14
Mission: To Provide a Modeling and Simulation Environment to Support Army Transformation and Army SMART Decisions in a Joint C4ISR Framework. Mission: To Provide a Modeling and Simulation Environment to Support Army Transformation and Army SMART Decisions in a Joint C4ISR Framework. Current Objective: To Build the M&S Environment to Support Acquisition Decision for the FCS Program. Current Objective: To Build the M&S Environment to Support Acquisition Decision for the FCS Program. Juan A. Perez Dir, M&S – JPSD [email protected]

Mission: To Provide a Modeling and Simulation Environment ... · Mission: To Provide a Modeling and Simulation Environment to Support Army Transformation and Army SMART Decisions

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Mission: To Provide a Modeling and Simulation Environment ... · Mission: To Provide a Modeling and Simulation Environment to Support Army Transformation and Army SMART Decisions

Mission: To Provide a Modeling and Simulation Environment to Support Army Transformationand Army SMART Decisions in a Joint C4ISR Framework.

Mission: To Provide a Modeling and Simulation Environment to Support Army Transformationand Army SMART Decisions in a Joint C4ISR Framework.

Current Objective: To Build the M&S Environment to Support Acquisition Decisionfor the FCS Program.

Current Objective: To Build the M&S Environment to Support Acquisition Decisionfor the FCS Program.

Juan A. PerezDir, M&S – JPSD

[email protected]

Page 2: Mission: To Provide a Modeling and Simulation Environment ... · Mission: To Provide a Modeling and Simulation Environment to Support Army Transformation and Army SMART Decisions

SBA Status Report, Sep 01

Excerpt from Mr. Olson’s Status Report on SBA to theGov. Electronics & Info. Tech. Association, Sep 01

• On SBA Infrastructure

•"No one [program] wants to buy the infrastructure" (RDEC federationquote)

•Developing the key cross- cutting enablers is being neglected withinDoD

•Almost all the money is within individual acquisition programs, whohave no motivation to be altruistic regarding larger DoD needs

•Framework provides a viable tool to support next steps

•A systems engineering approach is needed to complete the frameworkand move to capability

Page 3: Mission: To Provide a Modeling and Simulation Environment ... · Mission: To Provide a Modeling and Simulation Environment to Support Army Transformation and Army SMART Decisions

Historical Background/Accomplishments

• January 2001, ASA(ALT) Directed PEO IEW&S(JPSD) to Build the JVB.

• October 2001, ASA(ALT) Recognized JVB’s Potential to Support FCS’Acquisition Process. Also, ASA(ALT) Reaffirmed the Army Need to Havethe JVB Capability to Support S&T Activities for OF.

• November 2001, the First Instance of the JVB Environment WasDemonstrated to OFTF.

• December 2001, FCS and TRAC Initiated Plans to Conduct a Phase IIC4ISR Study to Support FCS Milestone B. The JVB Was Identified As aRequired Capability.

• Early February 2002, JVB Demonstrated to DUSA(OR).

• February 2002, JVB Adjusted It’s Development Path and Schedule toEnsure an Instance of the JVB Capability Will Be in Place to Answer theIssues Proposed in the AoA Area 7.

• June 2001- April 2002, Dr. Andrews, DASA-RT, Recognizes JVB on threeoccasions while presenting testimony to congressional committees.

• An Instance of JVB Will Be Ready for Scenario Loading in Sep 02 tosupport the FCS AoA Area 7.

Page 4: Mission: To Provide a Modeling and Simulation Environment ... · Mission: To Provide a Modeling and Simulation Environment to Support Army Transformation and Army SMART Decisions

DASA-RT on JVB

• Dr. Andrews, DASA-RT, Recognizes JVB on three occasions whilepresenting testimony to congressional committees.

– 5 Jun 01 to Senate Armed Services Committee - Subcommittee onEmerging Threats and Capabilities

– 26 June 01 to House Armed Services Committee - Subcommittee onMilitary Research and Development

– 10 Apr 02 to Senate Armed Services Committee - Subcommittee onEmerging Threats and Capabilities

• Advanced Simulation: … the Joint Virtual Battlespace, (JVB) program, isan enabling technology for evaluating how FCS contributes to the totalcapability of the Objective Force, and how the Objective Force plays in a jointforce. JVB, combined with virtual prototyping, also could provide an effectivemeans for performing Operational Test and Evaluation without the need fornumerous hardware test articles. This could result in significant time andfinancial savings in the Army Acquisition Process.

Page 5: Mission: To Provide a Modeling and Simulation Environment ... · Mission: To Provide a Modeling and Simulation Environment to Support Army Transformation and Army SMART Decisions

JVB Common Battlespace

Current Approach

JVB 04-13

JVB Framework

Weather 1

Terrain 1

Data 1

Algorithms 1

Weather 2

Terrain 2

Data 2

Algorithms 2

Weather 3

Terrain 3

Data 3

Algorithms 3

Simulation1

Simulation2

Simulation3

Precoordinate to ensure everything is asConsistent as possiblePost coordinate to interpret inconsistenciesbetween models

Simulation1

Simulation2

Simulation3

Data

Weather

Algorithm

All simulations use Consistentdata and algorithms

Terrain

Page 6: Mission: To Provide a Modeling and Simulation Environment ... · Mission: To Provide a Modeling and Simulation Environment to Support Army Transformation and Army SMART Decisions

SMART(Simulation & Modeling for Acquisition, Requirements and Training)…

…Tool To Support The Objective Force andFuture Combat System

JVB 04-19a

JVB Baseline Capabilities

NTM

Global Hawk

JSTARS

Carrier

ACS

Comanche

M1A2M577

Joint Environment

Army Environment

JointStrike

Fighter

Command andControl

OF/FCS Network Centric

JVB Design Includes:

• Joint Forces

• Legacy Forces

• Objective Force

• Future Combat Systems

- C3- ISR

- Robots

- New Weapons

• Logistics

• Dynamic Weather

• Dynamic Terrain• High Fidelity Terrain

• Certified Data

Page 7: Mission: To Provide a Modeling and Simulation Environment ... · Mission: To Provide a Modeling and Simulation Environment to Support Army Transformation and Army SMART Decisions

Unit of Action C4ISR Analysis Strategy (TRAC)

• Surrogate UA C2 systems.• Sensor & network models.• Feeds from higher.• High resolution environment.• Caspian scenario vignettes.

UA C4ISR Experiment Objectives• Serve as a major integrating event for

FCS/UA C4ISR O&O and OA.• Assess Cdr’s ability to command UA.• Assess C4ISR capabilities to enable the

UA O&O.• Collect DTLOMS insights.

C2Systems

UA Cdr& Staff

FOERed Cell

WhiteCell

JVBJVB

US

MTF

Fall’02

LSI 4 Demo Thrusts• Scalable Mobile Networking• Synch’d Collaborative C2• Distributed Info Mgmt• Tactical Info Assurance

Battle Lab Experiments• Unit of Action (MMBL)• Sustainment (CSSBL)• Shaping Battle (DSABL)• Cdr’s Info Cell (BCBL-L)• UA ISR Rqm’ts (BCBL-H)

C4ISR Model & AnalysisWorking Group

• Army Red Team M&S• Oversee & Integrate• LSI, Industry, FFRDC

Pre

vio

us

C4I

SR

Eff

ort

s

O&OM&S

AoAM&S+

LSI C

apstone Experim

ent

Briefed to CSA at AET RRC, 19 Apr 02

Page 8: Mission: To Provide a Modeling and Simulation Environment ... · Mission: To Provide a Modeling and Simulation Environment to Support Army Transformation and Army SMART Decisions

PL WOLF

Decisiv

e Engagem

ents

Vertical

Informatio

n

Management

PL BULLDOG

Decisiv

e Engagem

ents

Horizontal I

nformatio

n

Management

First Detection to Engagement, Vertical versus Horizontal

190 sec

790 sec

T500B0010 T500B1010 T500B0020 T500B0030 T500B2010 T500B2020 T500B2030 T500B3010 T500B3020 T500B3030

Bumper Number

2400

2000

1600

1200

800

400

0

RunsElapsed Time to Kill-VElapsed Time to Kill-H

Elapsed Time (Sec)

Combination ofCombination ofInformation, Systems,Information, Systems,

and CONOPS/and CONOPS/TTPsTTPsProvidesProvides Warfighters Warfighters the theTools and ApplicationsTools and Applications

to Accomplish theto Accomplish theMissionMission

JVB 05-07a

JVB Unique Capabilities

Page 9: Mission: To Provide a Modeling and Simulation Environment ... · Mission: To Provide a Modeling and Simulation Environment to Support Army Transformation and Army SMART Decisions

JVB Support for FCS C4ISR StudyDecember 2002

Overarching Study Issue: How Does the Objective Force CommanderExercise Battle Command, Enabled by the C4ISR Architecture?

In the TRADOC-approved

Scenario, JVB Will -

• Implement FCS C4ISR Procedures and TTPs

• Collect Data Supporting Analysis of the C4ISR Procedures and TTPs

C4ISR Capabilities and Limits

Force Effectiveness

• Provide the Link for Large and Small Scale Units to Work Together in aCommon Battlespace

JVB Gives Decision Makers theJVB Gives Decision Makers theCapability to Measure the CombatCapability to Measure the Combat

Effectiveness of Information and how It’sEffectiveness of Information and how It’sUsedUsed

Page 10: Mission: To Provide a Modeling and Simulation Environment ... · Mission: To Provide a Modeling and Simulation Environment to Support Army Transformation and Army SMART Decisions

UA MBL/LSIIPR

IdentifyPlayers

Jun 02 Jul 02 Sep 02 Oct 02Aug 02 Nov 02 Dec02 Jan03

FD, Concept, andTTP Delivery to

JVB

Develop IMP and HTFManual for UA CDR

UA MBL/LSIExperiment

Events

TRAC Experiment

Events

JVBExperiment

Events

Analyst Training Develop MESL List(7 May- 15 Jul)

C4ISR EXPERIMENTDEPLOYMENT PLAN

C4ISRExperimentReport NLT 15 Jan 03

JVB Integration IPR

Summer IntegrationDevelopment

(1 May- 14 Jun)

Summer IntegrationEvent (17 Jun- 26 Jul)

Fall Development andScenario Implementation

(22 Jul- 20 Aug)

Fall IntegrationEvent and ScenarioTest (2 Sep- 4 Oct)

JVB Integration IPR

Deploy Baseline S/WAnd Set Up (14 Oct- 8 Nov)

DELIVER S/W & H/Wto MBL 8 NOV

Scenario Build in Eagle(7 May- 1 Aug)

Refine Scenario

TRAC IPR TRAC IPR

C4ISRExperiment8-18 DEC

FinalAnalyst

Prep Session6-8 Nov

C4ISR EXPERIMENTDATA COLLECTION

PLANC4ISR

EXPERIMENTANALYSIS

PLAN

C4ISRExperiment

ExerciseDirective Conduct Staff Nodal

Training (UA,HQ,CA,BN, NLOS, RSS)

Player Training(11-22 Nov)

ExperimentRehearsals(11-22 Nov)

Current (Jun 02) JVB Schedule toSupport FCS Fall 02 Study

Page 11: Mission: To Provide a Modeling and Simulation Environment ... · Mission: To Provide a Modeling and Simulation Environment to Support Army Transformation and Army SMART Decisions

Future of JVB

• JVB will

– Support Army Transformation Acquisition Decisions

– Provide Authoritative Joint C4ISR Environment for Acquisition,Analysis and Experimentation

– Provide Flexible Environment to Integrate Test and EvaluationModels

– Support Requirements, Tech. Tradeoffs (What-If Analyses toprovide insight for S&T investments) and InteroperabilityStudies

– Support O&O and TTP Development

Page 12: Mission: To Provide a Modeling and Simulation Environment ... · Mission: To Provide a Modeling and Simulation Environment to Support Army Transformation and Army SMART Decisions

JVB 05-08

JVB Value to the Warfighter

•• AcceleratesAcceleratesFielding of Fielding of ObjObj..Force SystemsForce Systems

•• Achieves JointAchieves JointInteroperabilityInteroperability(System of Systems)(System of Systems)

•• UnderscoresUnderscoresWarfighter’sWarfighter’s Logistic LogisticChallenge (Tooth toChallenge (Tooth toTail Ratio)Tail Ratio)

• Architecture Provides

- Common Synthetic Battlespace

- Component BasedEnvironment

- Information Driven

- Plug & Play Simulation

• Reduces Development Time

- Integrate Mature Technologies

- Early Experimentation

- Requirements Development

- CONOPS/TTPs Refinement

- Trade-Off Studies

• Enhances Quality

- Re-use Partners’ AuthoritativeModels

- Early Concept Evaluation inRealistic Environment

- Flexibility For SystemModifications

• Reduces Costs

- Engineering Design ThroughSimulation

- Streamline DevelopmentProcess

Page 13: Mission: To Provide a Modeling and Simulation Environment ... · Mission: To Provide a Modeling and Simulation Environment to Support Army Transformation and Army SMART Decisions

JVB and SBA

• On Mr. Olson’s Status Report -- SBA Infrastructure

•"No one [program] wants to buy the infrastructure" -- ASA(ALT) Making anInvestment in Critical Technologies to Enable a Coherent Environment for SBA

•Developing the key cross- cutting enablers is being neglected within DoD –Starting to Address Those With the JVB Architecture Based on ConsensusStandards Components and a Consistent Environment

•Almost all the money is within individual acquisition programs, who have nomotivation to be altruistic regarding larger DoD needs – ASA(ALT) RecognizedThis in the Vision for JVB and Has Taken Steps to Fund It for Broad Use

•Framework provides a viable tool to support next steps – On the Path toEstablish the Framework

•A systems engineering approach is needed to complete the framework andmove to capability – Fully Agree and Will Participate With Other Members of theCommunity

Page 14: Mission: To Provide a Modeling and Simulation Environment ... · Mission: To Provide a Modeling and Simulation Environment to Support Army Transformation and Army SMART Decisions

Joint Virtual BattlespaceTeam and Partners

Sandia National Lab• Robotics• Sustainment/Reliability• Human Factors• Acoustics

JFCOM• Joint C2 &

SimulationSupport

STRICOM• High Fidelity Live-Virtual-

Constructive• Semi Automated Forces

COE ERDC• Terrain/Weather• Mobility

• Seismic

DOE Labs• Lethality/Survivability

JPSD• PM FCS Support• Leverage ACTD’s• Joint C4ISR• Integrated Analysis Tools

• Integration & Evaluation Center

CECOM• Night Vision Simulations• Comms Model

Los Alamos National Lab• Force Structure

TRADOC TRAC-Leavenworth• Force-on-Force

MANSCEN• NBC Environment• Obscurants

Army Research Laboratory• Human Workload• Acoustics

JVB 03-74b

AMC

TRADOC

DMSO• HLA Standards• Enviro. Fed

•• RDEC FederationRDEC Federation

• MMBL• TRAC Ft Lee• FPBL

Standard, Flexible, ExtensibleArchitecture Allows Integrationof Models from Subject Matter

Experts to support ArmyTransformation

AMSO• M&S Policy• SMART

ASA(ALT)• Army S&T Investment• Guidance