Facade Installer
Model Curriculum
1. Facade Installer
SECTOR: SUB-SECTOR: OCCUPATION:
REF ID: NSQF LEVEL:
Construction Real Estate and Infrastructure Construction Interior & Exterior Finishes CON/Q1106, V1.0 3
Facade Installer
Facade Installer
TABLE OF CONTENTS
1. Curriculum 01
2. Trainer Prerequisites 13
3. Annexure: Assessment Criteria 14
Facade Installer
Facade Installer CURRICULUM / SYLLABUS
This program is aimed at training candidates for the job of a “Facade Installer”, in the “Construction” Sector/Industry and aims at building the following key competencies amongst the learner
Program Name Facade Installer
Qualification Pack Name & Reference ID
CON/Q1106, v1.0
Version No. 1.0 Version Update Date 23-08-2017
Pre-requisites to Training
Preferably 5th standard and 5 years site experience in same
occupation for Non trained worker/ 2 years site experience as
a certified Assistant Façade Installer for trained worker
Training Outcomes After completing this programme, participants will be able to:
Gain insight into Façade Installer job role and its career progression:-Introduction to Façade Installer job role, its roles and responsibilities and its career progression.
Carry out checks and measures prior to fixing of stick system, unitized and structural glazing curtain wall:-Select tools and equipment and carry out checks and measures as pre-preparatory steps for fixing of stick system, unitized and structural glazing curtain wall system.
Install stick system curtain walls:- Select tools and equipment and carry out installation of stick system curtain wall
Install structural glazing type of façade installation:- Select tools and equipment and carry out installation of structural glazing type of façade installation
Work effectively in a team to deliver results at a construction site: - Introduction to team working and effective communication
procedures to be followed at construction sites
Plan and organize work to meet expected outcomes:- Prioritizing activities and organising resources to meet desired outcome
Work according to personal health, safety and environment protocol at construction site: - Importance of health & safety aspect and measures to be followed at work site.
Facade Installer
This course encompasses 6 out of 6 National Occupational Standards (NOS) of “Facade Installer” Qualification Pack issued by “Construction Skill Development Council of India”.
Sr. No.
Module Key Learning Outcomes Equipment Required
1 Introduction Theory Duration (hh:mm) 08:00 Practical Duration (hh:mm) 00:00
General Discipline in the class room.
Basic knowledge of Unit &
measurement & arithmetic
calculation.
Basic terms used and types of façade
works.
Role of façade installer in construction
industry & their career progression
1. Classroom having seating requirement for 30 people.
2. Projector 3. Toilet/Urinals
(Separate for gents and Ladies)
4. Blackboard
2 Carry out checks and measures prior to fixing of stick system, unitized and structural glazing curtain wall Theory Duration (hh:mm) 16:00 Practical Duration (hh:mm) 68:00 Corresponding NOS Code CON/N1116
Theory:-
standard practices for façade
installation
sketches used for façade installation
various manufacturer’s instructions
for façade installation, their
understanding and use
specifications for wall frame
members, joints ,gaskets and
sealants etc.
different type of glass used for panels
different type of frame materials used
in façade works like timber, steel,
aluminum, PCVu, composites etc
Different type of paneling material
used for façade works like aluminum
composite panel, glass, glass fiber
reinforced concrete, stone, ceramic
etc. and their respective properties
and applications
different type of curtain walls such as
panelized curtain wall, unitised curtain
wall, stick system curtain wall, rain
screens etc
transom drained curtain wall and
mullion drained curtain wall
components of different type of
curtain wall
use of glazing gaskets and sealants
Various fastening methods to be used
in façade works like clips & screws,
backside attachment, etc.)
Different types of joints to be used in
frames including butt joint, etc.
different types of flashing and
interface and their construction as per
drawings and specifications
1. Measuring tape
2. Scale
3. Right angle
4. Framing square
5. Chalk line
6. pencil
7. Line dori
8. Plumb bob
9. Spirit level
10. Pliers
11. Punch pliers
12. Hammers
13. Taping knife
14. Sanding tool
15. Hand circular saw
16. Hack saw
17. Jig saw
18. Rake angle
19. Screw driver set
20. Screw gun
21. Hammer Drill
machine
22. Rivet gun
23. Metal cutter
24. Silicon gun/caulk
gun
25. Stapler
26. Clutch angle
27. Utility knife
Facade Installer
Sr. No.
Module Key Learning Outcomes Equipment Required
how to check for alignment,
straightness ,plumb and
imperfections in panels and sub
frames
how to check for panel material
imperfections, frame members
imperfections etc.
Process of checking structural
adequacy of the interface structure for
fixing wall panels, connections etc.
process involved in cleaning of joints
in frames
Process of application of primer on
joints.
use of suitable lifting devices for lifting
heavy panels to the required places
allowable tolerance limits for panel
positioning
Process of keeping the panels flat &
straight with appropriate no. of screws
per
sheet
principles of water and air tightness
and concept of drained facades,
ventilated facades and pressure
equalized facades
Demonstration/ Practical :-
Read and interpret details from
relevant drawing.
Explain task by interpreting work
methodology.
Identify and select different type of
panel materials, frames for fixing.
Carry out checks to ensure panels are
of specified material and type and as
per specifications
Carry out checks on glass panels for
surface and edge defects
Carry out checks for imperfections in
the panel and frame members and
Carry out checks replacement of
panels which are not fit for installation
check to ensure suitable lifting
equipment is in place at point of
installation
Facade Installer
Sr. No.
Module Key Learning Outcomes Equipment Required
carry out measurement to check the
structural adequacy of interface
structure so that structure is fit to
accommodate wall panels, its
connections etc
Carry out checks for the rigidity of the
fixed framed structure /interface
Carry out measurement to ensure that
sub frame is straight ,aligned and rigid
carry out straightening of sub frame
as per requirement
check to ensure the joints in frame
are as per approved specification
check and ensure proper cleaning of
joints and application of primer on
joints as per applicability
check to ensure that all wall framing
members are in place and secured
check that gasket and sealant are as
per specification plan for fixing of
panels as per approved and
instructed methodology
check all fixing members are of
specified type, size and material
3 Install stick system curtain walls Theory Duration (hh:mm) 22:00 Practical Duration (hh:mm) 88:00 Corresponding NOS Code CON/N1117
Theory:-
standard practices for façade
installation
sketches used for façade installation
various manufacturer’s instructions
for façade installation, their
understanding and use
Specifications for wall frame
members,joints, gaskets and sealants
etc.
different type of glass used for panels
different type of frame materials used
in façade works like timber, steel,
aluminium, PCVu, composites etc
Different type of panelling material
used for façade works like aluminium
composite panel, glass, glass fibber
reinforced concrete, stone, ceramic
etc. and their respective properties
and applications
different type of curtain walls such as
panelised curtain wall, unitised curtain
1. Measuring tape
2. Scale
3. Right angle
4. Framing square
5. Chalk line
6. pencil
7. Line dori
8. Plumb bob
9. Spirit level
10. Pliers
11. Punch pliers
12. Hammers
13. Taping knife
14. Sanding tool
15. Hand circular saw
16. Hack saw
17. Jig saw
18. Rake angle
19. Screw driver set
20. Screw gun
21. Hammer Drill
machine
22. Rivet gun
23. Metal cutter
Facade Installer
Sr. No.
Module Key Learning Outcomes Equipment Required
wall, stick system curtain wall, rain
screens etc
Difference in transom drained curtain
wall and mullion drained curtain wall
components of stick system curtain
wall
various hardware component for stick
wall curtain system including anchors,
aluminium connectors, setting blocks,
corner blocks, pressure plates, caps,
gaskets and sealants
Various fastening method used in
façade works like clips & screws,
backside attachment, etc.
different sealants and gaskets used
for weatherproofing and drainage
system
joints, their uniformity and acceptable
tolerance for uniformity of joints
Installation of vertical mullion,
horizontal mullion, vision panels,
corner blocks etc.
expansion joints in vertical mullions
Fixing of panels, gasket and sealant
in stick build system.
Weep holes and their use
Providing door window opening and
weep holes
Demonstration/ Practical :-
Read and interpret details from
relevant drawing.
Identify various components of stick
build system.
Measure to check appropriateness of
wall members.
Carry out installation of vertical
mullions over floor edge at
appropriate spacing as per
specifications
Provide expansion joints in vertical
mullions as per specifications
Carry out installation of corner block
at the junction of the vertical mullion
and rail
Place and fix panels as per
specifications
24. Silicon gun/caulk
gun
25. Stapler
26. Clutch angle
27. Utility knife
Facade Installer
Sr. No.
Module Key Learning Outcomes Equipment Required
Carry out installation of vision panels
Carry out fixing of gasket and
sealants as per specifications
Carry out checks to confirm
horizontal, vertical alignment.
Checks uniformity of joints
Use appropriate fastening methods
for fixing of panels and frames.
Carry out fastening and sealing of
back pan.
Check pilot holes for size, screws and
panel clip attachments for secure
fixing
Carry out weather proofing and
provide drainage in the stick system
as per specifications
Check door/window opening
Provide weep holes as per
requirement
4 Install structural glazing type of façade installation Theory Duration (hh:mm) 22:00 Practical Duration (hh:mm) 88:00
Corresponding NOS Code CON/N1119
Theory:-
standard practices for façade
installation
sketches used for façade
installation
various manufacturer’s instructions
for façade installation, their
understanding and use
Specifications for wall frame
members, joints, gaskets and
sealants etc.
different type of glass used for
panels
different type of frame materials
used in façade works like timber,
steel, aluminium, PCVu,
composites etc
Different type of panelling material
used for façade works like
aluminium composite panel, glass,
glass fibre reinforced concrete,
stone, ceramic etc. and their
respective properties and
applications
different type of curtain walls such
as panelised curtain wall, unitised
curtain
1. Measuring tape
2. Scale
3. Right angle
4. Framing square
5. Chalk line
6. pencil
7. Line dori
8. Plumb bob
9. Spirit level
10. Pliers
11. Punch pliers
12. Hammers
13. Taping knife
14. Sanding tool
15. Hand circular saw
16. Hack saw
17. Jig saw
18. Rake angle
19. Screw driver set
20. Screw gun
21. Hammer Drill
machine
22. Rivet gun
23. Metal cutter
24. Silicon gun/caulk
gun
25. Stapler
26. Clutch angle
27. Utility knife
Facade Installer
Sr. No.
Module Key Learning Outcomes Equipment Required
wall, stick system curtain wall, rain
screens etc
Difference in transom drained
curtain wall and mullion drained
curtain wall
components of structural glazing
type curtain wall
various hardware component for
structural glazing type curtain wall
including anchors, aluminium
connectors, setting blocks, corner
blocks, pressure plates, caps,
gaskets and sealants
Various fastening method used in
façade works like clips & screws,
backside attachment, etc.
different sealants and gaskets used
for weatherproofing and drainage
system
use of silicon sealants and its
application
joints, their uniformity and
acceptable tolerance for uniformity
of joints
Installation of vertical mullion,
horizontal mullion, vision panels,
corner blocks etc.
expansion joints in vertical mullions
Fixing of panels, gasket and
sealant in stick build system.
Weep holes and their use
Providing door window opening
and weep holes
Impact of temperature and vapours
on façade work
Demonstration/ Practical :-
Read and interpret details from
relevant drawing.
Identify various components of
structural glazing system
Measure to check appropriateness
of wall members as well as
structural adequacy.
Carry out installation of vertical
mullions over floor edge at
Facade Installer
Sr. No.
Module Key Learning Outcomes Equipment Required
appropriate spacing as per
specifications
Provide expansion joints in vertical
mullions as per specifications
Carry out installation of horizontal
mullions to create frame openings
Carry out installation of corner
block at the junction of the vertical
mullion and rail
Place and fix panels as per
specifications
Carry out installation of vision
panels
Carry out fixing of gasket and
sealants as per specifications
Carry out checks to confirm
horizontal, vertical alignment.
Checks uniformity of joints
Use appropriate fastening methods
for fixing of panels and frames.
Create a cap less vertical joint
system by sealing from outside
using silicon sealant as per
specification
Check pilot holes for size, screws
and panel clip attachments for
secure fixing
Carry out weather proofing and
provide drainage in the stick
system as per specifications
Check door/window opening
Provide weep holes as per
applicability
5 Work effectively in a team to deliver results at a construction site Theory Duration (hh:mm) 05:00 Practical Duration (hh:mm) 19:00
Theory:-
Method of oral and written
communication skills with co-
workers, trade seniors while
handling and carrying out visual
checks on materials, , tools and
equipment
How to interpret scope of façade
works, material/ tools handling by
adhering to instructions or
consulting with seniors
Facade Installer
Sr. No.
Module Key Learning Outcomes Equipment Required
Corresponding NOS Code CON/N8001
Method of providing instruction to
subordinates or reporting to seniors
clearly and promptly
Seek necessary support and
complete assigned tasks within
stipulated time duration
Keep good relation and maintain
well behaviour with co-workers
Demonstration/ Practical :- The skills will be developed and
practiced while carrying out following
trade related activities in a predictable
and familiar working condition
Selection of materials, tools or
devices for defined purpose under
façade installation works and
providing instructions to
subordinates for the same.
Handling of tools, equipment and
materials for various types of
façade installation works including
efficiently communicating with co-
workers for desired requirement as
per specification
Carrying out installation of stick
system, unitized system and
structural glazing curtain wall
façade installation works while
working as a team to ensure
optimum utilization of material and
resources
Carrying out façade installation
works utilizing the effort of co-
workers.
Undertaking visual checks to
assess the quality of material and
check line, level and alignments of
work
Selection and handing over of
desired/ appropriate tools/
materials while assisting trade
senior
6 Plan and organize work to meet expected outcomes Theory Duration
Theory:-
To plan façade installation activities
within defined scope of work
Basic concept of productivity,
sequence of working and
Facade Installer
Sr. No.
Module Key Learning Outcomes Equipment Required
(hh:mm) 03:00 Practical Duration (hh:mm) 13:00 Corresponding NOS Code CON/N8002
implementation of safety and
organizational norms while working
Upkeep, storing and stacking
methods of tools, materials used for
domain specific works
Requisition of resources, reporting
for requirement of resources orally
and in written to concerned
authority - (T/P)
Demonstration/ Practical :-
The skills will be developed and
practiced while carrying out
following trade related activities in a
predictable and familiar working
condition
Selection of materials, tools or
devices for defined purpose in an
optimum manner
Handling/organizing masonry tools,
material, fixtures and device for
installation of stick system curtain
wall and structural glazing type of
façade installation works.
Prioritize all works/ activities
Planning installation stick system
curtain wall and structural glazing
type of façade installation works as
per scope and schedule.
Carrying out installation of façade
works by optimum utilization of
material and resources
Optimum use of resources while
performing task
Adherence to stipulated timelines
for completion of facade installation
activities
7 Work according to personal health, safety and environment protocol at construction site Theory Duration (hh:mm) 10:00 Practical Duration
Theory: -
Types of hazards involved in
construction sites
Types of hazards involved in
façade installation works.
Emergency safety control
measures and actions to be
taken under emergency situation
Concept of: -
1. Safety Helmets 2. Face shield 3. Overalls 4. Knee pads 5. Safety shoes 6. Safety belts 7. Safety harness 8. Safety Gloves 9. Safety goggles 10. Particle masks 11. Ear Plugs
Facade Installer
Sr. No.
Module Key Learning Outcomes Equipment Required
(hh:mm) 38:00 Corresponding NOS Code CON/N9001
1. First Aid process
2. Use of fire extinguisher
3. Classification of fires and fire
extinguisher
4. Safety drills
5. Types and use of PPEs as per
safety norms
Reporting procedure to the
concerned authority in
emergency situations
Standard procedure of handling,
storing and stacking material.
What is safe disposal of waste,
type of waste and their disposal
Importance of handling tools,
equipment and materials as per
applicable.
Safety relevant to tools, tackles,
& requirement as per
applicability.
basic ergonomic principles as per
applicability
Demonstration/ Practical (D/P): - The skills will be developed and practiced while carrying out following trade related activities in a predictable and familiar working condition.
Selection of PPEs and use them
appropriately as per working
need of façade installation
operations, handling, storing,
stacking and shifting of tools and
equipment for façade installation
work
Selection of PPEs and use them
appropriately as per façade
installation work need.
Analysis of hazards involved in
façade installation work and
taking necessary steps or
informing to seniors.
Identification of locations,
situations/ circumstances,
malpractices which can be
hazardous for general or façade
installation work
12. Reflective jackets 13. Fire Extinguisher 14. Fire prevention kit 15. First Aid box 16. Safety tags 17. Safety Notice board
Facade Installer
Sr. No.
Module Key Learning Outcomes Equipment Required
Selection of fire extinguisher
based on classification of fire,
standard practice of storing &
stacking firefighting equipment/
materials at work locations
Disposal of waste materials as
per their nature and effects on
weather
Total Duration Theory Duration 86:00 Practical Duration 314:00
Unique Equipment Required: Classroom having seating requirement for 30 people, Toilet/Urinals (Separate for gents and Ladies), Projector, Blackboard, Work shop for practical assessment, Measuring tape, Scale, Right angle, Framing square, Chalk line, pencil, Line Dori, Plumb bob, Spirit level, Pliers, Punch pliers, Hammers, Taping knife, Sanding tool, Hand circular saw, Hack saw, Jig saw, Rake angle, Screw driver set, Screw gun, Hammer Drill machine, Rivet gun, Metal cutter, Silicon gun/caulk gun, Stapler, Clutch angle, Utility knife, Safety Helmets, Face shield, Overalls, Knee pads, Safety shoes, Safety belts, Safety harness, Safety Gloves, Safety goggles, Particle masks, Ear Plugs, Reflective jackets, Fire Extinguisher, Fire prevention kit, First Aid box, Safety tags, Safety Notice board
Grand Total Course Duration: 400 Hours, 0 Minutes (This syllabus/ curriculum has been approved by Construction Skill Development Council of India)
Facade Installer
Trainer Prerequisites for Job role: “Facade Installer” mapped to Qualification Pack: “CON/Q1106, v1.0”
Sr. No.
Area Details
1 Description To deliver accredited training service, mapping to the curriculum detailed above, in accordance with the Qualification Pack “CON/Q1106”.
2 Personal Attributes
Aptitude for conducting training, and pre/ post work to ensure competent, employable candidates at the end of the training. Strong communication skills, interpersonal skills, ability to work as part of a team; a passion for quality and for developing others; well-organised and focused, eager to learn and keep oneself updated with the latest in the mentioned field
3 Minimum Educational Qualifications
ITI/12th standard pass
4a Domain Certification
Trainer/Assessor- 50% in each NOS of Qualification Pack “CON/Q1106” & 80% overall , Lead trainer/Lead Assessors- 50% in each NOS of Qualification Pack “CON/Q1106” & 90% overall
4b Platform Certification
Trainer/Assessor-80% in each NOS of Qualification Pack “MEP/Q0102” or “MEP/Q0104”, Lead trainer/ Lead Assessors- 90% in each NOS of Qualification Pack “MEP/Q0101” or “MEP/Q0103”and overall 90%
5 Experience i. Technical Degree holder with minimum three years of Field experience and preferably two years of teaching experience or, ii. In case of a Diploma Holder five years of field experience and preferably two years of teaching experience or, iii. In case of ITI/12th pass minimum eight years of field experience and preferably two years of teaching Experience.
Facade Installer
CRITERIA FOR ASSESSMENT OF TRAINEES
Job Role Façade Installer
Qualification Pack CON/Q1106
Sector Skill Council Construction
Guidelines for Assessment 1. Criteria for assessment for each Qualification Pack will be created by the Sector Skill Council. Each
Performance Criteria (PC) will be assigned marks proportional to its importance in NOS. SSC will also lay down
proportion of marks for Theory and Skills Practical for each PC.
2. The assessment for the knowledge part will be based on knowledge bank of questions created by Assessment
Bodies subject to approval by SSC
3. Individual assessment agencies will create unique question papers for knowledge/theory part for assessment
of candidates as per assessment criteria given below
4. Individual assessment agencies will create unique evaluations for skill practical for every student at each
examination/training centre based on assessment criteria.
5. The passing percentage for each QP will be 50%. To pass the Qualification Pack, every trainee should score a
minimum of 50% individually in each NOS.
6. The Assessor shall check the final outcome of the practices while evaluating the steps performed to achieve
the final outcome.
7. The trainee shall be provided with a chance to repeat the test to correct his procedures in case of improper
performance, with a deduction of marks for each iteration.
8. After the certain number of iteration as decided by SSC the trainee is marked as fail, scoring zero marks for
the procedure for the practical activity.
9. In case of successfully passing only certain number of NOSs, the trainee is eligible to take subsequent
assessment on the balance NOSs to pass the Qualification Pack within the specified timeframe set by SSC.
10. Minimum duration of Assessment of each QP shall be of 4hrs/trainee.
Facade Installer
Marks Allocation
Assessment outcomes
Assessment Criteria for outcomes Total Mark
Out Of Theory Skills Practical
CON/N1116: Carry out checks and measures prior to fixing of stick system, unitized and structural glazing curtain wall
PC1. read and interpret sketches and work methodology relevant to façade installation work
100
6 1.2 4.8
PC2. identify the type of panel material, frames and the method of fixing from work instructions
6 1.2 4.8
PC3. select tools and equipment as per applicability and check prior to use for safety and serviceability
6 1.2 4.8
PC4. check that panels are of specified material and type and as per specifications
6 1.2 4.8
PC5. check the glass panels for surface and edge defects
6 1.2 4.8
PC6. check for imperfections in the panel and frame members and replace panels which are not fit for installation
5 1 4
PC7. check that suitable lifting equipment is in place at point of installation
5 1 4
PC8. measure and check the structural adequacy of interface structure so that structure is fit to accommodate wall panels, its connections etc
6 1.2 4.8
PC9. check the rigidity of the fixed framed structure /interface
6 1.2 4.8
PC10. measure and ensure that sub frame is straight ,aligned and rigid
6 1.2 4.8
PC11. carry out straightening of sub frame as per applicability
6 1.2 4.8
PC12. check to ensure the joints in frame are as per approved specification
6 1.2 4.8
PC13. check and ensure proper cleaning of joints and application of primer on joints as per applicability
6 1.2 4.8
PC14. ensure that all wall framing members are in place and secured
6 1.2 4.8
PC15. check that gasket and sealant are as per specification
6 1.2 4.8
PC16. plan for fixing of panels as per approved and instructed methodology
6 1.2 4.8
PC18. check all fixing members are of specified type, size and materials
6 1.2 4.8
Total 100 20 80
Facade Installer
CON/N1117: Install stick system curtain walls
PC1. identify various components of stick build system including hardware components for installation
100
4 0.8 3.2
PC2. check and ensure wall members are cut to appropriate length prior to installation
4 0.8 3.2
PC3. install the vertical mullion over the floor edge with a steel angle as per instructions
4 0.8 3.2
PC4. install mullions at appropriate spacing as per specification
6 1.2 4.8
PC5. provide expansion joint in vertical mullions as per instructions
5 1 4
PC6. attach the horizontal mullion (transom) to vertical mullion to create frame opening
5 1 4
PC7. install corner block at the junction of the vertical mullion and rail
5 1 4
PC8. place and fix panels in both vision area and spandrel panel cover area as per specification
5 1 4
PC9. install vision panels in frame opening between floors as per specifications
5 1 4
PC10. seal the inside of panels using dry gasket or sealant on outside as specified
5 1 4
PC11. check that each panel is set to plumb and panel joints are uniformly engaged as per requirements
5 1 4
PC12. hold panels in place using full length pressure plates and aluminum snap caps
4 0.8 3.2
PC13. adopt appropriate fastening method (clips & screws, backside attachment, etc.) to attach panels with framing members
5 1 4
PC14. enclose the spandrel area with metal back pan (air and vapor barrier), with high density glass fiber or mineral fiber insulation within the back pan
5 1 4
PC15. fasten and seal the back pan to frame as per specification
5 1 4
PC16. check that pilot holes are of the appropriate size for fastening process
4 0.8 3.2
PC17. check that screws and panel clip attachments are secured at the appropriate angle as per the specified procedure
4 0.8 3.2
PC18. protect all coated surface from damage during handling and installation
4 0.8 3.2
PC19. carry out weather proofing and provide drainage in the stick system as per specifications
4 0.8 3.2
PC20. ensure window and door openings are provided as per specification
4 0.8 3.2
PC21. provide weep holes as per applicability 4 0.8 3.2
PC22. carry out fixing of all the elements as per acceptable tolerance limit
4 0.8 3.2
Facade Installer
Total 100 20 80
CON/N1119: Install structural glazing type of façade installation
PC1. identify various components of structural glazing system including hardware components for installation
100
5 1 4
PC2. check and ensure wall members are cut to appropriate length prior to installation
5 1 4
PC3. check the as built surface for adequacy prior to fixing structural glazing
5 1 4
PC4. install the vertical mullion over the floor edge with a steel angle as per instructions
5 1 4
PC5. install mullions at appropriate spacing as per specification
5 1 4
PC6. provide expansion joint in vertical mullions as per instructions
5 1 4
PC7. attach the horizontal mullion (transom) to vertical mullion to create frame opening
5 1 4
PC8. install corner block at the junction of the vertical mullion and rail
5 1 4
PC9. place and fix panels in both vision area and spandrel panel cover area as per specification
5 1 4
PC10. install vision panels in frame opening between floors
5 1 4
PC11. check that each panel is set to plumb and panel joints are uniformly engaged as per requirements
5 1 4
PC12. hold panels in place using full length pressure plates and aluminum snap caps
5 1 4
PC13. adopt appropriate fastening method (clips & screws, backside attachment, etc.) to attach panels with framing members
5 1 4
PC14. create a capless vertical joint system by sealing from outside using silicon sealant as per specification
5 1 4
PC15. check that pilot holes are of the appropriate size for fastening process
5 1 4
PC16. check that screws and panel clip attachments are secured at the appropriate angle as per the specified procedure
5 1 4
PC17. protect all coated surface from damage during handling and installation
4 0.8 3.2
PC18. carry out weather proofing and provide drainage in the stick system as per specifications
4 0.8 3.2
PC19. ensure window and door openings are provided as per specification
4 0.8 3.2
PC20. provide weep holes as per applicability 4 0.8 3.2
PC21. carry out fixing of all the elements as per acceptable tolerance limit
5 1 4
Total 100 20 80
PC1. pass on work related information/ requirement clearly to the team members
100
10 2 8
Facade Installer
CON/N8001: Work effectively in a team to deliver desired results at the workplace
PC2. inform co-workers and superiors about any kind of deviations from work
5 1 4
PC3. address the problems effectively and report if required to immediate supervisor appropriately
5 1 4
PC4. receive instructions clearly from superiors and respond effectively on same
5 1 4
PC5. communicate to team members/subordinates for appropriate work technique and method
5 1 4
PC6. seek clarification and advice as per requirement and applicability
10 2 8
PC7. hand over the required material, tools tackles, equipment and work fronts timely to interfacing teams
30 6 24
PC8. work together with co-workers in a synchronized manner
30 6 24
Total 100 20 80
CON/N8002: Plan and organize work to meet expected outcomes
PC1. understand clearly the targets and timelines set by superiors
100
10 2 8
PC2. plan activities as per schedule and sequence 10 2 8
PC3. provide guidance to the subordinates to obtain desired outcome
10 2 8
PC4. plan housekeeping activities prior to and post completion of work
10 2 8
PC5. list and arrange required resources prior to commencement of work
10 2 8
PC6. select and employ correct tools, tackles and equipment for completion of desired work
10 2 8
PC7. complete the work with allocated resources 10 2 8
PC8. engage allocated manpower in an appropriate manner
10 2 8
PC9. use resources in an optimum manner to avoid any unnecessary wastage
5 1 4
PC10. employ tools, tackles and equipment with care to avoid damage to the same
5 1 4
PC11. organize work output, materials used, tools and tackles deployed,
5 1 4
PC12. processes adopted to be in line with the specified standards and instructions
5 1 4
Total 100 20 80
CON/N9001: Work according to personal health, safety and environment protocol at construction site
PC1. identify and report any hazards, risks or breaches in site safety to the appropriate authority
100
5 1 4
PC2. follow emergency and evacuation procedures in case of accidents, fires, natural calamities
5 1 4
PC3. follow recommended safe practices in handling construction materials, including chemical and hazardous material whenever applicable
10 2 8
PC4. participate in safety awareness programs like Tool Box Talks, safety demonstrations, mock drills, conducted at site
5 1 4
Facade Installer
PC5. identify near miss , unsafe condition and unsafe act
5 1 4
PC6. use appropriate Personal Protective Equipment (PPE) as per work requirements including: • Head Protection (Helmets) • Ear protection • Fall Protection • Foot Protection • Face and Eye Protection • Hand and Body Protection • Respiratory Protection (if required)
10 2 8
PC7. handle all required tools, tackles , materials & equipment safely
5 1 4
PC8. follow safe disposal of waste, harmful and hazardous materials as per EHS guidelines
5 1 4
PC9. install and apply properly all safety equipment as instructed
15 3 12
PC10. follow safety protocol and practices as laid down by site EHS department
15 3 12
PC11. collect and deposit construction waste into identified containers before disposal, separate containers that may be needed for disposal of toxic or hazardous wastes
10 2 8
PC12. apply ergonomic principles wherever required 10 2 8
Total 100 20 80