MIR - Plan Presentation. Presented by Jason Abbett and Devon Berry. Objectives. Clearly outline each stage of our project Document important project deadlines Explain the Design, Planning and Testing process Explain the procedures for managing changes and resolving risks. Gantt Chart - PowerPoint PPT Presentation

Citation preview

Page 1: MIR -  Plan Presentation

MIR - Plan Presentation

Presented by Jason Abbett and Devon Berry

Page 2: MIR -  Plan Presentation

Objectives

• Clearly outline each stage of our project• Document important project deadlines• Explain the Design, Planning and Testing

process• Explain the procedures for managing changes

and resolving risks

Page 3: MIR -  Plan Presentation

Schedule

• Gantt Chart• 9 to 11 man

hours needed

Page 4: MIR -  Plan Presentation

Process Plan

• Specifications• Programming• Testing• Delivery

Build prototypesystem

Develop abstractspecification

Use prototypesystem

Deliversystem

Systemadequate?

YES

N

Page 5: MIR -  Plan Presentation

Organization Plan

• Analysis

• Design– Hardware– Software

• Programming

• Testing

Page 6: MIR -  Plan Presentation

Test Plan

• Modular tests

• Integration tests

• Track tests

Page 7: MIR -  Plan Presentation

Potential Risks

• Hardware Changes

• Incomplete Hardware

• Interface Changes

• Design Changes

• Code Changes

Page 8: MIR -  Plan Presentation

Documentation

• Responsibilities– Team Decision

• Outlines– Dr. Waxman (or team decision)

• Contents– Follow outline

Page 9: MIR -  Plan Presentation

Training

• Internal (CS Team)– Upload to XRC– Use eCos

• External (ECE Team)– XRC– Robot Hardware

Page 10: MIR -  Plan Presentation

Review and Reporting

• Reviews– Determine project status

• Reports– Time logs– Status reports

Page 11: MIR -  Plan Presentation

Installation and Operation

• Installation– Team– Only up to competition

• Operation– Team– Only up to competition

Page 12: MIR -  Plan Presentation

Resources and Deliverables

• Manpower

• Computer Resources

• Other Resources

• Required Software– Cygwin– Xport Dev. Kit– Xport eCos

Page 13: MIR -  Plan Presentation

Project Status

• Software– Design– Motor use– eCos threading

• Hardware– Motors– Compass– Servos– Mouse– CMU Camera

Page 14: MIR -  Plan Presentation

Conclusion

• Implementation following design and testing plans

• Regular reports and logs

• If problems occur, follow risk resolution procedures