MIMIC WP 5 - Creating effective measures to prevent accidents. Annukka Lehikoinen Fisheries and Environmental Management Group Department of Environmental Sciences. 23.9.2014. 1. Central output of the WP5: integrative risk analysis and decision support model. - PowerPoint PPT Presentation
Citation preview
Bio-tieteellinen tiedekunta / Henkilön nimi / Esityksen nimi
MIMIC WP 5 - Creating effective measures to
prevent accidentsAnnukka Lehikoinen
Fisheries and Environmental Management Group
Department of Environmental Sciences
21.04.23 1
Bio-tieteellinen tiedekunta / Henkilön nimi / Esityksen nimi
Central output of the WP5: integrative risk analysis and decision support model• Under the current kowledge and prevailing
uncertainty, what would be the most (cost-)effective ways to decrease the risk of a major oil accident in the GoF?
• RISK = Probability * Harm• Preventive or / and post-accidental management?
• Despite of the high unpredictability in some parts of the system, we should be able to assess and compare alternative actions and investments.
• Also answering the question: In what part of the system additional knowledge (decreasing the uncertainty) would be most helpful?
Bio-tieteellinen tiedekunta / Henkilön nimi / Esityksen nimi
Environmental risk assessment context: DPSIR-approach
Responses
ImpactsInstruments to assess the harm
DriversNeeds behind the pressures
StatesHarm caused by the pressure
Pressurescausing harm in the system
How much certain level of need creates pressure?
How / to what degree the system is affected by the pressures?
According to the instruments, should we react?
How harmful the effects are seen?(How we valuate them?)
What to doto manage the system(and what part of it)?
Bio-tieteellinen tiedekunta / Henkilön nimi / Esityksen nimi
Decision support models
• Provide a quantitative means to study alternative decisions in the presence of multiple aims
• Help the decision-makers to make consistent and justifiable choices in complicated and multifaceted evaluation problems
• Modeling aims at finding out optimal actions; when and where investments on the future state of our environment are most effective?
• The evaluation of the nature and extent of uncertainty in different parts of the system is essential!
• The uncertainty doesn’t prevent comparison of alternative actions but makes the model to give more realistic results in the light of current knowledge
Bio-tieteellinen tiedekunta / Henkilön nimi / Esityksen nimi
Idea of the system in WP 5
Traffic
Geometricprobability
Accident
Human error
Consequences
Magnitude andvalue of losses
Controllingthe causationprobability
Minimizing theconsequences
Controlling the traffic
Preventive management:
Post-accidental management:Minimizing theConsequences(oil recovery)
€
€
€
€
€€U
U UU
U
UUU
U
Bio-tieteellinen tiedekunta / Henkilön nimi / Esityksen nimi
”State of the art”: SAFGOF –metamodel
Bio-tieteellinen tiedekunta / Henkilön nimi / Esityksen nimi
Current traffic / Tanker collision risk
0
50
100
150
200
250
300
350
C1 C2 C3 C4 jointLocation
Yea
rs /
1 ta
nke
r co
llisi
on No actions implemented
VTS alarm + extendedpiloting
2015 traffic / Tanker collision risk
0
20
40
60
80
100
120
C1 C2 C3 C4 joint
Location
Yea
rs /
1 ta
nke
r co
llisi
on
Bio-tieteellinen tiedekunta / Henkilön nimi / Esityksen nimi
Current traffic / Leak risk
0100200300400500600700800900
C1 C2 C3 C4 joint
Location
Yea
rs /
1 ta
nke
r co
llisi
on
th
at le
ads
to le
akag
e
No actionsimplemented
VTS alarm +extended piloting
2015 traffic / Leak risk
0
50
100
150
200
250
300
C1 C2 C3 C4 joint
Location
Yea
rs /
1 ta
nke
r co
llisi
on
th
at le
ads
to le
akag
e
Bio-tieteellinen tiedekunta / Henkilön nimi / Esityksen nimi
Current traffic / Oil risk 1
0
5
10
15
20
25
C1 C2 C3 C4 joint
Location
Th
eore
tica
l am
ou
nt
of
oil
to
sea
(t /
year
)
No actions implemented
VTS alarm + extendedpiloting
2015 traffic / Oil risk 1
01020304050607080
C1 C2 C3 C4 joint
Location
Th
eore
tica
l am
ou
nt
of
oil
to w
ater
(t
/ yea
r)
Current traffic / Oil risk 2
0
1
2
3
4
5
6
7
8
C1 C2 C3 C4 joint
Location
Th
eore
tica
l am
ou
nt
of
oil
to
coas
t (t
/ ye
ar)
2015 traffic / Oil risk 2
0
5
10
15
20
25
C1 C2 C3 C4 joint
Location
Th
eore
tica
l am
ou
nt
of
oil
to c
oas
t (t
/ ye
ar)
Bio-tieteellinen tiedekunta / Henkilön nimi / Esityksen nimi
Bio-tieteellinen tiedekunta / Henkilön nimi / Esityksen nimi
Simplified metamodel
SAFGOF map user interface to evaluate the spatial environmental risk
+
SpillMod drifting simulations(180 scenarios * 6 years ofWeather data = 1080 simulations)
+
OILECO databaseOf conservationindexes
Bio-tieteellinen tiedekunta / Henkilön nimi / Esityksen nimi
Oil type: heavyTraffic: 2008Hot spot: C3
Risk in grid X = P(the grid is going to be oiled) * Conservation value index
Bio-tieteellinen tiedekunta / Henkilön nimi / Esityksen nimi
Further development of the approach in MIMIC
• New and updated sub-models
• Grounding model (Arsham)
• Level of accident tendency (human error) (CAFE)?
• Ecological risk modeling (Annukka / FEM group)
• Security?
• ???
• New current state and future traffic scenarios (O-P)
• Hot spots (areas) -> ship routes (vectors?)
Bio-tieteellinen tiedekunta / Henkilön nimi / Esityksen nimi
Further development continues…
• More actions to be analysed (O-P, Päivi)
• Prices wherever available
• cost-effectiveness of maritime safety policy instruments (MIMIC, O-P)
• PROPABS (willingness to pay),
• CAFE (cost-benefit factor)
• More SpillMod runs if needed (OILRISK)
• Planning with the potential end users?
• Scientific use vs. real decision-making needs?
Bio-tieteellinen tiedekunta / Henkilön nimi / Esityksen nimi
WP 5 - planned schedule
• The metamodel will be in the making all the time!• Ideas and materials are wellcome
• Input and output variables of the sub-models!‒ Alternative states
• Objective is to know the final elements and structure by the end of 2012 (MS 5)
• MS 6: building the model architecture• All the materials (statistics, model pieces and results etc.) to
be included should be ready by the end of MS 6 (April 2013)
• MS 7: Finalizing, testing and modifying the model
• MS 8: Analysing the results, writing etc.
Bio-tieteellinen tiedekunta / Henkilön nimi / Esityksen nimi
Done so far
• State of the art –journal article manuscript allmost finalized (UH, CMS, Aalto)
• State of the art -conference paper accepted to PSAM 11 & ESREL 12 conference in Helsinki, in June 2012
• Annukka will give a presentation concerning the integrative model (state of the art model + MIMIC plans)