7/25/2019 MICRO TRENCHING OF VARIOUS DEPTH WITH REINSTATEMENT (R4G-70-FBC-SCM-PR-0....pdf
1/1
Footpath Footpath
Footpath Footpath
Road Road
Proposed Micro TrenchRoute
1000
Outside Plant (osp) WorksBroadband Wireless Access (bwa)services
Reliance Jio Infocomm Limited
Drawing NumberDrawing Title
All dimensions are in MM except as Noted other wiseNotes:-
7 Way Micro Duct.
STAGE WISE FILLING
WITH PURE 20MM SIZE
COARSE AGGREGATE & FILL THE VOIDSWITH NON SHRINK SEALANT( SBS-2511 OF
FAIRMATE OR EQVT.). KEEP GAP OF 15 Mins.
BETWEEN THE STAGES.
300
125
(Stg-I)
175
(Stg-II)
50
50
STAGE WISE FILLING
WITH PURE 20MM SIZE
COARSE AGGREGATE & FILL THE VOIDS
WITH NON SHRINK SEALANT( SBS-2511 OF
FAIRMATE OR EQVT.). KEEP GAP OF 15 Mins.
BETWEEN THE STAGES.
450
50
50
150
(Stg-I)
150
(Stg-II)
150
(Stg-III)
600
50
50
160
(
Stg-I)
220
(Stg-II)
220
(Stg-III)
STAGE WISE FILLING
WITH PURE 20MM SIZE
COARSE AGGREGATE & FILL THE VOIDS
WITH NON SHRINK SEALANT( SBS-2511 OF
FAIRMATE OR EQVT.). KEEP GAP OF 15 Mins.
BETWEEN THE STAGES.
R4G-70-FBC-SCM-PR-002
FILL WITH NON SHRINK GROUT TOP
FLUSH WITH ROAD LEVEL (2 mm THK.)
FILL WITH NON SHRINK GROUT TOPFLUSH WITH ROAD LEVEL (2 mm THK.)
FILL WITH NON SHRINK GROUT TOPFLUSH WITH ROAD LEVEL (2 mm THK.)
40 DUCT - VIOLET COLOR
40 DUCT - RED COLOR
R2
40 DUCT - GREY COLOR
40 DUCT - VIOLET COLOR
40 DUCT - RED COLOR
40 DUCT - GREY COLOR
R2
O
O
O
O
O
O
DRAWING REVISED INCORPORATING
PLANNING GUIDELINES NO.-
R4G-20-FTX-NGL-PR-020-00
ISSUED ON 18/10/203
40 DUCT - ORANGE COLORO
(FOR DUCT CONFIGARATION REF.- INTRA CITY FIBER ENGINEERING GUIDE LINE)
R2 HOLD
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED
BY
AN
AUTODESK
EDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCED
BY
AN
AUTODE
SK
EDUCATIONALPRODUCT