25
HUAWEI TECHNOLOGIES CO., LTD. www.huawei.com Huawei Confidential ISSUE 1.0 Microwave Network planning and design process

Microwave Network Planing and Design Process

Embed Size (px)

Citation preview

ISSUE 1.0
*
Huawei Confidential
:32-35pt : R153 G0 B0 : FrutigerNext LT Medium : Arial :30-32pt : R153 G0 B0 : :20-22pt (2-5) :18pt : : FrutigerNext LT Regular : Arial :18-20pt (2-5):18pt : :
13
.
Page *
Microwave network plan and design guide
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
:32-35pt : R153 G0 B0 : FrutigerNext LT Medium : Arial :30-32pt : R153 G0 B0 : :20-22pt (2-5) :18pt : : FrutigerNext LT Regular : Arial :18-20pt (2-5):18pt : :
13
.
Page *
Know microwave network plan process
Know work scope of each phase
Strengthen the process availability and make it under control
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
:32-35pt : R153 G0 B0 : FrutigerNext LT Medium : Arial :30-32pt : R153 G0 B0 : :20-22pt (2-5) :18pt : : FrutigerNext LT Regular : Arial :18-20pt (2-5):18pt : :
13
.
Page *
Composing of Microwave plan
According to network lifecycle, microwave plan is consist of two parts, biding network plan, rollout network plan
Microwave plan run though all network lifecycle, it include, biding network plan route, capacity, frequency plan, output bidding document etc), rollout network plansite survey, route, capacity, frequency plan, interference analysis, detailed network plan etc
biding network plan
rollout network plan
Huawei Confidential
:32-35pt : R153 G0 B0 : FrutigerNext LT Medium : Arial :30-32pt : R153 G0 B0 : :20-22pt (2-5) :18pt : : FrutigerNext LT Regular : Arial :18-20pt (2-5):18pt : :
13
.
Page *
biding network plan
Microwave solution review
Contract
negotiating
Solution
adjust
Huawei Confidential
:32-35pt : R153 G0 B0 : FrutigerNext LT Medium : Arial :30-32pt : R153 G0 B0 : :20-22pt (2-5) :18pt : : FrutigerNext LT Regular : Arial :18-20pt (2-5):18pt : :
13
.
Page *
biding network plan
Output
2. Available frequency resource (Frequency band, sub frequency band, T-R spacing)
Content
1.RFP issue or formal requirement from customer (such as Email) is the condition of project initiation.
2.NTS manager designate microwave plan engineer, build microwave plan team.
3.Microwave planner read RFP and get the customer requirement.
4.Collect existing transmission information, it include network structure, capacity, existing microwave frequency band, T-R spacing, available frequency resource etc.
*
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
:32-35pt : R153 G0 B0 : FrutigerNext LT Medium : Arial :30-32pt : R153 G0 B0 : :20-22pt (2-5) :18pt : : FrutigerNext LT Regular : Arial :18-20pt (2-5):18pt : :
13
.
Page *
2. Existing network microwave
related information (route direction,
2. Bidding plan
3. RFP clarify
biding network plan
1. Reading RFP, make SOW clear, output feasibility analysis report
2. The department for project establish check the report
According to project schedule make microwave plan
*
2
Huawei Confidential
:32-35pt : R153 G0 B0 : FrutigerNext LT Medium : Arial :30-32pt : R153 G0 B0 : :20-22pt (2-5) :18pt : : FrutigerNext LT Regular : Arial :18-20pt (2-5):18pt : :
13
.
Page *
biding network plan
Bidding strategy review
1. Push biding manager organize biding strategy review.
2. Microwave plan strategy under different business modetotal price, unit price contract with fixed total price, unit price.
3. Decision for key technical point: KPIhigh capacity microwave transmission mode and equipment model, network compose mode, protection, antenna, with existing network or not etc.
4. Strategy for existing equipment: use existing transmission, use existing site, use other accessorial equipments.
*
Huawei Confidential
:32-35pt : R153 G0 B0 : FrutigerNext LT Medium : Arial :30-32pt : R153 G0 B0 : :20-22pt (2-5) :18pt : : FrutigerNext LT Regular : Arial :18-20pt (2-5):18pt : :
13
.
Page *
1. RFP
3. Existing information (site, transmission etc)
4. Biding strategy meeting minutes
Output:
Preliminary survey
Microwave plan
make a decision if preliminary survey is required
or not, it could be done with RF team together.
Make microwave plan with high precision
digital map, it includenetwork structure, link
capacity, protection, frequency plan, typical link
reliability calculation etc. Required input
RFP or customer formal requirement.
Survey result or the transmission
information obtained after investigations.
requirement, network topology etc which
provide by customer.
product sales manager.
of the Wireless Network.
make a decision for product model (both
equipment and antenna), microwave plan
engineer get related equipment parameters
for pathloss use.
biding network plan
Huawei Confidential
:32-35pt : R153 G0 B0 : FrutigerNext LT Medium : Arial :30-32pt : R153 G0 B0 : :20-22pt (2-5) :18pt : : FrutigerNext LT Regular : Arial :18-20pt (2-5):18pt : :
13
.
Page *
biding network plan
2. tower information collection form
Content
1. Submit the Microwave Solution to the supervisor, after get approve
Output microwave plan BOQ and provide it to transmission product manager to make the equipment configuration and quotation.
Output tower height information to site design department to prepare civil work quoted pricing.
Output solution and BOQ to service bidding manager and project manager to make service bidding and the project execution plan.
*
Huawei Confidential
:32-35pt : R153 G0 B0 : FrutigerNext LT Medium : Arial :30-32pt : R153 G0 B0 : :20-22pt (2-5) :18pt : : FrutigerNext LT Regular : Arial :18-20pt (2-5):18pt : :
13
.
Page *
biding network plan
Preparing bidding documents
Input
1. Microwave plan solution (it include MW route plan, frequency plan, capacity plan) and BOQ
Prepare technical proposal
Review technical proposal
Content
Prepare the Technical Proposal for Microwave Transmission Planning according to the Overall Microwave Solution that passes the review.
2. The reviewers review the Technical Proposal for Microwave Transmission Planning, The review elements are as follows:
Whether the proposal is compiled according to the template.
Whether the risk mitigation measures are specified in the proposal.
*
Huawei Confidential
:32-35pt : R153 G0 B0 : FrutigerNext LT Medium : Arial :30-32pt : R153 G0 B0 : :20-22pt (2-5) :18pt : : FrutigerNext LT Regular : Arial :18-20pt (2-5):18pt : :
13
.
Page *
biding network plan
Win the tender
Bidding
clarify
1. Microwave plan solution clarify (with word or ppt format)
Content
1. Pay attention to the customer’s doubt of microwave plan solution, provide related clarify.
2. Win the tender and receive LOI.
*
Huawei Confidential
:32-35pt : R153 G0 B0 : FrutigerNext LT Medium : Arial :30-32pt : R153 G0 B0 : :20-22pt (2-5) :18pt : : FrutigerNext LT Regular : Arial :18-20pt (2-5):18pt : :
13
.
Page *
biding network plan
Contract negotiation
Solution adjust
Quotation adjust
Contract review
Contract signature
Assist the bidding manager to contract negotiation.
Adjust the Microwave Solution according to the customer requirements and provide Microwave Equipment Requirement List.
Review the renewed microwave solution, output review form for Microwave bidding. Review related contract documents.
Sign the contract.
Huawei Confidential
:32-35pt : R153 G0 B0 : FrutigerNext LT Medium : Arial :30-32pt : R153 G0 B0 : :20-22pt (2-5) :18pt : : FrutigerNext LT Regular : Arial :18-20pt (2-5):18pt : :
13
.
Page *
biding network plan
2. Bidding documents (RFPmicrowave plan solution related clarify documents etc.)
Output
Content
1. After sign the contract, hand over the project documents to the assigned microwave plan engineer.
RFP and the related clarify documents from customer
Microwave solution and CMT
Contract without commercial confidentialtechnical proposal, equipment configuration, Pathloss plan result, gr4/pl4 and specification about site legend or link layer etc.
Handover reportit include but not limited to plan principle, the oral promise to customer etc, which will take some influence to project delivery.
2. Biding network plan end.
*
Huawei Confidential
:32-35pt : R153 G0 B0 : FrutigerNext LT Medium : Arial :30-32pt : R153 G0 B0 : :20-22pt (2-5) :18pt : : FrutigerNext LT Regular : Arial :18-20pt (2-5):18pt : :
13
.
Page *
rollout network plan
Attention: The last two modules are not the scope of MW network
Optimization of overall solution
Equipment
Installation
Commission
Compile guideline for microwave planning
Pre-planning of proposal
Prepare the engineering project planning report or compile the RFQ
Detailed design
Review design
Design approval
Design handover
Network
commissioning
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
:32-35pt : R153 G0 B0 : FrutigerNext LT Medium : Arial :30-32pt : R153 G0 B0 : :20-22pt (2-5) :18pt : : FrutigerNext LT Regular : Arial :18-20pt (2-5):18pt : :
13
.
Page *
rollout network plan
Project initiation 1
1. contract
2. Microwave equipment, antenna datum and the latest parameters etc.( discuss with product sales manager
3. KPI, the principle of equipment setting and the rules of equipment configuration (Discuss with customer)
Determine responsible engineer
Content
After the procurement of contract, it is necessary to determine the person in charge of microwave planning, In urgent case, the project manager need to star the microwave planning in the phase of contract negotiation.
Confirm related product, antenna type with microwave sales manager, get related datum and equipment parameters for microwave plan.
Confirm the KPI, the principle of equipment setting and the rules of equipment configuration with customer etc.
Write the guideline for microwave network planning, and submit it to customer for review and get approval.
Output
*
2.
Huawei Confidential
:32-35pt : R153 G0 B0 : FrutigerNext LT Medium : Arial :30-32pt : R153 G0 B0 : :20-22pt (2-5) :18pt : : FrutigerNext LT Regular : Arial :18-20pt (2-5):18pt : :
13
.
Page *
rollout network plan
Project initiation 2
4. Project guide report
Preliminary plan
Frequency application
according to the requirements in the Guide.
2. Output site PRI list to PM, SA and CW engineer,
backbone and hub sites should be regarded as the
first PRI site for site survey and acquisition.
3. Submit the planning result to the frequency
acquisition manager according to the pre-planning
result by using the frequency application form
template. The frequency acquisition manager
applies for frequencies.
microwave engineering project and determine the
outsourcing strategies for the microwave survey
and design service. If the team outsource the
service, the team should compile the RFQ and the
subcontractor procurement department should
invite bids for the service, which can be carried out
after the contract is signed.
Input
3. Site acquisition information
4. Civil work information
Content
Huawei Confidential
:32-35pt : R153 G0 B0 : FrutigerNext LT Medium : Arial :30-32pt : R153 G0 B0 : :20-22pt (2-5) :18pt : : FrutigerNext LT Regular : Arial :18-20pt (2-5):18pt : :
13
.
Page *
rollout network plan
Content
According to the site acquisition progress make microwave site survey, The primary work is to check whether LOS available. In addition, assist the site survey engineers to prepare the microwave part of the Site Survey Report and to scan frequencies, Provide the report three days after the completion of the survey and frequency scanning. The Site Survey Report template is provided by the site engineer.
Provide the Design Document of a Single Hop for Microwave Link one week after the completion of the survey.
Input
*
Huawei Confidential
:32-35pt : R153 G0 B0 : FrutigerNext LT Medium : Arial :30-32pt : R153 G0 B0 : :20-22pt (2-5) :18pt : : FrutigerNext LT Regular : Arial :18-20pt (2-5):18pt : :
13
.
Page *
rollout network plan
Network optimization 1
Output
Content
optimizing the overall solution, it including:
Optimize frequency, analyze interference
*
Huawei Confidential
:32-35pt : R153 G0 B0 : FrutigerNext LT Medium : Arial :30-32pt : R153 G0 B0 : :20-22pt (2-5) :18pt : : FrutigerNext LT Regular : Arial :18-20pt (2-5):18pt : :
13
.
Page *
rollout network plan
Network optimization 2
2. Equipment configuration and version number
Output
2. Implementation Phase Microwave Design Quality Evaluation
Equipment configuration
Solution review
Content
1. According to the optimized overall solution, provide the Implementation Phase Microwave Equipment Requirement List.
*
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
:32-35pt : R153 G0 B0 : FrutigerNext LT Medium : Arial :30-32pt : R153 G0 B0 : :20-22pt (2-5) :18pt : : FrutigerNext LT Regular : Arial :18-20pt (2-5):18pt : :
13
.
Page *
rollout network plan
Content
1.Complete the detailed design in the implementation phase according to the overall solution.
2.Review the design document and provide the review comments.
3.Link configuration, complete Microwave Link Configuration List
4.The microwave planning manager organizes the project manager, acquisition manager, wireless network planning engineers, and engineering manager to review the detailed engineering design. The microwave planning manager modifies the design according to the review comments and submits the final design to the customer for approval
Input
1. General proposal
2. Survey report for each signal hop, tower height, site information, it include address, coordinates etc.
Output
2. Microwave Link Configuration List
3. Microwave Site And Link Information Form
*
1.3
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
:32-35pt : R153 G0 B0 : FrutigerNext LT Medium : Arial :30-32pt : R153 G0 B0 : :20-22pt (2-5) :18pt : : FrutigerNext LT Regular : Arial :18-20pt (2-5):18pt : :
13
.
Page *
rollout network plan
Content
Submit the documents to the operator or concerned government departments for approval
2. After the acquisition manager obtains the approval of the operator, the project manager organizes the product sales manager, acquisition manager, implementation manager, and TK network planning manager to clarify the detailed design documents.
3. The product sales department prepare the detailed microwave equipment configuration according to the design. The supply chain department organizes equipments preparation and delivery by the related workflows.
4. Microwave equipment transport, complete the customs clearance, and microwave equipment store in warehouses.
Input
1.3
1.4
Huawei Confidential
:32-35pt : R153 G0 B0 : FrutigerNext LT Medium : Arial :30-32pt : R153 G0 B0 : :20-22pt (2-5) :18pt : : FrutigerNext LT Regular : Arial :18-20pt (2-5):18pt : :
13
.
Page *
rollout network plan
Telecom equipment Installation
Output
Installation
Commissioning
Content
2. Site commissioning of Microwave equipment
*
Huawei Confidential
:32-35pt : R153 G0 B0 : FrutigerNext LT Medium : Arial :30-32pt : R153 G0 B0 : :20-22pt (2-5) :18pt : : FrutigerNext LT Regular : Arial :18-20pt (2-5):18pt : :
13
.
Page *
rollout network plan
Network commissioning
Acceptance test
On air
Project evaluation
3. Evaluate the project and subcontractor by the
project team
4. Handover