Standard Time System Tank Container 2009 MODE 10 Page 1 Revision A Tank Container of 20 Revised : 2009-nov TABLE OF CONTENTS TABLE OF CONTENTS ............................................................................................................................................ 1 TABLE OF REVISIONS ............................................................................................................................................ 3 CONFIRMATION OF RECEIPT .............................................................................................................................3 GENERAL REMARKS .............................................................................................................................................. 4 0.0 MISCELLANEOUS .............................................................................................................................................. 5 0.1 PREPARATION TIME.............................................................................................................................5 0.2 CLEANING .............................................................................................................................................5 0.3 DECALS AND ISO-MARKING...............................................................................................................6 0.4 MISCELLANEOUS. ................................................................................................................................6 0.5 CHECKING ISO DIMENSION. ...............................................................................................................7 1.0 TOP........................................................................................................................................................................ 8 1.1 TOP CROSSMEMBER -- REPLACEMENT.............................................................................................8 1.2 TOP CROSSMEMBER SECTIONING. .................................................................................................8 1.3 SUPPORT RAIL -- REPLACEMENT / STRAIGHTENING ......................................................................8 1.4 MANHOLE -- REPLACEMENT ..............................................................................................................9 1.5 GANGWAY REPLACEMENT / STRAIGHTENING.............................................................................9 2.0 ENDS ................................................................................................................................................................... 10 2.1 END TOP RAIL -- REPLACEMENT...................................................................................................... 10 2.2 END TOP RAIL INSERT / STRAIGHTENING.................................................................................... 10 2.3 END TOP RAIL -- SECTIONING........................................................................................................... 10 2.4 END BOTTOM RAIL -- REPLACEMENT. ............................................................................................ 11 2.5 END BOTTOM RAIL INSERT / STRAIGHTENING. .......................................................................... 11 2.6 END BOTTOM RAIL -- SECTIONING.................................................................................................. 11 2.7 CORNER POST - REPLACEMENT. ...................................................................................................... 12 2.8 CORNER POST INSERT / STRAIGHTENING.................................................................................... 12 2.9 CORNER CASTING -- REPLACEMENT............................................................................................... 12 2.10 SUPPORT RIB PLATE -- REPLACEMENT ......................................................................................... 13 3.0 SIDES................................................................................................................................................................... 14 3.1 SIDE TOP RAIL -- REPLACEMENT. .................................................................................................... 14 3.2 SIDE TOP RAIL INSERT / STRAIGHTENING. .................................................................................. 14 3.3 SIDE TOP RAIL -- SECTIONING. ......................................................................................................... 14 3.4 SIDE BOTTOM RAIL -- REPLACEMENT. ........................................................................................... 15 3.5 SIDE BOTTOM RAIL INSERT / STRAIGHTENING. ......................................................................... 15 3.6 SIDE BOTTOM RAIL -- SECTIONING. ................................................................................................ 15 3.7 SIDE POST -- REPLACEMENT............................................................................................................. 16 3.8 SIDE POST -- SECTIONING ................................................................................................................. 16 3.9 BEARER -- REPLACEMENT ................................................................................................................ 16 3.10 DIAGONAL BRACE -- REPLACEMENT ............................................................................................ 16

Mode10 - Tank Equipment

Embed Size (px)

DESCRIPTION

manual

Citation preview

Page 1: Mode10 - Tank Equipment

Standard Time System Tank Container

2009 MODE 10 Page 1 Revision A Tank Container of 20 Revised : 2009-nov

TABLE OF CONTENTS

TABLE OF CONTENTS ............................................................................................................................................ 1

TABLE OF REVISIONS ............................................................................................................................................ 3

CONFIRMATION OF RECEIPT.............................................................................................................................3

GENERAL REMARKS .............................................................................................................................................. 4

0.0 MISCELLANEOUS .............................................................................................................................................. 5

0.1 PREPARATION TIME.............................................................................................................................5 0.2 CLEANING .............................................................................................................................................5 0.3 DECALS AND ISO-MARKING...............................................................................................................6 0.4 MISCELLANEOUS. ................................................................................................................................6 0.5 CHECKING ISO DIMENSION. ...............................................................................................................7

1.0 TOP........................................................................................................................................................................ 8

1.1 TOP CROSSMEMBER -- REPLACEMENT.............................................................................................8 1.2 TOP CROSSMEMBER – SECTIONING. .................................................................................................8 1.3 SUPPORT RAIL -- REPLACEMENT / STRAIGHTENING ......................................................................8 1.4 MANHOLE -- REPLACEMENT ..............................................................................................................9 1.5 GANGWAY – REPLACEMENT / STRAIGHTENING.............................................................................9

2.0 ENDS ................................................................................................................................................................... 10

2.1 END TOP RAIL -- REPLACEMENT......................................................................................................10 2.2 END TOP RAIL – INSERT / STRAIGHTENING....................................................................................10 2.3 END TOP RAIL -- SECTIONING...........................................................................................................10 2.4 END BOTTOM RAIL -- REPLACEMENT. ............................................................................................11 2.5 END BOTTOM RAIL – INSERT / STRAIGHTENING. ..........................................................................11 2.6 END BOTTOM RAIL -- SECTIONING..................................................................................................11 2.7 CORNER POST - REPLACEMENT. ......................................................................................................12 2.8 CORNER POST – INSERT / STRAIGHTENING....................................................................................12 2.9 CORNER CASTING -- REPLACEMENT...............................................................................................12 2.10 SUPPORT RIB PLATE -- REPLACEMENT .........................................................................................13

3.0 SIDES................................................................................................................................................................... 14

3.1 SIDE TOP RAIL -- REPLACEMENT. ....................................................................................................14 3.2 SIDE TOP RAIL – INSERT / STRAIGHTENING. ..................................................................................14 3.3 SIDE TOP RAIL -- SECTIONING. .........................................................................................................14 3.4 SIDE BOTTOM RAIL -- REPLACEMENT. ...........................................................................................15 3.5 SIDE BOTTOM RAIL – INSERT / STRAIGHTENING. .........................................................................15 3.6 SIDE BOTTOM RAIL -- SECTIONING. ................................................................................................15 3.7 SIDE POST -- REPLACEMENT.............................................................................................................16 3.8 SIDE POST -- SECTIONING .................................................................................................................16 3.9 BEARER -- REPLACEMENT ................................................................................................................16 3.10 DIAGONAL BRACE -- REPLACEMENT............................................................................................16

Page 2: Mode10 - Tank Equipment

Standard Time System Tank Container

2009 MODE 10 Page 2 Revision A Tank Container of 20 Revised : 2009-nov

4.0 VALVES .............................................................................................................................................................. 17

4.1 BOTTOM VALVE. ................................................................................................................................17 4.2 FOOT VALVE. ......................................................................................................................................17 4.3 REMOTE ASSEMBLY ..........................................................................................................................17 4.4 PRESSURE RELIEF VALVE.................................................................................................................17 4.5 AIR LINE VALVE .................................................................................................................................18 4.6 VALVE BOX .........................................................................................................................................18

5.0 UNDERSTRUCTURE......................................................................................................................................... 19

5.1 BOTTOM CROSSMEMBER -- REPLACEMENT..................................................................................19 5.2 BOTTOM CROSSMEMBER -- SECTIONING.......................................................................................19 5.3 SUPPORT RAIL—REPLACEMENT / STRAIGHTENING ....................................................................19

REQUEST OF CHANGE / NEW STS CODE. ........................................................................................................ 20

Page 3: Mode10 - Tank Equipment

Standard Time System Tank Container

December 2001 MODE 10 Page 3 Revision A Tank Container of 20 Revised : 2002-01-23

TABLE OF REVISIONS

Chapter No. Revision No Revision Date Sign. May 2000

TABLE OF CONTENTS A pse TABLE OF REVISION A pse GENERAL REMARKS A pse 0.0 MISCELLANEOUS A pse 1.0 ROOF A pse 2.0 FRONT A pse 3.0 SIDES A pse 4.0 REAR A pse 5.0 DOORS A pse 6.0 FLOOR A pse 7.0 UNDERSTRUCTURE A pse

Confirmation of receipt

As confirmation of receipt of STS mode 10 this page must be returned to CENEQUEMR,TEC with e-mail to [email protected]. Please fill out below and return: Date______________________________ Location __________________________ Department________________________ Confirm hereby receipt of STS, mode 10, December 2001, chapter: All Signed by ________________________(user ID) In case you distribute to other locations/departments please add these locations below: Cc___________________________ Cc___________________________ Cc___________________________ Cc___________________________ Final, if you have any comments, request for codes, request to changes etc., please do not hesitate to apply same on attached sheet, page 31 and forward to CENEMR,TEC on above adress.

Page 4: Mode10 - Tank Equipment

Standard Time System Tank Container

December 2001 MODE 10 Page 4 Revision A Tank Container of 20 Revised : 2002-01-23

GENERAL REMARKS All estimations of man-hours are based on high cube containers and include: • MIG welding when joining steel parts. • 3 coat paint system Estimation of repairs which includes use of spare parts such as corner casting – corner post – crossmember – header – sill and top/bottom rail, asume spare parts delivered in correct size and shape. Time for manufacturing of spare parts shall bee included in the price for spare parts. Glossary of terms Replace : Remove damaged part and install new part. Reinstallation : Remove sound part and install same part in previous position. Doubler plate : Plate or angle which add thickness to a part of a structure such as header/sill Reinforcement/ gusset plate : Same as doubler plate Stiffener : Plate which add strength to the formed part of a structure such as header/sill Section : A piece of a structure such as: top/bottom rail – floor – locking rod. Splice : A section which is connected to the structure with plates (e.g. ALU-container) Insert : A part worked in a structure such as: top/bottom rail – corner post – header/sill etc.

Page 5: Mode10 - Tank Equipment

Standard Time System Tank

CPH Refe-rence

Description

Size L x W (in mm)

Max. Pieces

Man-hours

per piece

STS Code

2009 MODE 10 Page 5 Revision A Tank Container of 20 Revised : 2009-nov

0.0 MISCELLANEOUS

0.1 PREPARATION TIME

0A Job with a process time of less than or equal to 2 hours.

1 0.1 0003

0A Job with a process time of more than 2 hours but less than or equal to 8 hours.

1 0.3 0005

0A Job with a process time of more than 8 hours but less than or equal to 24 hours.

1 0.6 0008

0A Job with a process time of more than 24 hours but less than or equal to 40 hours.

1 0.9 0011

0A Job with a process time of more than 40 hours 1 1.2 0014

*** Total labor cost and hours 9997

*** Total repair shop material 9998

*** Total owner supplied parts 9999

0.2 CLEANING

*** Remove cargo label. per piece 9 0.1 0986

All other cleaning please see chapter “General instruction” in Policy Manual.

*** Partial blasting/repainting (only after CPH’s approval)

2 2.0 0918

*** Mechanical cleaning (scrap off paint/glue) (Only after CPH’s approval)

2 2.0 0919

*** Sales tax (Only after CPH’s approval) 1 0976

Page 6: Mode10 - Tank Equipment

Standard Time System Tank

CPH Refe-rence

Description

Size L x W (in mm)

Max. Pieces

Man-hours

per piece

STS Code

2009 MODE 10 Page 6 Revision A Tank Container of 20 Revised : 2009-nov

0.3 DECALS AND ISO-MARKING.

8B Replace decal of type 4 letters e.g. MAEU 7 0.2 0951

8B Replace decal of digit type (per 3 digits) 9 0.2 0952

8B Replace ckeck decal 7 0.1 0953

8B Replace U.I.C. decal 2 0.1 0954

8C Replace Star Door Logo 2 0.1 0955

*** Replace Miscellaneous markings 4 0.2 0959

8A Paint marking of Side Star Logo 2 0,7 0961

8A Paint marking of Side Letter 9 0.2 0962

8A Painting repair of part of letter 9 0.1 0963

10.03 Re-install data plate. (per piece) 2 0.2 0985

0.4 MISCELLANEOUS.

Emergency repair. 3 0.5 0802

*** Handling and trucking charge. 2 0.0 0917

10.02 Replace document box 9 0.2 6721

*** Replace temperature gauge 1 0,1 6722

10.05 Weld and paint cuts or cracks. = < 500 9 0.2 7891

> 500 9 0.3 7892

*** Tank presure test 1 M 8100

*** Replace gusset plate. (leased boxes only) 4 0.5 7920

*** Straighten gusset plate. (leased boxes only) 4 0.1 7981

*** Straighten/re-weld gusset plate. (leased boxes only)

4 0.2 7982

Page 7: Mode10 - Tank Equipment

Standard Time System Tank

CPH Refe-rence

Description

Size L x W (in mm)

Max. Pieces

Man-hours

per piece

STS Code

2009 MODE 10 Page 7 Revision A Tank Container of 20 Revised : 2009-nov

0.5 CHECKING ISO DIMENSION.

5B Checking ISO dimension 4 0.3 9200

(3 measurements - Roof, front and side)

Page 8: Mode10 - Tank Equipment

Standard Time System Tank

CPH Refe-rence

Description

Size L x W (in mm)

Max. Pieces

Man-hours

per piece

STS Code

December 2001 MODE 10 Page 8 Revision A Tank Container of 20 Revised : 2002-01-23

1.0 TOP

1.1 TOP CROSSMEMBER -- REPLACEMENT.

4.01 Replace top crossmember 4 0.6 1121

(Remove damaged crossmember --- install new crossmember - masking and painting)

1.2 TOP CROSSMEMBER – SECTIONING.

4.01 Replace top crossmember section. 600 4 0.4 1151

(including masking and painting)

1200 4 0.5 1152

1.3 SUPPORT RAIL -- REPLACEMENT / STRAIGHTENING Support between end top rail and side top rail

4.02 Replace support rail 4 0.4 1221

(Remove damaged support rail --- install new support rail - masking and painting)

*** Straighten support rail 4 0.1 1281

Page 9: Mode10 - Tank Equipment

Standard Time System Tank

CPH Refe-rence

Description

Size L x W (in mm)

Max. Pieces

Man-hours

per piece

STS Code

December 2001 MODE 10 Page 9 Revision A Tank Container of 20 Revised : 2002-01-23

1.4 MANHOLE – REPLACEMENT (including masking and painting if necessary)

4.05 Replace Manhole Lid 1 0.3 1321

4.05 Replace Gasket for manhole lid 1 0.3 1322

4.05 Replace Hinge Pin for manhole lid 2 0.2 1323

4.05 Replace Bracket for hinge pin 2 0.1 1324

4.05 Replace Lock for manhole lid 1 0.1 1325

4.05 Replace Bracket for lock 2 0.1 1326

4.07 Replace Manhole Box 1 1.7 1621

4.07 Replace Lid for manhole box 1 0.2 1622

4.07 Straighten Manhole Box 1 0.1 1681

4.07 Straighten Lid for manhole box 1 0.1 1682

1.5 GANGWAY – REPLACEMENT / STRAIGHTENING (including masking and painting if necessary)

4.06 Replace Gangway < 600 4 0.2 1521

600 to 1200 2 0.3 1522

> 1200 2 0.4 1523

4.06 Straighten Gangway 4 0.1 1581

Page 10: Mode10 - Tank Equipment

Standard Time System Tank

CPH Refe-rence

Description

Size L x W (in mm)

Max. Pieces

Man-hours

per piece

STS Code

December 2001 MODE 10 Page 10 Revision A Tank Container of 20 Revised : 2002-01-23

2.0 ENDS

2.1 END TOP RAIL -- REPLACEMENT.

5.04 Replace End Top Rail 2 1.8 2421 (Remove damaged end top rail --- install new end

top rail - masking and painting )

2.2 END TOP RAIL – INSERT / STRAIGHTENING.

5.00 Manufacture and install insert (material thickness 5 mm)

150 2 0.9 2441

(including masking and painting)

300 2 1.0 2442

450 2 1.0 2443

600 2 1.1 2444

900 1 1.3 2445

1200 1 1.5 2446

1500 1 1.7 2447

*** Straighten Top End Rail 2 0.1 2481

2.3 END TOP RAIL -- SECTIONING.

5.04 Replace End Top Rail section 1200 1 0.8 2451 (including masking and painting)

Page 11: Mode10 - Tank Equipment

Standard Time System Tank

CPH Refe-rence

Description

Size L x W (in mm)

Max. Pieces

Man-hours

per piece

STS Code

December 2001 MODE 10 Page 11 Revision A Tank Container of 20 Revised : 2002-01-23

2.4 END BOTTOM RAIL -- REPLACEMENT.

5.04 Replace End Bottom Rail 2 1.8 2521 (Remove damaged end bottom rail--- install new

end bottom rail- masking and painting

2.5 END BOTTOM RAIL – INSERT / STRAIGHTENING.

5.00 Manufacture and install insert (material thickness 5 mm)

150 2 0.9 2541

(including masking and painting)

300 2 1.0 2542

450 2 1.0 2543

600 2 1.1 2544

900 1 1.3 2545

1200 1 1.5 2546

1500 1 1.7 2547

*** Straighten Bottom End Rail 2 0.1 2581

2.6 END BOTTOM RAIL -- SECTIONING.

5.04 Replace End Bottom Rail section 1200 1 0.8 2551 (including masking and painting)

Page 12: Mode10 - Tank Equipment

Standard Time System Tank

CPH Refe-rence

Description

Size L x W (in mm)

Max. Pieces

Man-hours

per piece

STS Code

December 2001 MODE 10 Page 12 Revision A Tank Container of 20 Revised : 2002-01-23

2.7 CORNER POST - REPLACEMENT.

5.03 Replace Corner Post --- exclucive castings 2 2.2 2521

(Remove damaged corner post--- install new corner post - masking and painting)

2.8 CORNER POST – INSERT / STRAIGHTENING.

5.00 Manufacture and install insert (material thickness 6 mm)

150 2 1.0 2641

(including masking and painting)

300 2 1.1 2642

450 2 1.2 2643

600 2 1.4 2644

900 1 1.6 2645

1200 1 1.9 2646

1500 1 2.1 2647

5.03 Straighten Corner Post 2 0.5 2681

2.9 CORNER CASTING -- REPLACEMENT.

5.03 Replace Corner Casting 2 1.3 2721 (Remove damaged corner casting --- install new

corner casting - masking and painting)

Page 13: Mode10 - Tank Equipment

Standard Time System Tank

CPH Refe-rence

Description

Size L x W (in mm)

Max. Pieces

Man-hours

per piece

STS Code

December 2001 MODE 10 Page 13 Revision A Tank Container of 20 Revised : 2002-01-23

2.10 SUPPORT RIB PLATE -- REPLACEMENT

Support between corner post and end rails

5.01 Replace Support Rib Plate 2 0.5 2221 (Remove damaged rib plate --- install new rib plate -

masking and painting)

*** Straighten Support Rib Plate 2 0.1 2281

*** Alignment of frame to ISO standard 1 0.5 2381

Page 14: Mode10 - Tank Equipment

Standard Time System Tank

CPH Refe-rence

Description

Size L x W (in mm)

Max. Pieces

Man-hours

per piece

STS Code

December 2001 MODE 10 Page 14 Revision A Tank Container of 20 Revised : 2002-01-23

3.0 SIDES

3.1 SIDE TOP RAIL -- REPLACEMENT.

7.01 Replace Side Top Rail 2 1.8 3421 (Remove damaged side top rail --- install new side

top rail - masking and painting )

3.2 SIDE TOP RAIL – INSERT / STRAIGHTENING.

5.00 Manufacture and install insert (material thickness 5 mm)

150 2 0.9 3441

(including masking and painting)

300 2 1.0 3442

450 2 1.0 3443

600 2 1.1 3444

900 1 1.3 3445

1200 1 1.5 3446

1500 1 1.7 3447

*** Straighten Side Top Rail 2 0.1 3481

3.3 SIDE TOP RAIL -- SECTIONING.

7.01 Replace Side Top Rail section 600 2 1.1 3451

(including masking and painting)

900 2 1.1 3452

1200 1 1.2 3453

1800 1 1.7 3454

2400 1 2.1 3455

Page 15: Mode10 - Tank Equipment

Standard Time System Tank

CPH Refe-rence

Description

Size L x W (in mm)

Max. Pieces

Man-hours

per piece

STS Code

December 2001 MODE 10 Page 15 Revision A Tank Container of 20 Revised : 2002-01-23

3.4 SIDE BOTTOM RAIL -- REPLACEMENT.

7.02 Replace Side Bottom Rail 2 2.0 3521 (Remove damaged side bottom rail --- install new

enside bottom rail - masking and painting )

3.5 SIDE BOTTOM RAIL – INSERT / STRAIGHTENING.

5.00 Manufacture and install insert (material thickness 6 mm)

150 2 1.0 3541

(including masking and painting)

300 2 1.1 3542

450 2 1.2 3543

600 2 1.4 3544

900 1 1.6 3545

1200 1 1.9 3546

1500 1 2.1 3547

*** Straighten Side Bottom Rail 2 0.1 3581

3.6 SIDE BOTTOM RAIL -- SECTIONING.

7.01 Replace Side Bottom Rail section 600 2 1.4 3551

(including masking and painting)

900 2 1.4 3552

1200 1 1.5 3553

1800 1 2.0 3554

2400 1 2.5 3555

Page 16: Mode10 - Tank Equipment

Standard Time System Tank

CPH Refe-rence

Description

Size L x W (in mm)

Max. Pieces

Man-hours

per piece

STS Code

December 2001 MODE 10 Page 16 Revision A Tank Container of 20 Revised : 2002-01-23

3.7 SIDE POST -- REPLACEMENT

7.03 Replace Side Post 2 0.4 3121 (Remove damaged side post --- install new side

post - masking and painting )

3.8 SIDE POST -- SECTIONING

7.03 Replace Side Bottom Rail section < 1200 1 0.6 3151

(including masking and painting)

> 1200 1 0.7 3152

3.9 BEARER -- REPLACEMENT

7.05 Replace Bearer 2 1.5 3321

(Remove damaged besrer --- install new besrer - masking and painting )

*** Straighten Bearer 2 0.1 3381

3.10 DIAGONAL BRACE -- REPLACEMENT

7.04 Replace Diagonal Brace 2 0.5 3221

(Remove damaged brace --- install new brace - masking and painting )

*** Straighten Diagolan Brace 2 0.1 3281

Page 17: Mode10 - Tank Equipment

Standard Time System Tank

CPH Refe-rence

Description

Size L x W (in mm)

Max. Pieces

Man-hours

per piece

STS Code

December 2001 MODE 10 Page 17 Revision A Tank Container of 20 Revised : 2002-01-23

4.0 VALVES

4.1 BOTTOM VALVE.

8.01 Replace Bottom Valve 1 0.2 6121

8.01 Replace ‘‘O’’ ring and main seal in Bottom Valve 1 0.1 6122

8.01. Replace two ‘‘O’’ rings at spindle for Bottom Valve 1 0.2 6123

8.01 Replace connecting flange with blind flange 1 0.2 6124

4.2 FOOT VALVE.

8.01 Replace Foot Valve 1 0.2 6221

8.01 Replace ‘‘O’’ ring in Foot Valve 1 0.2 6222

4.3 REMOTE ASSEMBLY (including painting if necessary)

8.01 Replace Wire for remote assembly 1 0.2 6821

*** Replace bracket for Wire 4 0.1 6822

8.01 Replace Bearing Bracket for remote assembly 2 0.2 6823

8.01 Replace Handle for remote assembly 1 0.2 6824

4.4 PRESSURE RELIEF VALVE

8.02 Replace Pressure Relief Valve and envelope seal 2 0.1 6321

8.02 Replace ‘‘O’’ ring/spring/presure plate/vacuum poppet for pressure relief valve

2 0.2 6322

(Dismounting of valve - replace damaged items e.g ‘‘O’’ rings, springs - remounting of valve)

Page 18: Mode10 - Tank Equipment

Standard Time System Tank

CPH Refe-rence

Description

Size L x W (in mm)

Max. Pieces

Man-hours

per piece

STS Code

December 2001 MODE 10 Page 18 Revision A Tank Container of 20 Revised : 2002-01-23

4.5 AIR LINE VALVE

8.03 Replace Air Line Valve 1 0.2 6421

4.6 VALVE BOX

4.07 Replace Valve Box 1 1.7 6621 (including masking and painting)

4.07 Replace Lid for valve box 1 0.2 6622

4.07 Straighten Valve Box 1 0.1 6681

4.07 Straighten Lid for valve box 1 0.1 6682

Page 19: Mode10 - Tank Equipment

Standard Time System Tank

CPH Refe-rence

Description

Size L x W (in mm)

Max. Pieces

Man-hours

per piece

STS Code

December 2001 MODE 10 Page 19 Revision A Tank Container of 20 Revised : 2002-01-23

5.0 UNDERSTRUCTURE

5.1 BOTTOM CROSSMEMBER -- REPLACEMENT

4.01 Replace bottom crossmember 4 0.7 7121

(Remove damaged crossmember --- install new crossmember - masking and painting )

5.2 BOTTOM CROSSMEMBER -- SECTIONING

4.01 Replace bottom crossmember section 600 4 7151

(including masking and painting

1200 7152

5.3 SUPPORT RAIL—REPLACEMENT / STRAIGHTENING

Support between end bottom rail and side bottom rail

4.02 Replace support rail 4 0.4 7221

(Remove damaged support rail --- install new support rail - masking and painting )

*** Straighten support rail 4 0.1 7281

Page 20: Mode10 - Tank Equipment

Standard Time System Tank

2009 MODE 10 Page 20 Revision A Tank Container of 20 Revised : 2009-nov

Request of change / new STS code.

This page must be forwarded to CENEMRTEC case you request changes in codes or request new STS code.

Requesting office:Telex address:Name and initials:

New STS code yes no Revised STS code (code number)

Code requested for modes:00 01 02 03 04 05 06

Description of work:

Size (in mm): Pieces: Suggested Man-hours: Page:

For CENEQUEMR,TEC use only

Suggested STS Manual Description

Suggested RKRP Description

Suggested WMNR Description

CENEMR comments: