NEDO Projyect, Fy2010-FY2013 June 19, 2014 Smart Community Summit 2014 NEDO New Mexico Project Micro Grid Demonstration Project in a Commercial Building in Albuquerque, NM. Demonstration of the high reliability power supply in a commercial building supply in a commercial building Kimio Morino Shimizu Corporation

Micro Grid Demonstration Project in a Commercial …...NEDO Projyect, Fy2010-FY2013 June 19, 2014Smart Community Summit 2014 NEDO New Mexico Project Micro Grid Demonstration Project

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Micro Grid Demonstration Project in a Commercial …...NEDO Projyect, Fy2010-FY2013 June 19, 2014Smart Community Summit 2014 NEDO New Mexico Project Micro Grid Demonstration Project

NEDO Projyect, Fy2010-FY2013 June 19, 2014Smart Community Summit 2014

NEDO New Mexico Project

Micro Grid Demonstration Project in a Commercial Building in Albuquerque, NM.

Demonstration of the high reliability power supply in a commercial buildingsupply in a commercial building

Kimio MorinoShimizu Corporation

Page 2: Micro Grid Demonstration Project in a Commercial …...NEDO Projyect, Fy2010-FY2013 June 19, 2014Smart Community Summit 2014 NEDO New Mexico Project Micro Grid Demonstration Project

Japan-US corroboration researchMicro Grid Demonstration Project in a Commercial BuildingMicro Grid Demonstration Project in a Commercial Building

in Albuquerque, NM. (FY2010-FY2013)

Project Objectives Construction of the 400kW grade

micro grid for commercial buildings Demonstration test Demonstration test・Power flow control at PCC in

interconnected mode with DERsSt bl d hi h lit l・Stable and high quality power supply

in islanded mode・Demand control by demand response

signals・Power change compensation control

by chiller Mesa del Sol Aperture Center

2

p

Page 3: Micro Grid Demonstration Project in a Commercial …...NEDO Projyect, Fy2010-FY2013 June 19, 2014Smart Community Summit 2014 NEDO New Mexico Project Micro Grid Demonstration Project

Diagram of Demonstration Smart Grid

Shimizu

400k 冷凍機

Shimizu Shimizu Shimizu

ElectricLoad Thermal

StorageAir-Source

ChillerAbsorption

ChillerCoolingTower

Distribution System

CityCenter

MdS

400kW 70USR

T20USRT

冷凍機StorageTank

Tower

Shimizu&

Tokyo GasReceivingPoint

Toshiba

Heat SourceEquipmentController

Power SupplyEquipmentController

Main Grid

PCSMeidensya

Lead acid Gas Engine

240kW

Sharp Fuji Elec. MHI

燃料電池

80kW

Furukawa

50kW 50kW/100kW

160kWh

Dummy Load

100kWShimizuToshiba

Battery Fuel CellGas EngineGenerator

Exist. Power lineNew Power line Comun. linenotes

Smart meter Meter

Exist. Power line Co u e

Page 4: Micro Grid Demonstration Project in a Commercial …...NEDO Projyect, Fy2010-FY2013 June 19, 2014Smart Community Summit 2014 NEDO New Mexico Project Micro Grid Demonstration Project

Project Architecturej

NEDOS i C i

Pre study

Design, ProductionSystem construction

Demonstration testData analysis

SHIMIZU

Secretariat CompaniesITOCHU, ACCENTURE

BEMS(MGCS), HVAC, Total Coordinate

Toshiba

Sharp

μEMS (simulate PNM’s power system )PV (Solar Power)

Meidensha

Fuji Electric

PCS for PVPAFC (Fuel Cell)Co generation and MGCSTokyo Gas

Mitsubishi HI

Furukawa Electric

Co-generation and MGCSGas Engine GeneratorO/M of Lead Acid Battery

Tokyo Gas

Furukawa Battery Advanced Lead Acid Battery

Page 5: Micro Grid Demonstration Project in a Commercial …...NEDO Projyect, Fy2010-FY2013 June 19, 2014Smart Community Summit 2014 NEDO New Mexico Project Micro Grid Demonstration Project

Demonstration Site

EnergyPlantAperture

CenterCenter

PV Panel

PV PanelPV Panel Plant yard

Page 6: Micro Grid Demonstration Project in a Commercial …...NEDO Projyect, Fy2010-FY2013 June 19, 2014Smart Community Summit 2014 NEDO New Mexico Project Micro Grid Demonstration Project

System Diagram ofth A t C t t M d l S lthe Aperture Center at Mesa del Sol

Building Load400kW

Thermal Storage Tank Air-Cooled Chiller70USRT

Absorption Chiller20USRT

Cooling Tower

PNM DOE Project500kW PV & 2MWh Battery

Studio Substation

400kW 70USRT 20USRT

Shimizu/Tokyo Gas

BEMS• High Quality & steady power supply

both in connected & islanded mode• Power flow control at PCC

S C &

• Contribution to feeder line stability• Capacity reduction

of grid located battery

Feed

er-1

4

PCC HVAC ControllerSmart Meter

• DSM by HVAC & thermal storage control

Power Supply Controller

Photovoltaic Panels 50kW Gas Engine Generator240kW

Fuel Cell80kW

Lead Acid Battery50/90kW, 160kWh

Dummy Load100kW

EMS MDMS

Toshiba

• Power flow monitor• DR message

SharpFuji Electric Mitsubishi Heavy Industries• PV performance Furukawa Battery

μEMS+MDMS

PV PCS

• Performance evaluationin high altitudes

• Stable frequency & voltageproduction in islanding

Meidensha

Fuji Electric Mitsubishi Heavy Industries

• Performance evaluationin high altitudes

• Base load in micro grid

• Performance evaluationof advanced lead acid battery

• Battery management system• Rapid load fluctuation following • Robust PV PCS

evaluationnew power line

communication line

existing power line

& Furukawa Electric

Page 7: Micro Grid Demonstration Project in a Commercial …...NEDO Projyect, Fy2010-FY2013 June 19, 2014Smart Community Summit 2014 NEDO New Mexico Project Micro Grid Demonstration Project

Test of Constant Power Control at PCC

PNM Power system

~CTBEMS

REF

TES

SMSmart meter

Controldirection

F S

PCS PCSPCSPCC

Load

PV

GE

FC

BAT

Load

Load

50kW 240kW80kW±50kW160kWh

Commercial Building

Micro gridMicro- grid

Page 8: Micro Grid Demonstration Project in a Commercial …...NEDO Projyect, Fy2010-FY2013 June 19, 2014Smart Community Summit 2014 NEDO New Mexico Project Micro Grid Demonstration Project

Image of the Constant Power Control at PCC

負荷変動

Powerchange

蓄電池ガスエンジン

急激な負荷変動

B tt Gas engine

change

Steepchange

蓄電池発電機 蓄電池

出力

Battry ggenerator Battery

output

ガスエンジン発電機出力

緩やかな負荷変動GE

output

Gradualchange

発電機出力output

Page 9: Micro Grid Demonstration Project in a Commercial …...NEDO Projyect, Fy2010-FY2013 June 19, 2014Smart Community Summit 2014 NEDO New Mexico Project Micro Grid Demonstration Project

Test Result 1 Constant power flow control at PCCTest Result 1 Constant power flow control at PCC

Sep 9,2013p ,P

ower

[kW

]

Page 10: Micro Grid Demonstration Project in a Commercial …...NEDO Projyect, Fy2010-FY2013 June 19, 2014Smart Community Summit 2014 NEDO New Mexico Project Micro Grid Demonstration Project

Test of Isolated Operation

PNM Power system

~CTBEMS

y

REF

TEST

Controldirection

Open/CloseF S

PCS PCSPCSPCC

Load

PV

GE

FC

BAT

Load

Load

50kW 240kW80kW±50kW160kWh

Commercial Building

Mi idMicro- grid

Page 11: Micro Grid Demonstration Project in a Commercial …...NEDO Projyect, Fy2010-FY2013 June 19, 2014Smart Community Summit 2014 NEDO New Mexico Project Micro Grid Demonstration Project

Test Result 2 Stable Islanding Operation

Smooth transition between grid-interconnected mode and islanding mode without any power interruption

Test Result 2 Stable Islanding Operation

350

PCC BAT PV GE FC LOAD R‐2 DL

Grid‐connecting→ Islanding I l di → G id i

Sep 8,2013

200

250

300Grid connecting → Islanding  Islanding → Grid‐connecting 

100

150

200

wer [kW]

0

50

Pow

150

‐100

‐50

‐15013:00 13:15 13:30 13:45 14:00 14:15 14:30 14:45 15:00 15:15 15:30

Page 12: Micro Grid Demonstration Project in a Commercial …...NEDO Projyect, Fy2010-FY2013 June 19, 2014Smart Community Summit 2014 NEDO New Mexico Project Micro Grid Demonstration Project

Fluctuation in Voltage and Frequency

63 

64 

530 

540 Voltage Freqency

59

60 

61 

62 

490

500 

510 

520 

uency [Hz]

oltage [

V]

ency

[Hz]

age

[V]

56 

57 

58 

59 

460 

470 

480 

490 

FreqVo

Freq

u

Volta

55 450 13:00 13:15 13:30 13:45 14:00 14:15 14:30 14:45 15:00 15:15 15:30

8 Variation of V and F

4

6

率[%

]

⊿ 0.3Hz滞在率

98.1%

60±0.3Hz以内の滞在率Staying rate

g ra

te [%

]

2

出現

Staying rate of F

Stay

ing

056 58 60 62 64

周波数 [Hz]

Staying rate of FFrequency [Hz]

Page 13: Micro Grid Demonstration Project in a Commercial …...NEDO Projyect, Fy2010-FY2013 June 19, 2014Smart Community Summit 2014 NEDO New Mexico Project Micro Grid Demonstration Project

Test of Demand Response Operationp p

PNM Power system

~CTBEMS

DR signal REF

TES

SMSmart meter

Controldirection

F S

PCS PCSPCSPCC

Load

PV

GE

FC

BAT

Load

Load

50kW 240kW80kW±50kW160kWh

Commercial Building

Micro gridMicro- grid

Page 14: Micro Grid Demonstration Project in a Commercial …...NEDO Projyect, Fy2010-FY2013 June 19, 2014Smart Community Summit 2014 NEDO New Mexico Project Micro Grid Demonstration Project

Demand Response Signal

μEMSからのDR信号

DR Signal

DR signal from μEMS

μEMSからのDR信号

DR signal DR Mode Operation

DR1 Normal 1 Interconnected (by Scheduled operation)

DR2 N l 2 I t t d (b di t d di ti )

DR Signal

DR2 Normal 2 Interconnected (by predicted direction)

DR3 Normal 3Interconnected, Constant power flow control at PCC(include reverse power flow)

DR4 Normal 4 Interconnected , 0kW power flow control at PCC

DR5 Emergency 1 Islanded (by PCC’s breaker open)

Page 15: Micro Grid Demonstration Project in a Commercial …...NEDO Projyect, Fy2010-FY2013 June 19, 2014Smart Community Summit 2014 NEDO New Mexico Project Micro Grid Demonstration Project

Test Result 3 Operation in DR control

300

PCC BAT PV GE FC LOAD R‐2 DL

200

250

Sep. 11, 2013

100

150

[kW]

‐50

0

50

Power [

13:45-14:00

‐150

‐100 13:30-13:45PCC:50kWSD=1.99kW

13 45 14 00PCC:-190kWBATdischargeGE power riseFC power riseDL load downR-2 stop

14:00-14:15PCC:50kWBAT chargeGE power downFC power down

‐20013:30 13:45 14:00 14:15

R 2 stop p

Page 16: Micro Grid Demonstration Project in a Commercial …...NEDO Projyect, Fy2010-FY2013 June 19, 2014Smart Community Summit 2014 NEDO New Mexico Project Micro Grid Demonstration Project

Test Result 4 Power change compensation control by chiller and generatory g

250

270

80

100 Chiller+BAT    Oct 23 2013

Battery PV Chiller PCC

0

20

160

200All Generator     Mar 10 2014

190

210

230

20

40

60

f PCC

 [kW]

er [

kW

Chiller

PV‐60

‐40

‐20

40

80

120

wer of PCC

 [kW]

Power  [kW

]

GE

FC

PCC

PV

130

150

170

‐40

‐20

0 Power of

Powe

Battery

PCC

140

‐120

‐100

‐80

120

‐80

‐40

0 PowP

Bat PV GE FC PCC

Battery

PCC

130‐4009:30 09:40 09:50 10:00 10:10 10:20 10:30

140

160

80

100Chiller+all generator   Oct 24 2013

GE

‐140‐12012:00 12:10 12:20 12:30 12:40 12:50 13:00

60

Chiller alone   Oct 23 2013

All Generator Chiller+BAT

80

100

120

140

20

40

60

80

f GE [kW]

W]

GE

FC

Chiller

PV 20

40

]

Chiller

PV

20

40

60

80

‐40

‐20

0

20

Power of

Power [kW

PCC

Battery ‐20

0

Power [kW]

PCC

0‐6013:30 13:40 13:50 14:00 14:10 14:20 14:30

Battery PV FC PCC Chiller GE‐40

14:30 14:40 14:50 15:00 15:10 15:20 15:30

PV PCC Chiller

Chiller aloneAll Generator + Chiller

Page 17: Micro Grid Demonstration Project in a Commercial …...NEDO Projyect, Fy2010-FY2013 June 19, 2014Smart Community Summit 2014 NEDO New Mexico Project Micro Grid Demonstration Project

Evaluation of control accuracy

9 49

13.13 

12

16 

W]

Standard Deviation for PCC  power 

図7 各試験の制御精度

2 02 2 03 2 18

9.21  9.49 

4

12 ower [kW

2.02  2.03  2.18 

4 P

Standard deviation for power fluctuation at PCC

Page 18: Micro Grid Demonstration Project in a Commercial …...NEDO Projyect, Fy2010-FY2013 June 19, 2014Smart Community Summit 2014 NEDO New Mexico Project Micro Grid Demonstration Project

Operation condition of a chiller

356

TCOP Flow rate (1min Ave) Inlet temp Outet temp

30

35

5

6

TCOP

Chiller + Battery , Oct 23 2013

254

℃]

rate [m

3/h]

15

20

2

3

Temp. [

OP [‐],  Flow 

Inlet temp

Outlet temp

101

TCO Outlet temp

Flow rate50

09:30 09:40 09:50 10:00 10:10 10:20 10:30

TCOP and chilled water temperaturep

Page 19: Micro Grid Demonstration Project in a Commercial …...NEDO Projyect, Fy2010-FY2013 June 19, 2014Smart Community Summit 2014 NEDO New Mexico Project Micro Grid Demonstration Project

Reduction of the battery capacity by a chiller

冷凍機あり 冷凍機なしwith chiller no chiller

0 296kWh0.296kWh

0.190kWh

Reduction effect of the battery capacity

Page 20: Micro Grid Demonstration Project in a Commercial …...NEDO Projyect, Fy2010-FY2013 June 19, 2014Smart Community Summit 2014 NEDO New Mexico Project Micro Grid Demonstration Project

Future developments

● O erseas● Overseas

・ Micro-grid system based on a local characteristic.

Th i d d l b BEMS・ The various demand responses control by smart BEMS.

● Domestic・ Optimal power and demand control corresponding to the

power system reform.

・Contribution to introduction expansion of the renewable energy.

・Heat and power supply by the cogeneration system.

・Stable and high-quality islanding operation at the time of the emergency. (BCP measures)