Upload
omar-sangrona
View
214
Download
0
Embed Size (px)
Citation preview
8/10/2019 Mode05 - Opentop Equipment
1/32
Standard Time System Steel Open Top
2009 MODE 05 Page 1 Revision: 1.1 Steel Open Top Container of 32 Revised : 2009
TABLE OF CONTENTS
TABLE OF CONTENTS ............... ........................ ................. ........................ .................... ..................... ................... 1
TABLE OF REVISIONS ............... ........................ ................. ........................ .................... ..................... ................... 3
CONFIRMATION OF RECEIPT .............................................................................................................................3
GENERAL REMARKS...... .................... ..................... .................... ..................... .................... ..................... ............. 4
Calculation of patch sizes:.............................................................................................................................4
0.0 MISCELLANEOUS........ ..................... ..................... .................... ..................... .................... ..................... .......... 5
0.1 PREPARATION TIME.............................................................................................................................50.2 CLEANING ............... ........................ ................. ........................ .................... ..................... ....................50.3 DECALS AND ISO-MARKING...............................................................................................................60.4 MISCELLANEOUS. .................... .................... ..................... ........................ .................... ..................... ..60.5 CHECKING ISO DIMENSION. .................... ..................... ..................... .................... ........................ .....7
1.0 TARPAULIN........ .................... ........................ ................. ........................ ..................... .................... ................... 8
1.1 TARPAULIN - REPLACEMENT. .................... ..................... ........................ .................... ..................... ..81.2 TARPAULIN PATCHING.....................................................................................................................81.3 TARPAULIN BOW. ..................... .................... ..................... ........................ .................... ..................... ..91.4 TIR-WIRE................................................................................................................................................9
2.0 FRONT ................. .................... ........................ ................. ........................ ..................... .................... ................. 10
2.1 FRONT PANEL - REPLACEMENT. ................ ..................... ........................ .................... ..................... 102.2 FRONT PANEL - PATCH/STRAIGHTENING.......................................................................................10
2.3 FRONT HEADER - REPLACEMENT....................................................................................................112.4 FRONT HEADER - INSERT/STRAIGHTENING...................................................................................112.5 FRONT SILL - REPLACEMENT. .................... ..................... ........................ .................... ..................... 122.6 FRONT SILL - INSERT/STRAIGHTENING................ ..................... .................... ..................... ............122.7 FRONT CORNER POST - REPLACEMENT..........................................................................................132.8 FRONT CORNER POST - INSERT/STRAIGHTENING.........................................................................132.9 FRONT CORNER CASTING - REPLACEMENT...................................................................................13
3.0 SIDES.......................... ................. ........................ .................... ..................... .................... ..................... .............. 14
3.1 SIDE PANEL - REPLACEMENT...........................................................................................................143.2 SIDE PANEL - PATCH/STRAIGHTENING...........................................................................................143.3 TOP RAIL - REPLACEMENT................................................................................................................153.4 TOP RAIL - INSERT.. ........................ ................. ........................ .................... ..................... ..................153.5 TOP RAIL - SECTIONING. ..................... .................... ..................... .................... ..................... ............163.6 NOT IN USE ................. ........................ .................... ..................... .................... ..................... ...............163.7 BOTTOM RAIL - REPLACEMENT.......................................................................................................163.8 BOTTOM RAIL - INSERT/STRAIGHTENING......................................................................................173.9 BOTTOM RAIL - SECTIONING............................................................................................................17
8/10/2019 Mode05 - Opentop Equipment
2/32
Standard Time System Steel Open Top
2009 MODE 05 Page 2 Revision: 1.1 Steel Open Top Container of 32 Revised : 2009
4.0 REAR.............. .................... ..................... .................... ..................... ..................... .................... ........................ .. 18
4.1 SWING HEADER - REPLACEMENT....................................................................................................184.2 SWING HEADER - INSERT/STRAIGHTENING...................................................................................184.3 SWING HEADER - MISCELLANEOUS. ............ ........................ .................... ..................... ..................194.4 REAR SILL - REPLACEMENT..............................................................................................................194.5 REAR SILL - INSERT/STRAIGHTENING. .................... ..................... .................... ..................... .........204.6 REAR CORNER POST - REPLACEMENT. .................... ..................... .................... ..................... .........214.7 REAR CORNER POST - INSERT/STRAIGHTENING. ..................... .................... ..................... ............214.8 REAR CORNER CASTING - REPLACEMENT. ................ ..................... .................... ........................ ...22
5.0 DOORS..... ................. ........................ ..................... .................... ..................... .................... ..................... ........... 23
5.1 DOOR PANEL - REPLACEMENT.........................................................................................................235.2 DOOR PANEL - PATCH/STRAIGHTENING. ................ ..................... .................... ..................... .........235.3 DOOR - FRAME. ................... ..................... .................... ..................... .................... ..................... .........245.4 DOOR PANEL - GASKET. ................... .................... ..................... .................... ..................... ...............245.5 DOOR HARDWARE REPLACEMENT / REPAIR...............................................................................255.6 DOOR HARDWARE - STRAIGHTENING. .................... ..................... .................... ..................... .........255.7 DOOR PANEL - MISCELLANEOUS.....................................................................................................26
6.0 FLOOR..... ................. ........................ ..................... .................... ..................... .................... ..................... ........... 27
6.1 FLOORING............................................................................................................................................276.2 FLOOR BOARD - PLANK. ................... .................... ..................... .................... ..................... ...............276.3 FLOOR BOARD - PLYWOOD.. ..................... .................... ..................... .................... ........................ ...276.4 CENTER RAIL ................... ..................... .................... ..................... .................... ..................... ............28
7.0 UNDERSTRUCTURE................. ........................ .................... ..................... .................... ..................... .............. 29
7.1 CROSSMEMBER. .................... .................... ..................... ..................... .................... ........................ ...29
7.2 TUNNEL SECTION...............................................................................................................................307.3 FORK LIFT POCKET. ................. ....................... ........................ .................... ..................... ..................31
REQUEST OF CHANGE / NEW STS CODE. ................. .................... ..................... .................... ........................ .. 32
8/10/2019 Mode05 - Opentop Equipment
3/32
Standard Time System Steel Open Top
2009 MODE 05 Page 3 Revision: 1.1 Steel Open Top Container of 32 Revised : 2009
TABLE OF REVISIONS
Chapter No. Revision No Revision Date Sign.June 2001
TABLE OF CONTENTS A 2001-06-01 pseTABLE OF REVISION C 2002-01-23 pseGENERAL REMARKS C 2002-01-23 pse0.0 MISCELLANEOUS A 2001-06-01 pse1.0 ROOF C 2002-01-23 pse2.0 FRONT C 2002-01-23 pse3.0 SIDES C 2002-01-23 pse4.0 REAR C 2002-01-23 pse5.0 DOORS C 2002-01-23 pse6.0 FLOOR C 2002-01-23 pse7.0 UNDERSTRUCTURE C 2002-01-23 pse3.9 BOTTOM RAIL _ SECTIONING 1.0 2005-04-14 kpk1.0 TARPAULIN 1.0 2005-11-22 kpk
Confirmation of receiptAs confirmation of receipt of STS mode 05 this page must be returned to CENEQUEMR,TEC with e-mail [email protected] .
Please fill out below and return:
Date______________________________
Location __________________________
Department________________________
Confirm hereby receipt of STS, mode 05, June 2009, chapter: All
Signed by ________________________(user ID)
In case you distribute to other locations/departments please add these locations below:
Cc___________________________ Cc___________________________
Cc___________________________ Cc___________________________
Final, if you have any comments, request for codes, request to changes etc., please do not hesitate to apply same onattached sheet, page 31 and forward to CENEQUEMR,TEC on above adress.
8/10/2019 Mode05 - Opentop Equipment
4/32
Standard Time System Steel Open Top
2009 MODE 05 Page 4 Revision: 1.1 Steel Open Top Container of 32 Revised : 2009
GENERAL REMARKS
All estimations of man-hours are based on high cube containers and include: MIG welding when joining steel parts. 3 coat paint system.
Estimation of repairs which includes use of spare parts such as corner casting corner post crossmember header sill - top/bottom rail and side panel, asume spare parts delivered in correct size and shape.
Time for manufacturing of spare parts shall bee included in the price for spare parts.
Calculation of patch sizes:
If patch sizes not as described in this manual, please use the repair code which covers the circumference ofthe actual patch.
e.g.Actual patch 600 x 600 (perimeter = 2.400 mm) ref. page 14, the proper code to use is 3116 (patch 850 x600) whose perimeter covers the actual perimeter.Actual patch 1.150 x 500 (perimeter = 3.300 mm) ref. page 14, the smallest patch which covers the perimeteris 900 x 1.060 and the proper code is 3117
If any difficulties, please contact Container Maintenance & Repair in Copenhagen for advice.
Glossary of terms
Replace : Remove damaged part and install new part.Reinstallation : Remove sound part and install same part in previous position.Doubler plate : Plate or angle which add thickness to a part of a structure such as header/sillReinforcement/gusset plate : Same as doubler plate Stiffener : Plate which add strength to the formed part of a structure such as header/sillSection : A piece of a structure such as: top/bottom rail floor locking rod.Splice : A section which is connected to the structure with plates (e.g. ALU-container)Insert : A part worked in a structure such as: top/bottom rail corner post header/sill etc.
8/10/2019 Mode05 - Opentop Equipment
5/32
Standard Time System Steel Open Top
CPHRefe-rence
Description
SizeL x W(in mm)
Max.Pieces
Man-hours
perpiece
STSCode
2009 MODE 05 Page 5 Revision: 1.1 Steel Open Top Container of 32 Revised : 2009
0.0 MISCELLANEOUS
0.1 PREPARATION TIME
0A Job with a process time of less than or equal to 2hours.
1 0.1 0003
0A Job with a process time of more than 2 hours butless than or equal to 8 hours. 1 0.3 0005
0A Job with a process time of more than 8 hours butless than or equal to 24 hours.
1 0.6 0008
0A Job with a process time of more than 24 hours butless than or equal to 40 hours.
1 0.9 0011
0A Job with a process time of more than 40 hours 1 1.2 0014
*** Total labor cost and hours 9997
*** Total repair shop material 9998
*** Total owner supplied parts 9999
0.2 CLEANING
*** Remove nails 1 0.2 0806
*** Remove cargo label. per piece 9 0.1 0986
Please refer to the chapter General STSInstructions for all other types of cleaning.
*** Partial blasting/repainting (only after CPHsapproval)
2 2.0 0918
*** Mechanical cleaning (scrap off paint/glue) (Onlyafter CPHs approval)
2 2.0 0919
*** Sales tax (Only after CPHs approval) 1 0976
8/10/2019 Mode05 - Opentop Equipment
6/32
Standard Time System Steel Open Top
CPHRefe-rence
Description
SizeL x W(in mm)
Max.Pieces
Man-hours
perpiece
STSCode
2009 MODE 05 Page 6 Revision: 1.1 Steel Open Top Container of 32 Revised : 2009
0.3 DECALS AND ISO-MARKING.
8B Replace decal of type 4 letters e.g. MAEU 7 0.2 0951
8B Replace decal of digit type (per 3 digits) 9 0.2 0952
8B Replace ckeck decal 7 0.1 0953
8B Replace U.I.C. decal 2 0.1 0954
8C Replace Star Door Logo 2 0.1 0955
*** Replace Miscellaneous markings 4 0.2 0959
8A Paint marking of Side Star Logo 2 0,7 0961
8A Paint marking of Side Letter 9 0.2 0962
8A Painting repair of part of letter 9 0.1 0963
*** Paint ISO --- marking (4 letters and 7 digits) attarpaulin (per tarpaulin)
1 0,3 0964
10.03 Re-install data plate. (per piece) 2 0.2 0985
0.4 MISCELLANEOUS.
4B Apply sealer including removal of old sealer. 5400 4 0.2 0801
10.04 Replace lashing ring/bar 9 0.2 6721
Emergency repair. 3 0.5 0802
1D3 Replace missing rivets/huckbolts. (per 5 pieces) 9 0.1 0804
*** Shower test. 1 1.0 0915
*** Handling and trucking charge. 2 0.0 0917
10.05 Weld and paint cuts or cracks. = < 500 9 0.2 7891
> 500 9 0.3 7892
8/10/2019 Mode05 - Opentop Equipment
7/32
Standard Time System Steel Open Top
CPHRefe-rence
Description
SizeL x W(in mm)
Max.Pieces
Man-hours
perpiece
STSCode
2009 MODE 05 Page 7 Revision: 1.1 Steel Open Top Container of 32 Revised : 2009
*** Replace gusset plate. (leased boxes only) 4 0.5 7920
*** Straighten gusset plate. (leased boxes only) 4 0.1 7981
*** Straighten/re-weld gusset plate. (leased boxesonly)
4 0.2 7982
0.5 CHECKING ISO DIMENSION.
5B Checking ISO dimension 4 0.3 9200(3 measurements - Roof, front and side)
8/10/2019 Mode05 - Opentop Equipment
8/32
Standard Time System Steel Open Top
CPHRefe-rence
Description
SizeL x W(in mm)
Max.Pieces
Man-hours
perpiece
STSCode
2009 MODE 05 Page 8 Revision: 1.1 Steel Open Top Container of 32 Revised : 2009
1.0 TARPAULIN
*** Renewing of Tarpaulin 20ft 1 1.2 1421
*** Renewing of Tarpaulin 40 ft 1 1.3 1422
1.1 TARPAULIN - REPLACEMENT.
*** Reinstallation of Tarpaulin 20 ft 1 0.8 1431
*** Reinstallation of Tarpaulin 40 ft 1 0.9 1432
1.2 TARPAULIN PATCHING.
*** Manufacture and install patch. 50 x 50 9 0.1 1111(including TIR seal)
100 x 100/150 x 150
9 0.1 1112
250 x 250/ 200 x 300
9 0.3 1113
300 x 300 8 0.4 1114
400 x 400/200 x 600
7 0.6 1115
200 x 800/300 x 600
6 0.7 1116
200 x 1000/600 x 600
5 0.8 1117
300 x 1000 4 0.9 1118
200 x 2000 3 1.0 1119
>200 x 2000 2 4.0 1110
8/10/2019 Mode05 - Opentop Equipment
9/32
Standard Time System Steel Open Top
CPHRefe-rence
Description
SizeL x W(in mm)
Max.Pieces
Man-hours
perpiece
STSCode
2009 MODE 05 Page 9 Revision: 1.1 Steel Open Top Container of 32 Revised : 2009
1.3 TARPAULIN BOW.
*** Replace bows, per 6 pieces 4 0.2 1221
*** Reinstallation of bows, per 6 pieces 4 0.1 1222
*** Replacement/repair of tarpaulin bow neck 8 0.2 1223
*** Straighten/repair 8 0.5 1281
*** Repair/replace tarpaulin bow socket 8 0.2 3620
1.4 TIR-WIRE.
*** Replacement 20 ft 1 0.2 1721
40 ft 1 0.3 1722
*** Replacement of TIR wire terminal 20/40 ft 1 0.1 1723
*** Replacement of TIR-wire end pin, per 2 pieces 20/40 ft 1 0.1 1921
Repair/replacement TIR-wire securing eye, per 3pieces
9 0.3 3621
*** Eyelet repair, per 3 pieces 9 0.3 1820
8/10/2019 Mode05 - Opentop Equipment
10/32
Standard Time System Steel Open Top
CPHRefe-rence
Description
SizeL x W(in mm)
Max.Pieces
Man-hours
perpiece
STSCode
2009 MODE 05 Page 10 Revision: 1.1 Steel Open Top Container of 32 Revised : 2009
2.0 FRONT
2.1 FRONT PANEL - REPLACEMENT.
(Remove damaged panel install new panel masking and painting)
7.01 1 st. section 1026 x 2700 1 4.4 2121
7.01 Next section 1026 x 2700 1 3.2 2122
2.2 FRONT PANEL -PATCH/STRAIGHTENING.
7.00 Manufacture and install patch. 100 X 150 6 0.7 2111(including masking and painting)
150 X 300 6 0.9 2112
200 X 300 4 0.92113
200 X 450 4 1.1 2114
300 X 600 4 1.4 2115
450 X 750 3 1.7 2116
600 X 900 2 2.0 2117
900 X 1028 2 2.4 2118
1200 x 1028 2 2.6 2119
* Add 0.2 hour for each 300 mm. the heightexceeds 1200 mm.
> 1200 x 1200 1 * 2110
3G Straighten damaged area up to (950 x 950 mm) bymeans of hydraulic tools (per damaged area)
950 x 950 2 0.3 2181
8/10/2019 Mode05 - Opentop Equipment
11/32
Standard Time System Steel Open Top
CPHRefe-rence
Description
SizeL x W(in mm)
Max.Pieces
Man-hours
perpiece
STSCode
2009 MODE 05 Page 11 Revision: 1.1 Steel Open Top Container of 32 Revised : 2009
7.10 Straighten front panel by means of hammer 500 x 500 5 0.1 2183
2.3 FRONT HEADER - REPLACEMENT.
(Remove damaged header install new header masking and painting)
5.05 Replace front header complete. 1 3.4 2421
*** Replace/repair of top plate/tray. 2 0.3 2422
2.4 FRONT HEADER -INSERT/STRAIGHTENING.
5.00 Manufacture and install insert. (material thickness6.0 mm)
150 2 1.0 2441
(including masking and painting)300 2 1.1 2442
450 2 1.2 2443
600 2 1.3 2444
900 1 1.6 2445
1200 1 1.8 2446
1500 1 2.1 2447
1800 1 2.4 2448
*** Straighten front header. 1 0.5 2481
*** Straightenen/reweld top corner plate/tray 2 0.1 2482
8/10/2019 Mode05 - Opentop Equipment
12/32
Standard Time System Steel Open Top
CPHRefe-rence
Description
SizeL x W(in mm)
Max.Pieces
Man-hours
perpiece
STSCode
2009 MODE 05 Page 12 Revision: 1.1 Steel Open Top Container of 32 Revised : 2009
2.5 FRONT SILL - REPLACEMENT.
(Remove damaged sill install new sill maskingand painting)
5.05 Replace front sill complete.(including reinstallation of floor board 1200 x 2400mm)
20 ft 1 3.8 2523
5.05 Replace front sill complete.(including reinstallation of floor board 1200 x 2400mm)
40 ft 1 4.4 2522
2.6 FRONT SILL -INSERT/STRAIGHTENING.
*** Manufacture and install U-V twistlock cone insert(including masking and painting)
350 2 0.7 2541
5.00 Manufacture and install insert (material thickness4.5 mm) 300 2 1.0 2542
(including masking and painting)450 2 1.1 2543
600 1 1.3 2544
900 1 1.5 2545
1200 1 1.7 2546
1500 1 1.9 2547
1800 1 2.2 2548
5.05 Straighten flange. 2 0.1 2581
5.05/4.02 Straighten / re-weld flange. 2 0.2 2582
*** Manufacture and install reinforcement/gussetsplates.
2 0.4 2561
(including masking and painting)
8/10/2019 Mode05 - Opentop Equipment
13/32
Standard Time System Steel Open Top
CPHRefe-rence
Description
SizeL x W(in mm)
Max.Pieces
Man-hours
perpiece
STSCode
2009 MODE 05 Page 13 Revision: 1.1 Steel Open Top Container of 32 Revised : 2009
2.7 FRONT CORNER POST -REPLACEMENT.
5.03 Replace front corner post - exclucive castings 806 2 6.2 2621(including reinstallation of floor board 1200 x 2400mm --- lashing bars and masking and painting) 906 2 6.2 2622
2.8 FRONT CORNER POST -INSERT/STRAIGHTENING
5.00 Manufacture and install insert (material thickness6.0 mm)
150 2 1.0 2641
(including masking and painting)300 2 1.1 2642
450 2 1.2 2643
600 2 1.3 2644
900 2 1.6 2645
1200 2 1.8 2646
1500 2 2.1 2647
5.03 Straighten front corner post. 2 0.5 2681
2.9 FRONT CORNER CASTING -REPLACEMENT.
5.03 Replace top front corner casting 2 1.5 2721
5.03 Replace bottom front corner casting(includind reinstallation of floor board 12 00x 1400mm)
2 2.3 2722
*** Alignment of frame to ISO standard 1 0.5 2281
8/10/2019 Mode05 - Opentop Equipment
14/32
Standard Time System Steel Open Top
CPHRefe-rence
Description
SizeL x W(in mm)
Max.Pieces
Man-hours
perpiece
STSCode
2009 MODE 05 Page 14 Revision: 1.1 Steel Open Top Container of 32 Revised : 2009
3.0 SIDES
3.1 SIDE PANEL - REPLACEMENT.(Remove damaged panel install new panel maskingand painting)
7.01 Replace 1 st. side panel section 1112 x 2700 1 4.4 3121
Replace subsequent sections. 1112 x2700 9 1.9 3122
3.2 SIDE PANEL -PATCH/STRAIGHTENING.
7.00 Manufacture and install patcht. 150 x 150 9 0.7 3111(including masking and painting)
300 x 150 9 0.8 3112
450 x 200 9 1.0 3113
600 x 300 9 1.3 3114
700 x 450 9 1.5 3115
850 x 600 6 1.8 3116
1000 x 900 5 2.2 3117
1150 x 1200 5 2.6 3118
1400 x 1500 4 3.1 3119
* Add 0.2 hour for each 300 mm. the heightexceeds 1500 mm.
>1400 x 1500 4 * 3110
8/10/2019 Mode05 - Opentop Equipment
15/32
Standard Time System Steel Open Top
CPHRefe-rence
Description
SizeL x W(in mm)
Max.Pieces
Man-hours
perpiece
STSCode
2009 MODE 05 Page 15 Revision: 1.1 Steel Open Top Container of 32 Revised : 2009
3G4 Straighten damaged area up to (950 x 950 mm) bymeans of hydraulic tools (per damaged area)
950 x 950 9 0.2 3181
7.10 Straighten side panel by hammer. 500 x 500 9 0.1 3183
3.3 TOP RAIL - REPLACEMENT.
7.02 Replace top rail complete.-(including reinstallationof roof bow socket -- - masking and painting)
20 ft 2 5.6 3421
Please use appropriate repair code for lashingrings if replaced in connection with this job) 40 ft 2 10.6 3422
3.4 TOP RAIL - INSERT.
5.00 Manufacture and install insert. (material thickness3.0 mm)
150 4 0.7 3441
(including reinstallation of roof bow socket))300 4 0.8 3442
450 4 0.9 3443
600 4 1.0 3444
900 4 1.1 3445
1200 4 1.3 3446
1500 2 1.5 3447
1800 2 1.7 3448
8/10/2019 Mode05 - Opentop Equipment
16/32
Standard Time System Steel Open Top
CPHRefe-rence
Description
SizeL x W(in mm)
Max.Pieces
Man-hours
perpiece
STSCode
2009 MODE 05 Page 16 Revision: 1.1 Steel Open Top Container of 32 Revised : 2009
3.5 TOP RAIL - SECTIONING.
7.02 Replace top rail section.(including replacement of roof bow - roof bow
socket and masking and painting)
600 4 1.0 3451
(Please use appropriate repair code for lashingrings if replaced in connection with this job) 900 4 1.2 3452
1200 4 1.4 3453
1800 4 1.9 3454
2400 4 2.3 3455
3600 2 3.1 3456
4800 2 4.0 3457
6000 2 4.8 3458
7200 2 5.7 3459
3.6 NOT IN USE
3.7 BOTTOM RAIL - REPLACEMENT.
7.03 Replace bottom rail complete.(including masking and painting)
20 ft 2 7.9 3521
(Please use appropriate repair code for floorboardsand lashing rings if replaced in connection with this
job)
40 ft 2 14.9 3522
8/10/2019 Mode05 - Opentop Equipment
17/32
Standard Time System Steel Open Top
CPHRefe-rence
Description
SizeL x W(in mm)
Max.Pieces
Man-hours
perpiece
STSCode
2009 MODE 05 Page 17 Revision: 1.1 Steel Open Top Container of 32 Revised : 2009
3.8 BOTTOM RAIL -INSERT/STRAIGHTENING.
5.06 Manufacture and install insert. (material thickness4.5 mm)
150 4 0.9 3541
(including masking and painting)300 4 1.0 3542
450 4 1.1 3543
600 4 1.3 3544
900 2 1.5 3545
1200 2 1.7 3546
1500 2 1.9 3547
1800 2 2.2 3548
7.03 Straighten flange. 300 8 0.1 3581
3.9 BOTTOM RAIL - SECTIONING.
7.03 Replace bottom rail section( including support of floor, masking and painting)
600 4 1,4 3551
(Please use appropriate repair code for floorboardsand lashing rings if replaced in connection with this
job)900 4 1.7 3552
1200 2 2.1 3553
1800 2 2,8 3554
2400 2 3.5 3555
3600 2 4,9 3556
4800 2 6,3 3557
6000 2 7,8 3558
7200 2 9,2 3559
8/10/2019 Mode05 - Opentop Equipment
18/32
Standard Time System Steel Open Top
CPHRefe-rence
Description
SizeL x W(in mm)
Max.Pieces
Man-hours
perpiece
STSCode
2009 MODE 05 Page 18 Revision: 1.1 Steel Open Top Container of 32 Revised : 2009
4.0 REAR
4.1 SWING HEADER - REPLACEMENT.
*** Replace rear header complete.(Remove damaged header install new header masking and painting)
1 0.5 4421
4.2 SWING HEADER -INSERT/STRAIGHTENING.
5.00 Manufacture and install insert. (material thickness6.0 mm)
150 2 1.0 4441
(including masking and painting)300 2 1.1 4442
450 2 1.2 4443
600 2 1.3 4444
900 2 1.6 4445
1200 1 1.8 4446
1500 1 2.1 4447
1800 1 2.4 4448
*** Straighten 1 0.5 4481
8/10/2019 Mode05 - Opentop Equipment
19/32
Standard Time System Steel Open Top
CPHRefe-rence
Description
SizeL x W(in mm)
Max.Pieces
Man-hours
perpiece
STSCode
2009 MODE 05 Page 19 Revision: 1.1 Steel Open Top Container of 32 Revised : 2009
4.3 SWING HEADER -MISCELLANEOUS.
*** Replacement of top plate/tray 2 0.3 1621
*** Straighten/reweld top corner plate/tray 2 0.1 1681
*** Replace swing header hinge 2 0.2 4470
*** Replace swing header hinge pin 2 0.1 4471
*** Replace swing header pin chain 2 0.1 4472
*** Free up swing header 1 0.2 4473
4.4 REAR SILL - REPLACEMENT.
5.04 Replace rear sill complet(including reinstallation of floor board 1200 x 2400mm --- cam keepers and masking and painting)
1 4.0 4521
8/10/2019 Mode05 - Opentop Equipment
20/32
Standard Time System Steel Open Top
CPHRefe-rence
Description
SizeL x W(in mm)
Max.Pieces
Man-hours
perpiece
STSCode
2009 MODE 05 Page 20 Revision: 1.1 Steel Open Top Container of 32 Revised : 2009
4.5 REAR SILL -INSERT/STRAIGHTENING.
*** Manufacture and install U-V twistlock cone insert(including masking and painting)
350 2 0.7 4541
5.00 Manufacture and install insert. (material thickness4.0 mm)
300 2 1.0 4542
(including masking and painting)
450 2 1.1 4543
600 1 1.3 4544
900 1 1.5 4545
1200 1 1.7 4546
1500 1 1.9 4547
1800 1 2.2 4548
*** Manufacture and install reinforcement / gussetsplates(including masking and painting)
2 0.4 4561
5.04 Straighten flange. 2 0.1 4581
*** Straighten rear sill in conection with cam keeper 4 0.1 4582
8/10/2019 Mode05 - Opentop Equipment
21/32
Standard Time System Steel Open Top
CPHRefe-rence
Description
SizeL x W(in mm)
Max.Pieces
Man-hours
perpiece
STSCode
2009 MODE 05 Page 21 Revision: 1.1 Steel Open Top Container of 32 Revised : 2009
4.6 REAR CORNER POST -REPLACEMENT.
5.03 Replace rear corner post including replacement oflashing bars
806 2 4.6 4621
(including reinstallation of floor board 1200 x 1400mm --- lashing bars and masking and painting) 906 2 4.6 4622
Time for reinstallation of door is given separatly
4.7 REAR CORNER POST -INSERT/STRAIGHTENING.
5.00 Manufacture and install insert.(material thickness6.0 mm)
150 2 1.0 4641
(including masking and painting)300 2 1.1 4642
450 2 1.2 4643
600 2 1.3 4644
900 2 1.6 4645
1200 2 1.8 4646
1500 2 2.1 4647
*** Manufacture and install insert in J-bar. 150 2 0.6 4648
*** 450 2 0.9 4649
5.03 Straighten corner post 2 0.5 4681
3J3 Straighten J-bar. 2 0.1 4682
8/10/2019 Mode05 - Opentop Equipment
22/32
Standard Time System Steel Open Top
CPHRefe-rence
Description
SizeL x W(in mm)
Max.Pieces
Man-hours
perpiece
STSCode
2009 MODE 05 Page 22 Revision: 1.1 Steel Open Top Container of 32 Revised : 2009
4.8 REAR CORNER CASTING -REPLACEMENT.
5.03 Replace top rear corner casting.(including masking and painting)
2 1.5 4721
5.03 Replace bottom rear corner casting.(including reinstallation of floor board 1200 x 1400mm --- masking and painting)
2 2.3 4722
Time for reinstallation of door is given separatly
*** Alignment of frame to ISO standard 1 0.5 4281
8/10/2019 Mode05 - Opentop Equipment
23/32
Standard Time System Steel Open Top
CPHRefe-rence
Description
SizeL x W(in mm)
Max.Pieces
Man-hours
perpiece
STSCode
2009 MODE 05 Page 23 Revision: 1.1 Steel Open Top Container of 32 Revised : 2009
5.0 DOORS
5.1 DOOR PANEL - REPLACEMENT.
6.01 Replace door complete including removal andrefitting of door hardware and gasket.
806 2 3.2 5121
906 2 3.2 5122
6.01 Reinstallation of door 806 2 1.2 5123
906 2 1.2 5124
5.2 DOOR PANEL -PATCH/STRAIGHTENING.
6.00 Manufacture and install patch. 150 x 150 4 0.8 5111(including masking and painting)
150 x 200 4 0.8 5112
300 x 200 4 0.9 5113
450 x 300 4 1.2 5114
600 x 450 4 1.5 5115
700 x 600 2 1.8 5116
850 x 700 2 2.0 5117
850 x 900 2 2.2 5118
850 x 1200 2 2.4 5119
6.05 Straighten. 2 0.5 5181
8/10/2019 Mode05 - Opentop Equipment
24/32
Standard Time System Steel Open Top
CPHRefe-rence
Description
SizeL x W(in mm)
Max.Pieces
Man-hours
perpiece
STSCode
2009 MODE 05 Page 24 Revision: 1.1 Steel Open Top Container of 32 Revised : 2009
5.3 DOOR - FRAME.
6.00 Replace section in door frame. 300 4 1.3 5141(including re-installation of gasket -- - masking amdpainting) 450 4 1.5 5142
Time for re-installation of guide plate or hinge isgiven separately 600 4 1.6 5143
900 4 1.8 5144
1200 2 2.1 5145
1500 2 2.3 5146
1800 2 2.5 5147
5.4 DOOR PANEL - GASKET.
6.04 Replace gasket partially. < 1500 4 0.3 5721
> 1500< 2300
4 0.5 5722
6.04 Replace gasket complete. 2 1.2 5726
*** Replace corner tap. (per 2 pieces) 4 0.1 5727
*** Repair cut by lap joint. (per piece) 5 0.1 5728
*** Re-fasten gasket. 4 0.1 5731
*** Replace gasket retainer. 1200 6 0.3 5921
8/10/2019 Mode05 - Opentop Equipment
25/32
Standard Time System Steel Open Top
CPHRefe-rence
Description
SizeL x W(in mm)
Max.Pieces
Man-hours
perpiece
STSCode
2009 MODE 05 Page 25 Revision: 1.1 Steel Open Top Container of 32 Revised : 2009
5.5 DOOR HARDWARE REPLACEMENT / REPAIR
(including masking and painting if necessary)
6.02 Replace cam keeper. (per piece) 8 0.3 4821
*** Replace door hold back. (per piece) 2 0.1 5624
6.03 Replace hinge. (per piece) 8 0.6 5221
6.03 Replace hinge pin. (per piece) 8 0.2 5222
6.02 Replace locking rod assembly. (per piece) 4 0.7 5421
6.02 Sectioning of locking rod 4 0.3 5451
6.02 Replace locking rod guide. (per piece) 4 0.2 5522
6.02 Replace handle. (per piece) 4 0.1 5523
6.02 Re-installation of cam. (per piece) 8 0.3 5524
*** Seal plate and pin. (per piece) 4 0.1 5621
*** Replace lap plate. (per piece) 2 0.1 5622
*** Replace uni-tie plate. (per piece) 2 0.2 5623
5.6 DOOR HARDWARE -STRAIGHTENING.
*** Straightening hinge. (per piece) 8 0.1 5281
*** Straightening locking rod. (per piece) 4 0.2 5481*** Straightening locking rod guide 4 0.1 5482
*** Straightening lap or uni-tie plate. (per piece) 2 0.1 5682
8/10/2019 Mode05 - Opentop Equipment
26/32
Standard Time System Steel Open Top
CPHRefe-rence
Description
SizeL x W(in mm)
Max.Pieces
Man-hours
perpiece
STSCode
2009 MODE 05 Page 26 Revision: 1.1 Steel Open Top Container of 32 Revised : 2009
5.7 DOOR PANEL - MISCELLANEOUS.
*** Free up both doors and hardware 1 0.3 5271
6.01 Dismantle door for ventilation purpose(per door plate)
1 0.4 5931
6.01 Re-install door after dismantle (per door plate) 1 0.9 5932
8/10/2019 Mode05 - Opentop Equipment
27/32
Standard Time System Steel Open Top
CPHRefe-rence
Description
SizeL x W(in mm)
Max.Pieces
Man-hours
perpiece
STSCode
2009 MODE 05 Page 27 Revision: 1.1 Steel Open Top Container of 32 Revised : 2009
6.0 FLOOR
6.1 FLOORING.
*** Repair holes < 5 mm in floor board per 5 pieces 9 0.1 6141
*** Repair holes < 25 mm in floor board per 5 pieces 9 0.1 6142
*** Re-fasten floor screws. per 5 pieces 3 0.1 6171
*** Caulking of floorboard 6 0.1 6172
4.00 Add floor screw per 3 screw 5 0.1 6173
6.2 FLOOR BOARD - PLANK.
4.01 Replace floor complete
(including cutting and prepare plank and sealing)
20 ft 1 12.6 6423
40 ft 1 27.6 6424
4.01 Replace floor partially. 1200 9 0.9 6622(including cutting and prepare plank and sealing)
1800 9 1.2 6624
2400 9 1.5 6625
3000 9 1.7 6626
*** Additional time for replacing floor above tunnel 6 0.3 6627
4.01 Reinstallation floor board(including sealing)
1500 9 0.5 6632
3000 9 0.8 6636
*** Repair or replace threshold plate 1 0.5 6970
6.3 FLOOR BOARD - PLYWOOD.
8/10/2019 Mode05 - Opentop Equipment
28/32
Standard Time System Steel Open Top
CPHRefe-rence
Description
SizeL x W(in mm)
Max.Pieces
Man-hours
perpiece
STSCode
2009 MODE 05 Page 28 Revision: 1.1 Steel Open Top Container of 32 Revised : 2009
4.00 Replace floor complete. -- - Plate is delivered infixed dimension
20 ft 1 10.6 6426
(including sealing) 40 ft 1 19.0 6427
4.00 Replace floor partially. Plate is delivered in fixeddimension
1100 x 650 4 0.8 6521
(including sealing) 2000 x 650 2 1.1 6522
1600 x 1200 2 1.5 6523
2400 x 1200 8 2.1 6524
4.00 Additional time for replacing the floor above tunnel. 40 ft 1 2.0 6528
4.00 Reinstallation(including sealing)
1100 x 650 2 0.5 6531
2000 x 650 2 0.7 6532
1600 x 1200 2 1.0 6533
2400 x 1200 8 1.3 6534
*** Replace/repair centre spacer/divider 2438 4 0.3 6571
6.4 CENTER RAIL
4.06 Replace section of center rail including manu-facturing of section and installation of rubberblocks. Joint to be at centre of X-member.
< 1800 5 0.3 6351
> 1800 5 0.4 6352
8/10/2019 Mode05 - Opentop Equipment
29/32
Standard Time System Steel Open Top
CPHRefe-rence
Description
SizeL x W(in mm)
Max.Pieces
Man-hours
perpiece
STSCode
2009 MODE 05 Page 29 Revision: 1.1 Steel Open Top Container of 32 Revised : 2009
7.0 UNDERSTRUCTURE
7.1 CROSSMEMBER.
4.02 Replace CROSSMEMBER.(including painting)
9 0.9 7121
5.00 Manufacture and install insert. ( material thickness4 mm)(including painting)
150 8 0.9 7141
300 8 1.0 7142
450 8 1.1 7143
4.02 Straighten flange. 9 0.1 7181
4.02 Straighten and re-weld. 8 0.2 7182
8/10/2019 Mode05 - Opentop Equipment
30/32
Standard Time System Steel Open Top
CPHRefe-rence
Description
SizeL x W(in mm)
Max.Pieces
Man-hours
perpiece
STSCode
2009 MODE 05 Page 30 Revision: 1.1 Steel Open Top Container of 32 Revised : 2009
7.2 TUNNEL SECTION.
4.05 Replace tunnel assembly complete.(including painting)(Please use appropriate repair code for floorboardsif replaced in connection with this job)
1 8.7 7321
4.05 Replace section of formed tunnel plate(including painting)(Please use appropriate repair code for floorboardsif replaced in connection with this job)
350 1 2.7 7351
700 1 3.3 7352
1050 1 3.9 7353
1400 1 4.4 7354
1750 1 5.0 7355
5.00 Insert/straighten tunnel rail(including painting)
300 2 1.1 7356
600 2 1.3 7357
900 2 1.6 7358
4.05 Replace outrigger.(including painting)
9 0.5 7421
4.05 Straighten of outrigger flange. 8 0.1 7481
Straighten and re-weld outrigger. 8 0.2 7482
*** Replace of tunnel bolster.(including painting)
1 3.1 7721
5.00 Manufacture and install insert in bolster.(including painting)
300 1 1.1 7741
600 1 1.3 7743
900 1 1.5 7744
8/10/2019 Mode05 - Opentop Equipment
31/32
Standard Time System Steel Open Top
CPHRefe-rence
Description
SizeL x W(in mm)
Max.Pieces
Man-hours
perpiece
STSCode
2009 MODE 05 Page 31 Revision: 1.1 Steel Open Top Container of 32 Revised : 2009
7.3 FORK LIFT POCKET.
4.03 Replace fork lift pocket complete.(including painting)
4 3.3 7521
5.00 Manufacture and install insert in fork lift pocket.(including painting)
150 4 0.9 7541
300 4 1.0 7542
450 4 1.1 7543
600 4 1.2 7544
900 4 1.4 7545
1200 4 1.6 7546
1500 2 1.8 7547
1800 2 2.0 7548
4.03 Replace of strap.(including painting)
4 0.4 7621
4.03 Straighten strap. 4 0.1 7681
4.03 Straighten and re-weld strap. 4 0.2 7682
*** Straighten and weld fork lift pocket wall. < 500 4 0.2 7581
> 500 4 0.3 7582
8/10/2019 Mode05 - Opentop Equipment
32/32
Standard Time System Steel Open Top
Request of change / new STS code.
This page must be forwarded to CENEMRTEC case you request changes in codes or request new STS code.
Requesting office:Telex address:Name and initials:
New STS code yes no Revised STS code (code number)
Code requested for modes:00 01 02 03 04 05 06
Description of work:
Size (in mm): Pieces: Suggested Man-hours: Page:
For CENEQUEMR,TEC use only
Suggested STS Manual Description
Suggested RKRP Description
Suggested WMNR Description
CENEMR comments: