Page 1: Minitab 16 Assistant Demo – Control Charts - ASQ-1302

Minitab 16 Assistant Demo Control Charts

Presented by Jon Ridgway

Nov. 2011

Source for all materials presented: Minitab

Page 2: Minitab 16 Assistant Demo – Control Charts - ASQ-1302

Scenario

• Security at an airport wants to know if the time required for passengers is consistent over time.

• Factors:

– 5 security lanes

– 1 passenger per lane per hour is measured for the total time to pass through

Source for all materials presented: Minitab

Page 3: Minitab 16 Assistant Demo – Control Charts - ASQ-1302

Source for all materials presented: Minitab

Page 4: Minitab 16 Assistant Demo – Control Charts - ASQ-1302

Source for all materials presented: Minitab

Page 5: Minitab 16 Assistant Demo – Control Charts - ASQ-1302

Source for all materials presented: Minitab

Page 6: Minitab 16 Assistant Demo – Control Charts - ASQ-1302

Source for all materials presented: Minitab

Page 7: Minitab 16 Assistant Demo – Control Charts - ASQ-1302

Source for all materials presented: Minitab

Page 8: Minitab 16 Assistant Demo – Control Charts - ASQ-1302

Source for all materials presented: Minitab

Page 9: Minitab 16 Assistant Demo – Control Charts - ASQ-1302

Source for all materials presented: Minitab

!Stability

has a special cause, omit it from the calculations.

chance, even when the process is stable). You should investigate the out-of-control subgroup and if it

(4.0%) subgroup is out of control on the R chart (you may see 0.5% out-of-control subgroups by

control limits on the Xbar chart making it difficult to assess the stability of the process mean. One

Xbar chart, there is an out-of-control subgroup on the R chart. This may affect the validity of the

The process mean and variation may not be stable. Although no subgroups are out of control on the

of Data

Amount

points are included in the calculations.

You do not need to be concerned about the precision of your control limits because 100 or more data

Data

Correlated

the subgroups are outside the control limits on the Xbar chart, the correlation test is not needed.

If the data are correlated, you may see an increased number of false alarms. Because less than 2% of

Check Status Description

Xbar-R Chart of Minutes

Report Card

Page 10: Minitab 16 Assistant Demo – Control Charts - ASQ-1302

Source for all materials presented: Minitab

10

5

0

Mean

__X=5.33

UCL=10.05

LCL=0.62

252321191715131197531

20

10

0

Subgroup

Ran

ge

_R=8.17

UCL=17.28

LCL=0

R Unusually large range 6

Chart Reason Out-of-Control Subgroups

Xbar-R Chart of Minutes

Stability Report

Is the process stable?

Investigate out-of-control subgroups. Look for patterns and trends.

Page 11: Minitab 16 Assistant Demo – Control Charts - ASQ-1302

Source for all materials presented: Minitab

> 5% 0%

NoYes

0.0%

on the Xbar chart.

The process mean is stable. No subgroups are out of control252321191715131197531

10

5

0

Subgroup

Mean __

X=5.33

UCL=10.05

LCL=0.62

252321191715131197531

15

10

5

0

Subgroup

Ran

ge

_R=8.17

UCL=17.28

LCL=0

Comments

Xbar-R Chart of Minutes

Summary Report

Is the process mean stable?

Evaluate the % of out-of-control subgroups.Xbar Chart

Investigate out-of-control subgroups.

R Chart

Investigate out-of-control subgroups.

Page 12: Minitab 16 Assistant Demo – Control Charts - ASQ-1302

Questions?

• Thanks!

Source for all materials presented: Minitab