Page 1: Minimum Generation Emergency  Operating Reserve Proposal

1

Minimum Generation Emergency

Operating Reserve ProposalGary Zielanski

Markets Committee MeetingSeptember 30, 2004

Page 2: Minimum Generation Emergency  Operating Reserve Proposal

2

Overview of Issue

• During Min Gen Emergencies increment LMPs are set to zero

• Certain units are ramped up (some to EcoMax) during these situations. This is due to a problem with dispatch software.

• These units are not being compensated in RT– In Energy MWs * $0 LMP = $0

– In OR, if unit for the day was “whole” then, there would be no OR compensation.

Page 3: Minimum Generation Emergency  Operating Reserve Proposal

3

Overview of Issue (Con’t)

• Concern: There are not proper market signals to ensure units will respond to Dispatch Instructions in Real Time.– Costs were incurred to provide Energy but there

was No Energy or OR compensation for these Min Gen Emergency hours.

Page 4: Minimum Generation Emergency  Operating Reserve Proposal

4

Drag the side handles to

Overview of Proposal

• The Settlement Department would manually compensate ‘Eligible Units’ in hours when the Pool is in a Min Gen Emergency.

• Set units ineligible in the automated OR during Min Gen hours to avoid the potential of double compensation.

Page 5: Minimum Generation Emergency  Operating Reserve Proposal

5

Drag the side handles to

Definition of Eligible Units

• Units ([min(DDP,RQM)]-EcoMin) > 5 MWs.

• Otherwise, OR eligible (e.g. No FTF flag)

• Participants would be required to submit written request to the ISO seeking compensation.

Page 6: Minimum Generation Emergency  Operating Reserve Proposal

6

Drag the side handles to

Proposal of Charge Allocation

• Proposed Charge Allocation is hourly prorata share of RTGO during the hours of Min Gen Emergency

Page 7: Minimum Generation Emergency  Operating Reserve Proposal

7

• What additional information do you need to vote at the next meeting?

Page 8: Minimum Generation Emergency  Operating Reserve Proposal

8

Questions?