“Revised” Pre-Demolition Hazardous Building Materials Inspection Report Former Gary’s Furniture 109 Main Avenue East Frazee, Minnesota Prepared for
Minnesota Pollution Control Agency and Becker County
Project B1511698.01 September 30, 2016 Braun Intertec Corporation
Table of Contents
Description Page A. Introduction ...................................................................................................................................... 1 B. Scope of Services .............................................................................................................................. 1 C. Site Description ................................................................................................................................ 2 D. Results .............................................................................................................................................. 2
D.1. Asbestos .............................................................................................................................. 2 D.1.a. Asbestos-Containing Materials .............................................................................. 2 D.1.b. Non-Asbestos-Containing Materials ...................................................................... 4
D.2. Lead-Based Paint ................................................................................................................. 5 D.3. Miscellaneous Regulated Waste ......................................................................................... 6
D.3.a. Poly-Chlorinated Biphenyls (PCBs) ......................................................................... 6 D.3.b. Mercury .................................................................................................................. 6 D.3.c. Chlorofluorocarbons (CFCs) and Hydro chlorofluorocarbons (HCFCs) .................. 6 D.3.d. Hazardous Waste ................................................................................................... 6 D.3.e. Miscellaneous ......................................................................................................... 6
E. Discussion ......................................................................................................................................... 7 E.1. Asbestos-Containing Materials ........................................................................................... 7
E.1.a. Friable ACM ............................................................................................................ 7 E.1.b. Category I Non-Friable ACM ................................................................................... 7 E.1.c. Category II Non-Friable ACM .................................................................................. 8
E.2. Lead-Based Paint ................................................................................................................. 8 E.3. Miscellaneous Regulated Waste ......................................................................................... 9
F. Limitations ........................................................................................................................................ 9 G. Asbestos Building Inspector Certification ...................................................................................... 10
Appendices A: Table I. Asbestos Building Inspection Results B: Table II. Bulk Asbestos Analytical Results C: Table III. Lead-Based Paint Testing Results D: Bulk Asbestos Analysis Reports E: Sample Location Sketch F: Asbestos Inspector Certificates
A. Introduction
Braun Intertec Corporation was retained by the Minnesota Pollution Control Agency (MPCA) to conduct a
pre-demolition Hazardous Materials (HazMat) Survey/Inspection of the Former Gary’s Furniture property
located at 109 Main Avenue East in Frazee, Becker County, Minnesota (the Site). The Assessment,
Cleanup & Redevelopment Exchange System (ACRES) Property ID is #210341. The general scope,
methods and procedures for the HazMat Inspection were described in the Sampling and Analysis Plan
(SAP) prepared by Braun Intertec dated March 28, 2016, which was approved by the MPCA and U.S.
Environmental Protection Agency (EPA) Region 5.
The HazMat Inspection Activities were completed per our Professional and Technical Services Master
Contract (SWIFT Contract No. #63181; Purchase Order 3000016982) under the Minnesota Targeted
Brownfields Assessment Program (MNTBAP). MNTBAP Program is administered by the MPCA and is
funded from 128(a) assessment money provided by the EPA (Cooperative Agreement #RP-96529808).
Braun Intertec completed an initial HazMat Inspection of the Site, the results of which were presented in
a report dated June 30, 2016. Following issuance of the report, the MPCA authorized follow-up sampling
at the Site which was conducted in August 2016 and included additional sampling of floor tile from the
on-site buildings and destructive sampling of the train car located at the Site. The results of the follow-up
sampling have been incorporated into this “revised” HazMat Inspection Report.
B. Scope of Services
The general scope of services for the HazMat Inspection included:
Visually examine accessible areas and identify locations of suspect asbestos-containing
material (ACM), lead, polychlorinated biphenyls (PCB), mercury, and other miscellaneous
hazardous material.
Collect and analyze representative bulk samples of materials suspected of containing
asbestos.
Conduct limited lead-based paint testing of painted surfaces suspected of containing lead.
Document the various materials' current conditions and ACM quantities.
Minnesota Pollution Control Agency
Project B1511698.01 September 30, 2016 Page 2
Generate a final report documenting the sample locations, analysis results, conditions, ACM
quantities and recommendations.
C. Site Description
The Site located at 109 Main Avenue East in Frazee, Minnesota. The building consists of multiple
individual buildings connected through doorways. The building consists of a single-story wood, metal,
concrete block and masonry structure with three individual basements. There are six individual (but
connected) buildings that were constructed between 1900 and 1906, and encompasses 17,700 square
feet. The typical interior finishes include sheetrock/joint compound, plaster, floor tile, lay-in ceiling
panels, vinyl sheet flooring and carpet. A railroad train car is located within the lower west showroom of
the buildings. The exterior of the buildings has wood and metal siding with an asphalt roof shingle, rock
and tar, and rubber membrane roof system. The buildings were vacant and unoccupied at the time of the
inspection.
D. Results
D.1. Asbestos
Seventy-eight bulk samples were collected from the site buildings on May 26, 2016 and June 1, 2016. The
samples were submitted to EMSL Analytical, Inc. (EMSL) in Plymouth, Minnesota for analysis. The follow-
up sampling was conducted on August 22, 2016 and included collection of several floor tiles (Sample No.
35 and 36), and a floor tile sample from within the train car (Sample No. 56). These additional samples
were submitted to EMSL for asbestos analysis using the Polarized Light Microscopy (PLM) method.
D.1.a. Asbestos-Containing Materials
The following is a summary of building materials found to contain greater than one percent asbestos
(asbestos-containing materials by regulatory definition).
2-foot by 4-foot ceiling panels with pinholes and fissures located in the east showroom
contained 2% chrysotile (asbestos).
Brown adhesive associated with the wood wall paneling in the east showroom contained 5%
chrysotile.
Minnesota Pollution Control Agency
Project B1511698.01 September 30, 2016 Page 3
Tan adhesive associated with the foam insulation in the east showroom contained 8%
chrysotile.
Black adhesive associated with the wood wall paneling in the east showroom contained 6%
chrysotile.
Troweled ceiling texture located in the basement of the east showroom contained 3%
Chrysotile.
9-inch by 9-inch brown floor tile located in the middle showroom contained 8% chrysotile;
the associated black felt mastic was non-detect.
9-inch by 9-inch black floor tile located in the train car (underneath the carpet) contained
12% chrysotile; the associated filler, tar paper, and brown/tan mastics were non-detect.
Residual air-o-cell pipe wrap located in the center wall of the middle showroom basement
contained 75% chrysotile.
12-inch by 12-inch green floor tile located in the upper west showroom contains 12%
chrysotile; the associated black/tan/brown mastics were non-detect.
12-inch by 12-inch tan floor tile located in the upper west showroom contains 12%
chrysotile; the associated black mastic was non-detect.
Sheet flooring with cobblestone pattern located in the upper west showroom bathroom
contained 35% chrysotile.
Pipe wrap around the 8-inch air duct pipe located in the upper west showroom basement
contained 40% chrysotile.
9-inch by 9-inch brown floor tile contained 6% chrysotile, its associated mastic was non-
detect.
Tar flashing (black), located in the west warehouse former roof line contained 15%
chrysotile.
Tar flashing (black), located on the roof contained 6% chrysotile.
Tar flashing (black with white surface) contained 10% chrysotile.
Minnesota Pollution Control Agency
Project B1511698.01 September 30, 2016 Page 4
D.1.b. Non-Asbestos-Containing Materials
The following is a summary of building materials found to contain no asbestos, or materials that contain
one percent or less asbestos (non-asbestos-containing materials by regulatory definition).
12-in by 12-in green floor tile and black adhesive
12-in by 12-in tan floor tile and black adhesive
18-in by 18-in ceiling tile – painted black surface
1-foot by 1-foot ceiling tile – white
2-foot by 4-foot ceiling panel – textured – pinhole and fissures
9-in by 9-in brown floor tile with black mastic
Adhesive (black) – carpet
Adhesive (black) – mirror
Adhesive (grey) – roof membrane
Adhesive (yellow) – carpet
Caulking (black) – roofing
Caulking (grey/tan) – Exterior windows
Caulking (white) – exterior utility piping
Caulking (white) – exterior wall paneling
Caulking (yellow ) – Exterior windows
Ceiling and wall plaster (grey)
Ceiling and wall plaster (yellow and grey)
Ceiling texture material – popcorn
Chimney patch
Clay block (red) and grey mortar
Floor filler (grey)
Furnace vibration gasket - grey
Insulation (brown) – blown in
Interior stucco - grey
Rock and tar roofing
Sheet flooring – 12-in by 12-in slate pattern
Sheet flooring – 3-in by 3-in beige tile pattern
Sheet flooring – 4-in by 4-in white tile pattern
Sheet flooring – tan floral pattern
Sheetrock/joint compound – pink
Sheetrock/joint compound – white
Tan vinyl baseboard with tan adhesive
Tar paper (black) – basement ceiling
Minnesota Pollution Control Agency
Project B1511698.01 September 30, 2016 Page 5
Tar paper (black) – under red shingles
Tar paper (black) – under rubber membrane
Tar shingles (black) with yellow adhesive
Tar shingles (red)
Train car roof membrane and adhesive
Train car window glaze (pink)
Wall plaster (grey) – fiber board backing
Table I, included in Appendix A, lists individual functional spaces of the building, the suspect materials
identified in that functional space, whether the suspect material was identified by analysis to be an
asbestos-containing material, an estimated amount of each suspect material for the functional space,
and includes condition, assessment categories and hazard ratings based on subjective observations made
by our representatives.
Table II, included in Appendix B, lists the homogenous material sample numbers, sample locations,
suspect material descriptions, and the analysis results for each sample. This table summarizes the results
from the Bulk Asbestos Laboratory Report, which is included in Appendix D. A sample location map is
attached in Appendix E.
Bulk asbestos analysis was conducted in accordance with the Environmental Protection Agency's (EPA)
Method 40 CFR, Chapter 1, Part 763, Subpart F, and Appendix A (7/1/87 Edition).
D.2. Lead-Based Paint
Testing of limited building components for lead-based paint was accomplished utilizing a Niton XL X-Ray
Fluorescence (XRF) field portable analyzer, Model No. XLP303A - Serial No. 22287, equipped with a
40-milocurie CD-109 source - Serial No. TR2026, installed on December 29, 2011.
Analysis decision-making protocols were based on compliance with the United States (US) EPA and
Minnesota Department of Health (MDH), which consider any x-ray fluorescence (XRF) result of 1.0
milligram per square centimeter (mg/cm2) or greater to be “lead-based paint”.
Table III, included in Appendix D, lists the sample numbers, sample locations, component descriptions,
XRF field results, and the paint condition for each sample. No “lead-based paint” was detected on the
limited building components tested.
Minnesota Pollution Control Agency
Project B1511698.01 September 30, 2016 Page 6
D.3. Miscellaneous Regulated Waste
A visual inspection for miscellaneous regulated waste materials that require separate handling and
disposal prior to disturbance during building demolition was also performed as part of this assessment.
The following is a list of items documented at the Site:
D.3.a. Poly-Chlorinated Biphenyls (PCBs)
Transformers
Capacitors
Light ballasts
D.3.b. Mercury
Batteries – smoke detectors, emergency lighting
Lighting – fluorescent lamps
Heating –unit heater controls, thermostats, ceiling-mounted heaters
Electrical Systems – electrical panels
D.3.c. Chlorofluorocarbons (CFCs) and Hydro chlorofluorocarbons (HCFCs)
Refrigerants – HVAC units, air-conditioning units
D.3.d. Hazardous Waste
Petroleum products – oils in lawn mower motors and door closers
Chemicals – 1–gallon and 5-gallon paints cans, aerosol paints, screen printing inks, 55-gallon
drum of solvent (mineral spirits)
D.3.e. Miscellaneous
Microwave oven
Computer and monitor
Water heater
Miscellaneous cleaning
supplies
Door closers
Central air conditioners
Walk-in cooler
Silicon spray lubricant
Printer inks
Electronic equipment
Fan units
Electric motors
Pumps
Compressors
Computer panels
Minnesota Pollution Control Agency
Project B1511698.01 September 30, 2016 Page 7
E. Discussion
E.1. Asbestos-Containing Materials
E.1.a. Friable ACM
The following asbestos-containing materials are classified as friable materials according to EPA 40 CFR
Part 61 National Emission Standard for Hazardous Air Pollutants (NESHAPs):
2-foot by 4-foot ceiling panels with pinholes and fissures located in the east showroom
contained 2% chrysotile.
Residual air-o-cell pipe wrap located in the center wall of the middle showroom basement
contained 75% chrysotile.
Pipe wrap around the 8-inch air duct pipe located in the upper west showroom basement
contained 40% chrysotile.
Sheet flooring with cobblestone pattern located in the upper west showroom bathroom
contained 35% chrysotile.
Troweled ceiling texture located in the basement of the east showroom contained 3%
chrysotile.
The above friable ACMs were observed to be in damaged and significantly damaged conditions at the
time of our assessment. Friable ACMs are to be removed prior to disturbance by demolition in
accordance with applicable state and federal regulations.
E.1.b. Category I Non-Friable ACM
The following asbestos-containing materials are classified as Category I non-friable materials as defined
by EPA NESHAPs:
9-inch by 9-inch brown floor tile located in the middle showroom contained 8% chrysotile, its
associated black felt mastic was non-detect.
9-inch by 9-inch black floor tile located in the train car (underneath the carpet) contained
12% chrysotile; the associated filler, tar paper, and brown/tan mastics were non-detect.
Minnesota Pollution Control Agency
Project B1511698.01 September 30, 2016 Page 8
12-inch by 12-inch green floor tile located in the upper west showroom contains 12%
chrysotile; the associated black/tan/brown mastics were non-detect.
12-inch by 12-inch tan floor tile located in the upper west showroom contains 12%
chrysotile; the associated black mastic was non-detect.
9-inch by 9-inch brown floor tile contained 6% chrysotile; the associated mastic was non-
detect.
Brown adhesive associated with the wood wall paneling in the east showroom contained 5%
chrysotile.
Tan adhesive associated with the foam insulation in the east showroom contained 8%
chrysotile.
Black adhesive associated with the wood wall paneling in the east showroom contained 6%
chrysotile.
Tar flashing (black), located in the west warehouse former roof line contained 15%
chrysotile.
Tar flashing (black), located on the roof contained 6% chrysotile.
The above Category I non-friable ACMs were observed to be in good to significantly damaged condition
at the time of our assessment. Category I non-friable ACMs are not considered a hazard unless cut,
drilled, sanded, or otherwise abraded. However, any Category I material that may become friable during
demolition must be removed prior to that activity. Category I materials in good condition may be left in
place for demolition. However, if left in place, the crushing or recycling of demolition debris is strictly
prohibited. In addition, all demolition debris containing Category I materials must be disposed of at a
landfill specifically permitted to accept this type of waste.
E.1.c. Category II Non-Friable ACM
No Category II non-friable ACM as defined by EPA NESHAPs was identified during the inspection.
E.2. Lead-Based Paint
No lead-based paint was detected by the limited testing conducted. The U.S. OSHA Lead in Construction
Standard 29 Code of Federal Regulations (CFR) 1926.62 applies to all situations where employees are
engaged in the disturbance of lead-containing coatings, regardless of the quantity of lead involved.
Minnesota Pollution Control Agency
Project B1511698.01 September 30, 2016 Page 9
Therefore, any XRF result above 0.0 mg/cm2 is considered “lead-containing coatings” in order to be in
compliance with the OSHA standard. Demolition of the building may involve disturbing lead-containing
coatings. Contractors should be informed of the presence of lead coatings and that they will be required
to comply with the OSHA lead standard.
E.3. Miscellaneous Regulated Waste
In the case of building renovation/demolition, any of the miscellaneous regulated waste items listed
in Section C.3 that will be disturbed, must be removed prior to disturbance and must be recycled or
disposed of in accordance with state and federal guidelines.
F. Limitations
In any building, the potential exists for hazardous building materials to be located inside walls, above
ceilings, under floors, and other inaccessible areas. Destructive investigation was performed in an
attempt to locate hazardous materials in inaccessible areas of the building. However, it was not feasible
to inspect 100 percent of these areas. Also, the potential exists for hazardous materials to be found
outside the building buried underground. Braun Intertec cannot be held responsible for the presence of
any such hidden materials. In the case of building demolition, contractors involved in the project should
be made aware of this potential. If previously unidentified suspect hazardous building materials are
exposed during their activities they should be sampled and analyzed for content prior to any disturbance.
In performing its services, Braun Intertec used that degree of care and skill ordinarily exercised under
similar circumstances by reputable members of its profession currently practicing in the same locality.
No warranty, express or implied, is made.
Appendix A
Table I. Asbestos Building Inspection Results
Table I. Asbestos Building Inspection Results
Client: Minnesota Pollution Control Agency
Location: Gary's Furniture - 109 Main Avenue East, Frazee, MN
Date of Inspection: May 26, June 1, and August 22, 2016
Project: B1511698.01
Functional SpaceHomogeneous Material
Description
Contains
Asbestos
(Yes/No)
Ref. Client
Sample No.
(See Table II)
Material
Condition1
Hazard
Category2
East ShowroomCeiling Tile - 2 ft x 4 ft,
pinhole fissuresYes 1 5,000 ft.² D 3
East ShowroomAdhesive - wall panel,
brownYes 2 100 ft.² D 3
East ShowroomAdhesive - foam insulation,
tanYes 3 100 ft.² ND 1
East Showroom Adhesive - wall panel, black Yes 4 400 ft.² ND 1
East Showroom Carpet Adhesive - yellow No 5 6,000 ft.² D 0
East ShowroomSheet flooring, 4-in by 4-
in tile pattern, whiteNo 6 3,000 ft.² D 0
East Showroom Floor filler, grey No 7 150 lin. ft. ND 0
East ShowroomSheet flooring, tan floral
patternNo 8 200 ft.² SD 0
East ShowroomSheetrock and joint
compoundNo 9 1,125 ft.² SD 0
East Showroom Ceiling Texture, white No 10a-e 1,880 ft.² SD 0
East ShowroomCeiling Texture - troweled,
whiteYes 11a-c 300 ft.² ND 2
East Showroom Brick and mortar No 12 160 ft.² D 0
East Showroom Chimney patch, grey No 13 1 ft.² D 0
East Showroom
Ceiling Tile, 2-ft by 4-ft
textured pinhole and
fissures
No 14 16 ft.² D 0
Estimated Quantity Units
Table I. Asbestos Building Inspection Results
Table I. Asbestos Building Inspection Results
109 Main Avenue East; Frazee, Minnesota
Project B1511698.01
Page 2
Functional SpaceHomogeneous Material
Description
Contains
Asbestos
(Yes/No)
Ref. Client
Sample No.
(See Table II)
Material
Condition1
Hazard
Category2Estimated Quantity Units
Middle Showroom Plaster, ceiling and wall, grey No 15a-g 4,350 ft.² SD 0
Middle Showroom Sheetrock, pink No 16 290 ft.² ND 0
Middle Showroom Vibration Gasket, grey No 17 2 gaskets SD 0
Middle Showroom
Floor tile, 9-in by 9-in,
brown with black mastic
felt
Yes 18 2,100 ft.² SD 3
Middle ShowroomSheet flooring, 12-in by 12-in
slate patternNo 19 15 ft.² SD 0
Middle ShowroomCove base, 4' tan with tan
adhesiveNo 20
15 lin. ft.SD 0
Middle ShowroomSheet Flooring, 3-in by 3-in
beige patternNo 21 4 ft.² SD 0
Middle Showroom Residual Airocell pipewrap Yes 22 <1 lin. Ft. SD 5
Middle ShowroomCeiling Tile, 1-ft by 1-ft,
whiteNo 23 800 ft.² SD 0
Middle Showroom Carpet Adhesive - black No 24 1,000 ft.² ND 0
Lower West ShowroomSheetrock and joint
compoundNo 25 1,200 ft.² ND 0
Lower West Showroom Plaster, yellow and grey No 26a-e 1,200 ft.² ND 0
Lower West Showroom Stucco, grey No 27a-e 800 ft.² ND 0
Lower West ShowroomClay block (red) with grey
mortarNo 28 960 ft.² ND 0
Lower West Showroom Insulation - blown in, brown No 29a-c 4,250 ft.² ND 0
Lower West Showroom
(Train Car)Roofing membrane, black No 30 500 ft.² F 0
Table I. Asbestos Building Inspection Results
109 Main Avenue East; Frazee, Minnesota
Project B1511698.01
Page 3
Functional SpaceHomogeneous Material
Description
Contains
Asbestos
(Yes/No)
Ref. Client
Sample No.
(See Table II)
Material
Condition1
Hazard
Category2Estimated Quantity Units
Lower West Showroom
(Train Car)Window glaze, pink No 31 50 windows ND 0
Upper West ShowroomPlaster, grey with board
backingNo 32a-c 3,000 ft.² D 0
Upper West ShowroomCeiling Tile, 1-ft by 1-ft with
pinholes, brown paintedNo 33 2,500 ft.² SD 0
Upper West Showroom Adhesive - Mirror, black No 34 4 mirrors ND 0
Upper West ShowroomFloor tile, 12-in by 12-in
green with black masticYes 35 SD 3
Upper West ShowroomFloor tile, 12-in by 12-in tan
with black masticYes 36 SD 3
Upper West ShowroomCeiling Tile, 18-in by 18-in,
black surfacedNo 37 400 ft.² SD 0
Upper West ShowroomSheetflooring, cobblestone
patternYes 38 20 ft.² SD 3
Upper West Showroom Pipewrap, 8-in air duct pipe Yes 39 1 lin. ft. SD 5
Upper West Showroom Tar paper, on ceiling, black No 40 24 ft.² SD 0
West Warehouse Floor tile, 9-in by 9-in,
brown with black masticYes 41 150 ft.² SD 3
West Warehouse Tar Flashing, black, from old
roof lineYes 42 90 ft.² SD 1
Roof Tar Paper No 43 6,250 ft.² ND 0
RoofAdhesive, grey, under
membraneNo 44 6,250 ft.² ND 0
RoofCaulking, black, around air
exchangerNo 45 200 lin. ft. ND 0
Roof Rock and Tar roofing No 46 2,550 ft.² ND 0
1,200 ft.²
Table I. Asbestos Building Inspection Results
109 Main Avenue East; Frazee, Minnesota
Project B1511698.01
Page 4
Functional SpaceHomogeneous Material
Description
Contains
Asbestos
(Yes/No)
Ref. Client
Sample No.
(See Table II)
Material
Condition1
Hazard
Category2Estimated Quantity Units
RoofTar shingles, with yellow
adhesiveNo 47 400 ft.² ND 0
Roof Tar Flashing, Black Yes 48 160 lin. ft. ND 1
Roof Tar Flashing, white Yes 49 100 lin. ft. ND 1
Roof Tar Paper, black No 50 4,250 ft.² ND 0
ExteriorCaulking, white - around
utility pipesNo 51 2 lin. ft. ND 0
ExteriorCaulking, white - on brown
wall panellingNo 52 6 lin. ft. ND 0
Exterior Caulking, yellow - windows No 53 2 windows ND 0
Exterior Caulking, grey/tan - windows No 54 4 windows ND 0
Roof Tar shingles, red No 55 4,250 ft.² ND 0
Lower West Showroom
(Train Car)
Floor Tile, 9-in by 9-in,
with tar paper layer; tan
and brown mastic
Yes 56 500 ft.² ND 1
1. Condition of ACM:
ND = Not Damaged
D = Damaged
SD = Significantly Damaged
2. Hazard Category:
0 = No hazard - material does not contain asbestos
1 = ACM with potential for damage
2 = ACM with potential for significant damage
3 = Damaged or significantly damaged asbestos-containing miscellaneous material
4 = Damaged or significantly damaged friable asbestos-containing thermal system insulation
5 = Damaged or significantly damaged friable asbestos-containing surfacing material
Appendix B
Table II. Bulk Asbestos Analytical Results
Table II. Bulk Asbestos Analytical Results
Client: Minnesota Pollution Control Agency
Location: Gary's Furniture - 109 Main Avenue East, Frazee, MN
Date of Inspection: May 26, June 1, and August 22, 2016
Project: B1511698.01
Sample No. Material
1 East Showroom Ceiling Tile - 2 ft x 4 ft, pinhole fissures
2 East Showroom First Floor East Wall Adhesive - wall panel, brown
3 East Showroom First Floor East Wall Adhesive - foam insulation, tan
4 East Showroom Adhesive - wall panel, black
5 East Showroom Carpet Adhesive - yellow
6 East ShowroomSheet flooring, 4-in by 4-in tile
pattern, white
7 East Showroom Floor filler, grey
8 East Showroom Sheet flooring, floral pattern
9 East Showroom First Floor North Room Sheetrock and joint compound
10a East Showroom First Floor North Room Ceiling Texture, white
10b East Showroom First Floor North Room Ceiling Texture, white
10c East Showroom First Floor North Room Ceiling Texture, white
10d East Showroom First Floor North Room Ceiling Texture, white
10e East Showroom First Floor North Room Ceiling Texture, white
11a East Showroom Basement Ceiling Ceiling Texture - troweled, white
11b East Showroom Basement Ceiling Ceiling Texture - troweled, white Not Analyzed
6% Chrysotile
ND
ND
ND
ND
Sample Location Asbestos %
2% Chrysotile
5% Chrysotile
8% Chrysotile
ND
ND
ND
3% Chrysotile
ND
First Floor
First Floor
First Floor ND
NDFirst Floor
First Floor
First Floor
Table II. Bulk Asbestos Analytical Results
Table II. Bulk Asbestos Analytical Results
109 Main Avenue East, Frazee, MN
Project B1511698.01
Page 2
Sample No. MaterialSample Location Asbestos %
2% ChrysotileFirst Floor 11c East Showroom Basement Ceiling Ceiling Texture - troweled, white
12 East Showroom Basement Chimney Brick and mortar
13 East showroom Basement Chimney Chimney patch, grey
14Middle Show
RoomSouth Room Ceiling
Ceiling Tile, 2-ft by 4-ft textured
pinhole and fissures
15aMiddle Show
RoomSouth Room South wall Plaster, ceiling and wall, grey
15bMiddle Show
RoomSouth Room East wall Plaster, ceiling and wall, grey
15cMiddle Show
RoomSouth Room Ceiling Plaster, ceiling and wall, grey
15dMiddle Show
RoomSouth Room East wall Plaster, ceiling and wall, grey
15eMiddle Show
RoomSouth Room North wall Plaster, ceiling and wall, grey
15fMiddle Show
RoomSouth Room West wall Plaster, ceiling and wall, grey
15gMiddle Show
RoomSouth Room West Wall Plaster, ceiling and wall, grey
16Middle Show
Room
Middle
BackroomOffice Sheetrock, pink
17Middle Show
RoomNorth Room Furnace Vibration Gasket, grey
18Middle Show
RoomShowroom Floor
Floor tile, 9-in by 9-in, brown with
black mastic felt
19Middle Show
RoomBathroom Floor
Sheet flooring, 12-in by 12-in slate
pattern
20Middle Show
RoomBathroom Floor Cove base, 4' tan with tan adhesive
21Middle Show
RoomBathroom Under sink
Sheet Flooring, 3-in by 3-in beige
pattern
22Middle Show
RoomBasement Middle Wall Residual Airocell pipewrap
ND
Not Analyzed
ND
ND
ND
ND
ND
ND
ND
ND
8% Chrysotile
ND
ND
ND
ND
ND
ND
75% Chrysotile
Table II. Bulk Asbestos Analytical Results
109 Main Avenue East, Frazee, MN
Project B1511698.01
Page 3
Sample No. MaterialSample Location Asbestos %
2% ChrysotileFirst Floor 23Middle Show
RoomBasement Ceiling Ceiling Tile, 1-ft by 1-ft, white
24Middle Show
RoomLoft Floor Carpet Adhesive - black
25Lower West
ShowroomSheetrock and joint compound
26aLower West
ShowroomPlaster, yellow and grey
26bLower West
ShowroomPlaster, yellow and grey
26cLower West
ShowroomPlaster, yellow and grey
26dLower West
ShowroomPlaster, yellow and grey
26eLower West
ShowroomPlaster, yellow and grey
27aLower West
ShowroomStucco, grey
27bLower West
ShowroomStucco, grey
27cLower West
ShowroomStucco, grey
27dLower West
ShowroomStucco, grey
27eLower West
ShowroomStucco, grey
28Lower West
ShowroomClay block (red) with grey mortar
29aLower West
ShowroomInsulation - blown in, brown
29bLower West
ShowroomInsulation - blown in, brown
29cLower West
ShowroomInsulation - blown in, brown
30Lower West
ShowroomTrain car Roof Roofing membrane, black
ND
ND
ND
East Wall ND
ND
ND
NDWest Wall
West Wall
East Wall
East Wall
West Wall
West Wall ND
ND
ND
Loft
Loft
East Wall
East Wall
West Wall
West Wall
West Wall
Loft ND
ND
ND
ND
ND
ND
ND
ND
Table II. Bulk Asbestos Analytical Results
109 Main Avenue East, Frazee, MN
Project B1511698.01
Page 4
Sample No. MaterialSample Location Asbestos %
2% ChrysotileFirst Floor 31Lower West
ShowroomTrain car Windows Window glaze, pink
32aLower West
ShowroomPlaster, grey with board backing
32bLower West
ShowroomPlaster, grey with board backing
32cLower West
ShowroomPlaster, grey with board backing
32dLower West
ShowroomPlaster, grey with board backing
32eLower West
ShowroomPlaster, grey with board backing
33Upper West
ShowroomSouth Room Ceiling
Ceiling Tile, 1-ft by 1-ft with pinholes,
brown painted
34Upper West
ShowroomAdhesive - Mirror, black
35Upper West
Showroom
Floor tile, 12-in by 12-in green with
black mastic
36Upper West
Showroom
Floor tile, 12-in by 12-in tan with black
mastic
37Upper West
ShowroomNorth Room Ceiling
Ceiling Tile, 18-in by 18-in, black
surfaced
38Upper West
ShowroomSheetflooring, cobblestone pattern
39Upper West
ShowroomPipewrap, 8-in air duct pipe
40Upper West
ShowroomTar paper, on ceiling, black
41West
Warehouse
Floor tile, 9-in by 9-in, brown with
black mastic
42West
WarehouseTar Flashing, black, from old roof line
43 East Showroom Tar Paper
44 East Showroom Adhesive, grey, under membrane
40% Chrysotile
ND
6% Chrysotile
12% Chrysotile
ND
ND
ND
12% Chrysotile
15% Chrysotile
ND
ND
35% Chrysotile
ND
ND
West Wall
1st Floor
1st Floor
ND
ND
Ceiling
Ceiling
ND
South Wall
ND
Ceiling
Ceiling
Ceiling
Bathroom
Basement
Basement
Entryway to west showroom
Roof
Roof
Table II. Bulk Asbestos Analytical Results
109 Main Avenue East, Frazee, MN
Project B1511698.01
Page 5
Sample No. MaterialSample Location Asbestos %
2% ChrysotileFirst Floor 45 East Showroom Caulking, black, around air exchanger
46Middle Show
RoomRock and Tar roofing
47Middle Show
RoomTar shingles, with yellow adhesive
48Middle Show
RoomTar Flashing, Black
49 East Showroom Tar Flashing, white
50 West Showroom Tar Paper, black
51 Caulking, white - around utility pipes
52Caulking, white - on brown wall
panelling
53 Caulking, yellow - windows
54 Caulking, grey/tan - windows
55 West Showroom Tar shingles, red
56Lower West
ShowroomTrain car
Flooring (Under
Carpet)
Floor Tile, 9-in by 9-in, with tar paper
layer; tan and brown mastic
* Materials containing 1 percent of asbestos or less are not considered to be asbestos-containing materials by the U.S.EPA.
1. Asbestos content is indicated as an approximate percent by area.
2. N.D. = None Detected
3. NA = Not Analyzed
4. < = Less than
12% Chrysotile
ND
ND
ND
ND
ND
6% Chrysotile
10% Chrysotile- black layer only
ND
ND
ND
NDExterior
Exterior
Roof
Exterior
Exterior
Roof
Roof
Roof
Roof
Roof
Roof
Appendix C
Table III. Lead-Based Paint Testing Results
Table III. Lead-Based Paint Testing
Client: Minnesota Pollution Control Agency
Location: Gary's Furniture - 109 Main Avenue East, Frazee, MN
Date of Inspection: May 26, 2016 and June 1, 2016
Project: B1511698.00
Sample
I.D. No. Results
Paint
Condition
G = Good
P = Peeling
-- 1.1 ---
-- 1.1 ---
-- 1.0 ---
1 Ceiling Support Truss Metal Read 0.02 G
2 Basement Support Beam Metal White 0.01 P
3 Basement Floor Concrete Red 0.04 P
4 Basement Walls Cinderblock White 0.00 P
5 Basement East Wall Cinderblock Grey/Yellow 0.00 P
6 West Wall Pipe Metal Yellow 0.00 P
7 West Wall Pipe Metal Maroon 0.01 G
8East Show
RoomFurnace Room South Wall Wall Cinderblock White 0.00 G
9 Exterior Wall Wall Metal White 0.01 G
10 Roof Roof Metal White 0.01 P
11 Siding Siding Metal Yellow 0.02 P
12 Exterior Wall Garage Door Trim Metal White 0.00 P
Component DescriptionRoom/Area
Surface
Buried
Surface
Calibration
Calibration
Calibration
East Show Room
East Show Room
East Show Room
Middle Warehouse
109 Main Avenue East, Frazee, MN
East Show Room
East Show Room
East Show Room
East Show Room
East Warehouse
East Warehouse
West Warehouse
Table III. Lead-Based Paint Testing
Table III. Lead-Based Paint Testing
109 Main Avenue East; Frazee Minnesota
Project B1511698.00
Page 2
Sample
I.D. No. Results
Paint
Condition
G = Good
P = PeelingComponent DescriptionRoom/Area
SurfaceCalibration13 Exterior Wall Siding Metal Yellow 0.08 G
14 Exterior Door Metal Blue 0.30 G
15 Exterior Siding Metal Brown 0.00 P
16 Exterior Window Sash Metal Tan 0.00 P
17 Exterior Support Beam Metal Black 0.40 G
18 Exterior Support Beam Metal Black 0.18 P
19 Exterior Awning Metal White 0.01 P
20 Exterior Siding Metal White 0.01 G
mg/cm2 = milligrams of lead per square centimeter of paint
West Warehouse
Building Front
Building Front
Building Front
Building Front
Building Front
Building Front
Building Front
Appendix D
Bulk Asbestos Analysis Reports
EMSL Analytical, Inc.14375 23rd Avenue North Minneapolis, Mn 55447
Tel/Fax: (763) 449-4922 / (763) 449-4924
http://www.EMSL.com / [email protected]
351603526EMSL Order:
Customer ID: BRAU50
Customer PO:
Project ID:
Attention: Phone:Steve Luth (952) 995-2688
Fax:Braun Intertec (952) 995-2020
Received Date:11001 Hampshire Avenue South 06/01/2016 9:25 AM
Analysis Date:Bloomington, MN 55438 06/06/2016
Collected Date: 05/27/2016
Project: B1511698.00
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light
Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
1
351603526-0001
2% ChrysotileNon-fibrous (Other)8%Cellulose
Glass
45%
45%
Gray/White
Fibrous
Homogeneous
East Showroom, First
Floor, Ceiling Tile - 2
ft x 4 ft, pinhole
fissures
2
351603526-0002
5% ChrysotileNon-fibrous (Other)95%Brown
Non-Fibrous
Homogeneous
East Showroom, First
Floor, East Wall,
Adhesive - wall panel,
brown
3
351603526-0003
8% ChrysotileNon-fibrous (Other)92%Tan
Non-Fibrous
Homogeneous
East Showroom, First
Floor, East Wall,
Adhesive - foam
insulation, tan
4
351603526-0004
6% ChrysotileNon-fibrous (Other)94%Black
Non-Fibrous
Homogeneous
East Showroom, First
Floor, Adhesive - wall
panel, black
5
351603526-0005
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
East Showroom, First
Floor, Carpet
Adhesive - yellow
6-Sheet Flooring
351603526-0006
None DetectedNon-fibrous (Other)75%Cellulose
Synthetic
5%
20%
White
Fibrous
Homogeneous
East Showroom, First
Floor, Sheet flooring,
4-in by 4-in tile
pattern, white
6-Adhesive
351603526-0006A
None DetectedNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
East Showroom, First
Floor, Sheet flooring,
4-in by 4-in tile
pattern, white
7-Filler
351603526-0007
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
East Showroom, First
Floor, Floor filler, grey
7-Adhesive
351603526-0007A
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
East Showroom, First
Floor, Floor filler, grey
8-Clear Adhesive
351603526-0008
None DetectedNon-fibrous (Other)100%Clear
Non-Fibrous
Homogeneous
East Showroom, First
Floor, Sheet flooring,
floral pattern
8-Sheet Flooring
351603526-0008A
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
East Showroom, First
Floor, Sheet flooring,
floral pattern
8-Yellow Adhesive
351603526-0008B
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
East Showroom, First
Floor, Sheet flooring,
floral pattern
9
351603526-0009
None DetectedNon-fibrous (Other)90%Cellulose
Glass
5%
5%
White
Fibrous
Homogeneous
East Showroom, First
Floor, North Room,
Sheetrock and joint
compound
This result is a composite of sheetrock and joint compound layers.
10a
351603526-0010
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
East Showroom, First
Floor, North Room,
Ceiling Texture, white
Initial Report From: 06/06/2016 13:16:39
Page 1 of 6PLM - 1.69 Printed: 6/6/2016 12:16 PM
EMSL Analytical, Inc.14375 23rd Avenue North Minneapolis, Mn 55447
Tel/Fax: (763) 449-4922 / (763) 449-4924
http://www.EMSL.com / [email protected]
351603526EMSL Order:
Customer ID: BRAU50
Customer PO:
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light
Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
10b
351603526-0011
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
East Showroom, First
Floor, North Room,
Ceiling Texture, white
10c
351603526-0012
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
East Showroom, First
Floor, North Room,
Ceiling Texture, white
10d
351603526-0013
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
East Showroom, First
Floor, North Room,
Ceiling Texture, white
10e
351603526-0014
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
East Showroom, First
Floor, North Room,
Ceiling Texture, white
11a
351603526-0015
3% ChrysotileNon-fibrous (Other)97%Gray
Non-Fibrous
Homogeneous
East Showroom,
Basement, Ceiling,
Ceiling Texture -
troweled, white
11b
351603526-0016
Positive Stop (Not Analyzed)East Showroom,
Basement, Ceiling,
Ceiling Texture -
troweled, white
11c
351603526-0017
Positive Stop (Not Analyzed)East Showroom,
Basement, Ceiling,
Ceiling Texture -
troweled, white
12-Brick
351603526-0018
None DetectedNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
East Showroom,
Basement, Chimney,
Brick and mortar
12-Mortar
351603526-0018A
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
East Showroom,
Basement, Chimney,
Brick and mortar
13
351603526-0019
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
East Showroom,
Basement, Chimney,
Chimney patch, grey
14
351603526-0020
None DetectedPerlite10%Cellulose
Glass
45%
45%
Gray/White
Fibrous
Homogeneous
Middle Show Room,
South Room, Ceiling,
Ceiling Tile, 2-ft by
4-ft textured pinhole
and fissures
15a
351603526-0021
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Middle Show Room,
South Room, South
wall, Plaster, ceiling
and wall, grey
15b
351603526-0022
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Middle Show Room,
South Room, East
wall, Plaster, ceiling
and wall, grey
15c
351603526-0023
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Middle Show Room,
South Room, Ceiling,
Plaster, ceiling and
wall, grey
15d
351603526-0024
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Middle Show Room,
South Room, East
wall, Plaster, ceiling
and wall, grey
15e
351603526-0025
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Middle Show Room,
South Room, North
wall, Plaster, ceiling
and wall, grey
Initial Report From: 06/06/2016 13:16:39
Page 2 of 6PLM - 1.69 Printed: 6/6/2016 12:16 PM
EMSL Analytical, Inc.14375 23rd Avenue North Minneapolis, Mn 55447
Tel/Fax: (763) 449-4922 / (763) 449-4924
http://www.EMSL.com / [email protected]
351603526EMSL Order:
Customer ID: BRAU50
Customer PO:
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light
Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
15f
351603526-0026
None DetectedNon-fibrous (Other)95%Hair5%White
Non-Fibrous
Homogeneous
Middle Show Room,
South Room., West
wall, Plaster, ceiling
and wall, grey
15g
351603526-0027
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Middle Show Room,
South Room, West
Wall, Plaster, ceiling
and wall, grey
16
351603526-0028
None DetectedNon-fibrous (Other)90%Cellulose10%White/Pink
Non-Fibrous
Homogeneous
Middle Show Room,
Middle Backroom,
Office, Sheetrock,
pink
This result is a composite of sheetrock and joint compound layers.
17
351603526-0029
None DetectedNon-fibrous (Other)10%Cellulose90%Gray
Fibrous
Homogeneous
Middle Show Room,
North Room,
Furnace, Vibration
Gasket, grey
18-Tan Mastic
351603526-0030
None DetectedNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
Middle Show Room,
Bathroom, Floor,
Floor tile, 9-in by 9-in,
brown with black
mastic felt
18-Floor Tile
351603526-0030A
8% ChrysotileNon-fibrous (Other)92%Brown
Non-Fibrous
Homogeneous
Middle Show Room,
Bathroom, Floor,
Floor tile, 9-in by 9-in,
brown with black
mastic felt
18-Black Mastic
351603526-0030B
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Middle Show Room,
Bathroom, Floor,
Floor tile, 9-in by 9-in,
brown with black
mastic felt
18-Tar Paper
351603526-0030C
None DetectedNon-fibrous (Other)50%Cellulose50%Black
Fibrous
Homogeneous
Middle Show Room,
Bathroom, Floor,
Floor tile, 9-in by 9-in,
brown with black
mastic felt
19-Sheet Flooring
351603526-0031
None DetectedNon-fibrous (Other)100%Brown/Gray
Non-Fibrous
Homogeneous
Middle Show Room,
Bathroom, Floor,
Sheet flooring, 12-in
by 12-in slate pattern
19-Adhesive
351603526-0031A
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Middle Show Room,
Bathroom, Floor,
Sheet flooring, 12-in
by 12-in slate pattern
20-Cove Base
351603526-0032
None DetectedNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
Middle Show Room,
Bathroom, Floor,
Cove base, 4' tan with
tan adhesive
20-Adhesive
351603526-0032A
None DetectedNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
Middle Show Room,
Bathroom, Floor,
Cove base, 4' tan with
tan adhesive
21
351603526-0033
None DetectedNon-fibrous (Other)80%Glass20%White
Fibrous
Homogeneous
Middle Show Room,
Bathroom, Under
sink, Sheet Flooring,
3-in by 3-in beigh
pattern
Initial Report From: 06/06/2016 13:16:39
Page 3 of 6PLM - 1.69 Printed: 6/6/2016 12:16 PM
EMSL Analytical, Inc.14375 23rd Avenue North Minneapolis, Mn 55447
Tel/Fax: (763) 449-4922 / (763) 449-4924
http://www.EMSL.com / [email protected]
351603526EMSL Order:
Customer ID: BRAU50
Customer PO:
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light
Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
22
351603526-0034
75% ChrysotileCellulose25%Gray
Fibrous
Homogeneous
Middle Show Room,
Basement, Middle
Wall, Residual
Airocell pipewrap
23
351603526-0035
None DetectedCellulose100%Tan/White
Fibrous
Homogeneous
Middle Show Room,
Basement, Ceiling,
Ceiling Tile, 1-ft by
1-ft, white
24
351603526-0036
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Middle Show Room,
Loft, Floor, Carpet
Adhesive - black
25
351603526-0037
Not SubmittedLower West
Showroom, West
Wall, Sheetrock and
joint compound
26a
351603526-0038
Not SubmittedLower West
Showroom, West
Wall, Plaster, yellow
and grey
26b
351603526-0039
Not SubmittedLower West
Showroom, West
Wall, Plaster, yellow
and grey
26c
351603526-0040
Not SubmittedLower West
Showroom, West
Wall, Plaster, yellow
and grey
26d
351603526-0041
Not SubmittedLower West
Showroom, West
Wall, Plaster, yellow
and grey
26e
351603526-0042
Not SubmittedLower West
Showroom, West
Wall, Plaster, yellow
and grey
27a
351603526-0043
Not SubmittedLower West
Showroom, East Wall,
Stucco, grey
27b
351603526-0044
Not SubmittedLower West
Showroom, East Wall,
Stucco, grey
27c
351603526-0045
Not SubmittedLower West
Showroom, East Wall,
Stucco, grey
27d
351603526-0046
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Lower West
Showroom, East Wall,
Stucco, grey
27e
351603526-0047
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Lower West
Showroom, East Wall,
Stucco, grey
28
351603526-0048
None DetectedNon-fibrous (Other)50%Cellulose50%Black
Fibrous
Homogeneous
Lower West
Showroom, West
Wall, Clay block (red)
with grey mortar
29a
351603526-0049
None DetectedCellulose100%Gray
Fibrous
Homogeneous
Lower West
Showroom, Loft,
Insulation - blown in,
brown
Initial Report From: 06/06/2016 13:16:39
Page 4 of 6PLM - 1.69 Printed: 6/6/2016 12:16 PM
EMSL Analytical, Inc.14375 23rd Avenue North Minneapolis, Mn 55447
Tel/Fax: (763) 449-4922 / (763) 449-4924
http://www.EMSL.com / [email protected]
351603526EMSL Order:
Customer ID: BRAU50
Customer PO:
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light
Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
29b
351603526-0050
None DetectedCellulose100%Gray
Fibrous
Homogeneous
Lower West
Showroom, Loft,
Insulation - blown in,
brown
29c
351603526-0051
None DetectedCellulose100%Gray
Fibrous
Homogeneous
Lower West
Showroom, Loft,
Insulation - blown in,
brown
30-Membrane
351603526-0052
None DetectedNon-fibrous (Other)80%Cellulose20%Black
Fibrous
Homogeneous
Lower West
Showroom, Train car,
Roof, Roofing
membrane, black
30-Fibrous Layer
351603526-0052A
None DetectedCellulose100%Brown
Fibrous
Homogeneous
Lower West
Showroom, Train car,
Roof, Roofing
membrane, black
31
351603526-0053
None DetectedNon-fibrous (Other)100%Pink
Non-Fibrous
Homogeneous
Lower West
Showroom, Train car,
Windows, Window
glaze, pink
32a-Plaster
351603526-0054
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Lower West
Showroom, Ceiling,
Plaster, grey with
board backing
32a-Backing
351603526-0054A
None DetectedCellulose100%Tan
Fibrous
Homogeneous
Lower West
Showroom, Ceiling,
Plaster, grey with
board backing
32b-Plaster
351603526-0055
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Lower West
Showroom, Ceiling,
Plaster, grey with
board backing
32b-Backing
351603526-0055A
None DetectedCellulose100%Tan
Fibrous
Homogeneous
Lower West
Showroom, Ceiling,
Plaster, grey with
board backing
32c
351603526-0056
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Lower West
Showroom, Ceiling,
Plaster, grey with
board backing
This sample only contains plaster.
33
351603526-0057
None DetectedCellulose100%Brown
Fibrous
Homogeneous
Upper West
Showroom, South
Room, Ceiling,
Plaster, grey with
board backing
34
351603526-0058
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Upper West
Showroom, West
Wall, Adhesive -
Mirror, black
35
351603526-0059
Not SubmittedUpper West
Showroom, 1st Floor,
Floor tile, 12-in by
12-in green with black
mastic
Initial Report From: 06/06/2016 13:16:39
Page 5 of 6PLM - 1.69 Printed: 6/6/2016 12:16 PM
EMSL Analytical, Inc.14375 23rd Avenue North Minneapolis, Mn 55447
Tel/Fax: (763) 449-4922 / (763) 449-4924
http://www.EMSL.com / [email protected]
351603526EMSL Order:
Customer ID: BRAU50
Customer PO:
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light
Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
36
351603526-0060
Not SubmittedUpper West
Showroom, 1st Floor,
Floor tile, 12-in by
12-in tan with black
mastic
37
351603526-0061
None DetectedCellulose100%Brown/Black
Fibrous
Homogeneous
Upper West
Showroom, North
Room, Ceiling,
Ceiling Tile, 18-in,
black surfaced
38
351603526-0062
35% ChrysotileNon-fibrous (Other)65%Gray
Fibrous
Homogeneous
Upper West
Showroom,
Bathroom,
Sheetflooring,
cobblestone pattern
32d
351603526-0063
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Lower West
Showroom, Ceiling,
Plaster, grey with
board backing
This sample only contains plaster.
32e
351603526-0064
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Lower West
Showroom, Ceiling,
Plaster, grey with
board backing
This sample only contains plaster.
Analyst(s)
Miles DelBusso (64) Rachel Travis, Laboratory Manager
or Other Approved Signatory
EMSL maintains liability limited to cost of analysis . This report relates only to the samples reported and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no
responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. This report must not be used by the client to claim
product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government . Non-friable organically bound materials present a problem matrix and therefore EMSL
recommends gravimetric reduction prior to analysis. Samples received in good condition unless otherwise noted. Estimated accuracy, precision and uncertainty data available upon request. Unless
requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Reporting limit is 1%
Samples analyzed by EMSL Analytical, Inc. Minneapolis, Mn NVLAP Lab Code 200019-0
Initial Report From: 06/06/2016 13:16:39
Page 6 of 6PLM - 1.69 Printed: 6/6/2016 12:16 PM
OrderID: 351603526
Page 1 Of 5
OrderID: 351603526
Page 2 Of 5
OrderID: 351603526
Page 3 Of 5
OrderID: 351603526
Page 4 Of 5
OrderID: 351603526
Page 5 Of 5
EMSL Analytical, Inc.14375 23rd Avenue North Minneapolis, Mn 55447
Tel/Fax: (763) 449-4922 / (763) 449-4924
http://www.EMSL.com / [email protected]
351603623EMSL Order:
Customer ID: BRAU50
Customer PO:
Project ID:
Attention: Phone:Steve Luth (952) 995-2688
Fax:Braun Intertec (952) 995-2020
Received Date:11001 Hampshire Avenue South 06/03/2016 9:15 AM
Analysis Date:Bloomington, MN 55438 06/08/2016
Collected Date: 06/01/2016
Project: B1511698.00
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light
Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
39
351603623-0001
40% ChrysotileNon-fibrous (Other)30%Cellulose30%Beige
Fibrous
Homogeneous
Upper West
Showroom,
Basement, Pipewrap,
8-in air duct pipe
40
351603623-0002
None DetectedNon-fibrous (Other)10%Cellulose90%Brown/Black
Fibrous
Homogeneous
Upper West
Showroom,
Basement, Tar paper,
on ceiling, black
41-Floor Tile
351603623-0003
6% ChrysotileNon-fibrous (Other)94%Brown
Non-Fibrous
Homogeneous
West Warehouse,
Entryway to west
showroom, Floor tile,
9-in by 9-in, brown
with black mastic
41-Mastic
351603623-0003A
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
West Warehouse,
Entryway to west
showroom, Floor tile,
9-in by 9-in, brown
with black mastic
42
351603623-0004
15% ChrysotileNon-fibrous (Other)85%Black
Non-Fibrous
Homogeneous
West Warehouse,
South Wall, Tar
Flashing, black, from
old roof line
43
351603623-0005
None DetectedNon-fibrous (Other)15%Cellulose
Glass
70%
15%
Gray/Black
Fibrous
Homogeneous
East Showroom,
Roof, Tar Paper under
foam and rubber
membrane
44-Gray Layer
351603623-0006
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
East Showroom,
Roof, Adhesive, grey,
under membrane
44-Blue Layer
351603623-0006A
None DetectedNon-fibrous (Other)80%Synthetic20%White/Blue
Fibrous
Homogeneous
East Showroom,
Roof, Adhesive, grey,
under membrane
44-White Layer
351603623-0006B
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
East Showroom,
Roof, Adhesive, grey,
under membrane
45
351603623-0007
None DetectedNon-fibrous (Other)95%Cellulose5%Black
Non-Fibrous
Homogeneous
East Showroom,
Roof, Caulking, black,
around air exchanger
46
351603623-0008
None DetectedNon-fibrous (Other)84%Cellulose
Hair
12%
4%
Black
Non-Fibrous
Homogeneous
Middle Show Room,
Roof, Rock and Tar
roofing
47-Shingle
351603623-0009
None DetectedMica
Non-fibrous (Other)
5%
37%
Cellulose
Hair
50%
8%
Black
Fibrous
Homogeneous
Middle Show Room,
Roof, Tar shingles,
with yellow adhesive
47-Adhesive
351603623-0009A
None DetectedNon-fibrous (Other)100%Tan/Yellow/Clear
Non-Fibrous
Homogeneous
Middle Show Room,
Roof, Tar shingles,
with yellow adhesive
Initial Report From: 06/08/2016 16:03:21
Page 1 of 2PLM - 1.69 Printed: 6/8/2016 3:03 PM
EMSL Analytical, Inc.14375 23rd Avenue North Minneapolis, Mn 55447
Tel/Fax: (763) 449-4922 / (763) 449-4924
http://www.EMSL.com / [email protected]
351603623EMSL Order:
Customer ID: BRAU50
Customer PO:
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light
Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
48
351603623-0010
6% ChrysotileNon-fibrous (Other)94%Black
Fibrous
Homogeneous
Middle Show Room,
Roof, Tar Flashing,
Black
49-White Layer
351603623-0011
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
East Showroom,
Roof, Tar Flashing,
white
49-Black Layer
351603623-0011A
10% ChrysotileNon-fibrous (Other)90%Black
Non-Fibrous
Homogeneous
East Showroom,
Roof, Tar Flashing,
white
50
351603623-0012
None DetectedNon-fibrous (Other)10%Cellulose
Hair
85%
5%
Brown/Black
Fibrous
Homogeneous
West Showroom,
Roof, Tar Paper,
black
51
351603623-0013
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Exterior, Caulking,
white - around utility
pipes
52
351603623-0014
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Exterior, Caulking,
white - on brown wall
panelling
53
351603623-0015
None DetectedNon-fibrous (Other)100%White/Yellow
Non-Fibrous
Homogeneous
Exterior, Caulking,
yellow - windows
54
351603623-0016
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Exterior, Caulking,
grey/tan - windows
55-Tar Layer
351603623-0017
None DetectedNon-fibrous (Other)100%Red/Black
Non-Fibrous
Homogeneous
West Showroom
Roof, Tar shingles,
red
55-Fibrous Layer
351603623-0017A
None DetectedNon-fibrous (Other)15%Cellulose
Hair
75%
10%
Black
Fibrous
Homogeneous
West Showroom
Roof, Tar shingles,
red
25
351603623-0018
None DetectedMica
Non-fibrous (Other)
<1%
90%
Cellulose10%Gray/Tan/White
Fibrous
Heterogeneous
Sheetrock and Joint
Compound
Analyst(s)
Stephanie Courtney (24) Rachel Travis, Laboratory Manager
or Other Approved Signatory
EMSL maintains liability limited to cost of analysis . This report relates only to the samples reported and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no
responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. This report must not be used by the client to claim
product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government . Non-friable organically bound materials present a problem matrix and therefore EMSL
recommends gravimetric reduction prior to analysis. Samples received in good condition unless otherwise noted. Estimated accuracy, precision and uncertainty data available upon request. Unless
requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Reporting limit is 1%
Samples analyzed by EMSL Analytical, Inc. Minneapolis, Mn NVLAP Lab Code 200019-0
Initial Report From: 06/08/2016 16:03:21
Page 2 of 2PLM - 1.69 Printed: 6/8/2016 3:03 PM
OrderID: 351603623
Page 1 Of 3
OrderID: 351603623
Page 2 Of 3
OrderID: 351603623
Page 3 Of 3
EMSL Analytical, Inc.14375 23rd Avenue North Minneapolis, Mn 55447
Tel/Fax: (763) 449-4922 / (763) 449-4924
http://www.EMSL.com / [email protected]
351603750EMSL Order:
Customer ID: BRAU50
Customer PO:
Project ID:
Attention: Phone:Steve Luth (952) 995-2688
Fax:Braun Intertec (952) 995-2020
Received Date:11001 Hampshire Avenue South 06/09/2016 3:25 PM
Analysis Date:Bloomington, MN 55438 06/10/2016
Collected Date: 05/25/2016
Project: Gary's Furniture/B1511698.00
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light
Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
26A-Yellow Layer
351603750-0001
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
Lower West Side,
Plaster Yellow/Green
26A-Green Layer
351603750-0001A
None DetectedNon-fibrous (Other)100%Green
Non-Fibrous
Homogeneous
Lower West Side,
Plaster Yellow/Green
26B-Yellow Layer
351603750-0002
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
Lower West Side,
Plaster Yellow/Green
26B-Green Layer
351603750-0002A
None DetectedNon-fibrous (Other)100%Green
Non-Fibrous
Homogeneous
Lower West Side,
Plaster Yellow/Green
26C-Yellow Layer
351603750-0003
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
Lower West Side,
Plaster Yellow/Green
26C-Green Layer
351603750-0003A
None DetectedNon-fibrous (Other)100%Green
Non-Fibrous
Homogeneous
Lower West Side,
Plaster Yellow/Green
26D-Yelllow Layer
351603750-0004
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
Lower West Side,
Plaster Yellow/Green
26D-Green Layer
351603750-0004A
None DetectedNon-fibrous (Other)100%Green
Non-Fibrous
Homogeneous
Lower West Side,
Plaster Yellow/Green
26E-Yellow Layer
351603750-0005
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
Lower West Side,
Plaster Yellow/Green
26E-Green Layer
351603750-0005A
None DetectedNon-fibrous (Other)100%Green
Non-Fibrous
Homogeneous
Lower West Side,
Plaster Yellow/Green
27A-Gray Layer
351603750-0006
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Lower West Side,
Stucco grey
27A-White Layer
351603750-0006A
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Lower West Side,
Stucco grey
27B
351603750-0007
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Lower West Side,
Stucco grey
27C
351603750-0008
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Lower West Side,
Stucco grey
28-Block
351603750-0009
None DetectedNon-fibrous (Other)100%Red
Non-Fibrous
Homogeneous
Lower West Side,
Clay block (red) and
mortar
28-Mortar
351603750-0009A
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Lower West Side,
Clay block (red) and
mortar
Initial Report From: 06/10/2016 16:31:30
Page 1 of 2PLM - 1.69 Printed: 6/10/2016 3:31 PM
EMSL Analytical, Inc.14375 23rd Avenue North Minneapolis, Mn 55447
Tel/Fax: (763) 449-4922 / (763) 449-4924
http://www.EMSL.com / [email protected]
351603750EMSL Order:
Customer ID: BRAU50
Customer PO:
Project ID:
Analyst(s)
Miles DelBusso (16) Rachel Travis, Laboratory Manager
or Other Approved Signatory
EMSL maintains liability limited to cost of analysis . This report relates only to the samples reported and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no
responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. This report must not be used by the client to claim
product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government . Non-friable organically bound materials present a problem matrix and therefore EMSL
recommends gravimetric reduction prior to analysis. Samples received in good condition unless otherwise noted. Estimated accuracy, precision and uncertainty data available upon request. Unless
requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Reporting limit is 1%
Samples analyzed by EMSL Analytical, Inc. Minneapolis, Mn NVLAP Lab Code 200019-0
Initial Report From: 06/10/2016 16:31:30
Page 2 of 2PLM - 1.69 Printed: 6/10/2016 3:31 PM
OrderID: 351603750
Page 1 Of 1
EMSL Analytical, Inc.14375 23rd Avenue North Minneapolis, Mn 55447
Tel/Fax: (763) 449-4922 / (763) 449-4924
http://www.EMSL.com / [email protected]
351606115EMSL Order:
Customer ID: BRAU50
Customer PO:
Project ID:
Attention: Phone:Imants Pone (512) 363-6364
Fax:Braun Intertec (952) 995-2020
Received Date:11001 Hampshire Avenue South 08/25/2016 9:20 AM
Analysis Date:Bloomington, MN 55438 08/26/2016
Collected Date: 08/22/2016
Project: B1511698.01, GARY'S FURNITURE
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
35-Floor Tile
351606115-0001
12% ChrysotileNon-fibrous (Other)88%Green
Non-Fibrous
Homogeneous
FLOOR TILE
35-Black Mastic
351606115-0001A
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
FLOOR TILE
35-Brown Mastic
351606115-0001B
None DetectedNon-fibrous (Other)100%Brown
Non-Fibrous
Homogeneous
FLOOR TILE
36-Tan Mastic
351606115-0002
None DetectedNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
FLOOR TILE
36-Floor Tile
351606115-0002A
12% ChrysotileNon-fibrous (Other)88%Tan
Non-Fibrous
Homogeneous
FLOOR TILE
36-Black Mastic
351606115-0002B
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
FLOOR TILE
56-Floor Tile
351606115-0003
12% ChrysotileNon-fibrous (Other)88%Black
Non-Fibrous
Homogeneous
FLOOR TILE
56-Filler
351606115-0003A
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
FLOOR TILE
56-Tan Mastic
351606115-0003B
None DetectedNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
FLOOR TILE
56-Tar Paper
351606115-0003C
None DetectedNon-fibrous (Other)50%Cellulose50%Black
Fibrous
Homogeneous
FLOOR TILE
56-Brown Mastic
351606115-0003D
None DetectedNon-fibrous (Other)100%Brown
Non-Fibrous
Homogeneous
FLOOR TILE
Analyst(s)
Miles DelBusso (11) Rachel Travis, Laboratory Manager
or Other Approved Signatory
EMSL maintains liability limited to cost of analysis . This report relates only to the samples reported and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no
responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. This report must not be used by the client to claim
product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government . Non-friable organically bound materials present a problem matrix and therefore EMSL
recommends gravimetric reduction prior to analysis. Samples received in good condition unless otherwise noted. Estimated accuracy, precision and uncertainty data available upon request. Unless
requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Reporting limit is 1%
Samples analyzed by EMSL Analytical, Inc. Minneapolis, Mn NVLAP Lab Code 200019-0
Initial report from: 08/26/2016 17:28:26
Page 1 of 1ASB_PLM_0008 - 1.71 Printed: 8/26/2016 4:28 PM
OrderID: 351606115
Page 1 Of 1
Appendix E
Sample Location Sketch
12 5
6
47
44
43
4
7
48
49
45
8
10d
10e
9
10c
10a
17
10b
50
15e
16
24
4615d
18
15f
15c15g
1427c
27a
3031
28
25
26a
33
32a
32c 32b
34
26b
32e29c
26c
29b
26d
35 38
36
3726e
29a
27b
42 41
19,20,21
32d
3
15a
WESTWAREHOUSE
MIDDLEWAREHOUSE
ST
OR
AG
E
MIDDLEBACKROOM
EAST BACKROOM
EAST SHOWROOM
MIDDLE SHOWROOM
LOWERWEST
SHOWROOM
UPPERWEST
SHOWROOM
15b
FURNACE
BATHROOM
LOFT
OF
FIC
E
27e
27d
56
TR
AIN
CA
R
F:\2015\B1511698.dwg,Sample Loc-1st Floor,9/22/2016 1:25:41 PM
Project No:
B1511698
Drawn By:
Date Drawn:
Checked By:
Last Modified: 9/22/16
Scale:
Drawing No:
Sh
ee
t:of
Fig
:
SAMPLE LOCATION SKETCH - 1ST FLOORHAZARDOUS MATERIALS SURVEY
FORMER GARY'S FURNITURE109 MAIN AVENUE EAST
FRAZEE, MINNESOTA
B1511698.01
NONE
REJ
1/13/16
SL
FAX (952) 995-2020PH. (952) 995-2000
Minneapolis, MN 5543811001 Hampshire Avenue S
SAMPLE LOCATION
39
40
22
23
13
1211b
11c
11a
EAST BASEMENT
MIDDLEBASEMENT
WESTBASEMENT
F:\2015\B1511698.dwg,Sample Loc-Basement,9/20/2016 10:53:37 AM
Project No:
B1511698
Drawn By:
Date Drawn:
Checked By:
Last Modified: 6/16/16
Scale:
Drawing No:
Sh
ee
t:of
Fig
:
SAMPLE LOCATION SKETCH - BASEMENTHAZARDOUS MATERIALS SURVEY
FORMER GARY'S FURNITURE109 MAIN AVENUE EAST
FRAZEE, MINNESOTA
B1511698.01
1" = 50'
REJ
1/13/16
SL
FAX (952) 995-2020PH. (952) 995-2000
Minneapolis, MN 5543811001 Hampshire Avenue S
SAMPLE LOCATION
Appendix F
Asbestos Inspector Certificates