14

MILAN BELTWAY, AIRPORT ROAD ISGS #17 · Milan Beltway, Airport Road Wetland Compensation Site September 1, 2006 to September 5, 2007 Water-Level Elevations in Soil-Zone Monitoring

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: MILAN BELTWAY, AIRPORT ROAD ISGS #17 · Milan Beltway, Airport Road Wetland Compensation Site September 1, 2006 to September 5, 2007 Water-Level Elevations in Soil-Zone Monitoring
marstonml
Page 2: MILAN BELTWAY, AIRPORT ROAD ISGS #17 · Milan Beltway, Airport Road Wetland Compensation Site September 1, 2006 to September 5, 2007 Water-Level Elevations in Soil-Zone Monitoring

MILAN BELTWAY, AIRPORT ROAD ISGS #17WETLAND COMPENSATION SITEFAU 5822Sequence #67Rock Island County, near Milan, IllinoisPrimary Project Manager: Steven E. BentonSecondary Project Manager: Keith W. Carr

SITE HISTORY

C Spring 1997: The sump pump on the east side of the site was turned off and laterremoved.

C August 1997: ISGS data collection was initiated with the installation of monitoring wellsand staff gauges.

C August 2004: Construction of the Milan Bypass began. Wetland mitigation began with theexcavation of the southern portion of the site. Tree planting began in Fall 2004 and wascompleted in Spring 2005.

C January 2005: A Level II hydrogeologic characterization report was submitted to IDOT(ISGS Open-File Series 2005–04).

C December 2005: The ISGS was tasked by IDOT to perform five-year performancemonitoring.

WETLAND HYDROLOGY CALCULATION FOR 2007

The area of the site that satisfied wetland hydrology criteria (Environmental Laboratory 1987) formore than 5% of the 2007 growing season was estimated to be 4.8 ha (11.8 ac) out of a total areaof 8.9 ha (22.0 ac). The area that satisfied wetland hydrology criteria for more than 12.5% of thegrowing season was estimated to be 4.3 ha (10.7 ac). These estimates are based on the followingfactors:

C According to the MRCC, the median date that the growing season begins at the Quad CityInternational Airport in nearby Moline, Illinois, is April 13 and the season lasts 196 days; 5%of the growing season is 10 days and 12.5% of the growing season is 25 days.

C Total precipitation during the monitoring period was 113% of normal. Precipitation was ator above normal in December 2006, and in March, June, July, and August 2007. Totalprecipitation in the spring (April, May, and June) was 81% of normal.

C In 2007, wetland hydrology occurred for more than 5% of the growing season at wells 1SR,2SR, 5S, 6S, 7S, 8S, 17S, and 18S. Wetland hydrology also occurred for more than12.5% of the growing season at wells 1SR, 2SR, 5S, 6S, 7S, and 17S.

C Surface-water gauges showed that inundation occurred at gauge H, gauge I, and RDS 4during the growing season. At gauge H, gauge I, and RDS 4, inundation occurred at anelevation greater than 171.80 m (563.68 ft) for more than 5% of the growing season.

Page 3: MILAN BELTWAY, AIRPORT ROAD ISGS #17 · Milan Beltway, Airport Road Wetland Compensation Site September 1, 2006 to September 5, 2007 Water-Level Elevations in Soil-Zone Monitoring

C Limitations of the wetland hydrology determination are as follows:- The area of wetland hydrology includes pre-existing wetland.

ADDITIONAL INFORMATION

C The area of the site that satisfied the wetland hydrology criteria at both 5% and 12.5% ofthe growing season was confined entirely to the northern portion of the site designatedaquatic emergent wetland on the as-built plan.

C The excavated southern portion of the site, designated forested wetland on the as-builtplan, did not satisfy wetland hydrology criteria at either 5% or 12.5% of the growing season.Ground-water levels recorded by the data logger in monitoring well 12S reveal thatsaturation occurred several times during the growing season, but the longest periods ofsaturation were only about 5 days, or 2.5% of the growing season.

C The absence of jurisdictional wetland hydrology in the forested wetland is due to insufficientexcavation. Analysis of depth to ground-water data recorded by the logger in well 12Sreveals that land surface would have to be lowered by at least 25 cm (10 in), and as muchas 40 cm (16 in), in order to achieve jurisdictional wetland hydrology.

C The conceptual wetland design plan called for 15 cm (6 in) to 30 cm (12 in) of excavation.However, it appears, based on the change in ground-surface elevation at well 9S, that onlyabout 7 cm (3 in) of soil was excavated at that location.

PLANNED FUTURE ACTIVITIES

C Monitoring of the site will continue until notified otherwise by IDOT.

Page 4: MILAN BELTWAY, AIRPORT ROAD ISGS #17 · Milan Beltway, Airport Road Wetland Compensation Site September 1, 2006 to September 5, 2007 Water-Level Elevations in Soil-Zone Monitoring

Case

Cre

ek

j

j

�0

0

600 m

2000 ft

study area

I-280

Airport Road

Milan Beltway, Airport Road Wetland Compensation Site

(FAU 5822)

General Study Area and Vicinity

from the USGS Topographic Series, Milan IL-IA 7.5-minute Quadrangle (USGS 1992)

contour interval is 10 feet

Page 5: MILAN BELTWAY, AIRPORT ROAD ISGS #17 · Milan Beltway, Airport Road Wetland Compensation Site September 1, 2006 to September 5, 2007 Water-Level Elevations in Soil-Zone Monitoring

Milan Beltway, Airport Road Wetland Compensation Site

(FAU 5822)

Estimated Areal Extent of 2007 Wetland Hydrology

based on data collected between September 1, 2006 and September 5, 2007

Map based on USGS digital orthophotograph, Milan SW quarter quadrangle

from 03/30/2000 aerial photography (ISGS 2005)

0 100 m

300 ft0

perimeter fence

monitoring well

stage gauge

rain gauge

RDS data logger

north edge of tree-

planting area

>5% of growing season

>12.5% of growing season

BM6

Case

Cre

ek

B

8S,D

7S,DH6S,D

5S,D

RDS4

BM5

benchmark

11S,U

4S,D

10SR,U

9S,U14S

15S,UG16S

12S,U

F13S

IDOT-BM

1SR

17S

2SR

3SR

I

18S,U

2007 Wetland Hydrology

Page 6: MILAN BELTWAY, AIRPORT ROAD ISGS #17 · Milan Beltway, Airport Road Wetland Compensation Site September 1, 2006 to September 5, 2007 Water-Level Elevations in Soil-Zone Monitoring

Milan Beltway, Airport Road Wetland Compensation Site September 1, 2006 to September 5, 2007

Water-Level Elevations in Soil-Zone Monitoring Wells

171.0

171.5

172.0

172.5

Aug

2006

Sep

2006

Oct

200

6

Nov

200

6

Dec

200

6

Jan

2007

Feb

2007

Mar

200

7

Apr 2

007

May

200

7

Jun

2007

Jul 2

007

Aug

2007

Sep

2007

Oct

200

7

Elev

atio

n (in

m re

fere

nced

to N

AVD

, 198

8)

Well 1SRWell 2SRWell 3SRWell 4SWell 5SWell 6SWell 7SWell 8SWell 9SWell 10SRWell 11SWell 12S (tape)Well 13SWell 14SWell 15SWell 16SWell 17SWell 18SWell 12S (Global)

Page 7: MILAN BELTWAY, AIRPORT ROAD ISGS #17 · Milan Beltway, Airport Road Wetland Compensation Site September 1, 2006 to September 5, 2007 Water-Level Elevations in Soil-Zone Monitoring

Milan Beltway, Airport Road Wetland Compensation Site September 1, 2006 to September 5, 2007

Depths to Water in Soil-Zone Monitoring Wells-0.5

0.0

0.5

1.0

Aug

2006

Sep

2006

Oct

200

6

Nov

200

6

Dec

200

6

Jan

2007

Feb

2007

Mar

200

7

Apr 2

007

May

200

7

Jun

2007

Jul 2

007

Aug

2007

Sep

2007

Oct

200

7

Dep

th (i

n m

refe

renc

ed to

land

sur

face

)

Well 1SRWell 2SRWell 3SRWell 4SWell 5SWell 6SWell 7SWell 8SWell 9SWell 10SRWell 11SWell 12S (tape)Well 13SWell 14SWell 15SWell 16SWell 17SWell 18SWell 12S (Global)

Page 8: MILAN BELTWAY, AIRPORT ROAD ISGS #17 · Milan Beltway, Airport Road Wetland Compensation Site September 1, 2006 to September 5, 2007 Water-Level Elevations in Soil-Zone Monitoring

Milan Beltway, Airport Road Wetland Compensation Site September 1, 2006 to September 5, 2007

Water-Level Elevations at Surface-Water Gauges

171.5

172.0

172.5

Aug

2006

Sep

2006

Oct

200

6

Nov

200

6

Dec

200

6

Jan

2007

Feb

2007

Mar

200

7

Apr 2

007

May

200

7

Jun

2007

Jul 2

007

Aug

2007

Sep

2007

Oct

200

7

Elev

atio

n (in

m re

fere

nced

to N

AVD

, 198

8)

Gauge BGauge FGauge GGauge HGauge Iwater not detectedRDS 4

Page 9: MILAN BELTWAY, AIRPORT ROAD ISGS #17 · Milan Beltway, Airport Road Wetland Compensation Site September 1, 2006 to September 5, 2007 Water-Level Elevations in Soil-Zone Monitoring

Milan Beltway, Airport Road Wetland Compensation Site September 1, 2006 to September 5, 2007

Water-Level Elevations in Deeper Monitoring Wells

170.0

170.5

171.0

171.5

172.0

172.5

Aug

2006

Sep

2006

Oct

200

6

Nov

200

6

Dec

200

6

Jan

2007

Feb

2007

Mar

200

7

Apr 2

007

May

200

7

Jun

2007

Jul 2

007

Aug

2007

Sep

2007

Oct

200

7

Elev

atio

n (in

m re

fere

nced

to N

AVD

, 198

8)

Well 4DWell 5DWell 6DWell 7DWell 8DWell 9UWell 10UWell 11UWell 12UWell 15UWell 18U

Page 10: MILAN BELTWAY, AIRPORT ROAD ISGS #17 · Milan Beltway, Airport Road Wetland Compensation Site September 1, 2006 to September 5, 2007 Water-Level Elevations in Soil-Zone Monitoring

Milan Beltway, Airport Road Wetland Compensation Site September 1, 2006 to September 5, 2007

Depths to Water in Deeper Monitoring Wells-0.5

0.0

0.5

1.0

1.5

Aug

2006

Sep

2006

Oct

200

6

Nov

200

6

Dec

200

6

Jan

2007

Feb

2007

Mar

200

7

Apr 2

007

May

200

7

Jun

2007

Jul 2

007

Aug

2007

Sep

2007

Oct

200

7

Dep

th (i

n m

refe

renc

ed to

land

sur

face

)

Well 4DWell 5DWell 6DWell 7DWell 8DWell 9UWell 10UWell 11UWell 12UWell 15UWell 18U

Page 11: MILAN BELTWAY, AIRPORT ROAD ISGS #17 · Milan Beltway, Airport Road Wetland Compensation Site September 1, 2006 to September 5, 2007 Water-Level Elevations in Soil-Zone Monitoring

Milan Beltway, Airport Road Wetland Compensation Site September 1, 2006 to September 5, 2007

Depths to Water in Selected Monitoring Wells-0.5

0.0

0.5

1.0

1.5

Aug

2006

Sep

2006

Oct

200

6

Nov

200

6

Dec

200

6

Jan

2007

Feb

2007

Mar

200

7

Apr 2

007

May

200

7

Jun

2007

Jul 2

007

Aug

2007

Sep

2007

Oct

200

7

Dep

th (i

n m

refe

renc

ed to

land

sur

face

)

Well 5SWell 5DWell 6SWell 6DWell 7SWell 7DWell 8SWell 8D

Page 12: MILAN BELTWAY, AIRPORT ROAD ISGS #17 · Milan Beltway, Airport Road Wetland Compensation Site September 1, 2006 to September 5, 2007 Water-Level Elevations in Soil-Zone Monitoring

Milan Beltway, Airport Road Wetland Compensation Site September 1, 2006 to September 5, 2007

Depths to Water in Selected Monitoring Wells-0.5

0.0

0.5

1.0

1.5

Aug

2006

Sep

2006

Oct

200

6

Nov

200

6

Dec

200

6

Jan

2007

Feb

2007

Mar

200

7

Apr 2

007

May

200

7

Jun

2007

Jul 2

007

Aug

2007

Sep

2007

Oct

200

7

Dep

th (i

n m

refe

renc

ed to

land

sur

face

)

Well 4SWell 4DWell 10SRWell 10UWell 11SWell 11U

Page 13: MILAN BELTWAY, AIRPORT ROAD ISGS #17 · Milan Beltway, Airport Road Wetland Compensation Site September 1, 2006 to September 5, 2007 Water-Level Elevations in Soil-Zone Monitoring

Milan Beltway, Airport Road Wetland Compensation Site September 1, 2006 to September 5, 2007

Depths to Water in Selected Monitoring Wells-0.5

0.0

0.5

1.0

Aug

2006

Sep

2006

Oct

200

6

Nov

200

6

Dec

200

6

Jan

2007

Feb

2007

Mar

200

7

Apr 2

007

May

200

7

Jun

2007

Jul 2

007

Aug

2007

Sep

2007

Oct

200

7

Dep

th (i

n m

refe

renc

ed to

land

sur

face

)

Well 9SWell 9UWell 12SWell 12UWell 13SWell 14SWell 15SWell 15UWell 16S

Page 14: MILAN BELTWAY, AIRPORT ROAD ISGS #17 · Milan Beltway, Airport Road Wetland Compensation Site September 1, 2006 to September 5, 2007 Water-Level Elevations in Soil-Zone Monitoring

Milan Beltway, Airport RoadWetland Compensation Site

September 2006 through August 2007

0

1

2

3

4

5

6

7

8

9

10

11

12

Sep

200

6

Oct

200

6

Nov

200

6

Dec

200

6

Jan

2007

Feb

200

7

Mar

200

7

Apr

200

7

May

200

7

Jun

2007

Jul 2

007

Aug

200

7

Pre

cipi

tatio

n (in

ches

)

monthly precipitation recorded at weather station (Midwestern Regional Climate Center)

monthly precipitation recorded on site by ISGS

1971-2000 monthly 30% above average threshold (National Water and Climate Center)

1971-2000 monthly average precipitation (National Water and Climate Center)

1971-2000 monthly 30% below average threshold (National Water and Climate Center)

data incomplete

Total Monthly Precipitation Recorded On Site and at theQuad City International Airport Weather Station, Moline, IL

Graph last updated October 9, 2007

on-site rain gaugeremoved 12/05/2006 installed 03/06/2007