31
( Add PRO Submitted u VILLAG A M dress: Sta M OGRES under Rule RIV GE- BARGAD Araji No.-1 M/S AS ation Roa AR MINI SSIVE M 34 of Uttar and its VER SAN D, TEHSIL-SA 43, Total A PERM APP SHISH ad, Parich Pr RUN KU RQP/A Validity u ING INCLUDIN MINE Pradesh M s amendmen OF ND/MOR ADAR, DIST Allotted Area MIT PERIOD: 6 PLICANT H ENT hha, Teh repared B UMAR AJM/242/2 upto 21 st M PLAN NG CLOSU Minor Minera nt 2013) RRUM M TRICT- JHAN a- 8.50 Acr 6 MONTH TERPR hsil-Sadar By R YADA 2003/A, May, 2023 N URE P al Concessi MINE NSI, UTTAR P es (3.4398 H RISES r, Distric AV PLAN on Rules 19 PRADESH Ha.) ct-Jhansi 963

MINING PLAN- BARGAD - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...r bed (GM l hs APTER PPLICANT sil-Sadar, D v Charan Si mashankar S ingh R/O St INTENDS

  • Upload
    doxuyen

  • View
    251

  • Download
    4

Embed Size (px)

Citation preview

Page 1: MINING PLAN- BARGAD - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...r bed (GM l hs APTER PPLICANT sil-Sadar, D v Charan Si mashankar S ingh R/O St INTENDS

(

Add

PRO

Submitted u

VILLAG

A

Mdress: Sta

M

OGRES

under Rule

RIVGE- BARGAD

Araji No.-1

M/S ASation Roa

AR

MINI

SSIVE M

34 of Uttar and its

VER SAND, TEHSIL-SA

43, Total A

PERM

APP

SHISHad, Parich

Pr

RUN KURQP/A

Validity u

ING INCLUDIN

MINE

Pradesh Ms amendmen

OF

ND/MORADAR, DIST

Allotted Area

MIT PERIOD: 6

PLICANT

H ENThha, Teh

repared B

UMARAJM/242/2upto 21st M

PLANNG

CLOSU

Minor Minerant 2013)

RRUM MTRICT- JHAN

a- 8.50 Acr

6 MONTH

TERPRhsil-Sadar

By R YADA2003/A, May, 2023

N

URE P

al Concessi

MINE NSI, UTTAR P

es (3.4398 H

RISES r, Distric

AV

PLAN

on Rules 19

PRADESH

Ha.)

ct-Jhansi

963

Page 2: MINING PLAN- BARGAD - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...r bed (GM l hs APTER PPLICANT sil-Sadar, D v Charan Si mashankar S ingh R/O St INTENDS

INDEX

CHAPTER TITLE PAGE NO.

1. Introduction 1

2. Chapter – 1 : General Information 2

3. Chapter – 2 : Location 4

4. Chapter – 3 : Geology, Reserve and Replenishment Study 5

5. Chapter – 4 : Mining 10

6. Chapter – 5 : Blasting 12

7. Chapter – 6 : Mine Drainage 12

8. Chapter – 7 : Disposal of Waste 13

9. Chapter – 8 : Use of Mineral 13

10. Chapter – 9 : Mineral Beneficiation 13

11. Chapter – 10 : Surface Transport 13

12. Chapter – 11 : Site Services 14

13. Chapter – 12 : Employment Potential 14

14. Chapter – 13 : Environment Management Plan 15

15. Chapter – 14 : Any other Information 19

16. Progressive Mine Closure Plan 20

Page 3: MINING PLAN- BARGAD - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...r bed (GM l hs APTER PPLICANT sil-Sadar, D v Charan Si mashankar S ingh R/O St INTENDS

LIST OF ANNEXURES

S.No. Particulars Annexure No.

1 Authorization letter/Consent letter from applicant

I

2 LOI II

3 RQP Certificate III

4 Power of Attorney & partnership deed, Registration of firm

IV

LIST OF PLATES

S. No. Particulars Plate Number

1 Location Plan 1

2 Key Plan 2

3 Google Map 3

4 Cadastral Map 4

5 Surface cum Surface Geological Plan & Sections

5

6 Year Wise Development Plan & Sections 6

7 Conceptual Plan 7

Page 4: MINING PLAN- BARGAD - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...r bed (GM l hs APTER PPLICANT sil-Sadar, D v Charan Si mashankar S ingh R/O St INTENDS

Ov

Lette

Ashis

unde

perio

Minin

enclo

The

the r

allott

(U.P)

mm

In or

Exper

appro

given

RQP/

verseas Mi

er of Intent

sh Enterpris

er U.P Minor

od of 6 mon

ng Short ter

osed as Ann

proposed pr

river beds o

ted for mini

).Sand/Morr

to 0.50 mm

rder to proc

rt Appraisal

oval of Minin

the work

/AJM/242/

in-tech Con

(LOI) for mi

ses vide let

r Mineral Co

th The total

m permit is

nexure-II.

roduction cap

of Pahuj Rive

ing of River

rums Grades

and 0.63 m

cess further

Committee

g Plan for th

of Preparati

/2003/A, Va

nsultants

CH

INTR

ning of mino

tter no.184/

oncession Ru

area of min

granted for

pacity of San

er in Jhansi

Sand/Morru

s as fine, me

mm to 2.0 mm

by the con

is necessary

he said area

ion of Minin

alidity 21st M

HAPTER

RODUC

or mineral S

/30MMC/E-N

ules 1963 b

ning is (8.5

a period of

nd/Morrum i

district, U.P

um througho

edium and c

m respective

ncern Depar

y. For the gr

is also one

ng Plan to

May, 2023.Co

R – 1

CTION

Sand/Morrum

NIVIDA/APPR

by District M

50 Acres) 3.

6 month fro

is 8857cum.

P. The propo

out the rive

coarse with r

ely.

rtment, an e

rant of envir

of the comp

RQP- Arun

onsent is att

m has been g

ROVAL/2017

Mining Office

.4398 Hecta

om the date

The short t

osed mining

erbed of Pah

ranges 0.06

environment

ronment clea

ponents. For

n Kumar Ya

tached as An

granted in Fa

7-18 dated

er, Jhansi (U

res approxim

of grant of p

erm permit

g project lan

huj River dis

3 mm to 0.2

t clearance

arance, prep

r this, the Co

adav, havin

nnexure-I.

Page | 1

avor of M/S

19.05.2017

U.P) for the

mately. The

permit Copy

area lies on

nd has been

strict Jhansi

2 mm, 0.25

from State

paration and

ompany has

ng RQP No.

Page 5: MINING PLAN- BARGAD - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...r bed (GM l hs APTER PPLICANT sil-Sadar, D v Charan Si mashankar S ingh R/O St INTENDS

Ov

1.1. G

N

M A

1.2 ST

Pr

P

S

J

S

J

S

J

1.3 M

R

1.4 NP

Ar

RQ

Va

50

P.

E-

W

Te

1.5 N

M

1.6 D

(a

(b

verseas Mi

ENERAL IN

ame and ad

M/S Ashish ddress: Stat

TATUS OF T

rivate ltd. Co

Power of At

hri Ramasha

hansi.

hri Pamod K

hansi .

hri Ashish K

hansi.

INERALS T

iver Sand/M

NAME & ADDREPARED T

run Kumar Y

QP/AJM/242

alidity 21st M

01, Apex Tow

.O. Jaipur-30

-mail- arun@

ebsite- www

elefax- 0141

NAME & ADD

M/S Ashish E

DETAILS OF

a) Allotted a

b) Name of

District- J

State- Utt

Area in he

Status of

Permit Pe

in-tech Con

NFORMATIO

dress of App

Enterprisestion Road, Pa

THE APPLIC

ompany

ttorney Hol

ankar Singh

Kumar S/ o S

umar S/o Sh

THAT THE A

orrum (Mino

DRESS & RETHE MINING

Yadav,

2/2003/A,

May, 2023

wer, Tonk R

02015(Raj.)

@overseasm

w.overseasm

1-2744509, M

DRESS OF P

Enterprises THE MININ

rea of 3.439

the Mineral:

Jhansi

tar Pradesh

ectare: - 3.4

Land: - Rive

eriod- 6 Mont

nsultants

CHON ABOUT A

plicant:

s arichha, Teh

CANT:

ders

S/o Shri Shi

Shri Shri Ra

hri Kailash S

APPLICANT

or Mineral)

EGISTRATIG PLAN: -

oad,

intech.com

mintech.com

M-+91-9460

PROSPECTI

NG SHORT

98 hectares m

: - Sand/Mor

4398ha.

er bed (GM l

ths

HAPTERAPPLICANT

hsil-Sadar, D

iv Charan Si

mashankar S

Singh R/O St

INTENDS T

ON NUMBE

0221084

ING AGENCY

TERM PERM

marked on T

rrum (Minor

and)

R- 1 T

District-Jhans

ngh R/O St

Singh R/O S

ation Road,

TO MINE

ER OF RECO

Y

MIT AREA:

Toposheet No

Mineral)

si

(A

tation Road,

Station Road

Parichha, D

OGNISED PE

-

o refe

Annexure I

Parichha , D

d, Parichha ,

istrict-

ERSON, WH

rs Plate No.

Page | 2

IV)

District-

District-

HO HAS

2.

Page 6: MINING PLAN- BARGAD - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...r bed (GM l hs APTER PPLICANT sil-Sadar, D v Charan Si mashankar S ingh R/O St INTENDS

Ov

DESCRIPT

S. No.

PAHUJ RIV

1

1.7 S

1.8 IN

1.8.1. Rrace

1.8.2. N89

1.8.3. Nar

1.8.4. Nm

1.8.5. Aoflata

1.8.6. E

1.8.7. Ed

1.8.8. Mcoup

1.8.9. R

1.8.10. Oav

verseas Mi

TION OF GH

DISTRIC

ER)

JHANSI

HORT TERM

NFRASTRUC

Railway Statail head for enter of prop

Nearest Airp9Km from th

Nearest Higrea, NH-75 ,

Nearest Towmine activity.

Availability f Hand Pumpabors. Wateranker.

lectricity: -

ducational

Mode of traonnected to pto the site

River/ Cana

Other relevavailable at Jh

in-tech Con

HATS PILLA

CT NAME RIVE

PAHUJ RIVER

M PERMIT P

CTURE FAC

tion: - Consapproach a

posed mine a

port: - Conshe applied ar

hway: - Ne,11.00Km in

wn/City: -.N

of water: -p located ner required fo

- There is no

Facilities: -

ansportatioTehsil-Sada.Mineral will

l: -Pahuj Riv

ant informhansi district

nsultants

AR IN THE A

OF ER

NAGHA

BARGA

PERIOD: 6

CILITIES: -

sidering the and transpoactivities.

sidering the rea in NNW d

earest highw SSW of the

Nearest town

Water for darby the are

or dust suppr

o electric line

- The school

on of Miner Jhansi by be transpor

ver.

ation: - Bat.

AREA: -

ME OF THE AT/VILLAGE

AD

Months.

extent of rirtation of m

extent of ridirection.

way are SH-4 applied are

n is Jhansi w

drinking purpea is potableression will a

e pass throug

l and College

eral: - The SH-42 to rerted by truck

anking and

LATIT(N

A 25034

B 25034

C 25034

D 25034

E 25034

F 25034

G 25034

ver beds, Jhmineral whic

iver beds Gw

42 at 11.50a.

which is 18 k

pose is broue and being ualso be supp

gh the mine

e facilities ar

allotted areach at the ak/Dumper fr

all other es

COORDINATUDE N)

L

4'21.00'' 78

4'22.35'' 78

4'16.94'' 78

4'10.28'' 78

4'07.38'' 78

4'05.95'' 78

4'14.06'' 78

hansi Railwah is about

walior Airpo

Km in east

km SW from

ught from neused by the plied from th

area.

re available

ea is situatallotted areaom the site

ssential infra

ATE LONGITUDE

(E)

8036'54.00''

8036'55.05''

8037'02.34''

8037'12.72''

8037'18.70''

8037'17.97''

8037'04.32''

y Station is 14.50 km S

rt is the nea

direction of

the center

earby villagevillagers, ha

he Hand Pum

in Jhansi.

ted at BARG, metalled roto nearby M

astructural f

Page | 3

AREA IN(Ha.)

3.4398

the nearestSE from the

arest airport

the applied

of proposed

e. The water abitants and mp by water

GAD village oad is there arket.

facilities are

N

t e

t

Page 7: MINING PLAN- BARGAD - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...r bed (GM l hs APTER PPLICANT sil-Sadar, D v Charan Si mashankar S ingh R/O St INTENDS

Ov

2.0 LOCA2.1 LOCAA) DETAI

2.2. GEN

Location ois shown

verseas Mi

ATION & GEATION ILS OF THE

S. No. 1 2 3 4 5 6 7 8

ERAL

S. No.1 2

3 4 5

of Mine is shin Plate No.

in-tech Con

ENERAL DE

E AREA

Short

DN

.

P

CO

hown in Plat2. Surface G

nsultants

CHSCRIPTION

Particulart term perm

Village Tehsil

District & StName of Riv

Araji NoLatitude

Longitude

ParticulaMinera

eriod of M

Category ofOwnership o

Approach R

te No. 1. GGeological Pl

HAPTERN

s mit area

ate ver

e

ars al Mining

f Land of Land Road

oogle imagean of the ar

R-2

25°34'05.

78°36'54.00

RivLetter omining Sand/MgrantedAshish EU.P MinConcessDistrict Jhansi (Usix monRiver bePrivate

ery showing rea is shown

Descriptio3.4398ha.

BargadJhansi

Jhansi (U.PPahuj Rive

143 95'' N to 25°

0'' E to 78°3

Descriptioer Sand/Mof Intent (LOof minor m

Morrum has bin favor of Enterprises nor Mineralsion Rules 1Mining OffU.P) for a p

nth ed (Non Forlimited com

SH-42

in Plate Noin Plate No

n .

P) er

°34'22.35'' N

37'18.70'' E

n orrum OI) for

mineral been M/S under

l 1963 by fficer, period of

rest Land) mpany

o.3, 5 Km rao. 5.

Page | 4

N

adius area

Page 8: MINING PLAN- BARGAD - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...r bed (GM l hs APTER PPLICANT sil-Sadar, D v Charan Si mashankar S ingh R/O St INTENDS

Ov

3.1 P

Ththex

78arantrthhuplgrtemtem

3.2 G

P

Q

U

M

A

Lo

Thcomwsydugrsyfrthww

3.3 LOCA

MSa

verseas Mi

hysiograph

he topographe state .Jhaxtends betw

8°36'54.00'' rea is chieflynd Pahuj riributaries of hree main riumid and it lace from Jround wateremperature i

month with emperature

minimum tem

eology

robable Ge

Quaternary

pper Protero

Middle Protoe

rchean to

ower Protero

he northern onsisting of

maximum thweathered zoystem. The ugwells and ranite gneissystem. The arequently ochickness of a

wells. Groundwater occurs

AL GEOLOG

Mining area and/Morrum

in-tech Con

hy

phy of the aansi district ween the n

E to 78°37y drained byivers are trDhasan are

vers are peis characterune to Septr. January is 24.10 C amean dailyis 28.80 C.

mperature is

eological Su

---

ozoic

-----

erozoic

----

ozoic

part of the mainly fin

hickness of one of grannorthern atubewells.

sic complex aquifer systeccurring outcabout 20 to 4d water occuin fractures

Y

is situated m is spread a

nsultants

CH

rea is flat. Tis graduallyorth latitud

'18.70'' E y the river Bributaries ofe the Lakherennial. Theized by a hotember. Duis the coldend the meany maximum. The mean19.20 C.

uccession o

--------------

--------------

--------------

district is oe to coarseabout 60.0

nite-gneissicquifer systeIn southernof Archean

em exhibits crops, hilloc40 meters ars under waand in fine i

in the banll over the a

HAPTER

The district y sloping in es of 25°34

falling in theBetwa and mf Pahuj anderi, Sukhnai,e average anot dry summring monsooest month on daily minim

m temperatun monthly m

f the study

-- Unconform

- Unconform

--- Unconfor

occupied by e sand, gra00 meters. c basement em yields m parts of thage and ovheterogenei

cks and lineand yield is later table coninterstices o

k of Pahujarea.

R-3

Jhansi is locthe north-ea4'05.95'' N

e Survey of minor river d Dhasan i, Kurera etcnnual rainfaler and cold on surplus wof the year mum tempeure is 42.6maximum te

y area.

Alterna

with omity---------

mity----------

mity---------

the alluviumavel, pebble

The alluviuform a mo

moderate que district, th

verlying residity to some

ear quartz rimited to monditions in pf the weathe

River .No s

cated in the asterly directo 25°34'2

India toposlike Dhasan s tributary c which are ll is 850.1mwinter. Abouwater is avwhen the

rature is 9.260 C and emperature

ate bed of sa

ccasional be-------------

Vindh

-------------

D

--------------

Bu

m of quartere, silt, clay um togetheore or less uantities of he weatheredual soils laextent due eefs. This aoderate throplains. In theered rock ma

soil is prese

South westction. The a2.35'' N lon

sheet No’s. and Pahuj. of Betwa. mainly eph

m. The climut 91% of raailable for cmean daily

20 C, May is mean dailyis 32.60 C

and and clay

eds of calcret-

hyan Super

elhi Super G

--

undelkhand

rnary age. Tand kanka

er with the homogene

ground wated zone of Brgely forms to imperviouaquifer has ough dug wee granitic teraterial.

ent in the

Page | 5

tern part of llotted areangitudes of

. The The Betwa The major

hemeral. All mate is sub-ainfall takescharging to y maximum

the hottest y minimum

and mean

y

te. -

Group

Group

Granitoids

The alluviumar attains a

underlyingous aquiferter through

Bundelkhandthe aquifer

us nature ofan average

ells and tuberrain ground

area. River

r

r f

Page 9: MINING PLAN- BARGAD - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...r bed (GM l hs APTER PPLICANT sil-Sadar, D v Charan Si mashankar S ingh R/O St INTENDS

Ov

3.3 D

Mreexduinreto

3.4 M

ThprCrivshriv

verseas Mi

DETAILS OF

Mining of Sanequired as thxposed on turing rainy

ntensity of reserves is avo be found in

METHOD OF

his is the frroposed minoncession Rver bed minhall be appliver beds, st

The maximeters mwhicheve

The quarrailway brprohibited

No quarryghat or an

No quarry

The quarupstreampurpose.

No quarryembankmsix) metefurther reone) mete

A. D

Uthdicath

C

C

C

in-tech Con

EXPLORAT

nd/Morrum he river borhe surface. season by

rains on thevailable to mn the area.

ESTIMATIO

reshly allottening for 6 Moules, 1963 a

ning policy acable for exructure and

mum depth measured fror is less.

rrying of Saridge or any d 100 m of b

ying shall beny religious

ying shall be

rrying of Sa and downst

ying shall bements. The qers to 61(sixestricted up ers distance

Details of UN

NFC is a thrhe first digitigit. Each dategory of rehe code is (3

ode (111):

ode (121):

ode (211):

nsultants

TION

is being dorne sedimentMoreover, triver waters

e upstream meet the ma

ON OF RES

ed area for onths is seleand its amennd land form

xcavation of the adjoinin

of Sand/Moom the un-m

nd/Morrumbridge fallin

both sides of

e permitted place etc.

e permitted w

and/Morrumtream from

e permitted quarrying shxty one) meto a depth from the ab

NFC classif

ree digit cod, the feasibi

digit provideesources un334).

This codemeasured

This codeindicated

The part which as

ne since lonts are deposthese sedims to almost side. Adequ

arket deman

ERVES

mining of riected as perndment 2013m studies. Aminor mine

ng areas: -

orrum quarrymined bed l

shall be prng under anyf any other b

within 50 (f

within 5 (five

shall be pany dam/we

within 46 (hall be restrieters distanof 2.40 met

bove said em

ication

de based sylity axis the

ed Codes 1der UNFC sy

e is provided mineral res

e is providemineral reso

of the meper feasibili

ng time. Nosited all alonents are accmore than

uate quantitnd. There is

iver Sand/Mr the provisi3 under RuleAs per the LOral from rive

ying in the rlevel at any

rohibited wity National Hbridge.

fifty) meters

e) meters fro

prohibited weir or any ot

(forty six) micted up to

nce from theters within 6

mbankments

stem, the ee second dig, 2 and 3 ystem has c

ed for the esources (pro

ed for the eources (prob

asured minty study has

o specific meng the rivercumulated /extracted l

y of Sand/Mno possibilit

Morrum minoon made in e 34 and guOI, the folloer bed in or

iver bed shay point of ti

thin 300 m ighway/Stat

s of any pub

om both ban

within 100 ther structur

meters distaa depth of e said emba61 (sixty on.

conomic viait and the gin decreasi

code (111) a

economicallyoved categor

economicallybable catego

eral resourcs not found

ethod of exr bed and ar/replenished evel dependMorrum in mty of any ot

or mineral. Tthe U.P Miideline conta

owing speciader to ensur

all not exceeme or the w

on both site Highway a

blic place i.e

nks of the riv

(one hundrere erected fo

nce from Fl1.80m withiankments ane) meters to

ability axis regeological axng order. Tand for lowe

y mineable ry reserves).

y mineable ory reserves)

ces (proved economically

Page | 6

ploration is re very well every year

ding on the mixed state her mineral

The area of nor Mineral ained in the l conditions re safety of

ed 3 (three) water table

des of any and shall be

. cremation

ver.

ed) meters or irrigation

ood control in 46 (forty nd shall be o 91(ninety

epresenting xis the third The highest est category

part of the .

part of the ).

category), y mineable.

Page 10: MINING PLAN- BARGAD - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...r bed (GM l hs APTER PPLICANT sil-Sadar, D v Charan Si mashankar S ingh R/O St INTENDS

Ov

Geologic

The totalSand/Morbe realizedone only

verseas Mi

C

C

cal Reserve

l mineable rrum so extred after leavy up to a dep

in-tech Con

ode (222):

ode (333):

s

reserves asracted will bing out 25%pth of 3 m.

nsultants

The reserpermanen

The part which as The reserpermanen

Tonnage,level of co

s estimatedbe replenishe% as blocked

rves blockednt structure.

of the indiper feasibili

rves blockednt structure.

Grade andonfidence an

within theed every ye area in ord

in 7.5 mete

cated minerty study has in 7.5 mete

mineral cond resources

e short termar after moner to protec

ers buffer zo

ral resources not found ers buffer zo

ntents can s are also inf

m permit ansoon. The t the river b

one and 50 m

es (probableeconomically

one and 50 m

be estimateferred from g

re 8857cumextractable

banks. The m

Page | 7

meters from

category), y mineable. meters from

ed with low geological.

m .The rivereserves wi

mining will be

er ll e

Page 11: MINING PLAN- BARGAD - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...r bed (GM l hs APTER PPLICANT sil-Sadar, D v Charan Si mashankar S ingh R/O St INTENDS

O

Sr. No.

(PAHUJ

1.

Overseas Min-t

Name of the Ghats/

Village

RIVER)

ARAJI NO-143 BARGAD

tech Consultan

Name of River

PAHUJ RIVER

nts

Coo

Latitude (N)

25034'21.00''

25034'22.35''

25034'16.94''

25034'10.28''

25034'07.38''

25034'05.95''

25034'14.06''

ordinate

Longitud(E)

78036'54.00''

78036'55.05''

78037'02.34''

78037'12.72''

78037'18.70''

78037'17.97''

78037'04.32''

Short term

permitarea

In sqmde

34398

Page | 8

t

m

Total Proved

GeologicaReveres TONNE=

area*Dept(UNFC cod111)

(in cum)

103194

8

al

he

Blocked arof

25% blocked i

River, banrailwaysRoad / bridges

Short terpermit

Boundaretc.=

(in sqm)

8599

rea

in ks,

s,

s m y

)

GeologReserv

BlockArea(in

(UNCode 211

2579

gical ves in ked cum)

FC 1*222)

MinRes11

georese

c

99 8

neable serves 1% of logical

erve(in um)

8857

Page 12: MINING PLAN- BARGAD - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...r bed (GM l hs APTER PPLICANT sil-Sadar, D v Charan Si mashankar S ingh R/O St INTENDS

Ov

Total Min

The mine

ReservesTotal M

A. Min

1.

2.

B. Rem

1.

2.

3.

4.

5.

6.

Details o

UNFC is afeasibility

Codes 1, (111) and

Code (11

Code (12

Code (21

Code (22

Code (33

Anticipat

The area of grant othe antici

verseas Mi

neable Rese

eral reserve

s of Sand/MMineral Reso

neral Reserv

Proved Mine

Probable Mi

maining Min

Feasibility M

Prefeasibility

Measured M

Indicated M

Inferred Min

Reconnaissa

of UNFC clas

a three digity axis the sec

2 and 3 in dd for lowest

11): This resou

21): This resou

11): The pstudyzone

22): The pstudyzone

33): Tonnaresou

ted life of t

for Sand/Moof permit. Acpated life of

in-tech Con

erves

es are com

Morrum ources (A+

ves

eral Reserve

neral Reserv

neral

Mineral Resou

y Mineral Re

Mineral Resou

ineral Resou

neral Resour

ance Mineral

ssification

t code basecond digit an

decreaSingh category the

code is prorces (proved

code is prorces (probab

part of the my has not fouand 45 mete

part of the iny has not fouand 45 mete

age, Grade arces are also

the mine

orrum (minoccordingly, itmine will be

nsultants

=

=

puted as pe

+B)

s

ves

urces

esources

urces

urces

rces

Resources

d system, tnd the geolo

order. The he code is (33

ovided for thd category re

ovided for tble category

measured miund economers from per

ndicated minund economers from per

and mineral o inferred fro

r minerals) t is proposee 6 Months.

(Proved)

8857cum

er UNFC. Th

he economicogical axis th

highest cate34).

he economiceserves).

he economiy reserves).

ineral resourically minearmanent stru

neral resourcically minearmanent stru

contents canom geologic

has been cod to produce

) reserves

m

he reserves

Code

111

121 & 1

211

221 & 2

331

332

333

334

c viability axhe third digit

gory of reso

cally minea

ically minea

rces (provedble. The res

ucture.

ces (probableble. The res

ucture.

n be estimatal.

nsented for e 8857cum

s are as fol

22

22

xis represen. Each digit

ources under

ble part of

able part of

d category), serves block

e category),serves block

ted with low

a period of 6within 6 mo

lows:

Reser

8857c

Ni

Ni

Ni

Ni

Ni

Ni

Ni

nting the firsprovided.

r UNFC syste

the measu

f the indicat

which as peed in 7.5 m

which as peed in 7.5 m

level of con

6 Months froonth permit

Page | 9

rves

cum

l

l

l

l

l

l

l

st digit, the

em has code

red mineral

ted mineral

er feasibilityeters buffer

er feasibilityeters buffer

nfidence and

om the date period. So,

y r

r

Page 13: MINING PLAN- BARGAD - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...r bed (GM l hs APTER PPLICANT sil-Sadar, D v Charan Si mashankar S ingh R/O St INTENDS

Ov

4.0 P

ItmcaU

Itfosc

M

4.1 P

ThwbeTr

4.2 EX

Prmthbe

T

verseas Mi

resent Met

t is a case ofmechanized oarried out b.P.

t is proposedollowing concientifically.

Mining activity

Lightweig

No OB/ w

No drilling

Proper be

Roads wil

Roads in have slop

ExtractionThis will course.

Approach permanendestinatio

roposed Ye

he river Sanwill be require done by srucks. It is p

XTENT OF Mresently, no

mining operathe following e deployed a

he ProposeS.No. Ma

1. JCB

3. Du

4. Tra

in-tech Con

hod of Min

f freshly graonly in nighty the LOI h

d to producesideration ta

y will be car

ht excavato

waste materia

g/ blasting is

enching of 3.

l be properly

the short tepes more tha

n activities wnot obstruct

roads fromnt tar roadsons.

ear wise de

d/Morrum ised for the msemi- mechaproposed to

MECHANIZAmining is c

tions. To acmachinery i

and their Sp

ed Mining Mchine

B

umper/Truck

ctor Trolley

nsultants

CH

METHOing: -

nt of short tt) as per theolder with d

e 8857cum Saken for the

rried out by o

rs will be us

al will be pro

s required as

.0 m height

y made and

erm permit an 1 in 20.

will start in t the movem

m the various on both sid

evelopment

s exposed anmining of rivanized meaproduce abo

ATION carried out inhieve the des proposed ecifications a

Machinery is

ks

HAPTER

OD OF M

term permite provisions due permiss

Sand/Morrume proposed m

open cast Se

ed for diggin

oduced.

s the materi

will be main

sprayed by

area for the

the blocks ment of wate

s blocks as des of the r

t for Six Mo

nd does not er bed Sandans and traout 8857cum

n the allotteesired produto be deployare as follow

s as followsMa

JC

Ashok

Mahindra

R-4

MINING

. The mininglaid in the nion from the

m (minor minmine layout

emi-mechan

ng & loading

al is loose in

tained.

water for su

e movement

from the uer, if any, d

already desriver for tra

onths: -

have any ovd/Morrum. Ensportation

m.

ed area, so tuction, as pryed for Sandws - :

s: - ake

CB

Leyland

a/Sonalika

G

g is being donew Sand/Me departmen

nerals) withito be carrie

ized method

g of mineral

n nature.

uppression o

of loaded t

pstream sidduring mons

cribed earliensportation

ver burden sExtraction of

will be don

there is no moposed in sid/Morrum m

Capa

0.9

20 To

4 To

one by manuMorrum policynt of Mines

in six monthed out syste

d.

in Dumpers

f dust.

trippers/ tru

e to downstoon period

er will be mof the mine

so no develoriver Sand/

ne by hired

machinery dix month peining. The M

acity

m3

onne

nne

Page | 10

ually (semi-y. Mining is & Geology,

hs , for this, ematically &

& Trucks.

cks will not

tream side. in the river

erging with eral to final

opment work/Morrum willDumpers &

deployed forrmit period,

Machinery to

k l

&

r

Page 14: MINING PLAN- BARGAD - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...r bed (GM l hs APTER PPLICANT sil-Sadar, D v Charan Si mashankar S ingh R/O St INTENDS

Ov

4.3 P

Thar

4.4 P

Thre

4.5 M

Thth

4.6 P

O

M

ThSaw

M

TharbawrivdowbycoisthSaThbesesibe

Conceptu

The concework the mineral to

verseas Mi

roduction f

he productiorea will be re

ROPOSED R

he required equired targe

MINERAL RE

he area for She date of au

ROPOSED M

Opencast W

Method for d

he Mining wand/Morrum

will be exploit

Method of m

he area allotrea of Araji ank and stre

won from Rivver Sand/Moone by man

with proper ly formation onsumers ofs to be remohe dust supand/Morrumhe max. depe carried oueason. Movedes throughe done.

Mining wierosion.

Mining wiprotection

Excavatedarea.

The maximeters mwhicheve

ual Mining

eptual Minindeposit by

o its fullest e

in-tech Con

for the six m

on of Sand &eplenished n

RATE OF PR

rate of pret is planned

ESERVE AN

Sand/Morrumuction .So, t

METHOD OF

orking

developing

will be carrm will be tranted in its nat

mining

tted is for a NO-143 in eam for rivever Ghat wilorrum brougnually from ighting. Theof benches

f Jhansi Distoved before ppressed at

m is soft. Thpth of workinut in a mannement of trih approach ro

ill be confin

ill be done ln.

d area will b

mum depth measured fror is less.

Plan and lif

g Plan has bformation

extent. The p

nsultants

month: -

& Morrum wilnaturally due

RODUCTION

roduction is d & will be a

D ANTICIPA

m (minor mhe anticipate

F MINING:

and workin

ried out asnsported. Thtural form by

period of 6 BARGAD viller bed blockl be exploite

ght out durinmorning to

e river Sand/s & it will brict. Water wthe starts a

t the sourcherefore, Envng shall not ner so that ippers/ truckoads connec

ed within ce

eaving 25%

be replenish

of Sand/Moom the un-m

fe of Mine.

been prepareof benches proposed pla

ll be 8857cue to sedimen

N WHEN MI

around ofchieved duri

ATED LIFE

inerals) has ed life of min

-

ng the depo

s per New he river Sany semi- mec

Months in Plage. Miningks around thed and it wing monsoon evening, af/Morrum wile directly lowill be sprinand thereaftce itself. Thvironment abe more ththere is no ks after rivecting to tar r

entral of the

% of the tota

hed naturally

orrum quarrymined bed l

ed up to thetill the end

anned produ

m as given nt inflow from

INE IS FULL

8857cum Sing six mont

OF MINE: -

been consene will be 6

osits

Sand Policynd/Morrum dchanized ope

Pahuj River.g will be donhe Applied Aill be simultperiod. The

fter evening ll be excavaoaded into Dkled in the aer of exploithere is no and Ecology an 3m fromobstruction

er Sand/Morroads. No pr

e river. This

l area as sa

y due to se

ying in the rlevel at any

e mining con of short te

uction is 885

by the govt.m the catchm

LY DEVELO

Sand/Morrumth permit pe

-

ented for a pMonths.

y by U.P Gdeposited asen cast meth

Allotted areane in leavinArea. The rivaneously rec

e river Sand/it will be/

ated by lightDumpers & area from wtation, at re

need for of the area

m the river beto the flow

rrum loadingrocessing of

s will preven

afety zone fr

ediment inflo

river bed shay point of ti

tract of 6 Merm permit7cum.

in the auctiment area.

OPED: -

m minor miriod.

period of 6 M

Government the river b

hod.

a consists ofng safety disver Sand/Moclaimed by /Morrum mican be usedt weight excTrucks for

where the Saegular intervdrilling &

a remains ued Mining acof water, d

g will be toriver Sand/M

nt collapse o

rom the ban

ow from the

all not exceeime or the

onths. It is contract to

Page | 11

ion. Excavat

inerals. The

Months from

. Only dry ed material

f 3.4398 ha stance form orrum to be replenished ning will be d excavator cavators/jcbdispatch to

and/Morrumvals to keep blasting as ndisturbed. ctivities will during rainy wards both Morrum will

of bank and

nks for bank

e catchment

ed 3 (three) water table

proposed toexploit the

ted

Page 15: MINING PLAN- BARGAD - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...r bed (GM l hs APTER PPLICANT sil-Sadar, D v Charan Si mashankar S ingh R/O St INTENDS

Ov

The river

The prese

undertake

Drainage

verseas Mi

Sand/Morru

ent short te

en during ra

map of Jhan

in-tech Con

m is a loose

erm permit

iny season.

nsi is shown

nsultants

CH

Be material so

CH

MINarea is situa

The main riv

in Figure be

Fig. Dr

HAPTER

BLASTINo no blasting

HAPTER

E DRAIated in the

ver/stream w

elow-

rainage ma

R- 5

NG is required

R- 6

INAGEbank of Pa

will not be d

ap of Jhansi

for its minin

ahuj River M

iverted in an

i district

ng.

Mining work

ny case.

Page | 12

will not be

Page 16: MINING PLAN- BARGAD - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...r bed (GM l hs APTER PPLICANT sil-Sadar, D v Charan Si mashankar S ingh R/O St INTENDS

Ov

STACThere is ndoes not

The mineThere will

Const

Raw m

Raw m

The river required.

Mode of

During thTrucks, fomine is si

verseas Mi

CKING Ono waste or marise for the

ral river Sanl be no bene

truction mat

material for

material for

Sand/Morru

Transport o

he Mining Plor onward trtuated very

in-tech Con

OF MINmineral reje

e stacking of

nd/Morrum iseficiation or t

erial for buil

construction

roads constr

MIum will be u

of Mineral t

an period, transport to close to the

nsultants

CH

NERAL Rcts generatithe same.

CH

USE

s used for thtreatment be

dings,

n of dams,

ruction, pavi

CH

INERALused as bui

CH

SURFAC

to the Disp

the mineral the consum

e SH-42.

HAPTER

REJECTSon in the pro

HAPTER

OF MIN

he following efore its disp

ing, etc.

HAPTER

L BENEFlding constr

HAPTER

CE TRA

atch Point:

produced wer as well a

R – 7

S & DISoposed mini

R- 8

NERAL

uses and it wpatch.

R- 9

FICIATIruction mate

- 10

ANSPOR

: -

will be loadeas to the Ma

SPOSALng of river S

will be dispa

ION erial so no m

RT

ed into truckarket nearby

L OF WASand/Morrum

atched in its

mineral ben

ks/dumpers/y the allotte

Page | 13

ASTESm so questio

crude form.

eficiation is

/Dumpers &d area. The

n

&

Page 17: MINING PLAN- BARGAD - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...r bed (GM l hs APTER PPLICANT sil-Sadar, D v Charan Si mashankar S ingh R/O St INTENDS

Ov

Working

structure

be kept in

Rest She

mine site. Primary

the first a Protectiv

sprinkling

for their s

Requiremscientific

a. M

b. H

c. S

d. S

e. Se

To

verseas Mi

Office: Te

and can eas

n covered bu

elter: A tem

.

Health/Fir

aid treatmen

ve Measure

g will be done

safety measu

ent of Technmining: -

Mining Engine

.E.M.M. Ope

upervisor

killed Worke

emiskilled W

otal

in-tech Con

emporary w

sily shifted o

uckets / clay

mporary struc

st Aid: First

t to the wor

es: Shoes an

e to check th

ures.

DEnical and oth

eer

erators

ers

Workers

nsultants

CH

SITworking offic

one side to

pitcher and

cture as a re

t aid box wi

kers.

nd helmet w

he dust pollu

CH

ETAILS her superviso

-

-

-

-

-

-

HAPTER

E SERVce will be m

another side

will be prov

est shelter t

ith principal

will be provi

ution. Ear Pl

HAPTER

OF EMPory staff will

1

4

2

10

20

37

- 11

VICES maintained a

e as & when

vided to min

to labours w

medicine w

ded to all th

ug & dust m

- 12

PLOYMEl be as follow

at site. This

n required. S

e workers.

will be provid

ill be kept a

he workers

mask will be p

ENT ws for the pr

s will be a

Safe drinking

ded to the w

at mine site

during mini

provided to t

roposed syst

Page | 14

temporary

g water will

workers near

to facilitate

ng. Regular

the workers

tematic and

Page 18: MINING PLAN- BARGAD - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...r bed (GM l hs APTER PPLICANT sil-Sadar, D v Charan Si mashankar S ingh R/O St INTENDS

Ov

13.1 B

(i

(i

(i

(i

(

verseas Mi

ASE LINE I

i) EXIST

The aagricupermioperaseaso

ii) WATE

Surfa

whic

Grou

iii) FLOR

Top s

this is

specie

like K

Amp

Indian

iv) CLIM

Temp

and c

mons

month

mean

maxim

The m

is 19.

Rainf

(v) SOC

Peopl

Occu

in-tech Con

ENVIRO

INFORMATI

TING LAND

allotted shorulture land iit lies within

ation. The rivon. The ultim

Sum

Riv

ER REGIME

ce Water: S

ch is a peren

nd Water: W

RA & FAUNA

soil layer is

s a river ban

es like pipal

Kaner, Madar

hibians and

n Rohu are a

MATIC COND

perature: Tcold winter.

oon surplus

h of the ye

daily minim

mum tempe

mean month

20 C. fall: Average

IAL ENVIR

es, mainly in

pation

nsultants

CH

ONMEN

ION

D USE PATT

rt term permin the allotte river beds over Sand/Mo

mate land use

mmary

ver bed

Short term p

nnial water b

Water level

A

not present

nk of river So

, mango, Ne

r, Dhatura, M

reptiles are

also common

DITION

The climate i

About 91%

water is ava

ar when the

mum temper

rature is 42

ly maximum

e rain fall in

ONMENT

n this area b

HAPTER

T MANA

ERN

mit area of ed short terof Pahuj Riveorrum will be of the allot

permit area

body.

in wells vari

hence the

on where mi

eem, Ber, Ba

Makoi, and M

e common i

n in river wa

is sub-humid

% of rainfall

ailable for ch

e mean dai

rature is 9.2

2.60 C and

m temperatu

the month o

belong to Hin

- 13

AGEMEN

mining is arm permit aer and therebe replenishetted short te

Area (in

3.4398

is in the ban

es 5-15mbg

area devoid

neral (river

abool etc ar

Munj are a fe

in such type

ater.

d and it is c

takes place

harging to g

ly maximum

0 C, May is

mean daily

re is 32.60

of July Augu

ndu commun

NT PLA

a river bed.rea. The en

e will be no ced every yeerm permit a

Ha)

nk of River P

gl.

d of any kin

sand) is spr

e common i

ew common

e of habitat

characterized

e from June

round water

m temperatu

the hottest

minimum te

C and mean

st is around

nity.

AN

. There is ntire allotted change in lanar during th

area will not

Pahuj .

d of vegetat

read over the

n nearby ar

species.

. Species of

d by a hot d

e to Septem

r. January is

ure is 24.10

month with

emperature

n minimum t

850mm.

Page | 15

no forest or short term

nd use after he monsoon change.

tion. Infect,

e area. Tree

eas. Shurbs

f fishes like

dry summer

ber. During

s the coldest

0 C and the

mean daily

is 28.80 C.

temperature

r

t

Page 19: MINING PLAN- BARGAD - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...r bed (GM l hs APTER PPLICANT sil-Sadar, D v Charan Si mashankar S ingh R/O St INTENDS

Ov

(v

13.2 E

ThracoSa

i.

ii.

iii

iv

v.

So

i.

ii.

iii

Thex

Th

Thinlim

Thcow

Asm

ThseSa

13.3 E

MPoexthof

Ththac

verseas Mi

The m

other

vi) PUBL

The aconne

NVIRONME

he Sand/Moather it will honfined to tand/Morrum

Dust gene

Noise poll

. Impact on

v. Impact on

. Impact on

ome of the b

Regular d

Upgradati

. Vital supp

he baseline xcept monso

he study are

he data obtandicates thatmits which is

he surface woncentrationithin permis

s far as themineral. More

here is no rensitive areand/Morrum

NVIRONME

Mining of riveolicy, and xploitation ohe river will f infrastructu

he project inhe riverbedschieved by m

in-tech Con

main occupat

main occup

LIC BUILDI

llotted area ecting road f

ENT IMPACT

orrum mininhave beneficthe dry por

m mining:

eration durin

lution

n river water

n ground wa

n flora and f

beneficial eff

de-siltation o

ion of socio-

port to const

study of thoon.

ea also witne

ained from tt for a numbs quite obvio

water qualit of microbisible limits e

noise level eover, no po

rare speciesa, wildlife

m short term

ENTAL MAN

er Sand/MorU.P Minor

of river Sandbe used for ures, buildin

nvolves colle and to prev

maintaining t

nsultants

tion in the a

ations in ne

NG, PLACES

is parts of rfor local tran

T ASSESSM

ng activity wcial impact. Trtion of the

ng handling

r quality

ater

auna

fects from Sa

of the river to

-economic le

truction activ

e various e

esses huge t

the ambient ber of occasioous since the

ty data shoal organismexcept the d

is concernepulated area

s of flora orsanctuary apermit.

NAGEMENT

rum will be Mineral Co

d/Morrum neits exploitatg bridges, ro

ection of rivevent floodingthe existing

area is agricu

arby villager

S AND MON

river Ghats hnsportation.

MENT STATE

will have mThe removalbed. Howe

and transpo

and/Morrum

o avoid flood

evel of the ar

vity

nvironmenta

ransportatio

air quality aons the levee area has b

ws that all ms. Moreove

issolved min

ed, it is onlya found with

r endangereand nationa

PLAN

carried out oncession Recessary as tion so that oad etc.

er bed mateg off and dacourse of th

ultural. Teac

rs.

NUMENTS

having no inf

EMENT

inimum advl of the Sandever, the fo

rtation.

m mining acti

ding

rea

al paramete

on activities o

analysis carrel of air qualeen declared

the paramer the grounneral concen

y during thein 500 mete

ed fauna in al parks in

as per the gRules (amen

constructionit will be us

erial. This wamage to thehe river. This

ching, small

frastructures

verse impactd/Morrum frollowing area

ivity are:

rs is being

of minerals,

ried out by oity was highd critically p

eters are wnd water anntration level

e loading aners from the

the study a10 kms ra

guidelines isnded thereon material. Tsed in const

ill also help e adjoining s is ensured

business, m

s, except fai

t on the enom the riveras are affec

studied for

men, mater

our EIA/EMPher than the olluted area

within range nalysis data l.

nd transportaedge of the

area. There adius of th

sued under of).This proThe area allruction of va

to prevent areas. This through the

Page | 16

mining is the

r weathered

nvironment; r bed will be cted due to

one season

rial, etc.

P consultant permissible .

except the was found

ation of the river.

is no eco-e proposed

U.P Mineral oject is for lotted along arious kinds

widening of can only be

e following:

Page 20: MINING PLAN- BARGAD - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...r bed (GM l hs APTER PPLICANT sil-Sadar, D v Charan Si mashankar S ingh R/O St INTENDS

Ov

1.

2.

3.

4.

5.

6.

7.

8.

9.

10

11

12

13

14

15

16

17

18

Pbe

P

Plneso1pepe

verseas Mi

. The maxmeters mwhicheve

. The quarailway bbe prohi

. No quarror any re

. No quarr

. The quaupstreampurpose.

. No quarembankmsix) metfurther rone) me

. The irrigno case

. No quarrof 5 met

. The extrCertificatirrigation

0. No quarother tharaiyat.

1. No quarrnotifies a

2. Water sp

3. Maintain

4. Transpor

5. Maintena

6. Use of p

7. No withd

8. This proprovides

rogram of e afforeste

ROGRAMM

lantation wilearby schooource. The .13hectare her hectare aermit period

in-tech Con

ximum depthmeasured frer is less.

arrying of Sabridge or anbited 100 m

rying shall beligious plac

rying shall b

arrying of Sm and downs.

rying shall bments. The ters to 61(srestricted upters distance

gation outlet the river bed

rying shall bters.

raction of Ste’ from thn channels a

rying of Sanan the settle

rying of Sanas a restricte

praying alon

the health o

rtation by co

ance of truck

roper PPE’s

drawal/ pum

oject operats employmen

afforestatied.

E FOR PLAN

ll be carriedol, Hospital,

total allotthas to be coas a tree ded. The rainfa

nsultants

h of Sand/Morom the un-

and/Morrumny bridge fal of both side

be permittede etc.

e permitted

Sand/Morrumstream from

be permittedquarrying s

sixty one) mp to a depthe from the a

shall be mad level shall

be permitted

and/Morrume Water Re

are out flowin

nd/Morrum see unless the

nd/Morrum sed area.

g the haul ro

of the transp

overed truck

ks to preven

for the work

ping of wate

ion will pront to the peo

on, for six

NTATION

out side thpolice statioed area is

overed underensity, the aall in the are

orrum quarr-mined bed

m shall be plling under aes of any oth

d within 50 (

within 5 (fiv

m shall be m any dam/w

d within 46hall be restr

meters distan of 2.40 me

above said e

aintained at be permitte

d around the

m shall be pesources Deng.

shall be pere settlee obt

hall be perm

oads & trans

portation roa

ks.

nt spillage an

kforce is ens

er from Sand

vide livelihoople residing

month per

he river bedon and the 3.4398 hecr plantationapplicant wi

ea is also ina

rying in the rlevel at any

prohibited wany Nationaher bridge.

(fifty) meter

ve) meters f

prohibited wweir or any o

(forty six) mricted up to nce from theters within mbankment

the same leed to be belo

e infiltration

permitted onepartment i

mitted in antains the con

mitted in any

sportation ro

ads.

nd noise min

ured.

d/Morrum sh

ood to the g in vicinity d

rmit period

, at approacplace for cotare out of during the Pll plant min

adequate he

river bed shay point of t

ithin 300 ml Highway/S

s of any pub

rom both ba

within 100 other structu

meters distaa depth of e said emb61 (sixty ons.

evel as that ow the irrigat

well / intak

nly after obtn the case

ny private lansent of the

y area which

outes to prev

nimization.

hort term pe

poorest secdirectly or in

d indicating

ch road, traommon utilit

which 33%Permit perionimum 23 sance it is ess

all not exceeime or the

m on both sState Highwa

blic place i.e

anks of the r

(one hundrure erected f

ance from Fl1.80m withankments a

ne) meters t

of the rivertion outlet le

ke well up to

taining a ‘Nof rivers w

and owned bconcerned l

h the State G

vent air pollu

rmit areas.

ction of the directly by t

g number o

nsport road ty to arrest

% of the totd. Consideriaplings withsential that t

Page | 17

ed 3 (three) water table

ides of any ay and shall

e. cremation

iver.

red) meters for irrigation

lood control in 46 (forty nd shall be

to 91(ninety

r bed and in evel.

o a distance

o Objection where from

by a person land owner/

Government

ution.

society. It the project.

f plants to

of mineral,the dust at

tal area i.e. ng 20 trees in 6 month the saplings

Page 21: MINING PLAN- BARGAD - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...r bed (GM l hs APTER PPLICANT sil-Sadar, D v Charan Si mashankar S ingh R/O St INTENDS

Ov

ofpl

P

Plmdu

M

CPSa

1

2

3

4

Mea

1.

2.

3.

4.

5.

STA

Theso s

TRE

Therequman

MEA

No min

AFF

As twill

PRE

Themin

verseas Mi

f plants sholant 23 sapli

lace of pro

lantation shmineral, nearust at source

MEASURES F

ontrol of Arocessing ame Within

. Waterpoint

. Prope

. At evconcemeasthe ainterv

. Silenc

asures to C

All thegener

Noise

Atten

Noise

Densezone.

ABILISATIO

ere will be nstabilization

EATMENT A

e proposed muired. Therenagement.

ASURES FO

impact will neral nor any

FORESTATI

there is no bnot be requ

EPARATION

ere will be noneral nor any

in-tech Con

uld be of thngs of local

posed plan

all be donerby school, He.

FOR DUST S

Air PollutioOperations

n Permissib

r spray will of the minin

er care & freq

very work pentration ofurement at vailable con

vals not exce

cers will be f

Control Imp

e machinerieration of nois

source will

uation betwe

will be kept

e plantation

ON AND VE

o waste genof waste wil

AND DISPOS

mine workine will be no

OR MINIMIS

take place y toxic subst

ION OF TAI

beneficiationuired.

N OF DUMP

o generationy waste will r

nsultants

he variety wvariety with

ntation: -

in the ouHospital, po

SUPPRESSI

n Due To Ds For Minoble Limits S

be done thrng short term

quent maint

place where,f the respany workpla

ncentration oeeding 3 mo

fitted to the

pacts of Noi

es including se.

be isolated.

een source &

t as a prime

in mining a

GETATION

neration froml not be req

SAL OF WA

ngs will be treatment o

SINGH ADV

due to protance will be

LING POND

so tailing p

ING GROUN

of toxic subrequire dum

which requirehin 6 month

utside the rilice station

ION

Dust, Exhaor Mineral Specified Un

ice in a day m permit dur

enance of m

, the air bopirable dustace, source of permissibnths or 1 mo

dumpers.

ise: -

transport v

& receive po

consideratio

area will also

OF DUMPS

m the propouired.

ATER FROM

above the gof mineral to

VERSE EFFE

posed minin discharged

DS

onds are no

ND FOR STA

bstances, dumping ground

e minimum as recomme

ver bed, at and the plac

ust Emissio& Related

nder : -

over the haring the wor

machines will

orne dust get will be the concentle limit. Meaonth respect

ehicles will b

oints will be i

on while pur

o reduce pro

S

osed mining

MINE AND

ground wateo produce ef

ECTS ON WA

ng activities to the groun

t proposed,

ACKING TO

e to the prod for stacking

water and hended by the

approach rce for comm

ons or FumActivities

aul road & urking hour

be done.

enerated, todeterminedration in accasurements tively.

be properly

incased.

chasing the

opagation of

of Sand/Mo

BENEFICIA

er table thuffluent hence

ATER REGI

on water qnd water.

hence affore

OXIC MINER

posed mining the toxic m

hence it is pe regional fo

road, transpmon utility to

mes DuringAnd Cont

pto 2 km fro

o be sampled semesterlcess of 50%shall be car

maintained

machines.

f noise outsi

orrum (mino

ATION PLA

us no measue it will not

ME

quality also

estation of ta

RAL SUBSTA

ng. So, neithmineral / sub

Page | 18

proposed to rest officer.

port road ofo arrest the

Mining oraining the

om the end

ed and the y. If any

% or 75% of rried on, at

to minimize

ide the core

r minerals),

ANT

ures will berequire any

neither the

ailing ponds

ANCE

er the bstance.

f

r

y

Page 22: MINING PLAN- BARGAD - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...r bed (GM l hs APTER PPLICANT sil-Sadar, D v Charan Si mashankar S ingh R/O St INTENDS

Ov

In prepar

Place :

Date :

verseas Mi

ation of this

Jaipur

in-tech Con

AN

Mining plan

nsultants

CH

NY OTHE

n Mrs. Prer

HAPTER

ER INFO

na Chauha

R-14

ORMAT

n Bisht Geo

ION

ologist has p

(

RQP

rovided her

(Arun Kum

RQP/ AJM/2

Validity 21s

Page | 19

assistance.

mar Yadav)

242/2003/Ast May, 2023

A

Page 23: MINING PLAN- BARGAD - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...r bed (GM l hs APTER PPLICANT sil-Sadar, D v Charan Si mashankar S ingh R/O St INTENDS

Ov

verseas Mi

P

CL

in-tech Con

PRO

LOS

nsultants

OG

M

SU

GRE

MIN

URE

ESS

NE

E P

SIV

PLA

VE

AN

Page | 20

N

Page 24: MINING PLAN- BARGAD - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...r bed (GM l hs APTER PPLICANT sil-Sadar, D v Charan Si mashankar S ingh R/O St INTENDS

Ov

1.0 IN

Le

M

19

(U

ap

of

Th

on

be

Jh

m

In

Ex

an

C

ha

A

1.1 R

Th

1.2 St

The limposthe InCentrcomp

The capproimposany o

1.3 C

M A

verseas Mi

NTRODUCT

etter of Inte

M/S Ashish

9.05.2017 u

U.P) for the

pproximately

f grant of pe

he proposed

n the river b

een allotted

hansi (U.P).S

mm, 0.25 mm

n order to p

xpert Appra

nd approval

ompany has

aving RQP

Annexure-I.

Reasons for

he area is fr

tatutory ob

egal obligatsed while exndian Bureaural Pollution Cliance positi

company wiloval of Shorsed by the Mther organiz

losure plan

M/S AshishAddress: Sta

in-tech Con

TION: -

ent (LOI) for

Enterprises

under U.P M

period of 6

y. The Minin

ermit Copy e

d production

beds of Pah

for mining

Sand/Morrum

m to 0.50 mm

rocess furth

isal Commit

of Mining

s given the

No. RQP/A

Closure : -

eshly allotte

bligations :

tions, if anyxecution of su of Mines, cControl Boaron there of:

l implementt term permMinistry of Ezation.

n preparatio

h Enterpriseation Road,

nsultants

CH

r mining of m

s vide lett

inor Mineral

6 month The

ng Short term

enclosed as A

capacity of

uj River in J

of River San

ms Grades a

m and 0.63

her by the co

tee is neces

Plan for the

work of Pr

AJM/242/2

-

ed area there

-

y which the short term pconditions imrd or by any

t like specialmit, directiveEnvironment

on : -

es Parichha, TE

HAPTER

minor miner

ter no.184

l Concession

e total area

m permit is

Annexure-I

Sand/Morru

Jhansi distri

nd/Morrum t

as fine, med

mm to 2.0 m

oncern Depa

ssary. For th

e said area

reparation o

003/A, Va

efore closure

applicant ipermit ,appromposed by ty other organ

l conditions es issued by & Forests,

EHSIL-SADA

R –1

ral Sand/Mo

/30MMC/E-N

n Rules 1963

of mining

granted for

II.

m is 8857cu

ct, U.P. The

throughout

dium and co

mm respectiv

artment, an

he grant of e

is also one

f Mining Pla

lidity 21st M

e of mine is

s bound to oval of Shorthe Ministrynization desc

imposed why the CentraState or Ce

AR, District-J

rrum has be

NIVIDA/APPR

3 by District

is (8.50 A

a period of

um. The sho

e proposed m

the riverbed

arse with ra

vely.

environmen

environment

of the com

an to RQP-

May, 2023.C

not applicab

implement rt term permof Environmcribing the n

hile executioal & State Gentral Polluti

hansi

een granted

ROVAL/2017

t Mining Off

Acres) 3.439

6 month fro

rt term perm

mining proje

d of Pahuj R

anges 0.063

nt clearance

t clearance,

mponents. F

Arun Kum

Consent is a

ble at this sta

like speciamit, directivement & Foresnature of con

on of short tGovernmenton Control B

Page | 21

in Favor of

7-18 dated

ficer, Jhansi

98 Hectares

om the date

mit area lies

ect land has

River district

mm to 0.2

from State

preparation

or this, the

mar Yadav,

attached as

age.

l conditions es issued by sts, State or nditions and

term permit , conditions Board or by

Page 25: MINING PLAN- BARGAD - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...r bed (GM l hs APTER PPLICANT sil-Sadar, D v Charan Si mashankar S ingh R/O St INTENDS

Ov

1.4 N

Ar

RQ

Va

50

P.

E-

W

Te

1.4 Ex

M A

verseas Mi

Name & add

run Kumar Y

QP/AJM/242

alidity 21st M

01, Apex Tow

.O. Jaipur-30

-mail- arun@

ebsite- www

elefax- 0141

xecuting Ag

M/S Ashish EAddress: Stat

in-tech Con

dress and R

Yadav,

2/2003/A,

May, 2023

wer, Tonk R

02015(Raj.)

@overseasm

w.overseasm

1-2744509, M

gency

nterprises tion Road, P

nsultants

Registration

oad,

intech.com

mintech.com

M-+91-9460

arichha, TEH

n Number o

0221084

HSIL-SADAR

of the Recog

R, District-Jh

gnized pers

ansi

son

Page | 22

Page 26: MINING PLAN- BARGAD - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...r bed (GM l hs APTER PPLICANT sil-Sadar, D v Charan Si mashankar S ingh R/O St INTENDS

Ov

2.1 G

P

Q

U

M

A

Lo

almwsydugrsyfrthtugr

3.3 LOCA

MSa

2.2 R

More

2

2

verseas Mi

EOLOGY

robable Ge

Quaternary

pper Protero

Middle Protoe

rchean to

ower Protero

The nolluvium cons

maximum thweathered zoystem. The ugwells and ranitegneissystem. The arequently ochickness of ubewells. Grround water

AL GEOLOG

Mining area and/Morrum

Reserves

Reserves

Proved rese

e details ar

.3.1 Minin

Miningmovin

.3.2 Mine

The ribenef

in-tech Con

eological Su

---

ozoic

-----

erozoic

----

ozoic

orthern partsisting of mahickness of one of grannorthern atubewells.

ic complex aquifer systeccurring outcabout 20 to

round water r occurs in fr

Y

is situated m is spread a

erves

re given in c

ng Method

g will be dng machiner

ral Benefic

iver Sand/Mficiation is re

nsultants

CH

MINE

uccession o

--------------

--------------

--------------

t of the distainly fine to

about 60.0nite-gneissicquifer systeIn southernof Archean em exhibits crops, hilloco 40 metersoccurs und

ractures and

in the banll over the a

San

chapter- 3

one by opery will be dep

iation

orrum will bequired.

HAPTER

DESCRI

f the study

-- Unconform

- Unconform

--- Unconfor

trict is occucoarse sand

00 meters. c basement em yields m parts of thage and ovheterogenei

cks and lines and yield er water tain fine inter

k of Pahujarea.

nd/Morrum

8857

of Mining P

en cast manployed. More

be used as bu

R –2

IPTION

y area.

Alterna

with omity---------

mity----------

mity---------

pied by thed, gravel, pe

The alluviuform a mo

moderate que district, therlying residity to some

ear quartz ris limited t

ble conditionrstices of the

River. No s

m in cum

Plan.

nual (semi-me details are

uilding const

N

ate bed of sa

ccasional be-------------

Vindh

-------------

D

--------------

Bu

e alluvium obble, silt, claum togetheore or less uantities of he weatheredual soils laextent due eefs. This ato moderatens in plains.e weathered

soil is prese

mechanized given in cha

truction mat

and and clay

eds of calcret-

hyan Super

elhi Super G

--

undelkhand

f quarternaray and kank

er with the homogene

ground wated zone of Brgely forms to imperviouaquifer has e through du. In the grarock materi

ent in the

method) Hapter- 4 of M

terial so no m

Page | 23

y

te. -

Group

Group

Granitoids

ry age. Thekar attains a

underlyingous aquiferter through

Bundelkhandthe aquifer

us nature ofan averageugwells andnitic terrainal.

area. River

Heavy earth Mining plan.

mineral

r

r f

Page 27: MINING PLAN- BARGAD - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...r bed (GM l hs APTER PPLICANT sil-Sadar, D v Charan Si mashankar S ingh R/O St INTENDS

Ov

REVIEW UP TO TH

This is a fPlan up to

4.1 M

No re

4.2 W

Mi im

4.3 A

Dp

Asecompr

4.4 W

Ddimprdemsu

This

4.5 To

Th

4.6 In

ThrasoIfdesupiinlikus

verseas Mi

OF IMPLEMHE FINAL C

freshly allotto the final cl

Mined out la

o proposal caplenished by

Water Qualit

ining activitympact on watAir Quality m

Describe therevention o

mbient air qeason monitollected on e

movement of revention of

Waste mana

escribe the isposal pract

material will revention ofescribed. If

measures to urface and g

here is no gs proposed. T

op Soil Man

here is no ge

nfrastructu

he existing ailways, powources in thef retained, tescribed. If upport faciliipeline, wat

nfrastructureke electrical se

in-tech Con

MENTATIONCLOSURE OF

ted area, so osure of min

and

an be given y the river. ty Managem

y (collecting ter quality. managemen

e existing of pollution

quality has btoring will beach day in f vehicles anpollution of

agement

type, qualittice. If no utbe stabilize

f siltation, ertoxic and

be taken forground water

eneration ofThe entire m

nagement

eneration of

ure

infrastructurwer lines, bue area etc. ahe measure

decommissities and otter works, e like roads,

cables, tran

nsultants

CHN OF MINIF MINE.

review of imne is not app

CH

CLO

for concurre

ment

sand) will b

nt

air qualityn of air shou

een monitorbe carried ou

future as ped machinerie

f Air quality e

y and quanttilization of wed should brosion and dhazardous r preventionr etc. should

f waste durinmineral produ

topsoil.

ral facilities uildings & stand their futs to be takesioning propther infrastsewer line, rail, bridge

nsformers to

HAPTERNG PLAN I

mplementatiplicable.

HAPTER

OSURE P

ent back-filli

e done in th

y status. Tuld be desc

red by us anut on two der the normes will produexcept sprin

tity of overbwaste materbe describeddust generatelements p

n of their disd be describe

ng mining ouced is usea

available sutructures, wture utilizatioen for their posed, dismructure like, telephonees, culverts o be describe

R –3 INCLUDING

on of Mining

R –4

PLAN

ng. Further,

he bank of riv

The correctcribed:

nd external adays in a wes laid down uce impact okling of wate

burden, minial is proposd. The protion from theresent in th

spersal in thed:

peration, thble.

uch as roadsater treatmon should bephysical sta

mantling ande electric tr cables, unetc, electric

ed in connec

G PROGRES

g Plan includ

mined out r

ver Pahuj. S

tive measu

agency. For eek with 24by MoEF. E

on air. As suer on haul ro

eral reject esed, the manective measese waste mhe waste me air enviro

erefore, no

s, aerial ropeent plant, tre evaluated ability and md disposal oransmission nderground cal equipmenction with re

SSIVE CLOS

ing Progress

reserve will b

So, there sha

ures to be

baseline stu4-hourly samEmission of dch there is noad etc. in d

etc. availablenner in whichsures to be

materials shomaterial the nment, leac

provision of

eways, convransport, waon case-to-

maintenanceof building line, watertanks, tran

nts and infrstoring land

Page | 24

SURE PLAN

sive Closure

be

all be no

taken for

dy, in each mples being dust due to no need for dry season.

e and their h the waste e taken for ould also be

protective ching in the

stock yard

veyer belts, ater supply case basis.

e should be structures,

r line, gas nsportation astructures for further

Page 28: MINING PLAN- BARGAD - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...r bed (GM l hs APTER PPLICANT sil-Sadar, D v Charan Si mashankar S ingh R/O St INTENDS

Ov

4.7 D

MM

4.8 Sa

Exetop

Dpr

Se

4.9 D

Thinemcalo

Henfoth

4.10 C

Foorunannean

DanthD

Sem

ECO

Manpowemeasures

At this sthave been

verseas Mi

Disposal of M

Mining is proMining plan.

afety & Sec

xplain the satc. and arrapened for ge

.G.M.S. approposed plan

ecurity guar

Disaster Man

his should dnundation inmergency papability of ocal authority

igh risk facncountered or quick evahe working a

are and Ma

or Short termr incompletenforeseen cind monitorinear future. Tnd objective

ue to unforend staffs wilhe concerneepartment w

ecurity guamanagement

ONOMIC

r retrenchms consequent

age there wn discussed.

in-tech Con

Mining Mac

posed for op

curity

afety measungements peneral public

proved Safetn period ther

rds are enga

nagement a

deal with an undergroulan proposeapplicant toy should also

ctors such anor anticipatcuation, pro

area is far aw

aintenance

m permit pee programmircumstanceng of status This should .

eseen reasol be taken. T

ed authority within the st

rds to takein case of a

C REPERMAN

ment, compet to the closu

will be no ma

nsultants

chinery

pen cast sem

ures implemroposed dur

c should be d

ty shoes andre is no prop

ged for secu

and Risk As

ction plan fund mines, d for quick meet such o be describ

as landslide,ted during potective meaway from the

during tem

riod an ememe due to co

s, should inof unplannedetail item

on the mine Temporary d

of D.G.M.Sipulated tim

e care of tny temporar

CH

RCUSSINPOWER

ensation to ure of mines

anpower ret

m i-mechani

ented to prering the mindescribed:

d helmets aposal to clos

urity.

ssessment

for high-riskfire, seism

evacuation,eventualitieed:

, subsidenceproposed Sixasures are ne locality.

mporary dis

ergency planourt order onclude a planed discontinwise status

will be a clodiscontinuanS., concernee.

the infrastrury discontinu

HAPTER

IONS OR RETR

be given, ss should be d

trenchment e

ized mining.

event accessne abandonm

re being proe the mine.

k accidents mic activitie, amelioratives and the a

e flood, firex Months planot proposed

continuanc

n for the situr due to stan indicating ued mining monitoring

osed tempoce notice in ed State Go

ucture shalluation.

R-5

F CLOSRENCHM

socio – econdescribed, sp

etc. in the a

. Details are

s to surface ment plan an

ovided to th

like landslides, tailing dve measuresassistance to

, tailing damn period. As

d. Also, no l

ce

uation of tematutory requmeasures ooperations eand mainte

rarily then pthe prescrib

overnment a

be kept u

SURE OFMENTS

nomic reperpecifically st

area, hence,

e given in Ch

openings; end up to the

e all workm

des, subsidedam failures to be takeo be require

m failure ets such, emerocal habitan

mporary discuirements orof care, maiexpected to enance with

proper care bed form willand concern

under the

F MINE

cussions antating the fo

, no proposa

Page | 25

hapter 4 of

excavations e site being

men. During

ence flood, e etc. and en etc. The ed from the

tc. are not rgency plan nt exists as

continuance r any other intenances, re-open in periodicity

of workers l be sent to ned Labour

roll of the

AND

d remedial llowing.

al for these

Page 29: MINING PLAN- BARGAD - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...r bed (GM l hs APTER PPLICANT sil-Sadar, D v Charan Si mashankar S ingh R/O St INTENDS

Ov

Not Applic

Not Applic

The finan

Area cons

The amou

Accordingassurance

Thus the or the off

verseas Mi

TIcable

cable

ncial assura

sidered for F

unt of Financ

g to rule 34e is Rs. 2 lak

applicant shicer authoris

in-tech Con

ME SCH

Fance has be

Financial Ass

cial Assuranc

4(6) of amekh.

hall submit ased by the S

nsultants

CH

HEDULI

CH

ABAND

CH

FINANCeen calcula

urance: 3.43

ce: Rs. 5159

nded rules

financial astate Govern

HAPTER

ING FOR

HAPTER

DONMEN

HAPTER

IAL ASSated on the

398ha

97

of UP MMCR

ssurance of Rment in this

R –6

R ABAN

R –7

NT COS

R –8

SURANbasis of fo

R 1963, the

Rs. 2.0 Lakhs behalf.

NDONME

ST

CE ollowing pa

e minimum

as applicab

ENT

rameters:

amount as

ble to the dis

Page | 26

a financial

strict officer

Page 30: MINING PLAN- BARGAD - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...r bed (GM l hs APTER PPLICANT sil-Sadar, D v Charan Si mashankar S ingh R/O St INTENDS

Ov

9.0 P

A

1

2

3

4

5

Place :

Date :

verseas Mi

LANS, SECT

ll relevant p

. Locat

. Key P

. Surfa

. Year W

. Conce

Jaipur

in-tech Con

TIONS

lans & sectio

ion Plan

Plan

ce Cum Surf

Wise Develo

eptual Plan

nsultants

CH

ons have bee

face Geologi

opment Plan

HAPTER

en enclosed.

cal Plan & S

& Sections

R –9

.

Sections

(

RQP V

(Arun Kum

RQP/ AJM/2

Validity 21st

Page | 27

mar Yadav)

242/2003/At May, 2023

A

Page 31: MINING PLAN- BARGAD - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...r bed (GM l hs APTER PPLICANT sil-Sadar, D v Charan Si mashankar S ingh R/O St INTENDS

Ov

An area o

river sand

concessio

Yadav, h

I request

recognize

Ar

RQ

Va

50

P.

E-

W

Te

I hereby

deemed t

on me in

same.

Date : Place:

verseas Mi

of about (8.5

d in village

on rule 1963

aving RQP N

t to make f

ed person on

run Kumar Y

QP/AJM/242

alidity 21st M

01, Apex Tow

.O. Jaipur-30

-mail- arun@

ebsite- www

elefax- 0141

undertake t

to have been

all respect

in-tech Con

CONSEN

50 Acres) 3.4

Bargad, Te

3. The mine

No. RQP/AJ

further corre

his followin

Yadav,

2/2003/A,

May, 2023

wer, Tonk R

02015(Raj.)

@overseasm

w.overseasm

1-2744509, M

hat all the i

n made with

. I have un

nsultants

NT LETT

4398 Hectar

ehsil-Sadar-

e plan in res

M/242/20

espondence

g address:

Road,

intech.com

mintech.com

M-+91-9460

nformation

my knowled

nderstood th

TER FRO

res of Araji N

Jhansi & D

spect of abo

03/A, Valid

regarding t

0221084

provided in

dge and con

he content o

M APPLI

No.-143 has

District-Jhan

ove area ha

ity 21st May

the modifica

Mining plan

sent and sha

of this mine

ICANT

s been grant

si, U.P. und

as been prep

, 2023

ation in min

n by the reco

all be accept

plan and a

Annex

ted for the e

der U.P. mi

pared by Ar

ning plan wi

ognized pers

table to me

agree to imp

M/S Ashish

Appli

Page | 28

xure-I

extraction of

nor mineral

run Kumar

ith the said

son may be

and binding

plement the

Enterprises

cant

f

r