MMB Operations / Parallels Briefing. 7 October 2004. High-Resolution Window Domains (colored) nested in Eta Domain (black). Primary mission of High- Resolution Window (HIRESW) run is to provide forecaster guidance for severe weather. Forecast length: 48 h Frequency: Once per day for - PowerPoint PPT Presentation

Citation preview

Page 1: MMB Operations / Parallels Briefing

MMB Operations / Parallels Briefing

7 October 2004

Page 2: MMB Operations / Parallels Briefing

High-Resolution Window Domains (colored) nested in Eta Domain (black)

Primary mission of High-Resolution Window (HIRESW)run is to provide forecasterguidance for severe weather.

Forecast length: 48 h

Frequency: Once per day forCONUS and Alaska domains; Twice per day for Hawaii (00z/12z) and Puerto Rico (06z/18z).

Initial/boundary conditions from operational Eta

00Z

06Z12Z

18Z

Page 3: MMB Operations / Parallels Briefing

Operational implementation

• 21 September 2004 : Replace single run of NCEP Non-hydrostatic Meso Model (NMM) in the HiResWindow suite with two runs – The WRF version of the NMM (WRF-NMM)– The WRF version of the Eulerian Mass core (WRF-

EM) with physics chosen by NCAR

http://wwwt.emc.ncep.noaa.gov/mmb/mmbpll/nestpage

Page 4: MMB Operations / Parallels Briefing

WRF-NMM Physics module

WRF-EM

Betts-Miller-Janjic Convection Kain-Fritsch

Ferrier Microphysics Ferrier

Mellor-Yamada-Janjic (Eta)

PBL MRF scheme

Monin-Obukhov (Janjic Eta) scheme

Surface layer Monin-Obukhov

OSU land-surface Land-surface OSU land-surface

GFDL (Eta) Radiation Dudhia

Page 5: MMB Operations / Parallels Briefing

Changes to NMM dynamics

• The Matsuno vertical advection scheme has been replaced with the neutral, unconditionally stable Crank-Nicholson scheme

• The Smagorinsky constant in the lateral diffusion is reduced by 70%

• The effect of horizontal shear of vertical velocity has been added to the lateral diffusion scheme.

• The fundamental time step has been reduced by 10%.

Page 6: MMB Operations / Parallels Briefing

Changes to NMM Physics• Input data on surface conditions (soil and vegetation type) have

been refined • Soil heat capacity has been increased which results in larger

ground fluxes • The dependence of roughness length (z0) on the height of

topography has been removed, significantly reducing z0 over elevated terrain

• The countergradient heat flux has been added to the turbulent kinetic energy (TKE) equation and in the vertical heat diffusion

• The diagnostic mixing length has been increased • The floor values for TKE and mixing length have been

significantly reduced • Increased residual turbulent mixing has been introduced in case

of strong stability between the top of the surface layer and the layer above the inversion

• The effect of entrainment has been incorporated into the procedure for finding convective cloud top pressure.

• The entropy change threshold for triggering deep convection has been reduced

Page 7: MMB Operations / Parallels Briefing

• Interaction With GFDL Hurricane Runs– No Hurricanes

• Full Set Runs – Two Large and Two Small WRF Domains

– One Hurricane• Eliminate Small WRF-NMM and WRF-EM Domains

– Two Hurricanes• Eliminate Large WRF-EM Domain

– Three Hurricanes• Eliminate Large WRF-NMM and WRF-EM Domains

– Four Hurricanes• No WRF Runs

• EMC will run any cancelled NMM run on dev machine • EMC will not rerun cancelled EM forecasts due to resource limitations

Page 8: MMB Operations / Parallels Briefing

24 Hour Accumulated Precipitation Valid 12Z 6 September, 2004, 42 Hour Forecast

OPS. NMM WRF NMM

OPS. Eta WRF EM

CPC RFC 1/8 deg Verification

Tropical Storm

Frances:

Subjective Comparison

Page 9: MMB Operations / Parallels Briefing

Hurricane Francis passing through Puerto Rico HIRESW domain :

31 August – 1 September

Page 10: MMB Operations / Parallels Briefing
Page 11: MMB Operations / Parallels Briefing
Page 12: MMB Operations / Parallels Briefing
Page 13: MMB Operations / Parallels Briefing

Implementation Strategy : 6-member HIRESW Ensemble

• When : 2nd Quarter 2005 (EMC) or 3rd Quarter 2005 (NCO) 

• Six-member WRF ensemble will run four times daily, once for each of 6 HIRESW domains.

- 2 controls (WRF-NMM, WRF-EM, now running in ops)- 4 additional members with bred perturbations in ICs/BCs

• 80-min run window (clock time) shared with GFDL Hurricane model.

• Availability of two control members guaranteed.

• Availability of additional members contingent on number of tropical storms.

• Ensemble feasible following CCS Phase 2 upgrade of NCEP computers. 

Page 14: MMB Operations / Parallels Briefing
Page 15: MMB Operations / Parallels Briefing

What has been tested: 32 km parallels

• Probable / Likely / Possible components– 3DVAR changes (NEXRAD level 2.5 radial winds;

2dvar analysis of sfc temperature data– “Scaled-back” precipitation assimilation

(eliminate/simplify increase and/or creation of latent heat)

– Version 2.7 of Noah LSM with hi-res soil/veg types– GFS radiation physics and changes to cloud cover

formulations

• Components no longer under consideration– Modified shallow convection parameterization

• Gory details for parallels ETAY, ETAZ, ETAL, ETAW at http://wwwt.emc.ncep.noaa.gov/mmb/mmbpll/paralog

Page 16: MMB Operations / Parallels Briefing

Analysis of surface data in Eta 3DVAR

• NCEP's Manuel Pondeca has developed a two dimensional data assimilation module, with the goal of improving the analysis of surface observations within the Eta 3DVAR system (sfc land temps removed from ops EDAS in September 2003 due to adverse impact on lower/mid tropospheric analysis)

• In the 2DVAR module, the analysis is univariate and the background error correlations may be chosen to be anisotropic functions that stretch along the contour lines of the terrain field to some degree.

• Applied to entire domain after 3DVAR analysis, 2DVAR increments on lowest Eta mmodel surface replace those from original 3DVAR analysis

• Impact is small

Page 17: MMB Operations / Parallels Briefing

RMS wind

RMS Z

RMS Temp

Bias Temp

12-h forecasts 13-22 Sept 2004

Page 18: MMB Operations / Parallels Briefing

Assimilation of Level 2.5 NEXRAD Radial winds :

32-km parallel ran 4-28 June 2004

Page 19: MMB Operations / Parallels Briefing

RMS Wind

RMS Temp

RMS HeightBias Temp

12-h forecasts 4-28 June 2004

Page 20: MMB Operations / Parallels Briefing

48-h forecasts 4-28 June 2004

RMS Wind RMS Temp

RMS Height Bias Temp

Page 21: MMB Operations / Parallels Briefing

Why is this the Final Eta change package??

• North America Meso (NAM) with WRF-NMM scheduled to replace Eta in 4th quarter of 2005

• Finalize Eta bundle now to start 12km parallel on new dev machine (which will be a full-blown 4x/day parallel w/DGEX)

• Begin transition / development of NAM Data Assimilation System (NDAS) with GSI analysis

Page 22: MMB Operations / Parallels Briefing

Proposed Timeline - 1 November : Finalize choice of components to Eta

change package; begin 4 cycles/day 12km parallel on new dev machine with DGEX - 1 November – 31 December : Closely monitor

performance and pray– 15 November : Write draft charter for NCO– 31 January 2005 (?) Try to get NCO the codes so

they can start implementation process as soon as CCS upgrade is operational

– 31 March 2005 ( at the absolute latest) Plan for 2nd quarter 2005 implementation

Page 23: MMB Operations / Parallels Briefing

Real-time runs at http://wwwt.emc.ncep.noaa.gov/mmb/mmbpll/etapll32http://wwwt.emc.ncep.noaa.gov/mmb/mmbpll/etapll32.etaw

or