Construction complete: Racks Network rack present PPS racks present DAQ racks present. Last two racks in shipment Air Conditioning Being installed Electrical Earth straps in All cable trays. Power in progress Network Installation started yesterday Floor - PowerPoint PPT Presentation
Citation preview
1
1
MLCRConstruction complete:
Racks Network rack present
PPS racks present
DAQ racks present.
Last two racks in shipment
Air Conditioning
Being installed
Electrical
Earth straps in
All cable trays.
Power in progress
Network
Installation started yesterday
Floor
David Pyke sorting out the supplier