MODEL RETAIL CONTRACT PROJECT: FRAMEWORK ISSUES. Tony Baldwin 27 August 2003. Role of Retail Contract in Wider Economic Context. ECONOMIC OBJECTIVES FOR INDUSTRY. Strong downward pressure on costs Strong downward pressure on prices to reflect costs Strong pressures to innovate. - PowerPoint PPT Presentation

Citation preview

Page 1: MODEL RETAIL CONTRACT PROJECT: FRAMEWORK ISSUES

1

MODEL RETAIL CONTRACT PROJECT:

FRAMEWORK ISSUES

Tony Baldwin

27 August 2003

Page 2: MODEL RETAIL CONTRACT PROJECT: FRAMEWORK ISSUES

2

Role of Retail Contract in Wider Economic Context

Page 3: MODEL RETAIL CONTRACT PROJECT: FRAMEWORK ISSUES

3

ECONOMIC OBJECTIVES FOR INDUSTRY

• Strong downward pressure on costs

• Strong downward pressure on prices to reflect costs

• Strong pressures to innovate

Page 4: MODEL RETAIL CONTRACT PROJECT: FRAMEWORK ISSUES

4

Real Electricity Prices for Consumers1990 - 2002

800

900

1000

1100

1200

1300

1400D

ec-

90

Dec-

91

Dec-

92

Dec-

93

Dec-

94

Dec-

95

Dec-

96

Dec-

97

Dec-

98

Dec-

99

Dec-

00

Dec-

01

Dec-

02

Ind

ex o

f P

rices

Farm Electricity Prices

Household Electricity Prices

Commercial Electricity Prices

Retail Reforms Announced

Wholesale Market Introduced

Page 5: MODEL RETAIL CONTRACT PROJECT: FRAMEWORK ISSUES

5

Domestic Electricity Costs

Page 6: MODEL RETAIL CONTRACT PROJECT: FRAMEWORK ISSUES

6

4.32

1.79

4.9

3.1 Retail

Lines

Trans

Gen

Costs for Consumers’ Electricity

Monopoly

Potentially Competitive

Potentially Competitive22%

35%

13%

30%

Page 7: MODEL RETAIL CONTRACT PROJECT: FRAMEWORK ISSUES

7

4.32

1.79

4.9

3.1 Retail

Lines

Trans

Gen

Page 8: MODEL RETAIL CONTRACT PROJECT: FRAMEWORK ISSUES

8

KEY MECHANISMS

Effective retail competition

If not, then regulation

Page 9: MODEL RETAIL CONTRACT PROJECT: FRAMEWORK ISSUES

9

EFFECTIVE RETAIL COMPETITION

Two key components –

• Real threat of customer switching

• Real threat of new retail entry

Page 10: MODEL RETAIL CONTRACT PROJECT: FRAMEWORK ISSUES

10

NEW RETAIL ENTRY

• Neutral access to lines

• Ability to hedge nodal pricing differentials

• Access to competitive wholesale supply contracts

• Certainty of regulatory environment

• Demand from customers for competitive retail services (particularly risk management on price and reliability)

In place:

Yes

No

No

No

Limited

Some key conditions -

Page 11: MODEL RETAIL CONTRACT PROJECT: FRAMEWORK ISSUES

11

CONSUMERS SWITCHING

• Retailer alternatives

• Easy consumer data transfer between retailers

• No inefficient restraints on consumer terminating contract

• Clear and timely information disclosure by retailer to consumer (particularly on prices)

• Active performance comparisons by independent agents

• Demand from customers for competitive retail services (particularly risk management on price and reliability)

Some

?

?

Yes?

Some

Limited

In place:Some key conditions -

Page 12: MODEL RETAIL CONTRACT PROJECT: FRAMEWORK ISSUES

12

OTHER RELEVANT FACTORS

• Culture of ‘consumer sovereignty’ is still relatively new and weak among retailers

• Consumers’ relatively weak contractual bargining

position (with occasional media exceptions), due to fragmentation, poor information and lack of expertise

• Inelasticity of consumer demand – gives rise to fears of exploitation

Page 13: MODEL RETAIL CONTRACT PROJECT: FRAMEWORK ISSUES

13

OTHER RELEVANT FACTORS

• Low awareness among consumers of supply and pricing risks

• Strong assumption by consumers of public provision and therefore government management of risks

• Weak retail competition – due to lack of transmission hedging + portfolio balancing by ‘gen-tailers’ = de facto regional monopolies

• Poor prospects of future retail competition – causes wider than issues relating to retail contract

Page 14: MODEL RETAIL CONTRACT PROJECT: FRAMEWORK ISSUES

14

VALUE OF MODEL RETAIL CONTRACT

However, a good retail contract could:

• Reduce some of the barriers to effective retail competition (promoting the economic efficiency objective)

• Create stronger incentives for costs and risks to be managed within the contract in an economically efficient manner (even in a framework of weak competition) (promoting the economic efficiency objective)

• Counter-balance concerns relating to consumers' weak bargining position (promoting the fairness objective)

Page 15: MODEL RETAIL CONTRACT PROJECT: FRAMEWORK ISSUES

15

MRCPT AND ECC CODE PROCESSES

Page 16: MODEL RETAIL CONTRACT PROJECT: FRAMEWORK ISSUES

16

HISTORY

• June 2000: Caygill Review notes problems in retailers’ consumer services (particularly on billing). Concerned about lack of confidence in credibility of competition as as an effective discipline on retailers

• August 2001: ECC scheme established

• February 2002: GPS calls for:

– an industry code of practice with standards for contracts, particularly on billing, disconnection and metering (paras 7, 29 + 30, GPS) (ECC responsible)

– a model domestic consumer contract covering charging, billing, dispute resolution, outage protection and retailer insolvency (para 30, GPS) (MGB responsible)

Page 17: MODEL RETAIL CONTRACT PROJECT: FRAMEWORK ISSUES

17

HISTORY

• October 2002: Minister suggests ECC and MGB develop a joint working plan for model contract and code review processes

• October 2002: ECC starts code review process, governed by ECC constitution

• Nov 02 – Feb 03: Independent review of code

• April 03: ECC decides on proposed code changes

Page 18: MODEL RETAIL CONTRACT PROJECT: FRAMEWORK ISSUES

18

HISTORY

• May – Aug 03: ECC consults with members + consumer groups

• July 03: MGB establishes MRCPT. No joint action plan with ECC

Page 19: MODEL RETAIL CONTRACT PROJECT: FRAMEWORK ISSUES

19

NEXT STEPS

• Possibly Sept 03: ECC to recommend changes to Board of Council

• Within 2 weeks: Board required to establish Scheme of Amendment Committee (SAC). Appointments: 6 by Board + 6 Consumers Institute. SAC can only vote yes or no. Can’t amend changes. Vote reported to Board.

• Within 40 days: Council members vote – only yes or no. Can’t amend changes. Revised Code not likely to take effect before November 03.

• Aug 04: ECC constitution requires whole scheme to be reviewed

Page 20: MODEL RETAIL CONTRACT PROJECT: FRAMEWORK ISSUES

20

NATURE OF CODE• Largely a set of disclosure obligations. Only about 10 of 54 clauses

set substantive minimum operating standards eg:

– 7.1: 30 days notice of changes to contracts– 8.3: Quality of service to meet ‘good industry standards’ –

to be established by a survey process– 10.1: Entitlement to refunds– 10.4: Self-meter reading– 13.6: 7 days notice of disconnection– 15.1: 4 days notice of planned shutdown– 19.2: Cap on retailer liability

• In concept, the Code is a set of principles, with details in contracts

Page 21: MODEL RETAIL CONTRACT PROJECT: FRAMEWORK ISSUES

21

ECC COMMISSIONER’S ROLE

• Makes recommendations as to fair and reasonable settlement after applying:– Statute and common law– Contract between retailer and consumer– ECC Code (which prevails over contract if conflict)– ‘Good industry practice’ (GIP) (based on survey of retailers)

• GIP is, in effect, a means of amending the Code between formal reviews

Page 22: MODEL RETAIL CONTRACT PROJECT: FRAMEWORK ISSUES

22

ECC SCHEME STRUCTURE

Companies

Council

Board3 lines +3 retail +Indep chair (John Robertson)

ECC Commission1 lines +1 retail +2 consumers +Indep chair (Alison Paterson)

Commissioner

Office

Page 23: MODEL RETAIL CONTRACT PROJECT: FRAMEWORK ISSUES

23

OBSERVATIONS

• Concept of Code and Model Contract not clear at start, particularly how ‘dove-tailed’ and how specific

• Driven by concern to build public confidence in credibility of retail competition as a discipline on costs and prices

• Based on assumption of industry self-regulation – no longer valid (Govt threat to regulate if not delivered)

• Part B of draft EGB Rules left blank

• Poor planning and co-ordination between ECC and MGB – ironic given common membership

Page 24: MODEL RETAIL CONTRACT PROJECT: FRAMEWORK ISSUES

24

ECC ISSUES

August 04 Review - Possible Outcome:

• Council is disolved

• ECC changes name to Electricity Ombudsman’s Office – role narrowed to dispute resolution

• New Commission becomes responsible for Code – with minimum contractual requirements

• New Commission could also prescribe a model contract under Ministerial direction (giving legal force to GPS)

Page 25: MODEL RETAIL CONTRACT PROJECT: FRAMEWORK ISSUES

25

ECC ISSUES

Current Code Review:

Should ECC pause to see shape of MRCPT work before recommending Code changes to Board of Council?

Page 26: MODEL RETAIL CONTRACT PROJECT: FRAMEWORK ISSUES

26

MGB Issues

• How does MGB respond to:

– Govt’s call for a Model Contract

– Possible role of new Commission

– ECC Code review

Page 27: MODEL RETAIL CONTRACT PROJECT: FRAMEWORK ISSUES

27

MGB Options

1. No Change: Continue current independent MRCPT process

2. Seek to Integrate: Option 1 as above, but try to dovetail with ECC Code review process (means ECC pauses). MRCPT continues if not possible

3. Freeze: Put MRCPT process on hold now pending completion of ECC Code review (recognising that ECC Council members have final vote)

4. Abandon: Cancel MRCPT process and promote single Code and/or wait to deal with new Commission on model contract

Page 28: MODEL RETAIL CONTRACT PROJECT: FRAMEWORK ISSUES

28

COMMENT

• Options 3 + 4 involve:

– Explanation to Government as to why no model contract

– Risk new Commission will impose more prescriptive minimum requirements on retailers with less scope for retailer input

– Perception within Government and new Commission of retailer failure of leadership and responsibility