Upload
dvsrinivasa-rao
View
228
Download
0
Embed Size (px)
Citation preview
8/12/2019 Model Estimate for neelam cyclone damage
1/26
ESTIMATED COST :Rs.5.00 lakhs
DISTRICT : WEST GODAVARI
CIRCLE : ELURU
DIVISION : ELURU
SUB DIVISION : ELURU
MANDAL : ELURU
ASSEMBLY CONSTITUENCY : DENDULURU
PARLIAMENTARY CONSTITUENCY : ELURU
GRANT :- NDRF(Neelam Cyclone)
Repairs to the R/F Jal ipudi to Kol leru lake
PROPOSAL ESTIMATE
GOVERNMENT OF ANDHRA PRADESH
PANCHAYATRAJ ENGINEERING DEPARTMENTHYDERABAD---INDIA
8/12/2019 Model Estimate for neelam cyclone damage
2/26
Name of the work:- Repairs to the R/F Jalipudi to Kolleru lake
Est.Cost.Rs.5.00 lakhs
The Road from Jalipudi to Kolleru lake is badly damaged during
the NEELAM CYCLONE from 28.10.2012 to 5.11.2012.The nature of damages are as given below:-
1 .Pot holes and patches are formed in BT surface2 .Pot holes and patches are formed in WBM layer
3 .Pot holes and patches are formed in gravel layer
4 .Gravel blindage is washed-off
5 Approaches and repairs are required for the CD work
6 New CD work to be provided
As such,the line estimate is prepared with the above repair items.
Further lum sum rovisions are made in the estimate for the followin items:-
1 Provision for VAT 5.00%2)QC charges @ 0.5%3)Provision for insurance@ 0.5%
The estimate is re ared as er the current SSR,i.e.2012-2013 rates and as erthe A.P Revised Standard data work will be carried out as er APDSS after administrative sanction&entrustment
Asst.Executive Engineer Dy.Executive Engineer
PRI,Eluru PRI,Eluru
SPECIFICATION REPORT
8/12/2019 Model Estimate for neelam cyclone damage
3/26
Name of the work:- Repairs to the R/F Jalipudi to Kolleru lake
Est.Cost.Rs.5.00 lak
S.No Description of item (Kms)
1 2 3
1 Cost of civil work(Road work)
2 Provision for VAT @5%
3 Provision for Q.C.Charges @0.5%
4 Provision for insurance @0.5%
5 Provision for KM&HM stones/Unforeseen
items
Grand Total
Asst.Exe.Engineer Deputy Exe.Engine
PR,Eluru PR,Eluru
GENERAL ABSTRACT
8/12/2019 Model Estimate for neelam cyclone damage
4/26
hs
Amount
in Rs.
4
464619.00
23231
2323
2323
7504
500000.00
r
8/12/2019 Model Estimate for neelam cyclone damage
5/26
Name of the work:- Repairs to the R/F Jalipudi to Kolleru lake
Est.Cost.Rs.5.00 lakhs
S.No Description of item Nos Quantity Rate Per
Length Bredth Depth
1
0.00sqm 220.00 1sqm
2
0.00sqm 290.00 1sqm
3
0.00Cum 2350.00 1Cum
4
0.00Cum 2950.00 1Cum
5
0.00sqm 54.00 1sqm
6
0.00sqm 11.50 1sqm
7
0.00sqm 224.50 1sqm
DETAILED-CUM-ABSTRACT ESTIMATE
Measurements
Maintenance of WBM road including filling up of pot holes, ruts and rectifying corrugated surface,
damaged edges and raveling as per technical specification Clause 1906 MORD.for Gr-III
Maintenance of WBM road including filling up of pot holes, ruts and rectifying corrugated surface,
damaged edges and raveling as per technical specification Clause 1906 MORD.for Gr-II
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of
granular base including cleaning of road surface and spraying primer at the rate of 0.85
kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use
on Wet mix macadam & WBM)
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at
the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface
cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD.
Providing, laying and rolling of close-graded premix surfacing material of 25 mm thickness
composed of 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to
required line, grade and level to serve as wearing course on a previously prepared base,
including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller
and finishing to required level and grades as per Technical Specification Clause 509 MORD
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound
macadam specification including spreading in uniform thickness, hand packing, rolling with smooth
wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone
screening to fill-up the interstices of coarse aggregate, watering and compacting to the required
density Grading 3as per Technical Specification Clause 405 MORD/ 404 MORTH. For compacted
thickness of 75 mm.
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound
macadam specification including spreading in uniform thickness, hand packing, rolling with smoothwheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone
screening to fill-up the interstices of coarse aggregate, watering and compacting to the required
density Grading 2as per Technical Specification Clause 405 MORD/ 404 MORTH. For compacted
thickness of 75 mm.
8/12/2019 Model Estimate for neelam cyclone damage
6/26
S.No Description of item Nos Quantity Rate Per
Length Bredth Depth
Measurements
8
168.75sqm 145.00 1sqm
650.00Cum 550.00 1Cum
9
285.00sqm 290.00 1sqm
TOTAL
Asst.Exe.Engineer Deputy Exe.Engineer
PR,Eluru PR,Eluru
Construction of granular sub-base by providing well graded material / Close graded material,
spreading in uniform layers with motor grader on prepared surface, mixing by mix in place
method with rotavator at OMC, and compacting with smooth wheel roller 80-100 kN /
Vibratory Roller to achieve the desired density, complete as per Technical Specification
Clause 401 MORD / MORTH.for blindage
Removal of all failed material, trimming of completed excavation to provide firm vertical faces,
cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503,
back filling the pot holes with hot bituminous material as per clause 511, compacting, trimming and
finishing the surface to form a smooth continuous surface, all as per clause 3004.2 MORTH for BT
patches
Maintenance of gravel road including making up the loss of profile, rectifying corrugated
surface, filling up of depressions, pot holes and erosion gullies by adding fresh material and
compacting it with appropriate equipment or to strip excess of material from the road
surface as per drawings and technical specification Clause 1905 MORD
8/12/2019 Model Estimate for neelam cyclone damage
7/26
Amount
0
0
0
0
0
0
0
8/12/2019 Model Estimate for neelam cyclone damage
8/26
Amount
24469
357500
82650
464619
8/12/2019 Model Estimate for neelam cyclone damage
9/26
Index-code Description Unit Quantity
2 3 4
ROAD WORK:-
RBR-SBBS-11 Granular Sub-base with Well Graded Material /
Close Graded Material Table 400.1
A By Mix in Place Method
Construction of granular sub-base by providing well
graded material / Close graded material, spreading inuniform layers with motor grader on prepared surface,
mixing by mix in place method with rotavator at OMC,
and compacting with smooth wheel roller80-100 kN /
Vibratory Roller to achieve the desired density,
complete as per Technical Specification Clause 401
MORD / MORTH.
iii For Grading III Material (CBR Value minimum 20)
Unit = cum
Taking output = 300 cum
a) LabourMate day -Mazdoor (Skilled) day 2.40
Mazdoor (Unskilled) day 8.00
Add MA@25%
b) Machinery
Tractor with grader hour 12.00
Vibratory roller hour 6.00
Tractor with Rotavator 25 cum per hour hour 12.00
Water tanker 6 kl capacity hour 5.00
c) Material
Well graded/ Close Graded granular sub-base material
as per Table 400.1
9.5 mm to 4.75 mm @ 66 per cent cum 237.60
2.36 mm below @ 34 per cent cum 122.40
d&e) Overheads & Contractors Profit
Cost for 300cum = a+b+c+d+e (Vibratory Roller)
Rate per cum = (a+b+c+d+e)/300
RBR-SBBS-9 2 II WBM Grading 2
1
DATA SHEET
S. No
#REF!
8/12/2019 Model Estimate for neelam cyclone damage
10/26
(i) Providing, laying, spreading and compacting stone
aggregates of specific sizes to water bound macadam
specification including spreading in uniform thickness,
hand packing, rolling with smooth wheel roller 80-100
kN in stages to proper grade and camber, applying and
brooming, stone screening/binding materials to fill-up
the interstices of coarse aggregate, watering andcompacting to the required density grading 2 as per
Technical Specification Clause 405 MORD / 404
MORTH. For compacted thickness of 75 mm.
By Manual Means
Unit = cum
Taking output = 360 cum
a) LabourMate day -
Mazdoor (Skilled) day 12.08
Mazdoor (Unskilled) day 250.00
Add MA@25%b) Machinery
Three wheel 80-100 kN static roller @ 10 cum per hour
for Rural Area works
hour 36.00
Water tanker 6 kl capacity hour 24.00
c) Material (Refer Tables 400.7, 8, 9 and 10 MORD/
400.6, 7, 8 & 9 MORTH)
Aggregate
Grading 2 63 mm to 45 mm @ 0.91 cum per 10 sqm
for compacted thickness of 75 mm
cum 435.60
Stone Screening
Type B 11.2 mm for Grading 2 @ 0.18 /10sqm cum 86.40
Binding Material
Binding Material @ 0.06 cum per 10 sqm forGrading
2 material
cum 28.80
Water kl 144.00
d&e) Overheads & Contractors Profit 14%
Using 11.2 mm for Grading 2 :
Cost for 360 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/360
RBR-MTRD-15 3 Maintenance of WBM Road
Maintenance of WBM road including filling up of pot
holes, ruts and rectifying corrugated surface, damaged
edges and raveling as per technical specification
Clause 1906 MORD.For grading II Material compacting with Smooth
Wheel Roller 80-100 kNUnit = Sqm
Output - Taking affected area @ 5% in 1 km
= 1000 x 3.75 x 0.05 = 187.5 sqm
Quantity 187.5 x 0.075 = 14.06 cum
a) Rate as per item 4.7(3) of Chapter 4 cum 14.060
8/12/2019 Model Estimate for neelam cyclone damage
11/26
b) Add 50% for extra efforts involved as maintenance is
to be done in small reaches
50%
Cost of 187.5 Sqm = a+b
Rate of per sqm a+b/187.5
4 III WBM Grading 3
(i) Providing, laying, spreading and compacting stoneaggregates of specific sizes to water bound macadam
specification including spreading in uniform thickness,
hand packing, rolling with smooth wheel roller 80-100
kN in stages to proper grade and camber, applying and
brooming, stone screening to fill-up the interstices of
coarse aggregate, watering and compacting to the
required density Grading 3 as per Technical
Specif ication Clause 405 MORD/ 404 MORTH. For
compacted thickness of 75 mm.
By Manual Means
Unit = cumTaking output = 360 cum
a) LabourMate day -
Mazdoor (Skilled) day 12.08
Mazdoor (Unskilled) day 250.00
Add MA@25%
b) Machinery
Three wheel 80-100 kN static roller @ 10 cum per hour
for Rural Area works
hour 36.00
Water tanker 6 kl capacity hour 24.00
c) Material (Refer Tables 400.7, 8, 9 & 10 MORD/
400.6, 7, 8 & 9 MORTH)
Aggregate
Grading 3 53 mm to 22.4 mm @ 0.91 cum per 10 sqm
for compacted thickness of 75 mm
cum 435.60
Stone Screening
Type B 11.2 mm for Grading 3 @ 0.18 cum per 10sqm cum 86.40
Binding Material
Binding Material @ 0.06 cum per 10 sqm forGrading
2 material
cum 28.80
Water kl 144.00
d&e) Overheads & Contractors Profit@14%
Cost for 360 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/360
RBR-MTRD-15 5 Maintenance of WBM Road
Maintenance of WBM road including filling up of pot
holes, ruts and rectifying corrugated surface, damaged
edges and raveling as per technical specification
Clause 1906 MORD.
For grading III Material compacting with Smooth
Wheel Roller 80-100 kN
8/12/2019 Model Estimate for neelam cyclone damage
12/26
Unit = Sqm
Output - Taking affected area @ 5% in 1 km
= 1000 x 3.75 x 0.05 = 187.5 sqm
Quantity 187.5 x 0.075 = 14.06 cum
a) Rate as per item 4.7(3) of Chapter 4 cum 14.060
b) Add 50% for extra efforts involved as maintenance is
to be done in small reaches
50%
Cost of 187.5 Sqm = a+b
Rate of per sqm a+b/187.5
RBR-BASC-1 6 Prime Coat
Low porosity
Providing and applying primer coat with bitumen
emulsion (SS-1) on prepared surface of granular base
including cleaning of road surface and spraying primer
at the rate of 0.70-1.0 kg/sqm using mechanical means
as per Technical Specification Clause 502 MORD (for
use on Wet mix macadam & WBM)
Unit = sqm
Taking output = 1750 sqm
a) LabourMate day -
Mazdoor (Unskilled) day 1.040
Add MA@25%
b) Machinery
Hydraulic broom @ 1250 sqm per hour hour 1.400
Air compressor 210 cfm hour 1.400
Bitumen emulsion pressure distributor @ 1750
sqm/hour
hour 1.000
Water tanker 6 kl capacity 1 trip per hour hour 0.500
c) Material
Bitumen emulsion (SS-1) @ 0.85 kg per sqm t 1.480
Water kl 3.000
d&e) Overheads & Contractors Profit
Cost of 1750 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/1750
RBR-BASC-2 7 Providing and applying tack coat with Bitumen emulsion
(RS-1) using emulsion distributor at the rate of 0.25 to
0.30 kg per sqm on the prepared dry and hungry
bituminous surface cleaned with Hydraulic broom as
per Technical Specification Clause 503 MORD.
Unit = sqm
Taking output = 1750 sqm
a) LabourMate day -
Mazdoor (Unskilled) day 1.040
Add MA@25%
b) Machinery
Hydraulic broom @ 1250 sqm per hour hour 1.400
8/12/2019 Model Estimate for neelam cyclone damage
13/26
Air compressor 210 cfm hour 1.400
Emulsion pressure distributor @1750 sqm per hour hour 1.000
c) Material
Bitumen emulsion (RS-1) @ 0.275 kg per sqm t 0.480
d&e) Overheads & Contractors Profit
Cost of 1750 sqm = (a+b+c+d+e)
Rate per sqm = a+b+c+d+e/1750
RBR-BASC-16 8 Mix Seal Surfacing
Providing, laying and rolling of close-graded premix
surfacing material of 25 mm thickness composed of
13.2 mm to 0.9 mm (Type-B) aggregates using
penetration grade bitumen to required line, grade and
level to serve as wearing course on a previously
prepared base, including mixing in a suitable plant,
laying and rolling with a three wheel 8-10 kN static roller
and finishing to required level and grades as per
Technical Specification Clause 509 MORDBy Mechanical Means
Type A
Bitumen (S-65)
Unit = sqm
Taking output = 8200 sqm (205 cum)
a) LabourMate day 0.840
Mazdoor (Unskilled) day 14.000
Add MA@25%
b) Machinery
HMP not less than 40 to 60 TPH capacity hour 12.000
Electric generator set 250 KVA hour 6.000
Front end loader 1 cum bucket capacity hour 6.000
Paver finisher 100 TPH capacity hour 4.800
Three wheel 80-100 kN static roller hour 6.000
c) Material
Bitumen (S-65) @ 23.75 kg per 10 sqm t 19.480
Stone crushed aggregates 11.2 mm to 0.09 mm @
0.40 cum per 10 sqm
cum 276.750
d&e) Overheads & Contractors Profit
Cost of 8200 sqm = a+b+c+d+e
Cost of 1sqm =
RBR-MTRD-49 Filling Pot-holes and Patch Repairs with open-
Graded Premix surfacing, 20mm.Removal of all failed material, trimming of completed
excavation to provide firm vertical faces, cleaning of
surface, painting of tack coat on the sides and base of
excavation as per clause 503, back filling the pot holes
with hot bituminous material as per clause 511,
compacting, trimming and finishing the surface to form
a smooth continuous surface, all as per clause 3004.2
MORTH
8/12/2019 Model Estimate for neelam cyclone damage
14/26
Unit = Sqm
Taking out put = 10250 sqm (205 cum)(405 tonne)
a) Labour
Mate Day -
Mazdoor (Unskilled) Day 90.000
Mazdoor skilled Day 7.760
Add MA@25%
b) Machinery
Air compressor 250 cfm hour 6.000
HMP 100-110 TPH Capacity hour 6.000
Tipper 5.5 tonnes capacity hour 90.000
Smooth wheeled roller 8-10 tonnes hour 12.000
c) Material
Crushed stone aggregates nominal size 13.2mm cum 184.500
Crushed stone aggregates nominal size 11.2mm cum 92.250
Bitumen VG 30 tonne 14.970
Bitumen emulsion for tack coat including vertical sides
of pot hole.
tonne 2.460
d&e) Overheads & Contractors Profit
Cost for 10250 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/10250
CD WORK DATAS:-
RBR-PCVT-311 Providing and Laying Reinforced Cement Concrete
Pipe NP3 as per design.Providing and laying reinforced cement concrete pipe
NP3 for culverts on first class bedding of granular
material including fixing collar with cement mortar 1:2
but excluding excavation, protection works, backfilling,concrete and masonry works in head wall and parapets.
Tech Specification Clause 1106 MORD.For 600mm dia
Unit = m
Taking output = 7.5 m
(3 pipes of 2.5 m length each)
900 mm dia
a) LabourMate day -
Mason (1st Class) day 0.15
Mazdoor (Unskilled) day 1.25
Add MA@25%
80% of above value for 600m dia pipes
Laying & fixing of Pipes with colors in position including
lifting, aligning etc.,
rm
b) Material
Sand at site cum 0.04
Cement at site t 0.03
600mm dia RCC pipe NP3 pipe m 7.50
8/12/2019 Model Estimate for neelam cyclone damage
15/26
600mm dia RCC pipe NP3 collors No 2.00
c&d) Overheads & Contractors Profit@14%
Cost for 7.5 m = a+b+c+d
Rate per m = (a+b+c+d)/7.5
RBR-FNDN-1 12 Excavation of structures:
Earth work in excavation for structures as per drawing
and technical specifications clause 305.1 including
settling out construction of shoring and bracing,
removal of stumps and other deleterious material and
disposal upto a lead of 50m, dressing of sides and
bottom and back filling in tranches with excavated
suitable material as per clause 300 (1) of MORD
Ordinary soil
Upto 3 m. depth
Unit = cum
Taking outpuot = 10 cum
LabourMate day ---
Mazdoor unskilled day 3.64
Add MBA@20%
Add sienorage charges
Over head charges & contracots profit @ 14%
cost for 10 cum = a+b+c
Rate per cum = (a+b+c)/10
RBR-FNDN-2
13 Filling in foundation trenches as per drawing and
technical specification Clause 305.3.9 MORD & 304
MORTHSand filling
Unit = cum
a) LabourMate day -
Mazdoor (Unskilled) day 0.31
Add MBA@20%
b) Material
Sand cum 1.00
c&d) Overheads & Contractors Profit
Rate per cum = a+b+c+d
RBR-FNDN-4
14 Providing concrete for plain/reinforced concrete in open
foundations using 40 mm nominal size Graded hard
stone aggregate, mechanically mixed, placed infoundation and compacted by vibration including curing
for 14 days complete as per drawings and technical
specifications Clause 802, 803, 1202 & 1203 MORD
and 1500, 1700 & 2100 MORTH.
P.C.C grade M 10
Nominal mix 1:3:6
Unit = cum
Material
8/12/2019 Model Estimate for neelam cyclone damage
16/26
Cement T 0.220
Coarse sand cum 0.450
40 mm aggregate cum 0.900
Labour
Mate day ---
Mason (1st Class) day 0.10
Mazdoor (Unskilled) day 1.39Add MBA@20%
Machinery
Mechnical concrete mixer 0.4/0.28 cum capacity fitted
with water measuring device and preferably also with
load cell.
hour 0.40
(d) Formwork @ 4% on cost of material, labour and
machinery (a+b+c)
4.00%
Over head charges & contracots profit @ 14%
Rate per cum = a+b+c+d
Rate per cum = (a+b+c+d+e)
RBR-FNDN-415 Providing concrete for plain/reinforced concrete in openfoundations complete as per drawings and technical
specifications Clause 802, 803, 1202 & 1203 forBody
Walls.
P.C.C grade M 15
Nominal mix 1:2.5:5
Unit = cum
Material
Cement T 0.275
Coarse sand cum 0.480
40 mm aggregate cum 0.48
20 mm aggregate cum 0.24
10 mm aggregate cum 0.08
Labour
Mate day
Mason (1st Class) day 0.10
Mazdoor (Unskilled) day 1.39
Add MBA@20%
Machinery
Mechnical concrete mixer 0.4/0.28 cum capacity fitted
with water measuring device and preferably also with
load cell.
hour 0.40
Formwork @ 10% on cost of material, labour and
machinery (a+b+c)
Over head charges & contracots profit @ 14%
Rate per cum
BLD-CSTN-2-1116 Plain Cement concrete (M 20) Nominal Mix using
20mm metal using concrete mixer
Unit : 1cum
A. MATERIALS:
Cement Kg 330.00
Coarse aggregate 20mm graded cum 0.90
8/12/2019 Model Estimate for neelam cyclone damage
17/26
Fine aggregate (Sand) cum 0.45
Water (including for curing) kl 1.20
B. MACHINERY
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity hour 1.00
C. LABOUR:
Mason 1stclass day 0.10
Mazdoor (unskilled) day 1.39Add MBA@20%
Formwork @ 4% on cost of material, labour and
machinery (a+b+c)
Over head charges & contracots profit @ 14%
Grand Total
Assistant Executive Engineer, Deputy Executi
PRI, Eluru PRI Sub-Divisio
8/12/2019 Model Estimate for neelam cyclone damage
18/26
#REF!
Rate Rs. Amount Rs. Remarks
5 6 7
250.00 600.00
250.00 2000.00
650.00
367.00 4404.00
2384.90 14309.40
367.00 4404.00
372.00 1860.00
#REF! #REF!
#REF! #REF!
#REF!
#REF!
#REF!
8/12/2019 Model Estimate for neelam cyclone damage
19/26
285.00 3442.80
250.00 62500.00
16485.70
920.60 33141.60
372.00 8928.00
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!
#REF!
#REF!
#REF! #REF!
8/12/2019 Model Estimate for neelam cyclone damage
20/26
#REF!
#REF!
#REF!
285.00 3442.80
250.00 62500.00
16485.70
920.60 33141.60
372.00 8928.00
#REF! #REF!
#REF! #REF!
#REF! #REF!
0.00 0.00
#REF!
#REF!
#REF!
8/12/2019 Model Estimate for neelam cyclone damage
21/26
#REF! #REF!
#REF!
#REF!
#REF!
250.00 260.00
65.00
310.00 434.00
402.00 562.80
748.00 748.00
372.00 186.00
#REF! #REF!
0.00 0.00
#REF!
#REF!
#REF!
250.00 260.00
65.00
310.00 434.00
8/12/2019 Model Estimate for neelam cyclone damage
22/26
402.00 562.80
748.00 748.00
#REF! #REF!
#REF!
#REF!
#REF!
285.00 239.40
250.00 3500.00
875.00
16626.00 199512.00
1609.00 9654.00
1431.00 8586.00
1183.00 5678.40
920.60 5523.60
#REF! #REF!
#REF! #REF!
#REF!
#REF!
#REF!
8/12/2019 Model Estimate for neelam cyclone damage
23/26
250.00 22500.00
285.00 2211.60
6177.90
402.00 2412.00
21018.00 126108.00
818.30 73647.00
920.60 11047.20
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!
#REF!
#REF!
315.00 47.25
250.00 312.50
89.94449.69
359.75
#REF! #REF!
#REF! #REF!
#REF! #REF!
8/12/2019 Model Estimate for neelam cyclone damage
24/26
#REF! #REF!
#REF!
#REF!
#REF!
0.00
250.00 910.00
182.00
200.00
180.88
1472.88
147.29
250.00 77.50
15.50
#REF! #REF!
#REF!
#REF!
8/12/2019 Model Estimate for neelam cyclone damage
25/26
#REF! #REF!
#REF! #REF!
#REF! #REF!
0.00
315.00 31.50
250.00 347.5075.80
370.00 148.00
#REF!
#REF!
#REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
0.00
315.00 31.50
250.00 347.50
75.80
372.00 148.80
#REF!
#REF!
#REF!#REF!
#REF! #REF!
#REF! #REF!
8/12/2019 Model Estimate for neelam cyclone damage
26/26
#REF! #REF!
372.00 372.00
315.00 31.50
250.00 347.5075.80
#REF!
#REF!
#REF!
e Engineer,
, Eluru