MINING QUALITY PLANNING
MINING QUALITY PLANNING
ADARO DISTRICT NoNama ProsesItem KritisParameter
Dokumen PelaksanaanMetode Kontrol
Penanganan
Control PointStandar
FrekuensiAlat KontrolPIC
1.Mine Plan & Design- Plan & design
(Yearly, Monthly,
Weekly, Daily) - Persetujuan dari
Customer per periode - Design customer
/Map Production Planning (ADR/ENG/99/001/SOP)- Quarterly
- Weekly - Map - Semua
Dept Head - Re design
- Expose priority - Design customer
/Map Equipment Planning (ADR/ENG/99/002/SOP) - Weekly - Survey - Planning - Percepat expose
Weekly Planning (ADR/ENG/99/003/SOP)
Mining Activity,Monitoring & Recording (ADR/PRO/99/014/SOP)
Mine Change shift (ADR/PRO/99/02/INK)
Coal Hauling Activities (ADR/HLG/01/006/SOP)
Change shift (ADR/RHA/99/002/INK)
Survey Activity (ADR/ENG/99/010/SOP)
Cleaning Coal (ADR/PRO/99/010/SOP)
2.Pit Service- Haul Road Construction
in PIT - Grade
- Super elevation
- Width
- Drainage
- Safety bund wall
- Pavement/surfacing
- Traffic sign
- Kualitas material - Design jalan tambang
* Stripping
* Coaling Access & Hauling Road Construction (ADR/PRO/99/001/SOP)Pit Service Activity
(ADR/PRO/99/017/SOP) - Awal/lay out design
- Selama proses
- Finish
construction - Survey
- Map - Surveyor
- G/L Road
- G/L Prod
- Engineer - Konstruksi ulang
- Maintenance
- Dewatering- Minimalkan volume
air
- Arah aliran - Kering
- Design customer
/Map Drainage System (ADR/PRO/99/007/SOP)Pit Service Activity
(ADR/PRO/99/017/SOP) - Setiap shift- Visual- G/L Prod- Pembuatan ditch
- Pemompaan
- Gorong-gorong
-Temporary
settling ponds - Kejernihan air - Design settling ponds Drainage System (ADR/PRO/99/007/SOP)- Daily- Visual- G/L Prod- Pendalaman
- Peninggian
3.O/B Removal Loading & Hauling Commodity- Top Soil Removal- Pengambilan- Top soil terpisah dari O/B Access & Hauling Road Construction (ADR/PRO/99/001/SOP)- Awal
- Pertengahan
- Akhir proses
Top Soil Management - Survey
- Map / plan - G/L Prod - Stop
- Analisis ketebalan
Top soil yang akan diambil
Land Clearing & Top Soil Removal (ADR/PRO/99/002/SOP)
Survey Activity (ADR/ENG/99/010/SOP)
- Lokasi dumping
- Ketebalan Top Soil
yang di final bench - Dumping pada
posisi luar frame
disposal (finish bench) Disposal Management (ADR/PRO/99/009/SOP)- Awal
- Pertengahan
- Akhir proses
Disposal Management - Map - Surveyor
- G/L Prod - Loading, pindahkan keluar frame disposal
- Bench- Kemiringan
- Tinggi jenjang
- Lebar jenjang
- Elevasi - Design dari customer / Map
(parameter bench) - Perhitungan
(Analisa kestabilan lereng)
- Proses OB Activity - Monthly (perhitungan)
- Daily
- Weekly - Survey- Surveyor
- Mine plan - Re design
- Finishing / Sloping
Overburden Activity (ADR/PRO/99/008/SOP)
- Drilling & Blasting
Preparation
Drilling (ADR/PRO/99/03/SOP)
- Drilling pattern
- Spacing
- Burden
- Kedalaman
- Toe
- Free face
- Stemming
- Delay sistem
- Priming
- Explosive Handling
- Wet Hole - Design drilling
- Design blasting
- KepMentamben No.555.K/26/M.PE/
1995 Pengeluaran,pengangkutan & pengembalian bahan peledak (ADR/PRO/99/005/SOP)- Setiap drilling &
blasting - diukur
(survey)
- Visual - G/L blasting
- G/L drilling - Re design blasting
- Retrainning
Blasting (ADR/PRO/99/001/INK)
- Blasting control- Suara
- Getaran
- Flying rock
- Ukuran hasil blasting atau Fragmentasi - Kep.Mentamben
No.555.K/26/
M.PE/1995 Inspeksi Bahan Peledak (ADR/PRO/99/006/SOP)- 1 x setahun
- setiap selesai
blasting - Report
- Loading
Productivity - G/L blasting
- Blast.Supv. - Re design blasting
- Ripping
Blasting (ADR/PRO/99/001/INK)
Misfire (ADR/PRO/99/003/INK)
- Disposal- Design
- Kemiringan
- Tinggi jenjang
- Lebar jenjang
- Elevasi - Design disposal
management Disposal Management (ADR/PRO/99/009/SOP)- Setiap Shift- Survey
- Map - Surveyor
- G/L Prod - Dozing
- Hauling + Dumping
di lokasi yang benar
- Perhitungan
(Analisa kestabilan
lereng)
- Coal Contamination - Material pengotor :
* Metal dari R/M
* Metal proses prod.
* Sampah
* Tanah, Scoria - zero contamination Cleaning Coal (ADR/PRO/99/010/SOP)
- Visual- Chief Mech
- G/L Prod
- Semua
Karyawan - Buang pengotor
- Perkirakan pengotor ada
di mana, cek saat loading di PIT dan dumping di crusher
Inspeksi Kontaminasi Batubara (ADR/PRO/99/015/SOP)- Kontinu- Sesudah R/M
Preventive Maintenance Trailer
(ADR/PCH/01/004/SOP)
Operasi Magnetic Sweeper (ADR/PRO/01/001/SOP)- Setiap Shift- Visual
- Magnetic Sweeper - Tyre
Section - Buang limbah metal
- Coal Quality- Posisi pengambilan/
lokasi pengambilan - Spesifikasi customer Survey Activity (ADR/ENG/99/010/SOP)- Weekly
- Daily - Visual / Instruksi
- Survey - Supv.
- Surveyor - Relokasi Unit
- Haul Road Maint
(75 km) - Super elevation
- Width
- Drainage
- Safety bund wall
- Pavement/surfacing
- Traffic sign
- Kualitas material - Maintenance
jalan hauling Road Maintenance (ADR/ROD/01/001/SOP)- Daily- Schedule- G/L Road
maint - Feed back customer
(material)
- Re Work
- Dust Control- Debu yang
berterbangan - Jalan tidak
terlalu berdebu
- Jarak Pandang Aman Road Maintenance (ADR/ROD/01/001/SOP)- Hourly (Kontinue) - Visual- G/L Produksi - Penyiraman secara
periodik pada saat kering
- Hubungi pengawas
lapangan
4.Monitor & Control- Commodity production - Produksi Perjam
- Produksi Mingguan
- Produksi Bulanan
- Produksi Harian - Rencana produksi CCR System (ADR/ENG/99/005/SOP)- Hourly- Truck/ vessel count
- Belt count - Prod. dept
- Hauling
dept - Analisis
- Informasi lewat
CCR
Recording, Reviewing and Report (ADR/ENG/99/004/SOP)
Pengukuran Standar Tonage Alat Angkut (ADR/ENG/99/009/SOP)
Berita Acara Penagihan (ADR/ENG/99/007/SOP)
Survey Activity (ADR/ENG/99/010/SOP)
Coal Dumping System (ADR/HLG/01/003/SOP)
Coal Hauling Activities (ADR/HLG/01/006/SOP)
- Safety- Perlengkapan safety
- Peralatan safety
- Target safety
- Safety Talk - PSMS
- KPI safety officer - PSMS- Continue- PSMS
manual - SHE Dept &
semua
Dept. - Peringatan
- Sanksi
- Induksi
- Laju kendaraan- Peraturan tambang
- Continue- Speed gun
- Peraturan yang
berlaku
(Regulation)