Facade Installer Model Curriculum 1. Facade Installer SECTOR: SUB-SECTOR: OCCUPATION: REF ID: NSQF LEVEL: Construction Real Estate and Infrastructure Construction Interior & Exterior Finishes CON/Q1106, V1.0 3

Model Curriculum · and carry out installation of stick system curtain wall ... -Select tools and equipment and carry out installation of structural glazing type of façade installation

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Model Curriculum · and carry out installation of stick system curtain wall ... -Select tools and equipment and carry out installation of structural glazing type of façade installation

Facade Installer

Model Curriculum

1. Facade Installer

SECTOR: SUB-SECTOR: OCCUPATION:

REF ID: NSQF LEVEL:

Construction Real Estate and Infrastructure Construction Interior & Exterior Finishes CON/Q1106, V1.0 3

Page 2: Model Curriculum · and carry out installation of stick system curtain wall ... -Select tools and equipment and carry out installation of structural glazing type of façade installation

Facade Installer

Page 3: Model Curriculum · and carry out installation of stick system curtain wall ... -Select tools and equipment and carry out installation of structural glazing type of façade installation

Facade Installer

TABLE OF CONTENTS

1. Curriculum 01

2. Trainer Prerequisites 13

3. Annexure: Assessment Criteria 14

Page 4: Model Curriculum · and carry out installation of stick system curtain wall ... -Select tools and equipment and carry out installation of structural glazing type of façade installation

Facade Installer

Facade Installer CURRICULUM / SYLLABUS

This program is aimed at training candidates for the job of a “Facade Installer”, in the “Construction” Sector/Industry and aims at building the following key competencies amongst the learner

Program Name Facade Installer

Qualification Pack Name & Reference ID

CON/Q1106, v1.0

Version No. 1.0 Version Update Date 23-08-2017

Pre-requisites to Training

Preferably 5th standard and 5 years site experience in same

occupation for Non trained worker/ 2 years site experience as

a certified Assistant Façade Installer for trained worker

Training Outcomes After completing this programme, participants will be able to:

Gain insight into Façade Installer job role and its career progression:-Introduction to Façade Installer job role, its roles and responsibilities and its career progression.

Carry out checks and measures prior to fixing of stick system, unitized and structural glazing curtain wall:-Select tools and equipment and carry out checks and measures as pre-preparatory steps for fixing of stick system, unitized and structural glazing curtain wall system.

Install stick system curtain walls:- Select tools and equipment and carry out installation of stick system curtain wall

Install structural glazing type of façade installation:- Select tools and equipment and carry out installation of structural glazing type of façade installation

Work effectively in a team to deliver results at a construction site: - Introduction to team working and effective communication

procedures to be followed at construction sites

Plan and organize work to meet expected outcomes:- Prioritizing activities and organising resources to meet desired outcome

Work according to personal health, safety and environment protocol at construction site: - Importance of health & safety aspect and measures to be followed at work site.

Page 5: Model Curriculum · and carry out installation of stick system curtain wall ... -Select tools and equipment and carry out installation of structural glazing type of façade installation

Facade Installer

This course encompasses 6 out of 6 National Occupational Standards (NOS) of “Facade Installer” Qualification Pack issued by “Construction Skill Development Council of India”.

Sr. No.

Module Key Learning Outcomes Equipment Required

1 Introduction Theory Duration (hh:mm) 08:00 Practical Duration (hh:mm) 00:00

General Discipline in the class room.

Basic knowledge of Unit &

measurement & arithmetic

calculation.

Basic terms used and types of façade

works.

Role of façade installer in construction

industry & their career progression

1. Classroom having seating requirement for 30 people.

2. Projector 3. Toilet/Urinals

(Separate for gents and Ladies)

4. Blackboard

2 Carry out checks and measures prior to fixing of stick system, unitized and structural glazing curtain wall Theory Duration (hh:mm) 16:00 Practical Duration (hh:mm) 68:00 Corresponding NOS Code CON/N1116

Theory:-

standard practices for façade

installation

sketches used for façade installation

various manufacturer’s instructions

for façade installation, their

understanding and use

specifications for wall frame

members, joints ,gaskets and

sealants etc.

different type of glass used for panels

different type of frame materials used

in façade works like timber, steel,

aluminum, PCVu, composites etc

Different type of paneling material

used for façade works like aluminum

composite panel, glass, glass fiber

reinforced concrete, stone, ceramic

etc. and their respective properties

and applications

different type of curtain walls such as

panelized curtain wall, unitised curtain

wall, stick system curtain wall, rain

screens etc

transom drained curtain wall and

mullion drained curtain wall

components of different type of

curtain wall

use of glazing gaskets and sealants

Various fastening methods to be used

in façade works like clips & screws,

backside attachment, etc.)

Different types of joints to be used in

frames including butt joint, etc.

different types of flashing and

interface and their construction as per

drawings and specifications

1. Measuring tape

2. Scale

3. Right angle

4. Framing square

5. Chalk line

6. pencil

7. Line dori

8. Plumb bob

9. Spirit level

10. Pliers

11. Punch pliers

12. Hammers

13. Taping knife

14. Sanding tool

15. Hand circular saw

16. Hack saw

17. Jig saw

18. Rake angle

19. Screw driver set

20. Screw gun

21. Hammer Drill

machine

22. Rivet gun

23. Metal cutter

24. Silicon gun/caulk

gun

25. Stapler

26. Clutch angle

27. Utility knife

Page 6: Model Curriculum · and carry out installation of stick system curtain wall ... -Select tools and equipment and carry out installation of structural glazing type of façade installation

Facade Installer

Sr. No.

Module Key Learning Outcomes Equipment Required

how to check for alignment,

straightness ,plumb and

imperfections in panels and sub

frames

how to check for panel material

imperfections, frame members

imperfections etc.

Process of checking structural

adequacy of the interface structure for

fixing wall panels, connections etc.

process involved in cleaning of joints

in frames

Process of application of primer on

joints.

use of suitable lifting devices for lifting

heavy panels to the required places

allowable tolerance limits for panel

positioning

Process of keeping the panels flat &

straight with appropriate no. of screws

per

sheet

principles of water and air tightness

and concept of drained facades,

ventilated facades and pressure

equalized facades

Demonstration/ Practical :-

Read and interpret details from

relevant drawing.

Explain task by interpreting work

methodology.

Identify and select different type of

panel materials, frames for fixing.

Carry out checks to ensure panels are

of specified material and type and as

per specifications

Carry out checks on glass panels for

surface and edge defects

Carry out checks for imperfections in

the panel and frame members and

Carry out checks replacement of

panels which are not fit for installation

check to ensure suitable lifting

equipment is in place at point of

installation

Page 7: Model Curriculum · and carry out installation of stick system curtain wall ... -Select tools and equipment and carry out installation of structural glazing type of façade installation

Facade Installer

Sr. No.

Module Key Learning Outcomes Equipment Required

carry out measurement to check the

structural adequacy of interface

structure so that structure is fit to

accommodate wall panels, its

connections etc

Carry out checks for the rigidity of the

fixed framed structure /interface

Carry out measurement to ensure that

sub frame is straight ,aligned and rigid

carry out straightening of sub frame

as per requirement

check to ensure the joints in frame

are as per approved specification

check and ensure proper cleaning of

joints and application of primer on

joints as per applicability

check to ensure that all wall framing

members are in place and secured

check that gasket and sealant are as

per specification plan for fixing of

panels as per approved and

instructed methodology

check all fixing members are of

specified type, size and material

3 Install stick system curtain walls Theory Duration (hh:mm) 22:00 Practical Duration (hh:mm) 88:00 Corresponding NOS Code CON/N1117

Theory:-

standard practices for façade

installation

sketches used for façade installation

various manufacturer’s instructions

for façade installation, their

understanding and use

Specifications for wall frame

members,joints, gaskets and sealants

etc.

different type of glass used for panels

different type of frame materials used

in façade works like timber, steel,

aluminium, PCVu, composites etc

Different type of panelling material

used for façade works like aluminium

composite panel, glass, glass fibber

reinforced concrete, stone, ceramic

etc. and their respective properties

and applications

different type of curtain walls such as

panelised curtain wall, unitised curtain

1. Measuring tape

2. Scale

3. Right angle

4. Framing square

5. Chalk line

6. pencil

7. Line dori

8. Plumb bob

9. Spirit level

10. Pliers

11. Punch pliers

12. Hammers

13. Taping knife

14. Sanding tool

15. Hand circular saw

16. Hack saw

17. Jig saw

18. Rake angle

19. Screw driver set

20. Screw gun

21. Hammer Drill

machine

22. Rivet gun

23. Metal cutter

Page 8: Model Curriculum · and carry out installation of stick system curtain wall ... -Select tools and equipment and carry out installation of structural glazing type of façade installation

Facade Installer

Sr. No.

Module Key Learning Outcomes Equipment Required

wall, stick system curtain wall, rain

screens etc

Difference in transom drained curtain

wall and mullion drained curtain wall

components of stick system curtain

wall

various hardware component for stick

wall curtain system including anchors,

aluminium connectors, setting blocks,

corner blocks, pressure plates, caps,

gaskets and sealants

Various fastening method used in

façade works like clips & screws,

backside attachment, etc.

different sealants and gaskets used

for weatherproofing and drainage

system

joints, their uniformity and acceptable

tolerance for uniformity of joints

Installation of vertical mullion,

horizontal mullion, vision panels,

corner blocks etc.

expansion joints in vertical mullions

Fixing of panels, gasket and sealant

in stick build system.

Weep holes and their use

Providing door window opening and

weep holes

Demonstration/ Practical :-

Read and interpret details from

relevant drawing.

Identify various components of stick

build system.

Measure to check appropriateness of

wall members.

Carry out installation of vertical

mullions over floor edge at

appropriate spacing as per

specifications

Provide expansion joints in vertical

mullions as per specifications

Carry out installation of corner block

at the junction of the vertical mullion

and rail

Place and fix panels as per

specifications

24. Silicon gun/caulk

gun

25. Stapler

26. Clutch angle

27. Utility knife

Page 9: Model Curriculum · and carry out installation of stick system curtain wall ... -Select tools and equipment and carry out installation of structural glazing type of façade installation

Facade Installer

Sr. No.

Module Key Learning Outcomes Equipment Required

Carry out installation of vision panels

Carry out fixing of gasket and

sealants as per specifications

Carry out checks to confirm

horizontal, vertical alignment.

Checks uniformity of joints

Use appropriate fastening methods

for fixing of panels and frames.

Carry out fastening and sealing of

back pan.

Check pilot holes for size, screws and

panel clip attachments for secure

fixing

Carry out weather proofing and

provide drainage in the stick system

as per specifications

Check door/window opening

Provide weep holes as per

requirement

4 Install structural glazing type of façade installation Theory Duration (hh:mm) 22:00 Practical Duration (hh:mm) 88:00

Corresponding NOS Code CON/N1119

Theory:-

standard practices for façade

installation

sketches used for façade

installation

various manufacturer’s instructions

for façade installation, their

understanding and use

Specifications for wall frame

members, joints, gaskets and

sealants etc.

different type of glass used for

panels

different type of frame materials

used in façade works like timber,

steel, aluminium, PCVu,

composites etc

Different type of panelling material

used for façade works like

aluminium composite panel, glass,

glass fibre reinforced concrete,

stone, ceramic etc. and their

respective properties and

applications

different type of curtain walls such

as panelised curtain wall, unitised

curtain

1. Measuring tape

2. Scale

3. Right angle

4. Framing square

5. Chalk line

6. pencil

7. Line dori

8. Plumb bob

9. Spirit level

10. Pliers

11. Punch pliers

12. Hammers

13. Taping knife

14. Sanding tool

15. Hand circular saw

16. Hack saw

17. Jig saw

18. Rake angle

19. Screw driver set

20. Screw gun

21. Hammer Drill

machine

22. Rivet gun

23. Metal cutter

24. Silicon gun/caulk

gun

25. Stapler

26. Clutch angle

27. Utility knife

Page 10: Model Curriculum · and carry out installation of stick system curtain wall ... -Select tools and equipment and carry out installation of structural glazing type of façade installation

Facade Installer

Sr. No.

Module Key Learning Outcomes Equipment Required

wall, stick system curtain wall, rain

screens etc

Difference in transom drained

curtain wall and mullion drained

curtain wall

components of structural glazing

type curtain wall

various hardware component for

structural glazing type curtain wall

including anchors, aluminium

connectors, setting blocks, corner

blocks, pressure plates, caps,

gaskets and sealants

Various fastening method used in

façade works like clips & screws,

backside attachment, etc.

different sealants and gaskets used

for weatherproofing and drainage

system

use of silicon sealants and its

application

joints, their uniformity and

acceptable tolerance for uniformity

of joints

Installation of vertical mullion,

horizontal mullion, vision panels,

corner blocks etc.

expansion joints in vertical mullions

Fixing of panels, gasket and

sealant in stick build system.

Weep holes and their use

Providing door window opening

and weep holes

Impact of temperature and vapours

on façade work

Demonstration/ Practical :-

Read and interpret details from

relevant drawing.

Identify various components of

structural glazing system

Measure to check appropriateness

of wall members as well as

structural adequacy.

Carry out installation of vertical

mullions over floor edge at

Page 11: Model Curriculum · and carry out installation of stick system curtain wall ... -Select tools and equipment and carry out installation of structural glazing type of façade installation

Facade Installer

Sr. No.

Module Key Learning Outcomes Equipment Required

appropriate spacing as per

specifications

Provide expansion joints in vertical

mullions as per specifications

Carry out installation of horizontal

mullions to create frame openings

Carry out installation of corner

block at the junction of the vertical

mullion and rail

Place and fix panels as per

specifications

Carry out installation of vision

panels

Carry out fixing of gasket and

sealants as per specifications

Carry out checks to confirm

horizontal, vertical alignment.

Checks uniformity of joints

Use appropriate fastening methods

for fixing of panels and frames.

Create a cap less vertical joint

system by sealing from outside

using silicon sealant as per

specification

Check pilot holes for size, screws

and panel clip attachments for

secure fixing

Carry out weather proofing and

provide drainage in the stick

system as per specifications

Check door/window opening

Provide weep holes as per

applicability

5 Work effectively in a team to deliver results at a construction site Theory Duration (hh:mm) 05:00 Practical Duration (hh:mm) 19:00

Theory:-

Method of oral and written

communication skills with co-

workers, trade seniors while

handling and carrying out visual

checks on materials, , tools and

equipment

How to interpret scope of façade

works, material/ tools handling by

adhering to instructions or

consulting with seniors

Page 12: Model Curriculum · and carry out installation of stick system curtain wall ... -Select tools and equipment and carry out installation of structural glazing type of façade installation

Facade Installer

Sr. No.

Module Key Learning Outcomes Equipment Required

Corresponding NOS Code CON/N8001

Method of providing instruction to

subordinates or reporting to seniors

clearly and promptly

Seek necessary support and

complete assigned tasks within

stipulated time duration

Keep good relation and maintain

well behaviour with co-workers

Demonstration/ Practical :- The skills will be developed and

practiced while carrying out following

trade related activities in a predictable

and familiar working condition

Selection of materials, tools or

devices for defined purpose under

façade installation works and

providing instructions to

subordinates for the same.

Handling of tools, equipment and

materials for various types of

façade installation works including

efficiently communicating with co-

workers for desired requirement as

per specification

Carrying out installation of stick

system, unitized system and

structural glazing curtain wall

façade installation works while

working as a team to ensure

optimum utilization of material and

resources

Carrying out façade installation

works utilizing the effort of co-

workers.

Undertaking visual checks to

assess the quality of material and

check line, level and alignments of

work

Selection and handing over of

desired/ appropriate tools/

materials while assisting trade

senior

6 Plan and organize work to meet expected outcomes Theory Duration

Theory:-

To plan façade installation activities

within defined scope of work

Basic concept of productivity,

sequence of working and

Page 13: Model Curriculum · and carry out installation of stick system curtain wall ... -Select tools and equipment and carry out installation of structural glazing type of façade installation

Facade Installer

Sr. No.

Module Key Learning Outcomes Equipment Required

(hh:mm) 03:00 Practical Duration (hh:mm) 13:00 Corresponding NOS Code CON/N8002

implementation of safety and

organizational norms while working

Upkeep, storing and stacking

methods of tools, materials used for

domain specific works

Requisition of resources, reporting

for requirement of resources orally

and in written to concerned

authority - (T/P)

Demonstration/ Practical :-

The skills will be developed and

practiced while carrying out

following trade related activities in a

predictable and familiar working

condition

Selection of materials, tools or

devices for defined purpose in an

optimum manner

Handling/organizing masonry tools,

material, fixtures and device for

installation of stick system curtain

wall and structural glazing type of

façade installation works.

Prioritize all works/ activities

Planning installation stick system

curtain wall and structural glazing

type of façade installation works as

per scope and schedule.

Carrying out installation of façade

works by optimum utilization of

material and resources

Optimum use of resources while

performing task

Adherence to stipulated timelines

for completion of facade installation

activities

7 Work according to personal health, safety and environment protocol at construction site Theory Duration (hh:mm) 10:00 Practical Duration

Theory: -

Types of hazards involved in

construction sites

Types of hazards involved in

façade installation works.

Emergency safety control

measures and actions to be

taken under emergency situation

Concept of: -

1. Safety Helmets 2. Face shield 3. Overalls 4. Knee pads 5. Safety shoes 6. Safety belts 7. Safety harness 8. Safety Gloves 9. Safety goggles 10. Particle masks 11. Ear Plugs

Page 14: Model Curriculum · and carry out installation of stick system curtain wall ... -Select tools and equipment and carry out installation of structural glazing type of façade installation

Facade Installer

Sr. No.

Module Key Learning Outcomes Equipment Required

(hh:mm) 38:00 Corresponding NOS Code CON/N9001

1. First Aid process

2. Use of fire extinguisher

3. Classification of fires and fire

extinguisher

4. Safety drills

5. Types and use of PPEs as per

safety norms

Reporting procedure to the

concerned authority in

emergency situations

Standard procedure of handling,

storing and stacking material.

What is safe disposal of waste,

type of waste and their disposal

Importance of handling tools,

equipment and materials as per

applicable.

Safety relevant to tools, tackles,

& requirement as per

applicability.

basic ergonomic principles as per

applicability

Demonstration/ Practical (D/P): - The skills will be developed and practiced while carrying out following trade related activities in a predictable and familiar working condition.

Selection of PPEs and use them

appropriately as per working

need of façade installation

operations, handling, storing,

stacking and shifting of tools and

equipment for façade installation

work

Selection of PPEs and use them

appropriately as per façade

installation work need.

Analysis of hazards involved in

façade installation work and

taking necessary steps or

informing to seniors.

Identification of locations,

situations/ circumstances,

malpractices which can be

hazardous for general or façade

installation work

12. Reflective jackets 13. Fire Extinguisher 14. Fire prevention kit 15. First Aid box 16. Safety tags 17. Safety Notice board

Page 15: Model Curriculum · and carry out installation of stick system curtain wall ... -Select tools and equipment and carry out installation of structural glazing type of façade installation

Facade Installer

Sr. No.

Module Key Learning Outcomes Equipment Required

Selection of fire extinguisher

based on classification of fire,

standard practice of storing &

stacking firefighting equipment/

materials at work locations

Disposal of waste materials as

per their nature and effects on

weather

Total Duration Theory Duration 86:00 Practical Duration 314:00

Unique Equipment Required: Classroom having seating requirement for 30 people, Toilet/Urinals (Separate for gents and Ladies), Projector, Blackboard, Work shop for practical assessment, Measuring tape, Scale, Right angle, Framing square, Chalk line, pencil, Line Dori, Plumb bob, Spirit level, Pliers, Punch pliers, Hammers, Taping knife, Sanding tool, Hand circular saw, Hack saw, Jig saw, Rake angle, Screw driver set, Screw gun, Hammer Drill machine, Rivet gun, Metal cutter, Silicon gun/caulk gun, Stapler, Clutch angle, Utility knife, Safety Helmets, Face shield, Overalls, Knee pads, Safety shoes, Safety belts, Safety harness, Safety Gloves, Safety goggles, Particle masks, Ear Plugs, Reflective jackets, Fire Extinguisher, Fire prevention kit, First Aid box, Safety tags, Safety Notice board

Grand Total Course Duration: 400 Hours, 0 Minutes (This syllabus/ curriculum has been approved by Construction Skill Development Council of India)

Page 16: Model Curriculum · and carry out installation of stick system curtain wall ... -Select tools and equipment and carry out installation of structural glazing type of façade installation

Facade Installer

Trainer Prerequisites for Job role: “Facade Installer” mapped to Qualification Pack: “CON/Q1106, v1.0”

Sr. No.

Area Details

1 Description To deliver accredited training service, mapping to the curriculum detailed above, in accordance with the Qualification Pack “CON/Q1106”.

2 Personal Attributes

Aptitude for conducting training, and pre/ post work to ensure competent, employable candidates at the end of the training. Strong communication skills, interpersonal skills, ability to work as part of a team; a passion for quality and for developing others; well-organised and focused, eager to learn and keep oneself updated with the latest in the mentioned field

3 Minimum Educational Qualifications

ITI/12th standard pass

4a Domain Certification

Trainer/Assessor- 50% in each NOS of Qualification Pack “CON/Q1106” & 80% overall , Lead trainer/Lead Assessors- 50% in each NOS of Qualification Pack “CON/Q1106” & 90% overall

4b Platform Certification

Trainer/Assessor-80% in each NOS of Qualification Pack “MEP/Q0102” or “MEP/Q0104”, Lead trainer/ Lead Assessors- 90% in each NOS of Qualification Pack “MEP/Q0101” or “MEP/Q0103”and overall 90%

5 Experience i. Technical Degree holder with minimum three years of Field experience and preferably two years of teaching experience or, ii. In case of a Diploma Holder five years of field experience and preferably two years of teaching experience or, iii. In case of ITI/12th pass minimum eight years of field experience and preferably two years of teaching Experience.

Page 17: Model Curriculum · and carry out installation of stick system curtain wall ... -Select tools and equipment and carry out installation of structural glazing type of façade installation

Facade Installer

CRITERIA FOR ASSESSMENT OF TRAINEES

Job Role Façade Installer

Qualification Pack CON/Q1106

Sector Skill Council Construction

Guidelines for Assessment 1. Criteria for assessment for each Qualification Pack will be created by the Sector Skill Council. Each

Performance Criteria (PC) will be assigned marks proportional to its importance in NOS. SSC will also lay down

proportion of marks for Theory and Skills Practical for each PC.

2. The assessment for the knowledge part will be based on knowledge bank of questions created by Assessment

Bodies subject to approval by SSC

3. Individual assessment agencies will create unique question papers for knowledge/theory part for assessment

of candidates as per assessment criteria given below

4. Individual assessment agencies will create unique evaluations for skill practical for every student at each

examination/training centre based on assessment criteria.

5. The passing percentage for each QP will be 50%. To pass the Qualification Pack, every trainee should score a

minimum of 50% individually in each NOS.

6. The Assessor shall check the final outcome of the practices while evaluating the steps performed to achieve

the final outcome.

7. The trainee shall be provided with a chance to repeat the test to correct his procedures in case of improper

performance, with a deduction of marks for each iteration.

8. After the certain number of iteration as decided by SSC the trainee is marked as fail, scoring zero marks for

the procedure for the practical activity.

9. In case of successfully passing only certain number of NOSs, the trainee is eligible to take subsequent

assessment on the balance NOSs to pass the Qualification Pack within the specified timeframe set by SSC.

10. Minimum duration of Assessment of each QP shall be of 4hrs/trainee.

Page 18: Model Curriculum · and carry out installation of stick system curtain wall ... -Select tools and equipment and carry out installation of structural glazing type of façade installation

Facade Installer

Marks Allocation

Assessment outcomes

Assessment Criteria for outcomes Total Mark

Out Of Theory Skills Practical

CON/N1116: Carry out checks and measures prior to fixing of stick system, unitized and structural glazing curtain wall

PC1. read and interpret sketches and work methodology relevant to façade installation work

100

6 1.2 4.8

PC2. identify the type of panel material, frames and the method of fixing from work instructions

6 1.2 4.8

PC3. select tools and equipment as per applicability and check prior to use for safety and serviceability

6 1.2 4.8

PC4. check that panels are of specified material and type and as per specifications

6 1.2 4.8

PC5. check the glass panels for surface and edge defects

6 1.2 4.8

PC6. check for imperfections in the panel and frame members and replace panels which are not fit for installation

5 1 4

PC7. check that suitable lifting equipment is in place at point of installation

5 1 4

PC8. measure and check the structural adequacy of interface structure so that structure is fit to accommodate wall panels, its connections etc

6 1.2 4.8

PC9. check the rigidity of the fixed framed structure /interface

6 1.2 4.8

PC10. measure and ensure that sub frame is straight ,aligned and rigid

6 1.2 4.8

PC11. carry out straightening of sub frame as per applicability

6 1.2 4.8

PC12. check to ensure the joints in frame are as per approved specification

6 1.2 4.8

PC13. check and ensure proper cleaning of joints and application of primer on joints as per applicability

6 1.2 4.8

PC14. ensure that all wall framing members are in place and secured

6 1.2 4.8

PC15. check that gasket and sealant are as per specification

6 1.2 4.8

PC16. plan for fixing of panels as per approved and instructed methodology

6 1.2 4.8

PC18. check all fixing members are of specified type, size and materials

6 1.2 4.8

Total 100 20 80

Page 19: Model Curriculum · and carry out installation of stick system curtain wall ... -Select tools and equipment and carry out installation of structural glazing type of façade installation

Facade Installer

CON/N1117: Install stick system curtain walls

PC1. identify various components of stick build system including hardware components for installation

100

4 0.8 3.2

PC2. check and ensure wall members are cut to appropriate length prior to installation

4 0.8 3.2

PC3. install the vertical mullion over the floor edge with a steel angle as per instructions

4 0.8 3.2

PC4. install mullions at appropriate spacing as per specification

6 1.2 4.8

PC5. provide expansion joint in vertical mullions as per instructions

5 1 4

PC6. attach the horizontal mullion (transom) to vertical mullion to create frame opening

5 1 4

PC7. install corner block at the junction of the vertical mullion and rail

5 1 4

PC8. place and fix panels in both vision area and spandrel panel cover area as per specification

5 1 4

PC9. install vision panels in frame opening between floors as per specifications

5 1 4

PC10. seal the inside of panels using dry gasket or sealant on outside as specified

5 1 4

PC11. check that each panel is set to plumb and panel joints are uniformly engaged as per requirements

5 1 4

PC12. hold panels in place using full length pressure plates and aluminum snap caps

4 0.8 3.2

PC13. adopt appropriate fastening method (clips & screws, backside attachment, etc.) to attach panels with framing members

5 1 4

PC14. enclose the spandrel area with metal back pan (air and vapor barrier), with high density glass fiber or mineral fiber insulation within the back pan

5 1 4

PC15. fasten and seal the back pan to frame as per specification

5 1 4

PC16. check that pilot holes are of the appropriate size for fastening process

4 0.8 3.2

PC17. check that screws and panel clip attachments are secured at the appropriate angle as per the specified procedure

4 0.8 3.2

PC18. protect all coated surface from damage during handling and installation

4 0.8 3.2

PC19. carry out weather proofing and provide drainage in the stick system as per specifications

4 0.8 3.2

PC20. ensure window and door openings are provided as per specification

4 0.8 3.2

PC21. provide weep holes as per applicability 4 0.8 3.2

PC22. carry out fixing of all the elements as per acceptable tolerance limit

4 0.8 3.2

Page 20: Model Curriculum · and carry out installation of stick system curtain wall ... -Select tools and equipment and carry out installation of structural glazing type of façade installation

Facade Installer

Total 100 20 80

CON/N1119: Install structural glazing type of façade installation

PC1. identify various components of structural glazing system including hardware components for installation

100

5 1 4

PC2. check and ensure wall members are cut to appropriate length prior to installation

5 1 4

PC3. check the as built surface for adequacy prior to fixing structural glazing

5 1 4

PC4. install the vertical mullion over the floor edge with a steel angle as per instructions

5 1 4

PC5. install mullions at appropriate spacing as per specification

5 1 4

PC6. provide expansion joint in vertical mullions as per instructions

5 1 4

PC7. attach the horizontal mullion (transom) to vertical mullion to create frame opening

5 1 4

PC8. install corner block at the junction of the vertical mullion and rail

5 1 4

PC9. place and fix panels in both vision area and spandrel panel cover area as per specification

5 1 4

PC10. install vision panels in frame opening between floors

5 1 4

PC11. check that each panel is set to plumb and panel joints are uniformly engaged as per requirements

5 1 4

PC12. hold panels in place using full length pressure plates and aluminum snap caps

5 1 4

PC13. adopt appropriate fastening method (clips & screws, backside attachment, etc.) to attach panels with framing members

5 1 4

PC14. create a capless vertical joint system by sealing from outside using silicon sealant as per specification

5 1 4

PC15. check that pilot holes are of the appropriate size for fastening process

5 1 4

PC16. check that screws and panel clip attachments are secured at the appropriate angle as per the specified procedure

5 1 4

PC17. protect all coated surface from damage during handling and installation

4 0.8 3.2

PC18. carry out weather proofing and provide drainage in the stick system as per specifications

4 0.8 3.2

PC19. ensure window and door openings are provided as per specification

4 0.8 3.2

PC20. provide weep holes as per applicability 4 0.8 3.2

PC21. carry out fixing of all the elements as per acceptable tolerance limit

5 1 4

Total 100 20 80

PC1. pass on work related information/ requirement clearly to the team members

100

10 2 8

Page 21: Model Curriculum · and carry out installation of stick system curtain wall ... -Select tools and equipment and carry out installation of structural glazing type of façade installation

Facade Installer

CON/N8001: Work effectively in a team to deliver desired results at the workplace

PC2. inform co-workers and superiors about any kind of deviations from work

5 1 4

PC3. address the problems effectively and report if required to immediate supervisor appropriately

5 1 4

PC4. receive instructions clearly from superiors and respond effectively on same

5 1 4

PC5. communicate to team members/subordinates for appropriate work technique and method

5 1 4

PC6. seek clarification and advice as per requirement and applicability

10 2 8

PC7. hand over the required material, tools tackles, equipment and work fronts timely to interfacing teams

30 6 24

PC8. work together with co-workers in a synchronized manner

30 6 24

Total 100 20 80

CON/N8002: Plan and organize work to meet expected outcomes

PC1. understand clearly the targets and timelines set by superiors

100

10 2 8

PC2. plan activities as per schedule and sequence 10 2 8

PC3. provide guidance to the subordinates to obtain desired outcome

10 2 8

PC4. plan housekeeping activities prior to and post completion of work

10 2 8

PC5. list and arrange required resources prior to commencement of work

10 2 8

PC6. select and employ correct tools, tackles and equipment for completion of desired work

10 2 8

PC7. complete the work with allocated resources 10 2 8

PC8. engage allocated manpower in an appropriate manner

10 2 8

PC9. use resources in an optimum manner to avoid any unnecessary wastage

5 1 4

PC10. employ tools, tackles and equipment with care to avoid damage to the same

5 1 4

PC11. organize work output, materials used, tools and tackles deployed,

5 1 4

PC12. processes adopted to be in line with the specified standards and instructions

5 1 4

Total 100 20 80

CON/N9001: Work according to personal health, safety and environment protocol at construction site

PC1. identify and report any hazards, risks or breaches in site safety to the appropriate authority

100

5 1 4

PC2. follow emergency and evacuation procedures in case of accidents, fires, natural calamities

5 1 4

PC3. follow recommended safe practices in handling construction materials, including chemical and hazardous material whenever applicable

10 2 8

PC4. participate in safety awareness programs like Tool Box Talks, safety demonstrations, mock drills, conducted at site

5 1 4

Page 22: Model Curriculum · and carry out installation of stick system curtain wall ... -Select tools and equipment and carry out installation of structural glazing type of façade installation

Facade Installer

PC5. identify near miss , unsafe condition and unsafe act

5 1 4

PC6. use appropriate Personal Protective Equipment (PPE) as per work requirements including: • Head Protection (Helmets) • Ear protection • Fall Protection • Foot Protection • Face and Eye Protection • Hand and Body Protection • Respiratory Protection (if required)

10 2 8

PC7. handle all required tools, tackles , materials & equipment safely

5 1 4

PC8. follow safe disposal of waste, harmful and hazardous materials as per EHS guidelines

5 1 4

PC9. install and apply properly all safety equipment as instructed

15 3 12

PC10. follow safety protocol and practices as laid down by site EHS department

15 3 12

PC11. collect and deposit construction waste into identified containers before disposal, separate containers that may be needed for disposal of toxic or hazardous wastes

10 2 8

PC12. apply ergonomic principles wherever required 10 2 8

Total 100 20 80