Mike Eardley, PE, LEED AP, CCPDirector of CommissioningCannonDesign

Brian Berg, Jr., PE, LEED AP, CSIPrincipalBerg Engineering Consultants, Ltd.

April, 2014

The Power of Retro-Commissioning

Illinois Healthy & HighPerforming Schools Symposium

Page 2: Mike Eardley, PE, LEED AP, CCP Director of Commissioning CannonDesign Brian Berg, Jr., PE, LEED AP, CSI Principal Berg Engineering Consultants, Ltd. April,

•Commissioning (Cx) Definition•Cx Process•Cx Applied to Existing Buildings•Retro-Commissioning Examples•Human Factor in Buildings•Hot/Cold and Energy Concerns•Q&A

Agenda

Page 3: Mike Eardley, PE, LEED AP, CCP Director of Commissioning CannonDesign Brian Berg, Jr., PE, LEED AP, CSI Principal Berg Engineering Consultants, Ltd. April,

High Performance Buildings

Characteristics• Functionality• Energy Efficiency• Indoor Environmental Quality• Comfort• Sustainability (ability to perform its function in a long term)

Page 4: Mike Eardley, PE, LEED AP, CCP Director of Commissioning CannonDesign Brian Berg, Jr., PE, LEED AP, CSI Principal Berg Engineering Consultants, Ltd. April,

Building Systems Commissioning

• Buildings function as intended • Realize high system performance

• Promotes integration of systems• Document facility requirements

Page 5: Mike Eardley, PE, LEED AP, CCP Director of Commissioning CannonDesign Brian Berg, Jr., PE, LEED AP, CSI Principal Berg Engineering Consultants, Ltd. April,

•Commissioning (Cx) is a comprehensive and systematic process to verify and document that new or renovated facility systems function completely as designed to meet the owner’s requirements

•Retro-Commissioning (RCx) is the commissioning of a building that has never been commissioned.

• Energy goals and low/no-cost measures often a focus

Commissioning Definition

Page 6: Mike Eardley, PE, LEED AP, CCP Director of Commissioning CannonDesign Brian Berg, Jr., PE, LEED AP, CSI Principal Berg Engineering Consultants, Ltd. April,

Without Commissioning

• Placement and calibration of Sensors• Simultaneous Heating and Cooling• Incorrect function of air-side Economizer and other efficiency measures• Operating Schedule is not what is necessary, or assumed by energy model• Cycling daylighting and other systems

Page 7: Mike Eardley, PE, LEED AP, CCP Director of Commissioning CannonDesign Brian Berg, Jr., PE, LEED AP, CSI Principal Berg Engineering Consultants, Ltd. April,

Energy Impacts

- Large effort in sustainable and energy efficient design- Will not be realized if design or intended use is:

misunderstoodignored

- Or if building systems are:operating incorrectlynot thoroughly tested

Page 8: Mike Eardley, PE, LEED AP, CCP Director of Commissioning CannonDesign Brian Berg, Jr., PE, LEED AP, CSI Principal Berg Engineering Consultants, Ltd. April,

Purpose of Functional Testing

- Verification of an operational systemnot a trouble shooting exercise (in theory)

- Reduces adjustment and tuning during occupancy- Impacts

energycomfortmaintenancefunctionality

Page 9: Mike Eardley, PE, LEED AP, CCP Director of Commissioning CannonDesign Brian Berg, Jr., PE, LEED AP, CSI Principal Berg Engineering Consultants, Ltd. April,

Types of Functional Testing

- Building Automation System- False load- Seasonal testing- Trend analysis

Page 10: Mike Eardley, PE, LEED AP, CCP Director of Commissioning CannonDesign Brian Berg, Jr., PE, LEED AP, CSI Principal Berg Engineering Consultants, Ltd. April,

•Commissioning: Process applied to new construction or major building renovation

•Re-commissioning: Facility has previously been commissioned and is in need of a “tune-up”

•Retro-commissioning: Performed on facilities that have been in service and never commissioned

•Ongoing commissioning: Ongoing program of structured commissioning throughout the lifetime of a building

New and Existing Buildings

Page 11: Mike Eardley, PE, LEED AP, CCP Director of Commissioning CannonDesign Brian Berg, Jr., PE, LEED AP, CSI Principal Berg Engineering Consultants, Ltd. April,

•Definition: Commissioning a building that never has been

• In practice: re-tuning systems

•Or, identify low-cost / no-cost measures to implement

• Site survey, owner interview, trending

•Drawings study, engineering calculation

Retro-Commissioning Process

Page 12: Mike Eardley, PE, LEED AP, CCP Director of Commissioning CannonDesign Brian Berg, Jr., PE, LEED AP, CSI Principal Berg Engineering Consultants, Ltd. April,

• Energy measure identification

• Implementation

•Measurement & Verification

• Persistence

• SEDAC Retro-Commissioning Program

•ComEd Retro-Commissioning Program

Retro-Commissioning Process

Page 13: Mike Eardley, PE, LEED AP, CCP Director of Commissioning CannonDesign Brian Berg, Jr., PE, LEED AP, CSI Principal Berg Engineering Consultants, Ltd. April,

Trending

- Functional testing before occupancy is a snapshot- Trending shows operation over time- Methods of trending

building automation systemportable data loggers

- Analyze trendsspreadsheet calculationssoftware tools

Page 14: Mike Eardley, PE, LEED AP, CCP Director of Commissioning CannonDesign Brian Berg, Jr., PE, LEED AP, CSI Principal Berg Engineering Consultants, Ltd. April,

Ongoing Commissioning

- GoodCx process with

functional testing- Better

Re-Cx program- Best

Ongoing Cx- Combination of software,

engineering support, action

Page 15: Mike Eardley, PE, LEED AP, CCP Director of Commissioning CannonDesign Brian Berg, Jr., PE, LEED AP, CSI Principal Berg Engineering Consultants, Ltd. April,

•Document current operation

• Identify opportunities for improvement

• Evaluate payback, consider measures

• Implement measures

• Verify measures

LEED for Existing Buildings

Page 16: Mike Eardley, PE, LEED AP, CCP Director of Commissioning CannonDesign Brian Berg, Jr., PE, LEED AP, CSI Principal Berg Engineering Consultants, Ltd. April,

Typical Air Handling Unit

Page 17: Mike Eardley, PE, LEED AP, CCP Director of Commissioning CannonDesign Brian Berg, Jr., PE, LEED AP, CSI Principal Berg Engineering Consultants, Ltd. April,

Typical Air Handling Unit – Components

Page 18: Mike Eardley, PE, LEED AP, CCP Director of Commissioning CannonDesign Brian Berg, Jr., PE, LEED AP, CSI Principal Berg Engineering Consultants, Ltd. April,

economizervariable air

volume

hot water heating

chilled water cooling

Moving Parts

Page 19: Mike Eardley, PE, LEED AP, CCP Director of Commissioning CannonDesign Brian Berg, Jr., PE, LEED AP, CSI Principal Berg Engineering Consultants, Ltd. April,

Common Problems – Air-side Economizer

- Damper is stuck / broken / non-functional- Control algorithms fighting

heating during economizermechanical cooling when free

cooling available- Outside sensor calibration or location

Page 20: Mike Eardley, PE, LEED AP, CCP Director of Commissioning CannonDesign Brian Berg, Jr., PE, LEED AP, CSI Principal Berg Engineering Consultants, Ltd. April,

static pressure reset

supply air temperature reset

hot water reset

chilled water reset

demand control ventilation

zone level CO2 control

Controls

Page 21: Mike Eardley, PE, LEED AP, CCP Director of Commissioning CannonDesign Brian Berg, Jr., PE, LEED AP, CSI Principal Berg Engineering Consultants, Ltd. April,

morning warm-up

occupied / unoccupied

Scheduling