Mizan Residence
Dhaka, Bangladesh
3298.BAN2007 Award Cycle
Client: Mizanur Rahman
Built Area: 511 m²
Cost: US$ 109’765
The client here is a property developer accustomed to maximising returns on his investment. ‘Despite making a shoestring box as a rule, he agreed to build an apartment that is livable and also sustainable in terms of climate and profit’ - an alternative model for Dhaka’s congested ‘apartment culture’. Besides the Mizan residence, the six-storey building contains eight apartments and ground-level parking. Throughout, the internal walls are either exposed concrete (the structure) or terracotta brick (the infill). A significant achievement of the project, according to the architects, was to dispense with the usual high boundary wall and revive the traditional ‘mer’ - an open threshold.
Architect: Shatotto: Architecture for Green Living
2007 On Site Review Report3298.BAN
Architect Shatotto: Architecture for Green Living
ClientMizanur Rahman
Design2001 - 2002
Completed2004
by Jimmy C.S. Lim
Mizan ResidenceDhaka, Bangladesh
Mizan Residence Dhaka, Bangladesh I. Introduction
The Mizan Residence is an apartment on the penthouse level of a six-storey block of flats in East Dhaka. It overlooks a man-made lake in Gulshan, a sought-after area that is seen as a new epicentre of elite high-class residential living. In this part of the city, property owners are approaching various developers to develop their land in return for ‘four units out of ten’, and many single-family homes are being torn down and replaced by six-storey walk-ups. This is one such project. The owner/developer is an entrepreneurial professional attached to a Dutch multinational corporation. The design of the apartment explores ways to introduce light, vegetation and elements of the open boundary (mer) into a new vocabulary.
II. Contextual Information A. Historical background
A land of rich cultural heritage of myths and legends, Bangladesh became a sovereign state in 1971 after its liberation from Pakistan. The country spreads over a total area of 119,724 square kilometres; its population density is 898 per square kilometre, according to the census of 2001. The capital, Dhaka, covers 1,464 square kilometres and its history stretches back about 400 years. Dhaka is currently the twelfth largest city in the world, with 11.6 million inhabitants (2003 est.), and is predicted to become the seventh largest by 2015, as its population grows to 17.9 million. Dhaka is located in one of the world’s leading rice and jute growing regions. Its industries include textile and food processing, especially rice milling. A variety of other consumer goods are also manufactured.
B. Local architectural character
Fertile and active in trade by virtue of its climate and location and graced with a rich history, Dhaka boasts a varied architectural heritage, now mainly confined to the old city. Muslim influence is reflected in the more than 700 mosques and historic buildings found throughout the city. The earliest monuments are the dargahs, khanqahs, tombs and mosques built by Arab missionaries who furthered the spread of Islam in the region.
C. Climatic conditions
Dhaka is about 22 degrees north of the equator and has sub-tropical climate. The city is hot and humid almost year-round, because of its location at the delta of Bengal. Prevailing winds are from the southeast, with occasional northerly winds from the Himalayas.
1
D. Site and surroundings
The building stands at a corner of a cul-de-sac and a T-junction. The back of the site faces east, overlooking the lake. The surroundings are consistently monotonous, being formed of similar six-storey apartment blocks all built to the permissible setback. Greenery is the only mitigating factor in the environment – where the shade trees that traditionally lined the streets are still standing.
E. Topography
It is a flat site and the soil seems relatively good as the foundations do not appear to be very heavy. Although the lake is nearby, no one was able to provide any solid information about the water-table and its possible effect on the stability of the site and foundations. However, possibly to mitigate the water issue, the footings of the development use pre-cast concrete piles, driven to a depth of about 20 feet.
III. Programme A. History of the inception of the project
The owner decided to build on the entire plot of land without leaving any surrounding space. A total of 10 units were built: the owner converted the two on levels 5 and 6 into a duplex apartment (the Mizan Residence), leaving a total of 9 units.
B. How were the architects and specialists chosen?
By reputation. C. General programme objectives
The client is a property developer accustomed to maximising returns on his investment. ‘Despite making shoestring boxes as a rule, he agreed here to build an apartment that was liveable and also sustainable in terms of climate and profit – an alternative model for Dhaka’s congested apartment culture.’
D. Functional requirements
Apart from the Mizan Residence, the apartment building contains a further eight simplex apartments from the second up to the sixth level. The ground level is reserved for resident parking.
IV. Description A. Building data
Total site area: 523.51 square metres Ground floor area: 379.18 square metres (for the nine apartments in total) Total combined floor area: 511.15 square metres
2
B. Evolution of design concepts
Dhaka is classified as an earthquake zone 2 area, so piles were used underneath the footing with connected tie-beams to improve earthquake resistance. The pre-cast concrete piles have a 12-inch diameter. The rest of the building is a concrete frame structure with brick infill. It seems to have complied with all the requirements set out by the developer. As with the traditional mer, there are no boundary walls demarcating the outside footpath and the site. The interplay of solids and voids on the facade is interesting, using exposed concrete with red bricks articulated with horizontal overhangs. However, this is not expressed internally.
Landscaping is not extensive but intermittent, restricted to the balcony area.
C. Structure, materials, technology
Structure: reinforced concrete frame with brick infill Construction technology: standard reinforced concrete construction Building services, site utilities: standard
D. Origin of technology, materials, labour force, professionals
All the people involved – labour force and professionals – are local. All materials are local or locally sourced.
V. Construction Schedule and Costs A. History of project
Project commissioned: April 2001 Design started: September 2001 Design accepted by client: June 2002 Construction started: July 2002 Completion date: September 2004
B. Total costs and main sources of financing
Total cost of land was c. USD 64,196, and total construction costs were USD 109,765, broken down as follows: Infrastructure USD 9,836 Labour USD 12,061 Materials USD 85,246 Landscaping USD 4,098 Professional Fees USD 3,443 Others USD 820 Cost per square metre USD 214
3
C. Comparative costs
Not available. D. Maintenance costs
The timber that is used here against the brickwork and concrete does not seem to be durable: the varnished timber shutters are weathering faster, so will require higher maintenance.
E. Ongoing costs
Electrical bill TK 2000-2500 per month. With air-conditioning the cost of electricity would double to TK 4000-5000 per month.
VI. Technical Assessment A. Functional assessment
The penthouse works well. All the major rooms have views of the garden (though it is not well maintained). A major concern is the lack of a fire escape. There is just one main staircase that connects the ground floor to all other floors; it is open and unprotected and leads directly to the open lift lobby.
B. Climatic performance
Generally fans and split-unit air-conditioners are used. No other systems are developed or utilised.
C. Response to treatment of water and rainfall
The shower veranda is an interesting/novel concept, a place for the inhabitants to sit and get drenched when it rains.
D. Response to, and planning for, emergency situations
The lack of a fire escape is major concern, as noted above. In addition, there seems to be no clear quantification of the threat posed by the proximity of the lake and the potential for the water-table to rise and undermine the foundations.
E. Ageing and maintenance problems
Generally with respect to ageing and maintenance problems, please refer to the previous section, item D. Apart from that, the garden does not appear to be well maintained and is not as large as one might expect.
4
F. Design features
The building’s massing and its use of concrete and brick make it different from the rest of the street. There is a play of solid and void, and the horizontal coursing of the brickwork breaks the verticality. It is apparent that many people visit the building to view the space utilisation, which by Dhaka standards is ground-breaking.
G. Durability and long-term viability of the project
The building is not expected to last an extraordinary length of time. That said, all the plumbing and electrical materials are of good quality and have an average life-expectancy of 25 years. The concrete and brickwork should last well under ordinary circumstances.
H. Interior design and furnishing
Most of the furnishings were selected by the client, just as the garden was all his work. VII. Users A. Description of those who use or benefit from the project
The client and his family. B. Response to project by clients, users, community, etc.
I was unable to secure a wide coverage of professional opinion. The few people I spoke to were reserved in their judgement. Popular reaction to the project was similarly reserved.
VIII. Persons involved
Client: Mr Mizanur Rahman Architect: Mohammad Rafiq Azam Structural Engineer: M A Sadeque Asst Project Architect: Md. Akter Hossen Mechanical Designer: Md. Sayedul Islam Electrical Engineer: Abdul Mannan Khan Contractor: Md. Belayer Hossan Khan Landscape designer: Md. Rafiq Azam & Mr Mizanur Rahman Sculpture: Hamiduzzaman Khan
IX. Bibliography
Cited in Architecture Asia Magazine 2, June 2002
Jimmy C.S. Lim May 2007
5
6
The Mizan Residence is an apartment on the penthouse level of a six-storey block of flats
Entrance view from top floor.
South side entrance.
Glass and concrete stairs connect the different levels of the duplex.
Drawing room and courtyard. The internal walls are either exposed concrete and terracotta bricks.
Drawing room.
Living room with lighting.
Kitchen.
View of dining room from balcony.
Master bedroom.
Rooftop sitting area. The purpose was to create a pavilion which can be connected with the nature.
Bench at rooftop.
Sitting room at the roof top.
Concrete texture.
Louvred windows.
Stairs guardrails.
Architects
Clients
CommissionDesignConstructionOccupancySiteGround FloorTotal FloorCostsProgramme
Mizan Residence
GulshanDhaka, Bangladesh
Shatotto: Architecture for Green LivingDhaka, Bangladesh
Mizanur RahmanDhaka, Bangladesh
20012001 - 20022002 - 20042004524 m2
380 m2
511 m2
US$ 109’765The client here is a property developer accustomed to maximising returns on his investment. ‘Despite making a shoestring box as a rule, he agreed to build an apartment that is livable and also sustainable in terms of climate and profit’ - an alternative model for Dhaka’s congested ‘apartment culture’. Besides the Mizan residence, the six-storey building contains eight apartments and ground-level parking. Throughout, the internal walls are either exposed concrete (the structure) or terracotta brick (the infill). A significant achievement of the project, according to the architects, was to dispense with the usual high boundary wall and revive the traditional ‘mer’ - an open threshold.
Building Type2007 Award Cycle 3298.BAN
5
4th level green, untamed After noon sun with green from the child bed Court connecting levels Glass stair, connecting the cosmos
Jaloushi_ the jali Living room in summer Mystery of nature Orchard at roof with context
Outside in at twilight Roof garden Staggered greens Stair with contrast
The sunshades Touch of last light Tradition & inspiration Untamed green
3298_dr
3298_dr2
S331037
S331038
S331039
S331040
S331041
S331042
S331043
S331044
S331045
S331046
S331047
S331048
S331049
S331050
S333229
S333230
S333231
S333232
S333233
S333234
S333235
S333236
S333237
S333238
S333239
S333240
S333241
S333242
S333243
S333244
S333245
S333246
S333247
S333248
S333249
S333250
S333251
S333252
S333253
S333254
S333255
S333256
S333257
S333258
S333259
S333260
S333261
S333262
S333263
S333264
S333265
S333266
S333267
S333268
S333269
S333270
S333271
S333272
S333273
S333274
S333275
S333276
S333277
S333278
S333279
S333280
S333281
S333282
S333283
S333284
S333285
S333286
S333287
S333288
S333289
S333290
S333291
S333292
S333293
S333294
S333295
S333296
S333297
S333298
S333299
S333300
S333301
S333302
S333303
S333304
S333305
S333306
S333307
S333308
S333309
S333310
S333311
S333312
S333313
S333314
S333315
S333316
S333317
S333318
S333319
S333320
S333321
S333322
S333323
S333324
S333325
S333326
S333327
S333328
S333329
S333330
S333331
S333332
S333333
S333334
S333335
S333336
S333337
S333338
S333339
S333340
S333341
S333342
S333343
S333344
S333345
S333346
S333347
S333348
S333349
S333350
S333351
S333352
S333353