COMPANY
PROFILE
All of the information and presentation material, including text, images and usage of logos , is either the property of, or used with permission by MAJU INTEGRATED ENGINEERS
SDN BHD (ENERGY DIV.) The information may not be distributed, modified, displayed or reproduced without the prior written permission from MIE.
MAJU INTEGRATED ENGINEERS SDN BHD
(MIE - ENERGY DIVISION)
491172 -T
ENERGY DIV.MAJU INTEGRATED ENGINEERS
WWW.MIE-ENERGY.COM
MAJU INTEGRATED ENGINEERS SDN BHD (MIE) was incorporated in 1999 and started as one
of Malaysia’s premier Civil, Structural, Mechanical and Electrical works for buildings and
infrastructures services.
In 2014, MIE set up a new division known as MIE-Energy Div. (MIE-Energy) towards diversifying
the business to penetrate energy sector, such as Oil & Gas (Upstream and Downstream),
Renewable Energy, Subsea, Power Plant and R&D/Technology industries, apart from boosting
young local talent in creating a multi-disciplinary engineering services in these industries.
Serving the sector for more than a decade, MIE-Energy proudly stands as a local unique
MALAYSIAN company that provides project efficiency delivery across project lifecycles, from
concept to final project delivery engineering solutions.
With integrated local expertise, joint-venturing, partnership as well as collaboration with
international partners, it drives us to become one of the comprehensive superiors to deliver
practical performance solutions to our clients for their asset reliability, quality, safety and
economics.
INTRODUCTION
WWW.MIE-ENERGY.COM
2017
TECHNOLOGY AND
PRODUCT DIVISION
350k manhours within 3
years of establishment
(Energy Division) and
expanded to more than 60
employees
2014
MIE – ENERGY DIV.
New division setup called as
MAJU INTEGRATED
ENGINEERS – ENERGY
DIVISION, with a vision to
boost the oil and gas market
sector
1999
INCEPTION INTO
MARKET
Incorporated in 1999 and
started as Malaysia’s Premier
Civil, Structural, Mechanical
& Electrical for Buildings &
Infrastructure
2015
INTERNATIONAL
Secured international
projects in Thailand and
Singapore
2021
PRESENT
• Securing major contracts
from reputable clients and
has grown up to over 200
employees
• Established footprint in
South East Asia (SEA) i.e.
Thailand, Indonesia,
Singapore and Vietnam
TO-DATE
WITHOUT LOST-TIME INJURY
1.8MILLION
SAFE
MANHOURS
OUR
VALUES & BELIEF
Empowering the excellentUnleash the true potential of our talent in
delivering exceptional result.
Mutual RespectEnables our people to work across functions and
at all levels in unlocking and maximizing
opportunities.
IntegrityUphold the values of integrity in innovating
creative solutions without compromising people,
environment, assets and reputation.
ENERGY DIV.MAJU INTEGRATED ENGINEERS
ABOUT US – OUR GROUP
WWW.MIE-ENERGY.COM
PARTNERSHIP
UNIVERSITY INDUSTRIAL PARTNERTHAILAND & MYANMAR
ENERGY DIV.MAJU INTEGRATED ENGINEERS
MAJU INTEGRATED ENGINEERS SDN BHD (MIE)
MIE OFFSHORE SOLUTIONS SDN BHD (MOFS)
• ENGINEERING SERVICES FOR ONSHORE & OFFSHORE
(Feasibility Study, Concept Select, Conceptual Study, FEED/Basic Engineering, Detailed
Engineering , Specialized Study, As-Builting)
• BROWNFIELD & GREENFIELD PROJECTS
ENERGY DIV.
• ENGINEERING & CONSTRUCTION (E&C), R&D/TECHNOLOGY, TRANSPORTATION &
INSTALLATION, ASSET INTEGRITY MANAGEMENT, MANPOWER SUPPLY AND MOBILE
OFFSHORE DRILLING UNIT (MODU)
• ENGINEERING, PROCUREMENT, CONSTRUCTION, INSTALLATION & HOOK-UP &
COMMISSIONING, 3D LASER SCANNING, PROVISION OF CHOKE VALVE SUPPLY & R&D/
TECHNOLOGYMIE ENGINEERING SOLUTIONS CO., LTD.
(THAILAND REGISTERED COMPANY)
TUAH ENERGY SDN BHD (TESB)
• PROJECT MANAGEMENT, PROCUREMENT, FABRICATION, CONSTRUCTION &
COMMISSIONING, TECHNOLOGY & SOLUTIONS PROVIDER, PRODUCTS, INSPECTION &
MAINTENANCE AND SPECIALIST MANPOWER SUPPLY
Jack-Up Rig Services
Engineering Services (Feasibility Study / Conceptual / FEED / Detailed Design/ Specialized Study / As-Builting)
Procurement / Fabrication
Installation / Hook Up & Commissioning / Decommissioning
Asset Integrity Management
Laser Scanning Services
Products
OUR SERVICES
WWW.MIE-ENERGY.COM
ENERGY DIV.MAJU INTEGRATED ENGINEERS
Topside Substructure Subsea Floaters Petrochemical Refinery Power Plant
Strategic Thinking & PlanningInnovative Design, Supplied & Project SolutionsCreative & Cost Effective SolutionsQuality DeliverablesHighest Safety Requirement
R&D / Technology
OFFICE LOCATIONHeadquarters & MIE Design Offices
HEADQUARTERS
BANDAR TASIK SELATAN
T4-2-2, TOWER 4, MAJU LINK, JALAN LINGKARAN TENGAH 2 (MRR2), 57100 BANDAR TASIK SELATAN, KUALA LUMPUR(MIE ENERGY HQ)
150
KERTEH
LOT 50080, TINGKAT ATAS,JALAN KEMAMAN-DUNGUN, KAMPUNG BARU,24300 KERTEH, KEMAMANTERENGGANU(KERTEH OFFICE)
20
LOT 1463&1464, JALAN MACHINDA, LUTONG, 98100, MIRI,SARAWAK(MIRI OFFICE)
MIRI
20KOTA KINABALU
BLOCK NO. F, LOT 1,1ST FLOOR, LINTAS JAYA SHOP LOT,88300 DISTRICT OF PENAMPANGSABAH(KK OFFICE)
10
BINTULU
LOT 7668, 3RD FLOOR, BLOCK 31, KEMENA LAND DISTRICT, 97000, BINTULU, SARAWAK(BINTULU OFFICE)
15
THAILAND
5
10/7, MOO 2, SUKHUMVIT ROAD, T.BANGLAMUNG, ABANGLAMUNG, CHONBURI 20150 THAILAND(THAILAND OFFICE)
WWW.MIEOFFSHORE.COM.MY
ENERGY DIV.MAJU INTEGRATED ENGINEERS
CORPORATE TEAM
WWW.MIE-ENERGY.COM
ENERGY DIV.MAJU INTEGRATED ENGINEERS
HEAD OF PROJECTS & ENGINEERING
Ir. AZAN ZAINUDDIN
FINANCE DEPARTMENT
MOHD HAFIZ MOHD SHUIB
HR/ADMIN DEPARTMENT
SAZREEN MOHAMED HUSSEIN
MIE ENGINEERING SOLUTIONS CO. LTD
(THAILAND)
SUPAPON SAE-BE
ENGINEERING DEPARTMENT
Ir. MOHD FADHIR AKHKAR ALI
CHIEF OPERATING OFFICER
Ir. AHMAD NAZWAN MAT ZIN
MANAGING DIRECTOR
Ir. MAT JUSOH MAMAT
PROJECT MANAGEMENT DEPARTMENT
Ir. MOHAMAD SETH FARABI ISMAIL
PROJECT SERVICES DEPARTMENT
SAIFUL ADLI MOHAMAD
COMMERCIAL, CONTRACT & PROPOSAL DEPARTMENT
RAINANI JAMALODIN
QHSSE DEPARTMENT
REZA SYAHRUZZAMAN MOHAMED
BUSINESS DEVELOPMENT DIRECTOR
BAIZURI JUSOH
IT DEPARTMENT
SYUKRI HAKIM ABDUL RAHMAN
SATELLITE OFFICE(DOMESTIC – MALAYSIA)
KERTEH
MIRI
BINTULU
KOTA KINABALU
MIE OFFSHORE SOLUTIONS SDN BHD
Ir. AHMAD NAZWAN MAT ZIN
PLANNING DEPARTMENT
WAN MOHD IFTITAHWAN KAMAL
TUAH ENERGY SDN BHD
SAIFUL ADLI MOHAMAD
CORPORATE & BUSINESS SUPPORT
JANISA ALDEAN
PROJECT EXPERIENCES
CLIENTELE
More than 30
International Market Penetration
Through partnership, collaboration & joint-venture
CONTRACTSAWARDED
Brownfield & Greenfield
368
Onshore & Offshore
More than
ENERGY DIV.MAJU INTEGRATED ENGINEERS
OUR CLIENTELE
WWW.MIE-ENERGY.COM
HALLIBURTON BAYAN PETROLEUM
ENERGY DIV.MAJU INTEGRATED ENGINEERS
OUR LICENSE & CERTIFICATE
WWW.MIE-ENERGY.COM
STANDARDISED WORK AND EQUIPMENT CATEGORIES (SWECs)
ISO 9001:2015
ENERGY DIV.MAJU INTEGRATED ENGINEERS
ENERGY DIV.MAJU INTEGRATED ENGINEERSOUR SOFTWARE
WWW.MIE-ENERGY.COM
Discipline Software
• Process Engineering
HYSIS ICON Petronas
PIPESIM
FlareNet
• Piping Engineering
AVEVA PDMS Naviswork
CAESAR II SmarPlant 3D
AutoCAD
ZWCAD
• Mechanical Engineering
TANK SolidWorks
PVelite AnSYS
HTRI
• Electrical EngineeringETAP
EDSA
• Instrumentation
Engineering
Instrument Calculation (InstruCalcs)
Intools (Smart Plant Instrumentation)
• Structural / Naval
Architecture Engineering
/ Civil
SACS Executive Bentley Openroad
BOCAD Tedds
MOSES Orion
STAAD Pro Prota
Tedds S-Frame
MX Road Profesional Bentley Power Civil
Miduss 98
• Pipeline EngineeringAutoPIPE Mathcad
Orcaflex Offpipe
• Project ManagementMicrosoft Project 2016
Primavera Enterprise P3e
CASE STUDY 1
Strength & Fatigue Analyses Assessment Of Flare Stack Structure
WWW.MIE-ENERGY.COM
ENERGY DIV.MAJU INTEGRATED ENGINEERS
Case Study Background and Problem Statement
• Client has identified a partly damaged and severely corroded flare tower. It has become aconcern to Client to ensure normal operability of this flare tower without compromisingthe structural integrity of the structure, loss of live, damage to the environment and lossof reputation.
• The study split in two phase as below:
• The flare tower not fit for service and is not recommended for furtherstrengthening or repair.
• For long term, it’s suggested to change the entire flare tower with a new one oras minimum to replace the lower part flare tower with new fabricated section.
• Due to this, Phase 2 is activated by implement the replacing of lower part offlare tower.
Our Proposed Design
Phase 1 Phase 2
• To identify the weak points and
compromising areas subject to normal
operation
• If the finding indicating sound and fit for
Operation, the Flare will not be assessed
in Phase 2. However, if the assessment
strongly suggests strengthening /
demolishment / replacement then Phase 2
is required.
• To provide options for strengthening
and possibility to completely re-
design a new flare tower structure.
• To come out with constructability
and construction scope of work
• To report the strength, fatigue and vortex shedding of the Flare Tower:Strength➢ Two structural components are found to be over-utilised. The locations are the lower flare
tower structure and the blower duct side reinforcements.Fatigue➢ The entire flare tower structure is noted to be free from fatigue damages. This in short
means that the flare tower structure is not influenced to wind induced fatigue damages.Vortex Shedding➢ Although the flare tower structure has relatively a larger D/t ratio, it is observed to be fairly
stiffened, due to the presence of platform supports, baffle plate, nozzles, openings andblower duct inlet. In short, the flare tower not influenced by the vortex induced vibration.
CASE STUDY 2
Life Boat 2 DAVIT – Permanent Repair
WWW.MIE-ENERGY.COM
ENERGY DIV.MAJU INTEGRATED ENGINEERS
Case Study Background &Problem Statement
• After conducting 1.1 Dynamic Load test on LB 2 Davit, crack onweld was found at leg 1 (AFT) and crack on parent metal on Leg 2(FWD) by using MPI technique. EMA only can detect crack depthuntil 2mm due to certain limitation.
• Further grinding off AFT leg, it was found the crack length increasesfrom 80mm to 200mm.
• To present preliminary assessment finding of the cracks foundafter lifeboat davit testing.
• To provide results of manual calculations of foundation stressesand unity checks before and after modification.
• To present load reactions of the davit structure from thesimplified SACS analysis.
• To highlight results for Finite Element (FE) verification analysis.• Conclusion and recommendation for lifeboat 1 davit modification.
Our Proposed Design
• The comparison of stresses shows good correlation between manual calculations and FE results.• The stresses at the hotspot area reduced significantly (up to 90%) after modification.• The design of the proposed modification strengthening can be considered very effective in
solving the crack issue. This is further evidence by no cracks found after the re-test.
1
2
3
Figure 1.0 : Davit leg-Foundation Footprint (Before and After Modification)
Figure 2.0: Loads Acting on Davit Structure
Table 2.0: Summary of Reactions at Davit Leg Foundation
Figure 3.0: Davit Leg-Foundation FE Models
(Before and After Modification)
Table 3.0: Comparison of Combined Stresses
• In order to obtain the more accurate reactions at davitfoundation subjected to applied load during lifeboat testing, asimplified SACS analysis has been performed.
• List of loads considered acting on davit structure are as below:✓ Design weights of lifeboat✓ Dynamic Factors considered✓ Davit self weight✓ Lateral reactions from pulley on top of davit✓ Wind was considered to be negligible during
lifeboat testing
• Manual calculations have been performed to obtain estimationof the stresses and unity checks at weld and steel at davit leg-foundation interface (see Figure 2c below).
• A FE analysis has been performed to verify the reactionsand results obtained earlier. Details of the foundation as-built and strengthening have been carefully considered inthe FE model. Load reactions considered were from thesimplified SACS analysis
Manual Calculation of Stresses at Foundation
Simplified SACS Analysis
Finite Element (FE) Analysis
CASE STUDY 3
Test Separator Optimization
WWW.MIE-ENERGY.COM
ENERGY DIV.MAJU INTEGRATED ENGINEERS
Existing Test Separator DesignCase Study Background and Problem Statement
• D21JT-A infill drilling was performed in 2017 under SIPROD campaign• The infill wells topside facility was designed based on individual well maximum flowrate
of 1500 BPD oil plus minimum watercut• However, during well completion and unloading, it came to surprise that one of the infill
well is capable of producing maximum 3000 BPD oil instead• To cope with the increased oil production rate, ROC requested MIE to assess the
feasibility of using the existing Test Separator by allocating the water leg for oil collection
Test Separator Capacity Assessment
Modified Test Separator
Advantages of the Proposed Design
• No changes to existing dimension of the vessel and its inlet/outlet nozzles is required• However, following modification is anticipated:
• Water weir and the back weir of the oil bucket are to be removed• Water related level instruments isolation valve is to be closed• Level setpoints adjustment are required• Changes of setpoints to be reflected in PMCS
GREENFIELD EXPERIENCEONSHORE
WWW.MIE-ENERGY.COM
BASIC ENGINEERING DESIGN FOR EFFLUENT MANAGEMENT AT SOURCE (EMAS) PROJECT
• EMBARK ON A DEVELOPMENT OF BASIC ENGINEERING DESIGN FOR EFFLUENT MANAGEMENT AT SOURCE PROJECT TO TREAT OILY
WATER AND MEET REGULATORY LIMIT TO IER 2009 STANDARD “A”
• SG. UDANG, MELAKA
• YEAR 2019
• 45,000 MANHOURS
ENERGY DIV.MAJU INTEGRATED ENGINEERS
GREENFIELD EXPERIENCEONSHORE
WWW.MIE-ENERGY.COM
ENGINEERING DESIGN SERVICES FOR PROPOSED
MODIFICATION TO EXISTING EXPANDABLE POLYSTRYENE
(EPS) AND TAMOL PLANT
• TOTAL CONVERSION FROM EXISTING EPS PLANT INTO
POLYMER DISPERSION PLANT
• PASIR GUDANG, JOHOR, MALAYSIA
• REACTOR, VESSEL, AGITATORS, TANK FARMS AND NEW
DELUGE SYSTEM
• YEAR 2014
• 35,000 MANHOURS
ENGINEERING OF GASIFIER STEAM BOILER
RENEWABLE ENERGY PLANT
• NEW BUILD DESIGN FOR GASIFIER STEAM
BOILER RENEWABLE ENERGY POLYMER
PLASTIC PARK
• KERTEH, MALAYSIA
• YEAR 2014
• 55,000 MANHOURS
ENERGY DIV.MAJU INTEGRATED ENGINEERS
GREENFIELD EXPERIENCEOFFSHORE
WWW.MIE-ENERGY.COM
PROVISION OF CONCEPTUAL & PRE-FEED
STUDY FOR LARAK & BAKONG WHP FOR
SK408 FIELD DEVELOPMENT
• UNMANNED WELLHEAD PLATFORM
• SARAWAK, MALAYSIA
• TOPSIDE : 475 MT
• SUBSTRUCTURE : 1,100 MT
• 80 MTRS WATER DEPTH
• YEAR 2015
PROVISION OF CONCEPTUAL FOR BAKONG
PRODUCTION PLATFORM FOR SK408 FIELD
DEVELOPMENT
• 6-LEGGED CPP
• SARAWAK, MALAYSIA
• TOPSIDE : 3,500 MT
• SUBSTRUCTURE : 1,800 MT
• 85 MTRS WATER DEPTH
• YEAR 2015
ENERGY DIV.MAJU INTEGRATED ENGINEERS
BROWNFIELD EXPERIENCEOFFSHORE & ONSHORE
WWW.MIE-ENERGY.COM
UMBRELLA CONTRACT ENGINEERING SERVICES FOR FACILITIES IMPROVEMENT PROPOSAL (FIP) & PLANT CHANGE
• 3 YEARS + 1 YEARS (OPTIONAL) EXTENSION : YEAR 2018 TILL 2022
• COVERAGE LOCATION : KL/MELAKA/KERTEH/KEMAMAN/GEBENG/GURUN/MIRI/BINTULU/ KOTA KINABALU
• ANY OF BROWNFIELD ENGINEERING SERVICES FOR ALL PETRONAS ASSET FOR PROJECT SERVICES, FEASIBILITY STUDY/BASIC, FEED,
DETAILED DESIGN AND OTHER SPECIALIZED ENGINEERING (FOR ONSHORE & OFFSHORE)
• ESTIMATED MORE THAN 2.0M MANHOURS THROUGHOUT CONTRACT DURATION
ENERGY DIV.MAJU INTEGRATED ENGINEERS
BROWNFIELD EXPERIENCEONSHORE
WWW.MIE-ENERGY.COM
PROVISION FOR ENGINEERING SERVICES FOR PLANT MODIFICATION AND IMPROVEMENT PROJECT FOR
PETRONAS GAS BERHAD, PETRONAS CHECMICAL ETHLYNE SDN BHD, PETRONAS CHEMICAL POLYETHYLENE SDN BHD &
PETRONAS PENAPISAN (TERENGGANU) SDN BHD.
• 3 YEARS + 2 YEARS (OPTIONAL) EXTENSION : YEAR 2015 TILL 2020
• COVERAGE LOCATION : KERTEH/KEMAMAN/GEBENG (TERENGGANU/PAHANG)
• ANY OF BROWNFIELD ENGINEERING SERVICES FOR ALL PETRONAS ASSET FOR PROJECT SERVICES, FEASIBILITY STUDY/BASIC, FEED,
DETAILED DESIGN AND OTHER SPECIALIZED ENGINEERING (FOR ONSHORE)
• ESTIMATED MORE THAN 1.0M MANHOURS THROUGHOUT CONTRACT DURATION
ENERGY DIV.MAJU INTEGRATED ENGINEERS
BROWNFIELD EXPERIENCEONSHORE
WWW.MIE-ENERGY.COM
PROVISION OF ENGINEERING DESIGN
TECHNOLOGY FOR SPENT CAUSTIC TREATMENT
UNIT PROJECT.
• DETAILED ENGINEERING DESIGN AND
TECHNOLOGY LIAISON (MERICHEM, USA)
• RAYONG, THAILAND
• YEAR 2016
• 20,000 MANHOURS
ENGINEERING DESIGN FOR SELECTIVE CATALYST
REDUCTION (SCR) SYSTEM FOR WHRU 3508-F01
PROJECT
• REDUCE NOx EMISSION FROM EXISTING WHRU 3502F01
LOCATED IN PTT RAYONG GAS SEPARATION GAS
SEPARATION. (100PPM@7% O2 (existing value) to
40PPM @7% O2 DUE TO LAW REGULATION
• RAYONG, THAILAND
• YEAR 2017
• 10,000 MANHOURS
ENERGY DIV.MAJU INTEGRATED ENGINEERS
BROWNFIELD EXPERIENCEOFFSHORE
WWW.MIE-ENERGY.COM
ENGINEERING, PROCUREMENT, CONSTRUCTION, INSTALLATION AND COMMISIONING FOR BENTARA WELLHEAD PLATFORM
REINSTATEMENT
• PLATFORM RE-INSTATEMENT/RE-ACTIVATION
• MIE HAD CARRIED OUT ALL SERVICES (PMT, Engineering, Laser Scanning, Procurement, Construction Engineering, Offshore
Hook-Up & Commissioning) IN-HOUSE
• SARAWAK, MALAYSIA
• AUG 2017 TO AUG 2018
• 150,000 MANHOURS (W/O LTI FOR ALL SCOPES)
ENERGY DIV.MAJU INTEGRATED ENGINEERS
BROWNFIELD EXPERIENCEOFFSHORE
WWW.MIE-ENERGY.COM
PROVISION OF STRUCTURAL ENGINEERING
SERVICES
• STRUCTURAL BROWNFIELD ENGINEERING
WORKS FOR ALL REPSOL PM-3 ASSET
• TERENGGANU, MALAYSIA
• 1-YEAR CONTRACT (2018 – 2019)
• 150,000 MANHOURS
UMBRELLA CONTRACT FOR PROVISION OF DESIGN,
ENGINEERING AND CONSULTANCY SERVICE FOR D35,
D21 AND J4 FIELDS
• BROWNFIELD & GREENFIELD ENGINEERING DESIGN
CONTRACT
• SARAWAK, MALAYSIA
• 2 YEARS + 1 YEARS (OPTIONAL): (2019 TO 2021)
• 500,000 MANHOURS
ENERGY DIV.MAJU INTEGRATED ENGINEERS
BROWNFIELD EXPERIENCEOFFSHORE
WWW.MIE-ENERGY.COM
PROVISION OF ENGINEERING & DETAILED
DESIGN FOR J4 & D21 SIMULTANEOUS
PRODUCTION DRILLING (SIPROD)
• D21JT-A:3 SLOT, J4DP-A:11 SLOT INFILL
DRILLING ENGINEERING
• SARAWAK, MALAYSIA
• YEAR 2016
• 40,000 MANHOURS
PROVISION OF ENGINEERING FOR D35DP-A
FACILITIES MODIFICATION AND WELL TIE-IN FOR
CTU DRILLING ACTIVITIES
• WELL WORKOVER ON D35DP-A FOR PHASE 1
PROJECT DEVELOPMENT, SIPROD INFILL
ENGINEERING
• SARAWAK, MALAYSIA
• YEAR 2015
• 25,000 MANHOURS
ENERGY DIV.MAJU INTEGRATED ENGINEERS
BROWNFIELD EXPERIENCEOFFSHORE
WWW.MIE-ENERGY.COM
PROVISION OF ENGINEERING SERVICES FOR
EAST BELUMUT INFILL DRILLING PROJECT
• 7 NOS OF INFILL DRILLING WELLS WITH DECK
EXTENSION
• TERENGGANU, MALAYSIA
• YEAR 2015
• 15,000 MANHOURS
PROVISION FOR PIPELINE REHABILITATION WITH IN-
FIELD (IFL) TECHNOLOGY FOR PETRONAS CARIGALI
(PL-234)
• NON-METALLIC PIPELINE REHABILITATION
(RTP/TCP/IFL) IS CHOSEN FOR CAPEX AND TOTAL
LIFE CYCLE COST COMPARED TO CARBON STEEL
REQUIREMENT
• SARAWAK, MALAYSIA
• YEAR 2018
• 8,000 MANHOURS
ENERGY DIV.MAJU INTEGRATED ENGINEERS
BROWNFIELD EXPERIENCEOFFSHORE
WWW.MIE-ENERGY.COM
PROVISION OF AS-BUILTING EXERCISE AND
STRUCTURAL GLOBAL ANALYSIS FOR PM323 AND
PM329
• AS-BUILT FOR ALL DISCIPLINE AND STRUCTURAL
GLOBAL ANALYSIS
• TERENGGANU, MALAYSIA
• PM323: BEL-A, CHR-A, WB-A, TG-A
• PM329: EPA-CPP, EPA-WHP
• 2 YEAR CONTRACT (2015 – 2017)
• 300,000 MANHOURS
PROVISION FOR CONCEPTUAL OF SAND REMOVAL
AND DISPOSAL SYSTEM AT DUYONG FOR PETRONAS
CARIGALI SDN BHD
• SAND REMOVAL TECHNOLOGIES FOR COMPARATIVE
ASSESSMENT BETWEEN THE OPTIONS
• TERENGGANU, MALAYSIA
• YEAR 2015
• 5,000 MANHOURS
ENERGY DIV.MAJU INTEGRATED ENGINEERS
BROWNFIELD EXPERIENCEOFFSHORE
WWW.MIE-ENERGY.COM
EPCIC OF DEEP DRAWN BOOSTER
COMPRESSION PILOT PROJECT AT ARTHIT
PLATFORM
• BOOSTER COMPRESSOR FOR AWP3 PLATFORM
• THAILAND
• YEAR 2014
• 15,000 MANHOURS
PROVISION OF ENGINEERING MODIFICATION
UPGRADE FOR EARLY PRODUCTION VESSEL
(EPV) AT BALAI CLUSTER
• FACILITIES UPGRADE MODIFICATION DUE TO
RELOCATION OF EPV BALAI MUTIARA TO
BENTARA CLUSTER FROM BALAI CLUSTER
• SARAWAK, MALAYSIA
• YEAR 2014
• 15,000 MANHOURS
ENERGY DIV.MAJU INTEGRATED ENGINEERS
MARINE & NAVAL ARCHITECH EXPERIENCEOFFSHORE
WWW.MIE-ENERGY.COM
PROVISION OF DEMOBILISATION SERVICES FOR MOPU-SATU AND MOPU-DUA
• DECOMMISSIONING/DEMOBILISATION OF MOPU-SATU & MOPU-DUA TO APPROVED LAYING AREA IN JOHORE DUE TO
PLATFORM ABANDONMENT BY CLIENT
• TERENGGANU, MALAYSIA
• YEAR 2016
• PREPARATION OF DECOMMISSIONING ENGINEERING & PROCEDURE INCLUDING OPERATION SUPPORT
• 7,500 MANHOURS
ENERGY DIV.MAJU INTEGRATED ENGINEERS
MARINE & NAVAL ARCHITECH EXPERIENCEOFFSHORE
WWW.MIE-ENERGY.COM
PROVISION OF MOORING ENGINEERING SERVICES
FOR TEMBIKAI OILFIELD
• MOORING ENGINEERING SERVICES FOR
PLATFORM SUPPORT VESSEL (PSV) AT TEMBIKAI
PLATFORM DURING HUC CAMPAIGN
• TERENGGANU, MALAYSIA
• YEAR 2015
• 5,000 MANHOURS
PROVISION OF ENGINEERING FOR BELIDA FPSO
PROJECT
• BELIDA FPSO PROJECT INSTALLATION ENGINEERING
• INDONESIA
• YEAR 2017
• 6,000 MANHOURS
ENERGY DIV.MAJU INTEGRATED ENGINEERS
CONSTRUCTION ENGINEERING EXPERIENCE
OFFSHORE
WWW.MIE-ENERGY.COM
PROVISION OF FABRICATION ENGINEERING
AND AS-BUILT FOR HOST TIE-IN AT KNDP-A
• STRUCTURAL FABRICATION / SHOP DRAWING
(IFC), MTO, NDE, GA, ERECTION DRAWING,
NESTING & CUTTING PLAN
• SABAH, MALAYSIA
• 2015
• 12,000 MANHOURS
PROVISION OF FABRICATION SUPPORT (SHOP
DRAWING) FOR CONSTRUCTION OF NEW LAB
AND MATERIALMAN ROOM AT BEKOK-A
PLATFORM
• ALL DISCIPLINES SHOP DRAWING /(IFC) FOR
MATERIALMAN LABS AT BEKOK-A
• TERENGGANU, MALAYSIA
• YEAR 2014
• 4,000 MANHOURS
ENERGY DIV.MAJU INTEGRATED ENGINEERS
3D LASER SCANNINGOFFSHORE & ONSHORE
WWW.MIE-ENERGY.COM
3D LASER SCANNING & CONSTRUCTION
DRAWINGS FOR MEP-A AND SAP-A NAG
• 3D LASER SCANNING & CONSTRUCTION
ENGINEERING
• SARAWAK, MALAYSIA
• YEAR 2016
• 15,000 MANHOURS
3D LASER SCANNING & 3D MODEL UPDATE FOR
SHELL BUKOM PLANT
• 3D LASER SCANNING & SP3D MODEL
COMPLETE (INTELLIGENT 3D MODEL)
• SINGAPORE
• YEAR 2017
• 8,000 MANHOURS
ENERGY DIV.MAJU INTEGRATED ENGINEERS
SPECIALIZED ENGINEERING
WWW.MIE-ENERGY.COM
FLOW ASSURANCE STUDY FOR TEMBIKAI GAS
DEVELOPMENT
• PIPELINE TRANSIENT ANALYSIS FOR 12” X
58KM FWS PIPELINE FROM TEMBIKAI WHP TO
BERANTAI FPSO
• TERENGGANU, MALAYSIA
• YEAR 2017
PROVISION OF FEA ANALYSIS FOR FLARE STACK
ASSESSMENT STUDY
• DAMAGED FROM SEVERE CORRODED FLARE TOWERS FOR
3 NOS OF FLARE STACK
• TERENGGANU, MALAYSIA
• ANSYS SOFTWARE
• YEAR 2015
ENERGY DIV.MAJU INTEGRATED ENGINEERS
SPECIALIZED ENGINEERING
WWW.MIE-ENERGY.COM
ENGINEERING ANALYSIS FOR STEAM TURBINE
INDUCE VORTEX STUDY
• INDUCE VORTEX STUDY FOR FEA & CFD
ANALYSIS
• TERENGGANU, MALAYSIA
• ANSYS & SOLIDWORK SOFTWARE
• YEAR 2017
PROVISION OF CFD ANALYSIS FOR STEAM INLET
DISTRIBUTOR
• CFD & FEA ANALYSIS FOR STEAM INLET DISTRIBUTOR
• TERENGGANU, MALAYSIA
• ANSYS SOFTWARE
• YEAR 2016
ENERGY DIV.MAJU INTEGRATED ENGINEERS
OTHER PROJECT EXPERIENCE LISTNo Project List Client Duration/Status
1PROVISION OF ENGINEERING AND DETAILED DESIGN FOR BAYAN GAS DEVELOPMENT PROJECT PHASE 2 (BROWNFIELD
WORKS)DIALOG E&C SDN BHD FEB 2021 - ONGOING
2PROVISION OF DETAILED ENGINEERING DESIGN FOR M1 TOPSIDE MODIFICATION IN PREPARATION FOR PL-395/396
DEPRESSURISING AND FLUSHING.PETRONAS CARIGALI SDN BHD JAN 2020 - ONGOING
3 PROVISION OF DETAILS ENGINEERING DESIGN FOR PFLNG2 TROPO ANTENNA STRUCTURE PETRA RESOURCSES SDN BHD JAN 2020 - ONGOING
4 MECHANICAL PE ENDORSEMENT FOR CHIMNEY TRAY SUPPORT VEKTHOR SDN BHD DEC 2020 - COMPLETED
5 PROVISION OF ENGINEERING DESIGN FOR BERANTAI GAS DEVELOPMENT STUDY INFILL DRILLING EPIC OG SDN BHD OCT 2020 - NOV 2020
6 PROVISION OF DE-CONSTRUCTION AND REMOVAL OF BIF REDUNDANT EQUIPMENT DH TECHNICAL SERVICES SDN BHD OCT 2020 - ONGOING
7 DETAILS ENGINEERING DESIGN FOR MCOT CULVERT BRIDGE PL106 MGV ENERGY SDN. BHD. SEPT 2020 - OCT 2020
8 BAKONG PIPELINE LEAK DETECTION SAPURAOMV UPSTREAM (SARAWAK)
INC.JUL 2020 - AUG 2020
9 PROVISION OF MANPOWER SUPPLY OF PIPELINE DESIGNERPETROFAC RNZ INTEGRATED (M)
SDN BHDJUNE 2020 - JUNE 2021
10 PROVISION OF ENGINEERING SERVICES FOR MRCSB REFINERY ASSET REJUVENATION TIGA (RESET) PROJECT - CATEGORY EMALAYSIAN REFINING COMPANY
SDN BHDMAY 2020 - SEPT 2020
11 PROVISION OF ENGINEERING SERVICES FOR IPC MALAYSIA B.V. IPC MALAYSIA B.V. FEB 2020 – FEB 2021
12 PROVISION OF FEED OF SK408W JERUN GAS FIELD DEVELOPMENT PROJECT - 3D MODEL VERIFICATIONPETROFAC RNZ INTEGRATED (M)
SDN BHDFEB 2020 - APR 2020
13 PROVISION OF ENGINEERING SERVICES FOR BENTARA A SIPROD - INFILL WELL DAYANG ENTERPRISE SDN BHD FEB 2020 - APR 2020
14 PROVISION OF ENGINEERING STUDY FOR SELIGI A COMPRESSOR TRAIN D REJUVENATION PROJECTENQUEST PETROLEUM PRODUCTION
MALAYSIA LTDNOV 2019 - APR 2020
15 PROVISION OF ENGINEERING SUPPORT FOR RE-DESIGN OF JACKET FOR A SUBSTATION RAMBOLL DANMARK A/S OCT 2019 - FEB 2020
WWW.MIE-ENERGY.COM
ENERGY DIV.MAJU INTEGRATED ENGINEERSOTHER PROJECT EXPERIENCE LIST
No Project List Client Duration/Status
16UMBRELLA CONTRACT FOR PROVISION OF ENGINEERING SUPPORT SERVICES FOR NORTH MALAY BASIN
(NMB), FULL FIELD DEVELOPMENT PROJECTS
HESS EXPLORATION & PRODUCTION
MALAYSIA B.V
OCT 2019
(2 + 1 YEARS)
17UMBRELLA CONTRACT FOR PROVISION OF TECHNICAL SERVICES AGREEMENT (TSA) FOR ENGINEERING
SERVICES FOR VESTIGO PETROLEUMVESTIGO PETROLEUM SDN BHD
SEPT 2019
(2 + 1 YEARS)
18PROVISION OF ENGINEERING SERVICES FOR THE SAND TECHNOLOGY PILOT IMPLEMENTATION AT BARAM
FIELDPETRONAS RESEACH SDN BHD JUN 2019 - AUG 2020
19PROVISION OF ENGINEERING ADEQUACY CHECK FOR SK310 B15 PLATFORM RAMPING UP PRODUCTION
FOR SAPURAOMV UPSTREAM (SARAWAK) INC.
SAPURAOMV UPSTREAM (SARAWAK)
INC.MAY 2019 - NOV 2019
20 FPSO BERANTAI FOR TEMBIKAI NON ASSIOCIATED GAS (TNAG) SAUJANA MARINE SDN BHD MAY 2019 – SEPT 2019
21 PROVISION OF ENGINEERING CALL-OUT SERVICES FOR BLOCK B-17 & C-19 AND B-17-01CARIGALI-PTTEPI OPERATING
COMPANY SDN BHD
APR 2019
(3 + 1 YEARS)
22PROVISION OF ENGINEERING, PROCUREMENT, CONSTRUCTION, INSTALLATION AND COMMISIONING
(EPCIC) FOR BAYAN REDEVELOPMENT PROJECT PHASE 2B & 2C DIALOG ENERGY SDN BHD FEB 2019 - FEB 2020
23FINATE ELEMENT ANALYSIS (FEA) AND DESIGN CHECK - PHASE 1 & PHASE 2 AT C-109 DEERTHANIZER
COLUMN SHELL REPAIR AT PPTSBEPIC OG SDN BHD JAN 2019 - APR 2019
24
UMBRELLA CONTRACT FOR PROVISION OF DESIGN, ENGINEERING AND CONSULTANCY SERVICES FOR D35,
D21 AND J4 FIELDS ROC OIL (SARAWAK) SDN BHDDEC 2018
(3 + 1 YEARS)
25PROVISION OF DETAIL ENGINEERING SUPPORT FOR NOVEL OFFSHORE SAND DISPOSAL SYSTEM (NOSDS)
(IN-SKID AND OFF-SKID) PILOTPETRONAS RESEACH SDN BHD NOV 2018 - DEC 2019
26PRELIMINARY DESIGN ENGINEERING OF LIQUID RECOVERY SYSTEM (LRS) AT BINTULU ADDITIONAL GAS
SALES FACILITIES (BAGSF)
PETRONAS TECHNOLOGY VENTURES
SDN BHDNOV 2018 - APR 2020
27PROVISION OF FEASIBILITY AND CONCEPTUAL DESIGN SERVICES FOR LIQUID RECOVERY SYSTEM (LRS)
SKID & TIE-IN
PETROLIAM NASIONAL BERHAD
(PETRONAS)NOV 2018 - DEC 2019
28 UMBRELLA CONTRACT FOR DESIGN ENGINEERING AND CONSULTANCY SERVICES (2 + 1 YEARS)REPSOL OIL&GAS MALAYSIA LTD /
PETROVIETNAM ENGINEERING J.S.CNOV 2018 - NOV 2020
29UMBRELLA CONTRACT ENGINEERING FOR FACILITIES IMPROVEMENT PROPOSAL (FIP) & PLANT CHANGE
( PACKAGE E - MIRI )
PETROLIAM NASIONAL BERHAD
(PETRONAS)
AUG 2018
(3 + 1 YEARS)
30UMBRELLA CONTRACT ENGINEERING FOR FACILITIES IMPROVEMENT PROPOSAL (FIP) & PLANT CHANGE
( PACKAGE D - KUALA LUMPUR/MELAKA )
PETROLIAM NASIONAL BERHAD
(PETRONAS)
AUG 2018
(3 + 1 YEARS)
OTHER PROJECT EXPERIENCE LIST – CONT.
WWW.MIE-ENERGY.COM
ENERGY DIV.MAJU INTEGRATED ENGINEERS
No Project List Client Duration/Status
31UMBRELLA CONTRACT ENGINEERING FOR FACILITIES IMPROVEMENT PROPOSAL (FIP) & PLANT CHANGE
( PACKAGE C - KERTEH )
PETROLIAM NASIONAL BERHAD
(PETRONAS)
AUG 2018
(3 + 1 YEARS)
32UMBRELLA CONTRACT ENGINEERING FOR FACILITIES IMPROVEMENT PROPOSAL (FIP) & PLANT CHANGE
( PACKAGE B - BINTULU )
PETROLIAM NASIONAL BERHAD
(PETRONAS)
AUG 2018
(3 + 1 YEARS)
33UMBRELLA CONTRACT ENGINEERING FOR FACILITIES IMPROVEMENT PROPOSAL (FIP) & PLANT CHANGE
( PACKAGE A - KOTA KINABALU)
PETROLIAM NASIONAL BERHAD
(PETRONAS)
AUG 2018
(3 + 1 YEARS)
34 PROVISION OF ENGINEERING SERVICES (STRUCTURAL ENGINEERING)REPSOL OIL&GAS MALAYSIA
LTDFEB 2018 - DEC 2019
35 DETAIL ENGINEERING DESIGN FOR HYPROCHLORITE SKID UPGRADINGSAPURA EXPLORATION AND
PRODUCTIONAUG 2018
36DETAIL ENGINEERING SERVICES FOR STRUCTURAL ANALYSIS EAST BELUMUT-A / WEST BELUMUT-A FOR
SICKLINE CAMPAIGN
SAPURA EXPLORATION AND
PRODUCTIONJUN 2018 - JUL 2018
37PROVISISON OF FACILITIES IMPROVEMENT, REJUVENATION AND MODIFICATION FOR VESTIGO FLOW ASSURANCE
FOR TEMBIKAI GAS DEVELOPMENTSAUJANA MARINE SDN BHD JUL 2018 - OCT 2018
38 PROVISION OF FACILITIES IMPROVEMENT, REJUVENATION AND MODIFICATION FOR VESTIGO-BENTARA PROJECT
SEMARAK PETRO SDN BHD /
VESTIGO PETROLEUM SDN
BHD
SEPT 2017 - AUG 2018
39PROVISION OF DETAILED ENGINEERING DESIGN FOR HEAT SHIELD/BARRIER AT EAST BELUMUT-A (BEL-A)
PLATFORM
SAPURAKENCANA ENERGY
INC.MAY 2017 - JUN 2017
40 PROVISION OF DETAIL ENGINEERING DESIGN FOR CASING BLEEDLINE AT EAST PIATU PLATFORMSAPURAKENCANA ENERGY
INC.MAY 2017 - JUN 2017
41 PROVISION FOR DETAILED ENGINEERING DESIGN TO REPLACE EXISTING FLEXIBLE HOSESAPURAKENCANA ENERGY
INC.FEB 2017 - MAY 2017
42 PROVISION OF ENGINEERING AND DETAILED DESIGN FOR J4 SIMULTANEOUS PRODUCTION & DRILLING (SIPROD) ROC OIL (SARAWAK) SDN BHD NOV 2016 - JUN 2018
43PROVISION OF ENGINEERING AND DETAILED DESIGN FOR D21 SIMULTANEOUS PRODUCTION & DRILLING
(SIPROD)ROC OIL (SARAWAK) SDN BHD OCT 2016 - MAR 2018
44PROVISION OF ENGINEERING SERVICES FOR PLANT MODIFICATION AND IMPROVEMENT PROJECT AT PETRONAS
PENAPISAN (TERENGGANU) SDN BHD (1 ½ + 2 YEARS TERM CONTRACT)
PETRONAS PENAPISAN
TERENGGANU SDN BHDOCT 2016 - MAR 2020
45 PROVISION OF INFILL WELL TIE IN FOR ANJUNG KECILVESTIGO PETROLEUM SDN
BHDJUN 2016 - AUG 2016
OTHER PROJECT EXPERIENCE LIST – CONT.
WWW.MIE-ENERGY.COM
ENERGY DIV.MAJU INTEGRATED ENGINEERS
No Project List Client Duration/Status
46 TOPSIDE AS-BUILT FOR ANJUNG KECIL VESTIGO PETROLEUM SDN BHD MAY 2016 - AUG 2016
47 PROVISION OF ENGINEERING STUDY FOR WELL REMOTE SHUT IN PROJECT SAPURAKENCANA ENERGY INC. DEC 2015 - MAR 2016
48 PROVISION OF FABRICATION ENGINEERING AND AS-BUILT FOR HOST TIE-INS AT KNDP-A PBJV GROUP SDN BHD OCT 2015 - FEB 2016
49 PROVISION OF ENGINEERING SERVICES FOR EAST BELUMUT INFILL DRILLING PROJECT SAPURAKENCANA ENERGY INC. AUG 2015 - FEB 2016
50
PROVISION OF MANPOWER SUPPLY FOR ENGINEERING SERVICES FOR PLANT MODIFICATION AND
IMPROVEMENT PROJECT AT PETRONAS CHEMICALS ETHYLENE SDN BHD AND PETRONAS
CHEMICALS POLYETHYLENE SDN BHD
PETRONAS CHEMICALS
ETHYLENE SDN BHD &
PETRONAS CHEMICALS
POLYETHYLENE SDN BHD
JUN 2015 – MAR 2020
(3 + 2 YEARS TERM CONTRACT)
51PROVISION OF AS-BUILTING EXERCISE AND STRUCTURAL GLOBAL ANALYSIS FOR PM323 AND
PM329SAPURAKENCANA ENERGY INC. APR 2015 - ONGOING
52
PROVISION OF ENGINEERING SERVICES FOR PLANT MODIFICATION AND IMPROVEMENT PROJECT
AT GAS PROCESSING & UTILITIES (GPU), PETRONAS GAS BHD PETRONAS GAS BERHADMAR 2015 - MAR 2020
(3 + 2 YEARS TERM CONTRACT)
OTHER PROJECT EXPERIENCE LIST – CONT.
WWW.MIE-ENERGY.COM
ENERGY DIV.MAJU INTEGRATED ENGINEERS
WWW.MIE-ENERGY.COM
ENERGY DIV.MAJU INTEGRATED ENGINEERS
MAJU INTEGRATED ENGINEERS SDN BHD(ENERGY DIVISION)
T4-2-2, Tower 4, Level 2, Maju Link,
Jalan Lingkaran Tengah 2 (MRR2),
57100 Bandar Tasik Selatan, Kuala Lumpur.
MALAYSIA
TEL: +603-9054 5701
FAX: +603-9054 4302
Email: [email protected]
www.mie-energy.com