Mindarie Mineral Sands Project Community Consultation Plan
6 December 2011
Murray Zircon Pty Ltd
Parsons Brinckerhoff Australia Pty Limited ABN 80 078 004 798
Level 16 1 King William Street Adelaide SA 5000 GPO Box 398 Adelaide SA 5001 Australia Telephone +61 8 8405 4300 Facsimile +61 8 8405 4301 Email [email protected]
Certified to ISO 9001, ISO 14001, AS/NZS 4801 A+ GRI Rating: Sustainability Report 2010
11-0990-01-2162559A
11-0990-01-2162559A
Revision Details Date Amended By
00 Original 2 December 2011 L Otrakdjian
01 Draft 6 December 2011 L Michael
©Parsons Brinckerhoff Australia Pty Limited [2011].
Copyright in the drawings, information and data recorded in this document (the information) is the property of Parsons Brinckerhoff. This document and the information are solely for the use of the authorised recipient and this document may not be used, copied or reproduced in whole or part for any purpose other than that for which it was supplied by Parsons Brinckerhoff. Parsons Brinckerhoff makes no representation, undertakes no duty and accepts no responsibility to any third party who may use or rely upon this document or the information.
Author: L Otrakdjian, L Michael .................................................................
Signed: .....................................................................................................
Reviewer: S Luyks .........................................................................................
Signed: .....................................................................................................
Approved by: S Luyks .........................................................................................
Signed: .....................................................................................................
Date: 6 December 2011 .........................................................................
Distribution: .....................................................................................................
Please note that when viewed electronically this document may contain pages that have been intentionally left blank. These blank pages may occur because in consideration of the environment and for your convenience, this document has been set up so that it can be printed correctly in double-sided format.
Mindarie Mineral Sands Project – Community Consultation Plan
PARSONS BRINCKERHOFF 11-0990-01-2162559A Page i
Contents Page number
1. Introduction 1
1.1 Background 1
1.2 Current mining proposal and rehabilitation 1
1.3 Objectives 1
2. Key stakeholders 3
3. Tools and activities 5
4. Issues management 9
4.1 Stakeholder contact and complaints management 9
5. Roles and responsibilities 11
List of tables Page number
Table 2.1 Stakeholder and issue identification 3 Table 3.1 Key communication and engagement tools and activities 5 Table 5.1 Communication roles and responsibilities 11
List of figures Page number
Figure 1.1 Site location follows page 2 Figure 4.1 Managing Stakeholder contact and complaints 9
Appendices Appendix A Record of consultation form
Mindarie Mineral Sands Project – Community Consultation Plan
PARSONS BRINCKERHOFF 11-0990-01-2162559A Page 1
1. Introduction
1.1 Background
Murray Zircon Pty Ltd (Murray Zircon) is proposing to initiate operations of the Mindarie Mineral Sands Project by re-commencing mining of the Mindarie C strandline and completing the rehabilitation activities that have been ongoing on the Mindarie A2 strandline. The Mindarie Mineral Sands Project is located approximately 150 km east of Adelaide in the Mallee region of South Australia.
1.2 Current mining proposal and rehabilitation
Murray Zircon proposes to commence mining operations on the remainder of the Mindarie C strandline in the first half of 2012 with mining activities starting northwest of the Loxton – Murray Bridge Road (Mindarie C West) moving towards the east. Once the western side of the strandline has been mined, the operations will move to the eastern side of the Loxton – Murray Bridge Road (Mindarie C East and Far East).
The heavy mineral sand will be extracted by developing an open pit strip mine to produce 120,000 tonnes per annum of heavy mineral concentrate (HMC). The heavy mineral sand will be mixed with water to form slurry with the slurry unit located in the mine pit or adjacent to the mine pit. The slurry will then be pumped to the Primary Concentrator Plant (PCP) where it is processed to form HMC and subsequently transported by truck to Port Adelaide for export (refer to Figure 1.1). MZ is assessing the potential of transporting the HMC by rail to Port Adelaide.
1.3 Objectives
The objective of this community consultation strategy is to provide a framework for the establishment of positive working relationships with both the local community and directly impacted landowners.
It aims to identify potential community and landowners issues and concerns early, outline a process of gathering feedback from the community and to address their concerns. The key objectives of this Plan are to:
provide regular and consistent information to stakeholders through the construction, operations and exploration phases of MZ activities provide opportunities for stakeholders to obtain information and have in place mechanisms for comment to be made
establish mechanisms for the two-way flow of information through project construction and operations
identify and manage issues proactively before they escalate build trust with stakeholders and become part of the community through open and
transparent communications demonstrate to shareholders and stakeholders, MZ’s commitment to environmental and
social sustainability of their operations identify opportunities to highlight the benefits economically, socially and environmentally
of the project.
Mindarie Mineral Sands Project – Community Consultation Plan
Page 2 11-0990-01-2162559A PARSONS BRINCKERHOFF
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
Mindarie CML 6226
AmiensML 6223
HalidonML 6222
Long TanML 6221
Lone PineML 6219 Mindarie A(2)
ML 6220
Mercunda NorthML 6137
Mindarie A(1)ML 6224
MPL 76
Mercunda SouthML 6225
MPL 77MPL 79MPL 78
MPL 80
MC 3432
EML 6232
EL4018
EL4017
WALKER FLAT RD
FARR RD
KRINGIN RD
TAPLAN RD
GOONDOLOO RD
MINDARIE RD
EUST
ICE
RD
CHRISTIE RD
FISHER RD
CRASE RD
MAY RD
KILPALIE RD
CURT
IS RD
BAKARA RD
WAIK
E RI E
RD
START RD
K ADLIE BORE RD
GIBBS RD
OLD LOXTON RD
MARRETT RD
EVANS RDEMAS RD
LALIRRA RD
SWAN REACH MERIBAH RD
JACH
MANN
RD
JACKA RD
CHARLESON RD
CHURCH RD
WOON RD
JIM JO
LLY R
D
PECH
RD
THE DOG FENCE RD
GOLD
POST
RD
MAGGEA RD
K NIGH TS WELL RD
VEITCH RD
HABEL RD
SNODGRASS RD
LUSH
RD
GOLDING RD
CUMMINS R D
CEMETERY RD
LORD
RD
KUNLARA RD
WALSHS BORE RD
MARTIN RD
MANVEL RD
E NDOMAH RDCASS RD
WORMALD RD
CLAYPANS RD
PAYNE RD
BAKARA W ELL RD
PARUNA MERIBAH RD
SHAN
NON
RD
HEINRICH RD
RUND
LE R
D
JACH
MAN RD
KNOW
LING RD
HOFFMAN RD
JOHN
S RD
HALL
RD
LOW
BANK
RD
MALPAS SOUTH RD
MCCABE RD
WHITE RD
REIMANN RD
LOECH EL RDLEEDHAM RD
HILLMANVILLE RD
HEN SCHKE RD
CLARK RD
VUNTEHOF F RD
MITCHELL RD
MACKE Y RD
KIBBY RD
FIEGERT RD
GRATWICK RD
TURNER WELL RD
BARTON RD
JAM TIN CORNER RD
WEST
BOU
NDAR
Y RD
PATTERSONS RD
PEDAL TO METAL TRK
FRENCH RD
GOSSE RD
AUNG
ER R
D
NEWTON RD
PRIE
ST R
D
FRANKEL RD
WUNKAR RD
WARD ST
GOODES RD BULLWINKLE RD
BARKER STRATTEY RD
EVANS RD
OLD LOXTON RD
MIND
ARIE
RD
THE DOG FENCE RDWAIKERIE RD
WAIKERIE RD
WAIKERIE RD
WAIKE
RIE R
D
PAYNE RD
PARUNA RD
WUNKAR RD
ALAW
OONA
RD
KAROONDA RD
LOXTON TO MURRAY BRIDGE ROAD
SWAN REACH LOXTON RD
MINDARIE RDKINGSTON RD
SWAN REACH LOXTON RD WUNKAR RD
TAILE
M BE
ND-LO
XTON
RAILW
AY
MALVEW
PANKINA
FRELYNE
AVONLEA
TENNSON
PASADENA
WYNMOORE
GLENVIEW
TAMARISK
ROSENEATH
THE FOLLIES
TANAH-MERAH
PATA
PYAP
GALGA
BAYAH
MYRLA
WILPY
WANBI
KOOWA
PARUNA
CALIPH
MAGGEA
WUNKAR
COBERA
BAKARA
GLUYAS
TUSCAN
KALYAN
NAIDIA
MALPAS
VEITCH
HALIDON
MERIBAH
KUNLARA
MANTUNG
KILPALIE
PILTENGE
MINDARIE
ALAWOONA
WINTRENA
MERCUNDA
COX PLAIN
COPEVILLE
MOOTATUNGA
GOONDOOLOO
SANDALWOOD
TOOKAYERTA
BAKARA WELL
HILLMANVILLE
LOXTON CO-OP WINERY LOXTON IRRIGATION AREA
LOXTON
400000
400000
420000
420000
440000
440000
460000
460000
480000
480000
6140
000
6140
000
6160
000
6160
000
6180
000
6180
000
Drawn By:
Date:
Client Ref:
2162559A_GIS_F001Drawing No.:
A4
Murray Zircon
Z0 5,000 10,000
metres
Checked by:
1:250,000 at A3Mindarie Mineral Sands Project
Site LocationFigure 1.1
Revision:
-DFData Source: PIRSA, DENR, Bing Maps
!
!!
!RENMARK
ADELAIDEPORT LINCOLN
PORT AUGUSTA
Coord. Sys.: GDA94 MGA Z54
Preliminary
" Homestead! Small town! Large town
RailwayRoads
Arterial roadLocal primary roadLocal secondaryProperty access roadExploration Licence RegionsMindarie C mineral leaseMindarie A(2) mineral lease
Active TenementsExtractive minerals leaseMineral claimMinerals leaseMiscellaneous purpose licence
© Parsons Brinckerhoff Australia Pty Ltd ("PB") Copyright in thedrawings, information and data recorded ("the information") is the property of PB. This document and the information are solelyfor the use of the authorised recipient and this document may notbe used, copied or reproduced in whole or part for any purposeother than that which it was supplied by PB. PB makes norepresentation, undertakes no duty and accepts no responsibility to any third party who may use or rely upon this document or theinformation.NCSI Certified Quality System to ISO 9001APPROVED FOR AND ON BEHALF OF Parsons Brinckerhoff Australia Pty Ltd
____________________DATE
____________________SIGNED
07/12/2011
\\AUADLF1\proj\M\Murray_Zircon\2162559A_Mindarie_C_PEPR\10_GIS\Projects\Drawings_Figures_Sketches\2162559A_GIS_F001_A4.mxd
Mindarie Mineral Sands Project – Community Consultation Plan
PARSONS BRINCKERHOFF 11-0990-01-2162559A Page 3
2. Key stakeholders This section identifies the key stakeholders with whom MZ will engage throughout the life of the project. MZ aim to work with the following stakeholders (but not limited to), throughout the Mindarie Mineral Sands Project.
Table 2.1 Stakeholder and issue identification
Stakeholder Group Specific Stakeholders
Board Murray Zircon Board
Project team Murray Zircon
Landowners Landowners affected by both Mindarie A2 and Mindarie C operations
Landowners affected only by Mindarie C operations
Surrounding Landowners, residents and community groups
General Public
East Murray Area School
Murray Mallee Community Education Network
Wynarka Recreation Committee
Landowners not affected
Landowners of potential other strandlines or exploration activities
Indigenous groups Mannum Aboriginal Community Association Incorporated
Local Government and Council District Council Karoonda East Murray
State Government Elected member
Department of Premier and Cabinet
Department of Planning and Local Government
South Australian Environment Protection Authority
Department for Water
Department for Planning, Transport and Infrastructure
Regulatory body Department for Manufacturing, Innovation, Trade, Resources and Energy (DMITRE)
Environmental Protection Authority
Federal Government Elected members
Non-Government Organisations Murraylands Regional Development Board
Murray Mallee Soil Conservation Board
Riverland Development Corporation
Mallee Coorong Natural Resource Management Group
Industry Groups The Australasian Institute of Mining and Metallurgy, Minerals and Energy Resources Group
Media groups The Loxton News
Riverland Weekly
The Advertiser
Stock Journal
ABC Radio
Emergency Services Karoonda Police Station
Loxton Hospital Complex
Mindarie Mineral Sands Project – Community Consultation Plan
Page 4 11-0990-01-2162559A PARSONS BRINCKERHOFF
Mindarie Mineral Sands Project – Community Consultation Plan
PARSONS BRINCKERHOFF 11-0990-01-2162559A Page 5
3. Tools and activities A range of communications materials and tools will be required to achieve the objectives outlined in this strategy. In order to support MZ with ongoing engagement with the community, the tools and activities have been broken down to focus on different stakeholder groups and phases, namely:
directly affected landowners wider community ongoing communications community programs and initiatives.
The primary goals for these tools and activities, in line with DMITRE requirements, are to:
identify community attitudes and expectations provide various mechanisms for dissemination of information gather feedback from the community in relation to construction and ongoing operations,
and analyse community feedback and concerns to inform the ongoing consultation with the
community.
Table 3.1 Key communication and engagement tools and activities
Communication tool/activity
Rationale Targeted stakeholder group
Directly affected landowners
Face to face meetings
Provide all stakeholders with the opportunity to meet face to face to discuss their specific issues
Continue to foster relationships built on trust, by engaging with the directly affected landowners on a first priority basis
Resident/property owners
Wider community engagement
Fact sheets Provide the community and stakeholders with information about the project.
Provide information about specific stages of the project.
To ensure that messages being distributed to the community and stakeholders are consistent, informative and based on fact.
To provide MZ with consultation/issues management support as needed and ensure newsletters address issues raised and questions asked.
Resident/property owners Government agencies Local community and
businesses Federal MP State MPs Aboriginal groups Environment groups Non-government
Organisations
Input into District Council of Karoonda East Murray Newsletter
Provide regular information to the wider community about the project and its progression
Advertise upcoming events or milestones
All stakeholders
Mindarie Mineral Sands Project – Community Consultation Plan
Page 6 11-0990-01-2162559A PARSONS BRINCKERHOFF
Communication tool/activity
Rationale Targeted stakeholder group
Introductory letters (or email) and ongoing letter (or email) correspondence
Purpose of letters is to:
inform community groups and stakeholders about MZ and their plans
make contact with stakeholders to seek their input into the rehabilitation process to be documented in the PEPR.
advertise contact methods to wider community, including upcoming event details
provide an ongoing form of communication with stakeholders.
Resident/property owners Government agencies Local Community and
Businesses State MPs Aboriginal groups Environment groups Non-government
organisations
Briefing to Council members and Local members
Ensure Council and Local elected members are aware of the PEPR process, investigations, consultation process and timing, and to address items of interest/issues.
Councils Local members
Website Provide stakeholders and community members with a forum to gain updates and other information.
Provide an avenue from which people can locate information about upcoming events, and contact details should further information be required.
Provide an opportunity for stakeholders to access project documents, including the PEPR and mining lease conditions.
All stakeholders
Face to Face Meetings
Provide stakeholder and community members the opportunity to discuss project issues and queries directly with project representatives.
Ensure information exchange is managed in a timely manner.
Internal contact will involve the discussion of emergent issues, content of material to be distributed to the community, and general implementation of the Communication and Engagement Strategy.
All stakeholders
Ongoing consultation
Murray Mallee Community Consultative Committee (MMCCC) meetings
To provide ongoing information to members of the community about Mindarie C operations.
Gather feedback about MZ’s performance and any issues within the community.
Provide information about the exploration activities and other plans for the region.
Resident/property owners Government agencies Local community and
businesses Environment groups Non-government
organisations (NGOs)
Mindarie Mineral Sands Project – Community Consultation Plan
PARSONS BRINCKERHOFF 11-0990-01-2162559A Page 7
Communication tool/activity
Rationale Targeted stakeholder group
Project email To act as a means by which the community can contact the project team via email with enquires regarding the project.
Assist to develop relationships of trust and confidence by listening and responding to community issues, concerns and acting with integrity in what we communicate
A method by which complaints and incidents can be reported and recorded.
All stakeholders
Consultation database
To provide an ongoing and real time record of all stakeholder interactions.
To assist in the reporting process. Provide input into the issues
identification process.
All stakeholders
Media releases To communicate information externally about project successes, milestones and achievements
Media Wider public Industry
Reporting/meeting minutes/notes
To document meetings and key discussions with landowners and stakeholders, including issues raised and any commitments made.
Internal Landowners Community groups Businesses and key
stakeholders
Community programs and initiatives
Community sponsorship plan
To outline MZ’s capacity to support community partnerships in building positive relationships with the community
Manage expectations of stakeholders as to how MZ are able to invest in community benefits
Landholders Local community groups Wider community and
businesses
Mindarie Mineral Sands Project – Community Consultation Plan
Page 8 11-0990-01-2162559A PARSONS BRINCKERHOFF
Mindarie Mineral Sands Project – Community Consultation Plan
PARSONS BRINCKERHOFF 11-0990-01-2162559A Page 9
4. Issues management
4.1 Stakeholder contact and complaints management
Stakeholders and community members interested in the project will be encouraged to contact the project team to ask questions and discuss their issues and concerns. Information discussed during one to one meetings with directly affected landowners, adjacent land owners, and the broader community will be recorded, and saved as electronic meeting notes.
See Figure 4.1 below for the key steps in process for managing stakeholder contact and complaints.
Figure 4.1 Managing Stakeholder contact and complaints
Landowner discussions should also be recorded using a form, and documented in the contact database. Copies of these notes should be provided to the landowners following the meeting for the own record, to demonstrate commitment to the discussions held, and transparency of process.
Mindarie Mineral Sands Project – Community Consultation Plan
Page 10 11-0990-01-2162559A PARSONS BRINCKERHOFF
Mindarie Mineral Sands Project – Community Consultation Plan
PARSONS BRINCKERHOFF 11-0990-01-2162559A Page 11
5. Roles and responsibilities The following table outlines some of the key roles as a part of the mining operations, and describes their role in the communication process.
Table 5.1 Communication roles and responsibilities
Role Responsibility
Mine Manager Interaction with landowners during mine development and operations
Liaise with the stakeholder engagement representative to ensure project milestones are communicated to the wider public
Identify potential issues on site which may be of media interest and elevate to MZ media contact
Environmental Manager Work with the directly affected landowners to develop appropriate processes for rehabilitation monitoring
Develop criteria for mine closure Manage environmental impacts during construction and
operations. Develop criteria for the return of mining land to farmers Liaise with landholders regarding environmental monitoring on
their property Work with the stakeholder engagement representative
Board representatives Develop and drive a community engagement strategy to support the successful recommencement of mining operations
Provide approval for all outgoing communications materials
Appendix A
Record of consultation form
PARSONS BRINCKERHOFF 11-0990-01-2162559A Page A.1
Record of Consultation form
Date: Job Name: Mindarie C Mineral Sands Project
Time:
Team Member:
Face to face Contact:
Telephone/ Online Contact: One-on-one meeting θ
Phone call θ Community group meeting θ
E-mail follow-up θ Present at meeting:
Written submission follow-up
θ
Access call θ
Conversation/meeting with:
Company/Organisation:
Postal Address:
Residential Address:
Property Description:
Telephone: Facsimile:
Mobile: Email:
Notes