35
Mobility COMPREHENSIVE PLAN AMENDMENT (CPA 01-09) TO EFFECTIVELY LINK LAND USE & TRANSPORTATION

Mobility COMPREHENSIVE PLAN AMENDMENT (CPA 01-09) TO EFFECTIVELY LINK LAND USE & TRANSPORTATION

Embed Size (px)

Citation preview

Page 1: Mobility COMPREHENSIVE PLAN AMENDMENT (CPA 01-09) TO EFFECTIVELY LINK LAND USE & TRANSPORTATION

Mobility

COMPREHENSIVE PLANAMENDMENT (CPA 01-09) TO EFFECTIVELY LINK

LAND USE &

TRANSPORTATION

Page 2: Mobility COMPREHENSIVE PLAN AMENDMENT (CPA 01-09) TO EFFECTIVELY LINK LAND USE & TRANSPORTATION

• NOV 2006 – BOCC ADOPTS PROP SHARE• APRIL 2007 – DRAFT LTCMS• MAY 2007 – SPRINGHILLS HEARING• FEB 2008 – PIP FOR LTCMS• JUNE 2008 – NEWBERRY VILLAGE CPA• MAY 2008 – MTPO PRESENTATION• AUG 2008 – CITY OF GAINESVILLE MGR • SEPT 2008 – MTPO PART II• SEPT 2008 – BOCC DIRECTION • OCT 2008 – CITY OF GAINESVILLE COMM• FEB 2009 – JOINT LPA / BOCC• APRIL 2009 – LPA PART I• MAY 2009 – LPA PART II• JUNE 2009 – BOCC TRANSMITTAL

Page 3: Mobility COMPREHENSIVE PLAN AMENDMENT (CPA 01-09) TO EFFECTIVELY LINK LAND USE & TRANSPORTATION

AVAILABLE OPTIONS

ROADWAYS ONLY VSMULTIMODAL APPROACH

Page 4: Mobility COMPREHENSIVE PLAN AMENDMENT (CPA 01-09) TO EFFECTIVELY LINK LAND USE & TRANSPORTATION

ISSUES IDENTIFIED WITH CURRENT CONCURRENCY SYSTEM

• CAPACITY NOT MOBILITY EMPHASIZED

• FOCUS ON SHORT TERM NOT LONG TERM

• MISSING LAND USE TRANSPORTATION

• INEQUITABLE

• UNPREDICTABLE

• DEVELOPMENT CHASES CAPACITY

Page 5: Mobility COMPREHENSIVE PLAN AMENDMENT (CPA 01-09) TO EFFECTIVELY LINK LAND USE & TRANSPORTATION

ALTERNATIVE: STICKING WITH EXISTING SYSTEM

• ROADS ONLY

• LONG TERM CONCURRENCY SYSTEM

• PROPORTIONATE SHARE

• ELIMINATE TRANSIT FUNDING

• ELIMINATE CONCURRENCY EXCEPTIONS

• COUNTY / DEVELOPERS PAY FOR EXCEPTIONS

Page 6: Mobility COMPREHENSIVE PLAN AMENDMENT (CPA 01-09) TO EFFECTIVELY LINK LAND USE & TRANSPORTATION

PLANNING FOR

THE FUTURE

Page 7: Mobility COMPREHENSIVE PLAN AMENDMENT (CPA 01-09) TO EFFECTIVELY LINK LAND USE & TRANSPORTATION

LINKING TRANSPORTATION & LAND USE

Page 8: Mobility COMPREHENSIVE PLAN AMENDMENT (CPA 01-09) TO EFFECTIVELY LINK LAND USE & TRANSPORTATION
Page 9: Mobility COMPREHENSIVE PLAN AMENDMENT (CPA 01-09) TO EFFECTIVELY LINK LAND USE & TRANSPORTATION

LOOKING @ BIG PICTURE

HOLISTIC LOOK @ MOBILITY

SYSTEM WIDE vs. PIECEMEAL

TRANSITIONARY 20 YEAR PLAN

MULTI-MODAL LAND USE PATTERN

EMPHASIZE DESIGN OVER LAND USE

GREEN & ENERGY EFFICIENT

**CAP & TRADE + VMT & GAS TAX**

Page 10: Mobility COMPREHENSIVE PLAN AMENDMENT (CPA 01-09) TO EFFECTIVELY LINK LAND USE & TRANSPORTATION

TRANSIT ORIENTED&

TRADITIONAL NEIGHBORHOOD DEVELOPMENT

Page 11: Mobility COMPREHENSIVE PLAN AMENDMENT (CPA 01-09) TO EFFECTIVELY LINK LAND USE & TRANSPORTATION

INSERT ORENCO STATION VIDEO

Page 12: Mobility COMPREHENSIVE PLAN AMENDMENT (CPA 01-09) TO EFFECTIVELY LINK LAND USE & TRANSPORTATION

LAND USE AMENDMENTS

TND EVOLVE / TOD REPLACE TCEPPT

MIXED-USE & DENSITY FOCUS

VILLAGE CENTER

SMALL BLOCKS (Specific Block Lengths)

PEDESTRIAN / BIKE FRIENDLY

GRID NETWORK

DE-EMPHASIZE PARKING

STAGE SET FOR ACTIVITY CENTER REDO

Page 13: Mobility COMPREHENSIVE PLAN AMENDMENT (CPA 01-09) TO EFFECTIVELY LINK LAND USE & TRANSPORTATION

TOD vs. TND

FUND TRANSIT FOR 15 YEARS

ALLOWED 24 UNITS PER ACRE

MINIMUM DENSITY THRESHOLDS

HIGHER MIXED-USE ALLOWANCE

FLEXIBILITY WITH MIXED-USE

LOCATED ON TRANSIT CORRIDOR

HIGHER INTERNAL CAPTURE

HIGHER MODE SHARE

Page 14: Mobility COMPREHENSIVE PLAN AMENDMENT (CPA 01-09) TO EFFECTIVELY LINK LAND USE & TRANSPORTATION

TOD/ TND INCENTIVES

• MIXED USE AS AN ELEMENT OF TND AND TOD

• LOWERS MINIMUM ACRE THRESHOLD FOR TND

• TND AND TOD WOULD NOT REQUIRE LAND USE AND ZONING CHANGES (I.E. STRAIGHT TO DEVELOPMENT PLAN APPROVAL)

• HIGHER DENSITY FOR TOD + TND DENSITY BONUS

• REDUCED TRANSPORTATION FEE FOR TND & TOD

Page 15: Mobility COMPREHENSIVE PLAN AMENDMENT (CPA 01-09) TO EFFECTIVELY LINK LAND USE & TRANSPORTATION

STRIKING A BALANCE

MORE DETAIL

MORE FLEXIBILITY

NO COMP PLAN OR REZONING

Page 16: Mobility COMPREHENSIVE PLAN AMENDMENT (CPA 01-09) TO EFFECTIVELY LINK LAND USE & TRANSPORTATION

VILLAGE CENTER & TSA

1/4

Transit Supportive

Area

1/4

1/2

VillageCenter

1/8

Page 17: Mobility COMPREHENSIVE PLAN AMENDMENT (CPA 01-09) TO EFFECTIVELY LINK LAND USE & TRANSPORTATION

VILLAGE CENTER & TSA

1/8

1/4

Transit Supportive

Area

1/8

1/4

1/4

VillageCenter

Page 18: Mobility COMPREHENSIVE PLAN AMENDMENT (CPA 01-09) TO EFFECTIVELY LINK LAND USE & TRANSPORTATION

TRANSIT STATION & DEDICATED CORRIDOR

1/4

Transit Supportive

Area

VillageCenter

1/8Dedicated

TransitCorridor

Page 19: Mobility COMPREHENSIVE PLAN AMENDMENT (CPA 01-09) TO EFFECTIVELY LINK LAND USE & TRANSPORTATION

BLOCK PATTERNS

Page 20: Mobility COMPREHENSIVE PLAN AMENDMENT (CPA 01-09) TO EFFECTIVELY LINK LAND USE & TRANSPORTATION
Page 21: Mobility COMPREHENSIVE PLAN AMENDMENT (CPA 01-09) TO EFFECTIVELY LINK LAND USE & TRANSPORTATION

TRANSPORTATION AMENDMENT

ELIMINATE CONCURRENCY IN CLUSTER

MULTI-MODAL TRANSPORTATION FEE

MOBILITY VIA MULTI MODESInterconnected RoadwaysMulti-Use PathsConnectivityExpress Transit Dedicated Lanes

EVOLVE FROM ROADS TO TRANSIT

RECOGNIZE CONGESTION WILL OCCUR

Page 22: Mobility COMPREHENSIVE PLAN AMENDMENT (CPA 01-09) TO EFFECTIVELY LINK LAND USE & TRANSPORTATION

OVERALL INFRASTRUCTURE PLAN

Page 23: Mobility COMPREHENSIVE PLAN AMENDMENT (CPA 01-09) TO EFFECTIVELY LINK LAND USE & TRANSPORTATION

TRANSIT

TRANSIT SUPPORTIVE LAND USE

SPAGHETTI MODEL DOES NOT WORK

PEOPLE WILL DRIVE, WALK, BIKE

PHASED EXPRESS SERVICE (2015 – 2020)

PARK N RIDE LOTS – REGIONAL DEMAND

DEDICATED LANES START IN 2020

MORE FREQUENT TRANSIT AFTER 2025

*** * COORDINATION WITH RTS ****

Page 24: Mobility COMPREHENSIVE PLAN AMENDMENT (CPA 01-09) TO EFFECTIVELY LINK LAND USE & TRANSPORTATION

TRANSIT NEEDS

EVOLVE FROM PRIMARY STUDENT FOCUS

DEDICATED LANES

PARK & RIDE LOTS

DEDICATED FUNDING SOURCE

REGIONAL TRANSIT AUTHORITY

REGIONAL FOCUS

MAINTENANCE FACILITY & CAPITAL

JOINT PLANNING

Page 25: Mobility COMPREHENSIVE PLAN AMENDMENT (CPA 01-09) TO EFFECTIVELY LINK LAND USE & TRANSPORTATION

INSERT EUGENE VIDEO

Page 26: Mobility COMPREHENSIVE PLAN AMENDMENT (CPA 01-09) TO EFFECTIVELY LINK LAND USE & TRANSPORTATION

URBAN CLUSTER EXPRESS TRANSITMTPO # 1 TRANSIT DEVELOPMENT CORRIDOR

Newberry / Jonesville ExpressMTPO # 6 PUBLIC TRANSPORTATION PRIORITY

Enhanced transit Service to Eastside

CONSISTENT WITH MTPO 2025 LRTP NEEDS PLAN

Page 27: Mobility COMPREHENSIVE PLAN AMENDMENT (CPA 01-09) TO EFFECTIVELY LINK LAND USE & TRANSPORTATION

RAPID TRANSIT AND POTENTIAL TOD/TND LOCATIONS

Page 28: Mobility COMPREHENSIVE PLAN AMENDMENT (CPA 01-09) TO EFFECTIVELY LINK LAND USE & TRANSPORTATION

BICYCLE/PEDESTRIAN GOALS

ACHIEVE “PLATINUM” LEVEL BICYCLE FRIENDLY COMMUNITY STATUS

MULTI-USE BIKE / PEDESTRIAN FACILITY ON ALL MAJOR ROADS IN URBAN AREA

5 foot 6 foot 8 foot 10 foot

BIKE LANES/ PAVED SHOULDERSON MOST MAJOR ROADS IN URBAN AREA

Page 29: Mobility COMPREHENSIVE PLAN AMENDMENT (CPA 01-09) TO EFFECTIVELY LINK LAND USE & TRANSPORTATION

INSERT BIKE / PED VIDEO

Page 30: Mobility COMPREHENSIVE PLAN AMENDMENT (CPA 01-09) TO EFFECTIVELY LINK LAND USE & TRANSPORTATION

BICYCLE / PEDESTRIAN FACILITIES

Page 31: Mobility COMPREHENSIVE PLAN AMENDMENT (CPA 01-09) TO EFFECTIVELY LINK LAND USE & TRANSPORTATION

MULTIMODAL TRANSPORTATION FEE

• EXISTING IMPACT FEE SERVES AS BASE

• MULTIMODAL INFRASTRUCTURE

• FEE REDUCTION FOR TOD AND TND

• TOD FUNDS TRANSIT SERVICE

• RURAL FEE URBAN FEE

Page 32: Mobility COMPREHENSIVE PLAN AMENDMENT (CPA 01-09) TO EFFECTIVELY LINK LAND USE & TRANSPORTATION

INFRASTRUCTURE SALES TAX

• 1 CENT = $38 MILLION/YEARCOUNTY’S SHARE = $18 MILLION/YEAR

• ½ CENT = $19 MILLION/YEARCOUNTY’S SHARE = $9 MILLION/YEAR

• ¼ CENT = $9.5 MILLION/YEARCOUNTY’S SHARE = $4.25 MILLION/YEAR

• 1 YEAR / 1 CENT = FOUR I-75 CROSSINGS

• LEVERAGE STATE/FEDERAL FUNDING

Page 33: Mobility COMPREHENSIVE PLAN AMENDMENT (CPA 01-09) TO EFFECTIVELY LINK LAND USE & TRANSPORTATION

ADDITIONAL FUNDING SOURCES

• BACKLOG AUTHORITY

• REGIONAL TRANSPORTATION AUTHORITY

• REGIONAL TRANSIT ASSESSMENT

• UF/SANTA FE COLLEGE FUNDING

• STATE/FEDERAL

• PUBLIC/PRIVATE PARTNERSHIPS

• FUTURE VMT & CARBON TAX

Page 34: Mobility COMPREHENSIVE PLAN AMENDMENT (CPA 01-09) TO EFFECTIVELY LINK LAND USE & TRANSPORTATION

PUBLIC / PRIVATEPARTNERSHIP

TODButlerPlaza

Urban Village

Beville Creek

UF

Dedicated TransitLanes

PROACTIVEVS

REACTIVE

Page 35: Mobility COMPREHENSIVE PLAN AMENDMENT (CPA 01-09) TO EFFECTIVELY LINK LAND USE & TRANSPORTATION

STAFF RECOMMENDS

TRANSMITTAL OF

CPA 01-09

TO THE

FLORIDA DEPARTMENT OF

COMMUNITY AFFAIRS