WCM GmbH Mobile Work Clearance Management Release ERP 6.0 September 2008

Mobile Work Clearance Management...Mobile Work Clearance Management Release ERP 6.0 September 2008 Motivation Switching technical objects can be a very time-consuming process. Mobile

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Mobile Work Clearance Management...Mobile Work Clearance Management Release ERP 6.0 September 2008 Motivation Switching technical objects can be a very time-consuming process. Mobile

WCM GmbH

Mobile Work Clearance ManagementRelease ERP 6.0

September 2008

Page 2: Mobile Work Clearance Management...Mobile Work Clearance Management Release ERP 6.0 September 2008 Motivation Switching technical objects can be a very time-consuming process. Mobile

Motivation

Switching technical objects can be a very time-consuming process.

Mobile processing offers the following:

Time saving

Employees do not have to collect operational lists on site and return them afterprocessing.

Higher Safety

You only need to confirm ONCE on the mobile device that the activities havebeen performed. This prevents errors that could arise from transcribingoperation lists.

The use of bar codes or RFIDs ensures that switching is only possible for theselected object.

© WCM GmbH 2008 / Page 2

Page 3: Mobile Work Clearance Management...Mobile Work Clearance Management Release ERP 6.0 September 2008 Motivation Switching technical objects can be a very time-consuming process. Mobile

Process Description

The feed water pump needs to be repaired. To do this, the pump has to be isolated(lockout/tagout). Information regarding the switching will not be printed in aoperational list, but will be distributed over the SAP Mobile Infrastructure onto therespective mobile devices.

On site the switching's are carried out and will be confirmed onthe mobile devices.

The person in charge of the switching's synchronizes the datawith the backend.with the backend.

The planner receives the information that all switching's have been completed.

Now the maintenance person is able to enter the save area and to carry out therepair.

© WCM GmbH 2008 / Page 3

Page 4: Mobile Work Clearance Management...Mobile Work Clearance Management Release ERP 6.0 September 2008 Motivation Switching technical objects can be a very time-consuming process. Mobile

Roles

These user roles are involved in this process:

Maintenance planner

Safety planner

Safety engineer

Operation

© WCM GmbH 2008 / Page 4

Page 5: Mobile Work Clearance Management...Mobile Work Clearance Management Release ERP 6.0 September 2008 Motivation Switching technical objects can be a very time-consuming process. Mobile

Detailed ProcessMultilevel List Editing

A maintenance order has been created. The necessary lockout/tagouts are defined asWCD template in the task list and have been automatically created.The assignment is shown in the multilevel list.

© WCM GmbH 2008 / Page 5

Page 6: Mobile Work Clearance Management...Mobile Work Clearance Management Release ERP 6.0 September 2008 Motivation Switching technical objects can be a very time-consuming process. Mobile

Detailed ProcessSwitching Screen of the Operational WCD

In the work clearance document, the information is shown that 4 switching's have to becarried out. Furthermore, the Operational WCD is prepared, i.e. it has been checked andauthorized for use (system status “PREP”) already.

© WCM GmbH 2008 / Page 6

Page 7: Mobile Work Clearance Management...Mobile Work Clearance Management Release ERP 6.0 September 2008 Motivation Switching technical objects can be a very time-consuming process. Mobile

Detailed ProcessStart of the Mobile Processing

Via menu function “Extras - Mobile Processing – Tagging List”, single items of theOperational WCD are assigned to the mobile devices according to the definition in theselection variants for the devices ( customizing settings).

© WCM GmbH 2008 / Page 7

Page 8: Mobile Work Clearance Management...Mobile Work Clearance Management Release ERP 6.0 September 2008 Motivation Switching technical objects can be a very time-consuming process. Mobile

Detailed ProcessSystem Status “MOBI”

The switching items get system status „MOBI“.Thus it is guaranteed that the items and the switching's cannot be changed by the backendsystem. The confirmation of the switching's takes place on the mobile devices.

© WCM GmbH 2008 / Page 8

Page 9: Mobile Work Clearance Management...Mobile Work Clearance Management Release ERP 6.0 September 2008 Motivation Switching technical objects can be a very time-consuming process. Mobile

Detailed ProcessOverview of Operational Lists

From the Operational WCD a operational list for tagging is generated.According to the selection criteria, the switching's can be distributed onto different mobiledevices, e.g.: Electricians get the electronic switching's which have to be carried out,mechanics the mechanical switching's.

© WCM GmbH 2008 / Page 9

Page 10: Mobile Work Clearance Management...Mobile Work Clearance Management Release ERP 6.0 September 2008 Motivation Switching technical objects can be a very time-consuming process. Mobile

Detailed ProcessMobile Operational List 1

The operational list 1 contains four active items. This is shown by icon . The listuses two further icons:

means that the item has been released for the lockout/tagout.means that the item has been allocated to a mobile device.

© WCM GmbH 2008 / Page 10

Page 11: Mobile Work Clearance Management...Mobile Work Clearance Management Release ERP 6.0 September 2008 Motivation Switching technical objects can be a very time-consuming process. Mobile

Detailed ProcessOperational List on the Mobile Device

2

On the mobile device the operational listshave been allocated according to theselection criteria.

© WCM GmbH 2008 / Page 11

Page 12: Mobile Work Clearance Management...Mobile Work Clearance Management Release ERP 6.0 September 2008 Motivation Switching technical objects can be a very time-consuming process. Mobile

Detailed ProcessEditing of a Switching Position

The person in charge has the followingoptions:

He can confirm the execution of theswitching. He can reject the execution of the

switching and file a short reason whyswitching and file a short reason why(feedback).

© WCM GmbH 2008 / Page 12

Page 13: Mobile Work Clearance Management...Mobile Work Clearance Management Release ERP 6.0 September 2008 Motivation Switching technical objects can be a very time-consuming process. Mobile

Detailed ProcessConfirmation of Execution on Site

The person in charge has confirmed theexecution of the switching. Now hesynchronizes his mobile device with theSAP system.This means the confirmation of theswitching will be transmitted to the planner.

© WCM GmbH 2008 / Page 13

Page 14: Mobile Work Clearance Management...Mobile Work Clearance Management Release ERP 6.0 September 2008 Motivation Switching technical objects can be a very time-consuming process. Mobile

Detailed ProcessSystem Status “Tagged”

As soon as data has been transmitted from the mobile device to the backend system, theapplication registers that all switching's have been completed (the WCD gets systemstatus: ”ETG“ – “Tagged”) and the traffic lights are changed to „green“.The order gets system status “EXEC” (”Released for execution“). Now the maintenancepersons can start repairing the feed water pump.

© WCM GmbH 2008 / Page 14

Page 15: Mobile Work Clearance Management...Mobile Work Clearance Management Release ERP 6.0 September 2008 Motivation Switching technical objects can be a very time-consuming process. Mobile

Detailed ProcessEnd

After completing maintenance, the reverse process starts: The technical objects canbe switched back.Operational lists are transferred for untagging onto the respective mobile devices,the operation switches the technical objects back and confirms the untagging.This information is synchronized with the backend system; the order and theassigned WCM objects can be completed.Finally, all operational lists will be archived.

© WCM GmbH 2008 / Page 15

Page 16: Mobile Work Clearance Management...Mobile Work Clearance Management Release ERP 6.0 September 2008 Motivation Switching technical objects can be a very time-consuming process. Mobile

Other Functions of the Mobile ProcessingMonitoring

If a confirmation of switching on the mobile device is not possible, the operational listcan be changed with the transaction „WCLG“ also in the backend system.

© WCM GmbH 2008 / Page 16

Page 17: Mobile Work Clearance Management...Mobile Work Clearance Management Release ERP 6.0 September 2008 Motivation Switching technical objects can be a very time-consuming process. Mobile

Other Functions of the Mobile ProcessingChange of Operational List

The change of the operational lists from the backend should take place only inexceptional cases, e.g. if the mobile device is not working and a confirmation ofswitching on site is not possible.

© WCM GmbH 2008 / Page 17

Page 18: Mobile Work Clearance Management...Mobile Work Clearance Management Release ERP 6.0 September 2008 Motivation Switching technical objects can be a very time-consuming process. Mobile

WCM Customizing

The activation of mobile processingtakes place per usage (planning plantdependent) of the Operational WCD.

© WCM GmbH 2008 / Page 18

Page 19: Mobile Work Clearance Management...Mobile Work Clearance Management Release ERP 6.0 September 2008 Motivation Switching technical objects can be a very time-consuming process. Mobile

WCM Customizing

Furthermore, the corresponding selection variants have to be defined for every mobileuser, in order to allocate the correct switching's during the process.

© WCM GmbH 2008 / Page 19

Page 20: Mobile Work Clearance Management...Mobile Work Clearance Management Release ERP 6.0 September 2008 Motivation Switching technical objects can be a very time-consuming process. Mobile

Technical basis

Front End

Pocket PC 2003 /(SE), Win CE, and Win 32 based devices with 128MB RAM

MI Client:

MI 2.5 (w/ WebAS 6.40)

mWCM or MAM client application (w/ RFID, Mobile Alert, and Signature Capture clientcomponents)

Light DB

Middleware

MI Server:

WebAS 6.40 (MI 2.5), part of NW 04

mWCM Middleware component (Sync BO definition) or

MAM Middleware component (Sync BO definition)

Backend

ERP 6.0

© WCM GmbH 2008 / Page 20

Page 21: Mobile Work Clearance Management...Mobile Work Clearance Management Release ERP 6.0 September 2008 Motivation Switching technical objects can be a very time-consuming process. Mobile

Application alternatives of „mobile WCM”

As single application on a PDA

As an application of Mobile Asset Management

© WCM GmbH 2008 / Page 21

Page 22: Mobile Work Clearance Management...Mobile Work Clearance Management Release ERP 6.0 September 2008 Motivation Switching technical objects can be a very time-consuming process. Mobile

Questions and Answers

© WCM GmbH 2008 / Page 22

Page 23: Mobile Work Clearance Management...Mobile Work Clearance Management Release ERP 6.0 September 2008 Motivation Switching technical objects can be a very time-consuming process. Mobile

Copyright 2008 WCM GmbH

You are not authorized to copy or pass on this publication or parts from thispublication no matter in which form or purpose, without prior written authorizationfrom WCM GmbH.

All content and information in this publication can be changed by WCM GmbHwithout prior notice.

SAP, R/3, mySAP, SAP NetWeaver and other mentioned SAP-Products andServices as well as the mentioned logos are brands or registered trademarks ofSAP AG, Germany and other countries worldwide.SAP AG, Germany and other countries worldwide.

All other mentioned product or services names or related logos are brands of theaccording companies.

© WCM GmbH 2008 / Page 23