GREATER SHEPPARTON PLANNING SCHEME SCHEDULE 4 TO CLAUSE 45.06 DEVELOPMENT CONTRIBUTIONS PLAN OVERLAY Shown on the planning scheme map as DCPO4. SHEPPARTON NORTH EAST DEVELOPMENT CONTRIBUTIONS PLAN 1.0 Area covered by this development contributions plan All land within the Shepparton North East Development Contributions Plan area shown as DCPO4 on the planning scheme maps. 2.0 Summary of costs Facilit y Total cost $ Time of provision Actual cost contribution attributable to development $ Proportion of cost attributable to development % Transpor t $9,324,65 9 $6,805,95 3 Refer to details in the Shepparton North East Development Contributions Plan. $9,324,659 $6,805,953 100% Communit y facility $728,699 $3,975,44 0 Refer to details in the Shepparton North East Development Contributions Plan. $728,699 $3,975,440 100% Open Space $8,522,23 5 $5,401,00 0 Refer to details in the Shepparton North East Development Contributions Plan. $8,522,235 $5,401,000 100% Drainage $19,536,7 27 $9,211,35 5 Refer to details in the Shepparton North East Development $19,536,727 $9,211,355 100% OVERLAYS – CLAUSE 45.06 – SCHEDULE 4 PAGE 1 OF 3 DD/MM/YYYY Proposed C118 DD/MM/YYYY Proposed C118 DD/MM/YYYY Proposed C118

MINISTERIAL DIRECTION - Amazon Web Services · Web viewp er net developable hectare Residential p er dwelling Transport $46,454 $0 Community facility $27,134 $0 Open Space $36,865

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: MINISTERIAL DIRECTION - Amazon Web Services · Web viewp er net developable hectare Residential p er dwelling Transport $46,454 $0 Community facility $27,134 $0 Open Space $36,865

GREATER SHEPPARTON PLANNING SCHEME

SCHEDULE 4 TO CLAUSE 45.06 DEVELOPMENT CONTRIBUTIONS PLAN OVERLAY

Shown on the planning scheme map as DCPO4.

SHEPPARTON NORTH EAST DEVELOPMENT CONTRIBUTIONS PLAN

1.0 Area covered by this development contributions plan

All land within the Shepparton North East Development Contributions Plan area shown as DCPO4 on the planning scheme maps.

2.0 Summary of costs

Facility Total cost $

Time of provision

Actual cost contribution attributable to development $

Proportion of cost attributable to development %

Transport $9,324,659

$6,805,953

Refer to details in the Shepparton North East Development Contributions Plan.

$9,324,659

$6,805,953

100%

Community facility

$728,699

$3,975,440

Refer to details in the Shepparton North East Development Contributions Plan.

$728,699

$3,975,440

100%

Open Space

$8,522,235

$5,401,000

Refer to details in the Shepparton North East Development Contributions Plan.

$8,522,235

$5,401,000

100%

Drainage $19,536,727

$9,211,355

Refer to details in the Shepparton North East Development Contributions Plan.

$19,536,727

$9,211,355

100%

Fees $207,040

$237,240

Refer to details in the Shepparton North East Development Contributions Plan.

$207,039

$237,240

100%

TOTAL $38,319,360

$25,630,988

$38,319,360

$25,630,988

100%

Note: Summary of costs for conventional infrastructure items in 2017 2018 dollars.

OVERLAYS – CLAUSE 45.06 – SCHEDULE 4 PAGE 1 OF 2

DD/MM/YYYYProposed C118

DD/MM/YYYYProposed C118

DD/MM/YYYYProposed C118

Page 2: MINISTERIAL DIRECTION - Amazon Web Services · Web viewp er net developable hectare Residential p er dwelling Transport $46,454 $0 Community facility $27,134 $0 Open Space $36,865

GREATER SHEPPARTON PLANNING SCHEME

3.0 Summary of contributions

Facility Levies payable by the development

DevelopmentInfrastructure

Communityinfrastructure

All development

per net developable hectare

Residential

per dwelling

Transport $64,385

$46,454

$0

Community facility

$5,032

$27,134

$0

Open Space $58,844

$36,865

$0

Drainage $134,898

$62,872

$0

Fees $1,430

$1,619

TOTAL $264,588

$174,944

$1,150

Note: The Community infrastructure levy is limited to a maximum of $1,150 per dwelling under legislation.

4.0 Land or development excluded from development contributions plan

Land required for the following is exempt from the provisions of this overlay:

Use and development for a non-government school.

Use and development associated with a dwelling that is existing or approved at the approval date of this provision.

Note: This schedule sets out a summary of the costs and contributions prescribed in the development contributions plan. Refer to the incorporated Shepparton North East Development Contributions Plan, February July 2018 for full details.

OVERLAYS – CLAUSE 45.06 – SCHEDULE 4 PAGE 2 OF 2

DD/MM/YYYY C118

DD/MM/YYYYProposed C118