14
Mission Mission Venera Venera D (2016) D (2016) - - scientific goals and payload scientific goals and payload Zasova L.V. (1), Korablev O.I. (1), Zelenyi L.M. (1), Zakharov A.V. (1), Polischuk G.M. (2), Pichkhadze K.M. (2), Vorontsov V.A. (2), Elkin K.S .(3), Voron V.V. (4), Marov M.Ya. (5), Basilevsky A.T.(5), Cheremukhina Z.P.(3), Gavrik A.L. (6), Gerasimov M.V. (1), Gotlib V.M.(1), Grigoriev A. (1), Gromov V. (1), Ignatiev N.I. (1), Khavroshkin O.B., (7), Klimov S.I. (1), Lipatov A.N. (1), Linkin V.M.(1), Liash A.(1), Mitrofanov I.G. (1), Moshkin B.E.(1), Rodin A.V.(8), Sanko N.F.(1,4), Skalsky A.A. (1), Vaisberg. O.L. (1), Zastenker G.N.(1). Venera-D workshop, IKI, 30.09-01.10.2009 (1) IKI RAS, (2) NPOL, (3) TSNIIMASH, (4) Roscosmos, (5) GEOKHI RAS, (6) IRE RAS, (7) IFZ RAS, (8) MIPT. E-mail: [email protected]

Mission Venera D (2016) - scientific goals and payload · 2009-11-14 · Venera – D mission is included in the Russian Federal Space Program with launch in 2016 A current year (2009)

  • Upload
    others

  • View
    8

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Mission Venera D (2016) - scientific goals and payload · 2009-11-14 · Venera – D mission is included in the Russian Federal Space Program with launch in 2016 A current year (2009)

MissionMission VeneraVenera D (2016)D (2016) --scientific goals and payloadscientific goals and payload

Zasova L.V. (1), Korablev O.I. (1), Zelenyi L.M. (1), Zakharov A.V. (1), PolischukG.M. (2), Pichkhadze K.M. (2), Vorontsov V.A. (2), Elkin K.S .(3), Voron V.V. (4),Marov M.Ya. (5), Basilevsky A.T.(5), Cheremukhina Z.P.(3), Gavrik A.L. (6),Gerasimov M.V. (1), Gotlib V.M.(1), Grigoriev A. (1), Gromov V. (1), Ignatiev N.I.(1), Khavroshkin O.B., (7), Klimov S.I. (1), Lipatov A.N. (1), Linkin V.M.(1), LiashA.(1), Mitrofanov I.G. (1), Moshkin B.E.(1), Rodin A.V.(8), Sanko N.F.(1,4), SkalskyA.A. (1), Vaisberg. O.L. (1), Zastenker G.N.(1).

Venera-D workshop, IKI, 30.09-01.10.2009

(1) IKI RAS, (2) NPOL, (3) TSNIIMASH, (4) Roscosmos,(5) GEOKHI RAS, (6) IRE RAS, (7) IFZ RAS, (8) MIPT.E-mail: [email protected]

Page 2: Mission Venera D (2016) - scientific goals and payload · 2009-11-14 · Venera – D mission is included in the Russian Federal Space Program with launch in 2016 A current year (2009)

Venera – D mission is included in theRussian Federal Space Program with

launch in 2016

A current year (2009) is the last year ofpreparatory phase.2010 -2011 – phase A, B .2011 – 2016 – Phase C, D2017 –2019 – Phase ELaunch – December, 2016 from BaikonurVenus encounter – May, 2017

Page 3: Mission Venera D (2016) - scientific goals and payload · 2009-11-14 · Venera – D mission is included in the Russian Federal Space Program with launch in 2016 A current year (2009)

At the moment three versions oflaunch vehicle with Fregat booster arestudied for Venus-D mission (NPOL)

2200Proton

1540Zenith -2SLB

1080Soyuz-2

Mass on orbitaroundVenus, kg

Launcher

Page 4: Mission Venera D (2016) - scientific goals and payload · 2009-11-14 · Venera – D mission is included in the Russian Federal Space Program with launch in 2016 A current year (2009)

To start the Phase A in 2010 the following problems are tobe solved in the current year

- Final formulation of scientific goals of the mission- Choice of the elements of the mission and developmentof technical requirement for each element of the mission-Scientific payload for every element of the mission andstrategy of observations- Ballistics of the flight to Venus- Choice of the orbit and strategy of separation of thedescent module (s)- A choice of the landing sites and latitudes of the balloonfloating- Improvement of the Reference Model of Venus- International cooperation

Page 5: Mission Venera D (2016) - scientific goals and payload · 2009-11-14 · Venera – D mission is included in the Russian Federal Space Program with launch in 2016 A current year (2009)

Orbit correctionFlight

Orbit correction

Lander

Atmosphericprobes

Orbiter

Injection on toescape orbitto Venus

Descentinjection into Venus

orbit

Vehicle injection intoEarth orbit

MPS separation

Separation of Balloonprobes Decent vehicle

Reentry

POSSIBLE VENERAPOSSIBLE VENERA--DD MISSION PROFILE (with PROTON)MISSION PROFILE (with PROTON)

Launch

Page 6: Mission Venera D (2016) - scientific goals and payload · 2009-11-14 · Venera – D mission is included in the Russian Federal Space Program with launch in 2016 A current year (2009)

Scientific goals of the mission

Investigation of the structure and chemicalcomposition of the atmosphere, including isotopicratio of light and noble gases;

Clouds, structure, composition, chemistry;

Study of the surface composition, mineralogy,geochemistry, insight to internal structure andinteraction between the surface and atmosphere,volcanic and seismic activity;

Study of the dynamics and nature of superrotation,radiative balance and nature of the enormousgreenhouse effect;

Investigation of the upper atmosphere, ionosphere,electrical activity, magnetosphere, escape rate

Page 7: Mission Venera D (2016) - scientific goals and payload · 2009-11-14 · Venera – D mission is included in the Russian Federal Space Program with launch in 2016 A current year (2009)

VENERA-D(a currrent preliminary conception)

Orbiter. Mass: 540 kg, scientific payload 70 - 80kg.

Balloon at 55-60 km (VEGA type; superpressure, d=3.4m), duration of functioning more than 8 days, payloadup to 5 kg. Mass ~60 kg (without entry system)

Balloon at 48-50 km (VEGA type; d= 3.4 m), duration offunctioning more than 8 days, payload up to 15 kg.Mass ~100 kg (without entry system)

Microprobes to be delivered from balloon one by one.Mass up to 2 kg, payload up to 0.5 kg, duration of thefalling down through the atmosphere ~ 30 min

Lander. Payload 20-25 kg, duration of functioning onthe surface more than 1 hour

Page 8: Mission Venera D (2016) - scientific goals and payload · 2009-11-14 · Venera – D mission is included in the Russian Federal Space Program with launch in 2016 A current year (2009)

Lander-GC- MS-Gamma spectrometer-Nephelometer-Particle counter-Meteo (P,T,W)-Optical package-Wave package-Accelerometer-Panoramic camera-Radio complex-Seism.-acoustic exp.

Payload , studied at preparatory phase

Page 9: Mission Venera D (2016) - scientific goals and payload · 2009-11-14 · Venera – D mission is included in the Russian Federal Space Program with launch in 2016 A current year (2009)

Balloon (Balloon (11),), HHflfl = 48= 48 -- 50 km50 km

-GC-MS-Nephelometer-Lidar-Optical package-Accelerometer-Meteo (P,T,W)-Seism.-acoustic exp,-Wave package-Radio complex-Microprobes

BalloonBalloon (2)(2),, HHflfl = 55= 55 --60km60km

-TDL-Nephelometer-Meteo (P,T,W)-Accelerometer-Radio complex-Seism.-acoustic-Wave package

Page 10: Mission Venera D (2016) - scientific goals and payload · 2009-11-14 · Venera – D mission is included in the Russian Federal Space Program with launch in 2016 A current year (2009)

Orbiter

- IR Fourier Spectrometer- UV and NIR mapping spectrometers- UV wide-angle camera- Sub-mm sounder- Mm sounder for lower atmosphere- Occultation experiment- Plasma package- Radio science

Page 11: Mission Venera D (2016) - scientific goals and payload · 2009-11-14 · Venera – D mission is included in the Russian Federal Space Program with launch in 2016 A current year (2009)

Preliminary conception of the Venera-D mission

BalloonBalloon(prototype VEGA)(prototype VEGA)(H=48(H=48--50km, t > 8 days)50km, t > 8 days)

MicroprobesMicroprobes(ballast)(ballast)

Landing sites (tesserae)

САСА

orbiterorbiter

Clouds

100 км

50 км

O2, OH, NO emissions

polar vortex

superrotation

Н2О, SO2, SO, CO, НF, HCl, HDO, ClO, BrO, H2S, ,H2O2, HCS

CO, H2O, SO2, OCS,H2S, HCl, HF

Ne,Ar, Kr,Xe,O,C,N

H2SO4+crystals?

H2SO4+УФ-absorber?

Si, O, Ca, Na, Al, Mg, Fe, TiK, Th, U

H, He, O, N, N2, COH+, He+, O+, N+,C+, CO2+, N2+, O2+, NO+

VMC VEX

VIRTIS VEX

VIRTIS VEX

Lander

CO2,

Page 12: Mission Venera D (2016) - scientific goals and payload · 2009-11-14 · Venera – D mission is included in the Russian Federal Space Program with launch in 2016 A current year (2009)

RadarOrbiter

VeneraVenera--D experiment plan (Proton launcher)D experiment plan (Proton launcher)

Decent vehicleReentry

Deployment ofparachute system

Deployment of balloonprobe (A3-1)

Deployment of balloonprobe(A3-2)

Deployment ofgliding probe

Lander

Approach to driftaltitude

H=45-50 km“Windcraft” drift

Page 13: Mission Venera D (2016) - scientific goals and payload · 2009-11-14 · Venera – D mission is included in the Russian Federal Space Program with launch in 2016 A current year (2009)

Descent module

1 – Balloon 12 - Balloon 23 – Drift zond4 - Landing module5 – Scientific payload6 – Landing device

Page 14: Mission Venera D (2016) - scientific goals and payload · 2009-11-14 · Venera – D mission is included in the Russian Federal Space Program with launch in 2016 A current year (2009)

WE INVITEEVERYBODY FORCOOPERATION