Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
MillenniumLineBroadwayExtension
ProjectUpdate
June2017
MILLENNIUMLINEBROADWAYEXTENSIONPROJECTOVERVIEW
WHYDOWENEEDRAPIDTRANSITALONGBROADWAY?
• Existingtransitservicesareinsufficienttoday.
• Broadwayishometothe:• busiestbusrouteinCanadaandtheUSA• largesthospitalinWesternCanada• largestuniversity inWesternCanada• secondlargestjobcentreinBritishColumbia
• MetroVancouvertogrowby1millionnewresidentsand600,000newjobsoverthenext30years.
BROADWAYEXTENSIONPHASE1:SkyTraintoArbutus
• TheMayors’CouncilVisioncallsforrapidtransitintheBroadwayCorridortoUBC.
• TheVisionprioritizestheextensionoftheMillenniumLinetoArbutusStreetwithinthefirst10years.
• TheExtensionissupportiveoffuturerapidtransittoUBC.
FastFacts• 6kmextension,primarilytunneledbelow
Broadway
• 6undergroundstationsnearmajorintersections
• FullundergroundintegrationwithBroadway– CityHallCanadaLinestation
LOCALANDREGIONALBENEFITS
WhatarethebenefitsofextendingtheMillenniumLine?
• MeetstheRegionalVision
• Improvestransitconnectivity• Speedsupcommutes
• Freesuproadspaceforgoodsmovement
• Reducesoperatingcosts
• Increasestransitcapacity
MILLENNIUMLINEBROADWAYEXTENSIONPROJECTUPDATE
PROJECTPLANNINGTIMELINE
Wearehere
Keythemes:• Constructionmethodsandimpacts• Projectroute(includingdesiretogotoUBC)and
stationdesign• Quickcompletionofproject• Costandfundingsources• LessonslearnedfromCanadaLine• Cyclingandwalkingintegration• LanduseandhousingonBroadwayCorridor
WHATWEHEARDINEARLY2017ENGAGEMENT
StrongsupportfortheBroadwayExtension:
92% 77% 61%
0%
25%
50%
75%
100%
Questionnaire Telephone Poll: Broadway Corridor
Telephone Poll: Region
4200questionnaires
70+ workshop attendees
400+open house attendees
Independent Telephone Poll
FOCUSFORMARCH– JULY2017
Continuingdesignparameterdevelopmentandgeotechnicalinvestigations.
Gatheringinputondesignfeaturesandconsiderations.
Startingthediscussionregardingtheconstructionphaseandneededmanagementstrategies.
MILLENNIUMLINEBROADWAYEXTENSIONDESIGNFEATURES&CONSIDERATIONS
Inside• Accessibility• Wayfinding • Safety• Planning for long-term
capacity• AmenitiesOutside• Multi-modal connections (bus
and bike)• Public realm integration• Wayfinding
DESIGN FEATURES: AT THE STATIONS
MILLENNIUMLINEBROADWAYEXTENSIONCONSTRUCTIONPHASE– ISSUES&STRATEGIES
MANAGINGCONSTRUCTION
Timeframe:• 5to6years• Underwayasearlyas2019
MinimizingImpacts:• Tunnels:
– Stagingandexcavationsitesatstartandendofalignment
• Stations:
– Constructionatsixstationlocations
– Anticipatedtorequiresomenight-timeconstructionactivity
Transportation• Transitnetwork• Trafficnetwork• Walking• Cycling
Business&Community• EstablishaCommunityLiaisonOffice• Collaboratewithbusinessesandthe
communitytodevelopaConstructionManagementPlan
• Minimizenoise,dustandvibration• Leverageprogrammingandevents
CONSTRUCTIONMANAGEMENTSTRATEGIES