MISE A LA MASSE SURVEY REPORT ON THE SEAGULL PROPERTY LECKIE LAKE AREA DISTRICT OF THUNDER BAY THUNDER BAY MINING DIVISION FOR EAST WEST RESOURCES LTD. BY 2 - 2 2 3 2 3 Dan Patrie Dan Patrie Agust 20, 2001 52H02SW2005 2.22323 LECKIE LAKE 010 Df,T 2* 2001 IGEOSCIENCE ASSESSMENT OFFICE

MISE A LA MASSE SURV RPT ON THE SEAGULL PROP€¦ · \ 1 s 4f1m?7i*^~ PGE ZONE isuir^m/ xJom ^ ^^W^OO/Q , Qahi* "*" Q.. -*^ ^- *^ "**,^^ 1 .659/4171 1^1 620m ***^ S s s 7 ^^^^3te

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: MISE A LA MASSE SURV RPT ON THE SEAGULL PROP€¦ · \ 1 s 4f1m?7i*^~ PGE ZONE isuir^m/ xJom ^ ^^W^OO/Q , Qahi* "*" Q.. -*^ ^- *^ "**,^^ 1 .659/4171 1^1 620m ***^ S s s 7 ^^^^3te

MISE A LA MASSE

SURVEY REPORT

ON THE

SEAGULL PROPERTY

LECKIE LAKE AREA

DISTRICT OF THUNDER BAY

THUNDER BAY

MINING DIVISION

FOR

EAST WEST RESOURCES LTD.

BY

2 - 2 2 3 2 3

Dan Patrie

Dan PatrieAgust 20, 2001

52H02SW2005 2.22323 LECKIE LAKE 010

Df,T 2* 2001

IGEOSCIENCE ASSESSMENT OFFICE

Page 2: MISE A LA MASSE SURV RPT ON THE SEAGULL PROP€¦ · \ 1 s 4f1m?7i*^~ PGE ZONE isuir^m/ xJom ^ ^^W^OO/Q , Qahi* "*" Q.. -*^ ^- *^ "**,^^ 1 .659/4171 1^1 620m ***^ S s s 7 ^^^^3te

TABLE OF CONTENTS

PAGE

INTRODUCTION l

SUMMARY AND RECOMMENDATIONS l

LOCATION AND ACCESS 3

GEOLOGY 3

TOPOGRAPHY AND VEGETATION 4

CLAIM DESCRIPTION 4

INSTRUMENTATION AND WORK DONE 4

MISE A LA MASSE SURVEY .. 4

INTERPRETATION 5

CONCLUSIONS 5

RECOMMENDED EXPLORATION PROGRAM 6

PERSONNEL

CERTIFICATE OF QUALIFICATION

LETTER OF CONSENT

CONTOURED MAPS

BASE MAP

52H02SW2005 2.22323 LECKIE LAKE

Page 3: MISE A LA MASSE SURV RPT ON THE SEAGULL PROP€¦ · \ 1 s 4f1m?7i*^~ PGE ZONE isuir^m/ xJom ^ ^^W^OO/Q , Qahi* "*" Q.. -*^ ^- *^ "**,^^ 1 .659/4171 1^1 620m ***^ S s s 7 ^^^^3te

Page l

INTRODUCTION

East West Resources Ltd., acquired the Seagull property from Avalon Ventures Ltd.,

located in Leckie Lake Area in the District of Thunder Bay Ontario, of the Thunder Bay Mining

Division.

As per request of the property owners a Mise a la masse induced polarization program

consisting of 14 days surveyed that began November 01, 2000 to November 30, 2000 and was

carried out by Dan Patrie Exploration Ltd.

SUMMARY AND RECOMMENDATIONS

The Seagull Property is located in Northwestern Ontario , Leckie Lake Area, Little Sturge

4.

Lake, Eaglehead Lake and Anders Lake District of Thunder Bay, Ontario and consists of 638

unpatented mining claim units.

Further exploration of the Seagull Property is warranted in proving its considerable merit

in hosting economic PGE, Ni, Cu and possible Au mineralization.

A program of 14 days of Mise a la Masse induced polarization survey was done on the

property to cover a mag feature centered upon an ultramafic intrusion body whose magnetic

signature has a diameter of approximately 9 kilometres for its PGE, Ni, and Cu potential. Due to

the lack of geological information the following programs are recommended to complete the

evaluation.

1. Completion of the grid lines over entire property.

2. Magnetometer survey over entire property.

3. Induced Polarization over all of property.

Page 4: MISE A LA MASSE SURV RPT ON THE SEAGULL PROP€¦ · \ 1 s 4f1m?7i*^~ PGE ZONE isuir^m/ xJom ^ ^^W^OO/Q , Qahi* "*" Q.. -*^ ^- *^ "**,^^ 1 .659/4171 1^1 620m ***^ S s s 7 ^^^^3te

Page 2

4. Diamond drilling I. P. anomalies to establish sulphide content and geology.

Following completion of this work and contingent upon the results then additional work

should be considered to further evaluate the economic potential of the property for PGE,

Ni, and Cu mineralization.

The following report summarizes the results obtained from the work carried out during the

current program and the interpretation is speculative.

Respectfully submitted,

Daniel F. Patrie

Geoiogy and Geophysics Technologist

March 20, 2001

Page 5: MISE A LA MASSE SURV RPT ON THE SEAGULL PROP€¦ · \ 1 s 4f1m?7i*^~ PGE ZONE isuir^m/ xJom ^ ^^W^OO/Q , Qahi* "*" Q.. -*^ ^- *^ "**,^^ 1 .659/4171 1^1 620m ***^ S s s 7 ^^^^3te

Black Sturgeon

LAC DCS ILES MINES LTD

Mikinak EastEWRM*

Lac Des Iles Mine 94.1 Million Tonnes Plate Boonier

PGM Option ^- Pebble ^~~~"98 g/t Pd+Pt+Au

Tib Lake l s Complex ~* ' *

Demars Complex

Lac des IlesRiver

New Millenium Option

Wakinoo Complex

LAC DES ILES MINES LTDCANPLATS RESOURCES CORPORATION - 1001*

EAST WEST RESOURCE CORPORATION -1001*___ STARCORE RESOURCES LTD

CANADIAN GOLDEN DRAGON RESOURCES LTD -100* [~T~1 STAKED

EAST WEST RESOURCE CORPORATIONCANADIAN GOLDEN DRAGON RESOURCES LTD - 30*AVALON VENTURES LTD - 40*

EAST WEST RESOURCE CORPORATION PGE PROPERTIES

EAST WEST RESOURCE CORPORATION - 50*CANADIAN GOLDEN DRAGON RESOURCES LTD - so*EAST WEST RESOURCE CORPORATION - 50* MAPLE MINERALS LTD - 50*

mo k cowflgM Dy MM l. HMWX md ~ poMxtrar M mr hrai ultail M ecnmil * Nota* l. IMMta

NQ1C: M*p oom|*rt Beaming to

Page 6: MISE A LA MASSE SURV RPT ON THE SEAGULL PROP€¦ · \ 1 s 4f1m?7i*^~ PGE ZONE isuir^m/ xJom ^ ^^W^OO/Q , Qahi* "*" Q.. -*^ ^- *^ "**,^^ 1 .659/4171 1^1 620m ***^ S s s 7 ^^^^3te

DISRAELJLAKE INTRUSION

49'00"l

After: GSC 2118, 2109, 2108 and 2117

EAST WEST RESOURCE CORPORATION

DISRAELI LAKE INTRUSIONAND SEAGULL PLUTON

(Wolf Mountain)

KILOMETRES 1 2

MILES

Page 7: MISE A LA MASSE SURV RPT ON THE SEAGULL PROP€¦ · \ 1 s 4f1m?7i*^~ PGE ZONE isuir^m/ xJom ^ ^^W^OO/Q , Qahi* "*" Q.. -*^ ^- *^ "**,^^ 1 .659/4171 1^1 620m ***^ S s s 7 ^^^^3te

SEAGULL Cu-Ni- PGE PROJECT (Wolf Mountain)

1700mE 2000mE 2300mE

II

ZTOOmE 2950mE

II

Longitudinal Section

Seagull Pluton

: Ultramafic **-: - Stock

O 2000 drill hole

1998 drill hole

1997 trench

1997 surface samples, pit

normal fault

AEM conductor

•*i

magnetic-^ w"*™ r

Black Sand f)

,i*™Jf5E ~" oxide'ayer J———————— ultra mafic ^ _ __p -. gabbro sill::;gabbro siiiH:::::::::: ̂ ——^e"

peridotite nativecopper

numerousPGE ZONE dunjte narrow

1 .049/1 6m PGE zones — ̂

"^\ Cu.Ni Sulphides dunite\ 1 s 4f1m

?7i*^~ PGE ZONEisuir^m/ , Qahi* "*" -*^ ^- 1 .659/4171 1^1xJom ^ ^^W^OO/Q Q.. *^ "**,^^

620m ***^ S s s 7 ^^^^3te /a^* *"** *z V7^~~'~L ^25l/,

tad S /f ^-t-s.cop r/x Oo ;/^ Feeder Sti ™ Dike

. gabbrol /pyroxenite{77? -324m —JL.*~~^' 359m -̂/2

|j 't 455m

J -^- AEM Conductor

i O— l Drillhole^7~/*/

^*~/^. 0 100 290 300 400 500

Joldfault? METRES819m or scarp

LONGITUDINAL VERTICAL SECTION 47NLOOKING NORTH

Page 8: MISE A LA MASSE SURV RPT ON THE SEAGULL PROP€¦ · \ 1 s 4f1m?7i*^~ PGE ZONE isuir^m/ xJom ^ ^^W^OO/Q , Qahi* "*" Q.. -*^ ^- *^ "**,^^ 1 .659/4171 1^1 620m ***^ S s s 7 ^^^^3te

PageS

LOCATION AND ACCESS

The Seagull Property is located 55 kilometers north east of the town of Thunder Bay,

Ontario. Access to the property is by driving from Thunder Bay some 45 kilometers north up the

Armstrong highway 527 and turning east onto the Dorion Cut Off road for 22 kilometers and then

turning north for another 22 kilometers into the property.

GEOLOGY

The Seagull Property, also referred to collectively with the Disraeli property as the Wolf

Mountain project is centered upon an-ultramafic intrusion body whose magnetic signature has a

diameter of approximately 9 kilometers.

Surface outcrop comprises of highly weathered ultramafic rock and magnetic layer weathered to

black sands over an area of approximately l square kilometer.

The aeromagnetic survey shows that the Seagull intrusive is six miles in diameter and is cone or

'bowl shaped" Layers of oxide minerals occur in the vicinity of the PGE showing and for this

reason Avalon had suggested this type of setting is similar to the Merensky Reef in the Bushveld

Complex in South Africa. This ultramafic body now exposed on surface but was originally

covered by a diabase sill up to 200 m in thickness. Tilting of blocks within the rift system has

brought this area closer to surface. The presence of older Sibley sediments adjacent to the

ultramafics is also a good sign since sulphate mineral-hydrogen sulphide and other sulpher bearing

hydrocarbons within the Sibley would provide a good source of sulphur for ultramafic rocks to

utilise in the generation of sulphides.

Page 9: MISE A LA MASSE SURV RPT ON THE SEAGULL PROP€¦ · \ 1 s 4f1m?7i*^~ PGE ZONE isuir^m/ xJom ^ ^^W^OO/Q , Qahi* "*" Q.. -*^ ^- *^ "**,^^ 1 .659/4171 1^1 620m ***^ S s s 7 ^^^^3te

Page 4

TOPOGRAPHY AND VEGETATION

The Seagull Property vegetation is currently a mix of alders, willows, poplars with most of

this as second growth leaving the trees very thick and hard to walk through.

To the south along the 800 east tie line there is a large swamp running in an north south

direction from line 2800 north to line 3200 north .

CLAIM DESCRIPTION

Consisting of 638 unpatented mining claim units, the Seagull Property, located in Leckie

Lake Area, Anders Lake, Eaglehead Lake and Little Sturge Lake in the District of Thunder Bay,

Thunder Bay Mining Division.

INSTRUMENTATION AND WORK DONE

MISE A LA MASSE

A total of 14 days of Mise a la masse of induced polarization survey was done on the

property with readings taken every 25 meters and plotting the voltage and contouring the results

using Geosoft software. The survey was a time Mise a la masse survey with a "a" spacing of 25

meters and was read with a Walcer MG-14 motor generator and a Huntec 14 kilowatt revised

Walcer Model transmitter and a Scintrex IPR-12 receiver. The motor generator and transmitter

were stationary on the end of the line being read and current transmitted through a wire with an

electrode down holes 0003 and 0005 locating area of high sulphide zone in the holes and

transmitting current to other infinity 500 meters past end of line connected to the operator with a

geo reel with 2 electrodes taking D.C. readings between 25 meter "a" spacing of the electrodes

and then plotted on a map for interpretation.

Page 10: MISE A LA MASSE SURV RPT ON THE SEAGULL PROP€¦ · \ 1 s 4f1m?7i*^~ PGE ZONE isuir^m/ xJom ^ ^^W^OO/Q , Qahi* "*" Q.. -*^ ^- *^ "**,^^ 1 .659/4171 1^1 620m ***^ S s s 7 ^^^^3te

f

Page 11: MISE A LA MASSE SURV RPT ON THE SEAGULL PROP€¦ · \ 1 s 4f1m?7i*^~ PGE ZONE isuir^m/ xJom ^ ^^W^OO/Q , Qahi* "*" Q.. -*^ ^- *^ "**,^^ 1 .659/4171 1^1 620m ***^ S s s 7 ^^^^3te

Page 5

INTERPRETATION

The induced polarization Mise a la masse survey picked up high voltage zones over an

area running in an east west direction from line 1900 east to line 2400 east centered at 4800 north

to 4500 north while reading hole 0005. Also a high voltage area from line 1600 east to 2000 east

centered at 4500 north while reading down hole 0003.

The induced polarization Mise a la masse survey proved successful in finding areas of high

voltage with 3 to 4 times the background which showed continuity between hole which suggests

sulphides and should be investigated further. The property merits more exploration work such as

more magnetometer and induced polarization surveys being done and W'ith follow up drilling of

the anomalies found.

CONCLUSIONS

With the presence of a favorable geological environment for the localization of PGE

mineralization of economic importance and with the very successful induced polarization mise a la

masse survey which was only a reconnaissance survey, to further evaluate the property's potential

the writer recommends an on going work program over the remaining claims and areas not

already covered on the property, consisting of line cutting, magnetometer and induced

poiarization surveys to locate areas of disseminated sulphide.

Page 12: MISE A LA MASSE SURV RPT ON THE SEAGULL PROP€¦ · \ 1 s 4f1m?7i*^~ PGE ZONE isuir^m/ xJom ^ ^^W^OO/Q , Qahi* "*" Q.. -*^ ^- *^ "**,^^ 1 .659/4171 1^1 620m ***^ S s s 7 ^^^^3te

RECOMMENDED EXPLORATION PROGRAM

The following program is recommended to evaluate the property for its potential to host a

PGE, Ni and Cu deposit.

1. Complete the line cutting as required to provide a control for geological,

geochemical and geophysical work.

2. Geochemical sampling over target areas.

3. Magnetometer survey over areas not covered.

4. Detailed Induced Polarization survey.

5. Geological mapping and sampling.

6. Stripping, trenching over anomalous areas.

As a result of encouraging data obtained from the recently completed geophysics survey

additional exploration on the property is recommended.

Daniel F. Patrie

Geology and Geophysical Technologist

August 20, 2001

Page 13: MISE A LA MASSE SURV RPT ON THE SEAGULL PROP€¦ · \ 1 s 4f1m?7i*^~ PGE ZONE isuir^m/ xJom ^ ^^W^OO/Q , Qahi* "*" Q.. -*^ ^- *^ "**,^^ 1 .659/4171 1^1 620m ***^ S s s 7 ^^^^3te

PERSONNEL

Dan Patne

Massey, Ontario

C. Brent Patrie

Massey, Ontario

Bryan Patrie

Spanish, Ontario

Claude Dubreuil

Spanish, Ontario

Page 14: MISE A LA MASSE SURV RPT ON THE SEAGULL PROP€¦ · \ 1 s 4f1m?7i*^~ PGE ZONE isuir^m/ xJom ^ ^^W^OO/Q , Qahi* "*" Q.. -*^ ^- *^ "**,^^ 1 .659/4171 1^1 620m ***^ S s s 7 ^^^^3te

CERTIFICATE OF QUALIFICATION

l Daniel F. Patrie do hereby certify:

1. That I am a Geology and Geophysics Technologist and I reside at Hwy. 17 West, P.O.

Box 45, Massey, Ont., Canada, POP 1PO,

2. I graduated from Cambrian College Of Applied Arts and Technology, Sudbury, Ontario,

in 1987 with a diploma in Geological Technology with a one year certificate in

Geophysics,

3. And I have practiced my profession continuously since graduation, as well as being an

active prospector since 1972.

4. That my report on the Seagull Property, Thunder Bay Mining Division, Ontario, is based

on my personal knowledge of the geology of the area, and on a review of published and

unpublished information on the property and surrounding area.

Daniel F. Patrie

Geology and Geophysics Technologist (Dipl. T)

August 20, 2001

Page 15: MISE A LA MASSE SURV RPT ON THE SEAGULL PROP€¦ · \ 1 s 4f1m?7i*^~ PGE ZONE isuir^m/ xJom ^ ^^W^OO/Q , Qahi* "*" Q.. -*^ ^- *^ "**,^^ 1 .659/4171 1^1 620m ***^ S s s 7 ^^^^3te

LETTER OF CONSENT

l, Daniel F. Patrie, of the Town of Massey, Ontario, do hereby consent to East West

Resources Ltd., using in whole or in part my Geophysics report on the Seagull Property situated

the District of Thunder Bay, Thunder Bay Mining Division in a prospectus of statement of

material facts or for filing with government regulatory bodies as deemed necessary.

Dated at Massey, Ontario, this 20:!! day of August. 2001. in the District of Sudbury.

Daniel F. Patriej

Geology and Geophysics Technologist, l/ '"""'^

Page 16: MISE A LA MASSE SURV RPT ON THE SEAGULL PROP€¦ · \ 1 s 4f1m?7i*^~ PGE ZONE isuir^m/ xJom ^ ^^W^OO/Q , Qahi* "*" Q.. -*^ ^- *^ "**,^^ 1 .659/4171 1^1 620m ***^ S s s 7 ^^^^3te

ONTARIO MINISTRY OF NORTHERN DEVELOPMENT AND MINES

Transaction No:

Recording Date:

Approval Date:

Client(s):

301086

Survey Type(s):

W0140.30997

2001-OCT-26

2001-NOV-07

Work Report Summary

Status: APPROVED

Work Done from: 2000-NOV-01

to: 2000-NOV-30

AVALON VENTURES LTD.

IP

Work Report Details:

Claim#

TB

TB

TB

TB

TB

1178189

1178818

1220497

1220498

1220499

Perform

33,500

S12,360

S3,500

S2.800

55,000

527,160

Perform Applied Approve Applied Approve

33,911

S16

S5

S1

S27

,894

,351

,004

SO

,160

SO

SO

SO

sososo

sosososososo

Assign Assign Approve

SO

soSO

sososo

0

0

0

0

0

so

Reserve

S3,500

S1 2,360

53,500

52,800

55,000

S27.160

Reserve Approve

53,911

516,894

55,351

51,004

SO

S27.160

Due Date

2002-JUN-30

2002-JUN-30

2002-JUN-30

2002-JUL-14

2002-JUL-31

Status of claim is based on information currently on record.

52H02SW2005 2.22323 LECKIE LAKE 900

2001-Nov-15 12:46 Armstrongjj Page 1 of 1

Page 17: MISE A LA MASSE SURV RPT ON THE SEAGULL PROP€¦ · \ 1 s 4f1m?7i*^~ PGE ZONE isuir^m/ xJom ^ ^^W^OO/Q , Qahi* "*" Q.. -*^ ^- *^ "**,^^ 1 .659/4171 1^1 620m ***^ S s s 7 ^^^^3te

Ministry ofNorthern Developmentand Mines

Date: 2001-NOV-09

Ministers du Developpement du Nord et des Mines Ontario

GEOSCIENCE ASSESSMENT OFFICE 933 RAMSEY LAKE ROAD, 6th FLOOR SUDBURY, ONTARIO P3E6B5

AVALON VENTURES LTD. 851 FIELD STREET THUNDER BAY, ONTARIO P7B 6B6 CANADA

Tel: (888)415-9845 Fax:(877)670-1555

Dear Sir or Madam

Submission Number: 2 .22323 Transaction Number(s): W0140.30997

Subject: Approval of Assessment Work

We have approved your Assessment Work Submission with the above noted Transaction Number(s). The attached Work Report Summary indicates the results of the approval.

At the discretion of the Ministry, the assessment work performed on the mining lands noted in this work report may be subject to inspection and/or investigation at any time.

NOTE:The assessment credits have been re-distributed on the claims to more accurately reflect where the work was performed. The re-distribution of credits is based on the location of the grid and claim boundaries as shown on the Plan and Drill hole location map.

NOTE ALSO:In future, please provide details in the report which document the linecutting that has been completed thatis relevant to the program. In particular, in future, please provide details and explanation where re-cuttingof grid lines has been completed. Please also provide accurate dates when the work was performed (the Fromand To dates indicate a one month period, however, the program took 14 days).

If you have any question regarding this correspondence, please contact JIM MCAULEY by email at [email protected] or by phone at (705) 670-5855.

Yours Sincerely,

Ron GashinskiSupervisor, Geoscience Assessment Office

Cc: Resident Geologist

Daniel F Patrie (Agent)Avaion Ventures Ltd. (Assessment Office)

Assessment File Library

Avalon Ventures Ltd. (Claim Holder)

Visit our website at http://www.gov.on.ca/MNDM/LANDS/mlsmnpge.htm Page: 1 Correspondence 10:16572

Page 18: MISE A LA MASSE SURV RPT ON THE SEAGULL PROP€¦ · \ 1 s 4f1m?7i*^~ PGE ZONE isuir^m/ xJom ^ ^^W^OO/Q , Qahi* "*" Q.. -*^ ^- *^ "**,^^ 1 .659/4171 1^1 620m ***^ S s s 7 ^^^^3te

mm w

PHOVMCUU. MHIHO

MINING LAND TENURE

MAP

I.R.o oM

CJu

o W

ttrMK 34) nine HjnK vncna

: -,-;,s i: .)W*fi.|:i|S'': ;- .;;to?

•™- .*: : ii: ; : M;|:i?i;

IPMii^S^liiili^ii-'?^HH''-r'*rr^'i^Mfe*^-J h'-t.iJjji'L.^ ,.Li; -::... l:..l.-.. 1.

\^M^^ !?jf?j!iff|ii^^

^i^ i^pwjwj,^lii^ iriifEiWsf

Date y T ime of Issue Get 28 2001

TOWNSHIP 7 AREA

LECKIE LAKE AREA

14:56 h E astern

PLAN

G-0067

ADMINISTRATIVE DISTRICTS l D IVISIONSMining Division Thurtd^r B ay

Land T itles/Registry D ivision THUNDER BAY

MinJttry o f N atural R tiourctt D iitrkt NIPIGON

TOPOGRAPHIC LAND TENURE

Q -™.-.,L.J HdUP.ftivtBrv*

LJ t"" f t r d Hi

Si-riief 4 n* Mirira i ahU

tLfraBin^^tir-

Hh-igrtlirh 'J-r.

r . Appioc .JUilm-pJitpititbit

B -———

[j nvtv P if*' -tan t))tt'" r

LAND T ENURE WITHDRAWALS

Oi i* ir.kt i ou rt l Wthd i wri Ty p n

IMPORTANT NOTICES

LAND T ENURE WITHDRAWAL DESCRIPTIONS

MlllftM tr n._________Q afl__________ft-aritaltan

itC.31Vr-LL-P*a!fl'PMfHT UAt I

l IMPORTANT NOTICES

Mionn tt HMbf d H*m iyitiiM*i4l*li h ilw PrwinMl MIHHM D m t ifene M HCHH^Hlng tlwr ihi MlnltOv alNvrttam DmlBpin*ni *idHfeiN w B tkt.

. imr*8*lw*i iM aUnlMia**, mutnmix, I if K ut ™jra nikdlK) rljMii, IKinim, ui uilwi faimi rdbD4HHpM*rrkilrii Mid litim* rt a m DI ( Cfn*i, M** i: •nil* BHI) unun Hd ud itiHfha nrii Itf -i pro l* W ft w? en^y to Make rnkHpw Ll^ni m*r "D" h* ikiiiratitt.

Page 19: MISE A LA MASSE SURV RPT ON THE SEAGULL PROP€¦ · \ 1 s 4f1m?7i*^~ PGE ZONE isuir^m/ xJom ^ ^^W^OO/Q , Qahi* "*" Q.. -*^ ^- *^ "**,^^ 1 .659/4171 1^1 620m ***^ S s s 7 ^^^^3te

1500

m

o

in

in

o o

g '

O O OJ

gO) fO

1600 1700 1800 1900 2000 2100 2200 2300 2400 2500

01

o o

g8

g

o o /'\

f . 'C

-N

wVio o

50

Scale 1:500060 100 150 200 250 300

metre

1500 1600 1700 1800 1900 2000 2100 2200 2300 2400 2500

52H02SW2005 2 .22323 LECKIE LAKE 210

EAST WEST RESOURCE CORP.MISE-A-LA-MASSE SURVEY

SEAGULL PROJECTDRILL HOLE 0003

Tx INFINITY POSITION; LINE 2000E @ 3200S Tx 0003 @ 530M; Rx INFINITY POSITION LINE 2000E @5500N

Tx USED; HUNTEC 7.5KW Rx USED; SCtENTREX 1PR12

DRAWN BY; DAN PATRIE EXPLORATION LTD.

Page 20: MISE A LA MASSE SURV RPT ON THE SEAGULL PROP€¦ · \ 1 s 4f1m?7i*^~ PGE ZONE isuir^m/ xJom ^ ^^W^OO/Q , Qahi* "*" Q.. -*^ ^- *^ "**,^^ 1 .659/4171 1^1 620m ***^ S s s 7 ^^^^3te

1700mE 2000mE 2300mE 2700mElOOOmE 2950mE

1216198

Oi/ter R/m of Seagu/l PlutonirriateApproxi

78189

WM98WMOO-04 98-08

22049*Baseline - 5000N

5000N

4900N 121619700-051163947 WMOO-024800N

WMbl-09M98Longitudinal Section

WMOO4700N

4600N

WMOO4500N WM01-0WMOO-06

4400 N WM01-07Seagull4300N

Pluton12318774200N WM01

4100N

4000N

1220499Magnetic Anomaly

1216304

Access Road L216193

LEGEND

EAST WEST RESOURCE CORPORATIONnormal fault2000 - 2001 * 98 Ext. drill holeSEAGULL Cu-Ni- PGE PROJECT

(Wolf Mountain)Thunder Bay, OntarioClaim Boundary1998 drill hole

PLAN AND DRILL HOLE LOCATION MAP

52H02SW2005 2.22323 LECKIE LAKE

Page 21: MISE A LA MASSE SURV RPT ON THE SEAGULL PROP€¦ · \ 1 s 4f1m?7i*^~ PGE ZONE isuir^m/ xJom ^ ^^W^OO/Q , Qahi* "*" Q.. -*^ ^- *^ "**,^^ 1 .659/4171 1^1 620m ***^ S s s 7 ^^^^3te

2700

2 -2232s

-N

50Scale 1:5000

SO 100 150 200 250 300mmmm ' ~metre

1800 1900 2000 2100 2200 2300 2400 2500 2600 2700

52H02SW2005 2 .22323 LECKIE LAKH 230

EAST WEST RESOURCE CORP.MISE-A-LA-MASSE SURVEY

SEAGULL PROJECTDRILL HOLE 0005

Tx INFINITY POSITION; LINE 2000E @ 3200S Tx 0005 @ 755M; Rx INFINITY POSITION LINE 2000E @5700N

Tx USED; HUNTEC 7.5KW Rx USED; SCIENTREX l PR 12

DRAWN BY; DAN PATRIE EXPLORATION LTD.