Upload
others
View
3
Download
0
Embed Size (px)
Citation preview
1
Minotaur Exploration | ASX: MEPShare Purchase Plan17 October 2018
Notes:1. Excludes 24.2m listedoptions (MEPO) withexercise price ofwithexercise price rangeof A$0.068 – A$0.30and expirydaterangeof 31October 2019 to6September 2021
Corporate snapshot
Financial information
Numberofshares1 257.6m
Shareprice(@ 15 October 2018) A$0.046
Marketcapitalisation(@ 15 October 2018) A$11.8m
Cash(@ 30 September 2018) A$2.5m
Debt(@ 30 September 2018) A$0.4m
Listedinvestments(@ 30 September 2018) A$0.5m
EnterpriseValue A$9.2m
About Minotaur Exploration (ASX: MEP)
§ Primaryfocusoncopperexploration inQueensland§ Wellregardedfortechnicalexcellence inexploration
§ SupportiveandhighqualityJVpartners§ CreatingJVentryopportunitiestounderpinbusinessmodel
§ LaunchingSPPtoadvanceseveralkeyprojectsinto2019
§ SPPtargetof$1.75million§ SPPclosesFriday2November2018
Strong shareholders and smart mining investors
Source: IRESS
MEP 6 month Share price
Sprott Inc.(TSX:SII)aglobalresourcesfund 10.4%
YarraandooPrivateAustralianmininginvestor 6.8%
OZMineralsASX-listedmajorcopper-goldminer 3.1%
MrI.R.GemmellPrivateAustralianmininginvestor 2.2%
SyndicatedMetalsAustraliangoldexplorer 2.0%
FMRInvestmentsOwner/operatoroftheEloiseCopperMine,Queensland 1.2%
Top20 35%
Major Shareholders (@ 30 September 2018)
MINOTAUR EXPLORATION (ASX: MEP) 10
SPP overview
§ TheCompanyintends toofferaSharePurchasePlan(SPP) toeligible investors toraiseapproximately A$1.75mnetofcosts
§ TheSPPwillalloweligible shareholders topurchaseuptoA$15,000worthoffullypaidshares intheCompany(subject toanyscale-back),withoutincurring brokerage andothertransaction costs
§ NewsharesofferedundertheSPPwillbeissuedatA$0.042,representing:― 8.7%discount tolastclose;and― 14.4%discounttothe10dayVolumeWeighted
Average Price (VWAP)
MINOTAUR EXPLORATION (ASX: MEP)
Minotaur to raise A$1.75m via a share purchase plan offered to eligible shareholders
In-filldrillingat‘Jericho’ inJVwithOZMinerals A$0.75m
Initial drillingprogramatthe Highlands project A$0.5m
Geophysics attheWindsorpolymetallic project A$0.5m
Total A$1.75m
1
2
Useoffunds
3
A$0.75mtobeappliedtoEloiseJV:Minotaur toco-contribute fromthestartof2019
A$0.5mtobeappliedtotheHighlands project: fora5-hole1,200mdrill programcommencing October2018A$0.5mtobeappliedtotheWindsorpolymetallicproject:groundgeophysicsandfirstrounddrill targetgeneration
1
2
3
2
SPP timetable
MINOTAUR EXPLORATION (ASX: MEP)
Timetable for the Share Purchase Plan is as follows*
*ThetimetableisindicativeandsubjecttotheASXListingRulessuchthatthedatesmaychangewithoutnotice
Recorddate forSPP 15October2018
SPPannounced toASX 16October2018
Dispatch SPPbooklet toshareholders 22October2018
Closingdate forSPP 2November 2018
Allotment dateforSPPshares 9November 2018
SPPsharescommence tradingonASX 12November 2018
3
Minotaur’s strategic focus in Qld
Strengthening the focus on copper and other base metals in Queensland
12
4
3 Windsor JV (MEPmayearn80%)
– Farm-inJVwith tenementholder– Minotaur mayearn80%for$4
millionexpenditure over5years– 629km2 landpackage invicinity of
severalhigh-gradepolymetallicmines
– Minotaur ispreparing ageophysicsand targetgeneration program
Eloise JV(MEP:49%,OZL:51%,earning70%)
– A$10mfarm-inagreementwithOZMinerals
– Copper resultsprove highfertilityalong3.3kmof’Jericho’ extent
– 28holescompleted into J1andJ2conductors for12,840m
– regional diamond drill campaignunderway totestEManomalies
– Extensiveregional geophysicalsurveysunderway
Highlands Project (MEP:100%)
– 667km2 tenementgroupsurroundingCopperChem’s BarbaraCu-Aumine
– TwoVTEMconductors refinedthrough recentground EM
– Fieldmappingandgrounddrilltargetdefinitioncompleted
– Copper-goldrockchipsamplescorrelatewithEMtargetsbelow
– RCdrilling starting midOctober– 5initialholes for1200m
Osborne JV(MEP:100%;JOGMECearningto51%)
– RecentEMsurvey southoftheCannington mine identified2drillworthy targets
– Diamond drillinginto2targetscompleted; nosignificantmineralisation located
1 2
3 4
MINOTAUR EXPLORATION (ASX: MEP) 4
Minotaur’s growth strategy in Qld
Minotaur has a growth strategy for its Qld exploration portfolio
2
1
3
Applyourunder-coverexplorationexpertisetoseekcompany-makingbasemetalsdiscoveries
Defineeconomic mineral resources from base metal discoveries
Leverage into development using existingregionalinfrastructure
EvolveMinotaurintoabasemetalsdeveloperalongsideitsJVpartners
MINOTAUR EXPLORATION (ASX: MEP) 5
Eloise JV: expanding the search
OZ Minerals endorsed an expanded JV program for Q4 2018
Q42018and conceptual 2019activityProjectoverview
§ ‘Jericho‘ EMconductors discovered late 2017inJVwith OZMinerals
§ Located 3kmsouthoftheEloise copper-goldmine (>[email protected]%Cu,0.9g/t Au)
§ Jericho comprises 2sub-parallel copper-goldmineralised plates; 3.5kmand 1kminlength
§ DrillingatJerichonow totals 28holes for12,840m
§ Assays for 5holes are pending
§ Anew $2mregional exploration campaigncommenced inSeptember
§ With Jericho‘s strike extent and continuityestablished, the expanded Q42018explorationcampaign includes:
− Drilling regional EMtargets ($1.35m)
− 13holes for 4,750m(Defiance, Navajo, J4,Winona,Clementine, Baghdad, Pasadena)
− Largegeophysical surveys across regionalzones (A$0.65m)
§ OZMinerals‘ JV interest is forecast to reach 70%by early 2019(for $10mtotalinvestment)
q Minotaurwillthen fund its30%shareofongoing work
q Minotaurexpects tomaintain itspositionasJVmanager &operator
1
MINOTAUR EXPLORATION (ASX: MEP) 6
1 Eloise JV: J1 and J2 copper-gold intersections1
MINOTAUR EXPLORATION (ASX: MEP) 7
§ Situatedaside tworegional-scale structural faults:
‒ CopperChem’s ‘Barbara’ [email protected]% Cu,0.15g/t Au islocated amidst (but isexcluded from)the tenement group
‒ Barbarahasstronggeochemical similarities tothe Jerichoironsulphide-coppergoldsystem (ISCG)nearEloisemine
‒ Minotaur is applying itsISCGmodel toexplorationacross thearea
§ Extensive outcropandvisiblecoppermineralisation:
‒ Numerous small, shallow, high-grade historic workings
‒ Elevated copper-in-soilgeochemical resultscoincident withmag highs
‒ Multiple airborneVTEM anomalies were definedbypreviousownerSyndicated Metals
‒ NogroundEMdonetorefineconductor orientations
‒ Cusulphides were reported inlimited historicshallow drilling
‒ Only 33holesdrilledbelow100mdepth
‒ Averages1drillholeper~11km2
Highlands CuProject
667km2 of copper prospective ground 50km NE of Mt Isa
8MINOTAUR EXPLORATION (ASX: MEP)
2
Highlands Cu project
The newly acquired Highlands project provides Minotaur with shallow drill targets
§ AcquiredbyMinotaurinJuly2018
§ Located50kmnortheastofMountIsaand80kmnorthwestofCloncurry
§ previousVTEMsurveysidentified several anomalies
− GroundEMconfirmed strongconductorsatGospel andCoolibah
− Elevated copper,goldandcobalt rockchipvalues associated withEMconductors
§ Reconnaissance RCdrilling frommidOctober− 5scoutholes for1,200m
− A$500kworkprogramOctober– March2019
§ Drilling programsoverthenext12monthsare intended toliftprojectvalueandcreate farm-inopportunities withamajorpartner
§ Discovery outcomecouldprovidedevelopment options forMinotaur− ProximitytoMtIsasmelter andErnest Henryconcentrator
GospelEMTarget
MINOTAUR EXPLORATION (ASX: MEP) 9
2
§ StrongVTEMconductors located overNW-oriented faults
§ VTEMconductorscomparable insizetoCopperChem’s Barbara deposit(see image toright)
§ Conductors rangebetween 600m– 1000mlong(Barbara is800mlong)
§ Minotaur’sgroundEMfirmedupVTEMmodels
§ Rockchips showelevated copper to16.9%andcobalt to454ppm,coincident withEMpositions
§ Nopreviousdrilling atanytarget
§ Drilling startsmidOctober
Highlands Cuproject
Shallow targets at Coolibah & Gospel
10
Source:CopperChem
MINOTAUR EXPLORATION (ASX: MEP)
2
§ 2EMconductive zonesrecently locatedjust12kmand22kmsouthoftheCanningtonmine
§ Monarch
§ 2plates interpreted toliewithinMtNorna Quartzite andalongside aregionalstructure
§ 1holetested bothplates
§ Quail
§ 2plates lieparalleltotheCloncurryFaultSystem
§ 1holetested bothplates
§ 800mdiamond drillingcompleted inOctober
§ Nosignificantmineralisation reported
Osborne JV
JV with JOGMEC funding to earn 51%
13MINOTAUR EXPLORATION (ASX: MEP)
3
Windsor JV
Minotaur has entered a farm-in agreement over ‘Windsor’ to explore ground adjacent to the Thalanga Zn-Pb-Cu-Au mine
§ TheWindsorpolymetallic JVislocated 200kmfromTownsville and60kmfromChartersTowersinnortheastQueensland
§ RedRiverResources (ASX:RVR), owneroftheadjacentThalanga project, restartedmining operations inSeptember2017,producinghighquality zinc, leadandcopperconcentrates withgoldandsilverby-products
§ MinotaurExploration andthe tenement ownerentered intoaJVagreement over7tenements immediately east oftheThalanga project
§ Tenement area629km2
§ Thefarm-inagreement commenced 15October2018
§ Minotaurmayearnupto80%interest inthe tenements forexpenditure of$4mover5years
§ Minotaurhastherighttointroducea‘backstop’ fundingpartnerinreturnforatenement interest
Windsorlocation
11MINOTAUR EXPLORATION (ASX: MEP)
4
Windsor JV
The region is well endowed with high-grade VMS style deposits
Thalanga (pre-mining):• [email protected]%Zn,3.7%Pb,2.5%Cu,89g/t
Ag,0.6g/tAu
Thalanga (current)• [email protected]%Zn,2.3%Pb,1.3%Cu,
55g/tAg,0.2g/tAu
Highway – Reward(mined):• [email protected]%Cu,1g/tAu
Waterloo (current):• 0.7Mt@11%Zn,1.6%Pb,1.9%Cu,50g/t
Ag,1g/tA
Liontown (current):• [email protected]%Zn,1.6%Pb,0.5%Cu,25g/t
Ag,0.8g/tAu
Thetenementshavereceived scantexplorationattentionsinceearly1990’sduetopresenceofhighly
conductivecoverMinotaur sees thisasopportunity toapplyitsunder-coverexploration
expertise usingtechniques responsive tosulphide dominantmineral systems
12MINOTAUR EXPLORATION (ASX: MEP)
4
14
Appendix
MINOTAUR EXPLORATION (ASX: MEP)
Minotaur insummary
§ Cash balance30th September 2018ofA$2.5million
§ EV~A$9million
§ CoreassetsinAustralianbasemetalendowedprovinces
§ Explorationsuccess;aspirationsmatched totechnical andfinancial capability
§ BusinessmodelbasedonJVpartnerships leads tosubstantial levelofexplorationactivity
§ OZMineralsfunding towardsA$10mearn-in investment inEloise JV;drilling continuingandnewgeophysical campaignsunderway
§ Newproject,Windsor,addedtotheassetmix;bolsteringexploration exposure inknownbasemetal regions
§ Continuing tooutplaynon-coreassets;underlines proactiveassetmanagement
AnnaOgilvie,Geologist,inspectingdrillcoreatEloiseJV
15
JerichoCu-Aucore(17ELD06)
MINOTAUR EXPLORATION (ASX: MEP)
Exploration funding model
Minotaur’s business model is based on JV funding; maximising exploration investment
Source: Appendix 5Bs
Minotaur’sannualexplorationandadministration expenditureandfundingsource(A$m)
Expenditure Funding source
9.4
6.2
6.2
8.1
FY15
FY18
FY16
FY17
0.6
0.6
0.7
0.5
3.8
2.7
3.0
4.7
5.0
2.9
2.5
2.9
Totalexploration&administration R&Dtaxincentive JVreceipts NetMinotaurspend
16MINOTAUR EXPLORATION (ASX: MEP)
Director Biography
Dr RogerHigginsNon-Executive ChairmanBE(Hons),MSc,PhD,FIEAust,FAusIMM
• Non-Executive Director ofNewcrest Mining(ASX:NCM)andMetminco (ASX:MMC)• PreviouslySeniorVicePresident ofCopper atTeck Resources, VicePresident andChief OperatingOfficerwithBHP Billiton Base
MetalsinAustraliaandheldsenior operations managementpositions withBHPBilliton inChile• PhDinwaterresources fromtheUniversityofNSW,MasterofSciencefrom theUniversityofAberdeenandBachelor of
Engineering fromtheUniversityofQueensland
Mr AndrewWoskettManagingDirectorBEng,MCommLaw,FAusIMM
• 35 yearsproject managementandcorporate experience inminingindustry• Ledmajordevelopment projects including theKalgoorlie SuperPit, Kanowna BelleandMaryima goldmines,numerous expansions
oftheBougainvillecopper mine, ironoremineexpansions (WA)andnewproject feasibilitystudies (Cu,Au,Fe,Ni,coal, OlympicDam)
• AsManagingDirector ofBallarat Goldfields wasresponsible forreactivating undergroundmining atBallarat aftera75yearhiatus
Dr TonyBelperioExecutiveDirectorBSc (Hons),PhD,FAusIMM
• Geologist with35+yearsexperience inuniversity, SAgeoscienceandmineralsexploration• AwardedAMEC’sProspector oftheYearAwardin2003forhisroleindiscoveryofProminent Hill copper-gold deposit• Non-Executive Director ofThomsonResources (ASX:TMZ)
Mr GeorgeMcKenzieNon-Executive DirectorBA(Law), LLB,FAICD
• 30+ yearsexperience inthemulti-faceted regulatory, legalandcommercial issuesfacedbynatural resources companies.]• Longtermcouncilor oftheSouthAustralianChamber ofMinesandEnergy(SACOME)• Solicitor member oftheMineralsandEnergyAdvisoryCouncil, advisingtheSouthAustralianMinisterforMineralResources and
Energyonstrategic issuesaffecting theindustry
Management Roles Biography
Glen LittleExploration ManagerBSc(Hons),MAIG
• Geologist with20+yearsindustry record inexploration, project generation, resource developmentandstrategic planning• Broad exposuretobasemetalsandgoldindiversegeologicalsettingswith particular expertise incopper-gold exploration• Ledsuccessfulexploration teamstodiscoverieswith AdityaBirla, Xstrata Copper andasGeneral ManageratKagara Zinc
Varis LidumsCompanySecretary&Commercial ManagerBEc,LLB,MBA,CA
• Chartered accountant andlawyerwithover25yearsexperience intheresources, energyandaccounting sectors• Heldsenior roleswithBP, ShellandConocoPhillips prior tojoiningMinotaurExploration in2011asCommercial Manager• Varis wasappointed CompanySecretaryinJuly2017
JimKouvoussisFinancial ControllerCA,B.Comm
• Chartered Accountant withover13yearsexperience inmid-tier/big fouraccounting firmsandindustry financeroles• Jimwasappointed FinancialController atMinotaur Exploration in2011
Minotaur Board & KMP
Deep technical expertise and extensive corporate experience
17MINOTAUR EXPLORATION (ASX: MEP)
Minotaur’s non-core assets
Divestment and asset realisation activities 2018
WesternAustralia–Ni
§ Poochera JV(MEP: 100%,ADNtoearn75%)- Kaolindeposits- AndromedatospendA$6Mover5years
§ Halloysite nanoclays R&D(MEP: 100%)- Uni ofNewcastleR&Dassessing
nanotechnology applicationsforhalloysitecomponentofkaolinclays
- MinotaurownsIP
§ LakePurdilla (MEP: 100%)- Large,highqualityGypsumresource
§ Leinsterproject- AvailableforsaleorJV
§ Saintsproject (MEP:100%)
- 2017JORCNickelresourceat‘Saints’- 2018EMshowsadditional,possibly
mineralised,conductorsarepresent§ Availableforsale
18
SouthAustralia– IndustrialMinerals
MINOTAUR EXPLORATION (ASX: MEP)
Explanatorystatements
About the Eloise Joint VentureOZMineralsLtd(ASX:OZL)maysolefundupto$10millionoversixyearsforwhichitwillearn70%beneficialinterestinMinotaur’s‘Eloise’tenements,65kmsouth-eastofCloncurry,Queensland.OZMinerals’70%interestisforecasttobeachievedbyearly2019,3yearsearlierthanoriginallycontemplated.Minotaurismanagerandoperatorofthejointventure.
DisclaimerThis presentation has been prepared by the management of Minotaur Exploration Limited (“Minotaur”, ASX: MEP) for the general benefit of analysts,brokers and investors and does not constitute specific advice to any particular party or persons. Information herein is based on publicly availableinformation, internally developed data and other sources.Where an opinion, projection or forward looking statement is expressed in this presentation,it is based on the assumptions and limitations mentioned herein and is an expression of present opinion only. No warranties or representations aremade or implied as to origin, validity, accuracy, completeness, currency or reliability of the information. Minotaur specifically disclaims and excludes allliability (to the extent permitted by law) for losses, claims, damages, demands, costs and expenses of whatever nature arising in anyway out of or inconnectionwith the information, its accuracy, completeness or by reason of reliance by any person onany of it. Where Minotaur expresses or impliesan expectation or belief as to the success of future exploration and the economic viability of future project evaluations, such expectation or belief isexpressed in good faith and is believed to have a reasonable basis. However, such projected outcomes are subject to risks, uncertainties and otherfactors which could cause actual results todiffermaterially from projected future results. Such risks include, but are not limited to, exploration success,metal price volatility, changes to current mineral resource estimates or targets, changes to assumptions for capital and operating costs as well aspolitical and operational risks and government regulatory outcomes. MEP disclaims any obligation to advise any person if it becomes aware of anyinaccuracy inor omission from any forecast or toupdate such forecast.
Competent Person’s StatementInformation in this presentation that relates to exploration results for Minotaur Exploration Ltd is based on information compiled byMrGlen Little, whois a full- time employee of the Companyand aMember of the Australian Institute of Geoscientists (AIG). Mr Little has sufficient experience relevant tothe style of mineralisation and type of deposits under consideration and to the activity that he has undertaken to qualify as a Competent Person asdefined in the 2012 Edition of the “Australasian Code for Reporting of ExplorationResults, Mineral Resources andOre Reserves” (JORC Code). Mr Littleconsents to inclusionof this information in the form andcontext inwhich it appears.
MINOTAUR EXPLORATION (ASX: MEP) 23