1/26
Senate Transportation CommitteeFebruary 25, 2013
Duane Hill, District Engineer218-725-2704
mailto:[email protected]:[email protected]:[email protected]7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)
2/26
Describe MnDOT Major Impacts from theEvent
Describe MnDOT Response
Describe Completed and Remaining Work
2
7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)
3/26
3
7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)
4/26
Torrential rain and flooding
turned the southwest
corner of Lake Superior a
muddy brown, seen here
in a satellite image taken
Thursday, June 21, 2012.
(National Oceanic and
Atmospheric
Administration photo)
4
7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)
5/26
Work with Law Enforcement to Close Roads Incident Command 26 Road Closures on Trunk Highway System
5
7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)
6/26
MnDOT DNR, DPS
Local Law Enforcement
FHWA Emergency contracting authority,consultants and contractors
Mutual Aid
6
7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)
7/26
MnDOT Forces Focus on reopening roads and making them safe
for travel
Set and remove road closure signing
Have presence at road closures when necessary Replace washed out culverts
Remove debris
Fill in eroded areas
Perform damage assessments
7
7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)
8/26
Contract Work Focus on repairs beyond the capability of MnDOT
resources
Bridges, box culverts, road grades and pavement
Clear debris Set long-term detours that required significant
signing
Perform specific engineering designs
Storm sewer inspection Soil stabilization
Contract work to date exceeds $11M
8
7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)
9/26
Trunk Highway 210 in Jay Cooke
Trunk Highway 210 in Thomson Trunk Highway 23 in Fond du Lac
neighborhood
Trunk Highway 2 from Proctor to I-35
9
7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)
10/26
10
7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)
11/26
Trunk Highway 210 Thomson
11
7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)
12/26
$1.7 Million dollar emergency repair contract
with Northland Construction Replace washed out 14 diameter overflow
pipe with 110 long bridge
MnDOT supplies steel bridge beams
12
7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)
13/26
Trunk Highway 210 East Park EntranceJay Cooke
13
7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)
14/26
$2.5 million dollar emergency repair contractswith Ulland Brothers Construction, KGMConstruction and Soil Nail Launchers Stabilize slopes, install 8 x 12 x 250 boxculvert, replace small culverts, paving Road reopened October 23, 2012
14
7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)
15/26
15
Realignroadway onmore stablealignment
Significant
environmentalprocess
April 2013letting
$3.4M est.
7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)
16/26
Trunk Highway 210 West of Power
Canal
Jay Cooke 16
7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)
17/26
Critical access for Minnesota Power and Lightfacilities at Thomson and Fond du Lac
Approximately $3.2 million dollar emergencyrepair contracts
Goal to provide road work through entirecorridor and access to the MPL facilities
Significant environmental process to determine
permanent solution with many options
17
7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)
18/26
Trunk Highway 210 East of
Power CanalJay Cooke
18
7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)
19/26
$3.1 Million dollar emergency repair contractwith Schaffer Construction mile grading and concrete pavement
replacement 10 X 16 box culvert Open November 8, 2012
19
7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)
20/26
Hwy 2 and 35 Proctor
(near Duluth)20
7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)
21/26
Trunk Highway 23 South of Bridge
Fond du Lac
21
7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)
22/26
Trunk Highway 61 Replace Silver Creek Bridge Trunk Highway 23 Replace Mission CreekBridge in Fond du Lac
22
7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)
23/26
State Aid System Over 1,000 miles of local roads
225 structures
2/3 of repairs planned for 2013 1/3 will be completed in 2014
23
7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)
24/26
Special post-flood bridge inspection program
6 consultant teams managed by SEH
177 local bridges inspected by consultants
58 structures inspected by local agencies
Contract administered by St. Louis County,
managed by MnDOT
24
7/29/2019 MNDOT presentation on Duluth flooding (2/25/13)
25/26
58 local bridges will be replaced or needmajor rehabilitation - $22,000,000
75 structures with minor damage -$2,200,000