STONECHANGE 2016 - STONE SECTOR and CHANGING TRENDS Carrara 16-17 June 2016 Mineral processing at Carrara: regulatory framework and production assessment A. Criscuolo M. Tonelli Carrara Municipality

Mineral processing at Carrara: regulatory framework and … · 2018. 12. 8. · Cremo 1° scelta 1.800,00 900,00 250,00 Venatino – Cremo 2° scelta Paonazzo – Zebrino 800,00 400,00

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Mineral processing at Carrara: regulatory framework and … · 2018. 12. 8. · Cremo 1° scelta 1.800,00 900,00 250,00 Venatino – Cremo 2° scelta Paonazzo – Zebrino 800,00 400,00

STONECHANGE 2016 - STONE SECTOR and CHANGING TRENDS

Carrara 16-17 June 2016

Mineral processing at Carrara: regulatory framework and production assessment

A. Criscuolo M. Tonelli

Carrara Municipality

Page 2: Mineral processing at Carrara: regulatory framework and … · 2018. 12. 8. · Cremo 1° scelta 1.800,00 900,00 250,00 Venatino – Cremo 2° scelta Paonazzo – Zebrino 800,00 400,00

STONECHANGE 2016 - STONE SECTOR and CHANGING TRENDS

Carrara 16-17 June 2016

Geographic framework

Marble region 20 km2 4 basins between 300 ÷1200 m on sea level 80 Quarries in operation

Page 3: Mineral processing at Carrara: regulatory framework and … · 2018. 12. 8. · Cremo 1° scelta 1.800,00 900,00 250,00 Venatino – Cremo 2° scelta Paonazzo – Zebrino 800,00 400,00

STONECHANGE 2016 - STONE SECTOR and CHANGING TRENDS

Carrara 16-17 June 2016

Historic framework

Beginning activities in VI century B.C. Roman period until 400 A.D. Start again from 1200 to date

Page 4: Mineral processing at Carrara: regulatory framework and … · 2018. 12. 8. · Cremo 1° scelta 1.800,00 900,00 250,00 Venatino – Cremo 2° scelta Paonazzo – Zebrino 800,00 400,00

STONECHANGE 2016 - STONE SECTOR and CHANGING TRENDS

Carrara 16-17 June 2016

Dimensional stone productions

Mining stock

Year 1985 1990 1995 2000 2005 2010 2011 2012 2013 2014 2015

Blocks

(ton x

1000) 878 950 1.182

912

878

980

965

871 927 917

922

Debris

(ton x

1000)

-

-

1.600

3.565

4.263

3.110

2.972

2.741 3.034 2.376

2.464

Extension = 14 km2

Thickness ~ 0.6 km

Deduction to 40%

Yield 25% = 2.250 mil ton

Duration (1 mil t/y) = 2.250 y

Production trend 1985-2015 Production yield block/debris

Technical limits

Enviromental limits

Market require

Page 5: Mineral processing at Carrara: regulatory framework and … · 2018. 12. 8. · Cremo 1° scelta 1.800,00 900,00 250,00 Venatino – Cremo 2° scelta Paonazzo – Zebrino 800,00 400,00

STONECHANGE 2016 - STONE SECTOR and CHANGING TRENDS

Carrara 16-17 June 2016

Legislation 1: Mining Law (R.D. 1443/1927)

1^ cat. raw materials Mine = public concession 2^ cat. raw materials Quarry and Peat bog = outward land supply

Page 6: Mineral processing at Carrara: regulatory framework and … · 2018. 12. 8. · Cremo 1° scelta 1.800,00 900,00 250,00 Venatino – Cremo 2° scelta Paonazzo – Zebrino 800,00 400,00

STONECHANGE 2016 - STONE SECTOR and CHANGING TRENDS

Carrara 16-17 June 2016

Legislation 2: Municipality marble lands regulations (1995-2005)

Editto Maria Teresa d’Este 1751 Beni Estimati (32%)/ Agri Marmiferi (68%) Cadastral division

Page 7: Mineral processing at Carrara: regulatory framework and … · 2018. 12. 8. · Cremo 1° scelta 1.800,00 900,00 250,00 Venatino – Cremo 2° scelta Paonazzo – Zebrino 800,00 400,00

STONECHANGE 2016 - STONE SECTOR and CHANGING TRENDS

Carrara 16-17 June 2016

Legislation 3: Tuscany Region Law n. 35/2015 Processing project authorization Products: - cut materials - derivatives of cut materials Duty for extraction = 10% average market value for cut materials , ≤ 4,20 €/ton for derivatives Concession rent ≤ 5% average market value for cut materials New A.M. Regulations : - temporary period of 7-25 years - optimal development areas - Upon payment and temporary administrative concession (≤ 25+2 years) - Public tender

Page 8: Mineral processing at Carrara: regulatory framework and … · 2018. 12. 8. · Cremo 1° scelta 1.800,00 900,00 250,00 Venatino – Cremo 2° scelta Paonazzo – Zebrino 800,00 400,00

STONECHANGE 2016 - STONE SECTOR and CHANGING TRENDS

Carrara 16-17 June 2016

Commercial varieties and types

Stratigraphy and quality Squared blocks/ Semi-squared bloks/ Unshaped blocks Apuan production 2004

Commercial

classes

Statuario

Calacatta

Cremo

Bianco C

Venato C

Bardiglio

Bianco C/D

Venato C/D

Bianco D

Venato D

Nuvolato

Dark

marbles

Total

Total % 2 17 42 37 2 100

Squared

blocks %

27 17 16 44 69 28

Semi-squared

bloks%

32 19 24 23 23 23

Unshaped

blocks %

41 64 60 33 8 49

Page 9: Mineral processing at Carrara: regulatory framework and … · 2018. 12. 8. · Cremo 1° scelta 1.800,00 900,00 250,00 Venatino – Cremo 2° scelta Paonazzo – Zebrino 800,00 400,00

STONECHANGE 2016 - STONE SECTOR and CHANGING TRENDS

Carrara 16-17 June 2016

Economic evaluation of production

Quarry table with: % commercial qualities % types for each quality Market prices list Weighted average = production economic value

Quarry n. ….. Types

Qualities % Healthy

bloks %

Semi-squared

bloks %

Unshaped

bloks %

Bianco C 20 20 30 50

Bianco C/D 40 20 30 50

Nuvolato 40 40 60 /

Types Squared healthy

bloks

Defective / semi-

squared bloks

Much defected /

unshaped bloks

Qualities €/ton €/ton €/ton

Statuario 1° scelta 4.500,00 2.000,00 400,00

Calacatta 1° scelta 4.500,00 2.000,00 400,00

Statuario 2° scelta

Calacatta 2° scelta 2.250,00 1.000,00 300,00

Cremo 1° scelta 1.800,00 900,00 250,00

Venatino – Cremo 2°

scelta Paonazzo –

Zebrino

800,00 400,00 175,00

Bianco Carrara C

Venato C – Arabescato 480,00 240,00 100,00

Bianco Carrara C/D

Venato C/D – Verdello 280,00 140,00 70,00

Nuvolato – Bardiglio 200,00 100,00 60,00

Bianco Carrara D

Venato D 140,00 70,00 40,00

Dark marbles 90,00 50,00 /

Page 10: Mineral processing at Carrara: regulatory framework and … · 2018. 12. 8. · Cremo 1° scelta 1.800,00 900,00 250,00 Venatino – Cremo 2° scelta Paonazzo – Zebrino 800,00 400,00

STONECHANGE 2016 - STONE SECTOR and CHANGING TRENDS

Carrara 16-17 June 2016

New quarries concessions and evaluations Financial evaluation :

Economic profit x quarry life New concessions: - optimal development areas -social-economic evaluation (preliminary project, enviroment management , occupational development, investments, concession rent) -short production chain