengeti, Virunga complex,…)
NILE BASIN INITIATIVE
Initiative du Bassin du Nil
What are the threats in the NEL region? Increasing Water Stress
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
1962 1969 1979 1989 1999 2006m
3 p
er
pers
on
Per capita Water availability
(LVNCA), Source CMS
Per Capity Annual Renewable Freshwater
Availability
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
1955 1990 2025
m3
Uganda
Tanzania
Kenya
Per Capita Annual Renewable
Freshwater Availability 1955-2025
Uganda, Kenya and Tanzania
NILE BASIN INITIATIVE
Initiative du Bassin du Nil
Rainfall(mm/year)
2,500
2,000
1,500
1,000
500
0
ETo(mm/year)
3,0002,5002,0001,5001,000
500
What are the threats in the NEL region? Water Development, Hostage to Hydrology
NILE BASIN INITIATIVE
Initiative du Bassin du Nil
What are the threats in the NEL region? Water Development, hostage to population Growth
• Growing population needs improved water resources management:– Safe water supply and sanitation, – Increasing food needs, Secure inputs for industrial processes– Use for hydropower and Maintenance of ecosystems
Projected population (million)
0
20
40
60
80
100
120
140
160
180
1990
1995
2000
2005
2010
2015
2020
2025
2030
2035
2040
2045
2050
Egypt
Ethiopia
Eritrea
Sudan
Uganda
Congo
Kenya
Tanzania
Burundi
Rwanda
NILE BASIN INITIATIVE
Initiative du Bassin du Nil
18
4
85
21
12
6
55
38
29
20
4
11
4
58
1
90
0
43
0
2108
0
200
400
600
800
1,000
1,200
1,400
1,600
1,800
2,000C
am
ero
on
Nig
eri
a
Eth
iop
ia
Ke
nya
Ta
nza
nia
Ug
an
da
Bu
rkin
a F
aso
Gh
an
a
Se
ne
ga
l
Alg
eri
a
Eg
yp
t
Mo
rocco
Wo
rld
Ave
rag
e
Ele
c c
on
su
mp
tio
n (
kW
h/yr)
/C
ap
ita
500 kWh/capita/year minimum consumption for reasonable quality of life
Energy use per person in Africa
United States consumption – 12000kWh/capita/yr
What are the threats in the NEL region? Infrastructure gap: Access to electricity
NILE BASIN INITIATIVE
Initiative du Bassin du Nil
What are the threats in the NEL region?
Destruction of environment: RBM Projects
NILE BASIN INITIATIVE
Initiative du Bassin du Nil
Sio-Malaba-Malakisi river basin
NILE BASIN INITIATIVE
Initiative du Bassin du Nil
Mara river basin
Over the last 15 years, the
400,000 ha Mau Forests Complex
has lost over 107,000 hectares
NILE BASIN INITIATIVE
Initiative du Bassin du Nil
Kagera river basin
NILE BASIN INITIATIVE
Initiative du Bassin du Nil
What is the Value added by the NELSAP?
• NELSAP broadens cooperation by:
– providing a vehicle for consensus, consultation, cooperation in Nile development projects
– strengthening economic growth and reduction of poverty by identifying and preparing investment projects for the development of shared water resources
– Facilitating multi country agreements for investment financing and for future management through the national agencies
– promoting „beyond the river‟ cooperation (ag. trade, Power trade)
– expanding existing regional frameworks
• Cooperation enhances regional integration through
– regional and sub regional cooperation programs on regional water infrastructure;
– trade and investment cooperation and integration;
– monetary and financial cooperation and integration; and
– Cooperation in regional public goods
NILE BASIN INITIATIVE
Initiative du Bassin du Nil
NEL-COM
NEL-TAC
NILE-SEC/NELSAP-CU
Implementation of
Nile investment
projects at country
level
Coordination – consultation
Consensus
Track 3in-country
RPSC
(Multi-country Government
representation)For each project
Regional Project
Management Unit
(PMU)
For each project
Regional and/or
National Institutions
Public/private
Track 1 & 2 inter-country
Cooperative
NELSAP Projects
National
Institutions
Public/private
Government
Multi-sectoral
project
management
mechanisms
Consultative
Nile Projects
Cooperative
Nile Projects
RPSC
(Multi-country
Government
Representation)
Regional
PMU
Regional
and/or
National
Institutions
Public/private
How are Projects Prepared and Implemented?
NILE BASIN INITIATIVE
Initiative du Bassin du Nil
NELSAP Track 1 Projects
Environment & Natural Resources Management & Development
• 3 River Basin Management Projects (Mara, Kagera, Sio-Malaba-Malakisi)sustainable framework for the joint management and development of the water resources
• Fisheries & Catchment Management Project for Lake Albert and Lake Edward
• Regional Agriculture project: Opportunities for cooperation in the Nile Basin through private investment, public-private partnerships and enhanced trade, in the field of high value crops and produce, and will identify steps to increase food security through increased investment, income generation and pro-poor growth.
Power Trade & Development
Power Master Plan of NEL countries through SSEA of Power Options completed in 2007
Rusumo Falls HEP & Multi-purpose Development project:,
Production of about 90 MW to be
shared between three countries and
develop related project area.
Four Transmission
interconnection projects: Ken-
Uga; DRC-Bur-Rwa; Bur-Rwa;
Uga-Rwa : Objective to strengthen
existing and new interconnections
between the NEL countries. Project
funded by 80% by AfDB 350 M USD
NILE BASIN INITIATIVE
Initiative du Bassin du Nil
NEL-WRD Sub program, Tracks II and IIIScaling Up Projects Portfolio
Lake Victoria
Lake George
Lake Edward
Lake Albert
Lake Kyoga
Lake Victoria
Lake George
Lake Edward
Lake Albert
Lake Kyoga
DRC and Uganda: Lakes Edward, George, Semliki WRD Project
Sudan and Uganda: Aswa basin development project
Uganda: Lake Kyoga basin Flood management & Multipurpose WRD project
Kenya: Yala/Sio Flood Management and Multipurpose WRD Project
Kenya: Gucha-Migori –Kano Flood/drought Management and Multipurpose WRD Project
Rwanda/Burundi: Bugesera Transboundary Water Management Project Tanzania: Water
Resources and Irrigation Project
NILE BASIN INITIATIVE
Initiative du Bassin du Nil
River Basin Projects
Objectives: establish a sustainable framework for the joint
management and development, prepare investment
plans based on the resources endowments in the basins
and strengthen national capacities for sustainable water
resources management.
1. Developing Transboundary Cooperative Framework
2. Investment Studies- 3 feasibility studies for integrated watershed management projects ongoing - Feasibility studies for 8 small dams for multipurpose use in the three basins have started. independent ESIA for the multipurpose small dams under procurement
NILE BASIN INITIATIVE
Initiative du Bassin du Nil
River Basin Projects
3. Improvement in water resources information systems28 strategic hydrological stations under installation
Training program on water monitoring and management organized for countries.
The 3 RBM Projects with operational database connected to the Nile-DSS. All the data collected by projects have to follow the Mike Basin system.
4. Projects on natural resources management and conservation ( Mau Forest restoration, Sio-Siteko wetlands management)
5. Climate change adaptation: downscale model and develop guidelines for water infrastructure proofing
Immediate Requirement for Investment US$ 450million
NILE BASIN INITIATIVE
Initiative du Bassin du Nil
NELSAP Project on Kagera river
• 3 major projects in the Kagera sub-basin:
– Rusumo Falls Hydropower Plant: Barrage on Kagera river and water reservoir of 97 M m3. 90 Mw to be shared within three countries. Multipurpose dimension to address the sub-catchment management issue. 450 M USD
– Kagera Tabu-Gakomere (Mwogo river) small multipurpose dam of 8.1 M m3: irrigation, water supply purpose.
– Bugesera IWRM (GIRET Project). Wetland conservation and fishery development.
NILE BASIN INITIATIVE
Initiative du Bassin du Nil
Key Challenges
• Conflicts in the region affecting effective participation of countries and timely implementation of projects
• legal recognition: Need for the CFA to be signed• Broadening participation at the country level -
through projects and multiplier effect, and other activities including partnership for watershed management
• Increase country contribution and financial sustainability of the institution
• Linkages SAPs/other national and regional initiatives and programs.
• Sustained long term donor support
NILE BASIN INITIATIVE
Initiative du Bassin du Nil
Key Challenges
• Resource mobilisation: several investments with feasibility studies under completion, need for investments at larger scale
• availability of reliable data insufficient => can not help governments in appropriate decision making
• Institutional arrangements at country level for improving data collection and management: government to invest in water and related resources monitoring and effectively share data.
• Insufficient data related to environmental and social in the DSS model
NILE BASIN INITIATIVE
Initiative du Bassin du Nil
Financing and Sustainability Issues
• Pre-Investment Mobilised to date: US$ 70 million• Investment mobilised for implementation: US$ 512 million• Ratio of Pre-investment: investment to date is approx 1: 7
NEL Investment Perspective
-
500.0
1,000.0
1,500.0
2,000.0
2,500.0
3,000.0
3,500.0
4,000.0
2002
2004
2006
2008
2010
2012
2014
2016
2018
2020
2022
Years
Am
ou
nt
(millio
ns, U
S$)
Cumm Pre-investment (m, US$) Cumm. Investment (m,US$)
-
50.00
100.00
150.00
200.00
250.00
300.00
WB
NB
TF
WB
(ID
A)
GT
Z
Sw
eden
Norw
ay
AfD
B
KfW
JIC
A
Neth
erlands
Development Partners
Resource Mobilisation todate, Partner
Contribution (m, US$)
Pre-Investment Investment
NILE BASIN INITIATIVE
Initiative du Bassin du Nil
Thank you for your attention