40
Projects THE BASIL READ GROUP Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke. Dr Michael Roberts, TWP SAIMM Zimbabwe Branch May 2010

Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke

  • Upload
    tana

  • View
    48

  • Download
    2

Embed Size (px)

DESCRIPTION

Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke. Dr Michael Roberts, TWP SAIMM Zimbabwe Branch May 2010 . Who are we?. Who are we?. What do we do?. A generic description of some project work undertaken in Zimbabwe by TWP. Activity. - PowerPoint PPT Presentation

Citation preview

Page 1: Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke

ProjectsTHE BASIL READ GROUP

Mining and processing activities in Zimbabwe and some thoughts on mining

the Great Dyke.

Dr Michael Roberts, TWP

SAIMM Zimbabwe Branch May 2010

Page 2: Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke

Who are we?

Basil Read

Construction

Buildings

Roads

Civils

Mining Developments Engineering

Basil Read Engineering

TWP

Page 3: Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke

Who are we?

Page 4: Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke

A generic description of some project work undertaken in Zimbabwe by TWP.

What do we do?

Page 5: Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke

Pickstone-Peerless hydrothermal gold deposits.

Activity

Page 6: Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke

Location

Page 7: Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke

Pickstone-Peerless hydrothermal gold deposits.

A plant will be built on site to treat a sulphide dump. Later there might be consideration given to going underground.

Activity

Page 8: Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke

Unki declines on the Great Dyke.

Activity

Page 9: Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke

Activity

Page 10: Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke

Unki declines on the Great Dyke.

Declines completed.

Activity

Page 11: Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke

Activity

Evaluating and assisting with respect to efficient Chrome mining associated with the Great Dyke.

Page 12: Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke

Activity

Optimise mining and process engineering on the Great dyke with respect to Platinum groupelements.

How done.

Optimise mineralogy, mining and process engineering by recognising that the ore body is not homogeneous.

Page 13: Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke

The Bushveld complex

Page 14: Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke

The Great dyke

Page 15: Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke

There might be some commonality with respect to structure in the Bushveld and the Great Dyke.

Mining on the Bushveld and Great dyke

Page 16: Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke

Easy mining on the Great Dyke

Page 17: Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke

Easy mining on the great dyke

Page 18: Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke

Easy mining on the Great Dyke

Page 19: Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke

Easy mining on the Bushveld

Page 20: Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke

Difficult mining on the great dyke

Page 21: Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke

Difficult mining in the Bushveld

Page 22: Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke

Some commonality with respect to structurein the Bushveld and the Great Dyke.

Flexural slip thrust faults.

Great dyke

Page 23: Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke

Flexural slip thrust fault

Page 24: Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke

What is a flexural slip thrust fault?

Ore body

SectionFlexural sl

ip thrust f

ault

Flat

Flat

Ram

p

Page 25: Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke

Flexural slip thrust fault

FlatRam

p

Page 26: Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke

Flexural slip thrust fault on the Great Dyke ?????

Page 27: Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke

Flexural slip thrust fault - origins

Page 28: Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke

Flexural slip thrust fault - origins

Page 29: Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke

Flexural slip thrust fault - origins

Page 30: Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke

Flexural slip thrust fault - origin

Page 31: Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke

Scientific description of a flexural slip thrust fault

Part of the Platmine Research Programme funded by: Anglo PlatinumImpala PlatinumLonmin

Peer reviewed scientific paper referenced:

S. Perritt and M.K.C. Roberts “Flexural-slip structures in the Bushveld Complex, South Africa?”Journal of Structural Geology, Volume 29, Issue 9, September 2007, Pages 1422-1429.

S. Perritt and M.K.C. Roberts “Flexural-slip structures in the Bushveld Complex, South Africa?”Journal of Structural Geology, Volume 29, Issue 9, September 2007, Pages 1422-1429.

S. Perritt and M.K.C. Roberts “Flexural-slip structures in the Bushveld Complex, South Africa?”Journal of Structural Geology, Volume 29, Issue 9, September 2007, Pages 1422-1429.

Page 32: Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke

Fall of ground fatalities over a set period

Curved joint moved as a precursor to fall of ground

Thrust fault or curved joint directly fell on deceased

Seismic causes

Other reasons for fall of ground

9/32 15/32 2/32 6/32

Breakdown as to cause of 32 fall of ground fatalities

Page 33: Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke

Pillar failure due to gouge on flexural slip thrust fault

Page 34: Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke

Pillar failure due to gouge on flexural slip thrust fault

Gouge

Page 35: Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke

Pillar failure due to gouge on flexural slip thrust fault

Page 36: Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke

Understanding the structures

• Understanding geological structures within the ore body.

• Rock mass ratings.• Rock strengths

• Mining method. • Appropriate mining span• Excavation support

Structural geology Rock engineering Mining engineering

Knowledge gap

Page 37: Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke

Understanding the structures

• Understanding geological structures within the ore body.

• Rock mass ratings.• Rock strengths

• Mining method. • Appropriate mining span• Excavation support

Structural geology Rock engineering Mining engineering

Knowledge gap

Expect surprises and production disruptions

Page 38: Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke

Understanding the structures

• Understanding geological structures within the ore body.

• Rock mass ratings.• Rock strengths

• Mining method. • Appropriate mining span• Excavation support

Structural geology Rock engineering Mining engineering

Expect smoother production profile

No knowledge gap

Page 39: Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke

TWP Plant Design Example

Page 40: Mining and processing activities in Zimbabwe and some thoughts on mining the Great Dyke

Thank you