INDUSTRY: Steel Fabrication
PROJECT TYPE: Machinery Moving
PROJECT OVERVIEW: Lifted, rotated and lowered the existing bridge crane to ground level using Omega Morgan Trilifter and set in staging area for maintenance. Following maintenance, Omega Morgan crew returned to lift the crane back into place and set onto the new rails.
PROJECT SPECS: Bridge Crane: 90 ft long, 26 ft wide, 110,000 lbs and is 29 ft above ground level.
EQUIPMENT USED: Trilifter, Versalift 40/60, and Versalift 60/80