Minutes of the 18 th meeting of the Committee Constituted for Deciding the Consent under orange Category, held on 17.09.2007 in the Conference Room of Chairman, DPCC. The following persons, attended the meeting on 17.09.2007 1. Sh. J. K Dadoo, Chairman DPCC 2. Sh. SS Ghonkrokta, Member Secretary, DPCC 3. Sh. S.K.Gupta ,Head Chemical Engineering Deptt.,IIT Delhi 4. Sh. B. Kumar, SEE, DPCC 5. Sh. M. Dwarakanath, SSO, Deptt of Env., GNCTD 6. EEs and AEE of CMC – I, II & AEE of Enquiry Counter. 18 th meeting of the Committee constituted for deciding the Consent (under orange Category) was held on 17.09.2007 and following decisions were taken in the meeting ; 40 cases out of 78 remaining cases were discussed on and decisions were taken. Tabulated statement of decisions taken in the meeting is annexed as Annexure - I The meeting ended with a vote of thanks to the Chair.

Minutes of the 18 th meeting of the Committee ... - Delhi ,Head Chemical Engineering Deptt.,IIT Delhi 4. Sh. B. Kumar, SEE, DPCC 5. Sh. M. ... 16 175 M/s New Adarsh Re-Rolling MillsA-137

  • Upload
    lamdung

  • View
    213

  • Download
    0

Embed Size (px)

Citation preview

Minutes of the 18th meeting of the Committee Constituted for Deciding theConsent under orange Category, held on 17.09.2007 in the ConferenceRoom of Chairman, DPCC.

The following persons, attended the meeting on 17.09.2007

1. Sh. J. K Dadoo, Chairman DPCC

2. Sh. SS Ghonkrokta, Member Secretary, DPCC

3. Sh. S.K.Gupta ,Head Chemical Engineering Deptt.,IIT Delhi

4. Sh. B. Kumar, SEE, DPCC

5. Sh. M. Dwarakanath, SSO, Deptt of Env., GNCTD

6. EEs and AEE of CMC – I, II & AEE of Enquiry Counter.

18th meeting of the Committee constituted for deciding the Consent (under

orange Category) was held on 17.09.2007 and following decisions were taken in

the meeting ;

40 cases out of 78 remaining cases were discussed on and decisions

were taken. Tabulated statement of decisions taken in the meeting is annexed as

Annexure - I

The meeting ended with a vote of thanks to the Chair.

S.No. Ref.No.

M/s Name of Industry/Unit Address IndustrialArea

Activity Remarks Decision Taken on 10.09.07.

1 160 M/s Bright ElectroplatingIndustries

C-5/2, Wazirpur Indl.Area

Electroplating

2 161 M/s Shakti Industries C-9/4, Wazirpur Indl.Area

Re-Rolling and Pickling of SSSheets.

3 162 M/s Ravi Steel Industries C-9/4, Wazirpur Indl.Area

Pickling of SS Sheets

4 163 M/s Ramesh Trading Co. C-9 Wazirpur Indl.Area

Electroplating

5 164 M/s Singhal Steel Udyog C-12/1 Wazirpur Indl.Area

Re-Rolling & Pickling of SSSheets.

6 165 M/s Ram Steel C-13(Backside) Wazirpur Indl.Area

Annealing, Re-Rolling &Pickling of SS Sheets.

7 166 M/s Durga Industries A-99/4 Wazirpur Indl.Area

Re-Rolling and Pickling of SSSheets.

8 167 M/s Anil Metal Industries A-104/9 Wazirpur Indl.Area

Annealing, Re-Rolling &Pickling of SS Sheets.

9 168 M/s Mahavir Agency A-109/2 Wazirpur Indl.Area

Unit Closed M/s Mahavir Agency closed (earlierengaged in pickling activity). M/s KrishnaSteel is in operation and engaged in Re-Rolling of SS Sheets & applied forconsent on 16.07.2007 for consent tooperate.

10 169 M/s Kesho Ram Industries A-100/6 Wazirpur Indl.Area

Re-Rolling & Pickling of SSSheets.

11 170 M/s Shri Shyam Steels A-113/1 Wazirpur Indl.Area

Re-Rolling & Pickling of SSSheets.

12 171 M/s Jai Shree SheyamEnterprises

A-123 Wazirpur Indl.Area

Pickling & Re-Rolling of SSsheets.

13 172 M/s Jay Kay Enterprises A-127 Wazirpur Indl.Area

Pickling, Annealing & Re-Rolling of SS Sheets

14 173 M/s Kalyan Steel Rolling Mills A-130 Wazirpur Indl.Area

Pickling, Annealing & Re-Rolling of SS Sheets

15 174 M/s Satvir Jain A-134 Wazirpur Indl.Area

Pickling of SS Sheets

16 175 M/s New Adarsh Re-Rolling Mills A-137 Wazirpur Indl.Area

Pickling, Annealing & Re-Rolling of SS Sheets

17 176 M/s Ganpati Steels A-47 Wazirpur Indl.Area

Re-Rolling and Pickling of SSSheets.

18 177 M/s Goyal Steel Industries A-35 Wazirpur Indl.Area

Annealing, Re-Rolling &Pickling of SS Sheets.

19 178 M/s Pradeep Industries A-31 Wazirpur Indl.Area

Annealing, Re-Rolling andPickling of SS Sheets.

20 179 M/s Vishal Metals A-93/4 Wazirpur Indl.Area

unit does not exist (Premisesinspected for pickling)

M/s Vishal Metals does not exist at thisaddress. M/s Xenitone Electronics isoperating and engaged in assembling ofelectronic items. M/s Vishal Metals wasexisting at A-93/14 WIA (earlier engagedin pickling activity) which was foundclosed and shifted during the inspectionon 16.01.07. and as per decision taken bycommittee on 29.01.07 and 07.05.07letter issued for cancellation of MCDlicense and for disconnection of electricity& water supply in the name of the unit.Consent application of this unit ispending.

21 180 M/s Vikash Steel B-17/2 Wazirpur Indl.Area

Unit Closed Two other pickling units found, but notapplied.

22 181 M/s Ganpati Industries B-27/2, Group Wazirpur Indl.Area

Unit Closed

23 182 M/s Shri Sai Enterprises B-27/2, Group Wazirpur Indl.Area

24 183 M/s Vardhman Metal B-50, Group Wazirpur Indl.Area

Pickling Earlier direction u/s 31 (A) was temporaryrevoked for submission of test report &adequecy report, unit has submitted thesame. Unit has submitted representationand informed to restart the work. Andrequested for revocation of direction.

25 184 M/s Gupta Enterprises B-47/2, Group Wazirpur Indl.Area

Annealing, Re-Rolling &Pickling of SS Sheets.

26 185 M/s Jagdish & company B-39/1 Wazirpur Indl.Area

Pickling

27 186 M/s R.D. Steel C-58/2 Wazirpur Indl.Area

Re-Rolling & Pickling of SSSheets.

28 187 M/s Narander Industries C-58/4 Wazirpur Indl.Area

Annealing, Re-Rolling &Pickling of SS Sheets.

29 188 M/s Rishabh Steel C-59/2 Wazirpur Indl.Area

Pickling of SS Sheets

30 189 M/s Pooja Enterprises D-26 Wazirpur Indl.Area

Re-Rolling & Pickling of SSSheets.

31 190 M/s Bright India Industries C-9/3 Wazirpur Indl.Area

Re-Rolling and Pickling of SSSheets.(annealing furnaceunder installation)

32 191 M/s Harihant Steel C-10/2 Wazirpur Indl.Area

Pickling of SS Sheets

33 192 M/s Jagdish & Co. C-39/1 Wazirpur Indl.Area

Unit Closed M/s Abhishek Industries (Engaged in Re-Rolling of SS Sheets & having consentupto 30.07.08) & M/s Navdurga Industries(Engaged in circle cutting and applied forrenewal of consent on 31.07.07)

34 193 M/s Hari Ram C-40/3 Wazirpur Indl.Area

Pickling of SS Sheets Representation received from owner afterinspection on 07.08.07 informed that hewas under medical treatment thereforeproduction has been stoped requested forreinspection

35 194 M/s Balaji Steel C-58/1 Wazirpur Indl.Area

Annealing, Re-Rolling andPickling of SS Sheets.

36 195 M/s Rana Motors Pvt. Ltd. A-3 Wazirpur Indl.Area

Service Station

37 196 M/s Mohan's Leela Banquet A-8/3 Wazirpur Indl.Area

Banquet Hall

38 197 M/s Puri Hosiery Works A-9/1 Wazirpur Indl.Area

Unit closed M/s Puri Hosiery Works closed. M/s SunilHosiery Factory is operating and engagedin cloth manufacturing and not applied forconsent.

39 198 M/s Jaquar Co. Ltd (Unit -2) A - 6 Wazirpur Indl.Area

Bathroom Fittings ( IncludingCasting , Electroplating &Buffing)

40 199 M/s Richi Rich Restaurant (P)Ltd.

A - 7 Wazirpur Indl.Area

Restaurant Cum Banquet Hall Three years have been lapsed, letterissued for re-submission of application26.02.2007 and also not applied underHW Rules.

41 200 M/s Pawa International Pvt. Ltd. C-93 Wazirpur Indl.Area

Service Station Earlier direction temporarily revoked for30 days.

42 201 M/s Shalimar Motors C-91/9 Wazirpur Indl.Area

Service Station

43 202 M/s Uttam Steel Alloy (P)Ltd. C-14 Wazirpur Indl.Area

Pickling, Annealing & Re-Rolling of SS Sheets

44 203 M/s U-like Exports C-34 Wazirpur Indl.Area

Pickling, Annealing & Re-Rolling of SS Sheets andmfg. of SS utensils (w/obuffing)

45 204 M/s Celebration Banquet A-16/3 Wazirpur Indl.Area

Banquet Hall

46 205 M/s Tonika Automobiles A-15 Wazirpur Indl.Area

Service Station

47 206 M/s Jai Mata Metal Treatment A-74(GroundFloor)

Wazirpur Indl.Area

Heat Treatment

48 207 M/s Gem Sanitary Appliances(P) Ltd.

A-57 Wazirpur Indl.Area

Bathroom Fittings(Including Casting,Electroplating & Buffing)

49 208 M/s Gagan Vishal Export(P).Ltd

A-94/5 Wazirpur Indl.Area

Mfg of Sweets & Namkeen& Restaurant

50 209 M/s Rameshwar Foods A-94/4 Wazirpur Indl.Area

Mfg of Sweets& Namkeen

51 210 M/s Gee Aar Industries A-9/3 Wazirpur Indl.Area

Mfg A cotton thread,Mercerizing, andBleaching.

52 211 M/s RCI industries &Technologies Ltd.UNITALL HEAVENS.

B-97 Wazirpur Indl.Area

Resturant & Bar Unit has submitted afidavit and adequacyreport and informed ETP is Bilogicalprocess not genrating hazrdous waste.

53 212 M/s Jain & Company A-95/4 Wazirpur Indl.Area

M.S. Wire drawing withPickling

54 213 M/s S.S. Enterprises B-36, Group Wazirpur Indl.Area

Pickling, Annealing & Re-Rolling of SS Sheets

55 214 M/s Laxmi Industries A-97/4 Wazirpur Indl.Area

Pickling, Annealing & Re-Rolling of SS Sheets

56 215 M/s Dr.Jagdish Lal Sethi A-95/1 Wazirpur Indl.Area

Aeralyic Dental Powder

57 216 M/s Super Dental Product A-95/1 Wazirpur Indl.Area

Aeralyic Dental Teeth

58 217 M/s M.M. Bros Merry MakerBanquet Hall

C-91/4 Wazirpur Indl.Area

Banquet Hall

59 218 M/s Ambica Steels B10/9,Group Wazirpur Indl.Area

Pickling

60 219 M/s Lakshmai Milk TestingMachinery co.

A-90, Group Wazirpur Indl.Area

Mfg of Dairy Equipments(Milk Canes) withAnodizing.

61 220 M/s Sohal Motor works B-24 Wazirpur Indl.Area

Pickling, Annealing & Re-Rolling of SS Sheets

62 221 M/s Shree Krishna Industries A-101/1 Wazirpur Indl.Area

Pickling & Cold Re rolling ofSS Sheets.

63 222 M/s Him Giri Cars Pvt. Ltd B-99 Wazirpur Indl.Area

Sales Service And Spares

64 223 M/s R.K.Metal Industries A-99/3 Wazirpur Indl.Area

Mfg of Copper & Brass Sheetwith casting & washing

65 224 M/s Sh. Abdul Rasheed Shed no.100,DSIDC

Wazirpur Indl.Area

Buffing and BuffingMachines Installed

66 225 M/s Sh. Balak Ram. Sh.Suresh. Sh. Islam, Sh.Ram Bils

Shed no.101,DSIDC

Wazirpur Indl.Area

Buffing

67 226 M/s Sh. Shree VenkateshwarEnterprises

Shed no, 54DSIDC

Wazirpur Indl.Area

S.S. Utensils (Pressing &Buffing)

68 227 M/s Sh. Varun Fabricators Shed no.80,DSIDC

Wazirpur Indl.Area

S.S. Utensils (Pressing &Buffing)

69 21 M/s Sh. Rakesh (SobtiAssociates)

B-78 Wazirpur Indl.Area

No activity Case of M/s Sobti Associates decided inthe meeting on 4.07.07. (Ref. No 21).

70 228 M/s Sh. Bhupinder(M/s JainSteel Udyog)

Shed no, 71DSIDC

Wazirpur Indl.Area

Steel Untenslis

71 229 M/s Sh. Ravi (M/s DayalIndustries)

Shed no,63,DSIDC

Wazirpur Indl.Area

Buffing

72 230 M/s Sh. Yaseen and Sh.Sultal

C-85 Wazirpur Indl.Area

Steel Polish

73 51 M/s Sh. Sunil Bansal (M/sEastern Engineering)

C-86 Wazirpur Indl.Area

Steel Rolling Annealing Re-Rolling & Pickling

Case of Eastern Engineering alreadydecided on 4.07.07.(Ref. No 51)

74 231 M/s Sh. Shajid and Sh. Aslam A-103/6 Wazirpur Indl.Area

Steel Polish

75 232 M/s Sh. Vijay Kumar Goel A-104 Wazirpur Indl.Area

Buffing

76 233 M/s Sh. Mohammad, Sh.Noshad, Sh. Lekraj (M/sPratap Metals)

A-136 Wazirpur Indl.Area

Buffing

77 52 M/s Sh. Paras and sh. Mohd.Latif & (M/s Krishna MetalIndustries)

A-40 Wazirpur Indl.Area

Steel Rolling Annealing Re-Rolling & Pickling

Case of M/s Krishna Metal Industriesalready decided on 4.07.07. (Ref No.52)

78 54 M/s Bitto Malhotra Industries B-20 Wazirpur Indl.Area

Re-Rolling & Pickling Case of Malhotra Industries B-20 alreadydecided on 4.07.07 (Ref No.54)

Wazirpur Indl.Area

Buffing

126 M/s A.V. Metal A-75/2 Wazirpur Indl.Area

Re-Rolling and Pickling of SSSheets.

SCN for refusal of authorization underHW Rules & SCN u/s 5 of EP Act issuedas per decision taken on 05.07.07, replyawaited.

2 M/s Mitul Industries A-124 Wazirpur Indl.Area

Pickling, Annealing & Re-Rolling of SS Sheets

unit reinspected by the WIA committee asdecided in the meeting on 05.07.07.

75 M/s Jain Udyog B-41, Group Wazirpur Indl.Area

Re-Rolling and Pickling ofSS Sheets.

w.r.t High Court case, the case wasdiscussed in the meeting on 22.08.07 &as decided case to be taken up on28.08.07.Earlier the unit had obtainedconsent to establish which has expired on06.03.07.Thereafter unit has not appliedfor consent under Air & Water Act. Brief ofthe case is mentioned in the sheetenclosed.

81 M/s Vishal Industries C-55/1 Wazirpur Indl.Area

Re-Rolling and Pickling ofSS Sheets.

w.r.t High Court case, the case wasdiscussed in the meeting on 22.08.07 &as decided case to be taken up on28.08.07.Consent application under Air &Water Act submitted earlier on 20.07.07&application for authorization submitted on18.07.07. Brief of the case is mentioned inthe sheet enclosed.

9 M/s S.K Enterprises A-126/1 Wazirpur Indl.Area

Pickling, Annealing & Re-Rolling of SS Sheets

unit was earlier inspected by thecommittee for WIA and also by thepresent committee for WIA.unit hassubmitted bank guarantee of Rs. 3 lakhas asked by DPCC. As decided in themeeting on 05.07.07 this case was to betaken up in the next meeting on 18.07.07.

12 M/s W.C Steel B-70/2 WazirpurIndl. Area

Pickling of SS Sheets Letter issued for cancellation of MCDlicense, consent & authorizationapplication pending ETP & ECS installedand requested for earlier issued closuredirection to the unit. As decided on05.07.07 this case was to be taken up inthe next meeting on 18.07.07.

75 17 M/s Pawan Kumar A-87/1 WazirpurIndl. Area

Plastic injection moulding SCN issued on 22.01.07. since foundoperating without consent. Hearing wasgiven on 28.03.07. Representative of unitrequested for time upto 10.04.07 forsubmission of consent applicationhowever consent application under Air &Water Acts has not been recieved so far.As decided on 05.07.07 this case was tobe taken up in the next meeting on18.07.07.

51 1 M/s R.N Gupta & Co. A-125 WazirpurIndl. Area

Pickling and Annealing ofSS Sheets

Inspection was carried out by committeefor WIA & unit was found in operation inviolation of directions issued for closureon 09.01.07. ETP found defunct anduntreated effluent was found discharging.The committee in the meeting held on05.07.07 decided as given below"directions to concerned SDM for effectiveclosure of the unit since despite thedirections issued by the DPCC for closureof the unit, the unit is operating defyingthe directions and the unit is habitualoffender and willfull defaulter. ConcernedSDM be asked to ensure effective closureof the unit & to confirm to DPCC within 3weeks. Member Secretary DPCC, willalso write to concerned DeputyCommissioner in this regard. This matterbe brought in the meeting of committee inAugust 2007. Letters issued . Compliancereport awaited.

S.No. Ref.No.

M/s Name ofIndustry/Unit

Address IndustrialArea

Activity Remarks Decision Taken on 17.09.07.

1 160 M/s BrightElectroplatingIndustries

C-5/2, WazirpurIndl. Area

Electroplating Letter be issued asking the unit to apply for renewal of consent. SCNbe issued u/s 5 for the deficiencies observed by the specialinspection team.

2 161 M/s Shakti Industries C-9/4, WazirpurIndl. Area

Re-Rolling andPickling of SSSheets.

According to the record, unit has written saying that they haveclosed down. Unit has not applied for renewal of consent since1.8.05. Unit also not applied for authorization under HW Rules.Special inspecting team also recommended closure. Therefore, aspeaking order bringing out all facts be issued u/s 33(A) of WaterAct, 1974, u/s 31(A) of Air Act, 1981 and u/s 5 of EP Act, 1986.

3 162 M/s Ravi SteelIndustries

C-9/4, WazirpurIndl. Area

Pickling of SSSheets

There is no application in our record. Inspection team says that theunit does not exists.

4 163 M/s Ramesh TradingCo.

C-9 WazirpurIndl. Area

Electroplating This unit surprisingly has no consent to operate, but has been givenauthorization under HW Rules in 2004 valid up to 15.7.06. Thespecial inspecting team found several deficiencies warrantingclosure of the unit u/s 33(A) of Water Act, 1974 [invoking rule 34(6)],u/s 31(A) of Air Act[invoking rule 20 A (6)], 1981 and u/s 5 of EP Act,1986[invoking rule 4(5)] . Committee concurred with therecommendation of the inspecting team and ordered closure of theunit u/s 33(A) of Water Act, 1974 [invoking rule 34(6)], u/s 31(A) ofAir Act[invoking rule 20 A (6)], 1981 and u/s 5 of EP Act,1986[invoking rule 4(5)] and for disconnection of electricity and watersupply

5 164 M/s Singhal SteelUdyog

C-12/1 WazirpurIndl. Area

Re-Rolling &Pickling of SSSheets.

The inspecting team found basic systems O.K. But house keepingwas found to be poor. Let the unit file an affidavit to the effect thatthe house keeping has been improved. If such an affidavit is filed,consent to operate and authorization are granted.

6 165 M/s Ram Steel C-13(Backside)

WazirpurIndl. Area

Annealing, Re-Rolling & Picklingof SS Sheets.

Consent to operate applied for first time on 30.12.04. Applied forauthorization under HW Rules on 02.8.06. There is no application forconsent to establish at any time. The inspecting team, by and large,found systems O.K, except a few minor improvements required. TheCommittee felt that the unit should apply for Consent to establishfirst and do the necessary improvements suggested by theinspecting team. If this is done in two weeks, the Committee willdecide all the three applications in the next CMC meeting.

7 166 M/s Durga Industries A-99/4 WazirpurIndl. Area

Re-Rolling andPickling of SSSheets.

Both applications of consent to operate and authorization are pending.The inspecting team found basic systems O.K, but made certainsuggestions for improvement. In view of this, let the unit file an affidavitto the effect that necessary action has been taken as suggested by theinspecting team. If such an affidavit is filed, consent to operate andauthorization are granted.

8 167 M/s Anil MetalIndustries

A-104/9 WazirpurIndl. Area

Annealing, Re-Rolling & Picklingof SS Sheets.

Consent is valid. Authorization renewal applied on 26.9.06. Inspectionteam found basic systems O.K.. Issue authorization under HW Rules.

9 168 M/s Mahavir Agency A-109/2 WazirpurIndl. Area

Unit Closed M/s Mahavir Agencyclosed (earlierengaged in picklingactivity). M/s KrishnaSteel is in operationand engaged in Re-Rolling of SS Sheets& applied for consenton 16.07.2007 forconsent to operate.

Both record and inspecting team found unit closed. Wrt CMC’s orderdated 29.01.07 for closure and cancellation of MCD license,compliance report received from NDPL and DJB. Get compliance reportfrom MCD. Trishna Steel (Another unit found by the team) file beplaced before the Committee on the next date of meeting to discuss theremaining cases.

10 169 M/s Kesho RamIndustries

A-100/6 WazirpurIndl. Area

Re-Rolling &Pickling of SSSheets.

Consent to operate applied for first time on 15.3.05. Applied forauthorization under HW Rules on 26.7.06. There is no application forconsent to establish at any time. The inspecting team, by and large,found systems O.K, except a few minor improvements required. TheCommittee felt that the unit should apply for Consent to establish firstand do the necessary improvements suggested by the inspecting team.If this is done in two weeks, the Committee will decide all the threeapplications in the next CMC meeting.

11 170 M/s Shri ShyamSteels

A-113/1 WazirpurIndl. Area

Re-Rolling &Pickling of SSSheets.

Inspecting team observed certain deficiencies and recommended SCNunder section 5 of EP Act, 1986. The Committee concurs with therecommendation of the inspecting team. Once the reply to SCN isreceived, both consent and authorization applications will beconsidered next month.

12 171 M/s Jai Shree SheyamEnterprises

A-123 WazirpurIndl. Area

Pickling & Re-Rolling of SSsheets.

Applied for consent to operate on 02.8.02 and again on 15.5.07.Applied for renewal of authorization on 04.8.06. Inspecting team foundcertain deficiencies. Let the unit apply for consent to establish and alsocorrect all the deficiencies completely. If he files an affidavit to thiseffect all his applications will be considered by CMC in next monthmeeting. Since he has filed wrong affidavit wrt DG set, he must fileBank Guarantee for Rupees one lakh and also file another affidavitexplaining why he should not be prosecuted for filing wrong affidavit.

13 172 M/s Jay KayEnterprises

A-127 WazirpurIndl. Area

Pickling,Annealing & Re-Rolling of SSSheets

Applied for renewal of consent on 29.6.05. Applied for renewal ofauthorization on 23.8.06. The inspecting team found basic systemsO.K. But found minor deficiencies. Let the unit file an affidavit to theeffect that the deficiencies have been rectified. If such an affidavit isfiled, consent to operate and authorization are granted.

14 173 M/s Kalyan SteelRolling Mills

A-130 WazirpurIndl. Area

Pickling,Annealing & Re-Rolling of SSSheets

Applied for renewal of consent on 01.8.05. Applied for renewal ofauthorization on 02.8.06. The special inspecting team found severaldeficiencies warranting closure of the unit u/s 33(A) of Water Act, 1974[invoking rule 34(6)], u/s 31(A) of Air Act[invoking rule 20 A (6)], 1981and u/s 5 of EP Act, 1986[invoking rule 4(5)] . Committee concurredwith the recommendation of the inspecting team and ordered closure ofthe unit u/s 33(A) of Water Act, 1974 [invoking rule 34(6)], u/s 31(A) ofAir Act[invoking rule 20 A (6)], 1981 and u/s 5 of EP Act, 1986[invokingrule 4(5)] and for disconnection of electricity and water supply. MCDlicense may also be cancelled. Pending consent application andauthorization be also refused.

15 174 M/s Satvir Jain A-134 WazirpurIndl. Area

Pickling of SSSheets

Applied for consent to operate on 30.12.04. Applied for renewal ofauthorization on 18.8.06. This unit surprisingly has no consent tooperate, but has been given authorization under HW Rules. Let the unitapply for consent to establish with proper project report of all the repairwork still to be one. The case will be taken up for consideration forreinspection as suggested by the inspecting team once he complieswith the same.

16 175 M/s New Adarsh Re-Rolling Mills

A-137 WazirpurIndl. Area

Pickling,Annealing & Re-Rolling of SSSheets Applied for renewal of consent on 24.12.04. Applied for renewal of

authorization on 28.7.06. This unit surprisingly has no consent tooperate, but has been given authorization under HW Rules. The specialinspecting team found several deficiencies warranting closure of theunit u/s 33(A) of Water Act, 1974 [invoking rule 34(6)], u/s 31(A) of AirAct [invoking rule 20 A (6)], 1981 and u/s 5 of EP Act, 1986[invokingrule 4(5)] . Earlier inspection dated 29.6.04 also found majordeficiencies. Committee concurred with the recommendation of theinspecting team and ordered refusal of consent and authorization andclosure of the unit u/s 33(A) of Water Act, 1974 [invoking rule 34(6)], u/s31(A) of Air Act[invoking rule 20 A (6)], 1981 and u/s 5 of EP Act,1986[invoking rule 4(5)] and for disconnection of electricity and watersupply. Speaking orders for closure including the habitual offender beissued.

17 176 M/s Ganpati Steels A-47 WazirpurIndl. Area

Re-Rolling andPickling of SSSheets.

The inspecting team found basic systems ok. But certain leakage fromthe filter press was observed. Let the unit file an affidavit to the effectthat the same has been improved. If such an affidavit is filed, consent tooperate and authorization may be granted.

18 177 M/s Goyal SteelIndustries

A-35 WazirpurIndl. Area

Annealing, Re-Rolling & Picklingof SS Sheets.

Applied for consent to operate on 14.3.05. Applied for authorization on8.7.04. The inspecting team found no pickling activity but rerollinga ndannealing going on. He must therefore first apply for consent toestablish as his earlier application for consent to operate was refused.

19 178 M/s PradeepIndustries

A-31 WazirpurIndl. Area

Annealing, Re-Rolling andPickling of SSSheets.

Applied for renewal of authorization on 26.7.06. Consent is valid up to01.8.08. The inspecting team suggested SCN under various acts.Committee concurs with the recommendation of the inspecting team.SCN be issued under various acts and for revocation of consent.

20 179 M/s Vishal Metals A-93/4 WazirpurIndl. Area

unit does not exist(Premisesinspected forpickling)

M/s Vishal Metals does notexist at this address. M/sXenitone Electronics isoperating and engaged inassembling of electronicitems. M/s Vishal Metalswas existing at A-93/14WIA (earlier engaged inpickling activity) which wasfound closed and shiftedduring the inspection on16.01.07. and as perdecision taken bycommittee on 29.01.07 and07.05.07 letter issued forcancellation of MCDlicense and fordisconnection of electricity& water supply in the nameof the unit. Consentapplication of this unit ispending.

Applied for consent to operate on 17.1.05. The inspecting team foundunit called Xenitone Electronics at A – 93/4. CMC may track this file tobe taken up with Vishal Steels. 3 units namely Bhatia Impex, KrishnaRolling Works and Balaji Rolling Works found by the inspecting team.CMC will track their files and place the same in the next CMC meeting.

21 180 M/s Vikash Steel B-17/2 WazirpurIndl. Area

Unit Closed Two other pickling unitsfound, but not applied.

Applied for consent to operate and was valid up to 17.1.05. Not appliedfor renewal and also for the authorization. Inspection team found nosuch unit. In view of above, no action is required. Issue letter fordisconnection of electricity and water supply to the unit. MCD be askedto cancel the license in the name of the unit. However, there is otherunit in the sane name at C -17/2, where renewal of authorizationapplied. Inspection team should inspect the unit and place report beforeCMC.Further, inspecting team found two units namely MoonlightTrading Company (Pickling) and another pickling unit (Name notknown) found operating. CMC to track the files and place before theCommittee.

22 181 M/s Ganpati Industries B-27/2,Group

WazirpurIndl. Area

Unit Closed Inspecting team found no such unit. Issue letter for disconnection ofwater and electricity supply and cancellation of MCD license.

23 182 M/s Shri SaiEnterprises

B-27/2,Group

WazirpurIndl. Area

Consent is valid up to 30.9.07 and authorization is valid up to 31.8.08.renewal of authorization on 02.8.06. The special inspecting team foundseveral deficiencies warranting closure of the unit u/s 33(A) of WaterAct, 1974 [invoking rule 34(6)], u/s 31(A) of Air Act[invoking rule 20 A(6)], 1981 and u/s 5 of EP Act, 1986[invoking rule 4(5)] . Committeeconcurred with the recommendation of the inspecting team and orderedclosure of the unit u/s 33(A) of Water Act, 1974 [invoking rule 34(6)], u/s31(A) of Air Act[invoking rule 20 A (6)], 1981 and u/s 5 of EP Act,1986[invoking rule 4(5)] and for disconnection of electricity and watersupply. MCD license may also be cancelled. Revoke consent andauthorization.

24 183 M/s Vardhman Metal B-50,Group

WazirpurIndl. Area

Pickling Earlier direction u/s 31 (A)was temporary revoked forsubmission of test report &adequecy report, unit hassubmitted the same. Unithas submittedrepresentation andinformed to restart thework. And requested forrevocation of direction.

The unit applied for consent to operate on 21.7.04 and authorization on29.806. Closure directions u/s 31(A) of Air Act, 1981 were issued on20.2.2003 for non installation of ECS. Directions were revokedtemporarily on 8.4.05 for submission of monitoring and adequacyreports. This unit surprisingly has no consent to operate, but has beengiven authorization under HW Rules. Since the unit is closed down,letter be issued for disconnection of electricity and water supply to theunit and cancellation of MCD license.

25 184 M/s Gupta Enterprises B-47/2,Group

WazirpurIndl. Area

Annealing, Re-Rolling & Picklingof SS Sheets.

Unit applied for renewal of consent on 30.9.05 and authorizationrenewal on 26.7.07. The special inspecting team found severaldeficiencies warranting closure of the unit u/s 33(A) of Water Act, 1974[invoking rule 34(6)], u/s 31(A) of Air Act[invoking rule 20 A (6)], 1981and u/s 5 of EP Act, 1986[invoking rule 4(5)] . Record shows that earlierinspection shows ETP was not in operation, which reveals that the unitis a habitual offender. Committee concurred with the recommendationof the inspecting team and ordered refusal of consent and authorizationand closure of the unit u/s 33(A) of Water Act, 1974 [invoking rule34(6)], u/s 31(A) of Air Act[invoking rule 20 A (6)], 1981 and u/s 5 of EPAct, 1986[invoking rule 4(5)] and for disconnection of electricity andwater supply

26 185 M/s Jagdish &company

B-39/1 WazirpurIndl. Area

Pickling Record shows the unit does not exist. Inspection team also reveals thesame. Letter for disconnection of electricity & water supply andcancellation of MCD license.

27 186 M/s R.D. Steel C-58/2 WazirpurIndl. Area

Re-Rolling &Pickling of SSSheets.

Consent to operate applied for first time on 28.3.05. Applied forauthorization under HW Rules on 15.9.05. There is no application forconsent to establish at any time. The inspecting team, by and large,found systems O.K, except a few minor improvements required. TheCommittee felt that the unit should apply for Consent to establish firstand do the necessary improvements suggested by the inspecting team.If this is done in two weeks, the Committee will decide all the threeapplications in the next CMC meeting.

28 187 M/s NaranderIndustries

C-58/4 WazirpurIndl. Area

Annealing, Re-Rolling & Picklingof SS Sheets.

Consent to operate applied for first time on 04.3.02 and again on05.9.05. Applied for authorization renewal under HW Rules on 22.8.06.There is no application for consent to establish at any time. Theinspecting team, by and large, found systems O.K, except a few minorimprovements required. The Committee felt that the unit should applyfor Consent to establish first and do the necessary improvementssuggested by the inspecting team. If this is done in two weeks, theCommittee will decide all the three applications in the next CMCmeeting.

29 188 M/s Rishabh Steel C-59/2 WazirpurIndl. Area

Pickling of SSSheets

Unit was given consent to establish. Unit applied for consent on16.03.05 and authorization on 14.03.05. The special inspecting teamfound several deficiencies warranting closure of the unit u/s 33(A) ofWater Act, 1974 [invoking rule 34(6)], u/s 31(A) of Air Act[invoking rule20 A (6)], 1981 and u/s 5 of EP Act, 1986[invoking rule 4(5)] .Committee concurred with the recommendation of the inspecting teamand ordered refusal of consent and authorization and closure of the unitu/s 33(A) of Water Act, 1974 [invoking rule 34(6)], u/s 31(A) of AirAct[invoking rule 20 A (6)], 1981 and u/s 5 of EP Act, 1986[invoking rule4(5)] and for disconnection of electricity and water supply

30 189 M/s Pooja Enterprises D-26 WazirpurIndl. Area

Re-Rolling &Pickling of SSSheets.

Unit applied for consent to operate on 25.6.04 and 20.8.07 respectivelyand renewal of authorization on 01.8.06. This unit surprisingly has noconsent to operate, but has been given authorization under HW Rules.Let him apply for consent to establish. The special inspecting team notfound major deficiencies except the final discharge on open land.If theconveyance system exists, the unit must get connected and come backto CMC. If not so, it will wait for DJB to complete conveyance system.Till then the consent application is kept pending.

31 190 M/s Bright IndiaIndustries

C-9/3 WazirpurIndl. Area

Re-Rolling andPickling of SSSheets.(annealingfurnace underinstallation)

Unit applied for consent to operate on 20.3.07 and authorization on20.3.07. The special inspecting team found several deficiencieswarranting closure of the unit u/s 33(A) of Water Act, 1974 [invokingrule 34(6)], u/s 31(A) of Air Act[invoking rule 20 A (6)], 1981 and u/s 5of EP Act, 1986[invoking rule 4(5)] . Committee concurred with therecommendation of the inspecting team and ordered refusal of consentand authorization and closure of the unit u/s 33(A) of Water Act, 1974[invoking rule 34(6)], u/s 31(A) of Air Act[invoking rule 20 A (6)], 1981and u/s 5 of EP Act, 1986[invoking rule 4(5)] and for disconnection ofelectricity and water supply.

32 191 M/s Harihant Steel C-10/2 WazirpurIndl. Area

Pickling of SSSheets

Unit obtained consent to establish on 21.9.05.Applied for consent tooperate and authorization on 03.5.07. The inspecting team suggestedSCN under various acts, as the team found certain deficiencies.Committee concurs with the recommendation of the inspecting team.SCN be issued under various acts and for refusal of consent.

33 192 M/s Jagdish & Co. C-39/1 WazirpurIndl. Area

Unit Closed M/s Abhishek Industries(Engaged in Re-Rolling ofSS Sheets & havingconsent upto 30.07.08) &M/s Navdurga Industries(Engaged in circle cuttingand applied for renewal ofconsent on 31.07.07)

Inspection team found closed unit. Consent and authorization berefused and issue letter for disconnection of electricity & water supplyand cancellation of MCD license. Two units found in operation. CMC totrack their files and put up in next CMC meeting.

34 193 M/s Hari Ram C-40/3 WazirpurIndl. Area

Pickling of SSSheets

Representation receivedfrom owner afterinspection on 07.08.07informed that he wasunder medical treatmenttherefore production hasbeen stoped requested forreinspection

This unit surprisingly has no consent to operate, but has been givenauthorization under HW Rules. The special inspecting team foundseveral deficiencies warranting closure of the unit u/s 33(A) of WaterAct, 1974 [invoking rule 34(6)], u/s 31(A) of Air Act[invoking rule 20 A(6)], 1981 and u/s 5 of EP Act, 1986[invoking rule 4(5)] . Committeeconcurred with the recommendation of the inspecting team and orderedrefusal of consent & authorization and closure of the unit u/s 33(A) ofWater Act, 1974 [invoking rule 34(6)], u/s 31(A) of Air Act [invoking rule20 A (6)], 1981 and u/s 5 of EP Act, 1986[invoking rule 4(5)] and fordisconnection of electricity and water supply

35 194 M/s Balaji Steel C-58/1 WazirpurIndl. Area

Annealing, Re-Rolling andPickling of SSSheets.

The inspecting team found basic systems O.K. Consent is valid up to30.9.08.Authorization under HW Rules is granted.

36 195 M/s Rana Motors Pvt.Ltd.

A-3 WazirpurIndl. Area

Service Station Applied for consent to operate on 24.8.06 and authorization on14.11.06. The special inspecting team found several deficiencieswarranting closure of the unit u/s 33(A) of Water Act, 1974 [invokingrule 34(6)], u/s 31(A) of Air Act[invoking rule 20 A (6)], 1981 and u/s 5of EP Act, 1986[invoking rule 4(5)] . Committee concurred with therecommendation of the inspecting team and ordered refusal of consent& authorization and closure of the unit u/s 33(A) of Water Act, 1974[invoking rule 34(6)], u/s 31(A) of Air Act [invoking rule 20 A (6)], 1981and u/s 5 of EP Act, 1986[invoking rule 4(5)] and for disconnection ofelectricity and water supply

37 196 M/s Mohan's LeelaBanquet

A-8/3 WazirpurIndl. Area

Banquet Hall Unit applied for consent to operate and authorization on 26.7.02 andagain on 19.4.04 and for authorization on 31.10.05 respectively. Theinspecting team suggested SCN under various acts, as the team foundcertain deficiencies. Committee concurs with the recommendation ofthe inspecting team. SCN be issued under various acts and for refusalof consent. To come up in the next CMC meeting.

38 197 M/s Puri HosieryWorks

A-9/1 WazirpurIndl. Area

Unit closed M/s Puri Hosiery Worksclosed. M/s Sunil HosieryFactory is operating andengaged in clothmanufacturing and notapplied for consent.

Inspecting team found the unit closed. CMC to track the file and take upin next CMC meeting.Inspection team found Sunil Hosiery Factory. Hemay be asked to apply for consent to establish under green category.

39 198 M/s Jaquar Co. Ltd(Unit -2)

A - 6 WazirpurIndl. Area

Bathroom Fittings( IncludingCasting ,Electroplating &Buffing)

Unit applied for renewal of consent on 10.01.06 and for authorizationon 05.7.06 respectively. The inspecting team suggested SCN undervarious acts, as the team found certain deficiencies. Committeeconcurs with the recommendation of the inspecting team. SCN beissued under various acts and for refusal of consent. To come up in thenext CMC meeting.

40 199 M/s Richi RichRestaurant (P)Ltd.

A - 7 WazirpurIndl. Area

Restaurant CumBanquet Hall

Three years have beenlapsed, letter issued for re-submission of application26.02.2007 and also notapplied under HW Rules.

Unit applied for consent to operate on 19.7.02 and not applied forauthorization . The inspecting team suggested SCN under variousacts, as the team found certain deficiencies. Committee concurs withthe recommendation of the inspecting team. SCN be issued undervarious acts and for refusal of consent. Let it apply for consent toestablish and authorization.