1
1 1 MLCR Construction complete: Racks Network rack present PPS racks present DAQ racks present. Last two racks in shipment Air Conditioning Being installed Electrical Earth straps in All cable trays. Power in progress Network Installation started yesterday Floor David Pyke sorting out the supplier Last estimate – “before Christmas”

MLCR

  • Upload
    kioko

  • View
    59

  • Download
    0

Embed Size (px)

DESCRIPTION

Construction complete: Racks Network rack present PPS racks present DAQ racks present. Last two racks in shipment Air Conditioning Being installed Electrical Earth straps in All cable trays. Power in progress Network Installation started yesterday Floor - PowerPoint PPT Presentation

Citation preview

Page 1: MLCR

1

1

MLCRConstruction complete:

Racks Network rack present

PPS racks present

DAQ racks present.

Last two racks in shipment

Air Conditioning

Being installed

Electrical

Earth straps in

All cable trays.

Power in progress

Network

Installation started yesterday

Floor

David Pyke sorting out the supplier

Last estimate – “before Christmas”