Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
MODEL:GM37305PRODUCT SIZE(LxWxH):242x392x237cmPLEASE READ CAREFULLY BEFORE ASSEMBLY
Assembly InstructionsMODEL: Veranda vegg
CONTENTS
1. Assembly Advice ................................................................Page 12. Product Features ................................................................Page 2 - 33. Part Lists .............................................................................Page 4 - 74. Roof Vents Assembly ..........................................................Page 8 - 126. Doors Assembly ..................................................................Page 13 - 197. Base Assembly ....................................................................Page 20 - 218. Framework Assembly ..........................................................Page 22 - 439. Panels Assembly .................................................................Page 44 - 52
11
Free ToolFree ToolFree ToolFree Tool
Assembly and Maintenance Advice1. For safety purposes, we strongly recommend that this product is assembled by at least two people.2. Some components have sharp metal edges. Please be careful when handling metal components. Please wear gloves, shoes and safety goggles during assembly.3. Lay all of the components on a soft carpet or blanket to avoid any scratches or damages.4. DO NOT climb or stand on the roof. Heavy articles should not be leaned against the greenhouse.5. Keep the roof and gutter clear of snow, dirt & leaves. Allowing snow to build up on the roof may damage the product.6. Unlike steel, if the paint finish is scratched this will not harm the aluminium underneath.7. When your product needs cleaning, use a mild detergent solution and rinse with cold clean water. Do not use acetone, abrasive cleaners or strong detergents to clean the panels.
Tools Provided:
Component required but not provided:
Neutral Silicone Sealant
Tools Required when Assembly (Not Provided)
Assembly at least by two Persons
2
30mm120mm 71mm
72mm83mm
8&10mm 8&10mm8&10mm
(8/10mm)PC Panel
4&6mm 4&6mm4&6mm
(4/6mm)Glass Panel
* If you are glazing this greenhouse with glass you will need to slide the rubber gaskets (provided) into the bar capping.
Functions and Features:1. Compared with traditional greenhouses, this exciting new product features many significant improvements. The hollow box profile aluminium framing is much stronger than other greenhouses and it can withstand much greater pressure. Wind resistance up to 12th typhoon (40M/S or 120KM/H). Weight Support 80KGS/M2,
Snow load capability over 40CM.
Gutter Profile Post
Traditional Greenhouse New Large Lean to Greenhouse
2. A great improvement for this new greenhouse is bigger bar capping and thicker connectors, which are much neater and stronger. Another benefit is that these greenhouses can be glazed with glass or polycarbonate of varying thicknesses.
Expansionscrew/Concreteground
3
3. Base anchor brackets are included as standard with expanding bolts to ensure a secure fixing into concrete or paving. Alternatively, you can use the brackets to fix into a timber base with wood screws.
5. The strong two part eaves beam includes an integral gutter. Downpipes are also included as standard so you can collect rainwater.
7. Remove approximately 2 inches of film from all sheet edges before installing and remove all film immediately after the construction is completed. Please ensure that the side with the white film faces outwards.
4. Our unique frame connectors (2.5mm thick) make much stronger joints than conventional greenhouses.
Steel bar/Lawn land
Manual opener Automatic opener
GM80001
6. Manual window handles are included as standard with the roof vents. If required, automatic roof vent openers are available as an inexpensive optional extra.
4
L26A 2
L26B
L26C
2
4
L01B 2
L06 1
L07 1
D 1
E 1
F 1
G 1
L08A 2
L08B
L10
A
B
J01
1
1
2
2
4
PART NO QTY
L01A 2
L01C 2
L09 1
L14 1
GM37305(ALU. Box No.1)
ALU. Box No. 1
5
GM37305
ALU. Box No. 2
(ALU. Box No.2)
L23B 4
L02B 4
L23C 22
L23D 12
L23A 5
L02A 3
L23N 2
L02K 12
L24A 12
L25A 2
L25B 2
L25C 2
L25D 2
L25E 2
L25F 2
L24D 1
L24E
L24F
L24G
1
1
1
L24B
L24C
2
4
PART NO QTY
L02D 1
K 42
M 4
L02E
L02F
L02G
1
1
1
L23E 10
L23F 6
6
ALU.BoxNo.3
GM37305(ALU.BoxNo.3)
L23C 14
1L12D
1L12F
L11A 4
L11D 7
14L12K
1L12E
1L12G
L11C 2
3L12A
L11E 2
L11B 4
4L12B
PART NO QTY
L02K 2
PART NO QTY
W10 2
GM80001 2
8Ø4X10Z03
Automatic Openers (Optional)
K 4
W08 2
10Ø4X14DZ02
S01M6X12 9
Z 4
M03M6 9
W03 2
J02R/L 1/1
J03R/L 1/1
J06 2
J07 2
J08 2
2Ø4X14Z01
J05 2
W06 2
Windowx2pcs
PART NO QTY
L13 1
L16A 8
L17 2
L18A 2
L16B 8
L18B 1
L18C 1
L18D 4
PART NO QTY
8
8Ø4X40Z04
D 4S02 4M8X30M02M8 4
L11H 8
L11J 8
J
DoorPART NO QTY
PART NO QTY
S03 12M8X60
W05 12
Base
PART NO QTY
L19A 4
L19B 2
L20 2
L11F 4
L11G 4
W06 2
J 8
4Z03
Ø4X10
Y10 2
L15A 2
4Ø4X14DZ02
W12 2
W13 2
M01M6 3
GM37305
PC/Glass
7
PART NO QTY
Y1 1
Y2 6
Y3 1
Y4 1
Y7 5
Y6 6
Y5 1
Y4
Y2
Y8
Y2
Y13
Y2
Y4
Y2
Y8
Y2
Y13
Y2
Y6 Y6
Y6 Y6
Y6 Y6
Y11 Y11
Y11 Y11
Y7 Y9
Y7 Y9
Y7 Y9
Y7
Y7 Y10
Y10
Y8 1
Y9 3
Y10 2
Y11 4
Y13 1
(PC/GLASS. Box)
PART NO QTY
L19A 4
L19B 2
L20 2
L11F 4
L11G 4
W06 2
J 8
8
L20
L19B
L19A
L19A
B
B
B
BY10
L11FL11F
L11G
L11GW06
4Z03
Ø4X10
Y10 2
L15A 2
4Ø4X14DZ02
L15A
Roof Vents Assembly 2PCS
9
L20
L19B
L19A
L19A
J
J
J
J
1
1
2
2
L20J
L19AJ
L19A
L19B
1
2
Push down the button on connector J before inserting it into the end of the frame profile.
After connector J has been fitted, use the hole in the profile to tighten the connector in place.
10
L11G
L11G
L11FL11F
Y10
Y10First the glazing panel Y10 should be loosely retained by the bar capping profiles L11F and L11G. Next tap the bar capping gently into position with a rubber mallet.
11
Z03Z03
W06
Y10
Y10
Fix the W06 vent handles using Z03 screws.
12
Y10
L15A
Z02
1
2
Z02
L15A2 1 2
Fill the gap with silicone sealant on 4 sides to avoid any leaking.
PART NO QTY
L13 1
L16A 8
L17 2
L18A 2
L16B 8
L18B 1
L18C 1
L18D 4
PART NO QTY
8
PART NO QTY
Y11 4
8Ø4X40Z04
D 4S02 4M8X30M02M8 4
13
L11H 8
L11J 8
J
Door Assembly
14
L18D
L16A
L16A
L16A
L16A
L17
L16B
L16B
L18D
J
JJ
J
L18A
L18B
Left Door
S02x2pcs
L18D
L16A&B
L18A&B&D
L17
L16A
L16A
1
1
1
1
22
1
2 Z04
L18A/L18B
L16B
L17
L16A
L16A
then assemble the door frames using connector J, as shown in the sketches below.
Put L16A into L17 and L18D and put L16B into L18A and L18B,
Push down the button on connector J before inserting it into the end of the frame profile.
Tighten L17 throughL18A/L18B with Z04.
After connector J has been fitted, use the hole in the profile to tighten the connector in place.
15
Y11
Y11
L11H
L11H
L11H
L11H
L11J
L11J
Y11 Y11
First the glazing panels should be loosely retained by the bar capping profiles L11H and L11J. Next tap the bar capping gently into position with a rubber mallet,
16
M2
H100mm 100mm
29mm 29mm
L13
1 1 2
3
11
2
3
After Assembly
Slide 2xS02 into L18D, positioned 100mm away from each edge. Secure S02 using M02 bolts, then rotate the wheels to ensure free movement.
14.4mm
L13
L13
14.4mm
Attention: make sure you leave 14.4mm space on both ends when you install L13
17
L18D
L16A
L16A
L16A
L16A
L17
L16B
L16B
L18D
J
JJ
J
L18C
L18A
S02x2pcs
L18D
L16A&B
L18A&B&D
L17
L16A
L16A
1
1
1
1
22
1
2 Z04
L18A/L18C
L16B
L17
L16A
L16A
Right Door then assemble the door frames using connector J, as shown in the sketches below.
Put L16A into L17 and L18D and put L16B into L18A and L18C,
Push down the button on connector J before inserting it into the end of the frame profile.
Tighten L17 throughL18A/L18C with Z04.
After connector J has been fitted, use the hole in the profile to tighten the connector in place.
18
Y11 Y11
Y11
Y11
L11H
L11H
L11H
L11H
L11J
L11J
First the glazing panels should be loosely retained by the bar capping profiles L11H and L11J. Next tap the bar capping gently into position with a rubber mallet,
19
M2
H100mm 100mm
29mm 29mm
1 1
11
After Assembly
* This is the method ofadjusting the door height.
Slide 2xS02 into L18D, positioned 100mm away from each edge. Secure S02 using M02 bolts, then rotate the wheels to ensure free movement.
ab
a b=
ab
a b=
20
It is essential the dimensions a = b are the same to ensure the base is square.Expansion bolt in concrete
Steel pegs in soil or wood
Support at the corners only is inadequate.
21
106.3
PART NO QTY
S03 12M8X60
W05 12
2254mm
3790
mm
4409
.6m
m
4409.6mm
325 768 768 325
325
1536
1536
325
325 768 768 325
325
768
325
This size is the inner specification of the product,
Expansion bolts assembly
22
12
4
3
L08B
L08A
L08A
L10
1 2
43
L08B
L08A
A
J01
A
L08B
L08A
J01
J01 J01L10L10
L08AL08A
L08A
PART NO QTY
L08A 2
L08B
L10
A
B
J01
1
1
2
2
4
First lay out the aluminium profiles, connectors and anchor brackets approximately in place.
Make sureyou payclose attentionto the directionof the pins
Assemly L08A, L08B and L10 with connecter A and B. Insert connector A/B into L08A/L08B and L10, tight the bolts with the special spanner (provided) when the connector A/B is in the right position.Anchor bracket J01 must be assembled at the same time.
23
L01C
L01C
L01A
L01A
1
2
2
1
L01C
A
J01
L01CB
J01
L01A
B
J01
L10
L01A
A
J01
1 2
3 4
PART NO QTY
L01A 2
L01C 2
Make sureyou payclose attentionto the directionof the pins
Assembly L01A/L01C with connector A/B,insert connector A/B into L01A/L01C, tight the bolts with the special spanner when they are in the right positions.
24
1 2
43
L06G
L01B
L01C
L06F
L01B
L01C
L01B
E
L01A
L07
L01B
D
L01A
L07
PART NO QTY
L01B 2
L06 1
L07 1
D 1
E 1
F 1
G 1
L061
2
L01B
L01B
L07
3
4
Make sureyou payclose attentionto the directionof the pins
Install L01B and L06 using connector G/F, insert connector G/F into L01B and L06, tight the bolts with the special spanner when they are in right positions. Then connect them to L01C, using the other end of connector G/F, tight the bolts when they are in right positions.
Install L01B and L07 using connector D/E, insert connector D/E into L01B and L07, tight the bolts with the special spanner when they are in right positions. Then connect them to L01A, using the other end of connector D/E, tight the bolts when they are in right positions.
25
L26A
L26A
L26B
L26B
L26C
L26C
L26CL26C
L08B
L06
L08A
L08A
L06
L01C L01C
L01C
L01C
L08A L08B L10
PART NO QTY
L26A 2
L26B
L26C
2
4
L26C
L26A
L26A
L26C
L26C L26BL26B L26C
Please pay attention to the direction
Tap the bar capping L26A into L01C, L26B into L08A, and L26C into L06, L10 and L08B gently with
a rubber mallet as shown above.
L10
26
L24B
L24C
L24C
L24B
L24C
L24C
L23CL23C
L23CL23C
L23CL23C
51mm51mm
51mm51mm
50mm 50mm50mm 50mm
L08A
L01B
L08A
L01B
PART NO QTY
L23C 6
L24B
L24C
2
4
L01BL01B
L08AL08A
L23C
L23C
L24B
L24CL24B
L24C
Tap the bar capping L24C/L24B into L01B gently with a rubber mallet. Make sure you leave 51mm between each two L24C or L24C and L24B in the middle for later assembly.
L01B
Tap the bar capping L23C into L08A gently with a rubber mallet. Make sure you leave 50mm between each two L23C in the middle for later assembly.
L08A
27
M
L02D&E&F&G*L01B
M
1
L01B
K
L02D&E&F&G*
KL23C
L23C
L08A
2
PART NO QTY
L02D 1
K 4
M 4
L02E
L02F
L02G
1
1
11
1
11
22
22
L02E
L02G
L02DL02F
Put connector K into the slot of L08A and M into the slot of L01B, turn their direction until they go into the holes on L02D/L02E/L02F/L02G. Tight the bolts in the connector K and M with the spanner. Pay attention to the direction on the spanner.
L08A
L01B
Slide in Tight it up
Slide in Tight it up
28
L02GL02E
L02D
L02F
L24E
L24G
L24DL24F
L24D&E&F&G
PART NO QTY
L24D 1
L24E
L24F
L24G
1
1
1
L24DL24F
L24E
L24G
Tap the bar capping L24D into L02D,L24E into L02E, L24F into L02F, L24G into L02G, gently with a rubber mallet.
29
50mm50mm
L25A&B&C&D&E&F
L24AL02D&E&F&GL01C L01A
PART NO QTY
L24A 12
L25A 2
L25B 2
L25C 2
L25D 2
L25E 2
L25F 2
L24AL24A
L25F
L25D L25B
L25F
L25D L25BL25E
L25CL25A
L25E
L25C L25A
L02GL02E
L01A
L01C
L02FL02D
L01A
L01C
L24A
L25AL25B
L25CL25D
L25EL25F
L24A
L25AL25B
L25CL25D
L25EL25F
Tap the bar capping L24A,L25A,L25B,L25C,L25D,L25E and L25F,into the corresponding aluminium profiles gently with a rubber mallet as above shown. Make sure you leave 50mm between the L24A and L25A/L25B/L25C/L25D/L25E/L25F/in the middle,for later assembly of L02K. Do the same on the other sides.
30
PART NO QTY
L02K 6
K 12
L02K
L24A
L25A&B&C&D&E&F
K
K
L02KL02K
L02KL02K
Put connector K into the slot of L01A,L01C,L02D,L02E,L02F,and L02G, turn their direction until they go into the holes on L02K. Tight the bolts in the connector K with the spanner.
Slide in Tight it up
31
50mm50mm 50mm
50mm50mm
50mm
L23C
L23C
L23N
L07
L10
L07
L10
PART NO QTY
L23C 6
L23N 2
L23C
L23N
L23N
L23C
Tap the bar capping L23C and L23N into L10 and L07 gently with a rubber mallet. Make sure you leave 50mm between the two L23C or between L23C and L23N in the middle,for later assembly of L02A.
L10
L07
32
L02A
KL23E&N
L23N&E
L10
1 2L07
L02A
K
PART NO QTY
L02A 3
K 6
L02AL02A
L02A
11 1
22 2
Install L02A (3PCS). Put connector K into the slot of L07 and L10, turn its direction until it goes into the hole on L02A. Tight the bolt in the connector K with the spanner.
Slide in Tight it up
33
L23AL23A
L23A
L23A
L02A
PART NO QTY
L23A 3
Tap the bar capping L23A into L02A gently with a rubber mallet.
34
L23D
L23DL23D
L23AL02AL02A
L02A L01A
L02A
50mm50mm
L23D
L23D
L02BL01B L01B
50m
m
50m
m
50m
m
50m
m
50m
m
50m
m
PART NO QTY
L23A 2
L23D 12
L23D
L23D
L23DL23D
L23DL23D
L23A
Tap the bar capping L23A and L23D into L01A and L02A gently with a rubber mallet. Make sure you leave 50mm between the two L23D in the middle,for later assembly of L02K.
35
L02K
L23D
L23D
K
K
PART NO QTY
L02K 3
K 6
L02K
L02KL02K
Put connector K into the slot of L01A and L02A, turn its direction until it goes into the hole on L02K. Then, tight the bolt in the connector K with the spanner.
Slide in Tight it up
36
50mm 50mm
50mm 50mm
50mm
50mm 50mm
50mm
L23CX10pcs
L06
L07
L07L06
PART NO QTY
L23C 10
L23C
Tap the bar capping L23C(10PCS) into L06 and L07 gently with a rubber mallet. Make sure you leave 50mm between the two L23C in the middle,for later assembly of L02B.
37
KL02B
L23CL23C
L07
K
L06
L02BKL23C
1 2
PART NO QTY
L02B 4
K 8
2
L02B
1
L02BL02B
L02B
Install L02B (4PCS). Put connector K into the slot of L06 and L07, turn its direction until it goes into the hole on L02B. Then tight the bolt in the connector K with the spanner.
Slide in Tight it up
38
L02B
L23B
PART NO QTY
L23B 4
L23BL23B
L23BL23B
Tap the bar capping L23B into L02B gently with a rubber mallet.
39
L23E
L23F
L23EL23E
L23F
L23EL23E
L23F
50mm
50mm
50mm50mm
50mm50mm
L01B
L01BL02B
50mm50mm
L23F
L23E
L02A
L02BL01B L01B
PART NO QTY
L23E 10
L23F 6
L23EL23E
L23EL23E
L23EL23F
L23FL23F
Tap the bar capping L23E and L23F into L01B and L02B gently with a rubber mallet. Make sure you leave 50mm between the two L23E or L23E and L23F in the middle as shown above,for later assembly of L02K.
40
K
L02K
L23E L23FK
PART NO QTY
L02K 3
K 6
L02KL02K
L02K
Assembly L02K. Put connector K into the slot of L01B and L02B, turn its direction until it goes into the hole on L02K. Then tight the bolt in the connector K with the spanner.
Slide in Tight it up
41
PART NO QTY
L23C 12
L23C
L02K
L23CL23C
L23C
L23CL23C
L23C
L23C
L23CL23CL23C
Tap the bar capping L23C into the corresponding aluminium profiles gently with a rubber mallet as shown above.
42
PART NO QTY
L02K 2
K 4
L02K
L23E L02BK
K
W10
L02K
PART NO QTY
W10 2
L02KL02K1 1 1 1
Assembly L02K. Put connector K into the slot of L02B, turn its direction until it goes into the hole on L02K. Then tight the bolt in the connector K with the spanner.Make sure L02K must connect to L23F closely.
Attention: If you install automatic openers, make sure you slide W10 into L02K before you install L02K.
43
PART NO QTY
L23C 2
L23C
L02K
L23CL02K
cut 42mm
338mm
338mm
W10
L23CL23C
Tap the bar capping L23C into L02K gently with a rubber mallet.
Attention: If you install automatic openers, please cut L23C into 2pcs (Length: 338MM/PC)Tap them into L02K gently with the a rubber mallet, and leave 42mm space for W10.
44
Y1 Y3
Y2 Y2 Y2
1
1
5
5
9
9
PART NO QTY
L11B 1
1L12D
1L12F
Y2 4
L11A 1
L11C 1
L11D 3
3L12K
Y1 1
Y3 1
Y5 1
Y5
L11B
L11AL12D
L12F
L12KL12K
L12K
L11DL11D
L11D
L11C
2
3
4
6
7
8
10
11
12 13
14
Install the panels and aluminum bar capping in order as shown above, tap these bar cappinginto the channels of each position properly with a rubber hammer.
45
PART NO QTY
L11B 1
1L12E
1L12G
Y2 4
L11A 1
L11C 1
Y4Y8Y13
Y2Y2Y2
1
1
2
3
45
5
9
9
6
7
8
10
11
1213
14
L11D 3
3L12K
Y4 1
Y8 1
Y13 1
L11B
L11AL12E
L12G
L12KL12K
L12K
L11DL11D
L11D
L11C
Install the panels and aluminum bar capping in order as shown above, tap these bar cappinginto the channels of each position properly with a rubber hammer.
46
PART NO QTY
L11D 1
3L12A
3L12K
Y6 6
Y6
Y6
Y6
Y6
Y6
Y6L11A
L11A
L12A
L12A
L12K
L12KL12K
L11E
L11EL11D
Y7
Y7
L11A 2
L11E 2
Y6
Y6
Y6Y6
Y6Y6L11A
L11A
L12AL12A
L12K
L12KL12K
L11E
L11EL11D
Install the panels and aluminum bar capping in order as shown above, tap these bar cappinginto the channels of each position properly with a rubber hammer.
47
PART NO QTY
L11B 2
4L12B
5L12K
Y7 5
L09 1
Y9 3
Y7Y7
Y7Y7
Y7Y9Y9
Y9
L12K
L12KL12K
L12KL12K
L09
L11B
L11B
L12BL12B
L12BL12B
Install the roof panels and aluminum bar capping in order as shown above, tap these bar cappinginto the channels of each position properly with a rubber hammer.
48
Fill the silicone sealant on the places shown above to avoid any water leaking.
49
W06W08 M03
L07L07
Z
W08
M03
S01
2
L15A
L06
1
L15A
Z02x2
PART NO QTY
W08 2
4Ø4X14DZ02
S01M6X12
M03M6
4
4
Z 4
Z03
GM80001
L02K
L19B
W10
L02K
Z03GM80001
2PART NO QTY
GM80001 2
8Ø4X10Z03
1 1
2
Windowx2pcs
S01
Z
*Ensure the manual vent is closed as shown.
Slide the window vent along the groove in the L06 and fix it in the correct position using Z02 screws.
Use a screw S01 to pass over Part Z,and then put part Z (2pcs) into the slot of L07, turn its direction until it can fix W08. Adjust the position of W08 until the manual vent can be closed as shown, then lock the S01 tight.
Way to assembly automatic openers
Left Door
Right Door
1L14
50
DM03
1
L14
L09
L18D
PART NO QTY
L14 1
M03M6 5
S01M6X12 5
S02X3pcs
HL14
L14
W12 2
W13 2W12
W13
S01
M03
W12
M01M6 3
L14
Door
M03M01
Use a bolt S01 to pass over W12, and then slide W12 (2pcs) into the channel of L14, fix them using W13 and M03 loosely.
Rotate D, the roller wheels, to adjust the height of the door so it does not bind or rub on the bottom track.
Adjust the positions of the two W12 until the doors are closed properly as shown, then lock the S01 tight.
51
PART NO QTY
W03 2
6Ø4X14DZ02
J03R/L J02R/L
W03Z02
1 2
J02R/L 1/1
J03R/L 1/1
22
11
Install the anchor brackets J03R/L and J02R/L using screw Z02.
11
J06
J06
J07
J08
Z01
52
2
PART NO QTY
J06 2
J07 2
J08 2
2Ø4X14Z01
J06
J05
L07L01B
J02R/L
J05 2
1
3
2
1
3
2
Drill a hole in L01A and L01B, approximately 3.2mm diameter and 700mm up from the bottom. Fix the J08 downpipe bracket with Z01 screws and then clip the J06 downpipe into the J08 bracket.
Fill some silicone sealantaround J02, J07 and J06 to avoid water leaking.
Fill some silicone sealantaround the downpipe bends to avoid water leaking.