Page 1 of 32 Minutes of the Steering Committee Meeting on Competence of Human Resources for Regulatory Bodies in Member States Vienna, 30 November 2 December 2010 Contents: 1. Introduction 2. Adoption of the Agenda and Minutes of the previous meeting 3. Report on the Bureau meetings 4. Report on work on the draft Safety Report and SARCoN 5. Discussion of the Action plan 6. Presentations by IAEA 7. Breakout Sessions 8. Review of comments on the draft Safety Report and SARCoN 9. Summary and Conclusion Appendix 1 Agenda Appendix 2 Participants of the SC Meeting Appendix 3 Terms of reference of the Steering Committee Appendix 4 Action Plan Appendix 5 Letter to Dr. M. Weightman Chairman of the RCF Appendix 6 Breakout group members Appendix 7 Presentation by Mr. Jean-Luc Lachaume Appendix 8 Presentation by Mr. R. Bhattacharya Appendix 9 Presentation by Ms. P. Wieland Appendix 10 Presentation by Mr. P. Mignot

Minutes of the Steering Committee Meeting on Competence of

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1 of 32

Minutes of the Steering Committee Meeting on Competence of Human

Resources for Regulatory Bodies in Member States

Vienna, 30 November – 2 December 2010

Contents:

1. Introduction

2. Adoption of the Agenda and Minutes of the previous meeting

3. Report on the Bureau meetings

4. Report on work on the draft Safety Report and SARCoN

5. Discussion of the Action plan

6. Presentations by IAEA

7. Breakout Sessions

8. Review of comments on the draft Safety Report and SARCoN

9. Summary and Conclusion

Appendix 1 Agenda

Appendix 2 Participants of the SC Meeting

Appendix 3 Terms of reference of the Steering Committee

Appendix 4 Action Plan

Appendix 5 Letter to Dr. M. Weightman Chairman of the RCF

Appendix 6 Breakout group members

Appendix 7 Presentation by Mr. Jean-Luc Lachaume

Appendix 8 Presentation by Mr. R. Bhattacharya

Appendix 9 Presentation by Ms. P. Wieland

Appendix 10 Presentation by Mr. P. Mignot

Page 2 of 32

1. Introduction

This was the second meeting of the Steering Committee, which was established to advise IAEA on

ways to support effective systems and strategies to ensure and maintain the necessary competence to

perform the regulatory functions in Member States (MSs) with NPPs.

The Convention on Nuclear Safety requires in Article 8 each of the signatory Member States (MSs) to

“establish or designate a regulatory body entrusted with the implementation of the legislative and

regulatory framework referred to in Article 7, and provided with adequate authority, competence and

financial and human resources to fulfil its assigned responsibilities.”

IAEA has published a number of documents to assist MSs on the essential elements of a training

framework for staff working on nuclear activities, and this includes the regulatory bodies. It convened

Technical Meetings (TM) in December 2007 and December 2008, to advise the IAEA on how it can

best assist MSs to meet their training needs and comply with these documents. The second of these

TMs reached a broad consensus supporting the setting up of the Steering Committee (SC), as well as a

smaller Bureau that could meet to help plan and steer the work between the main meetings of the

Steering Committee.

Bureau Meetings were held on 22 - 23 April 2009, 22 - 23 September 2009, 23 – 24 February 2010

and 8 – 9 July 2010. The main aims of these meetings were to establish and develop:

A Plan of Work (later to be called an Action Plan),

An Agenda for the Steering Committee meetings in Vienna in December 2009 and December

2010

Terms of Reference for the Steering Committee

Guidance documents on competence of Regulatory Bodies.

The Proposed Agenda for the Steering Committee is given in Appendix 1 and the participants are

listed in Appendix 2.

Because of problems arising from the weather, the Chairman of the Steering Committee, Mr. Ian

Britten (UK) was unable to attend, cancelling at the last moment. With the agreement of the meeting,

Mr. Pierre Mignot (Belgium) took the place of Chairman. Ms. Maria Josefa Moracho Ramirez (NSNI)

was also unavailable on the first day and her place on that day was met by Mr. Paul Woodhouse

(NSNI); Ms. Moracho attended the other two days.

The meeting was opened by Mr. Gustavo Caruso NSNI who spoke specifically on the relationship

between the work of the Steering Committee and Bureau and that of the IAEA on embarking

countries. He explained that DS 424 had now been approved by IAEA and spoke on the packages for

sharing information on HR development and Peer review services. He also spoke on DS 416 on

licensing and the embarking country background to it. In discussion afterwards concern was expressed

that embarking countries had not generally taken up the invitation to the SC meeting. Mr. Caruso

informed the meeting that 60 countries had been sent invitations, but to the Permanent Missions and

not the Regulatory Bodies. The meeting noted that there were difficulties in making the Regulatory

Bodies aware of the meetings, and aware of the relevance of the SC to their activities.

The meeting was also addressed by Mr. Jean Rene Jubin (IAEA), on developments in the GSR

document structure, and Mr. Russell Gibbs (IAEA), on embarking countries (see 7. Below).

Page 3 of 32

2. Adoption of the Agenda and the Minutes of the Previous Meeting

After a round table of introductions, Mr. Mignot presented the proposed Agenda which had been

developed in the Bureau Meeting of July 2010. He emphasised that the Agenda could be modified as

the meeting progressed if members wished it, and on that basis the Agenda was adopted as a working

document (It is attached as Appendix 1).

The Report of the previous meeting was discussed [http://www-

ns.iaea.org/downloads/ni/training/report_steering_committee_dec_2009.pdf]. Mr. Woodhouse and

others commented on the significant amount of work that had taken place since the last Steering

Committee meeting and, even thought there were minor errors in the report, since the meeting was a

year ago, no specific changes were proposed and the report was approved by the meeting.

3. Reports on the Bureau Meetings

Mr. Lyn Summers (Consultant) gave a report on the work of the Bureau since the last SC meeting.

Two Bureau Meetings had been held and the notes of these meetings circulated [Include Hypertext

links]. Significant work had been done by consultants, by email by the bureau members, and in the

Bureau meetings on the two documents: Guidelines for Competence Needs Self-Assessment

(SARCoN) and the Draft Safety report - A Framework for Managing a Regulatory Body’s

Competence and that work was reported later in the meeting (see 4. below).

In the first Bureau meeting, in Vienna, 23 – 24 February 2010, Mr. Caruso IAEA had briefed members

on embarking countries and upcoming training activities at IAEA. Extensive work is underway in

IAEA on embarking countries and Mr. Caruso sought to develop the relevance to the SC. A Senior

Regulators Meeting had taken place which had concluded that some embarking countries would need

case by case support as well as generic support. The Bureau had concluded that the work of the SC

and Bureau is as relevant to embarking countries as to established countries and the SC needs to

ensure that these countries aspire to the same level of competence as established countries. Actions

were considered to ensure that all, outside the SC and inside, recognised this.

A Draft Proposed Plan of Work (now called the Action Plan – Appendix 4) had been developed in

previous Bureau meetings and discussed in the SC. Particular care to ensure that all the discussions in

breakout sessions and in plenary sessions of the SC were taken into account in a line by line review of

the minutes.

A new topic area had been proposed, on assistance proposals specific to the needs of embarking

countries.

After discussion of Revision 7, the development of a new Revision 8 of Guidelines for Competence

Needs Self-Assessment (SARCoN) had been proposed, with significant amendments to the tables of

competence related to technical disciplines and management so that all levels of staff, including

managers were included. A Consultant had been commissioned to draft a safety report based on

discussions in the SC, Tecdoc 1254 and SARCoN and revised in a Consultants’ meeting on 8 – 12

February 2010 and discussion of the draft report had taken place in the Bureau meeting and proposals

for further revision had been agreed including a new chapter dealing with embarking countries.

The second Bureau meeting was in Vienna, 8-9 July 2010. It was addressed by Mr. Erik Weinstein

IAEA, Safety and Security Coordination Section on embarking countries and further information had

been imparted and discussion had taken place. 27 countries are expressing interest in using nuclear

power and the Senior Regulator’s Meeting established a Regulatory Cooperation Forum (RCF) for

regulatory knowledge sharing and mutual learning. The Bureau had expressed a wish to influence the

Page 4 of 32

RCF, to make it aware of the relevance of our work to Embarking countries by approaching the RCF,

offering information.

The title of the Steering Committee and Bureau had been amended to reflect the relevance of advice

and guidance initiated by the SC and Bureau to embarking countries, removing reference to MSs with

NPPs and it had been decided to invite all MSs to send delegates to the SC meeting. The Action Plan

and the Terms of Reference (TOR) had been amended. The TOR was to be rewritten to remove the

aims, thus being a statement of the vision and mission and working methods, which are fixed (or

relatively long lasting) and the Action Plan was to be a strategic statement of the aims and the plan

itself (as these are expected to change). The TOR and Action Plan are attached at Appendices 3 and 4

respectively.

The needs of embarking countries are to be incorporated into the Action Plan, and a new Aim had

been created, whose preliminary description is: Aim 4 - Mutual support and sharing of experience, in

the area of regulatory competence, fully meets the needs of Embarking Countries.

A questionnaire had been distributed prior to the first Steering Committee meeting, 20 Member States

had responded, but no analysis had yet taken place. Possible help with the analysis from embarking

countries (which would also be of benefit to them) had been discussed.

A draft Agenda for the Steering Committee meeting was developed and there had been further

discussion on drafts of the Safety Report and SARCoN.

4. Report on work on the draft safety Report and SARCoN

Ms. Koskinen and Mr. Summers gave presentations on the developments in SARCoN and the draft

Safety Report.

SARCoN – Systematic Assessment of Regulatory Competence Needs, provides information on

specific and practical means to support the implementation of the IAEA safety standards in the area of

ensuring regulatory competence. It supports the implementation of Article 8 of the Nuclear Safety

Convention and Modules 3 and 4 of the IRRS by providing a systematic approach and step based

procedure for analyzing the training and development needs of regulatory bodies.

In context of countries “embarking” on nuclear power programmes, the guidelines are applicable to

the regulator and are a means of developing the competency of regulators staff. For this, the

appendices need to be examined with regard to the process of establishment and building of the

competence of their organizations.

In particular, SARCoN provides examples of a questionnaire for self assessment to enable the

planning of future staffing needs and advocates the use by RBs of Training Needs Assessment (TNA),

providing guidance on this. Appendices give tables showing typical competencies needed in the main

and supplementary Regulatory Functional Areas and detailed breakdowns of typical Competency

Profiles for Regulatory Bodies which are used to determine competency gaps . An EXCEL format is

available facilitating the assessment of the gaps. In this tool there is an option that supplementary

competences can be added to fit the needs of individual RBs.

Draft Safety report - A Framework for Managing a Regulatory Body’s Competence. Mr. Summers

said that the report recognised that the most valuable asset of a regulatory body is its employees, and

that RBs need to: provide adequate resources in the budget; meet future business requirements and

challenges; enable employees to develop; and allocate learning activities in a fair and equitable

manner. It incorporates the competence management framework concepts, Gap Analysis and

Systematic Approach to Training (SAT) developed in Tecdoc 1254 and SARCoN and supersedes

Tecdoc 1254.

Page 5 of 32

The current draft was the result of several consultancies and discussion, by email and at Bureau

meetings - with the Bureau members. It proposes that RBs should have a competence management

system which should be integral in the overall management of the regulatory body and should be a

continuous activity, dealing with the near term and longer term future. Thus, planning for competence

should be integral to the regulatory body’s overall planning and strategic management system,

providing the policies and objectives and management system to establish and maintain adequate

competences within the organization.

In the case of countries “embarking” on nuclear power programmes, the appendix deals with the

process of establishing and building of the competence of their RBs organizations.

In the discussion Mr. Mignot, felt that there was clearly a hierarchy on the two documents being

produced with the draft safety report at the top and SARCoN and the Tecdoc below, and Mr. Summers

noted that the Tecdoc was frozen and, in effect superseded.

Mr. Woodhouse reported that a DPP for the Safety Report had been produced within IAEA and had

now been approved with some amendments. A wider IAEA participation in further drafting had been

proposed to recognise the relevance to other parts of IAEA. Further work on developing a graded

approach to embarking countries was also needed. The title of the draft safety report was to be

amended to remove the word “framework”. Ms. Koskinen noted that work would be needed to

develop a graded approach to embarking countries and possibly to note the need for Ministries to

establish competencies before the RB was formed. Mr. Szabo also drew attention to the need to advise

the embarking countries on what the competencies mean.

The meeting was informed that the amendments to the DPP and the comments noted in 8. below

meant that new drafts of the two documents would be required and work would progress, with the aid

of consultants, next year.

5. Breakout sessions

Because of the limited number of participants, only two working groups were constituted (appendix 6

gives the members) and because of time constraints only one breakout session took place instead of

two.

Working Group 1 considered: What coordination between RCF and IAEA departments is needed in

respect of advice on regulatory body’s competence for embarking countries?

The group noted that the RCF provides a wide scope assistance for embarking countries and

the SC is concerned with competence management. The work done by the SC should not be

duplicated, so there is a need to coordinate activities between the SC and RCF - IAEA should

have this role.

Considering various questions embarking countries might be expected to ask:

what kind of assistance is provided? – it should be technology neutral in the very

beginning.

Is the assistance for all facilities and for all newcomers?

How many people are needed for the first year / for reviewing PSA / for…etc.

They need to know where to find answers, so how can we help?

Page 6 of 32

Some ideas on coordination:-

Could there be some grouping of embarking countries on the basis of region

/language/ culture / phase / technology /reactor type;

Should there be a basic selection on the IAEA documentation on competence

management.

Working Group 2 considered: How do we ensure that the work of the SC gets done by SC, Bureau,

MS, IAEA considering possible barriers to communication and information?

The group noted:-

Aim 1

Aims 1.1 and 1.2 is well underway and the documents are well developed.

1.3 - Software is available and training is now needed to get all countries informed,

not just for Training Coordinators (TC).

Improved communication about SCs work is now needed on the website, directed

towards the MS.

IAEA needs to address the lack of publicity of SC work for embarking countries.

Aims 2, 3, 4

That IAEA set up a web platform upon which responses to questionnaire can be posted

and MSs invited to contribute to continuously update information as they wanted to. This

could be the start of a vehicle for information exchange. This will be given further

consideration.

Translate the basic training documents (BPTC, Regulatory Control Course) into the 6

official languages.

Include the SARCoN and Safety Report into the document package sent before IRRS.

More visibility for SC and very definite actions to get more embarking countries

involved in our work and attending SC – include setting up parallel communication

channels through TCs or equivalent.

6. Discussion of the Action Plan

Mr. Summers and Mr. Mignot led a discussion on the Action Plan. Previously known as the work

plan, it had now been cast to show, persons responsible and due dates (Appendix 4).

Actions 1.1 and 1.2 on SARCoN and the Safety Report were well developed and reported

above.

Action 1.3 referred to Training trainers. Ms. Moracho reported that IAEA was considering

seminars to be held mid- 2011 and there was a discussion on whether a workshop on applying

SARCoN could be developed, perhaps connected to the next SC (e.g. extending it by 1 day),

this should be discussed in the Bureau and special efforts made to involve embarking

countries. All members were to receive copies of the EXCEL spreadsheet (this has been

done).

Actions 1.4, 1.5 and 2.2 were to be discussed in the working group 2 session and is reported in

5. above.

Action 2.1 referred to improvements on the website, see 7. below.

Action 2.3 is reported in 5. above, in the report of the breakout sessions.

Actions 2.4 and 2.5 refer to revisions of the BPTC and regulatory control course. Ms.

Moracho reported considerable progress. The course was designed for new junior

Page 7 of 32

professionals, it focused on using IAEA standards. The first draft of the new version was

complete and was now in the quality process(target for issue – early 2012), but parts could be

used now before it was fully available.

Actions 3.1 – 3.3 refers to ensuring IAEA document development incorporates the outcomes

of the SC’s work and more discussion is needed in the Bureau.

Action 4 refers to embarking countries and is discussed in 7. Below and elsewhere in these

minutes.

7. Presentations by IAEA

Mr. Jean Rene Jubin (IAEA) gave a presentation on the new GSR Part 1 which replaces the previous

GSR, with a clearer structure and the addition of several sections (such as a section on stakeholders)

and fits into the new pyramid of guides and standards, which he also outlined. He also presented on

SSG -12 on Licensing – the basic principles of which are:

Process characteristics; a management system for licensing; public participation; and a graded

approach. It covers the seven stages of the life cycle of installations from siting to decommissioning.

Importantly, it is applicable to all nuclear installations.

Mr. Russell Gibbs (IAEA), represents the secretariat of the embarking country Regulatory

Cooperation Forum (RCF). He informed the meeting that DS424 was now approved. Mr. Ian Britten,

in discharging an action from the Bureau on the new Aim 4, had written (Appendix 5) to Dr M

Weightman (UK) who was Chairman of RCF to establish a dialogue, and Mr. Gibbs wished to

establish more about the issue before helping Mr. Weightman to reply. In the discussion that

followed, the structure and basis of SARCoN, the Safety Report and the training and advice that is

given to trainers was described. It was explained that we talk directly to training providers and that

there was a valuable resource for embarking countries in our support networks.

SC members stressed that it wanted to make member states, especially embarking countries, aware of

this resource. Mr. Gibbs undertook to draw attention to the work of the SC at the working level of

RCF and to inform them about Aim 4.

Ms. Moracho gave a demonstration of the newly developed IAEA web pages on training. Early

meetings of the SC and Bureau had drawn attention to difficulties in navigating the diverse items

pertaining to training on the IAEA website. An interdepartmental group had been established in IAEA

and over 18 months, had reviewed all the parts of the website dealing with training elements. There is

still some variation in the way in which information is presented in various places, but the new

development had brought a new navigation facility into operation. Eventually, Nuclear Applications,

Safeguards and Technical Cooperation would all utilise the same navigation design. The

improvements in the website were well received by the members of the SC.

8. Review of comments on SARCoN and the draft Safety Report

This discussion commenced with consideration of comments which had been received recently from

Ms. Sokolova (Russia) and Mr. Ayub (Pakistan).

Ms. Sokolova commented on the Diagram at Figure 2 of SARCoN which shows a sample gap analysis

as a continuous red line. She pointed out that this was mathematically incorrect as it should be

presented as a histogram as the needed and existing competencies were. She also drew attention to the

situations where there is zero needed and zero actual competencies in a particular category, which did

not appear to be considered in the Excel software. The SC agreed that the software should be easily

modified to consider this and Ms. Moracho stated that MSs were encouraged to modify the software to

Page 8 of 32

fit their own uses. A new draft of SARCON will redraw the diagram and the Excel software is also to

be changed (changes are also needed to reflect changes in the descriptions of competencies in

SARCoN).

Mr. Ayub’s comments were detailed and were presented by Mr. Sadiq. Some of them were parked for

consideration during redrafting of the documents because of their detailed nature.

The following comments on SARCoN were specifically discussed:

Section 5 – on recruiting from foreign countries - to state “.. preferably of the same region or

continent to avoid cultural conflicts” – it was agreed to consider this comment further.

Section 6.2.2 step 2 confusing tasks with competencies, which are not the same.

Consistent figure numbering

Various errors in section numbering and in the numbering in the tables.

Consideration to be given to stating that there should be scope to put a zero against needed

competencies.

It should also be clear that all new people needed induction training of some form, this was

important for embarking countries.

Some possible technical competencies to add were identified – to be considered.

Mr. Summers thanked those who had made comments, including Ms. Jelinski, who had produced

comments earlier and which had been agreed by Mr. Summers. He was grateful for such detailed

review and it was agreed to keep a window open for any further comments until the end of the year.

Comments should be copied to Ms. Moracho, Ms. Salem and Mr. Summers. As stated in 4. Earlier,

further work is planned on these documents in 2011 and all comments would be considered.

9. Presentation from SC members

These are given in more detail in Appendices 7, 8, 9 and 10, and are summarised here:

Mr. Lachaume’s (France) presentation (Appendix 7) was on a working group formed in ASN on HR

issues. ASN had been reformed in 2006 as an Independent Agency and there had been a need to

address HR issues many of which were the result of most of the staff being Civil Servants subject to

rotation into and out of the main-stream Civil Service. 12 Actions had been pursued and resolved in a

recent report to the President of ASN in June 2010. The report had been shared with representatives of

the trade unions and a committee has been set up to implement an Action Plan.

Mr. Bhattacharya’s (India) presentation (Appendix 8) dealt with a one year training programme for

new staff and the methods of dealing with new, but experienced staff. Induction training lasting 3

months ends in an examination and oral interview leading to qualification as an inspector. A specific

programme of preserving knowledge and institutional memory and the use of retirees was described.

Ms. Wieland’s (Brazil) presentation (Appendix 9) described a programme of training at CNEN on

knowledge, skills and attitudes related to quadrant 4. 100 Inspectors were designated for training with

a mix of seniorities and experience. In four groups of 25 an intensive 16-hour course was given by an

external psychology/ auditing contractor. A large amount of preparation was made in which nominees

were contacted in person and by email to prepare them. The outcome was a better appreciation of

techniques, revised inspection procedures and a commitment to regular meetings amongst inspectors

to network amongst themselves.

Mr. Mignot’s (Belgium) presentation (Appendix 10) described a RAMG (EU) programme (INSC).

Any RB in the world could apply for help in training newcomers. The programme will deal with

Quadrant 1, 2 and 3 competencies and the call for contractors had been based on a questionnaire to all

countries who currently receive support. The main focus is Q2.2 And Q3 of SARCoN i.e.: 2.2.

Page 9 of 32

Applied Technologies, 3.1. Safety focused Analytical Techniques, 3.2. Inspection Techniques, 3.3.

Assessment Techniques and 3.4. Investigation Techniques.

10. Summary and Conclusion

Mr. Mignot made a summary of the meeting:

The two documents (SARCoN and Safety report) had been discussed and further

developments considered with the aid of consultants in particular to take into account the

remarks made in connection with the approval of the DPP. Comments by SC members are

welcome until the end of 2010.

Improvements to the website had been demonstrated by IAEA and had been well received.

Organisation of a training workshop/seminar for the training coordinators on application of

SARCoN will be considered by IAEA during 2011

The issue on analysis of the questionnaire had been put to the breakout groups and a good

suggestion had been made, that IAEA set up a web platform for countries to continuously

update information as they wanted to. This could be initially populated with the questionnaire

material. This will be given further consideration.

Barriers to communication had also been put to a breakout group which had recommended

IAEA translate the basic training documents into the 6 official languages (we were informed

that parts had been translated).

There was now a need for the Bureau to revise the action plan – it has been intention that it is

updated periodically.

There had been good exchanges on embarking countries, particularly with Mr. Gibbs. He had

agreed to inform the working level of RCF of the synergies in the work of the SC/Bureau and

parts of the work streams of RCF. The Bureau would also consider how to expand

participation in our work, particularly into embarking countries.

Note that the next Bureau meeting is provisionally scheduled for the 1st Quarter of 2011.

Page 10 of 32

Appendix 1. Agenda for the SC Meeting, 30 November - 2 December 2010

26.11.2010 (Rev 2)

Meeting room VIC M6

Tuesday, 30 November 2010, 9.30 a.m.

1 09:30

Opening of the Meeting Mr. Caruso

2 09:50 Introduction of participants

All to introduce

themselves

3 10:10 Presentation and Adoption of the Agenda Mr. I. Britten (UK)

Chairman

4 10:20

Presentation and adoption of the Minutes of the last

Steering Committee Meeting in December 2010 Mr. I. Britten (UK)

Chairman

10:40 Coffee Break

OBJECTIVE 1: ESTABLISH AND AGREE AN ACTION PLAN THAT MEETS MS

NEEDS

5

11:00

Reports from the Bureau Meetings and proposed Action

Plan for the Steering Committee

Update on IAEA revision of the TOR and status of

approval of the DPP for the future Safety Report

Discussion of the Action Plan

Mr. L. Summers

(UK) – (consultant)

Mr. P. Woodhouse

(Sc. Sec.)

Progress report

from Mr. I Britten

6 12:15

Set up of the Breakout Working Groups (WGs) description

of the first breakout topics Mr. I. Britten

12:30 Lunch Break

7 14:00 Discussion in the WGs All

16:00 Coffee Break

8 16:20 Presentation of conclusions by the WGs and discussion in

plenary – Continuation WG Reporters/ All

9 17:00 Summary of the discussion on the Action Plan

Close of the day

Mr. I. Britten (UK)

Chairman

Page 11 of 32

Wednesday, 1 December 2010

OBJECTIVE 2: EXCHANGE INFORMATION ON TRAINING OPPORTUNITIES AND

DEVELOPMENTS

10

09:00

Reports from the IAEA:

Updated information on training and IAEA

developments

Ms. M. Moracho,

NSNI-RAS

(Additional possible

other IAEA officers)

11 10:00 Discussion on the foregoing presentations All

10:30 Coffee

12

11:00

Presentation on IAEA activities:

Related to embarking countries

Regulatory Cooperation Forum

IAEA responsible

officers

Mr. R. Gibbs

(Sc. Sec. RCF)

13 12:00 Discussion on the foregoing presentations All

12:30 Lunch

OBJECTIVE 3: PROVIDE FEEDBACK ON THE EFFECTIVENESS OF SC

INFORMATION EXCHANGE

14 14:00 Clarification on barriers to information exchange All

15 14:15 Working Groups on Evaluation – The effectiveness of the

foregoing information exchanges; the IAEA strategy;

working practices of the SC and Bureau

Mr. I Britten to

outline the tasks

All

15:30 Coffee Break

16 16:00 Presentations and conclusions of Working Groups WG reporters/ All

17 17:00 Close of the day

Summary

Mr I Britten

17:15 Wine and Cheese Reception (VIC Restaurant)

Thursday, 2 December 2010

OBJECTIVE 4: PROVIDE EXAMPLES OF GOOD PRACTICE

18 09:00 Presentation of the IAEA “Guidelines for systematic

assessment of regulatory competence needs – SARCoN)

Ms. K Koskinen

Page 12 of 32

Presentation of the IAEA Draft Safety Report “ A

framework for managing a regulatory body’s competence”

Mr. L. Summers

19 09:30 Discussion on the foregoing presentations All

20 10:00 Presentations on recent developments and good practices

Presentation from Mr. Lachaume, DDG, ASN France

Member States and

others

10:30 Coffee Break

21 11:00 Continuation of presentations on recent developments and

good practices

Member States and

others

12:30 Lunch Break

22 14:00 Conclusions and dates for next meeting Mr. I. Britten

23 15:30 Closing of the Meeting

Page 13 of 32

Appendix 2. Participants of the SC Meeting

COUNTRY /

ORGANIZATION

PARTICIPANT

OFFICIAL MAILING

ADDRESS

Title Last Name

First Name, Middle Name

Initials

Belgium Mr Mignot

Pierre

Bel V Rue Walcourt 148 1070 BRUXELLES BELGIUM Tel: 0032 2 5280234 Fax: 0032 2 5280102 Email: [email protected]

Brazil Ms Wieland

Patricia

National Nuclear Energy

Commission (CNEN) Rua General Severiano 90 Botafogo 22290-901 RIO DE JANEIRO, RJ BRAZIL Tel: 0055 21 2173 2380 Fax: 0055 21 2173 2383 Email: [email protected]

Finland Ms Koskinen

Annakaisa

Radiation and Nuclear Safety

Authority (STUK) Laippatie 4 P.O. Box 14 00881 HELSINKI FINLAND Tel: 00358 9 75988322 Fax: 00358 9 75988400 Email: [email protected]

France Mr Lachaume

Jean-Luc

Autorité de Sûreté Nucléaire

(ASN) Autorité de Sûreté Nucléaire

(ASN) Adjoint au 6, place du Colonel Bourgoin 75572 Paris Cedex 12 FRANCE Tel: +33140198617 Email: jean-

[email protected]

Page 14 of 32

Germany Ms Jelinski

Marianne

Gesellschaft fuer Anlagen und

Reaktorsicherheit mbH Schwertnergasse 1 D-50667 Cologne Germany Email:

[email protected] Hungary Ms Petofi-Toth

Katalin

Hungarian Atomic Energy

Authority (HAEA); Nuclear

Safety Directorate Fényes Adolf u. 4 1036 BUDAPEST HUNGARY Tel: 0036 1 4364913 Fax: 0036 1 4364909 Email: [email protected]

India Mr Bhattacharya

Ramdas

Atomic Energy Regulatory

Board Industrial Plants Safety Division Niyamak Bhavan - A Anushaktinagar MUMBAI 400 094 INDIA Tel: +91 22 25 16342 Fax: +91 22 25 51 63 42 Email:

[email protected] Iran, Islamic

Republic of Mr Sebteahmadi

S. Mohammad Bagher

Atomic Energy Organization of

Iran (AEOI) P.O. Box 14155-1339 TEHRAN, North Kargar IRAN, ISLAMIC REPUBLIC

OF Tel: 0098 21 88221089 Fax: 0098 21 88221091 Email:

[email protected] Lithuania Mr Daubaras

Rimantas

State Nuclear Power Safety

Inspectorate (VATESI) A. Gostauto Street 12 01108 VILNIUS LITHUANIA Tel: 0037052661624 Fax: 0037052614487 Email: [email protected]

Pakistan Mr Sadiq

Mohammad

Pakistan Nuclear Regulatory

Authority Mauve Area G-8/1, Peshawar

More, Islamabad P.O. Box 1912 Islamad 44000 Pakistan Tel: +92 51 926 3029 Fax: +92 51 926 3007 Email: [email protected]

Page 15 of 32

Russian Federation Ms Sokolova

Elena

Federal Environmental,

Industrial and Nuclear

Supervision Service of Russia

(Rostechnadzor); Scientific and

Engineering Centre for Nuclear

and Radiation Safety (SEC

NRS) Malaya Krasnoselskaya ulitsa

2/8, dom 5 107140 MOSCOW RUSSIAN FEDERATION Tel: 007 495 2640352 Fax: 007 495 2642859 Email: [email protected]

Slovakia Mr Szabo

Viktor

Nuclear Regulatory Authority of

the Slovak Republic (UJDSR) Bajkalska 27 P.O. Box 24 820 07 Bratislava Slovakia Tel: 00421258221120 Fax: 0042125821166 Email: [email protected]

United Kingdom Mr Summers

John, Lyndon

3 Roosevelt Avenue LANCASTER, Lancashire LA1

5EJ UNITED KINGDOM Tel: +44 152 460 410 Email:

[email protected]

IAEA staff

G. Caruso, SH-NSNI-RAS

M. Moracho, NSNI-RAS

P. Woodhouse, NSNI-RAS

M. Mandl, NSNI-RAS

J.R. Jubin, NSNI-RAS

R. Gibbs, NS-SSCS

Page 16 of 32

Appendix 3. Terms of Reference of the Steering Committee

INTERNATIONAL ATOMIC ENERGY AGENCY

TERMS OF REFERENCE

OF THE

STEERING COMMITTEE ON COMPETENCE OF HUMAN RESOURCES

FOR REGULATORY BODIES IN MEMBER STATES

September 2010

Vienna, Austria

Page 17 of 32

CONTENTS

I. Introduction

II. Terms of Reference

1. Vision

2. Mission

3 Structure & Functions

3.1. The Committee

3.2. The Chairperson

3.3. The Bureau

3.4. The IAEA Secretariat

Page 18 of 32

I. Introduction A number of regulators face problems in the recruitment of new staff and in defining training

programmes to provide and maintain the necessary competence to perform their regulatory

functions. These problems have now been accentuated by the nuclear renaissance.

The Convention on Nuclear Safety requires in Article 8 that each Contracting Party “establish

or designate a regulatory body entrusted with the implementation of the legislative and

regulatory framework referred to in Article 7, and provided with adequate authority,

competence and financial and human resources to fulfil its assigned responsibilities.”

The IAEA has published a number of documents to assist Member States in devising training

programmes for staff involved in nuclear activities, including in regulatory bodies. These

documents include:

GS-R-1 Legal and Governmental Infrastructure for Nuclear, Radiation,

Radioactive Waste and Transport Safety

GS-R-3 The Management System for Facilities and Activities

GS-G-3.1 Application of the Management System for Facilities and Activities;

GS-G-1.1 Organization and Staffing of the Regulatory Body for Nuclear

Facilities; and

TECDOC-1254 A Training the staff of the regulatory body for nuclear facilities: A

competency framework.

In December 2007, the IAEA convened a Technical Meeting to discuss how the IAEA can

best assist Member States in meeting their training needs and comply with the above-

mentioned documents. Some 17 Member States were represented, with a very broad

geographical spread, and a wide variety of NPP designs.

In December 2008, a second Technical Meeting was held. The meeting reached a broad

consensus on setting up a Steering Committee, as well as a smaller Bureau to help plan and

steer the work between future meetings of the Steering Committee.

Page 19 of 32

II. Terms of Reference

1. Vision

“Adequate policies and strategies for providing sufficient and competent human resources are

in place in Member States to ensure effective nuclear safety regulation* at NPPs consistent

with the IAEA Safety Standards.”

* “safety regulation” involves both the regulatory body as well as technical support

organization (TSO) activities.

2. Mission

To advise the IAEA on how it could best assist Member States to develop suitable

competence management systems for their regulatory bodies.

3. Structure & Functions

3.1. The Committee

3.1.1. Composition

The Committee shall be composed of representatives that have – or are seeking to have - an

experience in regulatory bodies and come from Member States with an established nuclear

power programme or an interest in embarking on such a programme.

3.1.2. Meetings and Working Methods

A three-day Plenary Meeting will be held once a year. The venue and date will be decided by

the Committee.

During the Plenary Meetings, Members are expected to provide information of interest to the

Committee, including updates on domestic regulatory training issues and to report on any

other development related to the implementation of work programmes or tasks agreed to at

prior meetings

3.1.3. Output

At the end of each Plenary Meeting the following will be produced:

Conclusions of the meeting (which will be published on the IAEA website on

NSNI training)

Proposals for specific training projects, if appropriate

Actions and deadlines

Work programme for the following year including a follow-up of

implementation of actions agreed to at prior meetings

If necessary and upon recommendation from the Plenary Meeting, task forces

dealing with specific issues may be set up. The task forces will have a leader

who will report to the Bureau on the progress of the work.

Page 20 of 32

3.2. The Chairperson

The Committee shall elect a Chairperson.

The Chairperson will be responsible for:

Leading the plenary meetings of the Committee

Preparing the work programme and planning of the meetings

Ensuring the implementation of actions between meetings

Assessing the effectiveness and efficiency of the working methods and results.

The Chairperson will be assisted by a Bureau and the IAEA Secretariat.

3.3. The Bureau

The Bureau will consist of a limited group of representatives (approximately five) agreed to in

the Committee including the Chairperson and the IAEA scientific secretary. The Bureau will

meet at least once between plenary meetings in order to follow up on the implementation of

actions under the work programme, assess the working methods and results and define the

lines to take for the next plenary meeting.

In order to accomplish the objectives of the Committee, an evaluation of the effectiveness and

efficiency of the working methods will be conducted periodically under the responsibility of

the Bureau, which may propose changes to the Committee on the working methods as a result

of such evaluations. The Bureau will also conduct an evaluation of the implementation of the

work programme and report thereon to the Committee.

3.4. The IAEA Secretariat

The Division of Nuclear Installation Safety (NSNI) will provide a Technical

Officer who will serve as scientific secretary to the meetings of the Bureau and

the Plenary.

The scientific secretary will report on any IAEA development of interest for the

group, including events, conclusions from technical meetings and new material

useful for training. The scientific secretary will coordinate activities internally

with other IAEA Divisions/Departments.

The scientific secretary will also support the Chairperson and the Bureau with

the work programme and planning of meetings, follow-up of the implementation

of actions, and assessment of the working methods and results.

Page 21 of 32

Appendix 4. Action Plan

Steering committee on Competence of Human Resources for Nuclear

Regulatory Bodies in Member States – ACTION PLAN 2010/2011

ACTION

DETAIL

LEAD

TIMING

PROGRESS

AIM 1: Adequate tools are available for helping the RB to establish and implement an adequate competence

management system1.

1.1 Complete Safety Report on Competence Management and issue to SC for their consideration for endorsement at the SC meeting

This Safety Report provides guidance for regulatory bodies on their competence management systems, It is effectively a successor to TECDOC 1254 and will give consideration to and reference the SARCON document. This was determined by the Bureau following the identification of previous action 1.4 at the December SC meeting

IAEA Target for completion of first draft 30 September 2010.

It is anticipated that the Safety Report will be ready for SC endorsement in December 2010.

1.2 Issue Revision 10 of SARCON guide to Steering Committee for their consideration for endorsement at the SC meeting

‘SARCON’ is self-assessment of competence needs of the regulatory body. It will include refinement of applied technology section of quadrant 2.

IAEA Target for completion of revision 8, 30 September 2010.

It is anticipated that the Safety Report will be ready for SC endorsement in December 2010.

1.3 Provide training for Training Co-ordinators on application of the ‘Guidelines for Competence Needs Self Assessment for the Regulatory Body’

It is anticipated that this will be provided on a workshop/seminar basis.

IAEA Draft training prospectus produced by to be discussed. 2010. Training targeted for 2011

Progress will be reported to the SC in December 2010.

1.4 Set up system for the provision of examples of good practice on competence management and its continual updating.

It is expected that initial work will concentrate on information thought to be available in IRRS reports. In due course it may be possible to include examples provided by MS’s in the standing agenda item for this at SC meetings.

UK

Target completion by 31 Dec 2010 ratified by Bureau by 30 September 2010. Selected developments will be reported at the Steering Committee in December 2010.

No progress has been made to date due to difficulty in allocating resource to this task.

1.5 Analyse questionnaires on training systems and practices.

Approximately 20 questionnaires have been received to date.

Bureau

Progress report at next SC meeting in December 2010.

No progress has been made to date due to difficulty in allocating resource to this task.

Page 22 of 32

ACTION

DETAIL

LEAD

TIMING

PROGRESS

AIM 2: A system is in place for sharing knowledge, training materials and exchanging information on

training events2.

2.1 Establish an IAEA continuous improvement process for sharing relevant training information.

This should include obtaining, ‘capturing’ and making available training information from regional centres and other agencies eg NEA, in particular for use by embarking countries. It will also include an IAEA website location for accessing training information and capturing MS practice.

IAEA IAEA will report developments at each Steering Committee.

Much progress has been made on improvements to the IAEA website and these will be demonstrated in December 2010. The potential for further action will be determined then, in particular making available information from MS’s

2.2 Analyse questionnaire on web links.

Approximately 20 questionnaires have been received to date.

Bureau

Progress report at SC Dec 2010

2.3 Identify barriers to exchange of information on training and competence management.

This action has been raised to follow up and explore feedback on language barriers raised in December 2009. There may be other barriers to communication other than language. The Bureau will request MS to be prepared for discussions on this issue at the Steering Committee.

MS/Steering Committee

To be discussed at next Steering Committee in December 2010.

No progress pending clarification of the issues behind this proposal.

2.4 Complete revision of BPTC.

IAEA Progress and future intentions will be reported at next Steering Committee in December 2010.

2.5 Revision of the Regulatory control course

IAEA Progress and future intentions will be reported at next Steering Committee in December 2010.

AIM 3: To incorporate the outcome of the Steering Committee’s work into the development of IAEA safety

standards which deal with competence of the regulatory body3

.

3.1 IAEA to establish and implement a process to keep SC members advised of developments of all safety standards and other relevant activities which deal with the competence of the regulatory body.

This is intended to complement existing IAEA processes for the development of standards and guides.

IAEA The effectiveness of this will be a standing review item at the December Steering Committee.

The Bureau was invited to provide an input to the training elements of GS-G-1.1 Management Systems for Regulatory Bodies Part 2 but this clashed with the dates of the July Bureau meeting. Copies of SARCON and the Safety Report were provided instead.

Page 23 of 32

ACTION

DETAIL

LEAD

TIMING

PROGRESS

It may be possible in future to provide an input to the IRRS guidelines.

3.2 Training Co-ordinators in Member States to comment on relevant standards as appropriate and to report on any issues of concern to Bureau.

The IAEA will ensure that MS feedback will be taken into consideration as standards are developed.

MS Standing review item at the December Steering Committee.

3.3 Ensure that SC co-ordinates input to the development of any Safety Guide on competence so that it is compatible with existing Safety Report.

This remains under consideration as a potential long term action

AIM 4: Mutual support and sharing of experience, in the area of regulatory competence, fully meet the needs of Embarking Countries.

4.1 Develop assistance proposals specific to the needs of embarking country.

This is likely to include: Development of information exchange with Regulatory Cooperation Forum for embarking countries and other similar activities. Identification of additional steps needed that are not covered by other actions in this plan. Identification of the detail will be partly dependent on provision of feedback from TM’s on embarking countries. This will be provided by the IAEA.

Bureau

Detail will be worked up and agreed after any discussion at the Regulatory Cooperation Forum.

This is a new action not previously considered by the Steering Committee. Its need /convenience shall be discussed in December.

Page 24 of 32

Appendix 5. Letter to Dr M. Weightman, Chairman of the RCF

Dr Mike Weightman HM Chief Inspector of Nuclear Installations Health and Safety Executive Redgrave Court Bootle Merseyside L20 7HS United Kingdom Dear Mike CO-OPERATION BETWEEN RCF AND IAEA STEERING COMMITTEE ON COMPETENCE I am writing on behalf of the IAEA Steering Committee on the Competence of Human Resources for Nuclear Regulatory Bodies in Member States. This follows our discussion of 5 August on co-operation between this committee and the Regulatory Co-operation Forum (RCF). The mission of this Steering Committee is to ‘advise the IAEA on how it could best assist Member States to develop suitable competence management systems for their Regulatory Bodies’. It is supported by a Bureau that assists with the progress of activities between meetings of the full Steering Committee in December. At our last Bureau meeting in July, Eric Weinstein briefed its members on the activities of the RCF core group. Following this, the Bureau members expressed their concern to make sure that the work of the Steering Committee aligned with and supported RCF developments. It was suggested that it would be appropriate for me to approach you on this in your capacity as Chairman of the RCF and on 5 August we agreed that I would write formally with details of the work of the Steering Committee.

I therefore attach a copy of the committee’s Terms of Reference and also our current Action Plan. You will see that this has a specific reference to embarking countries, although proposals have not yet been developed. If you think it would be appropriate to do so I would be very grateful if you could ask the IAEA scientific secretary of the of the RCF to distribute this to RCF members and perhaps ask for their views on how we might co-ordinate our activities to support mutual interests. In particular we are keen to avoid any potential conflicts between our goals and workstreams and those of the RFC. With many thanks for your interest. Yours Sincerely Ian Britten Chairman, IAEA Steering Committee on the Competence of Human Resources for Nuclear Regulatory Bodies in Member States

Page 25 of 32

Appendix 6. Breakout Group Members

Group 1 Group 2

R. Bhattacharia

R Daubaras

K Koskinen

J-L Lachaume

S Sebteahmadi

V Szabo

M Jelinski

P Mignot

K Petofi-Toth

M Sadiq

E Sokolova

P Wieland

Page 26 of 32

Appendix 7. Presentation by Mr. Jean-Luc Lachume, (DDG/ASN – France)

Report of the working group about human resources at ASN - creation of a WG about human

resources

ASN regulates nuclear safety and radiation protection and was established in 2006 as an independent

administrative authority under a board of 5 commissioners. ASN’s has 460 staff : industrial and

medical engineers, physicians and pharmacists, legal and administrative specialists, human sciences

and communications experts; 3/4 civil servants with a budget of €65M. Additionally €80M is

dedicated to its TSO (Institute for radiation protection and nuclear safety) IRSN for its expert analysis

(~ 400 people).

Objectives of the WG (chaired by Commissioner Gouze) action plan - To review: The competences at

ASN; The management of human resources; Career deveopment inside and outside ASN.

Trades Unions were consulted in this work and four task forces were formed: Benchmarking with

other authorities (France and foreign countries); Relation with the ministers responsible for the civil

servants (a significant issue as many staff are civil servants who may stay for a few years and have

rights to return to mainstream civil service); competences and jobs at ASN: The promotion of the

agents all along their career.

Twelve actions were established:

Action n° 1 - ASN needs to have a strong internal capacity of expertise in order to be able to

order relevant expertises to IRSN or other experts and in order to take relevant decisions -

Establish a list of technical competences

Action n° 2 - ASN has to be able to recruit adequate agents and keep them inside ASN -

Identify careers for specialists inside ASN and give them promotion equivalent to managers

Action n° 3 - Training for new and in-place agents is a strength (IRRS) but has to be adapted

to the real needs - Improve the training programs

Action n° 4 - SN needs to develop a specific tool for a provisional management of its agents -

Establish a map of jobs and competences necessary to ASN

Action n° 5 - Recruitment is a key issue for a strong safety authority -Diversify recruitments

inside and outside France

Action n° 6 - ASN has to associate his top management to the management of the human

resources - Set up a training program dedicated to the management of the human resources

Action n° 7 - The need of a specific action regarding the civil servants for the management of

their careers - Establish a dialog with the different ministers in charge of the careers of their

civil servants working for ASN

Action n° 8 - Agents from IRSN and CEA working at ASN have to be well considered by

their companies - Enhance the dialog with the managers of human resources at IRSN and CEA

Action n° 9 - Administrative agents has to be correctly promoted - Give to administrative

agents the possibility to have better promotions and responsibilities inside ASN

Action n° 10 - ASN has to propose diversified careers to its agents - Prepare and anticipate the

movements of the agents - Be able to identify high-potential agents

Action n° 11 - Give the possibility to the agents to have an additional personal training - Be

able to propose specific training courses for some agents who declare their intention to stay at

ASN

Action n° 12 - ASN has to reward the evolutions in the careers of its agents - Define the status

of senior agents

Page 27 of 32

Outcomes of the report:

The report was given to the president of ASN in June 2010.

It has been presented to the committee with representatives from the trade unions.

An action plan will be implemented by ASN’s DG: a specific committee has been set up.

Page 28 of 32

Appendix 8. Presentation by R. Bhattacharya, AERB (INDIA)

Human Resource Development

The Atomic Energy Regulatory Board (AERB) was constituted on November 15, 1983. The mission

of the Board is to ensure that the use of ionizing radiation and nuclear energy in India does not cause

undue risk to health and the environment. The nature of job demands expertise in diverse fields. In

view of this, considerable amount of emphasis is placed on training of the personnel. The need for

manpower is assessed in advance keeping in mind the foreseen requirements, estimated attrition rates

and expected work load in future.

RECRUITMENT PROCESS - Training School: The fresh graduates (scientists and engineers) from

HBNI training schools at Bhabha Atomic Research Centre (BARC), Raja Ramanna Centre for

Advanced Technology (RRCAT), Nuclear Fuel Complex (NFC) and Nuclear Power Corporation of

India Limited (NPCIL) and IGCAR Training Schools are absorbed in AERB. In addition, personnel

from Diploma in Radiological Physics, a one-year university course on radiological protection and

Health Physics training course are also inducted. Transfers: Some persons, particularly with relevant

expertise and experience, are taken in AERB by transfer from various DAE organizations like NPCIL,

BARC, IGCAR and IRE. Direct: The direct recruitments in AERB is done by advertising the vacant

posts in national newspapers and then conducting the interviews. At this level, fresh graduates and

post graduate engineers/scientists and the ones with experience in relevant industries and/or in

research organizations are selected. Some students for M.Tech degree in I.I.T Bombay at Mumbai and

I.I.T Madras at Chennai are also selected and they join AERB after completing their M.Tech.

TRAINING IN AERB - A rigorous and structured training program available in AERB -In-house

training on nuclear science and engineering and on various regulatory aspects is imparted

(Theoretical). Lectures are arranged on topics like Reactor Physics, Nuclear Reactor concepts,

different safety and process systems, civil engineering and industrial safety/regulatory aspects,

radiation safety in industry, medicine and R&D institutes, Acts, Rules and Codes used in regulatory

process. The personnel are further trained in Nuclear Training Centres of NPCIL. The personnel

undergo theoretical classroom training and following this, they undergo On the Job Training (OJT) in

the plant. The personnel required for analytical work, are encouraged to do Ph.D. in educational

institutes. AERB also looks for the opportunities to train its staff abroad.

The staff is provided opportunity to participate in Conferences, Seminars and Workshops in India as

well as abroad to keep abreast with the new developments in the areas of relevance. Seminars/talks are

arranged by the respective divisions to encourage more and more interaction between the members of

other divisions with the respective divisional activities. AERB colloquiums and Technical talks are

organised frequently on topics of current interests and on new developments in various fields that are

of regulatory interest.

KNOWLEDGE PRESERVATION - The people who leave the organization on their superannuation,

possess wealth of knowledge. Therefore, the retired manpower from the utilities and R&D

organizations and private organizations depending on their expertise is employed in the review

process in AERB. They are appointed as Chairman and members in various review committees. This

source of knowledge augmentation provides fresh thought input and good use of tacit knowledge and

is proving very effective in regulatory process of AERB.

To preserve the institutional memory, continuity is maintained and at any time, AERB staff is a good

blend of senior and junior scientists and engineers. There is flow of information vertically and

horizontally in the organization. In addition, a book on AERB: 25 years of Regulation has also been

compiled.

The institutional memory is preserved in following ways:

Page 29 of 32

Reports: Records of the discussions of the review and authorization process, inspection and

enforcement are kept in the form of notes, reports and in electronic forms. The records are

appropriately indexed and stored.

Review Articles: Review articles are written to consolidate the knowledge.

Electronic Storage: The AERB has state of the art LAN facility with over 250 computers connected to

various nodes and servers.

Website: The information that is of interest to the public and other stake holders is put on the AERB

website.

QUALITY MANAGEMENT - A formal Quality Management System ISO 9001:2008 is also adopted

by AERB. Initiative has been taken to strengthen knowledge base in the Probabilistic Safety

Assessment, Reactor Physics, Thermo-hydraulics, industrial, chemical, fire and Civil Engineering; the

areas, which are of great importance for regulatory decision-making.

R&D in AERB - A Safety Research Institute (SRI) has been established to carry out and promote

safety related research and analysis in selected areas of relevance to regulatory work. In particular,

research activities are going on in nuclear, radiation and environmental safety, seismic analysis and

probabilistic safety assessment. A Safety Research Program (SRP) has been established to promote

research in areas of regulatory interest in educational and research institute in India.

TRANSPARENCY - AERB has taken various steps to be a transparent organization and open to the

public on nuclear and radiation safety related issues.

Website : www.aerb.gov.in

Newsletter: A newsletter is published on half yearly basis which consists of Chairman’s note, nuclear

news in that quarter, constitution/reconstitution of committees, AERB major activities in the quarter,

views on AERB working methodology from the heads of units of DAE, list of new AERB

publications and recruitments/retirements in the quarter.

Annual Report: Annual report is published summarising the activities and their results in the year.

About 1000 copies are distributed to premier educational institutes in India and all the DAE

organisations, hospitals and media.

Publications: About 150 AERB safety codes, guides, manuals, standards have been published by

AERB till date. These publications are useful both for DAE and Non-DAE related activities in India.

The documents are published after a thorough multi-tier review process in AERB and by taking help

from external experts.

Press Releases: Press releases are issued on major incidents and happenings in nuclear related fields.

Information under Right to Information Act: Recently, to fulfil the provisions of Right to Information

Act (RIA), an Appellate Authority (AA), a Public Information Officer (PIO) and an Assistant Public

Information Officer (APIO) have been appointed to deal with public and media queries.

INTERNATIONAL COOPERATION - AERB has been collaborating with various other regulatory

bodies like United States Nuclear Regulatory Commission (USNRC), Russian Regulatory Body

(ROSTEKHNADZOR) and French Regulatory Body (ASN). In addition, AERB officers interact with

IAEA in various technical meetings and training programs to keep themselves abreast with the latest

developments in the field of nuclear and radiation technology and its regulation process. AERB serves

as the nodal agency in arranging the review of IAEA and WTO documents with the help of experts

from various DAE organizations including the AERB itself.

Page 30 of 32

Appendix 9. Presentation by Ms. P Wieland, CNEN (Brazil)

An Insight on the Nuclear Competence Building Pillars – Attraction, Training and

Motivation

National Commission on Nuclear Energy - CNEN regulate: Nuclear Power Plants; Nuclear Fuel

Cycle; Uranium Mining and Milling Caetité, Bahia - Headquarters: Rio de Janeiro - Creation: October

10, 1956 - 2.733 employees , 30% MSc. and DSc. Nuclear regulatory sector: 277 employees

Attraction - Post-graduate MSc and DSc courses at CNEN; CNEN Scholarships from graduation to

post-doctoral (around 200); Specialized training courses, fellowships and scientific visits (CNEN and

IAEA); Public Concours (30 new employees in 2010)

Training - Competence requirements: knowledge, skills and attitudes - Initial and refresher training -

Types: Classroom, on-the-job, distance training; Communication and information exchange;

Mentoring; Immediate use of training investment

Training skills and shaping attitudes - Optimize essential skills and attitudes to perform inspections -

100 inspectors from nuclear reactors, medical and industrial installations, waste deposits, mining

industries divisions - 4 x 16 h training - Previous awareness programme by e-mail and corridor -

Context awareness: News Clipping and WNN

Training skills and shaping attitudes - Skills in planning and executing; Planning the inspection;

Knowing the licensee; Development and Use of Checklists; Inspection Report and its communication

to the parties involved

Behavioural Competencies: Code of Ethics - Technical skills and behaviour of inspectors

Profile and Quality of Inspector: Posture professional; The proper behaviour, good manners and

urgent; Personal presentation: caring image

Dealing with behavioural aspects of the auditee - The importance of communication - Credibility,

Respect, Fairness, Pride - Developing cooperation - Perceptions and Attitudes x Desire and Will -

Strengthening the organizational image.

Results - Establishment of regular inspectors meeting - Revision of inspection procedures.

Motivation and Retention - Clear definition of responsibilities and recognition - Modernization of

refresher nuclear training - Dissemination of job opportunities in other departments - Adequate salaries

- Commitment with long term projects - Task commitment (availability of resources) - Workers

involvement in decisions and information share - Professional network

Building Competence Resources – Regulations - Internal procedures for training and qualification -

Inspector’s Manual - Regulatory database (UNIDOC) - Internal communications (meetings, e-mail,

intranet) - Information exchange (conferences, meetings) - Nuclear Regulatory National Reports

(Conventions, agreements, government, public) - Public hearings - Regulatory Information National

Meeting (ENIR) - CNEN Information Programme (PIC) - www.foroiberam.org

Experience on Personal Certification - Formal recognition of professional competency by an

accredited organization, based on a norm - Follow up activities to maintain certification and to

continually develop nuclear competence - Certification by CNEN: nuclear reactor operators, radiation

protection supervisors, industrial radiography operators, NDT at NPPs.

Challenges and opportunities - Changing environment (ambitious Nuclear Programme) - Interfaces

with other regulatory agencies - Revision of the legal framework - Transfer of tacit knowledge -

Availability of time dedicated to training - Personal skills and attitudes adequate for regulatory tasks:

entry requirements.

Page 31 of 32

Conclusions - Keep on: Attracting; Training; Motivating. Communication, training and knowledge

sharing are transversal and depend both on workers and managers.

Page 32 of 32

Appendix 10. Presentation by Pierre Mignot, Bel V(Belgium)

Information on Training activities in RAMG

Objective of INSC programme managed by DG Aidco - Regulatory Assistance to RB - Technical

support for licensing with participation of local TSO - Training of newcomers, as a third pillar.

Possible types of projects for training - Training included in country specific projects (one

Beneficiary) - Training as only activity in a regional project (several Beneficiaries) - Training

organised through IAEA in frame of EC-IAEA cooperation.

Regional project MC.03/10 on training and tutoring - included in AP2010 - budget of €3M - to be

contracted before the end of 2011.

Orientations of project: Development of regulations and guides - Authorization and licensing - Review

and assessment - Inspection and enforcement - The four quadrant competency model is applied - Offer

should cover activities related to Q1, Q2, Q3.

Identification of needs by means of a questionnaire where the required competences are listed on the

basis of SARCON, rev 10 - Focus is on Applied Technology competency (section 2.2 of Q2) and

Regulatory Practices competency (Q3) - Catalogue of available training courses and tutoring offers

shall be established - Matching by EU of offer with demand (i.e. needs) - List of expected trainees to

be submitted by Beneficiary to EU - Selection of trainees by EU in cooperation with consultant -

Participation (fees, trips, per diems) of trainees covered by the project - Selection of potential lecturers

and mentors by EU on proposal of the consultant - Costs (fees, trips, per diems if abroad) of lecturers

covered by the project.