. July 20,1979 . I. Plan - Task A-36 Completion , MILESTONE TARGET DATE bMP(g (a) Prepare Table of Contents For NUREG Report July 20, 1979 Ce U b W h* August 3,1979 - W.nl P (b) C mpletion of Survey Of Operating Plants. usc- cw (c) Completion of Task Group discussions on various scenarios. August 15,1979 -fo& Led acIr Ald# -Io I (d) First draft of NUREG distributed to task group members. September 15, 1979 /g//Q d-Q (e) Second draft of NUREG distributed to Section Leaders and Branch "# 4 Nj' Chiefs. September 28, 1979 (f) Third draft of NUREG distributed to A/D's and Division Director's. October 15, 1979 (g) NUREG issued. November 16, 1979 (h) Memo issued with recommended changes to SRP's and R.G.'s. December 14, 1979 1728 298 80011 0 0 5C f,

MILESTONE TARGET DATE (a) Prepare Table of Contents For …

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: MILESTONE TARGET DATE (a) Prepare Table of Contents For …

.

July 20,1979.

I. Plan - Task A-36 Completion,

MILESTONE TARGET DATE

bMP(g(a) Prepare Table of Contents ForNUREG Report July 20, 1979

Ce U b W h*August 3,1979 - W.nl Pw[PmE@ wet M

(b) C mpletion of Survey Of OperatingPlants. usc-cw(c) Completion of Task Groupdiscussions on various scenarios. August 15,1979 -fo& Led acIr Ald#

-Io I(d) First draft of NUREG distributedto task group members. September 15, 1979

/g//Q d-Q(e) Second draft of NUREG distributedto Section Leaders and Branch "# 4 Nj'Chiefs. September 28, 1979

(f) Third draft of NUREG distributedto A/D's and Division Director's. October 15, 1979

(g) NUREG issued. November 16, 1979

(h) Memo issued with recommendedchanges to SRP's and R.G.'s. December 14, 1979

1728 298

80011 0 0 5C f,

Page 2: MILESTONE TARGET DATE (a) Prepare Table of Contents For …

.' r//7y- -

.

OUTLINE FOR NUREG REPORT

TASK A-36

CONTROL OF HEAVY LOADS NEAR SPENT FUEL

1. INTRODUCTION

1.1 BACKGROUND

(Def. of Heavy Load, potential consequences of accidental

load drop [ release of radioactive material, criticality,

damage to systems required for safe shutdown or continued

decay heat removal], extent considered in previous licensing

actions, and purpose for task).

1.2 DEFINITIONS

1.3 A-36 REVIEW PROCESS

(Brief dc;criptic.. of review process including: initiala

review, generic letter to licensees, information submitted,

survey of information, group discussion of various scenarios,

development of fault trees, analysis of available data, develop-

ment of guidelines, NUREG report).

1.4 SUMMARY OF RECOMMENDATIONS

(An executive type sumary of guidelines and recommendations).

2. SURVEY OF LICENSEE INFORMATION

2.1 HEAVY LOADS

(A discussion of the various heavy loads, and their frequency of

movement, that may be moved over or near spent fuel in the

reactor vessel or spent fuel pool).

2.2 PRESENT PROTECTION

(A description of the present protection provided that prevents,

or mitigates the consequences of, accidental load drops in-

cluding discussions of the following:)1728 299

Page 3: MILESTONE TARGET DATE (a) Prepare Table of Contents For …

--

. - - .

. .

,

-2-

s.

2.2.1 Technical Specifications

2.2.2 Procedures

2.2.3 Crane Designs

2.2.4 Other Design Features

2.2.5 Crane Operator Training

2.3 PREVIOUS ANALYSES

( A discussion of various analyses performed previously by

licensees or their consultants related to heavy load drop

accidents).

3. REVIEW 0F HISTORICAL DATA

(A discussion of the available historical data related to heavy load

handling at nuclear facilities and crane operations at non-nuclear

facilities. Will include a discussion of the conclusions thatmay be drawn from this data. Provide summary of data in Appendix A).

4. GUIDELINES

GUIDELINES FOR CONTROL 0F HEAVY LOADS4.1 _(Lead-in should provide background, such as: the objectives

of the guidelines, that various alternatives are provided to

meet the objectives, and that fault trees were developed and used

as discussed in Section 4.3 to evaluate the adequacy of the

guidelines).

1728 300

Page 4: MILESTONE TARGET DATE (a) Prepare Table of Contents For …

.

-

..

.

-3-

4."1.1 General

4.1.2 Spent Fuel Pool Area - PWP,'s

4.1.3 Containment Building - PUR's

4.1.4 Reactor Building - BUR

4.1.5 Other Areas

4.1.6 Single Failure Proof Cranes and Lifting Devices

4.2 BASES FOR GUIDELINES

(A discussion which provides the staff basis for the guidelines

including use of fault trees, historical data, and information

from licensees. Should sumarize conclusions that may be

drawn from the fault trees).

5. RECOMMENDATIONS

5.1 IMPLEMENTATION OF GUIDELINES - OPERATING PLANTS

(Recommend a program for implementing guidelines at operating

plants, reference draft generic letter, discuss impact of

implementation on operating plants, and discuss manpower,

technical assistance, and schedule for NRC to carry out a pro-

gram to implement the guidelines) .

5.2 INTERIM ACTIONS ~[ hadww(Discuss imediate actions required until guidelines are

implemented and basis for operation with only these actions

and existing measures).

5.3 CHANGES TO S.R.P's and R.G. 's

(Generalize recommended changes to SRP's and RG's to incorporate

guidelines not almady included).

1728 301

Page 5: MILESTONE TARGET DATE (a) Prepare Table of Contents For …

-.

.

-4-

5.4 ISSUES REQUIRING FURTHER STAFF ATTENTION

(Issues identified during task review but not within scope

oftask).

1728 302

1

:

9

Page 6: MILESTONE TARGET DATE (a) Prepare Table of Contents For …

.

.

APPENDICES'

Appendix A - Crane Historical Data

1. Navy

2. OSHA

3. NASA

4. LER

Will provide a data summary for each of these data sources.

Appendix B - Fault Trees

Will provide the fault trees developed related to handling of heavy loads,

development of probabilities for various events and sumary of probability

estimates for various cut-sets.

Appendix C - Modification of Existing Cranes

( A discussion of the typical modifications that may have to be made if

upgrading to intent of NUREG - 0554, feasibility of making such modifications,

and availability of equipment for these modifications. Will also include,

if possible, an implementation section identifying elements of NUREG 0554

that must be met in upgrading, and those elements where alternative

compensating actions may be taken in lieu of specific compliance. May

also indicate typical alternative actions that may be acceptable.

Appendix 0 - Draft Generic Letter To Licensees

1728 303

(

Page 7: MILESTONE TARGET DATE (a) Prepare Table of Contents For …

.=

_

sie LAa.as.z[6kyf 2I//($.g

. % L-n maaa,a! I _ - . ..

_

* cdola Mobut Ls2hpSananw(ow Ad/& -ak 4p;y m s{aq aMd syrkue'

*Om p fW/d W. AAy pi 4- Gas)~s a y

s , -a, pe

/ b oy M WoCo N & bru serkekwfw':yuht/k ; -7/y9 r

,

bfkW$vf* A b r a (t /a. S h o e M r D J g & d h a -

'ma aa gua/4y whp Jews22 agny 1728 304

Page 8: MILESTONE TARGET DATE (a) Prepare Table of Contents For …

t

9 $

e,

#

. _ [M#rsac ) . _ _ - _ .

. _0J k,-

; Ru~i .-.

,- .

h_ ._ _.

1 py*NI- Aw"JAdO f "

, &p km -*GJt-em .

* a& D<.fr'

con War. f 62C s.,_

fat 20 paa o s Ga 6 y --

y

. AlucGe - O K 4 - .

-..

,

1728 305--- emk ekij k;ke+ o

-- .

-_apan.e--- - - - - * + -

, e -*

e .,moaww m-t

$

Page 9: MILESTONE TARGET DATE (a) Prepare Table of Contents For …

-.

TJe /-36 - A4nh fewee<

.

TMt .A6 za'p&dk.o9

O m St4uk~/ w /w@

Aspn.ee tueuwa <f /z.

k k/0 YMM b hh} On$Mdl " 6H/2)

fp7,h' (M)0b m -Staasun̂

'

g (MkJ 26 AMd ceye,4/c .

)15</uim 2 &/tfa blALNn_ -Q-

h J Mto fw eveuweac--..-&fm a m- kind 4f .

@ dadSL. p' &&ewyn

a a vn J.

[[[$ [N1}km 1728 306

.

O