    Senate Transportation CommitteeFebruary 25, 2013

    Duane Hill, District Engineer218-725-2704

    [email protected]

    mailto:[email protected]:[email protected]:[email protected]
  • 7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)

    2/26

    Describe MnDOT Major Impacts from theEvent

    Describe MnDOT Response

    Describe Completed and Remaining Work

    2

  • 7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)

    3/26

    3

  • 7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)

    4/26

    Torrential rain and flooding

    turned the southwest

    corner of Lake Superior a

    muddy brown, seen here

    in a satellite image taken

    Thursday, June 21, 2012.

    (National Oceanic and

    Atmospheric

    Administration photo)

    4

  • 7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)

    5/26

    Work with Law Enforcement to Close Roads Incident Command 26 Road Closures on Trunk Highway System

    5

  • 7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)

    6/26

    MnDOT DNR, DPS

    Local Law Enforcement

    FHWA Emergency contracting authority,consultants and contractors

    Mutual Aid

    6

  • 7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)

    7/26

    MnDOT Forces Focus on reopening roads and making them safe

    for travel

    Set and remove road closure signing

    Have presence at road closures when necessary Replace washed out culverts

    Remove debris

    Fill in eroded areas

    Perform damage assessments

    7

  • 7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)

    8/26

    Contract Work Focus on repairs beyond the capability of MnDOT

    resources

    Bridges, box culverts, road grades and pavement

    Clear debris Set long-term detours that required significant

    signing

    Perform specific engineering designs

    Storm sewer inspection Soil stabilization

    Contract work to date exceeds $11M

    8

  • 7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)

    9/26

    Trunk Highway 210 in Jay Cooke

    Trunk Highway 210 in Thomson Trunk Highway 23 in Fond du Lac

    neighborhood

    Trunk Highway 2 from Proctor to I-35

    9

  • 7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)

    10/26

    10

  • 7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)

    11/26

    Trunk Highway 210 Thomson

    11

  • 7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)

    12/26

    $1.7 Million dollar emergency repair contract

    with Northland Construction Replace washed out 14 diameter overflow

    pipe with 110 long bridge

    MnDOT supplies steel bridge beams

    12

  • 7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)

    13/26

    Trunk Highway 210 East Park EntranceJay Cooke

    13

  • 7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)

    14/26

    $2.5 million dollar emergency repair contractswith Ulland Brothers Construction, KGMConstruction and Soil Nail Launchers Stabilize slopes, install 8 x 12 x 250 boxculvert, replace small culverts, paving Road reopened October 23, 2012

    14

  • 7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)

    15/26

    15

    Realignroadway onmore stablealignment

    Significant

    environmentalprocess

    April 2013letting

    $3.4M est.

  • 7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)

    16/26

    Trunk Highway 210 West of Power

    Canal

    Jay Cooke 16

  • 7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)

    17/26

    Critical access for Minnesota Power and Lightfacilities at Thomson and Fond du Lac

    Approximately $3.2 million dollar emergencyrepair contracts

    Goal to provide road work through entirecorridor and access to the MPL facilities

    Significant environmental process to determine

    permanent solution with many options

    17

  • 7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)

    18/26

    Trunk Highway 210 East of

    Power CanalJay Cooke

    18

  • 7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)

    19/26

    $3.1 Million dollar emergency repair contractwith Schaffer Construction mile grading and concrete pavement

    replacement 10 X 16 box culvert Open November 8, 2012

    19

  • 7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)

    20/26

    Hwy 2 and 35 Proctor

    (near Duluth)20

  • 7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)

    21/26

    Trunk Highway 23 South of Bridge

    Fond du Lac

    21

  • 7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)

    22/26

    Trunk Highway 61 Replace Silver Creek Bridge Trunk Highway 23 Replace Mission CreekBridge in Fond du Lac

    22

  • 7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)

    23/26

    State Aid System Over 1,000 miles of local roads

    225 structures

    2/3 of repairs planned for 2013 1/3 will be completed in 2014

    23

  • 7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)

    24/26

    Special post-flood bridge inspection program

    6 consultant teams managed by SEH

    177 local bridges inspected by consultants

    58 structures inspected by local agencies

    Contract administered by St. Louis County,

    managed by MnDOT

    24

  • 7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)

    25/26

    58 local bridges will be replaced or needmajor rehabilitation - $22,000,000

    75 structures with minor damage -$2,200,000

    25

  • 7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)

    26/26