The 5th working group meeting of Asian Highway Investment forum on Bangkok
Participants from Azerbaijan:
Ministry of Transport of Azerbaijan Republic“AZERROADSERVICE” OJSC
Mrs Gojulu Shafiga(Head of department of international relations and
translation of “Azerroadservice” OJSC, expert of UNESCAP, Doctor of transport sciense Academician and active member of International Transport academy of Russian Federation,
Highways of the Azerbaijan Republic(under the symbol "AH“)
International AH-roads – 1504 km. Republican network has codes M1, M2, M3, M4, M5, M6, M7, M8.
The main roads in the Republic 1. Baku - Alat - Kurdamir - Ganja - Gazakh - border of the
Republic of Georgia, stretching 503km (M2 AH-5 and E-60) 2. Guba - Baku - Salyan - Lenkaran - Astara - border Islamic
Republic of Iran, stretching 521 km (M1, M3, AH-8, E-119)3. Baku-Shirvan - Goradiz - Mindzhevan - Megry - Ordubad -
Nakhchivan - Sederek - the border of Turkey, stretching 631 km (M2, M6, M7, M8, AH-81 and E-002), There is accupation 20% (97 km) area.
Pictures of Road signs of AH
Main road indexes of Azerbaijan
Financial sources of roads
Financial Sources of Transportation sector of Azerbaijan Republic - State budget, including:
a) The miscellaneous type of taxes, b) Including road tax paid by owners of
vehicles of the Republic and foreign countries;
Financial sources of roads• Budget Fund "Avtomobil Yollari " (highways Fund)
including:
a) Road Tax,b) Simplified tax paid by persons engaged in passenger
and freight vehiclesc) Excise taxes apply to imported passenger cars,d) The customs duties applicable to imported motor
vehicles,e) The state fee charged for the granting of the
authorization governing international road transport in the territory of Azerbaijan Republic,
f) The state fee charged for an annual technical inspection of motor vehicles, trailers and semi-trailers
Construction of roads and road infrastructures
• Construction of roads and road infrastructures perform specialized organizations, companies and joint stock companies, including foreign companies, conducted under the competitive bidding - international tenders.
• For the highway of Baku - Alat-Kurdamir-Ganja-Gazakh-Georgian border Azerbaijan Government and “Azeryolservis”OJSC of Ministry of Transport successfully negotiated with foreign investors, financial institutions and banks, imcluding WDB, Kuwait Faundation of Arabian economic development, Abu-Dhabi Faundation, European Devolepment Fund, Islamic Developing Bank, Asian Devoloping Bank and etc.
Foreign investment projects
THE 2014 PROJECT ROAD CONSTRUCTION
Prediction ProjectsNr Names of projects Duration of
construction
1 Ganja-Georgian state border highway 2014-2017
2 Minghacevir st – Mingachevir – Bahramtapa highway 2014-2016
3 Bahramtapa – Horadiz 2015-2017
4 Bahramtapa – Bilasuvar hw 2014-2017
5 Yevlakh – Zagatala –Georgia state border hw 2015-2018
6 Ujar – Zardab – Aghjabady hw 2014-2017
7 Ismailli – Mususlu highway 2014-2017
8 Ismailli – Shaki part of Garamaryam – Ismailli highway 2015-2017
9 Ganja – Toghana part of Ganja Kalbajar – Lachin hw 2014-2017
10 Shirvan – Salyan – Neftchala highway 2017-2017
11 R-56 (M-5) – Karimli highway 2015-2017
12 Minghachevir dolama – Ganja – Yenikand Gibchag hw 2016-2018
Constant attention to road workers in Azerbaijan pays road safety. Work in the development of transport infrastructure and increase traffic safety in Azerbaijan continues.“Azerroadservice” OJSC does environmental requirements pre projects, constructions and exploitation during the work.
Information about average intensity of movement8 months of 2013
Title and name of road
Trucks from 3 ton to 5
ton
Heavy trucks more 5 ton
TrailersHalf trailersTractor
VehicleAuthomobiles,
Bus
Total transport units
M1 Baku-Guba-Russian border
2173 2363 929 16933 22398
M2 Baku-Alat-Gazakh-Georgia
1912 1729 1051 4591 9283
M3 Alat-Astara-Iran border 1410 1432 758 4638 8237
M4 Hajigabul-Bahramtapa
-Mingach757 753 439 2274 4228
Information about road accidentsJuly 2013
Months Total numer of road accidents
Information about injured By reason of road
Perishes Injured Total number of RA
Information of about injured
Perishes injured
January 25 27 21 0 0 0
February 42 24 45 0 0 0
March 46 42 50 0 0 01st quarter 113 93 116 1 0 1
April 50 32 56 1 0 1May 29 34 27 0 0 0June 40 28 29 0 0 0
2nd quarter 119 94 112 1 0 1
For 6 months 232 187 228 1 0 1
July 35 18 44 0 0 0
Information about road safety and road equipmentJanuary – August - 2013
1 Installation and restoration of road signs (unit) 754
2 Installation and restoration signal posts (unit) 6448
3 Installation of curvilinear bars (m) 40741
4 Installation and restoration of a handrail of the bridge (pm) -
5 Fastening of roadsides (m2) 1903995
6 Marking of roads ( m2) 97186
7 Cancellation of illegal exits and entrances (unit) 305
8 Hole’s repair (m2) 2212094
Information about road safety and road equipmentJanuary – August - 2013
9 Laying of borders (pm) 8756
10 Coloring of road elements (m2) 203441
11 Cleaning of ditches (pm) 3016676
12 Adding sand against sliding (m2) 19384
13 Adding salt against sliding (m2) 1431
14 Marking of roads – Road advertisement LTD (m2) 2010898
15 3 AAA LTD – Lining of roads (marking) (m2) 533566
Total lining (Azerroadservice, Road and advertisement, 3A LTD 2641650
INTERNATIONAL SEA TRADE PORT
Currently, work is underway on the construction of the new Baku International Sea Trade Port complex, which will cover the territory with an area of 490 hectares. In the center of the port and logistics facilities provided for the use of the latest technology. In 2015 it is planned to put into operation the first phase of the project - the construction of two ferries, three cargo berths for receiving containers, vessels "ro-ro" and conventional bulk carriers.
INTERNATIONAL SEA TRADE PORT IN ALYAT SETTLEMENT
After commissioning of the planned processing of up to 8 tons of cargo and 50,000 containers a year and after commissioning is the construction of three cargo berthsPhase 2 is planned to port processing 15 million tons of cargo, 150,000 containers a year after commissioningAfter the launch of the third stage is planned processing up to 25 million tons of cargo and 1 million containers a year.
Present status on AH AHnumber
Route Length Classification Note
Main Class I Class II Class III
Inferior to Class III
Will be completed under the 2nd category till 2015
AH-5 “East-West” Europe-caucasus-Asia
Baku-Alyat-Gazakh-Georgian RepublicBorder (M-2)
513 km 175.0 km 338.0 km
AH-8
“North-South’”Russian Federation(Dagestan) state borderBaku (M-1)- Alyat-Astara-IIR state border (M-3, M-6)
509 km 235 km 162.7 km 111.3 km
Baku-Alat section is considered in AH5 and H.Z.Tagiyev-Sahil (R6) (Baku city bypass).Will be completed in
Present status on AH
AH-81
Baku-Alat- Hajıgabul--Horadiz-Minjivan—Armenian Republic.state border-Ordubad-Nakhchivan-Sadarak-Turkey Republic state border (M-6.7,8)
473km - 87,0 km is completed in 2013
138,0 151,0
97,0 km Horadiz –Armenian Republic state border is not under exploitation as this area was occupied by Armenia.
AH-83 Gazakh-Uzuntala-Armenian Republic state border (R-23)
14 - - 14,0 -
AH router under constructionRoute Highway Length Progress of work Price, US$
1 2 3 4 5
AH-5“East-West”Baku-Alat-Qazakh-Georgia Republic state border (M-2)
502.0 km
a) Finished projects
Baku bypass
21,5(12,3/9,2)
Reconstruction (12,3) / new construction (9,2) -I class, 6 lane
153,97
Baku-Alat (km 22-49) 27,0+42(unfinished)
Reconstruction -1 class 6 lane98,0
Alat-Hajigabul 45,6Reconstruction -1 class, 4 lane 35,31
Hajigabul-Kurdamir
Kürdəmir by pass
85,0 (5,7/79,3)
Rehabilitation –I class.4Lane (5,7)/ II class. 2 lane (69,3)New construction –II class,2 lane
103,50
Kurdamir-Ujar 42,1 Rehabilitation - II class. 2 lane 88,83
Ujar-Yevlakh53,0 (8,5/44,9) Rehabilitation –I class 4 lane
(8,5) /II class 2 lane (44,9)
68,52
Yevlakh-Ganja50,0
Rehabilitation - II class. 2 lane 86.70
AH router under construction
AH-5
Ganja by pass 37.5Rehabilitation -II class 2
lane 73.9
Ganja-Gazakh 94.0 Rehabilitation -II class 2 lane
47.1
Tavuz by pass 10.5 New consrt. II class 2 lane
25.5
Gazakh –state border of Georgia 35.8 Rehabilitation -II class 2 lane
50.70
b)Design in progress
Baku-Alat (km 49-69)20,0
Reconstruction –I class 6 lane
46,9
AH router under construction
AH-8
295.8 km
Hajigabul-Kurdamir construction of 2 lane
80.0 Reconstruction – II class, 4 lane
416,5
Kurdamir-Yevlakh construction of 2 lane 87,0 Reconstruction –
Iclass, 4 lane682,2
a) Finished projects
Baku-Russian Federation state border (M-l)
North-South
Section km 6-1610.0 km
Rehabilitation-II class, 2 lane 68,29
Section km 89-109 20,0
Rehabilitation-II class, 2 lane 33,28
Section km 121-125,5 4,5
Rehabilitation-II class, 2 lane
51,82
AH router under construction
AH-8
Section km-28-45 (Sumgait circular road)
17,0 Rehabilitation -I class, 4 lane
104,7
Section km-16-134 (Khirdalan-Gandob) 118,0 (cement-concrete)
Reconstruction and new construction -I cl. 4 lane, and: new construction -I cl.., 4 lane -23,6 km (Siyazan and Shabran circular) Reconstruction -92,4km
875,10
Information on projects on Baku-Alat section (Baku circular, Baku-Alat (km 22-49 and 49-69)) is indicated in AH5
AH -81
Alat-Astara-Iran Islam Republic state border (M-3)
Section km 9-31Section 0-9 km
22,09,0
Reconstruction -I cl. 4 lane,New construction (on the present highway exploitation)-
48,1257,4
Bilasuvar roundable 10,0construction finishedII class, 2 lane 13.8
Section Hajigabul-Bahramtapa
50.0 Is completed in 2013 127.18
Project under progress
AH-8
“North-South”
Baku-Russian Federation state border (M-l)
Section km-132-192 60,0 (asphalt-concrete)
New construction and reconstruction I cl, 4 laneand:new construction -50,0 kmReconstruction -10,0km
229
Section km 31,0-54,4 23,4 New constructionI class, 4 lane
134,14
Section km 54,4-55,8 1,4 New constr. class, 4 lane(Kur bridge)
50,74
Section km 55,8-80,6 24,8 New constructionI class, 4 lane
148,19
R-6 Tagiyev-Sahil (Baku circular)
42,0 Rehabilitation-II class, 2 lane 107,41
Project under progress
Route Highway Length Progress of work Price, US$
1 2 3 4 5
AH-8 North-South
Alat-Astara-Iran Islam Republic state border (M-3) masalli Lenkoran “A”-”B”
46.0New construction-I class 4 lane
379.5
Project under progress
AH-81Hajigabul-Bahramtapa-Horadiz-Minjivan-Armenian Rep.state border-Ordubad-Nakhchivan-Sadarak-Turkeyrepublic state border
Hajigabul-Bahramtapa-Horadiz-Minjivan-Armenian Rep.state border (M-6) Bahramtapa-Horadiz
63,0 Rehabilitation, II class, 2 lane
148.82
Further priority projects on AH Highways
Route Highway Length Progress of work Price, US$
AH-5EAST -WEST
Ganja-Georgian state borderConstruction of additional 2 lanes
130 Reconstruction I class4 lane
637.20
AH-8
Alat-Astara-Iran Islam Republic state border (M-3) 80.6-142.9 km 39.3
New construction-I class 4 lane 270.2
Masalli-Astara
Section C,km 46,15-61,74
16,74 New construction-I class 4 lane 138,24
AH-81 Hajigabul-Bahramtapa-Horadiz-Minjivan-Armenian Rep.state border (M-6) Bahramtapa-Horadiz
69,0 Rehabilitation, II class, 2 lane 176,40
Further priority projects on AH Highways
AH-81 Baku-Alat- Hajıgabul-Horadiz-Minjivan-Armenian Republic.state border-Ordubad-Nakhchivan-Sadarak-Turkey Republic state border (There is 97 km part of occupational area)
a) Finished projectsBaku-Alat-Gazakh-Georgian Republic state
border Baku by pass
21.5Reconstruction (12.3 km) New construction (9.2 km)- I class, 6 lane
153.97
Baku-Alat (km22-49 ) 27.0 km Reconstruction- I class, 6 lane
99.33
Alat-Hajigabul is indicated in 45.6 Reconstruction- I class, 4 lane
35.31
Nakhchivan-Sadarak-Turkey Republic state border (M-7)
87,0Reconstruction- I class, 4 lane
Hajigabul-Bulagli (0-40.5 km) 50.0 Reabilitation II class, 2 lanes
94.11
b) Projects in progressBaku-Alat-Gazakh-georgian Republic state
border (M-2)Baku-Alat (km 49-69)
20,0Reconstruction- I class, 6 lane
46,9
Hajigabul-Bahramtapa-Horadiz-Minjivan-Armenian republic state border (M-6)
Section km 40,5-113,1Kur bridge (Shirvan)
72,6 0,43
Rehabilitation, II class, 2laneRehabilitation, II class, 2lane
134,31 21,97
Report on the road sector
The territory of the country, thousands of square km 86.6
The population, in thousands 9356.5The density of public roadsOn 1000 sq km, area 219.3Per 1000 inhabitants 2.03
The length of the road network, km
Automobile roads – total
Including:Public
18993.6
Of which:state roads
4640.0
Local roads 14353.6
Department and private -
Toll roads -
International roads “E”, E60, E119, E002 1490.0
International roads CIS (Protocol 11.09.98)
The length of public road on technical categories
Title of indices Public roadsKm
Including
State roads, km Local roads, km
Surfaced roads 18824.6 4634 14190.6
Including on technical roads:
Motorways
I 333.0 326.0 7.0
II 1379.3 1349.0 30.3
III 5264.7 2858.0 2406.7
IV 10466.6 101.0 10365.6
V 1381.0 1381.0
The length of public roads according of the types of road pavement, km
Title of indices Public roadsKm
Including
State roads, km Local roads, km
Public automobile roads – total 18993.6 4640 14353.6
Including:
With surfaced pavement-total 18824.6 4634.0 14190.6
Or which:With asphalt-concrete pavement 8025.6 4345.0 3630.6
With cement-concrete pavement 129.0 125.0 4.0
Created translation (grit, gravel, etc)
10670.0 164.0 10506.0
Ground water 169.0 6.0 163.0
The presence and extent of man-made structures on public roads
Title of indices In units ofPublic roadsKm
Including
State roads, km Local roads, km
Bridges (over asses) – total Pieces 1455 620 835
R.M 50121.8 27674.5 22447.3
Including:
ferroconcretePieces 1274 600 674
R.M 44004.2 25904.3 18099.9
MetallicPieces 178 20 158
R.M 6102.6 1770.2 4332.4
WoodenPieces 3 3
R.M 15.0 15.0
The presence of transport vehicles
The total number of fleet vehicles 1237
Including:
Trucks 196
Cars 1009
buses 32
Financial resources, designed in 2013 in the road sectorTitle of Incides Total vehicle Including on sources
Road fund
Public roads-total 2136698.3 247133.8 906285.2 983279.3
Including:
-Maintenance of roads and man-made structures on them
97923.6 96815.3 1108.3
Repair of roads and man-made structures on them 278367.1 150318.5 128048.6
Reconstruction (rehabilitation) of roads and man-made structures on them
1084590.5 123048.6 657439.3
Construction of a new roads and man –made structures on them
675817.1 427151.2 325840.0
The level of financial security (for 1 km of road) 112.5 13.01 47.72 51.77
State highways of the state (national) values all 1758086.2 147770.7 646765.5 963550
Including:
-Maintenance of roads and man-made structures on them
40331.2 39490.4 840.8
Repair of roads and man-made structures on them 163288.6 108280.3 55008.3 637710.0
Reconstruction (rehabilitation) of roads and man-made structures on them
979304.0 341594.0 637710.0
Financial resources, designed in 2013 in the road sector
Construction of a new roads and man –made structures on them
575162.4 249322.4 325840.0
The level of financial security (for 1 km of road)
378.9 3185 139.39 207.66
Local roads, total 378612.1 99363.1 259519.7 19729.3
Including:
-Maintenance of roads and man-made structures on them
57605.2 57324.9 280.3
Repair of roads and man-made structures on them
115040.2 42038.2 73002.0
Reconstruction (rehabilitation) of roads and man-made structures on them
105312.0 85582.7 19729.3
Construction of a new roads and man –made structures on them
100654.7 100654.7
The level of financial security (for 1 km of road)
26.37 6.92 18.08 1.37
Major accident rates on public roads (for 2013) 6 month and July
Title of accidents Public roadsThe total number of road accidents - all 267
İncluding due to road accidents - all 1
İncluding to road road conditions for 1000 vehicles 0.02
The number of died/because of road conditions 205/0
The number of injured/due to road conditions 272/1
The shared of road serviced in overload mode %
The length of roads providing a pass vehicles vvith an axle load. •thousands of km /% of the total length including::
18993.6
10 tons 19986/90.3
Also 11,5
Also 12 tons
Also 13 tons
Road management
1. Full and short name of the body of state road management: "Azerroadservice"OJSC
2. Last name. fırst name, middle ııame and official title of the head:
Javid Gurbanov Ganbar oglu, Chairman of "Azerroadservice" OJSC
Information about the existence and condition of road infrastructure in the CIS interstate roads, on 01.01.2013
The presence of road infrastructure
1 Petrol stations, units 130
2 Hotels, units / seats 30
3 Power points (cafes, canteens. etc.), units / seats 221
4 Parking facilities, units / car place 19
5 Vehicle maintenance items, units 135
6 The introduction of intelligent transport systems - total length, km
7 The presence of items weighing units 9
Thank you for your kind attention