Dr. Ir. Arnold Soetrisnanto Komisi Tetap Iptek, KADIN Indonesia Ketua Komisi Energi, Dewan Riset Nasional, 2015-2018 Calon Anggota Dewan Energi Nasional, 2019-2024 Jakarta, 11 Oktober 2019 1 MKI - Hari Listrik Nasional 2019 The Future of Nuclear Power for Electricity Jndustry Anticipation Toward NPP Developmeny in Indonesia

MKI - Hari Listrik Nasional 2019 · MKI - Hari Listrik Nasional 2019 The Future of Nuclear Power for Electricity Jndustry Anticipation Toward NPP Developmeny in Indonesia . 2 Arnold

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: MKI - Hari Listrik Nasional 2019 · MKI - Hari Listrik Nasional 2019 The Future of Nuclear Power for Electricity Jndustry Anticipation Toward NPP Developmeny in Indonesia . 2 Arnold

Dr. Ir. Arnold Soetrisnanto

Komisi Tetap Iptek, KADIN Indonesia

Ketua Komisi Energi, Dewan Riset Nasional, 2015-2018

Calon Anggota Dewan Energi Nasional, 2019-2024

Jakarta, 11 Oktober 2019 1

MKI - Hari Listrik Nasional 2019

The Future of Nuclear Power for Electricity

Jndustry Anticipation Toward NPP Developmeny in Indonesia

Page 2: MKI - Hari Listrik Nasional 2019 · MKI - Hari Listrik Nasional 2019 The Future of Nuclear Power for Electricity Jndustry Anticipation Toward NPP Developmeny in Indonesia . 2 Arnold

2

Arnold Soetrisnanto, Oktober.2019

Segitiga Pengelolaan Energi: Sustainability

Ketahanan, keekonomian dan kebersihan adalah 3 pilar utama yang harus direalisasikan dengan berbasis pada pengembangan Teknologi, menciderai salah satu dari 3 pilar akan menyebabkan gagalnya penyediaan energi berkelanjutan.

Technology

(Ketahanan Energi) (Energi Bersih)

(Menguntungkan)

Mandiri dan Berdaulat

Page 3: MKI - Hari Listrik Nasional 2019 · MKI - Hari Listrik Nasional 2019 The Future of Nuclear Power for Electricity Jndustry Anticipation Toward NPP Developmeny in Indonesia . 2 Arnold

3

8,66

10,80 11,73

12,94

15,81

18,48

24,66

29,28

35,74

41,01

45,04

2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025

PLTP PLT Bioenergi PLTA Mini Hidro PLTS PLT Bayu PLT Laut Total

2025 Geothermal 7.2 GW

Hydro 21 GW

Bioenergi 5.5 GW

Solar Power 6.4 GW

Wind 1.8 GW

Ocean 3.1 GW

Totall 45 GW

2015 2025

Total Installed Capacity 55 GW 135 GW

NRE Power Plant Capacity 8.7 GW (15.7%) 45 GW (33%)

NRE Target 23% in 2025 (KEN: 23% Primary Energy )

Arnold Soetrisnanto, Oktober.2019

- PLTN Pilihan Terakhir

- 1100 kWh/Kapita

Page 4: MKI - Hari Listrik Nasional 2019 · MKI - Hari Listrik Nasional 2019 The Future of Nuclear Power for Electricity Jndustry Anticipation Toward NPP Developmeny in Indonesia . 2 Arnold

4

(Yearly Capacity Factor)

o Nuclear ~ 90% Big, Stable Geothermal ~ 85% Medium, Stable Biomass/Waste ~ 85% Small, Stable Mini Hydro ~ 60% Small, Quasi Stable Sea current ~ 45% Small, Quasi Stable Wind ~ 35% Small, Intermittent Solar ~ 30% Small, Intermittent

New and Renewable Energy

Arnold Soetrisnanto, Oktober.2019

Electricity Base Load

Page 5: MKI - Hari Listrik Nasional 2019 · MKI - Hari Listrik Nasional 2019 The Future of Nuclear Power for Electricity Jndustry Anticipation Toward NPP Developmeny in Indonesia . 2 Arnold

5

Arnold Soetrisnanto, Oktober.2019

Energi Nuklir = Energi Alam Semesta

Energi Nuklir = Energi Terbarukan = Energi Abadi

Energi nuklir tidak berbasis sumber

daya alam, tetapi berbasis pada

teknologi dan kemampuan umat

manusia untuk melakukan eksplorasi

tanpa batas, karena energi nuklir

adalah energi bintang-bintang, energi

alam semesta.

Energi nuklir adalah asal dan sumber

dari energi fosil, energi baru dan energi

terbarukan yang kita kenal saat ini di

bumi.

Energi nuklir sudah ada sejak awal

alam semesta diciptakan dan akan

selalu ada hingga berakhirnya

peradapan umat manusia dan alam

semesta.

Harga Listrik

< BPP lokal.

Aman dan

Selamat.

- Menghasilkan energi listrik yang besar dan stabil

- GHG emission free, ramah lingkungan

Page 6: MKI - Hari Listrik Nasional 2019 · MKI - Hari Listrik Nasional 2019 The Future of Nuclear Power for Electricity Jndustry Anticipation Toward NPP Developmeny in Indonesia . 2 Arnold

Energi Nuklir Densitas Tinggi

6

Arnold Soetrisnanto, Oktober.2019

Page 7: MKI - Hari Listrik Nasional 2019 · MKI - Hari Listrik Nasional 2019 The Future of Nuclear Power for Electricity Jndustry Anticipation Toward NPP Developmeny in Indonesia . 2 Arnold

Arnold Soetrisnanto, Oktober.2019

Isu Lingkungan

7

Page 8: MKI - Hari Listrik Nasional 2019 · MKI - Hari Listrik Nasional 2019 The Future of Nuclear Power for Electricity Jndustry Anticipation Toward NPP Developmeny in Indonesia . 2 Arnold

Isu Teknologi

Arnold Soetrisnanto, Oktober.2019

8

Existing design/ prototype: Rusia, China, USA, Japan, France, Korsel, dll.

Page 9: MKI - Hari Listrik Nasional 2019 · MKI - Hari Listrik Nasional 2019 The Future of Nuclear Power for Electricity Jndustry Anticipation Toward NPP Developmeny in Indonesia . 2 Arnold

Arnold Soetrisnanto, Oktober.2019

Isu Limbah PLTN

9

1 ton limbah/tahun

Page 10: MKI - Hari Listrik Nasional 2019 · MKI - Hari Listrik Nasional 2019 The Future of Nuclear Power for Electricity Jndustry Anticipation Toward NPP Developmeny in Indonesia . 2 Arnold

Arnold Soetrisnanto, Oktober.2019

Isu Ekonomi

10

Country At 3% discount rate At 7% discount rate At 10% discount rate

France 50.0 82.6 115.2

Japan 62.6 87.6 112.5

South Korea 28.6 40.4 51.4

USA 54.3 77.7 101.8

China 26.3 37.5 49.6

Source: WNA 2018

Page 11: MKI - Hari Listrik Nasional 2019 · MKI - Hari Listrik Nasional 2019 The Future of Nuclear Power for Electricity Jndustry Anticipation Toward NPP Developmeny in Indonesia . 2 Arnold

Arnold Soetrisnanto, Oktober.2019

Isu Populasi

11

# Negara Populasi 2018 PLTN

Operasi PLTN

Kontruksi

1 China 1,415,045,928 43 15

2 India 1,354,051,854 22 7

3 United States 326,766,748 98 2

4 Indonesia 266,794,980 0 0

5 Brazil 210,867,954 2 1

6 Pakistan 200,813,818 5 2

7 Nigeria 195,875,237 0 0

8 Bangladesh 166,368,149 0 2

9 Russia 143,964,709 37 6

10 Mexico 130,759,074 2 0

Page 12: MKI - Hari Listrik Nasional 2019 · MKI - Hari Listrik Nasional 2019 The Future of Nuclear Power for Electricity Jndustry Anticipation Toward NPP Developmeny in Indonesia . 2 Arnold

12

3x Kecelakaan PLTN

Arnold Soetrisnanto, Oktober.2019

Page 13: MKI - Hari Listrik Nasional 2019 · MKI - Hari Listrik Nasional 2019 The Future of Nuclear Power for Electricity Jndustry Anticipation Toward NPP Developmeny in Indonesia . 2 Arnold

13

Lokasi PLTN Potensial

Arnold Soetrisnanto, Oktober.2019

Page 14: MKI - Hari Listrik Nasional 2019 · MKI - Hari Listrik Nasional 2019 The Future of Nuclear Power for Electricity Jndustry Anticipation Toward NPP Developmeny in Indonesia . 2 Arnold

14

East Indonesia

Capacity: 10 GWe (15%)

Grid: Separated

Need: SMR 100-300 MWe/unit

West Indonesia

Capacity: 55 GWe (85%)

Grid: Connected

Need: 900-1600 MWe/Unit

2 Regions for Electricity Status 2019

Arnold Soetrisnanto, Oktober.2019

- Muria Site, FS Finished - Bangka Site, FS Finished - Potential Sites

- Under Preparation

Page 15: MKI - Hari Listrik Nasional 2019 · MKI - Hari Listrik Nasional 2019 The Future of Nuclear Power for Electricity Jndustry Anticipation Toward NPP Developmeny in Indonesia . 2 Arnold

15

2 Types of NPP Market Up to 2030

Arnold Soetrisnanto, Oktober.2019

Big NPP > 1000 MWe/Unit SMR < 300 MWe/Unit

Muria site:

2~4 x 1000~1600 MWe

Bangka site:

2~4 x 1000~1600 MWe

West Kalimantan site:

4~6 x 100~300 MWe

East Kalimantan Site:

4~6 x 100~300 MWe

West Nusa Tengara :

2~4 x 50~300 MWe

Another medium Island such as Sulawesi , South Maluku, North Maluku,

East Nusa Tengara, and Papua will follow after 2030 for 2~4 x 50~300 MWe

Page 16: MKI - Hari Listrik Nasional 2019 · MKI - Hari Listrik Nasional 2019 The Future of Nuclear Power for Electricity Jndustry Anticipation Toward NPP Developmeny in Indonesia . 2 Arnold

16

KESIMPULAN

Arnold Soetrisnanto, Oktober.2019

Untuk pembangunan industri nasional diperlukan

pasokan listrik dari base load yang besar dan stabil

selama 24 jam tanpa henti, serta ramah lingkungan.

PLTN memenuhi kriteria di atas dan tidak lagi menjadi

pilihan terakhir, sehingga bisa bisa mengisi energi mix

di sektor pembangkitan kelistrikan.

Permasalahan pembangunan PLTN pertama di Indonesia

tidak tergantung pada aspek/isu teknologi, ekonomi dan

lingkungan, tetapi tergantung pada masalah sosial-

politik.

Pembangunan PLTN pertama di Indonesia hanya

tergantung pada keputusan pemerintah dan konsistensi

dalam menjalankan program yang sudah diputuskan.

Page 17: MKI - Hari Listrik Nasional 2019 · MKI - Hari Listrik Nasional 2019 The Future of Nuclear Power for Electricity Jndustry Anticipation Toward NPP Developmeny in Indonesia . 2 Arnold

17

Dr. Ir. Arnold Soetrisnanto

Phone: +628128218940

Email: [email protected]

Page 18: MKI - Hari Listrik Nasional 2019 · MKI - Hari Listrik Nasional 2019 The Future of Nuclear Power for Electricity Jndustry Anticipation Toward NPP Developmeny in Indonesia . 2 Arnold

Biodata: Arnold Soetrisnanto

- Pendidikan S-2 dan S-3 Bidang Energi, ENSIC-INPL Perancis, 1987-1993

- Peneliti Bidang Energi, BATAN, 1993-2002

- Kepala Bidang Sistem Energi, BATAN, 1996-2002

- Kepala Pusat Pengembangan Energi Nuklir, BATAN, 2002-2007

- Pengembangan Bisnis Bidang EBT, PT. Medco Power Indonesia, 2007-2015

- Wakil Ketua Bidang Energi, Persatuan Insinyur Indonesia, 2011-2016

- Anggota Komisi Energi, Dewan Riset Nasional, 2012-2015

- Ketua Komisi Energi, Dewan Riset Nasional, 2015-2018

- Ketua Umum Himpunan Masyarakat Nuklir Indonesia, 2015-2018

- Komisi Tetap Bidang Iptek, KADIN Indonesia, 2015-Sekarang.